{"id":85113,"date":"2023-06-27T16:59:05","date_gmt":"2023-06-27T16:59:05","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=85113"},"modified":"2026-10-15T08:45:47","modified_gmt":"2026-10-15T08:45:47","slug":"lean-manufacturing","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/","title":{"rendered":"\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8"},"content":{"rendered":"<div class=\"gb-container gb-container-zh-hans01\">\n\n<h1 class=\"wp-block-heading\" id=\"h-lean-manufacturing-efficiency-unlocked\">\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8<\/h1>\n\n\n<div class=\"gb-container gb-container-zh-hans02\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/\">\u9996\u9875<\/a>&nbsp;\u00bb&nbsp;<a href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/\">\u8d44\u6e90<\/a>&nbsp;\u00bb&nbsp;\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\uff1a <\/span><span class=\"yoast-reading-time__reading-time\">23<\/span><span class=\"yoast-reading-time__time-unit\"> \u5206\u949f<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-zh-hans03\">\n\n<p>\u60f3\u8c61\u4e00\u4e0b\uff1a\u60a8\u7684\u751f\u4ea7\u7ebf\u53d1\u751f\u62e5\u5835\u3002\u8ba2\u5355\u5806\u79ef\u5982\u5c71\u3002\u673a\u5668\u505c\u8f6c\u7684\u58f0\u97f3\u8ba9\u60a8\u5934\u75db\u4e0d\u5df2\u3002\u60a8\u7684\u516c\u53f8\u6b63\u9762\u4e34\u7740\u627c\u6740\u751f\u4ea7\u529b\u7684\u74f6\u9888\u3002\u5982\u679c\u8fd9\u79cd\u60c5\u666f\u542c\u8d77\u6765\u975e\u5e38\u719f\u6089\uff0c\u90a3\u4e48\u73b0\u5728\u6b63\u662f\u60a8\u4e86\u89e3\u7cbe\u76ca\u751f\u4ea7\u7684\u65f6\u5019\u4e86\u3002<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">TL;DR<\/h2>\n\n\n\n<p><strong>\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u4e13\u6ce8\u4e8e\u6700\u5927\u9650\u5ea6\u51cf\u5c11\u6d6a\u8d39\u5e76\u63d0\u9ad8\u751f\u4ea7\u6548\u7387\u7684\u65b9\u6cd5<\/strong>\u3002\u5b83\u878d\u5408\u4e86\u6301\u7eed\u6539\u8fdb\u3001\u5ba2\u6237\u6ee1\u610f\u5ea6\u548c\u667a\u80fd\u51b3\u7b56\u7684\u539f\u5219\u3002\u5f53\u4e0e Skyplanner \u7b49\u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b (APS) \u7cfb\u7edf\u7ed3\u5408\u4f7f\u7528\u65f6\uff0c\u5b83\u53ef\u4ee5\u663e\u8457\u63d0\u9ad8\u751f\u4ea7\u529b\u3002\u4e3b\u8981\u4f18\u52bf\u5305\u62ec\u6210\u672c\u8282\u7ea6\u3001\u66f4\u597d\u7684\u4ea7\u54c1\u8d28\u91cf\u3001\u5458\u5de5\u53c2\u4e0e\u5ea6\u3001\u7075\u6d3b\u6027\u3001\u73af\u5883\u8d23\u4efb\u548c\u7ade\u4e89\u4f18\u52bf\u3002\u7136\u800c\uff0c\u5b83\u53ef\u80fd\u4e0d\u9002\u7528\u4e8e\u9ad8\u5ea6\u5b9a\u5236\u5316\u6216\u5c0f\u6279\u91cf\u751f\u4ea7\u7684\u884c\u4e1a\u3002\u4ef7\u503c\u6d41\u56fe\u3001\u51ef\u5584\uff08Kaizen\uff09\u548c\u770b\u677f\u7b49\u5de5\u5177\u662f\u5bf9\u7cbe\u76ca\u751f\u4ea7\u7684\u8865\u5145\uff0c\u53ef\u5e2e\u52a9\u4f01\u4e1a\u7b80\u5316\u6d41\u7a0b\u5e76\u5728\u5f53\u4eca\u5e02\u573a\u4e2d\u84ec\u52c3\u53d1\u5c55\u3002<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u4ec0\u4e48\u662f\u7cbe\u76ca\u751f\u4ea7\uff1f<\/h2>\n\n\n<div class=\"gb-container gb-container-zh-hans04\"><div class=\"gb-inside-container\">\n\n<p><strong>\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u7cfb\u7edf\u5316\u7684\u65b9\u6cd5\uff0c\u65e8\u5728\u63d0\u9ad8\u751f\u4ea7\u8fc7\u7a0b\u4e2d\u7684\u6548\u7387\u3001\u751f\u4ea7\u529b\u548c\u4ef7\u503c\u3002<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>\u901a\u8fc7\u5728\u4fdd\u6301\u751f\u4ea7\u529b\u7684\u540c\u65f6\u4e13\u6ce8\u4e8e\u51cf\u5c11\u6d6a\u8d39\uff0c\u53ef\u4ee5\u7b80\u5316\u8fd0\u8425\u5e76\u6700\u7ec8\u63d0\u9ad8\u5229\u6da6\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-dcc34a4f gb-headline-text\">\u6574\u4f53\u65b9\u6cd5<\/h4>\n\n\n<div class=\"gb-container gb-container-zh-hans06\"><div class=\"gb-inside-container\">\n\n<p><strong>\u4ece\u6574\u4f53\u4e0a\u770b\uff0c\u7cbe\u76ca\u751f\u4ea7\u4e0d\u4ec5\u4ec5\u662f\u4e00\u79cd\u65b9\u6cd5\u8bba\uff1b\u5b83\u662f\u4e00\u79cd\u690d\u6839\u4e8e\u6301\u7eed\u6539\u8fdb\u548c\u5ba2\u6237\u6ee1\u610f\u5ea6\u7684\u54f2\u5b66\u3002<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>\u5b83\u53d6\u51b3\u4e8e\u505a\u51fa\u6709\u5229\u4e8e\u516c\u53f8\u3001\u5458\u5de5\u548c\u5ba2\u6237\u7684\u667a\u80fd\u9009\u62e9\uff0c\u901a\u8fc7\u964d\u4f4e\u6210\u672c\u5e76\u786e\u4fdd\u9ad8\u8d28\u91cf\u4ea7\u54c1\u7684\u53ca\u65f6\u4ea4\u4ed8\u3002\u5f53\u7cbe\u76ca\u751f\u4ea7\u4e0e<a href=\"https:\/\/skyplanner.ai\/zh-hans\/resources\/mes-system-what-it-is-and-what-it-does\/\">\u5236\u9020\u6267\u884c\u7cfb\u7edf<\/a> (MES) \u96c6\u6210\u65f6\uff0c\u5176\u6548\u76ca\u975e\u5e38\u663e\u8457\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-b9e25e36 gb-headline-text\">\u7cbe\u76ca\u751f\u4ea7 vs. \u51c6\u65f6\u5236\u751f\u4ea7\u65b9\u6cd5<\/h4>\n\n\n\n<p>\u867d\u7136\u7cbe\u76ca\u751f\u4ea7\u548c<a href=\"https:\/\/skyplanner.ai\/zh-hans\/resources\/just-in-time-manufacturing\/\">\u51c6\u65f6\u5236\u751f\u4ea7<\/a> (JIT) \u90fd\u65e8\u5728\u51cf\u5c11\u6d6a\u8d39\uff0c\u4f46\u5b83\u4eec\u6709\u6240\u4e0d\u540c\u3002JIT \u4e3b\u8981\u4fa7\u91cd\u4e8e\u51cf\u5c11\u5e93\u5b58\u548c\u589e\u5f3a\u8d27\u7269\u6d41\u52a8\u3002\u4e0e\u6b64\u540c\u65f6\uff0c\u7cbe\u76ca\u751f\u4ea7\u8d85\u51fa\u4e86\u8fd9\u4e00\u8303\u56f4\uff0c\u6db5\u76d6\u4e86\u5236\u9020\u8fc7\u7a0b\u7684\u6240\u6709\u65b9\u9762\uff0c\u5305\u62ec\u52b3\u52a8\u529b\u7ba1\u7406\u548c\u4f9b\u5e94\u5546\u5173\u7cfb\u3002<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u7cbe\u76ca\u751f\u4ea7\u662f\u5982\u4f55\u8fd0\u4f5c\u7684\uff1f<\/h2>\n\n\n\n<p>\u73b0\u4ee3\u5236\u9020\u4f01\u4e1a\u5229\u7528\u7cbe\u76ca\u751f\u4ea7\u6765\u4f18\u5316\u8d44\u6e90\uff0c\u4ece\u800c\u52a9\u529b\u53ef\u6301\u7eed\u53d1\u5c55\u3002\u901a\u8fc7\u51cf\u5c11\u6d6a\u8d39\uff0c\u8fd9\u79cd\u751f\u4ea7\u6a21\u5f0f\u652f\u6301\u73af\u4fdd\u5021\u8bae\uff0c\u786e\u4fdd\u4f01\u4e1a\u5728\u7ecf\u6d4e\u7e41\u8363\u7684\u540c\u65f6\u5bf9\u73af\u5883\u4ea7\u751f\u79ef\u6781\u5f71\u54cd\u3002<br><br>\u5bf9\u4e8e\u751f\u4ea7\u6392\u7a0b\u4eba\u5458\u6765\u8bf4\uff0c\u50cf <a href=\"https:\/\/skyplanner.ai\/zh-hans\/%e5%8a%9f%e8%83%bd\/\">Skyplanner<\/a> \u8fd9\u6837\u7684\u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b (APS) \u7cfb\u7edf\u662f\u8be5\u65b9\u6cd5\u8bba\u7684\u7ec8\u6781\u4f19\u4f34\u3002APS \u8f6f\u4ef6\u786e\u4fdd\u4e86\u4fe1\u606f\u7684\u65e0\u7f1d\u6d41\u52a8\uff0c\u8fd9\u5bf9\u4e8e\u5728\u7cbe\u76ca\u73af\u5883\u4e2d\u505a\u51fa\u5feb\u901f\u4e14\u660e\u667a\u7684\u51b3\u7b56\u81f3\u5173\u91cd\u8981\u3002<br><br><a href=\"https:\/\/skyplanner.ai\/zh-hans\/resources\/excel-production-planning-challenges-and-the-superior-alternative-skyplanner-aps\/\">Excel \u751f\u4ea7\u8ba1\u5212\u7684\u5c40\u9650\u6027<\/a>\u53ef\u80fd\u4f1a\u901a\u8fc7\u5f15\u5165\u4f4e\u6548\u548c\u9519\u8bef\u800c\u5bf9\u7cbe\u76ca\u751f\u4ea7\u4ea7\u751f\u8d1f\u9762\u5f71\u54cd\u3002\u7cbe\u76ca\u751f\u4ea7\u5f3a\u8c03\u7b80\u5316\u6d41\u7a0b\u548c\u51cf\u5c11\u6d6a\u8d39\uff0c\u4f46 Excel \u5728\u7528\u4e8e\u590d\u6742\u7684\u751f\u4ea7\u8ba1\u5212\u65f6\uff0c\u5bb9\u6613\u51fa\u73b0\u624b\u52a8\u6570\u636e\u5f55\u5165\u9519\u8bef\u3001\u7f3a\u4e4f\u5b9e\u65f6\u66f4\u65b0\u4ee5\u53ca\u5171\u4eab\u548c\u534f\u4f5c\u56f0\u96be\u7b49\u95ee\u9898\u3002\u8fd9\u4e9b\u7f3a\u70b9\u4f1a\u62b5\u6d88\u7cbe\u76ca\u751f\u4ea7\u7684\u539f\u5219\uff0c\u5bfc\u81f4\u5ef6\u8fdf\u3001\u8d44\u6e90\u5206\u914d\u4e0d\u5f53\u4ee5\u53ca\u65e0\u6cd5\u6709\u6548\u76d1\u63a7\u548c\u51cf\u5c11\u6d6a\u8d39\u3002\u56e0\u6b64\uff0c\u8fd9\u963b\u788d\u4e86\u6301\u7eed\u6539\u8fdb\u548c\u6548\u7387\u6700\u5927\u5316\u7b49\u7cbe\u76ca\u76ee\u6807\u7684\u5b9e\u73b0\u3002<\/p>\n\n\n\n<figure class=\"gb-block-image gb-block-image-2ccb3349\"><img decoding=\"async\" width=\"2160\" height=\"1131\" class=\"gb-image gb-image-2ccb3349\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5.png\" alt=\"\" title=\"Display wide 5\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5.png 2160w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 2160px) 100vw, 2160px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u7cbe\u76ca\u751f\u4ea7\u7684 8 \u5927\u6d6a\u8d39<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-f14e67cc gb-headline-text\">1.- \u7f3a\u9677<\/h4>\n\n\n\n<p>\u4ea7\u54c1\u6216\u6d41\u7a0b\u4e2d\u7684\u7f3a\u9677\u662f\u91cd\u5927\u7684\u6d6a\u8d39\u3002\u5b83\u4eec\u4f1a\u5bfc\u81f4\u8fd4\u5de5\u3001\u62a5\u5e9f\u548c\u5ba2\u6237\u4e0d\u6ee1\u3002\u7cbe\u76ca\u65b9\u6cd5\u8bba\u65e8\u5728\u8bc6\u522b\u5e76\u6d88\u9664\u7f3a\u9677\u7684\u6839\u672c\u539f\u56e0\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-711103e5 gb-headline-text\">2.- \u8fc7\u91cf\u751f\u4ea7<\/h4>\n\n\n\n<p>\u751f\u4ea7\u8d85\u8fc7\u6240\u9700\u7684\u91cf\u662f\u6d6a\u8d39\u3002\u8be5\u65b9\u6cd5\u8bba\u4e13\u6ce8\u4e8e\u6839\u636e\u5ba2\u6237\u9700\u6c42\u4ec5\u751f\u4ea7\u6240\u9700\u7684\u4ea7\u54c1\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-914dffb1 gb-headline-text\">3.- \u7b49\u5f85<\/h4>\n\n\n\n<p>\u8d44\u6e90\u672a\u88ab\u5229\u7528\u65f6\u7684\u95f2\u7f6e\u65f6\u95f4\u662f\u6d6a\u8d39\u3002\u7cbe\u76ca\u751f\u4ea7\u65e8\u5728\u4fdd\u6301\u8fd0\u8425\u987a\u7545\u6d41\u52a8\uff0c\u4e0d\u4ea7\u751f\u5ef6\u8fdf\u6216\u74f6\u9888\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a901716e gb-headline-text\">4.- \u672a\u80fd\u5229\u7528\u4eba\u624d<\/h4>\n\n\n\n<p>\u672a\u80fd\u5229\u7528\u5458\u5de5\u7684\u6280\u80fd\u548c\u624d\u534e\u4f1a\u5bfc\u81f4\u4eba\u529b\u8d44\u6e90\u7684\u6d6a\u8d39\u3002\u8fd9\u79cd\u65b9\u6cd5\u5305\u62ec\u8ba9\u5458\u5de5\u53c2\u4e0e\u5e76\u8d4b\u80fd\u4e8e\u5458\u5de5\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-ae582ff9 gb-headline-text\">5.- \u8fd0\u8f93<\/h4>\n\n\n\n<p>\u4e0d\u5fc5\u8981\u7684\u7269\u6599\u79fb\u52a8\u4f1a\u589e\u52a0\u6210\u672c\u548c\u98ce\u9669\u3002\u8fd9\u79cd\u65b9\u6cd5\u901a\u8fc7\u6539\u8fdb\u5e03\u5c40\u548c\u5de5\u827a\u6d41\u7a0b\u6765\u4f18\u5316\u7269\u6599\u7684\u79fb\u52a8\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-3e0d3250 gb-headline-text\">6.- \u5e93\u5b58<\/h4>\n\n\n\n<p>\u8fc7\u5269\u5e93\u5b58\u4f1a\u5360\u7528\u8d44\u91d1\u548c\u7a7a\u95f4\u3002\u7cbe\u76ca\u751f\u4ea7\u4e13\u6ce8\u4e8e\u5c06\u5e93\u5b58\u51cf\u5c11\u5230\u7ef4\u6301\u987a\u7545\u8fd0\u8425\u6240\u9700\u7684\u6700\u4f4e\u9650\u5ea6\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-aa772230 gb-headline-text\">7.- \u52a8\u4f5c<\/h4>\n\n\n\n<p>\u5de5\u4eba\u4e0d\u5fc5\u8981\u7684\u52a8\u4f5c\u9020\u6210\u7684\u6d6a\u8d39\u662f\u5e38\u89c1\u7684\u3002\u7cbe\u76ca\u65b9\u6cd5\u8bba\u901a\u8fc7\u4f18\u5316\u5de5\u4f5c\u7ad9\u548c\u51cf\u5c11\u52a8\u4f5c\u6d6a\u8d39\u6765\u63d0\u9ad8\u751f\u4ea7\u529b\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-cbdb11f2 gb-headline-text\">8.- \u8fc7\u5ea6\u52a0\u5de5<\/h4>\n\n\n\n<p>\u505a\u8d85\u51fa\u5fc5\u8981\u7684\u5de5\u4f5c\uff0c\u4f8b\u5982\u5bf9\u4ea7\u54c1\u8fdb\u884c\u8fc7\u5ea6\u8bbe\u8ba1\uff0c\u662f\u4e00\u79cd\u6d6a\u8d39\u3002\u8fd9\u79cd\u65b9\u6cd5\u901a\u8fc7\u4e13\u6ce8\u4e8e\u5ba2\u6237\u9700\u6c42\u6765\u6d88\u9664\u8fd9\u4e9b\u6d6a\u8d39\u3002<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u91ca\u653e\u7cbe\u76ca\u751f\u4ea7\u7684\u6548\u76ca<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-99e5be4f gb-headline-text\">\u63d0\u9ad8\u751f\u4ea7\u529b<\/h4>\n\n\n\n<p>\u7cbe\u76ca\u751f\u4ea7\u901a\u8fc7\u7b80\u5316\u6d41\u7a0b\u548c\u6709\u6548\u5206\u914d\u8d44\u6e90\u663e\u8457\u63d0\u9ad8\u751f\u4ea7\u529b\u3002\u8fd9\u662f\u901a\u8fc7\u51cf\u5c11\u7b49\u5f85\u65f6\u95f4\u3001\u63d0\u4f9b\u66f4\u987a\u7545\u7684\u7269\u6599\u6d41\u4ee5\u53ca\u786e\u4fdd\u6bcf\u9879\u64cd\u4f5c\u90fd\u80fd\u8fc5\u901f\u6709\u6548\u5730\u6267\u884c\u6765\u5b9e\u73b0\u7684\u3002\u6b64\u5916\uff0c\u901a\u8fc7\u6301\u7eed\u6539\u8fdb\u7684\u65b9\u6cd5\uff0c\u751f\u4ea7\u5468\u671f\u4e0d\u65ad\u5f97\u5230\u4f18\u5316\u3002\u6700\u7ec8\u6548\u679c\u662f\u5728\u76f8\u540c\u7684\u65f6\u95f4\u5185\u751f\u4ea7\u51fa\u66f4\u591a\u7684\u4ea7\u54c1\uff0c\u8fd9\u610f\u5473\u7740\u4ea7\u51fa\u91cf\u7684\u589e\u52a0\uff0c\u5e76\u6700\u7ec8\u5e26\u52a8\u9500\u552e\u989d\u7684\u589e\u957f\u3002<a href=\"https:\/\/skyplanner.ai\/zh-hans\/resources\/how-to-optimize-lead-time-in-manufacturing\/\">\u63a2\u7d22\u7f29\u77ed\u4ea4\u8d27\u671f\u7684\u4f18\u52bf\u3002<\/a><br><br>\u63d0\u9ad8\u751f\u4ea7\u529b\u7684\u76f4\u63a5\u7ed3\u679c\u662f\u80fd\u591f\u5feb\u901f\u54cd\u5e94\u5e02\u573a\u9700\u6c42\u3002\u5728\u5ba2\u6237\u504f\u597d\u4e0d\u65ad\u53d8\u5316\u7684\u5feb\u8282\u594f\u5e02\u573a\u4e2d\uff0c\u8fd9\u4e00\u70b9\u5c24\u4e3a\u91cd\u8981\u3002\u5229\u7528\u7cbe\u76ca\u751f\u4ea7\u539f\u5219\u7684\u751f\u4ea7\u6392\u7a0b\u4eba\u5458\u53ef\u4ee5\u7075\u6d3b\u5730\u9002\u5e94\u53d8\u5316\uff0c\u786e\u4fdd\u5236\u9020\u8fc7\u7a0b\u59cb\u7ec8\u4e0e\u5e02\u573a\u9700\u6c42\u4fdd\u6301\u4e00\u81f4\uff0c\u7edd\u4e0d\u9519\u5931\u826f\u673a\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-25cb9422 