{"id":96107,"date":"2026-10-04T04:30:32","date_gmt":"2026-10-04T04:30:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96107"},"modified":"2026-10-19T14:42:42","modified_gmt":"2026-10-19T14:42:42","slug":"production-schedule-template","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/","title":{"rendered":"\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c<\/h1>\n\n\n<p>\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\u80fd\u8ba9\u8ba2\u5355\u5728\u8868\u4e0a\u6709\u4e2a\u4f4d\u7f6e\u3002\u66f4\u96be\u7684\u95ee\u9898\u662f\uff0c\u8fd9\u4e9b\u8ba2\u5355\u5728\u5de5\u5382\u91cc\u662f\u5426\u4e5f\u6392\u5f97\u4e0b\uff1a\u6709\u6ca1\u6709\u53ef\u7528\u7684\u8bbe\u5907\u3001\u5408\u9002\u7684\u64cd\u4f5c\u4eba\u5458\uff0c\u80fd\u5426\u53ca\u65f6\u5b8c\u6210\u5de5\u5e8f\uff0c\u65e2\u4e0d\u803d\u8bef\u4e0b\u4e00\u9053\u5de5\u5e8f\uff0c\u4e5f\u4e0d\u5f71\u54cd\u5ba2\u6237\u4ea4\u671f\u3002<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template.csv\">\u4e0b\u8f7d\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff08\u9002\u7528\u4e8e Excel \u7684 CSV \u6587\u4ef6\uff09<\/a>\u3002\u8fd9\u662f\u4e00\u4e2a\u7b80\u5355\u7684\u5236\u9020\u4e1a\u793a\u4f8b\uff0c\u60a8\u53ef\u4ee5\u6309\u9700\u4fee\u6539\uff0c\u6bcf\u884c\u5bf9\u5e94\u4e00\u9053\u5de5\u5e8f\u3002\u4e0b\u8868\u5c55\u793a\u4e86\u5176\u4e2d\u7684\u4e24\u9879\u793a\u4f8b\u751f\u4ea7\u4efb\u52a1\uff1b\u4e0b\u8f7d\u6587\u4ef6\u4e2d\u540c\u65f6\u5305\u542b\u5b8c\u6574\u65e5\u671f\u548c\u65f6\u95f4\u3002<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>\u8ba2\u5355 \/ \u5de5\u5e8f<\/th>\n<th>\u8bbe\u5907 \/ \u64cd\u4f5c\u4eba\u5458<\/th>\n<th style=\"text-align: right;\">\u51c6\u5907\u65f6\u95f4\uff08\u5206\u949f\uff09<\/th>\n<th style=\"text-align: right;\">\u52a0\u5de5\u65f6\u95f4\uff08\u5206\u949f\uff09<\/th>\n<th>\u5f00\u59cb\u65f6\u95f4<\/th>\n<th>\u7ed3\u675f\u65f6\u95f4<\/th>\n<th>\u8981\u6c42\u5b8c\u6210\u65f6\u95f4<\/th>\n<th>\u72b6\u6001<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>A \/ A-10<\/td>\n<td>M1 \/ O1<\/td>\n<td style=\"text-align: right;\">30<\/td>\n<td style=\"text-align: right;\">120<\/td>\n<td>08:00<\/td>\n<td>10:30<\/td>\n<td>12:00<\/td>\n<td>\u5df2\u8ba1\u5212<\/td>\n<\/tr>\n<tr>\n<td>B \/ B-10<\/td>\n<td>M1 \/ O1<\/td>\n<td style=\"text-align: right;\">15<\/td>\n<td style=\"text-align: right;\">180<\/td>\n<td>10:30<\/td>\n<td>13:45<\/td>\n<td>16:00<\/td>\n<td>\u5df2\u8ba1\u5212<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>\u60a8\u53ef\u4ee5\u7528\u8fd9\u4e2a\u6a21\u677f\u4e86\u89e3\u6392\u7a0b\u6240\u9700\u7684\u6570\u636e\uff0c\u5e76\u6d4b\u8bd5\u7b80\u5355\u7684\u52a0\u5de5\u987a\u5e8f\u3002\u5982\u679c\u751f\u4ea7\u8ba1\u5212\u9700\u8981\u5728\u65b0\u589e\u8ba2\u5355\u3001\u5ef6\u8bef\u548c\u4ea7\u80fd\u53d8\u5316\u540e\u4ecd\u7136\u53ef\u7528\uff0c\u5e94\u4f7f\u7528 SkyPlanner APS \u6765\u8ba1\u7b97\u6392\u7a0b\u3002\u7535\u5b50\u8868\u683c\u53ef\u4ee5\u5c55\u793a\u60a8\u9009\u5b9a\u7684\u5f00\u59cb\u65f6\u95f4\uff1bSkyPlanner \u5219\u8d1f\u8d23\u6839\u636e\u73b0\u6709\u4ea7\u80fd\u5b89\u6392\u5404\u9053\u5de5\u5e8f\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\u5e94\u8be5\u544a\u8bc9\u60a8\u4ec0\u4e48\uff1f<\/h2>\n\n\n<p>\u5236\u9020\u4e1a\u751f\u4ea7\u6392\u7a0b\u8981\u786e\u5b9a\u5404\u9879\u751f\u4ea7\u4efb\u52a1\u5728\u4ec0\u4e48\u65f6\u95f4\u3001\u7531\u54ea\u4e9b\u8d44\u6e90\u5b8c\u6210\u3002\u7ec6\u5316\u5230\u5de5\u5e8f\u5c42\u9762\uff0c\u5b83\u5e94\u8be5\u56de\u7b54\u56db\u4e2a\u95ee\u9898\uff1a<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>\u505a\u4ec0\u4e48\uff1f<\/strong>\u660e\u786e\u8ba2\u5355\u53ca\u5177\u4f53\u5de5\u5e8f\uff0c\u800c\u4e0d\u53ea\u662f\u586b\u5199\u4ea7\u54c1\u540d\u79f0\u3002<\/li>\n<li><strong>\u5728\u54ea\u91cc\u505a\uff1f<\/strong>\u660e\u786e\u6240\u7528\u8bbe\u5907\u6216\u5de5\u4f5c\u4e2d\u5fc3\uff0c\u4ee5\u53ca\u5b8c\u6210\u4efb\u52a1\u6240\u9700\u7684\u4eba\u5458\u3002<\/li>\n<li><strong>\u4ec0\u4e48\u65f6\u5019\u80fd\u505a\uff1f<\/strong>\u8003\u8651\u51c6\u5907\u65f6\u95f4\u3001\u52a0\u5de5\u65f6\u95f4\u3001\u5de5\u4f5c\u65f6\u6bb5\uff0c\u4ee5\u53ca\u5f00\u5de5\u524d\u5fc5\u987b\u6ee1\u8db3\u7684\u6761\u4ef6\u3002<\/li>\n<li><strong>\u80fd\u6309\u65f6\u5b8c\u6210\u5417\uff1f<\/strong>\u5bf9\u7167\u5de5\u5e8f\u8981\u6c42\u5b8c\u6210\u7684\u65f6\u95f4\u68c0\u67e5\u6392\u7a0b\u7ed3\u679c\uff0c\u540c\u65f6\u8003\u8651\u53d1\u8d27\u524d\u8fd8\u5269\u54ea\u4e9b\u5de5\u4f5c\u3002<\/li>\n<\/ul>\n\n\n<p>\u6700\u540e\u8fd9\u4e00\u70b9\u9700\u8981\u7279\u522b\u5206\u6e05\u3002\u5982\u679c\u540e\u9762\u8fd8\u6709\u88c5\u914d\u3001\u68c0\u9a8c\u6216\u5305\u88c5\uff0c\u673a\u52a0\u5de5\u5de5\u5e8f\u5b8c\u6210\u5e76\u4e0d\u610f\u5473\u7740\u8ba2\u5355\u53ef\u4ee5\u53d1\u8d27\u3002\u5e94\u4e3a\u6bcf\u9053\u5de5\u5e8f\u8bbe\u5b9a\u8981\u6c42\u5b8c\u6210\u7684\u65f6\u95f4\uff0c\u4e3a\u540e\u7eed\u5de5\u4f5c\u7559\u51fa\u4f59\u91cf\u3002<\/p>\n\n\n<p>\u6bcf\u5468\u7684\u4ea7\u91cf\u8ba1\u5212\u5f88\u6709\u7528\uff0c\u4f46\u5b83\u56de\u7b54\u7684\u662f\u53e6\u4e00\u4e2a\u95ee\u9898\u3002<a