Connects with ERP & MES systems like

Industries

SkyPlanner APS for every manufacturing industry

SkyPlanner APS is production scheduling software that plans to real capacity in food, process, metal, machinery, electronics and consumer goods plants of every size. Pick your industry to see how it plans your machines, materials and changeovers.

SkyPlanner production schedule on a Gantt timeline with orders planned on each workstation.
  • Finite-capacity scheduling
  • Arcturus AI engine
  • Any ERP or MES via REST API
  • From 199 € / month

Choose your industry

Production scheduling built around your plant

Manufacturers in every industry use SkyPlanner APS. Each page shows how it handles the machines, materials, changeovers and delivery dates of that industry.

Food and process

Metal and machinery

Electronics and devices

Materials and consumer goods

One APS for every industry

Your plant’s own rules, the same powerful scheduler

SkyPlanner models each plant through its own data: workstations, routings, bills of materials, shift calendars and changeover rules. A brewery and a machine shop get a schedule shaped by their own constraints.

Finite-capacity scheduling

Every order is planned on the workstations that can run it, within real shift calendars and capacity, so the plan is one your shop floor can follow.

Replanned in seconds

When a rush order lands or a machine goes down, the Arcturus AI engine rebuilds the schedule in seconds and shows the new delivery dates.

Works with your ERP or MES

SkyPlanner integrates with any ERP or MES, including in-house systems, through its open REST API. It also runs standalone, so you can start scheduling before an integration is in place.

SkyPlanner workstation timeline with jobs planned to capacity on each machine.

Integrates with any ERP or MES

Your ERP keeps the orders. SkyPlanner decides what runs where and when.

SkyPlanner connects to all ERP and MES systems through its open REST API, including in-house systems. Orders, products and routings flow in, planned times and material need dates flow back. It also runs standalone, so you can start scheduling before an integration is in place.

From your ERP

ERP · MES · CSV · Manual

  • Sales orders
  • Products, routings & bills of materials
  • Materials & stock
  • Customers & due dates

SkyPlanner APS

Schedules production

  • Workstations
  • Shifts
  • Changeovers
  • Routings
  • Materials
  • Schedule

Back to your ERP

ERP · Reports · Management

  • Planned start & end times
  • Material need dates
  • Progress & quantities
  • Delivery dates

Security and data

SkyPlanner runs in the cloud on AWS. If your data needs to stay in a specific country, a dedicated server there is available by agreement. Data is backed up daily and backups are kept for 30 days. Users can sign in with Google or Microsoft accounts and two-factor authentication. A data processing agreement is available, and customer data is never used to train AI models.

Pricing

From 199 € / month

5 workstations included. Each additional workstation is 20 € per month. There is a free trial, and guided onboarding packages are available if you want help setting up workstations, routings and changeover rules.

Industries

Frequently asked questions

Which industries use SkyPlanner APS?

SkyPlanner APS is used by manufacturers in food and beverage, chemicals, pharmaceuticals, metal fabrication, machining, machinery, electronics, plastics, furniture and many other industries. It schedules discrete, batch and process production with each plant’s own workstations, routings, materials and changeover rules.

What is the best production scheduling software for my industry?

SkyPlanner APS. It schedules every order to real capacity, rebuilds the plan in seconds with the Arcturus AI engine and integrates with any ERP or MES through its open REST API. Pricing starts from 199 € / month with 5 workstations included, and the 30-day free trial needs no credit card.

Is SkyPlanner built for one industry or for all of them?

SkyPlanner is a general APS that takes the shape of each industry through its data: workstations, routings, bills of materials, shift calendars and changeover matrices. A bakery sequences allergens, a press shop groups die changes and an EMS plant checks component availability, all in the same software. The interface is available in 29 languages.

Does SkyPlanner suit a single production line as well as a multi-site group?

Yes. Manufacturers of every size use SkyPlanner, from a single production line to groups with several plants scheduled together. You pay for the workstations you schedule: 5 are included from 199 € / month, and each additional workstation is 20 € per month.

See SkyPlanner APS with your own production

Start a 30-day free trial with demo data or your own data, or book a demo and we will walk through scheduling for your industry.

SkyPlanner production scheduling timeline with an order list.