gb-headline-text\">\u964d\u4f4e\u6210\u672c<\/h4>\n\n\n\n<p>\u7cbe\u76ca\u751f\u4ea7\u7684\u8bbe\u8ba1\u521d\u8877\u662f\u51cf\u5c11\u5236\u9020\u8fc7\u7a0b\u4e2d\u7684\u5404\u79cd\u5f62\u5f0f\u7684\u6d6a\u8d39\u3002\u65e0\u8bba\u662f\u7531\u4e8e\u8fc7\u91cf\u751f\u4ea7\u3001\u7f3a\u9677\u8fd8\u662f\u4e0d\u5fc5\u8981\u7684\u52a8\u4f5c\u548c\u8fd0\u8f93\u9020\u6210\u7684\u6d6a\u8d39\uff0c\u524a\u51cf\u8fd9\u4e9b\u6d6a\u8d39\u90fd\u610f\u5473\u7740\u964d\u4f4e\u751f\u4ea7\u6210\u672c\u3002\u6b64\u5916\uff0c\u901a\u8fc7\u4f18\u5316\u5e93\u5b58\u6c34\u5e73\uff0c\u4f01\u4e1a\u53ef\u4ee5\u91ca\u653e\u539f\u672c\u4f1a\u88ab\u5e93\u5b58\u5360\u7528\u7684\u8d44\u91d1\u3002\u8fd9\u6709\u52a9\u4e8e\u964d\u4f4e\u642c\u8fd0\u548c\u5b58\u50a8\u6210\u672c\uff0c\u5e76\u6700\u5927\u9650\u5ea6\u5730\u964d\u4f4e\u4e0e\u5e93\u5b58\u8d2c\u503c\u6216\u8fc7\u65f6\u76f8\u5173\u7684\u98ce\u9669\u3002<br><br>\u6210\u672c\u964d\u4f4e\u7684\u53e6\u4e00\u4e2a\u65b9\u9762\u5728\u4e8e\u8282\u80fd\u3002\u7531\u4e8e\u7cbe\u76ca\u751f\u4ea7\u5f3a\u8c03\u8d44\u6e90\u7684\u6709\u6548\u5229\u7528\uff0c\u5b83\u672c\u8d28\u4e0a\u4fc3\u8fdb\u4e86\u8282\u80fd\u8fd0\u8425\u3002\u8fd9\u53ef\u4ee5\u901a\u8fc7\u4f18\u5316\u673a\u5668\u4f7f\u7528\u3001\u51cf\u5c11\u62a5\u5e9f\uff08\u8fd9\u610f\u5473\u7740\u51cf\u5c11\u539f\u6750\u6599\u4f7f\u7528\uff09\uff0c\u751a\u81f3\u662f\u7b80\u5316\u5e03\u5c40\u4ee5\u964d\u4f4e\u80fd\u6e90\u6210\u672c\u6765\u5b9e\u73b0\u3002\u4ece\u957f\u8fdc\u6765\u770b\uff0c\u8fd9\u4e9b\u8282\u7ea6\u4e3a\u516c\u53f8\u7684\u8d22\u52a1\u5065\u5eb7\u505a\u51fa\u4e86\u91cd\u5927\u8d21\u732e\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-04bb9277 gb-headline-text\">\u589e\u5f3a\u5ba2\u6237\u6ee1\u610f\u5ea6<\/h4>\n\n\n\n<p>\u5728\u7cbe\u76ca\u751f\u4ea7\u4e2d\uff0c\u5ba2\u6237\u662f\u6838\u5fc3\u3002\u901a\u8fc7\u4e13\u6ce8\u4e8e\u4e3a\u5ba2\u6237\u521b\u9020\u4ef7\u503c\uff0c\u4f01\u4e1a\u53ef\u4ee5\u786e\u4fdd\u4ea7\u54c1\u91cf\u8eab\u5b9a\u5236\uff0c\u4ee5\u6ee1\u8db3\u6216\u8d85\u8d8a\u5ba2\u6237\u7684\u671f\u671b\u3002\u8fd9\u5305\u62ec\u9ad8\u8d28\u91cf\u7684\u4ea7\u54c1\u3001\u53ca\u65f6\u7684\u4ea4\u4ed8\uff0c\u751a\u81f3\u662f\u53ef\u4ee5\u901a\u8fc7\u5177\u6709\u7ade\u4e89\u529b\u7684\u4ef7\u683c\u56de\u9988\u7ed9\u5ba2\u6237\u7684\u6210\u672c\u8282\u7ea6\u3002<br><br>\u6b64\u5916\uff0c\u51ed\u501f\u7cbe\u76ca\u751f\u4ea7\u5e26\u6765\u7684\u589e\u5f3a\u7075\u6d3b\u6027\uff0c\u4f01\u4e1a\u53ef\u4ee5\u5feb\u901f\u9002\u5e94\u5ba2\u6237\u4e0d\u65ad\u53d8\u5316\u7684\u9700\u6c42\u3002\u65e0\u8bba\u662f\u4ea7\u54c1\u529f\u80fd\u7684\u4fee\u6539\u8fd8\u662f\u7d27\u6025\u8ba2\u5355\uff0c\u7cbe\u76ca\u6d41\u7a0b\u90fd\u80fd\u987a\u5229\u5730\u5bb9\u7eb3\u8fd9\u4e9b\u53d8\u5316\u3002\u8fd9\u79cd\u654f\u6377\u6027\u4e0d\u4ec5\u8ba9\u73b0\u6709\u5ba2\u6237\u611f\u5230\u6ee1\u610f\uff0c\u8fd8\u4f7f\u516c\u53f8\u5bf9\u6f5c\u5728\u5ba2\u6237\u66f4\u5177\u5438\u5f15\u529b\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-ff570909 gb-headline-text\">\u63d0\u5347\u8d28\u91cf<\/h4>\n\n\n\n<p>\u7cbe\u76ca\u751f\u4ea7\u662f\u8d28\u91cf\u63d0\u5347\u7684\u4ee3\u540d\u8bcd\u3002\u901a\u8fc7\u5728\u751f\u4ea7\u8fc7\u7a0b\u7684\u6bcf\u4e2a\u9636\u6bb5\u91c7\u7528\u6839\u672c\u539f\u56e0\u5206\u6790\u548c\u8d28\u91cf\u63a7\u5236\u7b49\u5de5\u5177\uff0c\u7cbe\u76ca\u751f\u4ea7\u786e\u4fdd\u5728\u7f3a\u9677\u53d8\u5f97\u8fc7\u4e8e\u6602\u8d35\u4e4b\u524d\u5c06\u5176\u6d88\u9664\u6216\u53ca\u65e9\u53d1\u73b0\u3002\u6301\u7eed\u6539\u8fdb\u4f5c\u4e3a\u7cbe\u76ca\u751f\u4ea7\u7684\u57fa\u77f3\uff0c\u4e5f\u786e\u4fdd\u4e86\u6d41\u7a0b\u4e0d\u65ad\u6f14\u8fdb\u548c\u8c03\u6574\uff0c\u4ee5\u6ee1\u8db3\u6700\u9ad8\u7684\u8d28\u91cf\u6807\u51c6\u3002<br><br>\u63d0\u5347\u8d28\u91cf\u4e0d\u4ec5\u964d\u4f4e\u4e86\u4e0e\u62a5\u5e9f\u548c\u8fd4\u5de5\u76f8\u5173\u7684\u6210\u672c\uff0c\u8fd8\u5efa\u7acb\u4e86\u54c1\u724c\u5728\u5e02\u573a\u4e0a\u7684\u58f0\u8a89\u3002\u4e00\u5bb6\u4ee5\u751f\u4ea7\u9ad8\u8d28\u91cf\u4ea7\u54c1\u800c\u95fb\u540d\u7684\u516c\u53f8\u66f4\u6709\u53ef\u80fd\u5438\u5f15\u66f4\u591a\u4e1a\u52a1\uff0c\u5e76\u4e14\u901a\u5e38\u53ef\u4ee5\u4e3a\u5176\u4ea7\u54c1\u8981\u6c42\u6ea2\u4ef7\uff0c\u8fd9\u4f1a\u6781\u5927\u5730\u5f71\u54cd\u8d22\u52a1\u7ed3\u679c\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-412aa6c4 gb-headline-text\">\u63d0\u9ad8\u5458\u5de5\u58eb\u6c14<\/h4>\n\n\n\n<p>\u7cbe\u76ca\u751f\u4ea7\u6d89\u53ca\u5e76\u5438\u5f15\u5404\u7ea7\u5458\u5de5\u7684\u53c2\u4e0e\u3002\u8d4b\u80fd\u5458\u5de5\u53c2\u4e0e\u89e3\u51b3\u95ee\u9898\u5e76\u9f13\u52b1\u4ed6\u4eec\u63d0\u51fa\u6539\u8fdb\u5efa\u8bae\uff0c\u4f1a\u8ba9\u4ed6\u4eec\u611f\u5230\u81ea\u5df1\u53d7\u5230\u91cd\u89c6\uff0c\u662f\u7ec4\u7ec7\u4e0d\u53ef\u6216\u7f3a\u7684\u4e00\u90e8\u5206\u3002\u8fd9\u79cd\u4e3b\u4eba\u7fc1\u611f\u548c\u8d21\u732e\u611f\u4f1a\u5e26\u6765\u66f4\u9ad8\u7684\u5de5\u4f5c\u6ee1\u610f\u5ea6\u3002\u6b64\u5916\uff0c\u7cbe\u76ca\u751f\u4ea7\u901a\u5e38\u4f1a\u5e26\u6765\u66f4\u5b89\u5168\u3001\u66f4\u6709\u6761\u7406\u7684\u5de5\u4f5c\u73af\u5883\u3002<br><br>\u901a\u8fc7 5S \u7b49\u5b9e\u8df5\uff0c\u5de5\u4f5c\u7a7a\u95f4\u4fdd\u6301\u6574\u6d01\u6709\u5e8f\uff0c\u63d0\u9ad8\u4e86\u6548\u7387\u5e76\u6709\u52a9\u4e8e\u5458\u5de5\u7684\u798f\u7949\u3002\u4e00\u652f\u79ef\u6781\u8fdb\u53d6\u4e14\u6ee1\u610f\u7684\u5458\u5de5\u961f\u4f0d\u66f4\u5177\u751f\u4ea7\u529b\uff0c\u4e14\u6d41\u5931\u7387\u66f4\u4f4e\uff0c\u8fd9\u6709\u5229\u4e8e\u516c\u53f8\u7684\u957f\u671f\u6210\u529f\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6636b964 gb-headline-text\">\u66f4\u5927\u7684\u7075\u6d3b\u6027<\/h4>\n\n\n\n<p>\u5728\u52a8\u6001\u7684\u5e02\u573a\u73af\u5883\u4e2d\uff0c\u7075\u6d3b\u6027\u662f\u751f\u5b58\u548c\u53d1\u5c55\u7684\u5173\u952e\u3002\u7cbe\u76ca\u751f\u4ea7\u5f3a\u8c03\u6548\u7387\u548c\u51cf\u5c11\u6d6a\u8d39\uff0c\u672c\u8d28\u4e0a\u4fc3\u8fdb\u4e86\u7075\u6d3b\u7684\u751f\u4ea7\u8fc7\u7a0b\u3002\u901a\u8fc7\u770b\u677f\u548c\u5355\u5143\u5236\u9020\u7b49\u5b9e\u8df5\uff0c\u7cbe\u76ca\u751f\u4ea7\u5141\u8bb8\u5feb\u901f\u5207\u6362\u5e76\u9002\u5e94\u4e0d\u540c\u7684\u751f\u4ea7\u91cf\u548c\u7ec4\u5408\u3002<br><br>\u8fd9\u79cd\u7075\u6d3b\u6027\u4e0d\u4ec5\u9650\u4e8e\u751f\u4ea7\u8f66\u95f4\u3002\u5f53\u7cbe\u76ca\u601d\u7ef4\u6e17\u900f\u5230\u6574\u4e2a\u7ec4\u7ec7\u65f6\uff0c\u53ef\u4ee5\u5e26\u6765\u7075\u6d3b\u7684\u4ea7\u54c1\u5f00\u53d1\u3001\u4f9b\u5e94\u94fe\u7ba1\u7406\u548c\u5ba2\u6237\u670d\u52a1\u6d41\u7a0b\u3002\u5728\u5b9a\u5236\u5316\u548c\u5feb\u901f\u54cd\u5e94\u65f6\u95f4\u901a\u5e38\u662f\u7ade\u4e89\u4f18\u52bf\u7684\u65f6\u4ee3\uff0c\u7cbe\u76ca\u751f\u4ea7\u63d0\u4f9b\u7684\u7075\u6d3b\u6027\u662f\u65e0\u4ef7\u7684\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-52484489 gb-headline-text\">\u73af\u5883\u7ba1\u7406<\/h4>\n\n\n\n<p>\u5728\u73af\u4fdd\u610f\u8bc6\u4e0d\u4ec5\u662f\u8d8b\u52bf\u800c\u4e14\u662f\u5fc5\u7136\u8981\u6c42\u7684\u65f6\u4ee3\uff0c\u7cbe\u76ca\u65b9\u6cd5\u4e3a\u53ef\u6301\u7eed\u8fd0\u8425\u63d0\u4f9b\u4e86\u4e00\u6761\u8def\u5f84\u3002\u901a\u8fc7\u6700\u5927\u9650\u5ea6\u5730\u51cf\u5c11\u6d6a\u8d39\uff08\u65e0\u8bba\u662f\u6750\u6599\u62a5\u5e9f\u3001\u6392\u653e\u8fd8\u662f\u80fd\u6e90\u5f62\u5f0f\uff09\uff0c\u7cbe\u76ca\u751f\u4ea7\u6709\u52a9\u4e8e\u51cf\u5c11\u5236\u9020\u8fc7\u7a0b\u7684\u73af\u5883\u8db3\u8ff9\u3002\u6b64\u5916\uff0c\u8bb8\u591a\u7cbe\u76ca\u5de5\u5177\u548c\u6280\u672f\u4e0e\u7eff\u8272\u5236\u9020\u539f\u5219\u76f8\u4e00\u81f4\u3002<br><br>\u4f8b\u5982\uff0c\u4ef7\u503c\u6d41\u56fe\u53ef\u7528\u4e8e\u8bc6\u522b\u6d6a\u8d39\u5e76\u67e5\u660e\u53ef\u4ee5\u51cf\u5c11\u80fd\u6e90\u6d88\u8017\u6216\u4f18\u5316\u6750\u6599\u4f7f\u7528\u4ee5\u5b9e\u73b0\u53ef\u6301\u7eed\u53d1\u5c55\u7684\u9886\u57df\u3002\u8fd9\u79cd\u4e0e\u73af\u5883\u7ba1\u7406\u7684\u5951\u5408\u6709\u52a9\u4e8e\u6ee1\u8db3\u76d1\u7ba1\u8981\u6c42\uff0c\u5e76\u5438\u5f15\u65e5\u76ca\u589e\u957f\u7684\u73af\u4fdd\u610f\u8bc6\u5ba2\u6237\u7fa4\u4f53\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-2a35ba75 