Connects with ERP & MES systems like

Company size

Production scheduling software for every company size

SkyPlanner APS is production scheduling software for small factories, large plants and groups with several sites. The same finite-capacity scheduler and Arcturus AI engine run in all of them. Choose your company size or your industry.

SkyPlanner production schedule on a Gantt timeline with orders planned on each workstation.
  • Finite-capacity scheduling
  • Arcturus AI engine
  • Any ERP or MES via REST API
  • From 199 € / month

Choose your company size

Production scheduling software by company size

From a small factory replacing Excel to a manufacturing group scheduling every plant, each page shows how SkyPlanner fits that situation.

Choose your industry

Production scheduling software by industry

Each industry page shows how SkyPlanner handles the machines, materials, changeovers and delivery dates of that industry.

Food and process

Metal and machinery

Electronics and devices

Materials and consumer goods

One scheduler

The same scheduler at every size

A five-workstation shop and a plant with tens of thousands of active process steps use the same SkyPlanner. Only the number of workstations and the services around it change.

Configured to each factory

More than 1,000 configurable settings fit SkyPlanner to the process of each factory, so very different plants, even in different industries, use the same software.

Standalone or integrated

Start with Excel and CSV imports, and connect any ERP or MES through the open REST API when you are ready.

Pay per workstation

From 199 € / month with 5 workstations included and 20 € per month for each additional workstation, with enterprise terms for special requirements.

SkyPlanner workstation timeline with jobs planned on each workstation.

Integrates with any ERP or MES

Start standalone. Connect any ERP when you are ready.

SkyPlanner connects to all ERP and MES systems through its open REST API, including in-house systems. Orders and products flow in, planned times and material need dates flow back. It also runs standalone, so you can start scheduling before an integration is in place.

From your ERP

ERP · MES · CSV · Manual

  • Sales & production orders
  • Products & routings
  • Materials & stock
  • Customers & due dates

SkyPlanner APS

Schedules production

  • Workstations
  • Shifts
  • People
  • Routings
  • Materials
  • Schedule

Back to your ERP

ERP · Reports · Management

  • Planned start & end times
  • Material need dates
  • Progress & quantities
  • Delivery dates
  • SAP S/4HANA
  • Microsoft Dynamics 365 Business Central
  • Oracle NetSuite
  • Infor
  • Epicor
  • IFS Cloud
  • Sage X3
  • Odoo

Security and data

SkyPlanner runs in the cloud on AWS. If your data needs to stay in a specific country, a dedicated server there is available by agreement. Data is backed up daily and backups are kept for 30 days. Users can sign in with Google or Microsoft accounts and two-factor authentication. A data processing agreement is available, and customer data is never used to train AI models.

Pricing

From 199 € / month

5 workstations included. Each additional workstation is 20 € per month. There is a free trial, and guided onboarding packages are available if you want help setting up workstations, plants and integrations.

Questions about company size

Frequently asked questions

Is SkyPlanner for small or large manufacturers?

Both. SkyPlanner is used by manufacturers of every size. Small factories start with a few workstations and a free trial, and large plants and groups with several sites use the same system with ERP integration, role-based access and enterprise terms. See small manufacturers, large manufacturers and multi-site manufacturers.

What does SkyPlanner cost for different company sizes?

Pricing is per workstation for every company size: 199 € per month including the first 5 workstations, and 20 € per month for each additional workstation. Special requirements such as a dedicated server, custom features or tailored service levels are priced case by case. See pricing.

Can SkyPlanner schedule several plants?

Yes. Workstation groups separate the resources of each factory, local planners schedule their own plant, and SkyPlanner can suggest which plant’s workstations work should be routed through. See multi-site production scheduling.

Can very different factories use the same SkyPlanner?

Yes. SkyPlanner has more than 1,000 configurable settings in its scheduling logic, user interface and data structure, so factories with very different processes or in different industries use the same software. Several plants can share one SkyPlanner, or each plant can run its own SkyPlanner and share routings with the others, and subcontractors can join the same chain.

Do we need an ERP to use SkyPlanner?

No. SkyPlanner can be used standalone with data imported from CSV and Excel files. Any ERP or MES that provides an API can be connected later through the open REST API.

Which industries use SkyPlanner?

SkyPlanner schedules production in food, process, metal, machinery, electronics and consumer goods plants. The industries section has a page for each of 21 industries.

See your own orders scheduled

Start the free trial with demo data or your own workstations, or book a demo and we will show your orders scheduled to real capacity.

SkyPlanner production scheduling timeline with an order list.