SkyPlanner APS for your ERP

SkyPlanner APS gives manufacturers a finite capacity schedule for every workstation, operator, tool and material, right next to their ERP. You see which job runs where and when, and Autopilot reschedules automatically when production changes.

SkyPlanner APS Gantt timeline with jobs scheduled across workstations and an order list below.

SkyPlanner integrates with your ERP in both directions: orders, routings, stock and purchase orders flow in, and planned dates and logged work flow back. The SkyPlanner team configures the integration to your ERP setup during onboarding and supports it after go-live.

Pricing is from 199 € per month with 5 workstations included, and each extra workstation is 20 € per month. The free trial runs for 30 days with up to 20 workstations and no credit card, on an Excel or CSV export from your ERP.

What changes in your production

No more overbooked machines.

Every machine, person and tool gets a finite schedule with real shifts, absences and overtime. A die in use on one machine is never booked on another, and a job that needs three operators gets three people with free shifts. When a machine is busy, work moves to an alternative machine or person.

Delivery dates you can promise.

The schedule shows when each order will really finish. You answer customers from the plan, not from a guess.

Rush orders and breakdowns replanned automatically.

When a machine stops, a rush order lands or work finishes early, Autopilot reschedules automatically. Your locks and priorities stay in control.

Fewer changeovers.

SkyPlanner knows how long it takes to switch a machine from one product to the next, in both directions. Blue to red can take 30 minutes and red to blue 60. The schedule runs jobs in the order that loses the least time to setups.

A schedule that respects material.

SkyPlanner checks stock and incoming purchase orders. A job waiting for a vendor delivery is planned after that delivery date instead of stopping on the floor.

Operators see their queue.

Each operator sees the next jobs on a phone or tablet and logs work as it happens. The office sees progress live, and the logged work goes back to your ERP.

SkyPlanner with 8 ERPs

Your ERP keeps items, bills of materials, purchasing, inventory and finance. SkyPlanner schedules the production orders against real capacity and sends the dates back. Each ERP below has its own page, an article on its native planning and an integration guide.

Microsoft Dynamics 365 Business Central

A finite schedule for every work and machine center, not only the ones you flag as bottlenecks. Nothing to install in Business Central.

See the integration

NetSuite

Oracle NetSuite

All work orders sequenced automatically, with changeovers, operators and tools in the plan. Planned times, progress and logged hours go back to NetSuite.

See the integration

SAP Business One

Every production order sequenced against the real capacity of each workstation, by shift instead of by day. Planned dates and logged work flow back to B1.

See the integration

SAP S/4HANA

A finite schedule for every work center without a PP/DS project. Operation dates and confirmations go back to S/4HANA.

See the integration

Odoo

All open manufacturing orders sequenced together on one interactive Gantt, in every Odoo edition, Community included. Planned dates and logged time flow back.

See the integration

Epicor Kinetic

Workstations, people, tools and materials on one live Gantt, without an APS project. Planned operation dates and logged labor go back to Kinetic.

See the integration

Infor

Infor CloudSuite Industrial (SyteLine)

Finite capacity without licensing the APS module, and a plan that stays current all day. Planned operation dates and logged labor go back to CSI.

See the integration

Sage X3

Finite scheduling for X3 work orders, whether X3 runs in Sage’s cloud or on your own servers. Planned operation dates and production tracking flow back.

See the integration

Customers running SkyPlanner with their ERP

UTU on Oracle NetSuite. UTU builds switchboards and switchgear in Ulvila, Finland. SkyPlanner went live in September 2025, integrated with NetSuite and UTU’s payroll system. UTU saves 2 hours a week, and a new work queue reaches production in seconds. Read the UTU review

Laboratory & Allied on SAP Business One. A pharmaceutical manufacturer in Nairobi, Kenya, runs SAP Business One on HANA. Its in-house IT team connected SkyPlanner largely on its own, with SkyPlanner’s help. A three-month plan takes under half an hour, and production efficiency is up 90%. Read the Laboratory & Allied review

SkyPlanner reviews from manufacturers

A KJH-Comp welder grinding a welded steel structure at the Alahärmä plant

98%delivery reliability, up from about 50%

“SkyPlanner plays a decisive role in maintaining our delivery reliability.”