gb-headline-text\">\u7ade\u4e89\u4f18\u52bf<\/h4>\n\n\n\n<p>\u7cbe\u76ca\u751f\u4ea7\u901a\u8fc7\u5176\u5404\u79cd\u4f18\u52bf\uff08\u5982\u964d\u4f4e\u6210\u672c\u3001\u63d0\u9ad8\u8d28\u91cf\u3001\u5ba2\u6237\u6ee1\u610f\u5ea6\u548c\u7075\u6d3b\u6027\uff09\u6709\u52a9\u4e8e\u5efa\u7acb\u5f3a\u5927\u7684\u7ade\u4e89\u4f18\u52bf\u3002\u5728\u65e5\u76ca\u5168\u7403\u5316\u7684\u5e02\u573a\u4e2d\uff0c\u8fd9\u53ef\u80fd\u662f\u84ec\u52c3\u53d1\u5c55\u4e0e\u52c9\u5f3a\u751f\u5b58\u4e4b\u95f4\u7684\u533a\u522b\u3002<br><br>\u6b64\u5916\uff0c\u968f\u7740\u7cbe\u76ca\u601d\u7ef4\u5f00\u59cb\u5851\u9020\u7ec4\u7ec7\u6587\u5316\uff0c\u4f01\u4e1a\u901a\u5e38\u4f1a\u53d1\u73b0\u81ea\u5df1\u5904\u4e8e\u66f4\u597d\u7684\u521b\u65b0\u5730\u4f4d\u3002\u5bf9\u6539\u8fdb\u548c\u6548\u7387\u7684\u4e0d\u65ad\u8ffd\u6c42\uff0c\u52a0\u4e0a\u79ef\u6781\u53c2\u4e0e\u548c\u88ab\u8d4b\u80fd\u7684\u5458\u5de5\u961f\u4f0d\uff0c\u521b\u9020\u4e86\u4e00\u4e2a\u65b0\u60f3\u6cd5\u84ec\u52c3\u53d1\u5c55\u7684\u73af\u5883\u3002\u8fd9\u79cd\u521b\u65b0\u80fd\u529b\u8fdb\u4e00\u6b65\u5de9\u56fa\u4e86\u7ade\u4e89\u4f18\u52bf\uff0c\u786e\u4fdd\u516c\u53f8\u59cb\u7ec8\u5904\u4e8e\u884c\u4e1a\u524d\u6cbf\u3002<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-zh-hans25\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-zh-hans26\">\n\n<h2 class=\"wp-block-heading\">\u7cbe\u76ca\u751f\u4ea7\u7684\u6ce8\u610f\u4e8b\u9879<\/h2>\n\n\n\n<p>\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u4e2a\u5f3a\u5927\u7684\u5de5\u5177\uff0c\u4f46\u5b83\u4e0d\u662f\u4e07\u80fd\u7684\u89e3\u51b3\u65b9\u6848\u3002\u5b83\u9700\u8981\u6df1\u523b\u7684\u7406\u89e3\u548c\u8c28\u614e\u7684\u5b9e\u65bd\u3002<br><br>\u5728\u9ad8\u5ea6\u5b9a\u5236\u5316\u548c\u591a\u53d8\u6027\u7684\u884c\u4e1a\u4e2d\uff0c\u7cbe\u76ca\u65b9\u6cd5\u8bba\u7684\u6548\u679c\u53ef\u80fd\u8f83\u5dee\u3002\u6b64\u5916\uff0c\u5b83\u53ef\u80fd\u4e0d\u9002\u5408\u6781\u5c0f\u6279\u91cf\u7684\u751f\u4ea7\u73af\u5883\u3002<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u8865\u5145\u7cbe\u76ca\u751f\u4ea7\u7684\u5de5\u5177<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>\u4ef7\u503c\u6d41\u56fe\uff08VSM\uff09\uff1a\u4e00\u79cd\u7528\u4e8e\u53ef\u89c6\u5316\u7269\u6599\u4e0e\u4fe1\u606f\u6d41\u52a8\u7684\u5de5\u5177\u3002<\/li>\n\n\n\n<li><strong>\u6539\u5584\uff08Kaizen\uff09<\/strong>\uff1a\u8ba9\u5404\u5c42\u7ea7\u5458\u5de5\u53c2\u4e0e\u6301\u7eed\u6539\u8fdb\u7684\u7b56\u7565\u3002<\/li>\n\n\n\n<li><strong>5S \u7cfb\u7edf<\/strong>\uff1a\u4e00\u79cd\u63d0\u5347\u6548\u7387\u7684\u5de5\u4f5c\u573a\u6240\u7ec4\u7ec7\u65b9\u6cd5\u3002<\/li>\n\n\n\n<li>Kanban\uff08\u770b\u677f\uff09\uff1a\u4e00\u79cd\u7528\u4e8e\u7cbe\u76ca\u751f\u4ea7\u4e0e\u51c6\u65f6\u5316\u751f\u4ea7\u7684\u8c03\u5ea6\u5de5\u5177\u3002<\/li>\n\n\n\n<li><strong>\u5168\u9762\u751f\u4ea7\u7ef4\u62a4\uff08TPM\uff09<\/strong>\uff1a\u4e00\u79cd\u5f3a\u8c03\u8bbe\u5907\u53ef\u9760\u6027\u7684\u4e3b\u52a8\u7ef4\u62a4\u8ba1\u5212\u3002<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">\u5236\u80dc\u7ec4\u5408<\/h2>\n\n\n\n<p>\u901a\u8fc7\u5bf9 Skyplanner \u7684 APS \u7cfb\u7edf\u8fdb\u884c\u660e\u667a\u6295\u8d44\uff0c\u5e76\u8f85\u4ee5\u7cbe\u76ca\u751f\u4ea7\u539f\u5219\uff0c\u4e3a\u60a8\u7684\u5236\u9020\u6d41\u7a0b\u8d4b\u80fd\u3002\u4eab\u53d7\u964d\u4f4e\u6210\u672c\u3001\u63d0\u9ad8\u751f\u4ea7\u529b\u4ee5\u53ca\u654f\u6377\u54cd\u5e94\u7684\u751f\u4ea7\u7ebf\u5e26\u6765\u7684\u597d\u5904\uff0c\u907f\u514d\u74f6\u9888\u5e76\u5728\u73b0\u4ee3\u7ade\u4e89\u683c\u5c40\u4e2d\u84ec\u52c3\u53d1\u5c55\u3002\u73b0\u5728\u662f\u65f6\u5019\u91c7\u53d6\u884c\u52a8\uff0c\u5f7b\u5e95\u6539\u53d8\u60a8\u7684\u751f\u4ea7\u6392\u7a0b\u4e86\u3002\u8ba9 APS \u548c\u7cbe\u76ca\u751f\u4ea7\u52a9\u60a8\u8fc8\u5411\u6210\u529f\uff01<br><br>\u6211\u4eec\u7684<a href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%81%94%e7%b3%bb%e9%94%80%e5%94%ae\/\">\u4e13\u5bb6\u56e2\u961f<\/a>\u5df2\u51c6\u5907\u597d\u534f\u52a9\u60a8\u7684\u7cbe\u76ca\u751f\u4ea7\u4e4b\u65c5\u3002\u8054\u7cfb\u6211\u4eec\uff01\u5e76<a href=\"https:\/\/skyplanner.ai\/\">\u4e86\u89e3 Skyplanner APS \u7684\u4f18\u52bf\u3002<\/a><\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-609c09fb wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner \u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b Solutions to production problems\" class=\"uag-image-4232\" width=\"1024\" height=\"302\" title=\"\" loading=\"lazy\" role=\"img\" \/><\/figure><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">FAQ<\/h2>\n\n\n\n<p>\u672c\u8282\u6df1\u5165\u63a2\u8ba8\u6709\u5173\u7cbe\u76ca\u751f\u4ea7\u7684\u5e38\u89c1\u95ee\u9898\uff0c\u5e76\u9610\u660e Skyplanner \u7684\u9ad8\u7ea7\u8ba1\u5212\u7cfb\u7edf\u5982\u4f55\u589e\u5f3a\u60a8\u7684\u4e1a\u52a1\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-2e079e79 gb-headline-text\">\u4ec0\u4e48\u662f\u7cbe\u76ca\u751f\u4ea7\uff1f&nbsp;<\/h4>\n\n\n\n<p>\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u7cfb\u7edf\u5316\u7684\u65b9\u6cd5\uff0c\u65e8\u5728\u63d0\u9ad8\u751f\u4ea7\u8fc7\u7a0b\u4e2d\u7684\u6548\u7387\u3001\u751f\u4ea7\u529b\u548c\u4ef7\u503c\u3002\u901a\u8fc7\u5728\u4fdd\u6301\u9ad8\u751f\u4ea7\u529b\u7684\u540c\u65f6\u4e13\u6ce8\u4e8e\u51cf\u5c11\u6d6a\u8d39\uff0c\u8fd9\u79cd\u65b9\u6cd5\u53ef\u4ee5\u7b80\u5316\u8fd0\u8425\u5e76\u5e26\u6765\u5229\u6da6\u589e\u957f\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-80c52ee6 gb-headline-text\">\u8fd9\u79cd\u65b9\u6cd5\u4e0e\u51c6\u65f6\u5236\u751f\u4ea7\u6709\u4f55\u4e0d\u540c\uff1f<\/h4>\n\n\n\n<p>\u867d\u7136\u7cbe\u76ca\u751f\u4ea7\u548c\u51c6\u65f6\u5236\u751f\u4ea7 (JIT) \u90fd\u65e8\u5728\u51cf\u5c11\u6d6a\u8d39\uff0c\u4f46\u5b83\u4eec\u6709\u6240\u4e0d\u540c\u3002JIT \u4e3b\u8981\u4fa7\u91cd\u4e8e\u51cf\u5c11\u5e93\u5b58\u548c\u6539\u5584\u8d27\u7269\u6d41\u52a8\u3002\u53e6\u4e00\u65b9\u9762\uff0c\u7cbe\u76ca\u751f\u4ea7\u91c7\u53d6\u66f4\u5e7f\u6cdb\u7684\u65b9\u6cd5\uff0c\u6db5\u76d6\u5236\u9020\u8fc7\u7a0b\u7684\u6240\u6709\u65b9\u9762\uff0c\u5305\u62ec\u52b3\u52a8\u529b\u7ba1\u7406\u548c\u4f9b\u5e94\u5546\u5173\u7cfb\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-9c325e9d