Connects with ERP & MES systems like

MES Systems

On-Premises MES

On-Premises MES is a comprehensive system designed to manage and control manufacturing operations in a production facility.

SkyPlanner Production Planning Specialist, SkyPlanner Updated October 11, 2026 12 min read
On Premises MES
In this article
  1. TL;DR
  2. Unveiling On-Premises MES
  3. On-Premises MES vs. Cloud-Based MES: Key Considerations
  4. Unpacking the Components of an On-Premises MES
  5. Decoding the Appeal of On-Premises MES: Control, Security, and Customization
  6. A Step-By-Step Guide to Implementing an On-Premises MES
  7. Industries Benefiting from On-Premises MES
  8. SkyPlanner’s APS System: A Game-Changer for On-Premises MES

Home » Resources » On-Premises MES

Estimated reading time: 0 minutes

Within the intricate manufacturing universe, On-Premises Manufacturing Execution System (MES) is a powerhouse, streamlining operations and driving peak performance. On-Premises MES offers a blend of control, security, and optimization, making it a must-have tool for any forward-thinking production planner. However, its full potential often remains untapped, overshadowed by a lack of awareness or misconceptions.

Let’s unravel the mysteries of On-Premises MES, revealing why this remarkable tool is a game-changer in manufacturing. Brace yourself for an enlightening journey into the heart of advanced production planning.

TL;DR

On-Premises Manufacturing Execution System (MES) is a solution used to manage and control manufacturing processes within a company’s physical infrastructure. Preferred by organizations with sensitive data or stringent regulatory needs, it offers enhanced data security, control, and customization. While upfront costs are higher and maintenance falls on the organization, the system provides unparalleled data control and predictable costs over time. It’s contrasted with Cloud-Based MES, which may have lower upfront costs but can compromise data control. On-Premises MES involves various hardware, software, and networking components and can be implemented through a careful step-by-step process. It’s beneficial across industries like automotive, pharmaceutical, and electronics manufacturing. Integration with Advanced Planning and Scheduling (APS) software like SkyPlanner can further optimize production. The decision between On-Premises and Cloud-Based MES hinges on an organization’s specific needs, resources, and goals.

Unveiling On-Premises MES

What is On-Premises MES?

On-Premises MES is a comprehensive system designed to manage and control manufacturing operations in a production facility.

As its name suggests, this type of MES is housed on-site within the physical confines of an organization’s infrastructure rather than hosted on the cloud.

Why the Preference for On-Premises MES?

Businesses, particularly those dealing with sensitive data or stringent regulatory requirements, may opt for On-Premises MES due to its enhanced data security and control. Since the system resides within the business’s own infrastructure, data management falls directly under the company’s purview, eliminating reliance on external service providers. Learn more about Product Data Management. 

In addition, On-Premises MES allows for a higher degree of customization to meet specific operational needs. Since the software is under the organization’s direct control, custom features can be added or existing ones modified without waiting for a vendor’s updates or approval.

As a whole, On-Premises MES is a powerful tool for organizations seeking control, security, and reliable performance in managing their manufacturing operations. While it entails specific responsibilities and initial investment, the autonomy and potential for customization make it a preferred choice for many businesses. Remember, choosing an MES depends on your particular needs, and evaluating all factors is critical before deciding.

On-Premises MES vs. Cloud-Based MES: Key Considerations

When deciding between On-Premises MES and Cloud-Based MES, it’s vital to consider specific attributes.

On-Premises MES, though demanding a higher initial outlay, offers predictable costs over time. However, system maintenance and scalability are the organization’s responsibility, potentially adding complexity. Despite this, On-Premises MES allows for unparalleled data control, a feature invaluable for those handling sensitive data.

Conversely, Cloud-Based MES offers lower upfront costs but involves ongoing subscription fees. Maintenance becomes the provider’s task, and scalability is often more straightforward. However, control over data is compromised as data resides on the provider’s servers.

Ultimately, the choice hinges on an organization’s specific needs, resources, and objectives.

On-Premises MES: A Step-By-Step Guide to Its Functioning

On-Premises Manufacturing Execution System (MES) is a potent tool that aids in orchestrating manufacturing processes. Here’s a step-by-step breakdown of how it operates:

Installation and Integration

The journey of On-Premises MES begins with its installation on servers located within the company’s physical location. Post-installation, it’s integrated with various equipment, machines, and existing systems such as CRM (Customer Relationship Management) and Human Resources Management System (HRMS).