href=\"\/zh-hans\/resources\/master-production-schedule\/\">\u4e3b\u751f\u4ea7\u8ba1\u5212<\/a>\u660e\u786e\u9700\u8981\u54ea\u4e9b\u6210\u54c1\uff0c\u4ee5\u53ca\u4f55\u65f6\u9700\u8981\u3002\u8fd9\u4e2a\u6a21\u677f\u5219\u7528\u4e8e\u66f4\u7ec6\u4e00\u5c42\u7684\u5b89\u6392\uff1a\u5404\u9053\u5b9e\u9645\u5de5\u5e8f\u5982\u4f55\u5206\u914d\u8bbe\u5907\u548c\u64cd\u4f5c\u4eba\u5458\u7684\u65f6\u95f4\u3002<a href=\"\/zh-hans\/resources\/production-scheduling\/\">\u751f\u4ea7\u6392\u7a0b\u6307\u5357<\/a>\u4ecb\u7ecd\u4e86\u5982\u4f55\u5c06\u8fd9\u4e9b\u8f93\u5165\u6570\u636e\u8f6c\u5316\u4e3a\u53ef\u6267\u884c\u7684\u52a0\u5de5\u987a\u5e8f\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u4ece\u4ea7\u80fd\u5360\u7528\u7684\u89d2\u5ea6\u770b\u793a\u4f8b<\/h2>\n\n\n<p>\u5047\u8bbe\u8f66\u95f4\u91cc\u6709\u4e24\u9879\u751f\u4ea7\u4efb\u52a1\uff0c\u90fd\u5728\u7b49\u5f85\u540c\u4e00\u53f0\u8bbe\u5907 M1 \u548c\u540c\u4e00\u4f4d\u64cd\u4f5c\u4eba\u5458 O1\u3002\u4e24\u9879\u4efb\u52a1\u7684\u7269\u6599\u90fd\u5df2\u5c31\u7eea\uff0c\u8bbe\u5907\u548c\u4eba\u5458\u4ece 08:00 \u5230 16:00 \u53ef\u4ee5\u8fde\u7eed\u4f5c\u4e1a\uff0c\u4e24\u9053\u5de5\u5e8f\u4e5f\u90fd\u6ca1\u6709\u5c1a\u672a\u5b8c\u6210\u7684\u524d\u7f6e\u5de5\u5e8f\u3002<\/p>\n\n\n<p>\u751f\u4ea7\u4efb\u52a1 A \u9700\u8981 30 \u5206\u949f\u51c6\u5907\u548c 120 \u5206\u949f\u52a0\u5de5\uff0c\u5360\u7528\u8d44\u6e90\u76f4\u5230 10:30\u3002\u968f\u540e\uff0c\u751f\u4ea7\u4efb\u52a1 B \u9700\u8981 15 \u5206\u949f\u51c6\u5907\u548c 180 \u5206\u949f\u52a0\u5de5\uff0c\u5230 13:45 \u5b8c\u6210\u3002\u4e24\u9879\u4efb\u52a1\u7684\u65f6\u95f4\u6ca1\u6709\u91cd\u53e0\uff0c\u4e5f\u90fd\u80fd\u5728\u5404\u81ea\u8981\u6c42\u7684\u65f6\u95f4\u4e4b\u524d\u5b8c\u6210\u3002<\/p>\n\n\n<p>\u8fd9\u4e2a\u987a\u5e8f\u53ef\u884c\uff0c\u662f\u56e0\u4e3a\u524d\u63d0\u6761\u4ef6\u6210\u7acb\u3002\u5982\u679c O1 \u5728 11:00 \u9700\u8981\u64cd\u4f5c\u53e6\u4e00\u53f0\u8bbe\u5907\uff0c\u5373\u4f7f M1 \u4ecd\u7136\u7a7a\u95f2\uff0cB \u8fd9\u4e00\u884c\u7684\u5b89\u6392\u4e5f\u4e0d\u518d\u53ef\u884c\u3002\u5982\u679c\u4e2d\u95f4\u6709\u5348\u4f11\uff0c\u5c31\u4e0d\u80fd\u518d\u6309\u8fde\u7eed\u5de5\u4f5c\u65f6\u6bb5\u8ba1\u7b97\u3002\u5982\u679c\u8fd9\u4e9b\u53ea\u662f\u4e2d\u95f4\u5de5\u5e8f\uff0c\u540e\u7eed\u5de5\u5e8f\u4ecd\u9700\u8981\u5b89\u6392\u76f8\u5e94\u7684\u4ea7\u80fd\u3002<\/p>\n\n\n<p>\u8fd9\u5f20\u8868\u7684\u4ef7\u503c\u4e0d\u5728\u4e8e\u914d\u8272\uff0c\u800c\u5728\u4e8e\u6bcf\u4e00\u884c\u90fd\u660e\u786e\u5360\u7528\u4e86\u8d44\u6e90\u7684\u4e00\u6bb5\u53ef\u7528\u65f6\u95f4\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u6309\u9700\u4fee\u6539\u6a21\u677f\uff0c\u4f46\u4e0d\u8981\u5ffd\u7565\u7ea6\u675f\u6761\u4ef6<\/h2>\n\n\n<p>\u5728 Excel \u4e2d\u6253\u5f00 CSV \u6587\u4ef6\uff0c\u5e76\u5c06\u5de5\u4f5c\u526f\u672c\u53e6\u5b58\u4e3a Excel \u5de5\u4f5c\u7c3f\u3002\u5982\u679c\u6240\u6709\u5185\u5bb9\u90fd\u51fa\u73b0\u5728\u540c\u4e00\u5217\uff0c\u8bf7\u4f7f\u7528\u9017\u53f7\u4f5c\u4e3a\u5206\u9694\u7b26\u5bfc\u5165\u6587\u4ef6\u3002\u4e0b\u8f7d\u7684 CSV \u53ea\u5305\u542b\u793a\u4f8b\u6570\u636e\uff0c\u5e76\u4e0d\u662f\u81ea\u52a8\u6392\u7a0b\u6a21\u578b\u3002<\/p>\n\n\n<p>\u793a\u4f8b\u65e5\u671f\u4e3a <strong>2026 \u5e74 10 \u6708 5 \u65e5<\/strong>\u3002\u8bf7\u66ff\u6362\u4e3a\u5b9e\u9645\u751f\u4ea7\u65e5\u671f\uff0c\u5e76\u786e\u4fdd\u201c\u5f00\u59cb\u65f6\u95f4\u201d\u201c\u7ed3\u675f\u65f6\u95f4\u201d\u548c\u201c\u8981\u6c42\u5b8c\u6210\u65f6\u95f4\u201d\u662f\u7535\u5b50\u8868\u683c\u53ef\u8bc6\u522b\u7684\u65e5\u671f\u65f6\u95f4\u503c\uff0c\u800c\u4e0d\u662f\u5bfc\u5165\u7684\u6587\u672c\u3002\u663e\u793a\u65f6\u95f4\u65f6\u4e5f\u8981\u663e\u793a\u65e5\u671f\uff0c\u5426\u5219\u660e\u5929\u7684 08:00 \u53ef\u80fd\u770b\u8d77\u6765\u548c\u4eca\u5929\u7684\u6ca1\u6709\u533a\u522b\u3002<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u4e3a\u6bcf\u9053\u5de5\u5e8f\u660e\u786e\u6807\u8bc6\u548c\u5de5\u65f6\u4f9d\u636e<\/h3>\n\n\n<p>\u5c06 A \u548c B \u66ff\u6362\u4e3a\u60a8\u7684\u8ba2\u5355 ID \u548c\u5de5\u5e8f ID\u3002\u5982\u679c\u4e00\u4e2a\u8ba2\u5355\u9700\u8981\u5207\u5272\u3001\u6298\u5f2f\u548c\u710a\u63a5\uff0c\u8bf7\u4e3a\u8fd9\u4e9b\u5de5\u5e8f\u5206\u522b\u5efa\u884c\u3002\u5de5\u5e8f\u5148\u540e\u987a\u5e8f\u7531<a