View Categories

Reports

3 Documents

Order item report

Last Updated: May 9, 2025

An Order item report in SkyPlanner is a list that shows all the individual items that are part of a larger job or work order. Each row in the report gives you important details about one specific product that needs to be made or delivered. An Order item report is beneficial when you have to...

All Timelogs report

Last Updated: May 9, 2025

An All Timelogs Report is a detailed list of everything recorded using SkyPlanner’s timer. It tracks the work being done on the shop floor—step by step, person by person, with exact times and results. It’s great for checking how each task went, how long it took, who did it, and if there were any issues....

Job report

Last Updated: May 9, 2025

SkyPlanner’s Job Report is a tool that shows you everything that happened during each step of a job or task in production. It breaks down the full job into smaller actions so you can track what was done, when it was done, who did it, and how long it took. Here’s what each part of...