gb-headline-text\">\u7cbe\u76ca\u65b9\u6cd5\u80fd\u5426\u652f\u6301\u53ef\u6301\u7eed\u53d1\u5c55\u548c\u73af\u4fdd\u5021\u8bae\uff1f<\/h4>\n\n\n\n<p>\u662f\u7684\uff0c\u7cbe\u76ca\u751f\u4ea7\u53ef\u4ee5\u901a\u8fc7\u4f18\u5316\u8d44\u6e90\u5229\u7528\u548c\u51cf\u5c11\u6d6a\u8d39\u6765\u652f\u6301\u53ef\u6301\u7eed\u53d1\u5c55\u3002\u8fd9\u5177\u6709\u7ecf\u6d4e\u6548\u76ca\uff0c\u5e76\u6709\u52a9\u4e8e\u51cf\u5c11\u73af\u5883\u5f71\u54cd\uff0c\u4ece\u800c\u652f\u6301\u73af\u4fdd\u5021\u8bae\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-b34cc3f5 gb-headline-text\">\u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b (APS) \u7cfb\u7edf\u5728\u7cbe\u76ca\u751f\u4ea7\u4e2d\u7684\u4f5c\u7528\u662f\u4ec0\u4e48\uff1f&nbsp;<\/h4>\n\n\n\n<p>APS \u7cfb\u7edf\u5728\u7cbe\u76ca\u751f\u4ea7\u4e2d\u81f3\u5173\u91cd\u8981\uff0c\u56e0\u4e3a\u5b83\u4eec\u786e\u4fdd\u4e86\u4fe1\u606f\u7684\u65e0\u7f1d\u6d41\u52a8\uff0c\u8fd9\u5bf9\u4e8e\u505a\u51fa\u5feb\u901f\u4e14\u660e\u667a\u7684\u51b3\u7b56\u81f3\u5173\u91cd\u8981\u3002\u5728\u6548\u7387\u548c\u51cf\u5c11\u6d6a\u8d39\u4e3a\u5173\u952e\u7684\u7cbe\u76ca\u73af\u5883\u4e2d\uff0c\u8fd9\u662f\u5fc5\u4e0d\u53ef\u5c11\u7684\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-123a7395 gb-headline-text\">\u7cbe\u76ca\u751f\u4ea7\u4e2d\u7684\u516b\u5927\u6d6a\u8d39\u662f\u4ec0\u4e48\uff1f<\/h4>\n\n\n\n<p>\u516b\u5927\u6d6a\u8d39\u662f\uff1a\u7f3a\u9677\u3001\u8fc7\u91cf\u751f\u4ea7\u3001\u7b49\u5f85\u3001\u672a\u80fd\u5229\u7528\u4eba\u624d\u3001\u8fd0\u8f93\u3001\u5e93\u5b58\u3001\u52a8\u4f5c\u548c\u8fc7\u5ea6\u52a0\u5de5\u3002\u7cbe\u76ca\u751f\u4ea7\u65e8\u5728\u8bc6\u522b\u5e76\u6d88\u9664\u8fd9\u4e9b\u6d6a\u8d39\u4ee5\u63d0\u9ad8\u6548\u7387\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-9b054b0c gb-headline-text\">\u7cbe\u76ca\u65b9\u6cd5\u5982\u4f55\u63d0\u9ad8\u751f\u4ea7\u529b\uff1f<\/h4>\n\n\n\n<p>\u7cbe\u76ca\u751f\u4ea7\u901a\u8fc7\u7b80\u5316\u6d41\u7a0b\u548c\u6709\u6548\u5206\u914d\u8d44\u6e90\u6765\u63d0\u9ad8\u751f\u4ea7\u529b\u3002\u901a\u8fc7\u51cf\u5c11\u7b49\u5f85\u65f6\u95f4\u5e76\u786e\u4fdd\u66f4\u987a\u7545\u7684\u7269\u6599\u6d41\uff0c\u53ef\u4ee5\u5728\u76f8\u540c\u7684\u65f6\u95f4\u5185\u751f\u4ea7\u51fa\u66f4\u591a\u7684\u4ea7\u54c1\uff0c\u6700\u7ec8\u63d0\u9ad8\u9500\u552e\u989d\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-58136507 gb-headline-text\">\u8fd9\u79cd\u65b9\u6cd5\u8bba\u5728\u54ea\u4e9b\u65b9\u9762\u6709\u52a9\u4e8e\u964d\u4f4e\u6210\u672c\uff1f<\/h4>\n\n\n\n<p>\u7cbe\u76ca\u751f\u4ea7\u901a\u8fc7\u524a\u51cf\u751f\u4ea7\u4e2d\u5404\u79cd\u5f62\u5f0f\u7684\u6d6a\u8d39\u6765\u964d\u4f4e\u6210\u672c\u3002\u8fd9\u5305\u62ec\u51cf\u5c11\u8fc7\u91cf\u751f\u4ea7\u3001\u7f3a\u9677\u3001\u4e0d\u5fc5\u8981\u7684\u52a8\u4f5c\u548c\u8fd0\u8f93\u3002\u4f18\u5316\u5e93\u5b58\u6c34\u5e73\u548c\u4fc3\u8fdb\u8282\u80fd\u8fd0\u8425\u4e5f\u6709\u52a9\u4e8e\u964d\u4f4e\u6210\u672c\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-dfbeae82 gb-headline-text\">\u7cbe\u76ca\u65b9\u6cd5\u8bba\u5982\u4f55\u589e\u5f3a\u5ba2\u6237\u6ee1\u610f\u5ea6\uff1f<\/h4>\n\n\n\n<p>\u7cbe\u76ca\u751f\u4ea7\u4e13\u6ce8\u4e8e\u901a\u8fc7\u9ad8\u8d28\u91cf\u7684\u4ea7\u54c1\u3001\u53ca\u65f6\u7684\u4ea4\u4ed8\u548c\u6210\u672c\u8282\u7ea6\u6765\u4e3a\u5ba2\u6237\u521b\u9020\u4ef7\u503c\uff0c\u8fd9\u4e9b\u8282\u7ea6\u53ef\u4ee5\u901a\u8fc7\u5177\u6709\u7ade\u4e89\u529b\u7684\u4ef7\u683c\u4f20\u9012\u7ed9\u5ba2\u6237\u3002\u5b83\u8fd8\u5141\u8bb8\u4f01\u4e1a\u5feb\u901f\u9002\u5e94\u4e0d\u65ad\u53d8\u5316\u7684\u5ba2\u6237\u9700\u6c42\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4a3a3b72 gb-headline-text\">\u8fd9\u79cd\u65b9\u6cd5\u5bf9\u5458\u5de5\u58eb\u6c14\u6709\u4ec0\u4e48\u5f71\u54cd\uff1f<\/h4>\n\n\n\n<p>\u7cbe\u76ca\u751f\u4ea7\u5438\u5f15\u5404\u7ea7\u5458\u5de5\u53c2\u4e0e\uff0c\u5e76\u8d4b\u80fd\u4ed6\u4eec\u53c2\u4e0e\u89e3\u51b3\u95ee\u9898\u548c\u6301\u7eed\u6539\u8fdb\u3002\u8fd9\u79cd\u4e3b\u4eba\u7fc1\u611f\u548c\u8d21\u732e\u611f\u4f1a\u5e26\u6765\u66f4\u9ad8\u7684\u5de5\u4f5c\u6ee1\u610f\u5ea6\u548c\u66f4\u79ef\u6781\u8fdb\u53d6\u7684\u5458\u5de5\u961f\u4f0d\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-af2e5b69 gb-headline-text\">\u7cbe\u76ca\u751f\u4ea7\u6709\u4ec0\u4e48\u5c40\u9650\u6027\u5417\uff1f&nbsp;<\/h4>\n\n\n\n<p>\u662f\u7684\uff0c\u7cbe\u76ca\u751f\u4ea7\u53ef\u80fd\u4e0d\u9002\u7528\u4e8e\u5177\u6709\u9ad8\u5ea6\u5b9a\u5236\u5316\u548c\u591a\u53d8\u4ea7\u54c1\u7684\u884c\u4e1a\uff0c\u6216\u5c0f\u6279\u91cf\u751f\u4ea7\u73af\u5883\u3002\u5b83\u9700\u8981\u6df1\u523b\u7684\u7406\u89e3\u548c\u8c28\u614e\u7684\u5b9e\u65bd\u624d\u80fd\u594f\u6548\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-83f424c3 gb-headline-text\">\u6709\u54ea\u4e9b\u8865\u5145\u7cbe\u76ca\u751f\u4ea7\u7684\u5de5\u5177\uff1f<\/h4>\n\n\n\n<p>\u4e00\u4e9b\u8865\u5145\u7cbe\u76ca\u751f\u4ea7\u7684\u5de5\u5177\u5305\u62ec\u4ef7\u503c\u6d41\u56fe\u3001\u51ef\u5584\uff08Kaizen\uff09\u30015S \u7cfb\u7edf\u3001\u770b\u677f\u548c\u5168\u9762\u751f\u4ea7\u7ef4\u62a4 (TPM)\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-bde88add gb-headline-text\">\u8fd9\u79cd\u65b9\u6cd5\u5982\u4f55\u63d0\u4f9b\u7ade\u4e89\u4f18\u52bf\uff1f&nbsp;<\/h4>\n\n\n\n<p>\u7cbe\u76ca\u751f\u4ea7\u901a\u8fc7\u964d\u4f4e\u6210\u672c\u3001\u63d0\u9ad8\u8d28\u91cf\u3001\u5ba2\u6237\u6ee1\u610f\u5ea6\u548c\u7075\u6d3b\u6027\u6765\u5efa\u7acb\u7ade\u4e89\u4f18\u52bf\u3002\u6b64\u5916\uff0c\u5b83\u8425\u9020\u4e86\u4e00\u4e2a\u521b\u65b0\u73af\u5883\u5e76\u7b26\u5408\u73af\u5883\u7ba1\u7406\u8981\u6c42\uff0c\u4f7f\u516c\u53f8\u5728\u5e02\u573a\u4e2d\u5904\u4e8e\u6709\u5229\u5730\u4f4d\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-8a211508 gb-headline-text\">\u6211\u8be5\u5982\u4f55\u63d0\u5347\u6211\u7684\u5236\u9020\u6d41\u7a0b\u4ee5\u6ee1\u8db3\u73b0\u4ee3\u7ade\u4e89\u683c\u5c40\u7684\u9700\u6c42\uff1f<\/h4>\n\n\n\n<p>\u901a\u8fc7\u5bf9 Skyplanner \u7684\u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b (APS) \u7cfb\u7edf\u548c\u7cbe\u76ca\u751f\u4ea7\u539f\u5219\u8fdb\u884c\u6218\u7565\u6295\u8d44\uff0c\u4e3a\u60a8\u7684\u5236\u9020\u6d41\u7a0b\u8d4b\u80fd\u3002\u8fd9\u79cd\u7ec4\u5408\u65e8\u5728\u6539\u9020\u60a8\u7684\u751f\u4ea7\u7ebf\uff0c\u4f7f\u5176\u53d8\u5f97\u654f\u6377\u4e14\u54cd\u5e94\u8fc5\u901f\uff0c\u4ece\u800c\u907f\u514d\u74f6\u9888\u3002\u60a8\u5c06\u83b7\u5f97\u964d\u4f4e\u6210\u672c\u548c\u63d0\u9ad8\u751f\u4ea7\u529b\u7684\u597d\u5904\uff0c\u8fd9\u5bf9\u4e8e\u5728\u73b0\u4ee3\u7ade\u4e89\u683c\u5c40\u4e2d\u84ec\u52c3\u53d1\u5c55\u81f3\u5173\u91cd\u8981\u3002\u91c7\u53d6\u8fd9\u4e00\u6b65\u9aa4\u5c06\u5f7b\u5e95\u6539\u53d8\u60a8\u7684\u751f\u4ea7\u6392\u7a0b\uff0c\u5e76\u8ba9\u60a8\u8d70\u4e0a\u6210\u529f\u4e4b\u8def\u3002\u8981\u5f00\u59cb\u5e76\u4e86\u89e3\u5982\u4f55\u6839\u636e\u60a8\u516c\u53f8\u7684\u7279\u5b9a\u9700\u6c42\u91cf\u8eab\u5b9a\u5236\u65b9\u6848\uff0c\u8bf7\u968f\u65f6\u8054\u7cfb\u6211\u4eec\u7684\u4e13\u5bb6\u56e2\u961f\uff0c\u83b7\u53d6\u7cbe\u76ca\u751f\u4ea7\u4e4b\u65c5\u7684\u6307\u5bfc\uff01<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-zh-hans40\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-zh-hans41\">\n<div