Eskomatic’s SkyPlanner APS Review: More Accurate Delivery Dates and Smoother Daily Operations

Contract machining Turku, Finland 88 employees SkyPlanner since 2021 CNC lathes & machining centres
Aerial view of Eskomatic Oy's machine shop and yard in Turku, Finland
Eskomatic Oy’s machine shop in Turku, Finland.

Eskomatic Oy has manufactured demanding metal components in Turku since 1976. Roughly 70 production professionals run dozens of modern CNC lathes and machining centres, producing parts for equipment manufacturers in the metal, hydraulics, medical, defence, and electronics industries. With a wide product mix, varying batch sizes, and several industries served at once, daily scheduling becomes demanding quickly.

When the old system reached its limits

Before SkyPlanner, scheduling ran on an older ERP and production control system where work queues were organised largely by hand. Building an overall picture took effort, and because material availability was not visible in real time, delays could occur when a shortage surfaced too close to a job’s planned start. As the old system neared the end of its service life, the upgrade opened a chance to choose a solution built for a modern machine shop.

A forward-looking choice

Several options were evaluated. SkyPlanner stood out as a comprehensive, forward-looking solution with the exact capabilities Eskomatic needed — and its ERP integration removes manual data transfer, keeping planning up to date at all times.

Visual clarity, proactive AI

The biggest practical change is a clearer work queue: the AI-powered Gantt timeline shows the optimized upcoming load visually, so planners grasp the overall situation and decide faster. Two capabilities have proven especially valuable — delivery date setting and material shortage management. The AI checks at the moment an order is created that the materials needed are on hand; anything missing is surfaced clearly and visually in planning.

The value SkyPlanner brings us is that it is a tool that works in daily use, especially for setting delivery dates. There, I think, it works well.

Eskomatic’s review: reported results

  • More accurate delivery dates from automatic load scheduling
  • Production stoppages caused by material shortages have fallen sharply
  • Clearer, more controlled daily scheduling and faster decisions
  • Less time untangling issues, more time on actual production work

Putting an exact figure on the efficiency gain against the old system is hard, Männistö notes — but reliable day-to-day performance tells its own story: when the tool works, it stays out of the way.

The way I see it, SkyPlanner’s effectiveness comes from the fact that the system just works. There are no hiccups that eat up time to sort out.