href=\"\/zh-hans\/resources\/production-routing\/\">\u5de5\u827a\u8def\u7ebf<\/a>\u51b3\u5b9a\uff0c\u800c\u4e0d\u662f\u7531\u5b83\u4eec\u5728\u7535\u5b50\u8868\u683c\u4e2d\u7684\u884c\u5e8f\u51b3\u5b9a\u3002<\/p>\n\n\n<p>\u201c\u52a0\u5de5\u65f6\u95f4\uff08\u5206\u949f\uff09\u201d\u6307\u7684\u662f<strong>\u6574\u4e2a\u6279\u6b21\u7684\u603b\u52a0\u5de5\u65f6\u95f4<\/strong>\u3002\u5982\u679c\u60a8\u4f30\u7b97\u7684\u662f\u5355\u4ef6\u52a0\u5de5\u65f6\u95f4\uff0c\u8bf7\u5148\u4e58\u4ee5\u6570\u91cf\u518d\u586b\u5165\u3002\u201c\u51c6\u5907\u65f6\u95f4\uff08\u5206\u949f\uff09\u201d\u662f\u8bbe\u5907\u989d\u5916\u88ab\u5360\u7528\u7684\u65f6\u95f4\uff0c\u4e0d\u8981\u628a\u5b83\u6df7\u5728\u4e00\u4e2a\u6ca1\u6709\u8bf4\u660e\u7684\u603b\u65f6\u957f\u91cc\uff0c\u4e5f\u4e0d\u8981\u91cd\u590d\u8ba1\u7b97\u3002<\/p>\n\n\n<p>\u5bf9\u4e8e\u8fde\u7eed\u4f5c\u4e1a\u7684\u5de5\u5e8f\uff0c\u8bf7\u7528\u4ee5\u4e0b\u516c\u5f0f\u66ff\u6362 F2 \u4e2d\u56fa\u5b9a\u7684\u201c\u7ed3\u675f\u65f6\u95f4\u201d\u503c\uff0c\u518d\u5411\u4e0b\u586b\u5145\uff1a<\/p>\n\n\n<p><code>=E2+(C2+D2)\/1440<\/code><\/p>\n\n\n<p>\u8be5\u516c\u5f0f\u5728\u5f00\u59cb\u65f6\u95f4\u4e0a\u52a0\u4e0a\u51c6\u5907\u548c\u52a0\u5de5\u6240\u9700\u7684\u5206\u949f\u6570\u3002\u5b83\u4e0d\u4f1a\u9009\u62e9\u5f00\u59cb\u65f6\u95f4\u3001\u907f\u5f00\u5176\u4ed6\u751f\u4ea7\u4efb\u52a1\uff0c\u4e5f\u4e0d\u4f1a\u7ed5\u5f00\u975e\u5de5\u4f5c\u65f6\u6bb5\u3002\u5728\u8fd9\u5f20\u8868\u4e2d\uff0c\u8fd9\u4e9b\u6392\u7a0b\u51b3\u7b56\u4ecd\u9700\u60a8\u81ea\u5df1\u5b8c\u6210\u3002<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u8bb0\u5f55\u5f00\u5de5\u524d\u5fc5\u987b\u6ee1\u8db3\u7684\u6761\u4ef6<\/h3>\n\n\n<p>\u5728\u5de5\u5e8f\u6e05\u5355\u65c1\uff0c\u4e3a\u6bcf\u53f0\u8bbe\u5907\u548c\u6bcf\u4f4d\u64cd\u4f5c\u4eba\u5458\u8bb0\u5f55\u5e26\u65e5\u671f\u7684\u5de5\u4f5c\u65f6\u6bb5\uff0c\u5e76\u6ce8\u660e\u4f11\u606f\u3001\u7ef4\u62a4\u53ca\u5176\u4ed6\u4e0d\u53ef\u7528\u65f6\u6bb5\u3002\u5982\u679c\u9700\u8981\u5206\u522b\u68c0\u67e5\u8bbe\u5907\u548c\u4eba\u5458\u7684\u4efb\u52a1\u5b89\u6392\uff0c\u8bf7\u628a\u201c\u8bbe\u5907\u201d\u548c\u201c\u64cd\u4f5c\u4eba\u5458\u201d\u62c6\u6210\u72ec\u7acb\u7684\u5217\u3002<\/p>\n\n\n<p>\u5bf9\u4e8e\u591a\u5de5\u5e8f\u8ba2\u5355\uff0c\u6dfb\u52a0\u201c\u524d\u7f6e\u5de5\u5e8f\u201d\u5217\uff0c\u586b\u5165\u4e0a\u4e00\u9053\u5de5\u5e8f\u7684 ID\u3002\u5982\u679c\u7269\u6599\u5230\u8d27\u65f6\u95f4\u51b3\u5b9a\u4f55\u65f6\u5f00\u5de5\uff0c\u8fd8\u5e94\u6dfb\u52a0\u7269\u6599\u5c31\u7eea\u4fe1\u606f\u3002\u53ea\u6709\u6240\u9700\u7269\u6599\u7b49\u6761\u4ef6\u90fd\u5df2\u5177\u5907\u3001\u524d\u7f6e\u5de5\u4f5c\u4e5f\u5df2\u5b8c\u6210\uff0c\u8fd9\u4e00\u884c\u7684\u5de5\u5e8f\u624d\u5177\u5907\u5b89\u6392\u5f00\u5de5\u7684\u6761\u4ef6\u3002<\/p>\n\n\n<p>\u5982\u679c\u4e00\u9053\u5de5\u5e8f\u4e0d\u80fd\u4e2d\u65ad\uff0c\u5c31\u9700\u8981\u4e00\u6bb5\u8db3\u591f\u5b8c\u6210\u51c6\u5907\u548c\u52a0\u5de5\u7684\u8fde\u7eed\u5de5\u4f5c\u65f6\u95f4\u3002\u5982\u679c\u5de5\u5e8f\u53ef\u4ee5\u4e2d\u65ad\uff0c\u7b80\u5355\u7684\u7ed3\u675f\u65f6\u95f4\u516c\u5f0f\u4e5f\u65e0\u6cd5\u8ba1\u7b97\u8de8\u591a\u4e2a\u5de5\u4f5c\u65f6\u6bb5\u7684\u5b8c\u6210\u65f6\u95f4\u3002\u8fd9\u9700\u8981\u53e6\u884c\u8ba1\u7b97\uff0c\u5e76\u5c06\u5de5\u4f5c\u65e5\u5386\u7eb3\u5165\u8003\u8651\u3002<\/p>\n\n\n<p>\u5230\u8fd9\u91cc\uff0c\u6a21\u677f\u5f00\u59cb\u663e\u9732\u51fa\u8ba1\u5212\u5de5\u4f5c\u7684\u771f\u6b63\u96be\u70b9\uff1a\u4e0d\u662f\u5f55\u5165\u66f4\u591a\u884c\uff0c\u800c\u662f\u68c0\u67e5\u8fd9\u4e9b\u884c\u4e4b\u95f4\u5982\u4f55\u76f8\u4e92\u5f71\u54cd\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u6539\u53d8\u4e00\u4e2a\u524d\u63d0\uff0c\u68c0\u9a8c\u8ba1\u5212\u662f\u5426\u53ef\u884c<\/h2>\n\n\n<p>\u5728\u4f9d\u8d56\u7535\u5b50\u8868\u683c\u4e2d\u7684\u6392\u7a0b\u4e4b\u524d\uff0c\u5148\u770b\u770b\u751f\u4ea7\u60c5\u51b5\u53d8\u5316\u540e\u4f1a\u53d1\u751f\u4ec0\u4e48\u3002<\/p>\n\n\n<p>\u5047\u8bbe A \u5df2\u5728 10:30 \u5b8c\u6210\uff0c\u4f46 M1 \u4ece 10:30 \u5230 13:00 \u4e0d\u53ef\u7528\uff0cB \u8fd8\u6ca1\u6709\u5f00\u59cb\u3002B \u7684\u51c6\u5907\u548c\u52a0\u5de5\u5171\u9700 195 \u5206\u949f\uff0c\u5373\u4f7f\u8fde\u7eed\u4f5c\u4e1a\uff0c\u4e5f\u8981\u5230 16:15 \u624d\u80fd\u5b8c\u6210\u3002<\/p>\n\n\n<p>\u8fd9\u4e2a\u7ed3\u675f\u65f6\u95f4\u65e2\u8d85\u51fa\u4e86\u622a\u81f3 16:00 \u7684\u5de5\u4f5c\u65f6\u6bb5\uff0c\u4e5f\u665a\u4e8e B \u8981\u6c42\u7684 16:00 \u5b8c\u6210\u65f6\u95f4\u3002\u8fd9\u662f\u4e00\u4e2a\u8b66\u793a\uff0c\u5e76\u4e0d\u662f\u5df2\u83b7\u6279\u51c6\u7684\u65b0\u6392\u7a0b\u3002\u4fee\u6539 B \u7684\u5f00\u59cb\u65f6\u95f4\u5355\u5143\u683c\u53ea\u662f\u66b4\u9732\u4e86\u95ee\u9898\uff0c\u5e76\u6ca1\u6709\u89e3\u51b3\u95ee\u9898\u3002<\/p>\n\n\n<p>\u60a8\u53ef\u4ee5\u8003\u8651\u6362\u5230\u53e6\u4e00\u53f0\u7b26\u5408\u52a0\u5de5\u8981\u6c42\u4e14\u6709\u64cd\u4f5c\u4eba\u5458\u53ef\u7528\u7684\u8bbe\u5907\uff0c\u5728\u83b7\u5f97\u6279\u51c6\u540e\u5ef6\u957f\u5de5\u4f5c\u65f6\u95f4\uff0c\u6216\u8c03\u6574\u627f\u8bfa\u4ea4\u671f\u3002\u4f46\u628a