class=\"gb-grid-column gb-grid-column-zh-hans42\"><div class=\"gb-container gb-container-zh-hans42\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-zh-hans43\"><div class=\"gb-container gb-container-zh-hans43\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8 \u9996\u9875&nbsp;\u00bb&nbsp;\u8d44\u6e90&nbsp;\u00bb&nbsp;\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8 \u60f3\u8c61\u4e00\u4e0b\uff1a\u60a8\u7684\u751f\u4ea7\u7ebf\u53d1\u751f\u62e5\u5835\u3002\u8ba2\u5355\u5806\u79ef\u5982\u5c71\u3002\u673a\u5668\u505c\u8f6c\u7684\u58f0\u97f3\u8ba9\u60a8\u5934\u75db\u4e0d\u5df2\u3002\u60a8\u7684\u516c\u53f8\u6b63\u9762\u4e34\u7740\u627c\u6740\u751f\u4ea7\u529b\u7684\u74f6\u9888\u3002\u5982\u679c\u8fd9\u79cd\u60c5\u666f\u542c\u8d77\u6765\u975e\u5e38\u719f\u6089\uff0c\u90a3\u4e48\u73b0\u5728\u6b63\u662f\u60a8\u4e86\u89e3\u7cbe\u76ca\u751f\u4ea7\u7684\u65f6\u5019\u4e86\u3002 TL;DR \u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u4e13\u6ce8\u4e8e\u6700\u5927\u9650\u5ea6\u51cf\u5c11\u6d6a\u8d39\u5e76\u63d0\u9ad8\u751f\u4ea7\u6548\u7387\u7684\u65b9\u6cd5\u3002\u5b83\u878d\u5408\u4e86\u6301\u7eed\u6539\u8fdb\u3001\u5ba2\u6237\u6ee1\u610f\u5ea6\u548c\u667a\u80fd\u51b3\u7b56\u7684\u539f\u5219\u3002\u5f53\u4e0e Skyplanner \u7b49\u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b (APS) \u7cfb\u7edf\u7ed3\u5408\u4f7f\u7528\u65f6\uff0c\u5b83\u53ef\u4ee5\u663e\u8457\u63d0\u9ad8\u751f\u4ea7\u529b\u3002\u4e3b\u8981\u4f18\u52bf\u5305\u62ec\u6210\u672c\u8282\u7ea6\u3001\u66f4\u597d\u7684\u4ea7\u54c1\u8d28\u91cf\u3001\u5458\u5de5\u53c2\u4e0e\u5ea6\u3001\u7075\u6d3b\u6027\u3001\u73af\u5883\u8d23\u4efb\u548c\u7ade\u4e89\u4f18\u52bf\u3002\u7136\u800c\uff0c\u5b83\u53ef\u80fd\u4e0d\u9002\u7528\u4e8e\u9ad8\u5ea6\u5b9a\u5236\u5316\u6216\u5c0f\u6279\u91cf\u751f\u4ea7\u7684\u884c\u4e1a\u3002\u4ef7\u503c\u6d41\u56fe\u3001\u51ef\u5584\uff08Kaizen\uff09\u548c\u770b\u677f\u7b49\u5de5\u5177\u662f\u5bf9\u7cbe\u76ca\u751f\u4ea7\u7684\u8865\u5145\uff0c\u53ef\u5e2e\u52a9\u4f01\u4e1a\u7b80\u5316\u6d41\u7a0b\u5e76\u5728\u5f53\u4eca\u5e02\u573a\u4e2d\u84ec\u52c3\u53d1\u5c55\u3002 \u4ec0\u4e48\u662f\u7cbe\u76ca\u751f\u4ea7\uff1f \u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u7cfb\u7edf\u5316\u7684\u65b9\u6cd5\uff0c\u65e8\u5728\u63d0\u9ad8\u751f\u4ea7\u8fc7\u7a0b\u4e2d\u7684\u6548\u7387\u3001\u751f\u4ea7\u529b\u548c\u4ef7\u503c\u3002 \u901a\u8fc7\u5728\u4fdd\u6301\u751f\u4ea7\u529b\u7684\u540c\u65f6\u4e13\u6ce8\u4e8e\u51cf\u5c11\u6d6a\u8d39\uff0c\u53ef\u4ee5\u7b80\u5316\u8fd0\u8425\u5e76\u6700\u7ec8\u63d0\u9ad8\u5229\u6da6\u3002 \u6574\u4f53\u65b9\u6cd5 \u4ece\u6574\u4f53\u4e0a\u770b\uff0c\u7cbe\u76ca\u751f\u4ea7\u4e0d\u4ec5\u4ec5\u662f\u4e00\u79cd\u65b9\u6cd5\u8bba\uff1b\u5b83\u662f\u4e00\u79cd\u690d\u6839\u4e8e\u6301\u7eed\u6539\u8fdb\u548c\u5ba2\u6237\u6ee1\u610f\u5ea6\u7684\u54f2\u5b66\u3002 \u5b83\u53d6\u51b3\u4e8e\u505a\u51fa\u6709\u5229\u4e8e\u516c\u53f8\u3001\u5458\u5de5\u548c\u5ba2\u6237\u7684\u667a\u80fd\u9009\u62e9\uff0c\u901a\u8fc7\u964d\u4f4e\u6210\u672c\u5e76\u786e\u4fdd\u9ad8\u8d28\u91cf\u4ea7\u54c1\u7684\u53ca\u65f6\u4ea4\u4ed8\u3002\u5f53\u7cbe\u76ca\u751f\u4ea7\u4e0e\u5236\u9020\u6267\u884c\u7cfb\u7edf (MES) \u96c6\u6210\u65f6\uff0c\u5176\u6548\u76ca\u975e\u5e38\u663e\u8457\u3002 \u7cbe\u76ca\u751f\u4ea7 vs. \u51c6\u65f6\u5236\u751f\u4ea7\u65b9\u6cd5 \u867d\u7136\u7cbe\u76ca\u751f\u4ea7\u548c\u51c6\u65f6\u5236\u751f\u4ea7 (JIT) \u90fd\u65e8\u5728\u51cf\u5c11\u6d6a\u8d39\uff0c\u4f46\u5b83\u4eec\u6709\u6240\u4e0d\u540c\u3002JIT \u4e3b\u8981\u4fa7\u91cd\u4e8e\u51cf\u5c11\u5e93\u5b58\u548c\u589e\u5f3a\u8d27\u7269\u6d41\u52a8\u3002\u4e0e\u6b64\u540c\u65f6\uff0c\u7cbe\u76ca\u751f\u4ea7\u8d85\u51fa\u4e86\u8fd9\u4e00\u8303\u56f4\uff0c\u6db5\u76d6\u4e86\u5236\u9020\u8fc7\u7a0b\u7684\u6240\u6709\u65b9\u9762\uff0c\u5305\u62ec\u52b3\u52a8\u529b\u7ba1\u7406\u548c\u4f9b\u5e94\u5546\u5173\u7cfb\u3002 \u7cbe\u76ca\u751f\u4ea7\u662f\u5982\u4f55\u8fd0\u4f5c\u7684\uff1f \u73b0\u4ee3\u5236\u9020\u4f01\u4e1a\u5229\u7528\u7cbe\u76ca\u751f\u4ea7\u6765\u4f18\u5316\u8d44\u6e90\uff0c\u4ece\u800c\u52a9\u529b\u53ef\u6301\u7eed\u53d1\u5c55\u3002\u901a\u8fc7\u51cf\u5c11\u6d6a\u8d39\uff0c\u8fd9\u79cd\u751f\u4ea7\u6a21\u5f0f\u652f\u6301\u73af\u4fdd\u5021\u8bae\uff0c\u786e\u4fdd\u4f01\u4e1a\u5728\u7ecf\u6d4e\u7e41\u8363\u7684\u540c\u65f6\u5bf9\u73af\u5883\u4ea7\u751f\u79ef\u6781\u5f71\u54cd\u3002 \u5bf9\u4e8e\u751f\u4ea7\u6392\u7a0b\u4eba\u5458\u6765\u8bf4\uff0c\u50cf Skyplanner \u8fd9\u6837\u7684\u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b (APS) \u7cfb\u7edf\u662f\u8be5\u65b9\u6cd5\u8bba\u7684\u7ec8\u6781\u4f19\u4f34\u3002APS \u8f6f\u4ef6\u786e\u4fdd\u4e86\u4fe1\u606f\u7684\u65e0\u7f1d\u6d41\u52a8\uff0c\u8fd9\u5bf9\u4e8e\u5728\u7cbe\u76ca\u73af\u5883\u4e2d\u505a\u51fa\u5feb\u901f\u4e14\u660e\u667a\u7684\u51b3\u7b56\u81f3\u5173\u91cd\u8981\u3002 Excel \u751f\u4ea7\u8ba1\u5212\u7684\u5c40\u9650\u6027\u53ef\u80fd\u4f1a\u901a\u8fc7\u5f15\u5165\u4f4e\u6548\u548c\u9519\u8bef\u800c\u5bf9\u7cbe\u76ca\u751f\u4ea7\u4ea7\u751f\u8d1f\u9762\u5f71\u54cd\u3002\u7cbe\u76ca\u751f\u4ea7\u5f3a\u8c03\u7b80\u5316\u6d41\u7a0b\u548c\u51cf\u5c11\u6d6a\u8d39\uff0c\u4f46 Excel \u5728\u7528\u4e8e\u590d\u6742\u7684\u751f\u4ea7\u8ba1\u5212\u65f6\uff0c\u5bb9\u6613\u51fa\u73b0\u624b\u52a8\u6570\u636e\u5f55\u5165\u9519\u8bef\u3001\u7f3a\u4e4f\u5b9e\u65f6\u66f4\u65b0\u4ee5\u53ca\u5171\u4eab\u548c\u534f\u4f5c\u56f0\u96be\u7b49\u95ee\u9898\u3002\u8fd9\u4e9b\u7f3a\u70b9\u4f1a\u62b5\u6d88\u7cbe\u76ca\u751f\u4ea7\u7684\u539f\u5219\uff0c\u5bfc\u81f4\u5ef6\u8fdf\u3001\u8d44\u6e90\u5206\u914d\u4e0d\u5f53\u4ee5\u53ca\u65e0\u6cd5\u6709\u6548\u76d1\u63a7\u548c\u51cf\u5c11\u6d6a\u8d39\u3002\u56e0\u6b64\uff0c\u8fd9\u963b\u788d\u4e86\u6301\u7eed\u6539\u8fdb\u548c\u6548\u7387\u6700\u5927\u5316\u7b49\u7cbe\u76ca\u76ee\u6807\u7684\u5b9e\u73b0\u3002 \u7cbe\u76ca\u751f\u4ea7\u7684 8 \u5927\u6d6a\u8d39 1.- \u7f3a\u9677 \u4ea7\u54c1\u6216\u6d41\u7a0b\u4e2d\u7684\u7f3a\u9677\u662f\u91cd\u5927\u7684\u6d6a\u8d39\u3002\u5b83\u4eec\u4f1a\u5bfc\u81f4\u8fd4\u5de5\u3001\u62a5\u5e9f\u548c\u5ba2\u6237\u4e0d\u6ee1\u3002\u7cbe\u76ca\u65b9\u6cd5\u8bba\u65e8\u5728\u8bc6\u522b\u5e76\u6d88\u9664\u7f3a\u9677\u7684\u6839\u672c\u539f\u56e0\u3002 2.- \u8fc7\u91cf\u751f\u4ea7 \u751f\u4ea7\u8d85\u8fc7\u6240\u9700\u7684\u91cf\u662f\u6d6a\u8d39\u3002\u8be5\u65b9\u6cd5\u8bba\u4e13\u6ce8\u4e8e\u6839\u636e\u5ba2\u6237\u9700\u6c42\u4ec5\u751f\u4ea7\u6240\u9700\u7684\u4ea7\u54c1\u3002 3.- \u7b49\u5f85 \u8d44\u6e90\u672a\u88ab\u5229\u7528\u65f6\u7684\u95f2\u7f6e\u65f6\u95f4\u662f\u6d6a\u8d39\u3002\u7cbe\u76ca\u751f\u4ea7\u65e8\u5728\u4fdd\u6301\u8fd0\u8425\u987a\u7545\u6d41\u52a8\uff0c\u4e0d\u4ea7\u751f\u5ef6\u8fdf\u6216\u74f6\u9888\u3002 4.