Data Collection

Once fully integrated, On-Premises MES starts collecting real-time data from various touchpoints within the production facility. It continuously gathers and processes this data to offer real-time insights into the production processes.

Scheduling and Planning

With a wealth of historical and real-time data at its disposal, On-Premises MES then assists in creating efficient production schedules. It often collaborates with an Advanced Planning and Scheduling (APS) system for this purpose.

Execution and Monitoring

During the execution phase, On-Premises MES monitors the manufacturing process in real-time. It tracks progress against the planned schedule, identifies potential bottlenecks, and sends alerts for any deviations or issues.

Quality Management

On-Premises, MES also oversees product quality. It checks for any anomalies and ensures that products meet the set quality standards.

Labor and Inventory Management

The system efficiently manages labor and inventory. It helps in scheduling staff and maintaining optimal inventory levels, ensuring resources are used effectively and that wastage is minimized.

On-Premises MES is a diligent supervisor that oversees, manages, and optimizes various facets of the manufacturing process. From planning to execution to quality control, it’s involved every step of the way, driving operational efficiency and productivity.

Unpacking the Components of an On-Premises MES

An On-Premises Manufacturing Execution System (MES) is an intricate system with several vital components working harmoniously. Let’s delve into these components, segmented into hardware, software, and networking aspects:

Hardware Components

Hardware serves as the foundation for an On-Premises MES. It includes:

  1. Servers: These are the primary storage units where the MES software is installed. They handle data processing and storage.
  2. Workstations: These are the computers where users interact with the MES software. They enable access to system features, from data analysis to report generation.
  3. Industrial PCs and PLCs: Industrial Personal Computers (PCs) and Programmable Logic Controllers (PLCs) connect the MES to machines on the shop floor. They facilitate real-time data collection from these machines.

Software Components

The software component of an On-Premises MES is where most of the functionality resides:

  1. Core MES Software: This is the system’s heart, encompassing functions like scheduling, quality management, and inventory control.
  2. Database Management System: This system manages the storage, retrieval, and processing of data collected by the MES. Learn the importance of Product Information Management.
  3. User Interface: This component allows users to interact with the system, offering functions like data visualization, report generation, and system control.

Networking Components

Networking components connect all the elements of an On-Premises MES:

  1. Local Area Network (LAN): A LAN connects the servers, workstations, and other devices within the organization, facilitating data transfer and communication.
  2. Data Cables: These wires physically connect the system components, enabling data communication.
  3. Wireless Networks: Wireless networks offer a flexible connection option for devices not connected by data cables.
  4. Firewalls and Security Systems: To protect sensitive data, firewalls and security systems provide a line of defense against unwanted and unauthorized access and potential cyber threats. Product Data Management can assist with this task.

Each component plays a significant role in the overall operation of an On-Premises MES. Together, they create an integrated system capable of overseeing, managing, and optimizing complex manufacturing processes.

SkyPlanner APS - Production planning and scheduling product image straight view

Advanced production planning with AI – SkyPlanner APS

Read more about our approach to production planning and optimization leveraging the power of AI.

Decoding the Appeal of On-Premises MES: Control, Security, and Customization

On-Premises Manufacturing Execution System (MES) uniquely appeals to many businesses. Three vital advantages it offers are key to its charm: enhanced control, robust security, and extensive customization.

Unparalleled Control

Choosing an On-Premises MES equates to gaining complete control over the system and its data. The system operates from servers within the company’s physical premises, putting the organization firmly in the driver’s seat. Whether it’s managing system updates, handling maintenance issues, or overseeing data processing, all responsibilities rest with the organization. This level of control can be critical for companies dealing with sensitive data or those with strict compliance requirements.

Robust Security

On-Premises MES also offers robust security. Since data resides within the organization’s premises, it’s shielded from many risks associated with internet-based storage. While still present, the risk of data breaches or cyberattacks can be better managed and mitigated with appropriate internal security measures. This heightened level of protection can be a significant advantage for organizations that prioritize data security or operate in heavily regulated industries.

Extensive Customization

One of the most compelling benefits of On-Premises MES is its customization potential. Companies have the flexibility to modify the system according to their specific operational needs and requirements. They can add or remove functionalities, change the system’s layout, or tweak data processing mechanisms. This flexibility allows companies to build a system that fits their unique operational landscape like a glove, potentially improving productivity and efficiency.

