Connects with ERP & MES systems like

SkyPlanner Resources

Resources

Practical guides and explainers on advanced planning & scheduling, AI-assisted planning, ERP, MES, WMS, manufacturing efficiency, and the people who run the schedule.

Browse the topic

Latest resources

Metal blanks, trays of unfinished brackets waiting for coating, and finished goods show inventory across a factory.

Manufacturing Efficiency

Inventory Turnover in Manufacturing: Calculate and Improve

Calculate inventory turnover, find what is tying up cash in raw materials, WIP or finished goods, and improve the flow without weakening…

October 23, 2026 11 min read Read article
Blue machines and metal parts beneath shared factory lighting and a structural frame.

Manufacturing Efficiency

Manufacturing Overhead: Calculate and Use the Rate

Calculate manufacturing overhead, choose a sensible allocation base and see whether a lower unit cost means cash savings or better use of…

October 22, 2026 11 min read Read article
Accepted machined rings sit beside broken scrap components, with an empty delivery-tray slot showing the shortfall.

Manufacturing Efficiency

Scrap Rate in Manufacturing: Calculate the Real Loss

Scrapped parts cost more than material. Calculate a reliable scrap rate, account for lost stock and fit replacement work into a realistic…

October 22, 2026 11 min read Read article
A module-fitting task moves from the middle assembly bench to the first, spreading work across three stations.

Manufacturing Efficiency

Production Line Balancing: Make the Work Fit the Pace

One station falls behind while another waits. Redistribute work safely, meet the required pace and keep shared resources in a workable production…

October 22, 2026 11 min read Read article
Material and information paths connect three manufacturing stations, with parts waiting before the middle machine.

Manufacturing Efficiency

Value Stream Mapping: From Factory Map to Better Flow

Find why your products wait. Map one manufacturing family's material and information flow, interpret the queues and choose a change your factory…

October 22, 2026 12 min read Read article
Blue containers of metal brackets with blank kanban cards wait on a factory rack and a wheeled cart.

Manufacturing Efficiency

Kanban in Manufacturing: Signals, Loops and Sizing

Make replenishment work on your factory floor. Learn what authorizes production or movement, size a kanban loop, and plan for the machine…

October 21, 2026 11 min read Read article
Motors, shafts and bolts in separate trays beside an assembly awaiting a small bolt.

Manufacturing Efficiency

ABC Inventory Analysis: Calculate Classes That Work

Focus inventory control where the money goes, without letting a low-cost part stop production. Calculate ABC classes and turn them into practical…

October 21, 2026 11 min read Read article
Several blue brackets move individually through three connected manufacturing workstations.

Manufacturing Efficiency

One-Piece Flow: When It Works in Manufacturing

Can your next operation accept a part as soon as it is ready? Learn when one-piece flow cuts waiting and how to…

October 21, 2026 11 min read Read article
Internal machining and supplier-delivered components offer two routes to the same assembly requirement.

Manufacturing Efficiency

Make-or-Buy Decision: Compare Cost and Capacity

A lower unit price can hide a more expensive decision. Compare relevant costs, scarce capacity and supplier risk before you make or…

October 21, 2026 11 min read Read article
A machining station with finished parts and a rejected component illustrates equipment effectiveness losses.

ERP

Overall Equipment Effectiveness: Calculate and Use OEE

Your machine is busy, but good output is falling short. Calculate OEE, find the loss behind the percentage and turn it into…

October 21, 2026 10 min read Read article
A compact production cell sends parts to a separate inspection station used by other factory work.

Manufacturing Efficiency

Cellular Manufacturing: When a Production Cell Fits

Would a production cell improve your factory's flow? Learn where cellular manufacturing fits, why queues remain, and how to schedule shared resources.

October 21, 2026 10 min read Read article
Stored blue housings and additional production equipment illustrate two ways to prepare for a demand peak.

APS & Scheduling

Aggregate Planning: Level, Chase or a Mixed Strategy?

Should you build stock or add capacity for a demand peak? Compare aggregate planning strategies with one example, then turn the plan…

October 20, 2026 11 min read Read article