定价

Choose the most suitable service package to
schedule your production with AI.

SkyPlanner helps you in all stages of your company’s growth. The Basic package will serve most customers, but we can also meet your special requests with our Enterprise service. SkyPlanner is also fully customizable to your needs.
联系我们的专业团队; 我们可以一起优化您的生产计划!

Skyplanner

每月计费

199 € / 月

(包括前5个工作站)

+20 € / 月 / 工作站

什么是工作站?

免费开始


请求免费演示


功能:

附加服务

想要更多?

We can customize. Contact our team to get additional features, integrations, consultation and service levels tailored to your needs.

联系我们


功能:

Basic版本的所有功能
API
集成工作
可定制的AI逻辑
可定制的报告
可定制的用户界面
可定制的附加功能
可定制的服务级别
定义项目和工作坊
翻译成您的语言
高级入职套餐
专门支持

计算您的每月费用

您的生产中有多少个工作站?

5 件

一个工作站是一个拥有自己的计划工作队列的单一生产资源,通常一次处理一个任务。

The clearest example of a workstation is a production machine, which has its own unique work queue. A workstation can also be, for instance, a welding point, where different individuals weld in the morning and evening.

在SkyPlanner中,每个工作站还设置了每日产能,通常基于分配给工作站上的个人的工作班次。

As every production setup is unique, we are happy to assist when you need help defining and configuring workstations in SkyPlanner. Our customer service can be reached at [email protected]

费用

199 欧元/月

每月计费

开始免费试用


请求免费演示

常见问题解答

Welcome to our FAQ section! Here, we’ve compiled answers to the most common questions about our products and services.

我可以随时更改或取消我的订阅吗?

If you are on a monthly billing plan, you can decrease or increase the number of workstations at any time. You can also cancel your subscription at any time.

我需要输入我的信用卡详细信息来注册吗?

No, we don’t require your credit card details when you register. When the free trial period ends and you decide to continue using SkyPlanner, you will be asked to choose a paid plan and enter your billing information.

我可以在购买之前尝试SkyPlanner吗?

Yes, we offer a 14-day free trial period during which you can test all of SkyPlanner’s features. We do not require your credit card details when you start the trial period of SkyPlanner.

是否可以为SkyPlanner获得额外的自定义功能?

Yes, additional features are available for an extra charge. Please get in touch with our sales team for more information.

试用版本有哪些限制?

During the 2-week Trial version, you can add up to a maximum of 20 workstations. This allows you to try out SkyPlanner’s basic features before making a purchase decision.

SkyPlanner可以翻译成我的语言吗?

SkyPlanner can be translated into all languages. It is designed to be easily translatable. Contact us, and let’s discuss this further.

Enterprise套餐包括什么?

The Enterprise package is similar to the Basic package, but it’s equipped with additional services and customizations according to the customer’s preferences. We have aimed to build the Basic package in such a way that its features generally suffice for a company’s needs. However, we understand that every company is unique; therefore, you might wish for some unique additional features in SkyPlanner.

SkyPlanner has been designed to be modular and thus adaptable to user-specific needs. Customization is a service available for an additional fee, but it’s good to know that SkyPlanner can be modified to operate exactly the way you desire.

Contact us. Our professional team is ready to tell you more about the Enterprise package and our services.