Free trial · 30 days
Start your 30-day SkyPlanner trial
Build your first realistic production schedule with AI-powered production scheduling (APS) and an interactive Gantt timeline — no credit card required.
- A guided setup wizard — first scheduled product in about 5 minutes
- An interactive Gantt timeline you keep in human control
- Start with demo data or up to 20 of your own workstations
Create your free trial
30 days of SkyPlanner Basic. No credit card.
The fastest way to start — one click, no password needed
or
Sign up with work email
No credit card required. You will create a trial workspace and can start with demo data or your own setup. By continuing you agree to our Terms and Privacy Policy.
- 30 days free
- No credit card
- Up to 20 workstations
- Support included
What happens after you start
Your first AI-scheduled product in about 5 minutes
You will not face an empty screen or have to guess what to do. A guided setup assistant helps you describe your production, then Arcturus — our AI scheduling engine — turns it into a realistic plan you can see and adjust.
1
Create your trial workspace
Sign up with Google, Microsoft or work email — your workspace is ready in moments.
2
Demo data or start empty
Explore with ready-made example data, or begin with your own production right away.
3
Describe your production
Tell the setup assistant what you make in your own words. It drafts your workstations and products for you to review and adjust.
4
Run Arcturus
Arcturus builds a schedule that respects your real capacity — in seconds.
5
See and adjust your Gantt
See your first realistic timeline, then reschedule, lock and adjust it yourself.
This is your goal. AI-scheduled jobs across your workstations, shown as unscheduled, scheduled or late — with one-click rescheduling whenever priorities change.
Is this trial right for you?
Choose self-onboarding or assisted onboarding
Start independently with the free 30-day trial, or choose assisted onboarding when you want a SkyPlanner expert to help you set up, train your team and reach your first realistic production schedule faster.
Option 1 · Self-onboarding
Start your free trial today
- Teams that want to explore SkyPlanner independently
- A focused proof of concept with up to 20 workstations
- Production planners who can model their process with demo data or their own setup
- Companies replacing spreadsheets, manual scheduling or ERP planning gaps
Option 2 · Assisted onboarding
Get expert guidance from the start
- Teams that want a guided path to their first realistic production schedule
- More complex routing, workstation, capacity or data setup
- ERP, MES, data import or integration planning
- Companies that want onboarding, training and deployment support
- Cloud APS — nothing to host
- Strong data protection
- Support while you evaluate
Questions, answered
Trial FAQ
Do I need a credit card?
No. The 30-day free trial requires no credit card and no payment details. You can sign up with Google, Microsoft or work email and start right away.
What happens after 30 days?
You can decide whether to continue with SkyPlanner. If the trial has helped you build a useful production schedule, you can move forward with a subscription or talk with us about onboarding, integrations or a broader rollout.
What can I try during the trial?
You can evaluate SkyPlanner’s core scheduling workflow: workstations, process steps, products, orders, the Gantt timeline and AI-powered scheduling with Arcturus. The goal is to see whether SkyPlanner can create a realistic production schedule for your setup.
Can I use demo data or my own data?
Yes. You can start with demo data to explore SkyPlanner quickly, or build your own setup with your workstations, process steps, products and orders.
What does the 20-workstation limit mean?
The free trial is designed for a focused proof of concept with up to 20 workstations. If your production setup is larger, you can still evaluate SkyPlanner, but assisted onboarding may be the better path.
Can I get help with onboarding or integrations?
Yes. If you want help setting up your production model, training your team, planning imports, or discussing ERP/MES integration, you can choose assisted onboarding or contact us before starting.
Start with a trial
Build your first realistic production schedule in 30 days — and talk to us if your production setup is more complex.
30 days free · No credit card · SkyPlanner Basic · Support included