B \u8f6c\u79fb\u5230\u5176\u4ed6\u8bbe\u5907\uff0c\u4e5f\u610f\u5473\u7740\u8981\u68c0\u67e5\u90a3\u91cc\u5df2\u7ecf\u5b89\u6392\u7684\u4efb\u52a1\u3002\u5982\u679c B \u540e\u9762\u8fd8\u6709\u5de5\u5e8f\uff0c\u540e\u7eed\u5de5\u5e8f\u7684\u5f00\u59cb\u65f6\u95f4\u53ef\u80fd\u4e5f\u9700\u8981\u8c03\u6574\u3002<\/p>\n\n\n<p>\u8fd9\u5c31\u662f\u7b97\u672f\u8ba1\u7b97\u4e0e<a href=\"\/zh-hans\/resources\/finite-capacity-scheduling\/\">\u6709\u9650\u4ea7\u80fd\u6392\u7a0b<\/a>\u7684\u533a\u522b\u3002\u7b97\u672f\u8ba1\u7b97\u544a\u8bc9\u60a8\uff0c\u9009\u5b9a\u7684\u5b89\u6392\u4f1a\u5728\u4f55\u65f6\u7ed3\u675f\uff1b\u6392\u7a0b\u5219\u8981\u5728\u4e0d\u8d85\u51fa\u53ef\u7528\u4ea7\u80fd\u7684\u524d\u63d0\u4e0b\uff0c\u4e3a\u4efb\u52a1\u627e\u5230\u5408\u9002\u7684\u65f6\u95f4\u548c\u8d44\u6e90\u3002<\/p>\n\n\n<p>\u4e0b\u53d1\u7535\u5b50\u8868\u683c\u8ba1\u5212\u524d\uff0c\u8bf7\u68c0\u67e5\u8bbe\u5907\u548c\u64cd\u4f5c\u4eba\u5458\u662f\u5426\u6709\u65f6\u95f4\u51b2\u7a81\u3001\u7269\u6599\u662f\u5426\u5c31\u7eea\u3001\u524d\u7f6e\u5de5\u5e8f\u662f\u5426\u5b8c\u6210\uff0c\u4ee5\u53ca\u5de5\u4f5c\u65f6\u6bb5\u548c\u8981\u6c42\u5b8c\u6210\u65f6\u95f4\u662f\u5426\u6ee1\u8db3\u3002\u4fdd\u7559\u5df2\u5b8c\u6210\u4efb\u52a1\u7684\u5b9e\u9645\u65f6\u95f4\uff0c\u5e76\u6e05\u695a\u6807\u8bc6\u5df2\u6279\u51c6\u7684\u7248\u672c\uff0c\u907f\u514d\u8f66\u95f4\u6309\u7167\u8fc7\u671f\u526f\u672c\u6267\u884c\u3002<\/p>\n\n\n<p>\u5bf9\u8fd9\u4e2a\u793a\u4f8b\u6765\u8bf4\uff0c\u8fd9\u4e9b\u68c0\u67e5\u8fd8\u4e0d\u96be\u5904\u7406\u3002\u4f46\u5728\u751f\u4ea7\u60c5\u51b5\u4e0d\u65ad\u53d8\u5316\u7684\u5de5\u5382\u91cc\uff0c\u9010\u4e00\u91cd\u65b0\u68c0\u67e5\u6240\u6709\u53d7\u5f71\u54cd\u8ba2\u5355\uff0c\u6b63\u662f\u60a8\u5e0c\u671b\u4ea4\u7ed9\u6392\u7a0b\u7cfb\u7edf\u7684\u5de5\u4f5c\u3002<a href=\"\/zh-hans\/resources\/excel-production-planning-challenges-and-the-superior-alternative-skyplanner-aps\/\">Excel \u751f\u4ea7\u8ba1\u5212\u96be\u70b9\u6307\u5357<\/a>\u8fdb\u4e00\u6b65\u89e3\u91ca\u4e86\u4e3a\u4ec0\u4e48\u8fd9\u7c7b\u7ef4\u62a4\u8d1f\u62c5\u4f1a\u4e0d\u65ad\u589e\u52a0\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u60a8\u628a\u63e1\u8ba1\u5212\u65b9\u5411\uff0cSkyPlanner \u8d1f\u8d23\u8ba1\u7b97\u5982\u4f55\u5b89\u6392<\/h2>\n\n\n<p>SkyPlanner \u5c06\u5de5\u4f5c\u4e2d\u5fc3\u3001\u73ed\u6b21\u3001\u64cd\u4f5c\u4eba\u5458\u3001\u4f18\u5148\u7ea7\u548c\u7269\u6599\u7eb3\u5165\u6392\u7a0b\u3002\u60a8\u5b9a\u4e49\u751f\u4ea7\u8d44\u6e90\u548c\u5de5\u5e8f\u6570\u636e\uff0c\u6392\u7a0b\u4eba\u5de5\u667a\u80fd\u5f15\u64ce Arcturus \u5219\u6839\u636e\u914d\u7f6e\u7684\u4ea7\u80fd\u548c\u4f9d\u8d56\u5173\u7cfb\u8ba1\u7b97\u52a0\u5de5\u987a\u5e8f\u3002\u7ed3\u679c\u663e\u793a\u5728 Gantt \u65f6\u95f4\u8f74\u4e0a\uff0c\u6bcf\u4e2a\u5de5\u4f5c\u4e2d\u5fc3\u90fd\u6709\u81ea\u5df1\u7684\u4efb\u52a1\u961f\u5217\uff0c\u76f8\u5173\u5de5\u5e8f\u4e4b\u95f4\u4e5f\u4f1a\u663e\u793a\u5173\u8054\u3002<\/p>\n\n\n<p>\u9047\u5230 M1 \u4e2d\u65ad\u7684\u60c5\u51b5\uff0c\u60a8\u8bb0\u5f55\u4e0d\u53ef\u7528\u65f6\u6bb5\uff0c\u518d\u91cd\u65b0\u8ba1\u7b97\u6392\u7a0b\u3002Arcturus \u4f1a\u6839\u636e\u60a8\u5b9a\u4e49\u7684\u53ef\u9009\u8d44\u6e90\u548c\u7ea6\u675f\u6761\u4ef6\uff0c\u907f\u5f00\u4e0d\u53ef\u7528\u7684\u4ea7\u80fd\u6765\u5b89\u6392\u4efb\u52a1\u3002\u968f\u540e\u60a8\u53ef\u4ee5\u67e5\u770b\u7ed3\u679c\uff0c\u5224\u65ad\u54ea\u4e9b\u8ba2\u5355\u7684\u5b8c\u6210\u65f6\u95f4\u9700\u8981\u5173\u6ce8\uff0c\u800c\u4e0d\u5fc5\u81ea\u5df1\u5728\u7535\u5b50\u8868\u683c\u4e2d\u9010\u884c\u8ffd\u8e2a\u6240\u6709\u8fde\u9501\u53d8\u5316\u3002<\/p>\n\n\n<p>\u542f\u7528\u8003\u8651\u7269\u6599\u7684\u6392\u7a0b\u529f\u80fd\u540e\uff0c\u8ba1\u7b97\u4e2d\u4e5f\u53ef\u4ee5\u7eb3\u5165\u7269\u6599\u53ef\u7528\u60c5\u51b5\u3002\u9501\u5b9a\u529f\u80fd\u4fdd\u62a4\u60a8\u4e0d\u5e0c\u671b\u79fb\u52a8\u7684\u4efb\u52a1\uff0c\u9884\u8bbe\u4f18\u5148\u7ea7\u5219\u660e\u786e\u54ea\u4e9b\u4ea4\u4ed8\u627f\u8bfa\u6700\u91cd\u8981\u3002<strong>\u4f18\u5148\u7ea7\u7531\u60a8\u51b3\u5b9a\uff0c\u4eba\u5de5\u667a\u80fd\u6309\u60a8\u7684\u8bbe\u7f6e\u6267\u884c\u3002<\/strong>\u5b83\u65e0\u9700\u60a8\u9010\u4e00\u5b89\u6392\u6bcf\u9879\u751f\u4ea7\u4efb\u52a1\uff0c\u4e5f\u80fd\u843d\u5b9e\u8fd9\u4e9b\u51b3\u7b56\u3002<\/p>\n\n\n<p>\u5b83\u5e26\u6765\u7684\u4e0d\u53ea\u662f\u4e00\u4efd\u66f4\u6574\u9f50\u7684\u8ba2\u5355\u6e05\u5355\uff0c\u800c\u662f\u4e00\u4efd\u5728\u751f\u4ea7\u60c5\u51b5\u53d8\u5316\u540e\u4ecd\u80fd\u7528\u6765\u5f00\u5c55\u5de5\u4f5c\u7684\u8ba1\u5212\u3002\u60a8\u53ef\u4ee5\u628a\u7cbe\u529b\u653e\u5728\u751f\u4ea7\u51b3\u7b56\u4e0a\uff1a\u662f\u5426\u589e\u52a0\u4ea7\u80fd\u3001\u8c03\u6574\u4f18\u5148\u7ea7\uff0c\u6216\u4e0e\u5ba2\u6237\u6c9f\u901a\u4ea4\u671f\u3002\u80cc\u540e\u7684\u6392\u7a0b\u8ba1\u7b97\u5219\u4ea4\u7ed9 