Connects with ERP & MES systems like

Careers & Salaries

Production Manager Salary in Poland 2026

PLN 7,769–19,211 gross a month, about €1,776–4,392: production manager pay in Poland. Compare annual pay, salary factors and Germany.

SkyPlanner Production Planning Specialist, SkyPlanner Updated October 3, 2026 5 min read
Production Manager Salary in Poland
Production manager salary guides

Home » Resources » Production Manager Salary in Poland 2026

Estimated reading time: 10 minutes

PLN 7,769–19,211 gross a month, about €1,776–4,392, is the salary benchmark for production management in Poland. The range covers the middle 80% of production directors and managers surveyed by Pensjometr (checked 3 October 2026).

At 12 monthly payments, that works out to PLN 93,228–230,532 gross a year, about €21,312–52,699. Region, experience and company size help put an offer in context, while the euro figures give you a starting point for comparing opportunities across borders.

Production manager salary in Poland: monthly and annual pay

Pay periodGross pay in PLNCalculated gross equivalent in EUR
Monthly7,769–19,211About €1,776–4,392
Annual, monthly pay × 1293,228–230,532About €21,312–52,699

Calculations use the NBP table A euro reference rate for 2 October 2026: €1 = PLN 4.3745. PLN amounts are divided by 4.3745 and euro results rounded to the nearest euro; annual PLN pay is monthly pay multiplied by 12.

For an offer quoted in PLN, the monthly row gives you the closest pay-period comparison. The annual row brings 12 monthly payments onto the same time basis as a yearly salary quoted abroad.

Gross or net: what reaches your bank account?

The PLN 7,769–19,211 monthly range is gross pay, before taxes and employee contributions. Net pay is the amount paid into your account after those deductions. Your contract, tax position and personal circumstances determine the take-home amount.

What affects production manager pay in Poland?

Region, length of experience and company size are the pay factors identified by the Polish salary source. These give you three useful dimensions for narrowing your comparison: the location of the job, the experience you bring and the scale of the business.

Experience becomes concrete through the production work you have led. The role description covers production and capacity planning, budgets, resource efficiency, team leadership and technical changes. Examples from those areas let you show the scope of your management experience in an application or interview.

A production manager leads manufacturing operations and the team; a production planner focuses on the production plan and schedule, as explained in the production manager job description.

Poland compared with Germany

Hays gives an average of €64,000 gross a year for production managers in Germany, equivalent to about €5,333 a month when divided by 12. Poland’s calculated annual range of about €21,312–52,699 sits below that German average at the exchange rate used in the table.

The production manager salary guide for Germany also gives Hays benchmarks of around €46,000 a year for junior managers and more than €77,000 for experienced senior managers. The junior figure falls within Poland’s euro-converted range, giving you a useful experience-level reference alongside the German average.

Support production management with SkyPlanner APS

SkyPlanner APS is AI-based advanced planning and scheduling software for discrete manufacturers. It schedules jobs across workstations while taking material availability, shifts, priorities and delivery dates into account. Managers and planners can view the schedule on an interactive Gantt timeline.

SkyPlanner integrates with any ERP or MES system through its open REST API. Explore the production scheduling software and try SkyPlanner to see the scheduling workflow for yourself.

Frequently asked questions

How much does a production manager earn in Poland per month?

PLN 7,769–19,211 gross a month covers the middle 80% of the source’s production director and manager category. Calculated at the table’s NBP rate, that is about €1,776–4,392 a month. Multiplying monthly pay by 12 gives PLN 93,228–230,532 gross a year, about €21,312–52,699.

How much is the salary in euros and per year?

The calculated euro equivalent is about €1,776–4,392 gross a month or €21,312–52,699 gross a year. Annual pay is calculated as 12 monthly payments, with euro conversions rounded to the nearest euro using the NBP rate in the table.

Is production manager pay in Poland gross or net?

The salary range is gross, before taxes and employee contributions. Net pay is the take-home amount after deductions and depends on your contract and personal tax circumstances.

What can raise a production manager’s salary in Poland?

Region, length of experience and company size are the factors the Polish salary source identifies as affecting pay.

How does production manager pay in Poland compare with Germany?

Poland’s calculated range is about €21,312–52,699 gross a year. Hays gives a German average of €64,000, with around €46,000 for junior managers and more than €77,000 for experienced senior managers. The German junior benchmark falls within the Polish range, while the German average is above its upper end.

SkyPlanner

Production Planning Specialist, SkyPlanner

Support your planning team with a clearer schedule

See how SkyPlanner helps production planners handle capacity, priorities, and change with less manual work.