AI Production Scheduling Software for Manufacturers
SkyPlanner is an advanced planning and scheduling (APS) system that turns ERP orders, capacity and materials into a finite-capacity schedule. Arcturus AI rebuilds it in seconds, with planners in control.
or
We’ll show you
Personal demo
A guided tour of SkyPlanner, focused on your production.

Manufacturers around the world plan production with SkyPlanner
Recommended way to start
Your AI assistant sets it up.
Arcturus AI schedules it.
Connect Claude, ChatGPT or Copilot to SkyPlanner and give it the spreadsheet or ERP export you plan with today. It builds your workstations, products and orders, and Arcturus turns them into a finite-capacity schedule.
Want a demo or help connecting your assistant? Book a meeting
What is MCP?
MCP (Model Context Protocol) is an open standard that lets AI assistants such as Claude, ChatGPT and Copilot use other software.
Through SkyPlanner’s MCP server your assistant reads orders, capacity and the schedule, changes them and asks Arcturus AI to reschedule. You sign in with your SkyPlanner account and decide whether the assistant reads or also writes.
Your sheet is now a live schedule in SkyPlanner: 4 workstations, 12 products and 38 open orders.
The sheet had no shift times, so I used 7 to 15 and 15 to 23 on weekdays. Tell me if that is wrong.
Three orders are planned to finish after their due date. Want to see which ones?
If the order comes in today, it is planned to finish on Thursday next week.
No current order becomes late because of it. This was a trial run in the sandbox, so your live schedule is unchanged.
Want me to check what a delivery by Tuesday would push back?
Laser cutting 2 is your bottleneck. It has the longest queue, and most of the late orders are waiting for it.
| Workstation | Jobs waiting | Queue ends in |
|---|---|---|
| Laser cutting 2 | 14 | 9 working days |
| Bending 1 | 5 | 3 working days |
| Powder coating | 3 | 2 working days |
Laser cutting 1 can run six of those jobs. Should I try moving them in the sandbox?
Three orders are planned to finish after their due date:
| Order | Customer | Due | Late by |
|---|---|---|---|
| 24-1187 | Atlas Metalworks | Wednesday | 2 days |
| 24-1192 | Summit Frames | Thursday | 1 day |
| 24-1201 | Lakeside Pumps | Friday | 4 hours |
All three are waiting for Laser cutting 2, which is overbooked on Thursday. Moving order 24-1210 to Friday would free 6 hours.
Order 24-1215 is in SkyPlanner with the default routing of the product: laser cutting, bending and powder coating.
Laser cutting starts on Monday, and the order is planned to finish on Wednesday, two days before delivery.
On-time delivery is now the top scheduling goal. Live is unchanged.
| Live | Sandbox | |
|---|---|---|
| Late jobs | 7 | 2 |
| Workstations with late jobs | 3 | 1 |
Should I move the rule to live?
Your whole factory, scheduled in seconds
Everything you need to plan production against real capacity — in one system.

See every job on one finite-capacity timeline
Every workstation and order on one Gantt. Late jobs and dependencies are flagged before a delivery is late.
Production scheduling
Reschedule the whole plan in seconds
An order changes or a machine breaks down — Arcturus AI rebuilds the schedule in seconds, following the priorities your planners have set.
Arcturus AI
Schedule against real capacity and materials
Workstation limits, material availability, skills and setup times — see the next bottleneck before it happens.
Capacity & materials
Plan shifts, people and skills
Model shifts and calendars, cover absences and overtime without breaking the rest of the plan.
Shift planning