SkyPlanner\u3002<\/p>\n\n\n<p><a href=\"\/zh-hans\/%e5%8a%9f%e8%83%bd\/\">\u4e86\u89e3 SkyPlanner \u7684\u6392\u7a0b\u529f\u80fd<\/a>\uff0c\u770b\u770b Gantt\u3001\u8d44\u6e90\u53ef\u7528\u60c5\u51b5\u548c\u81ea\u52a8\u6392\u7a0b\u5982\u4f55\u652f\u6301\u8fd9\u4e9b\u5de5\u4f5c\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u544a\u522b Excel \u540e\uff0cUTU \u6709\u4e86\u54ea\u4e9b\u53d8\u5316\uff1f<\/h2>\n\n\n<p>UTU \u4f4d\u4e8e Ulvila \u7684\u5de5\u5382\u751f\u4ea7\u914d\u7535\u76d8\u548c\u5f00\u5173\u8bbe\u5907\u3002\u4f7f\u7528 SkyPlanner \u4e4b\u524d\uff0c\u5404\u90e8\u95e8\u5404\u81ea\u7528\u624b\u52a8\u66f4\u65b0\u7684 Excel \u8868\u683c\u5236\u5b9a\u8ba1\u5212\u3002ERP \u4e2d\u52a0\u5de5\u987a\u5e8f\u7684\u53d8\u66f4\u4e0d\u4e00\u5b9a\u80fd\u4f20\u8fbe\u5230\u8f66\u95f4\uff0c\u5b9e\u9645\u53ef\u7528\u4ea7\u80fd\u4e5f\u5f88\u96be\u770b\u6e05\u3002<\/p>\n\n\n<p>\u95ee\u9898\u5e76\u4e0d\u53ea\u662f\u8868\u683c\u5c11\u4e86\u4e00\u5217\uff0c\u800c\u662f\u5982\u4f55\u8ba9\u8ba2\u5355\u4fe1\u606f\u3001\u751f\u4ea7\u987a\u5e8f\u548c\u6267\u884c\u4efb\u52a1\u7684\u4eba\u5458\u59cb\u7ec8\u4fdd\u6301\u540c\u6b65\u3002<\/p>\n\n\n<p>UTU \u5728\u8f6c\u7528 Oracle NetSuite \u7684\u8fc7\u7a0b\u4e2d\u9009\u62e9\u4e86 SkyPlanner\u3002\u5728 UTU \u7684\u5b9e\u65bd\u9879\u76ee\u4e2d\uff0cSkyPlanner \u4e0e NetSuite \u548c\u85aa\u8d44\u7cfb\u7edf\u8fde\u63a5\uff0c\u5c06\u5de5\u5382\u5404\u6761\u4ea7\u7ebf\u548c\u5404\u4e2a\u90e8\u95e8\u7eb3\u5165\u540c\u4e00\u7cfb\u7edf\u3002\u56e2\u961f\u7279\u522b\u770b\u91cd\u4eba\u5de5\u667a\u80fd\u6392\u7a0b\u4e0e Gantt \u65f6\u95f4\u8f74\u7684\u7ed3\u5408\uff1a\u52a0\u5de5\u987a\u5e8f\u3001\u4ea7\u80fd\u548c\u8fdb\u5ea6\u53ef\u4ee5\u4e00\u5e76\u67e5\u770b\u3002<\/p>\n\n\n<p>\u636e UTU \u53cd\u9988\uff0c<strong>\u6bcf\u5468\u624b\u52a8\u66f4\u65b0\u7535\u5b50\u8868\u683c\u7684\u65f6\u95f4\u51cf\u5c11\u4e86\u7ea6\u4e24\u5c0f\u65f6<\/strong>\uff0c\u66f4\u65b0\u540e\u7684\u4efb\u52a1\u961f\u5217\u53ea\u9700\u51e0\u79d2\u5c31\u80fd\u4f20\u8fbe\u7ed9\u88c5\u914d\u4eba\u5458\u3002\u8fd9\u6b63\u662f\u4ece\u6a21\u677f\u8fc8\u5411\u6392\u7a0b\u7cfb\u7edf\u7684\u5b9e\u9645\u4ef7\u503c\uff1a\u51cf\u5c11\u7ef4\u62a4\u5404\u4efd\u526f\u672c\u7684\u5de5\u4f5c\u91cf\uff0c\u8ba9\u6267\u884c\u4efb\u52a1\u7684\u4eba\u5458\u66f4\u6e05\u695a\u5730\u638c\u63e1\u4f5c\u4e1a\u987a\u5e8f\u3002<\/p>\n\n\n<p><a href=\"\/zh-hans\/%e5%ae%a2%e6%88%b7%e6%a1%88%e4%be%8b\/utu\/\">\u4e86\u89e3 UTU \u4ece Excel \u8f6c\u5411 SkyPlanner \u7684\u7ecf\u9a8c<\/a>\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u4fdd\u7559\u6709\u7528\u7684\u57fa\u7840\u6570\u636e\uff0c\u544a\u522b\u53cd\u590d\u91cd\u505a\u6392\u7a0b\u3002<\/h2>\n\n\n<p>\u8fd9\u4efd\u6a21\u677f\u5e2e\u52a9\u60a8\u660e\u786e\u6392\u7a0b\u6240\u9700\u7684\u4fe1\u606f\uff1a\u5de5\u5e8f\u3001\u65f6\u957f\u3001\u8d44\u6e90\u3001\u53ef\u7528\u65f6\u95f4\u4ee5\u53ca\u8981\u6c42\u7684\u5b8c\u5de5\u65f6\u95f4\u3002\u8981\u8ba9\u8fd9\u4e9b\u6570\u636e\u53d1\u6325\u4f5c\u7528\uff0c\u5e76\u4e0d\u9700\u8981\u4e00\u76f4\u5728 Excel \u4e2d\u8ba1\u7b97\u5b83\u4eec\u4e4b\u95f4\u7684\u76f8\u4e92\u5f71\u54cd\u3002<\/p>\n\n\n<p><strong>SkyPlanner \u53ef\u901a\u8fc7\u5176\u5f00\u653e\u7684 REST API \u4e0e\u4efb\u4f55 ERP \u6216 MES \u96c6\u6210\u3002<\/strong>\u60a8\u53ef\u4ee5\u5728\u73b0\u6709\u7cfb\u7edf\u7684\u57fa\u7840\u4e0a\u6539\u8fdb\u6392\u7a0b\uff0c\u4f18\u5148\u7ea7\u8bbe\u5b9a\u548c\u751f\u4ea7\u51b3\u7b56\u4ecd\u7531\u60a8\u638c\u63e1\u3002<\/p>\n\n\n<p><a href=\"\/zh-hans\/%e8%81%94%e7%b3%bb%e9%94%80%e5%94%ae\/\">\u9884\u7ea6 SkyPlanner \u6f14\u793a<\/a>\uff0c\u5e76\u51c6\u5907\u4e00\u4e2a\u5178\u578b\u8ba2\u5355\u7684\u5de5\u827a\u8def\u7ebf\u548c\u8fd1\u671f\u7684\u4e00\u6b21\u6392\u7a0b\u53d8\u66f4\u3002\u4ee5\u8fd9\u4e9b\u5b9e\u4f8b\u4e3a\u5207\u5165\u70b9\uff0c\u63a2\u8ba8\u5728\u8bbe\u5907\u3001\u4eba\u5458\u548c\u4ea4\u671f\u8981\u6c42\u76f8\u4e92\u51b2\u7a81\u65f6\uff0c\u5982\u4f55\u5b89\u6392\u751f\u4ea7\u3002\u60a8\u4e5f\u53ef\u4ee5<a href=\"\/zh-hans\/%e8%af%95%e7%94%a8\/\">\u4f7f\u7528\u6f14\u793a\u6570\u636e\u8bd5\u7528 SkyPlanner<\/a>\uff0c\u5148\u5728 Gantt \u56fe\u4e2d\u67e5\u770b\u6392\u7a0b\uff0c\u518d\u89c4\u5212\u9002\u5408\u81ea\u5df1\u7684\u914d\u7f6e\u3002<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c \u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\u80fd\u8ba9\u8ba2\u5355\u5728\u8868\u4e0a\u6709\u4e2a\u4f4d\u7f6e\u3002\u66f4\u96be\u7684\u95ee\u9898\u662f\uff0c\u8fd9\u4e9b\u8ba2\u5355\u5728\u5de5\u5382\u91cc\u662f\u5426\u4e5f\u6392\u5f97\u4e0b\uff1a\u6709\u6ca1\u6709\u53ef\u7528\u7684\u8bbe\u5907\u3001\u5408\u9002\u7684\u64cd\u4f5c\u4eba\u5458\uff0c\u80fd\u5426\u53ca\u65f6\u5b8c\u6210\u5de5\u5e8f\uff0c\u65e2\u4e0d\u803d\u8bef\u4e0b\u4e00\u9053\u5de5\u5e8f\uff0c\u4e5f\u4e0d\u5f71\u54cd\u5ba2\u6237\u4ea4\u671f\u3002 \u4e0b\u8f7d\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff08\u9002\u7528\u4e8e Excel \u7684 CSV \u6587\u4ef6\uff09\u3002\u8fd9\u662f\u4e00\u4e2a\u7b80\u5355\u7684\u5236\u9020\u4e1a\u793a\u4f8b\uff0c\u60a8\u53ef\u4ee5\u6309\u9700\u4fee\u6539\uff0c\u6bcf\u884c\u5bf9\u5e94\u4e00\u9053\u5de5\u5e8f\u3002\u4e0b\u8868\u5c55\u793a\u4e86\u5176\u4e2d\u7684\u4e24\u9879\u793a\u4f8b\u751f\u4ea7\u4efb\u52a1\uff1b\u4e0b\u8f7d\u6587\u4ef6\u4e2d\u540c\u65f6\u5305\u542b\u5b8c\u6574\u65e5\u671f\u548c\u65f6\u95f4\u3002 \u8ba2\u5355 \/ \u5de5\u5e8f \u8bbe\u5907 \/ \u64cd\u4f5c\u4eba\u5458 \u51c6\u5907\u65f6\u95f4\uff08\u5206\u949f\uff09 \u52a0\u5de5\u65f6\u95f4\uff08\u5206\u949f\uff09 \u5f00\u59cb\u65f6\u95f4 \u7ed3\u675f\u65f6\u95f4 \u8981\u6c42\u5b8c\u6210\u65f6\u95f4 \u72b6\u6001 A \/ A-10 M1 \/ O1 30 120 08:00 10:30 12:00 \u5df2\u8ba1\u5212 B \/ B-10 M1 \/ O1 15 180 10:30 13:45 16:00 \u5df2\u8ba1\u5212 \u60a8\u53ef\u4ee5\u7528\u8fd9\u4e2a\u6a21\u677f\u4e86\u89e3\u6392\u7a0b\u6240\u9700\u7684\u6570\u636e\uff0c\u5e76\u6d4b\u8bd5\u7b80\u5355\u7684\u52a0\u5de5\u987a\u5e8f\u3002\u5982\u679c\u751f\u4ea7\u8ba1\u5212\u9700\u8981\u5728\u65b0\u589e\u8ba2\u5355\u3001\u5ef6\u8bef\u548c\u4ea7\u80fd\u53d8\u5316\u540e\u4ecd\u7136\u53ef\u7528\uff0c\u5e94\u4f7f\u7528 SkyPlanner APS \u6765\u8ba1\u7b97\u6392\u7a0b\u3002\u7535\u5b50\u8868\u683c\u53ef\u4ee5\u5c55\u793a\u60a8\u9009\u5b9a\u7684\u5f00\u59cb\u65f6\u95f4\uff1bSkyPlanner \u5219\u8d1f\u8d23\u6839\u636e\u73b0\u6709\u4ea7\u80fd\u5b89\u6392\u5404\u9053\u5de5\u5e8f\u3002 \u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\u5e94\u8be5\u544a\u8bc9\u60a8\u4ec0\u4e48\uff1f \u5236\u9020\u4e1a\u751f\u4ea7\u6392\u7a0b\u8981\u786e\u5b9a\u5404\u9879\u751f\u4ea7\u4efb\u52a1\u5728\u4ec0\u4e48\u65f6\u95f4\u3001\u7531\u54ea\u4e9b\u8d44\u6e90\u5b8c\u6210\u3002\u7ec6\u5316\u5230\u5de5\u5e8f\u5c42\u9762\uff0c\u5b83\u5e94\u8be5\u56de\u7b54\u56db\u4e2a\u95ee\u9898\uff1a \u505a\u4ec0\u4e48\uff1f\u660e\u786e\u8ba2\u5355\u53ca\u5177\u4f53\u5de5\u5e8f\uff0c\u800c\u4e0d\u53ea\u662f\u586b\u5199\u4ea7\u54c1\u540d\u79f0\u3002 \u5728\u54ea\u91cc\u505a\uff1f\u660e\u786e\u6240\u7528\u8bbe\u5907\u6216\u5de5\u4f5c\u4e2d\u5fc3\uff0c\u4ee5\u53ca\u5b8c\u6210\u4efb\u52a1\u6240\u9700\u7684\u4eba\u5458\u3002 \u4ec0\u4e48\u65f6\u5019\u80fd\u505a\uff1f\u8003\u8651\u51c6\u5907\u65f6\u95f4\u3001\u52a0\u5de5\u65f6\u95f4\u3001\u5de5\u4f5c\u65f6\u6bb5\uff0c\u4ee5\u53ca\u5f00\u5de5\u524d\u5fc5\u987b\u6ee1\u8db3\u7684\u6761\u4ef6\u3002 \u80fd\u6309\u65f6\u5b8c\u6210\u5417\uff1f\u5bf9\u7167\u5de5\u5e8f\u8981\u6c42\u5b8c\u6210\u7684\u65f6\u95f4\u68c0\u67e5\u6392\u7a0b\u7ed3\u679c\uff0c\u540c\u65f6\u8003\u8651\u53d1\u8d27\u524d\u8fd8\u5269\u54ea\u4e9b\u5de5\u4f5c\u3002 \u6700\u540e\u8fd9\u4e00\u70b9\u9700\u8981\u7279\u522b\u5206\u6e05\u3002\u5982\u679c\u540e\u9762\u8fd8\u6709\u88c5\u914d\u3001\u68c0\u9a8c\u6216\u5305\u88c5\uff0c\u673a\u52a0\u5de5\u5de5\u5e8f\u5b8c\u6210\u5e76\u4e0d\u610f\u5473\u7740\u8ba2\u5355\u53ef\u4ee5\u53d1\u8d27\u3002\u5e94\u4e3a\u6bcf\u9053\u5de5\u5e8f\u8bbe\u5b9a\u8981\u6c42\u5b8c\u6210\u7684\u65f6\u95f4\uff0c\u4e3a\u540e\u7eed\u5de5\u4f5c\u7559\u51fa\u4f59\u91cf\u3002 &#8230; <a title=\"\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/\" aria-label=\"Read more about \u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c\">\u9605\u8bfb\u66f4\u591a<\/a><\/p>\n","protected":false},"author":3,"featured_media":97779,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2516,2517],"tags":[],"class_list":["post-96107","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-","category-2517","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c<\/title>\n<meta name=\"description\" content=\"\u4e0b\u8f7d\u9002\u7528\u4e8e Excel \u7684\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff0c\u4e86\u89e3\u5982\u4f55\u5408\u7406\u5b89\u6392\u4efb\u52a1\uff0c\u4ee5\u53ca\u751f\u4ea7\u53d1\u751f\u53d8\u5316\u65f6 SkyPlanner \u5982\u4f55\u8c03\u6574\u8ba1\u5212\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c\" \/>\n<meta property=\"og:description\" content=\"\u4e0b\u8f7d\u9002\u7528\u4e8e Excel \u7684\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff0c\u4e86\u89e3\u5982\u4f55\u5408\u7406\u5b89\u6392\u4efb\u52a1\uff0c\u4ee5\u53ca\u751f\u4ea7\u53d1\u751f\u53d8\u5316\u65f6 SkyPlanner \u5982\u4f55\u8c03\u6574\u8ba1\u5212\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-04T04:30:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:42:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u4f5c\u8005\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/production-schedule-template\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/production-schedule-template\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c\",\"datePublished\":\"2026-10-04T04:30:32+00:00\",\"dateModified\":\"2026-10-19T14:42:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/production-schedule-template\\\/\"},\"wordCount\":76,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/production-schedule-template\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"articleSection\":[\"APS \u4e0e\u6392\u7a0b\",\"\u8d44\u6e90\"],\"inLanguage\":\"zh-CN\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/production-schedule-template\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/production-schedule-template\\\/\",\"name\":\"\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/production-schedule-template\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/production-schedule-template\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"datePublished\":\"2026-10-04T04:30:32+00:00\",\"dateModified\":\"2026-10-19T14:42:42+00:00\",\"description\":\"\u4e0b\u8f7d\u9002\u7528\u4e8e Excel \u7684\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff0c\u4e86\u89e3\u5982\u4f55\u5408\u7406\u5b89\u6392\u4efb\u52a1\uff0c\u4ee5\u53ca\u751f\u4ea7\u53d1\u751f\u53d8\u5316\u65f6 SkyPlanner \u5982\u4f55\u8c03\u6574\u8ba1\u5212\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/production-schedule-template\\\/#breadcrumb\"},\"inLanguage\":\"zh-CN\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/production-schedule-template\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/production-schedule-template\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"width\":1672,\"height\":941,\"caption\":\"Two groups of components waiting for one machining resource in a manufacturing production schedule\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/production-schedule-template\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-CN\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c","description":"\u4e0b\u8f7d\u9002\u7528\u4e8e Excel \u7684\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff0c\u4e86\u89e3\u5982\u4f55\u5408\u7406\u5b89\u6392\u4efb\u52a1\uff0c\u4ee5\u53ca\u751f\u4ea7\u53d1\u751f\u53d8\u5316\u65f6 SkyPlanner \u5982\u4f55\u8c03\u6574\u8ba1\u5212\u3002","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/","og_locale":"zh_CN","og_type":"article","og_title":"\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c","og_description":"\u4e0b\u8f7d\u9002\u7528\u4e8e Excel \u7684\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff0c\u4e86\u89e3\u5982\u4f55\u5408\u7406\u5b89\u6392\u4efb\u52a1\uff0c\u4ee5\u53ca\u751f\u4ea7\u53d1\u751f\u53d8\u5316\u65f6 SkyPlanner \u5982\u4f55\u8c03\u6574\u8ba1\u5212\u3002","og_url":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-04T04:30:32+00:00","article_modified_time":"2026-10-19T14:42:42+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\u4f5c\u8005":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c","datePublished":"2026-10-04T04:30:32+00:00","dateModified":"2026-10-19T14:42:42+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/"},"wordCount":76,"publisher":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","articleSection":["APS \u4e0e\u6392\u7a0b","\u8d44\u6e90"],"inLanguage":"zh-CN"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/","url":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/","name":"\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c","isPartOf":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","datePublished":"2026-10-04T04:30:32+00:00","dateModified":"2026-10-19T14:42:42+00:00","description":"\u4e0b\u8f7d\u9002\u7528\u4e8e Excel \u7684\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff0c\u4e86\u89e3\u5982\u4f55\u5408\u7406\u5b89\u6392\u4efb\u52a1\uff0c\u4ee5\u53ca\u751f\u4ea7\u53d1\u751f\u53d8\u5316\u65f6 SkyPlanner \u5982\u4f55\u8c03\u6574\u8ba1\u5212\u3002","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/#breadcrumb"},"inLanguage":"zh-CN","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/"]}]},{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","width":1672,"height":941,"caption":"Two groups of components waiting for one machining resource in a manufacturing production