Therefore, while On-Premises MES might require a more substantial initial investment and ongoing maintenance, the benefits it brings in terms of control, security, and customization make it a preferred choice for many organizations. By offering an environment that can be precisely tuned to the company’s needs and objectives, On-Premises MES stands as a compelling option in the complex world of manufacturing execution systems.

Predictable Costs

Though the upfront cost is high, ongoing expenses are usually fixed and predictable.

No Dependency on Internet Connectivity

As the system is on-premise, operations can continue even during Internet downtime.

Data Privacy

On-Premise storage ensures complete privacy of sensitive data, complying with strict regulatory requirements.

Direct System Integration

Easy and direct integration with other existing systems within the organization, like CRM and HRMS.

Long-Term Investment

Despite the high initial outlay, On-Premises MES proves cost-effective in the long run due to its durability and customization capabilities.

A Step-By-Step Guide to Implementing an On-Premises MES

Embarking on implementing an On-Premises MES can be a formidable task. Let’s break down this process into manageable steps:

Step 1: Requirements Gathering

The first step involves understanding and documenting the organization’s needs. Identify the processes the MES needs to manage and the data it needs to process. Also, consider any necessary integrations with existing systems.

Step 2: Vendor Selection

After outlining the requirements, it’s time to choose a suitable MES vendor. Compare different vendors, their offerings, support services, and the flexibility of their systems.

Step 3: System Design and Planning

Once the vendor is chosen, the next step involves designing the system. This phase includes planning the system layout, the required customizations, and the integration with other systems.

Step 4: Installation and Configuration

With the plan in place, the vendor installs the MES software on the organization’s servers. The system is then configured according to the design plan.

Step 5: System Integration

This step involves integrating the MES with other systems, such as CRM or HRMS. Also, it includes connecting the MES to shop floor machines for real-time data collection.

Step 6: User Training

Before going live, users need training to operate the new system effectively. Conduct comprehensive training sessions to ensure everyone understands how to use the new system.

Step 7: Testing

Testing is crucial to identify any system issues or bugs. Test the MES under various conditions and fix any problems that emerge.

Step 8: Going Live

With testing complete and issues resolved, it’s time to go live. Start using the new On-Premises MES for daily operations, closely monitoring the system during the initial period for any unexpected issues.

Step 9: Continuous Improvement

Post-implementation, it’s important to regularly evaluate the system’s performance and make any necessary adjustments or improvements. This continuous improvement approach ensures that the MES remains effective and aligned with changing business needs.

Implementing an On-Premises MES requires careful planning, meticulous execution, and ongoing commitment. But with a straightforward step-by-step approach, businesses can successfully navigate this journey and reap the rewards of an effective and efficient manufacturing execution system.

Industries Benefiting from On-Premises MES

On-Premises MES can deliver significant advantages across various industries. Here are three such sectors:

  1. Automotive Industry: Given the complexity of production processes and the need for precise quality control, the automotive industry benefits significantly from On-Premises MES. It aids in coordinating multiple production stages, tracking inventory, and maintaining rigorous quality standards.
  2. Pharmaceutical Industry: The stringent regulatory environment and the need for secure data handling make On-Premises MES an ideal fit for the pharmaceutical industry. It offers robust data security and enables adherence to compliance requirements.
  3. Electronics Manufacturing: The intricate nature of electronics manufacturing, with its multifaceted production stages and high precision requirements, is well-served by On-Premises MES. It provides real-time monitoring, error detection, and process optimization.

SkyPlanner’s APS System: A Game-Changer for On-Premises MES

Your on-premises MES records shop-floor progress, while your ERP holds order data. SkyPlanner APS adds a scheduling layer through its open REST API: SkyPlanner uses that data to calculate what should run next, on which workstation and when. Its AI engine, Arcturus, schedules work around capacity, shifts, operators, materials and the priorities your planners set, with the resulting schedule visible on the Gantt timeline. When an urgent order arrives or available capacity changes, Arcturus recalculates the schedule so your planners can see the revised job sequence and timing without rebuilding the plan job by job.

If you aim to elevate your production operations and sales, there’s no better time to explore SkyPlanner’s offerings. Reach out to our team and uncover how their expert solutions can help your organization grow and thrive. 

SkyPlanner

Production Planning Specialist, SkyPlanner

Build a clearer production schedule with SkyPlanner

Connect your data, review the first plan, and keep planners in control of every schedule that goes live.