Timer and Reports

8 Documents

ShopFloorApp and Timer

Last Updated: March 19, 2025

Tracking time on the shop floor shouldn’t slow things down—it should make work more efficient. With SkyPlanner’s ShopFloor module, employees can easily log their time on different tasks using a simple timer. Every time entry is recorded in real-time, so you always have a clear view of what’s happening on the production floor. In this...

How to Start a job in the Timer

Last Updated: March 31, 2025

To start a job in the Timer:

How to Disallow multi logging

Last Updated: April 1, 2025

To avoid a user starting multiple jobs at the same time instead of the first one that needs to be completed: Now, a job cannot start unless the previous is completed.

How to adjust the time on the timer

Last Updated: April 1, 2025

Accidents can happen, and an employee can forget to start the Timer, even if he has started or completed the job. In SkyPlanner, it is very easy to fix this: Now, this information will appear in the timelogs.

Add an Attachment to an Order and How to View It in the Timer

Last Updated: September 16, 2025

Attachments can be critically important, especially if it’s a custom-made product with specific requirements that must be met precisely. In SkyPlanner, you can easily add attachments at both the order level and the process step level. You’ll see information such as the workstations where this step can be performed and the calculation methods. At the...

Job report

Last Updated: June 13, 2025

SkyPlanner’s Job Report is a tool that shows you everything that happened during each step of a job or task in production. It breaks down the full job into smaller actions so you can track what was done, when it was done, who did it, and how long it took. Here’s what each part of...

All Timelogs report

Last Updated: June 13, 2025

An All Timelogs Report is a detailed list of everything recorded using SkyPlanner’s timer. It tracks the work being done on the shop floor—step by step, person by person, with exact times and results. It’s great for checking how each task went, how long it took, who did it, and if there were any issues....

Order item report

Last Updated: June 13, 2025

An Order item report in SkyPlanner is a list that shows all the individual items that are part of a larger job or work order. Each row in the report gives you important details about one specific product that needs to be made or delivered. An Order item report is beneficial when you have to...