Connects with ERP & MES systems like

SkyPlanner Resources

Resources for smarter production planning

Practical guides and explainers on advanced planning & scheduling, AI-assisted planning, ERP, MES, WMS, manufacturing efficiency, and the people who run the schedule.

Fresh from the team

Latest resources

Machining, bore inspection with an instruction, and assembly connected along one manufacturing route.

APS & Scheduling

Manufacturing Control Plan: From Risk to Daily Work

Turn process risks into clear checks, responsibilities and reactions. Build a manufacturing control plan whose inspection work fits your production schedule.

October 30, 2026 13 min read Read article
A machining station with finished parts and a rejected component illustrates equipment effectiveness losses.

ERP

Overall Equipment Effectiveness: Calculate and Use OEE

Your machine is busy, but good output is falling short. Calculate OEE, find the loss behind the percentage and turn it into…

October 21, 2026 10 min read Read article
Frequently used brackets, occasional-use plates and a protected critical coupling illustrate different inventory decisions.

MES Systems

FSN Analysis in Manufacturing: Turn Classes Into Action

Which parts need replenishment, and which need review? Use FSN analysis to distinguish real consumption from misleading inactivity and plan production.

October 28, 2026 10 min read Read article
S&OP

Supply Chain & S&OP

Unlocking the Power of S&OP in Manufacturing

S&OP is a strategic process for synchronizing all key components of a business's supply chain, unifying manufacturing, sales, marketing, and financial sectors.

July 14, 2023 13 min read Read article
Cable-cutting cell stops at an abnormal piece while an operator performs a separate assembly task.

Manufacturing Efficiency

Jidoka in Manufacturing: Build Quality Into the Process

Automatic machines can still make bad parts. Learn how jidoka stops abnormal production, frees operators and connects recovery to a workable schedule.

October 28, 2026 11 min read Read article
Production Planner Salary Argentina

Careers & Salaries

Production Planner Salary in Argentina 2026

The average production planner salary in Argentina in 2026 is approximately 792,000 ARS annually, translating to around 66,000 ARS per...

November 21, 2023 9 min read Read article
Tagged housing in an isolated tray, an approved-work document and a machining station with other housings waiting.

APS & Scheduling

Nonconformance Report: From Finding to Disposition

Write a manufacturing NCR that leads to a clear disposition and verified closure. See how to fit approved follow-up work into the…

October 30, 2026 12 min read Read article
Machining and another production bench feed parts to a shared inspection station for production-part approval work.

APS & Scheduling

Production Part Approval Process: From Run to Approval

Understand PPAP evidence, submission levels and customer approval. Plan the production run and inspection work without losing control of other deliveries.

October 30, 2026 12 min read Read article
Supplier cart, shared stock of blue fittings and two assembly benches connected by outgoing and return arrows.

APS & Scheduling

Vendor Managed Inventory: Make VMI Work for Production

Let suppliers handle replenishment without losing sight of production needs. Define VMI responsibilities and turn incoming supply into a workable schedule.

October 30, 2026 11 min read Read article
Incoming brackets under a magnifier, with separate trays, an amber divider and a path to a workstation.

APS & Scheduling

Incoming Inspection: From Receipt to Production Release

Received does not mean ready to use. Build an incoming inspection process that controls material release and gives production a schedule it…

October 30, 2026 11 min read Read article
Bored sleeve in a fixture, with parts routed to one machining centre and a separate alternative machine.

APS & Scheduling

Process Capability: Calculate Cp and Cpk, Then Act

A high Cp can hide an off-centre process. Calculate Cp and Cpk, check whether the study is valid, and plan production on…

October 29, 2026 12 min read Read article
Open metal housing under an inspection probe, with its cover set aside and trays of parts waiting.

APS & Scheduling

First Article Inspection: From Requirements to Release

Plan first article inspection before delivery is at risk. Understand FAI, FAIR and the work needed to verify a new part, then…

October 29, 2026 11 min read Read article