schedule"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-schedule-template\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/zh-hans\/"},{"@type":"ListItem","position":2,"name":"\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/zh-hans\/#website","url":"https:\/\/skyplanner.ai\/zh-hans\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/zh-hans\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-CN"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/zh-hans\/","logo":{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/zh-hans\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u5236\u9020\u4e1a\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff1a\u8ba9\u4efb\u52a1\u6392\u5f97\u4e0b\u3001\u505a\u5f97\u5b8c \u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\u80fd\u8ba9\u8ba2\u5355\u5728\u8868\u4e0a\u6709\u4e2a\u4f4d\u7f6e\u3002\u66f4\u96be\u7684\u95ee\u9898\u662f\uff0c\u8fd9\u4e9b\u8ba2\u5355\u5728\u5de5\u5382\u91cc\u662f\u5426\u4e5f\u6392\u5f97\u4e0b\uff1a\u6709\u6ca1\u6709\u53ef\u7528\u7684\u8bbe\u5907\u3001\u5408\u9002\u7684\u64cd\u4f5c\u4eba\u5458\uff0c\u80fd\u5426\u53ca\u65f6\u5b8c\u6210\u5de5\u5e8f\uff0c\u65e2\u4e0d\u803d\u8bef\u4e0b\u4e00\u9053\u5de5\u5e8f\uff0c\u4e5f\u4e0d\u5f71\u54cd\u5ba2\u6237\u4ea4\u671f\u3002 \u4e0b\u8f7d\u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\uff08\u9002\u7528\u4e8e Excel \u7684 CSV \u6587\u4ef6\uff09\u3002\u8fd9\u662f\u4e00\u4e2a\u7b80\u5355\u7684\u5236\u9020\u4e1a\u793a\u4f8b\uff0c\u60a8\u53ef\u4ee5\u6309\u9700\u4fee\u6539\uff0c\u6bcf\u884c\u5bf9\u5e94\u4e00\u9053\u5de5\u5e8f\u3002\u4e0b\u8868\u5c55\u793a\u4e86\u5176\u4e2d\u7684\u4e24\u9879\u793a\u4f8b\u751f\u4ea7\u4efb\u52a1\uff1b\u4e0b\u8f7d\u6587\u4ef6\u4e2d\u540c\u65f6\u5305\u542b\u5b8c\u6574\u65e5\u671f\u548c\u65f6\u95f4\u3002 \u8ba2\u5355 \/ \u5de5\u5e8f \u8bbe\u5907 \/ \u64cd\u4f5c\u4eba\u5458 \u51c6\u5907\u65f6\u95f4\uff08\u5206\u949f\uff09 \u52a0\u5de5\u65f6\u95f4\uff08\u5206\u949f\uff09 \u5f00\u59cb\u65f6\u95f4 \u7ed3\u675f\u65f6\u95f4 \u8981\u6c42\u5b8c\u6210\u65f6\u95f4 \u72b6\u6001 A \/ A-10 M1 \/ O1 30 120 08:00 10:30 12:00 \u5df2\u8ba1\u5212 B \/ B-10 M1 \/ O1 15 180 10:30 13:45 16:00 \u5df2\u8ba1\u5212 \u60a8\u53ef\u4ee5\u7528\u8fd9\u4e2a\u6a21\u677f\u4e86\u89e3\u6392\u7a0b\u6240\u9700\u7684\u6570\u636e\uff0c\u5e76\u6d4b\u8bd5\u7b80\u5355\u7684\u52a0\u5de5\u987a\u5e8f\u3002\u5982\u679c\u751f\u4ea7\u8ba1\u5212\u9700\u8981\u5728\u65b0\u589e\u8ba2\u5355\u3001\u5ef6\u8bef\u548c\u4ea7\u80fd\u53d8\u5316\u540e\u4ecd\u7136\u53ef\u7528\uff0c\u5e94\u4f7f\u7528 SkyPlanner APS \u6765\u8ba1\u7b97\u6392\u7a0b\u3002\u7535\u5b50\u8868\u683c\u53ef\u4ee5\u5c55\u793a\u60a8\u9009\u5b9a\u7684\u5f00\u59cb\u65f6\u95f4\uff1bSkyPlanner \u5219\u8d1f\u8d23\u6839\u636e\u73b0\u6709\u4ea7\u80fd\u5b89\u6392\u5404\u9053\u5de5\u5e8f\u3002 \u751f\u4ea7\u8ba1\u5212\u8868\u6a21\u677f\u5e94\u8be5\u544a\u8bc9\u60a8\u4ec0\u4e48\uff1f \u5236\u9020\u4e1a\u751f\u4ea7\u6392\u7a0b\u8981\u786e\u5b9a\u5404\u9879\u751f\u4ea7\u4efb\u52a1\u5728\u4ec0\u4e48\u65f6\u95f4\u3001\u7531\u54ea\u4e9b\u8d44\u6e90\u5b8c\u6210\u3002\u7ec6\u5316\u5230\u5de5\u5e8f\u5c42\u9762\uff0c\u5b83\u5e94\u8be5\u56de\u7b54\u56db\u4e2a\u95ee\u9898\uff1a \u505a\u4ec0\u4e48\uff1f\u660e\u786e\u8ba2\u5355\u53ca\u5177\u4f53\u5de5\u5e8f\uff0c\u800c\u4e0d\u53ea\u662f\u586b\u5199\u4ea7\u54c1\u540d\u79f0\u3002 \u5728\u54ea\u91cc\u505a\uff1f\u660e\u786e\u6240\u7528\u8bbe\u5907\u6216\u5de5\u4f5c\u4e2d\u5fc3\uff0c\u4ee5\u53ca\u5b8c\u6210\u4efb\u52a1\u6240\u9700\u7684\u4eba\u5458\u3002 \u4ec0\u4e48\u65f6\u5019\u80fd\u505a\uff1f\u8003\u8651\u51c6\u5907\u65f6\u95f4\u3001\u52a0\u5de5\u65f6\u95f4\u3001\u5de5\u4f5c\u65f6\u6bb5\uff0c\u4ee5\u53ca\u5f00\u5de5\u524d\u5fc5\u987b\u6ee1\u8db3\u7684\u6761\u4ef6\u3002 \u80fd\u6309\u65f6\u5b8c\u6210\u5417\uff1f\u5bf9\u7167\u5de5\u5e8f\u8981\u6c42\u5b8c\u6210\u7684\u65f6\u95f4\u68c0\u67e5\u6392\u7a0b\u7ed3\u679c\uff0c\u540c\u65f6\u8003\u8651\u53d1\u8d27\u524d\u8fd8\u5269\u54ea\u4e9b\u5de5\u4f5c\u3002 \u6700\u540e\u8fd9\u4e00\u70b9\u9700\u8981\u7279\u522b\u5206\u6e05\u3002\u5982\u679c\u540e\u9762\u8fd8\u6709\u88c5\u914d\u3001\u68c0\u9a8c\u6216\u5305\u88c5\uff0c\u673a\u52a0\u5de5\u5de5\u5e8f\u5b8c\u6210\u5e76\u4e0d\u610f\u5473\u7740\u8ba2\u5355\u53ef\u4ee5\u53d1\u8d27\u3002\u5e94\u4e3a\u6bcf\u9053\u5de5\u5e8f\u8bbe\u5b9a\u8981\u6c42\u5b8c\u6210\u7684\u65f6\u95f4\uff0c\u4e3a\u540e\u7eed\u5de5\u4f5c\u7559\u51fa\u4f59\u91cf\u3002&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/96107","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/comments?post=96107"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/96107\/revisions"}],"predecessor-version":[{"id":96136,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/96107\/revisions\/96136"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/media\/97779"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/media?parent=96107"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/categories?post=96107"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/tags?post=96107"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}