See real progress from the floor
Operators log time on tablet or phone; progress flows back to the Gantt in real time.
Real-time time loggingReal problems, solved on real factory floors
The everyday planning problems manufacturers face — and the results they report with SkyPlanner.
99.2% delivery reliability
The old way: Bottlenecks are found only after orders are already late.
See bottlenecks before they stop production
“SkyPlanner has brought visibility to our bottlenecks and clarified production management. Spotting problems early has significantly improved our delivery reliability.”
Accurate dates in daily use
The old way: Promising delivery dates is guesswork.
Promise delivery dates with confidence
“The real value is that it’s a tool that works in daily use — especially for setting delivery dates. There, it works well.”
Capacity visible 6 months ahead
The old way: Capacity planning is guesswork without a forward view.
Plan with facts, not guesswork
“SkyPlanner creates the foundation and reliability for all production planning. You can trust the system to bring the data and the facts, so you don’t have to work it all out yourself.”
90% higher production efficiency
The old way: Without a clear schedule, production time is wasted.
A clear schedule, more efficient production
“Efficiency has gone up 90% in production. Getting goods to customers on time and reporting on time has gone up 50%.”
Customer-reported results.
All SkyPlanner reviews →Works standalone — or integrates with your ERP and MES
Start planning right away from imported data, or connect SkyPlanner to the systems you already run through a documented REST API and webhooks in a scoped integration project.
QuickBooks
Google Sheets
SolidWorks
SiemensLogos show systems we’ve connected in real integration projects. If yours isn’t here, it can usually be connected too — scope is agreed per project.
Implementation built around your factory
You are never alone with the rollout. A named SkyPlanner expert guides every step, from first import to daily use.
A named onboarding expert
Your SkyPlanner expert guides the rollout through live calls and hands-on sessions. One person who knows your factory, not a ticket queue.
Onboarding expert
Your production model, mapped together
Together we model workstations, shifts, materials and priorities, and import your orders, so the schedule matches how your factory really runs.
Integrations set up as a project
If you run an ERP or MES, the integration is scoped and built as a defined project through a documented REST API. Standalone use needs no integration at all.
Training until the team runs it alone
Planners and operators get hands-on training, and you go live with an expert watching the first scheduling rounds.
We call him Arcturus
Arcturus reads your live production data and rebuilds a finite-capacity schedule in seconds. An order shifts, a machine goes down, a rush job lands — it recalculates the whole plan in seconds, exactly the way your team has told it to plan.
- Our own scheduling engine, built in-house. Not a wrapper around a third-party AI.
- Purpose-built for finite-capacity scheduling: it optimizes your plan against the priorities you set. It is not a chatbot.
- In production daily at manufacturers around the world.
Scheduling in seconds
Arcturus rebuilds the whole finite-capacity plan the moment something changes, even in large, complex productions. No overnight batch, no manual rework.
Planners stay in control
Arcturus proposes; your team decides. Accept, lock, drag or override any job. And when you are ready, switch on Autopilot and let Arcturus keep the schedule updated on its own.
Felt on the floor
Fuller capacity, fewer late deliveries, and hours saved in planning every day.Customer-reported — outcomes vary by factory.
See SkyPlanner in action
A short walkthrough of finite-capacity scheduling, AI rescheduling, and how planners stay in control.
Intro
Production scheduling for your industry
SkyPlanner builds finite-capacity schedules across discrete and process manufacturing — including:
A better way to schedule production
How finite-capacity manufacturing scheduling with SkyPlanner compares to the two most common alternatives to dedicated production scheduling software.
YesPartlyNo
Already running an ERP? SkyPlanner adds finite-capacity scheduling on top of it. See integrations →
Ready to schedule your factory in seconds?
Try the production scheduling software with your own data today, or walk through SkyPlanner with us first.
30-day free trial No credit card Standalone or ERP-integrated
Frequently asked questions
SkyPlanner APS is AI-powered production scheduling software for manufacturers — manufacturing scheduling against finite capacity. It builds the schedule from your orders, workstations, materials and shifts, and its AI engine Arcturus rebuilds the plan in seconds when something changes.
No. SkyPlanner works standalone from imported data, so you can start planning without any integration. If you run an ERP or MES, SkyPlanner can be connected to it in a scoped integration project.
Arcturus reads your live production data and proposes a complete finite-capacity schedule. Your planners always keep the final say: they can accept, lock, drag or override any job.
You can start a 30-day free trial with your own data, with no credit card. Assisted onboarding is available: a named SkyPlanner expert helps you map your production model, import data and train the team.
SkyPlanner is used across discrete and process manufacturing, for example in metal, electronics, plastics, food and pharmaceutical production, by manufacturers who schedule work across multiple workstations against real capacity.






