Skip to content
SkyPlanner
  • Značilnosti
    • Značilnosti
    • Rešitve
    • Integracije
  • Storitve
    • Pomoč pri uvajanju na trg
    • Integracije
    • Storitve prilagajanja
  • Cenik
  • Videoposnetki
  • Podjetje
    • O nas
    • Pišite na
    • Postanite partner SkyPlannerja
  • Docs
  • Začnite brezplačno!
  • Slovenščina
  • All
  • A
  • B
  • C
  • D
  • E
  • F
  • G
  • H
  • I
  • J
  • K
  • L
  • M
  • N
  • O
  • P
  • Q
  • R
  • S
  • T
  • U
  • V
  • W
  • X
  • Y
  • Z
  • Home
  • Encyclopedia
  • M
  • Material

Material

< 1 min read

Material generally refers to a resource that is either produced in-house or purchased from elsewhere, that then gets refined into a product or used as a part of a product's manufacturing process. This can include raw materials such as metals, plastics, or fabrics, as well as semi-finished or finished products that are integrated into the production process. 

Kontaktna prodaja

Jussi Mäntylä
+358 40 700 0002
[email protected]

Izdelek

Značilnosti

Rešitve

Stante sa partnerom skyplanner

Privacy policy

Podpora

Brezplačni preizkus

Zahtevajte sestanek

Kontaktna prodaja

Viri

Videos

Powered by Skycode Oy

Rantakatu 2 G (11. nadstropje)
65100 Vaasa, Finska
2204947-0
+358 40 700 0002
skycode.fi


    • Facebook
    • LinkedIn
    2025 © Skycode Oy
    • logo
    • Domov
    • Značilnosti
      • Značilnosti
      • Rešitve
      • Integracije
    • Storitve prilagajanja
      • Pomoč pri uvajanju na trg
      • Integracije
      • Storitve prilagajanja
    • Cenik
    • Videoposnetki
    • O nas
      • O nas
      • Kontaktna prodaja
      • Postanite partner SkyPlannerja
    • Zahtevajte sestanek
    • Začnite brezplačno!
    • Slovenščina