- \u672a\u80fd\u5229\u7528\u4eba\u624d \u672a\u80fd\u5229\u7528\u5458\u5de5\u7684\u6280\u80fd\u548c\u624d\u534e\u4f1a\u5bfc\u81f4\u4eba\u529b\u8d44\u6e90\u7684\u6d6a\u8d39\u3002\u8fd9\u79cd\u65b9\u6cd5\u5305\u62ec\u8ba9\u5458\u5de5\u53c2\u4e0e\u5e76\u8d4b\u80fd\u4e8e\u5458\u5de5\u3002 5.- \u8fd0\u8f93 \u4e0d\u5fc5\u8981\u7684\u7269\u6599\u79fb\u52a8\u4f1a\u589e\u52a0\u6210\u672c\u548c\u98ce\u9669\u3002\u8fd9\u79cd\u65b9\u6cd5\u901a\u8fc7\u6539\u8fdb\u5e03\u5c40\u548c\u5de5\u827a\u6d41\u7a0b\u6765\u4f18\u5316\u7269\u6599\u7684\u79fb\u52a8\u3002 6.- &#8230; <a title=\"\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/\" aria-label=\"Read more about \u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8\">\u9605\u8bfb\u66f4\u591a<\/a><\/p>\n","protected":false},"author":0,"featured_media":12240,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2545,2517],"tags":[],"class_list":["post-85113","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-2545","category-2517","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8 &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u65e8\u5728\u63d0\u9ad8\u751f\u4ea7\u8fc7\u7a0b\u4e2d\u7684\u6548\u7387\u3001\u751f\u4ea7\u529b\u548c\u4ef7\u503c\u7684\u7cfb\u7edf\u5316\u65b9\u6cd5\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8\" \/>\n<meta property=\"og:description\" content=\"\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u65e8\u5728\u63d0\u9ad8\u751f\u4ea7\u8fc7\u7a0b\u4e2d\u7684\u6548\u7387\u3001\u751f\u4ea7\u529b\u548c\u4ef7\u503c\u7684\u7cfb\u7edf\u5316\u65b9\u6cd5\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-06-27T16:59:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T08:45:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8\",\"datePublished\":\"2023-06-27T16:59:05+00:00\",\"dateModified\":\"2026-10-15T08:45:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing\\\/\"},\"wordCount\":52,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/LEAN-MANUFACTURING.png\",\"articleSection\":[\"\u5236\u9020\u6548\u7387\",\"\u8d44\u6e90\"],\"inLanguage\":\"zh-CN\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing\\\/\",\"name\":\"\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/LEAN-MANUFACTURING.png\",\"datePublished\":\"2023-06-27T16:59:05+00:00\",\"dateModified\":\"2026-10-15T08:45:47+00:00\",\"description\":\"\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u65e8\u5728\u63d0\u9ad8\u751f\u4ea7\u8fc7\u7a0b\u4e2d\u7684\u6548\u7387\u3001\u751f\u4ea7\u529b\u548c\u4ef7\u503c\u7684\u7cfb\u7edf\u5316\u65b9\u6cd5\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing\\\/#breadcrumb\"},\"inLanguage\":\"zh-CN\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/LEAN-MANUFACTURING.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/LEAN-MANUFACTURING.png\",\"width\":6000,\"height\":4000,\"caption\":\"Lean Manufacturing\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-CN\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8 &#8211; SkyPlanner","description":"\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u65e8\u5728\u63d0\u9ad8\u751f\u4ea7\u8fc7\u7a0b\u4e2d\u7684\u6548\u7387\u3001\u751f\u4ea7\u529b\u548c\u4ef7\u503c\u7684\u7cfb\u7edf\u5316\u65b9\u6cd5\u3002","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/","og_locale":"zh_CN","og_type":"article","og_title":"\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8","og_description":"\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u65e8\u5728\u63d0\u9ad8\u751f\u4ea7\u8fc7\u7a0b\u4e2d\u7684\u6548\u7387\u3001\u751f\u4ea7\u529b\u548c\u4ef7\u503c\u7684\u7cfb\u7edf\u5316\u65b9\u6cd5\u3002","og_url":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/","og_site_name":"SkyPlanner","article_published_time":"2023-06-27T16:59:05+00:00","article_modified_time":"2026-10-15T08:45:47+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-1024x683.png","type":"image\/png"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/"},"author":{"name":"","@id":""},"headline":"\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8","datePublished":"2023-06-27T16:59:05+00:00","dateModified":"2026-10-15T08:45:47+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/"},"wordCount":52,"publisher":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING.png","articleSection":["\u5236\u9020\u6548\u7387","\u8d44\u6e90"],"inLanguage":"zh-CN"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/","url":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/","name":"\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING.png","datePublished":"2023-06-27T16:59:05+00:00","dateModified":"2026-10-15T08:45:47+00:00","description":"\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u65e8\u5728\u63d0\u9ad8\u751f\u4ea7\u8fc7\u7a0b\u4e2d\u7684\u6548\u7387\u3001\u751f\u4ea7\u529b\u548c\u4ef7\u503c\u7684\u7cfb\u7edf\u5316\u65b9\u6cd5\u3002","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/#breadcrumb"},"inLanguage":"zh-CN","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/"]}]},{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING.png","width":6000,"height":4000,"caption":"Lean Manufacturing"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/zh-hans\/"},{"@type":"ListItem","position":2,"name":"\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/zh-hans\/#website","url":"https:\/\/skyplanner.ai\/zh-hans\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/zh-hans\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-CN"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/zh-hans\/","logo":{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING.png",6000,4000,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING.png",360,240,false]},"uagb_author_info":{"display_name":"","author_link":"https:\/\/skyplanner.ai\/zh-hans\/author\/"},"uagb_comment_info":0,"uagb_excerpt":"\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8 \u9996\u9875&nbsp;\u00bb&nbsp;\u8d44\u6e90&nbsp;\u00bb&nbsp;\u7cbe\u76ca\u751f\u4ea7\uff1a\u89e3\u9501\u6548\u7387\u4e4b\u95e8 \u60f3\u8c61\u4e00\u4e0b\uff1a\u60a8\u7684\u751f\u4ea7\u7ebf\u53d1\u751f\u62e5\u5835\u3002\u8ba2\u5355\u5806\u79ef\u5982\u5c71\u3002\u673a\u5668\u505c\u8f6c\u7684\u58f0\u97f3\u8ba9\u60a8\u5934\u75db\u4e0d\u5df2\u3002\u60a8\u7684\u516c\u53f8\u6b63\u9762\u4e34\u7740\u627c\u6740\u751f\u4ea7\u529b\u7684\u74f6\u9888\u3002\u5982\u679c\u8fd9\u79cd\u60c5\u666f\u542c\u8d77\u6765\u975e\u5e38\u719f\u6089\uff0c\u90a3\u4e48\u73b0\u5728\u6b63\u662f\u60a8\u4e86\u89e3\u7cbe\u76ca\u751f\u4ea7\u7684\u65f6\u5019\u4e86\u3002 TL;DR \u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u4e13\u6ce8\u4e8e\u6700\u5927\u9650\u5ea6\u51cf\u5c11\u6d6a\u8d39\u5e76\u63d0\u9ad8\u751f\u4ea7\u6548\u7387\u7684\u65b9\u6cd5\u3002\u5b83\u878d\u5408\u4e86\u6301\u7eed\u6539\u8fdb\u3001\u5ba2\u6237\u6ee1\u610f\u5ea6\u548c\u667a\u80fd\u51b3\u7b56\u7684\u539f\u5219\u3002\u5f53\u4e0e