Connects with ERP & MES systems like

  1. SkyPlanner reviews
  2. Fredman Operations Oy

Fredman Operations’ SkyPlanner APS Review: Reliable Delivery Promises Far into the Future

Food packaging manufacturing Rauma, Finland ~70 employees SkyPlanner since 2025 Visma L7 + LTR
6 months
free capacity visible to sales ahead
Seconds
to answer schedule-change requests that took an hour+
Dozens
of machines in one Gantt view
Anu Järvinen, Production Manager at Fredman Operations, beside a yellow palletising robot in Rauma
Anu Järvinen, Production Manager, Fredman Operations Oy.

SkyPlanner creates the foundation and reliability for all production planning. You can trust the system to bring the data and the facts — all durations and the like. You don’t have to personally decide on things you don’t have precise information about.

Fredman Operations Oy manufactures food-safe kitchen and packaging solutions in Rauma — among other things fat-resistant and packaging papers for food industry companies. Rising order volumes called for clear capacity visibility: both to manage production and to make reliable delivery commitments to a growing customer base.

Before SkyPlanner: manual planning as a growth bottleneck

Work cards moved manually from the Visma L7 ERP to LTR production management software. The planner prioritised jobs without precise visibility into machine release times or shift-by-shift capacity. Urgent rescheduling could take an hour or more, sudden changes regularly led to overtime, and material availability did not always align with the work queue. Without a clear shift-by-shift picture — including leave and holidays — realistic promises to new customers were impossible to calculate.

All information in one view

SkyPlanner was evaluated alongside other systems and stood out for visual clarity: the Gantt timeline shows all machines, free and booked capacity, and job progress in a single view. Implementation combined the L7 and LTR integrations, and production reached full operational use within approximately six months of data migration.

AI drives production

The Gantt timeline is the centre of daily planning. The AI-powered capacity load view and shift scheduling module bring shift-by-shift capacity directly into scheduling, a KPI dashboard tracks production metrics in real time, and need dates flow back to L7 automatically for procurement. Each job’s planned start and end is visible to everyone on the floor — production employees monitor the schedule themselves and manage their own pace.

Fredman Operations’ review: reported results

  • Sales makes delivery commitments on capacity data, up to six months ahead
  • Schedule-change answers come from the system in seconds, not hours
  • Reduced overtime need; faster response to changes
  • Delivery reliability stays high without over-promising

SkyPlanner gives you the foundation for the whole plan. Anyone in the company can see where things stand — what capacity exists, how much has been achieved, and what the utilisation rate is.

See how SkyPlanner would handle your production schedule

Bring your machines, shifts, and order book — in a short meeting we’ll show what finite-capacity AI scheduling looks like with your production.