Connects with ERP & MES systems like

SkyPlanner Resources

Resources

Practical guides and explainers on advanced planning & scheduling, AI-assisted planning, ERP, MES, WMS, manufacturing efficiency, and the people who run the schedule.

Browse the topic

Latest resources

An asymmetric component aligned with a matching keyed fixture illustrates mistake-proofing in manufacturing.

Manufacturing Efficiency

Poka-Yoke in Manufacturing: Choose What Stops the Error

Stop recurring assembly mistakes at the source. Choose and test a practical poka-yoke, then use SkyPlanner to schedule its rollout alongside customer…

October 27, 2026 11 min read Read article
Two grey enclosure variants share a coating rack while an amber variant sits on a separate setup.

Manufacturing Efficiency

SKU Rationalization in Manufacturing: What to Keep

Keep valuable customer choice while reducing factory complexity. Decide which SKUs to keep, change or retire and schedule the approved mix with…

October 27, 2026 11 min read Read article
A missing incoming casting and a clock connect to machining and assembly work affected by a supplier delay.

Manufacturing Efficiency

Supplier Performance Metrics That Protect Production

Choose supplier KPIs you can compare fairly, build a useful scorecard, and turn material delays into a workable production schedule with SkyPlanner.

October 27, 2026 11 min read Read article
Four trolleys fill a marked FIFO lane between two workbenches, with an arrow showing the direction of flow.

APS & Scheduling

FIFO Lanes in Manufacturing: Keep Queues Under Control

Stop production queues becoming overflow storage. Set clear FIFO lane limits and responsibilities, then coordinate the surrounding work with SkyPlanner.

October 26, 2026 11 min read Read article
Assembly, fixture setup and waiting beside an empty component tray illustrate work-sampling activity snapshots.

APS & Scheduling

Work Sampling in Manufacturing: Find Hidden Delays

Find where production time goes with random observations. Interpret activity shares, tackle delays and turn verified changes into a better schedule.

October 26, 2026 12 min read Read article
Regularly spaced sleeves and a clustered batch of housings illustrate contrasting consumption patterns for XYZ analysis.

APS & Scheduling

XYZ Analysis: Match Stock Control to Demand Patterns

The same average usage can hide different stock risks. Use XYZ analysis to choose better replenishment controls and connect material supply to…

October 26, 2026 12 min read Read article
A gloved finger checks metal parts arranged beside an open bin during a selected physical inventory count.

APS & Scheduling

Cycle Counting in Manufacturing: Fix Stock Discrepancies

Stock records say yes, but production is waiting? Use cycle counting to resolve discrepancies and put corrected stock into your production plan.

October 26, 2026 11 min read Read article
Repeated travel between a machining station, an inspection bench and a gauge rack in a spaghetti diagram.

APS & Scheduling

Spaghetti Diagram in Manufacturing: Map the Real Route

Repeated shop-floor trips? Draw a spaghetti diagram, test a better route and turn verified time savings into a realistic production plan.

October 26, 2026 11 min read Read article
Seals move from a supplier carton through storage to separate containers at two assembly benches

APS & Scheduling

Plan for Every Part (PFEP): Make Parts Ready for Work

Parts in stock but missing where work happens? Build a PFEP with clear supply rules and ownership, then connect material availability to…

October 26, 2026 11 min read Read article
A blue authorization card returns to waiting batches outside a bounded machining and inspection flow

APS & Scheduling

CONWIP in Manufacturing: Control What Starts Next

Too many orders on the floor? Use CONWIP to limit released work, choose the next ready order and connect each start to…

October 25, 2026 10 min read Read article
Scattered tooling becomes an organized preparation trolley beside a bending cell for repeatable changeovers

APS & Scheduling

Kaizen in Manufacturing: Make Improvements Stick

Turn recurring production problems into lasting improvements. Test a change, sustain better work and carry the benefit into your production plan.

October 25, 2026 12 min read Read article
Machined parts on a trolley linked to an inspection release tag before the handoff to assembly

APS & Scheduling

Manufacturing Process Mapping: Fix the Handoffs

Map how work moves through your factory. Clarify decisions and handoffs, then turn approved improvements into a production plan your teams can…

October 25, 2026 11 min read Read article