Skyplanner \u7b49\u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b (APS) \u7cfb\u7edf\u7ed3\u5408\u4f7f\u7528\u65f6\uff0c\u5b83\u53ef\u4ee5\u663e\u8457\u63d0\u9ad8\u751f\u4ea7\u529b\u3002\u4e3b\u8981\u4f18\u52bf\u5305\u62ec\u6210\u672c\u8282\u7ea6\u3001\u66f4\u597d\u7684\u4ea7\u54c1\u8d28\u91cf\u3001\u5458\u5de5\u53c2\u4e0e\u5ea6\u3001\u7075\u6d3b\u6027\u3001\u73af\u5883\u8d23\u4efb\u548c\u7ade\u4e89\u4f18\u52bf\u3002\u7136\u800c\uff0c\u5b83\u53ef\u80fd\u4e0d\u9002\u7528\u4e8e\u9ad8\u5ea6\u5b9a\u5236\u5316\u6216\u5c0f\u6279\u91cf\u751f\u4ea7\u7684\u884c\u4e1a\u3002\u4ef7\u503c\u6d41\u56fe\u3001\u51ef\u5584\uff08Kaizen\uff09\u548c\u770b\u677f\u7b49\u5de5\u5177\u662f\u5bf9\u7cbe\u76ca\u751f\u4ea7\u7684\u8865\u5145\uff0c\u53ef\u5e2e\u52a9\u4f01\u4e1a\u7b80\u5316\u6d41\u7a0b\u5e76\u5728\u5f53\u4eca\u5e02\u573a\u4e2d\u84ec\u52c3\u53d1\u5c55\u3002 \u4ec0\u4e48\u662f\u7cbe\u76ca\u751f\u4ea7\uff1f \u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u7cfb\u7edf\u5316\u7684\u65b9\u6cd5\uff0c\u65e8\u5728\u63d0\u9ad8\u751f\u4ea7\u8fc7\u7a0b\u4e2d\u7684\u6548\u7387\u3001\u751f\u4ea7\u529b\u548c\u4ef7\u503c\u3002 \u901a\u8fc7\u5728\u4fdd\u6301\u751f\u4ea7\u529b\u7684\u540c\u65f6\u4e13\u6ce8\u4e8e\u51cf\u5c11\u6d6a\u8d39\uff0c\u53ef\u4ee5\u7b80\u5316\u8fd0\u8425\u5e76\u6700\u7ec8\u63d0\u9ad8\u5229\u6da6\u3002 \u6574\u4f53\u65b9\u6cd5 \u4ece\u6574\u4f53\u4e0a\u770b\uff0c\u7cbe\u76ca\u751f\u4ea7\u4e0d\u4ec5\u4ec5\u662f\u4e00\u79cd\u65b9\u6cd5\u8bba\uff1b\u5b83\u662f\u4e00\u79cd\u690d\u6839\u4e8e\u6301\u7eed\u6539\u8fdb\u548c\u5ba2\u6237\u6ee1\u610f\u5ea6\u7684\u54f2\u5b66\u3002 \u5b83\u53d6\u51b3\u4e8e\u505a\u51fa\u6709\u5229\u4e8e\u516c\u53f8\u3001\u5458\u5de5\u548c\u5ba2\u6237\u7684\u667a\u80fd\u9009\u62e9\uff0c\u901a\u8fc7\u964d\u4f4e\u6210\u672c\u5e76\u786e\u4fdd\u9ad8\u8d28\u91cf\u4ea7\u54c1\u7684\u53ca\u65f6\u4ea4\u4ed8\u3002\u5f53\u7cbe\u76ca\u751f\u4ea7\u4e0e\u5236\u9020\u6267\u884c\u7cfb\u7edf (MES) \u96c6\u6210\u65f6\uff0c\u5176\u6548\u76ca\u975e\u5e38\u663e\u8457\u3002 \u7cbe\u76ca\u751f\u4ea7 vs. \u51c6\u65f6\u5236\u751f\u4ea7\u65b9\u6cd5 \u867d\u7136\u7cbe\u76ca\u751f\u4ea7\u548c\u51c6\u65f6\u5236\u751f\u4ea7 (JIT) \u90fd\u65e8\u5728\u51cf\u5c11\u6d6a\u8d39\uff0c\u4f46\u5b83\u4eec\u6709\u6240\u4e0d\u540c\u3002JIT \u4e3b\u8981\u4fa7\u91cd\u4e8e\u51cf\u5c11\u5e93\u5b58\u548c\u589e\u5f3a\u8d27\u7269\u6d41\u52a8\u3002\u4e0e\u6b64\u540c\u65f6\uff0c\u7cbe\u76ca\u751f\u4ea7\u8d85\u51fa\u4e86\u8fd9\u4e00\u8303\u56f4\uff0c\u6db5\u76d6\u4e86\u5236\u9020\u8fc7\u7a0b\u7684\u6240\u6709\u65b9\u9762\uff0c\u5305\u62ec\u52b3\u52a8\u529b\u7ba1\u7406\u548c\u4f9b\u5e94\u5546\u5173\u7cfb\u3002 \u7cbe\u76ca\u751f\u4ea7\u662f\u5982\u4f55\u8fd0\u4f5c\u7684\uff1f \u73b0\u4ee3\u5236\u9020\u4f01\u4e1a\u5229\u7528\u7cbe\u76ca\u751f\u4ea7\u6765\u4f18\u5316\u8d44\u6e90\uff0c\u4ece\u800c\u52a9\u529b\u53ef\u6301\u7eed\u53d1\u5c55\u3002\u901a\u8fc7\u51cf\u5c11\u6d6a\u8d39\uff0c\u8fd9\u79cd\u751f\u4ea7\u6a21\u5f0f\u652f\u6301\u73af\u4fdd\u5021\u8bae\uff0c\u786e\u4fdd\u4f01\u4e1a\u5728\u7ecf\u6d4e\u7e41\u8363\u7684\u540c\u65f6\u5bf9\u73af\u5883\u4ea7\u751f\u79ef\u6781\u5f71\u54cd\u3002 \u5bf9\u4e8e\u751f\u4ea7\u6392\u7a0b\u4eba\u5458\u6765\u8bf4\uff0c\u50cf Skyplanner \u8fd9\u6837\u7684\u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b (APS) \u7cfb\u7edf\u662f\u8be5\u65b9\u6cd5\u8bba\u7684\u7ec8\u6781\u4f19\u4f34\u3002APS \u8f6f\u4ef6\u786e\u4fdd\u4e86\u4fe1\u606f\u7684\u65e0\u7f1d\u6d41\u52a8\uff0c\u8fd9\u5bf9\u4e8e\u5728\u7cbe\u76ca\u73af\u5883\u4e2d\u505a\u51fa\u5feb\u901f\u4e14\u660e\u667a\u7684\u51b3\u7b56\u81f3\u5173\u91cd\u8981\u3002 Excel \u751f\u4ea7\u8ba1\u5212\u7684\u5c40\u9650\u6027\u53ef\u80fd\u4f1a\u901a\u8fc7\u5f15\u5165\u4f4e\u6548\u548c\u9519\u8bef\u800c\u5bf9\u7cbe\u76ca\u751f\u4ea7\u4ea7\u751f\u8d1f\u9762\u5f71\u54cd\u3002\u7cbe\u76ca\u751f\u4ea7\u5f3a\u8c03\u7b80\u5316\u6d41\u7a0b\u548c\u51cf\u5c11\u6d6a\u8d39\uff0c\u4f46 Excel \u5728\u7528\u4e8e\u590d\u6742\u7684\u751f\u4ea7\u8ba1\u5212\u65f6\uff0c\u5bb9\u6613\u51fa\u73b0\u624b\u52a8\u6570\u636e\u5f55\u5165\u9519\u8bef\u3001\u7f3a\u4e4f\u5b9e\u65f6\u66f4\u65b0\u4ee5\u53ca\u5171\u4eab\u548c\u534f\u4f5c\u56f0\u96be\u7b49\u95ee\u9898\u3002\u8fd9\u4e9b\u7f3a\u70b9\u4f1a\u62b5\u6d88\u7cbe\u76ca\u751f\u4ea7\u7684\u539f\u5219\uff0c\u5bfc\u81f4\u5ef6\u8fdf\u3001\u8d44\u6e90\u5206\u914d\u4e0d\u5f53\u4ee5\u53ca\u65e0\u6cd5\u6709\u6548\u76d1\u63a7\u548c\u51cf\u5c11\u6d6a\u8d39\u3002\u56e0\u6b64\uff0c\u8fd9\u963b\u788d\u4e86\u6301\u7eed\u6539\u8fdb\u548c\u6548\u7387\u6700\u5927\u5316\u7b49\u7cbe\u76ca\u76ee\u6807\u7684\u5b9e\u73b0\u3002 \u7cbe\u76ca\u751f\u4ea7\u7684 8 \u5927\u6d6a\u8d39 1.- \u7f3a\u9677 \u4ea7\u54c1\u6216\u6d41\u7a0b\u4e2d\u7684\u7f3a\u9677\u662f\u91cd\u5927\u7684\u6d6a\u8d39\u3002\u5b83\u4eec\u4f1a\u5bfc\u81f4\u8fd4\u5de5\u3001\u62a5\u5e9f\u548c\u5ba2\u6237\u4e0d\u6ee1\u3002\u7cbe\u76ca\u65b9\u6cd5\u8bba\u65e8\u5728\u8bc6\u522b\u5e76\u6d88\u9664\u7f3a\u9677\u7684\u6839\u672c\u539f\u56e0\u3002 2.- \u8fc7\u91cf\u751f\u4ea7 \u751f\u4ea7\u8d85\u8fc7\u6240\u9700\u7684\u91cf\u662f\u6d6a\u8d39\u3002\u8be5\u65b9\u6cd5\u8bba\u4e13\u6ce8\u4e8e\u6839\u636e\u5ba2\u6237\u9700\u6c42\u4ec5\u751f\u4ea7\u6240\u9700\u7684\u4ea7\u54c1\u3002 3.- \u7b49\u5f85 \u8d44\u6e90\u672a\u88ab\u5229\u7528\u65f6\u7684\u95f2\u7f6e\u65f6\u95f4\u662f\u6d6a\u8d39\u3002\u7cbe\u76ca\u751f\u4ea7\u65e8\u5728\u4fdd\u6301\u8fd0\u8425\u987a\u7545\u6d41\u52a8\uff0c\u4e0d\u4ea7\u751f\u5ef6\u8fdf\u6216\u74f6\u9888\u3002 4.- \u672a\u80fd\u5229\u7528\u4eba\u624d \u672a\u80fd\u5229\u7528\u5458\u5de5\u7684\u6280\u80fd\u548c\u624d\u534e\u4f1a\u5bfc\u81f4\u4eba\u529b\u8d44\u6e90\u7684\u6d6a\u8d39\u3002\u8fd9\u79cd\u65b9\u6cd5\u5305\u62ec\u8ba9\u5458\u5de5\u53c2\u4e0e\u5e76\u8d4b\u80fd\u4e8e\u5458\u5de5\u3002 5.- \u8fd0\u8f93 \u4e0d\u5fc5\u8981\u7684\u7269\u6599\u79fb\u52a8\u4f1a\u589e\u52a0\u6210\u672c\u548c\u98ce\u9669\u3002\u8fd9\u79cd\u65b9\u6cd5\u901a\u8fc7\u6539\u8fdb\u5e03\u5c40\u548c\u5de5\u827a\u6d41\u7a0b\u6765\u4f18\u5316\u7269\u6599\u7684\u79fb\u52a8\u3002 6.-&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/85113","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/comments?post=85113"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/85113\/revisions"}],"predecessor-version":[{"id":85272,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/85113\/revisions\/85272"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/media\/12240"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/media?parent=85113"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/categories?post=85113"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/tags?post=85113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}