Hannu Lahtinen, Managing Director
KJH-Comp · Sheet-metal mechanics and contract manufacturing

Delivery reliability rose from around 50% to as high as 98%, and scheduling now needs one supervisor instead of two.

Read the KJH-Comp review

Aerial view of Piristeel's roof safety factory in Kauhava

99.2%delivery reliability

“SkyPlanner has brought visibility to identifying bottlenecks and clarified production management.”

Toni Tuori, Production Manager
Piristeel · Roof safety and rainwater systems

Delivery reliability reached 99.2% this year, and scheduling saves up to four hours of working time per day.

Read the Piristeel review

Hannu Ryynänen, CEO of Mamec, in the company's production hall in Lohja

1,000swork orders scheduled automatically

“Production is under control in a different way, and our understanding of capacity is on a completely different level.”

Hannu Ryynänen, CEO
Mamec · Industrial mixers, pumps and high-tech contract manufacturing

Thousands of work orders are scheduled automatically, with a real-time view of production for the whole organization.

Read the Mamec review

Anu Järvinen, Production Manager at Fredman Operations, beside a robot palletising cell in Rauma

6 monthsof free capacity visible to sales

“SkyPlanner creates the foundation and reliability for all production planning.”

Anu Järvinen, Production Manager
Fredman Operations · Food-safe packaging papers

Sales sees free capacity six months ahead, and schedule-change requests that took an hour or more are answered in seconds.

Read the Fredman Operations review

How the integration works

Your ERP sends production orders, routings, stock and purchase orders to SkyPlanner, and planned dates and logged work go back. The SkyPlanner team configures the integration during onboarding, and the integration is quoted up front for your process and needs.

APIs, webhooks, data ownership and integration services for all systems, including MES and local ERPs, are on the SkyPlanner integrations page.

How to get started

  1. Start the free trial. 30 days, up to 20 workstations, all Basic features, no credit card.
  2. Model your production. Create machines, people and shifts in SkyPlanner, or import them. Assisted onboarding is available.
  3. Load your orders. Export production orders, routings and work centers from your ERP to Excel or CSV. Import them and compare SkyPlanner’s schedule with your current plan.
  4. Connect your ERP. The SkyPlanner team configures the two-way integration and supports it once you are live.

Pricing. Plans are billed monthly per workstation, and you can add or remove workstations or cancel at any time. See pricing for the details.

FAQ

Which ERPs does SkyPlanner integrate with?

SkyPlanner integrates with Business Central, NetSuite, SAP Business One, SAP S/4HANA, Odoo, Epicor Kinetic, Infor CloudSuite Industrial and Sage X3. Each has its own page above with the details.

My ERP is not on this list. Can SkyPlanner still work with it?

Yes. If your ERP exports production orders, routings and work centers, you can start the trial today. The SkyPlanner team then configures the two-way integration on your ERP’s API or file interface.

Does SkyPlanner replace my ERP’s manufacturing module?

No, it works on top of it. Your ERP keeps items, bills of materials, material planning, purchasing, inventory and finance. SkyPlanner schedules your production orders against real capacity and sends the dates back.

How much does SkyPlanner cost with an ERP integration?

From 199 € per month with 5 workstations included, plus 20 € per month per extra workstation. A workstation is a production resource with its own scheduled work queue. The integration is quoted up front for your process and needs, together with your plan, so you see the full cost before you start.

How long does implementation take?

Implementation is normally completed within weeks after onboarding starts, even for large companies. The team maps your machines and routings, connects orders and purchase orders, and sends planned dates back.

Can we test SkyPlanner before integrating with our ERP?

Yes. The 30-day trial runs on an Excel or CSV export from your ERP. You see a finite capacity schedule of your own production before any integration work starts.

Do we need a developer?

No. The SkyPlanner team configures and supports the integration. If you prefer to build it in-house, your developers need only an API key and the API documentation.