{"id":85013,"date":"2023-09-02T15:23:09","date_gmt":"2023-09-02T15:23:09","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=85013"},"modified":"2026-03-20T15:42:20","modified_gmt":"2026-03-20T15:42:20","slug":"erp-manufacturing","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/","title":{"rendered":"ERP \u5236\u9020"},"content":{"rendered":"<div class=\"gb-container gb-container-zh-hans01\">\n\n<h1 class=\"wp-block-heading\" id=\"h-erp-manufacturing\">ERP \u5236\u9020<\/h1>\n\n\n<div class=\"gb-container gb-container-zh-hans02\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/\">\u9996\u9875<\/a>&nbsp;\u00bb&nbsp;<a href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/\">\u8d44\u6e90<\/a>&nbsp;\u00bb&nbsp;ERP \u5236\u9020<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\uff1a <\/span><span class=\"yoast-reading-time__reading-time\">0<\/span><span class=\"yoast-reading-time__time-unit\"> \u5206\u949f<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-zh-hans03\">\n\n<p>\u6bcf\u4e00\u4f4d\u751f\u4ea7\u8ba1\u5212\u5458\u90fd\u6df1\u77e5\u5176\u4e2d\u7684\u6311\u6218\uff1a\u60a8\u6536\u5230\u4e86\u8ba2\u5355\uff0c\u4f46\u60a8\u662f\u5426\u6709\u80fd\u529b\u9ad8\u6548\u5730\u5b8c\u6210\u5b83\uff1f\u60f3\u8c61\u4e00\u4e0b\u8fd9\u6837\u7684\u573a\u666f\uff1a\u9700\u6c42\u6b63\u5728\u589e\u957f\uff0c\u4f46\u7531\u4e8e\u5bf9\u751f\u4ea7\u80fd\u529b\u3001\u539f\u6750\u6599\u5e93\u5b58\u751a\u81f3\u7269\u6599\u6e05\u5355 (BOM) \u7f3a\u4e4f\u6e05\u6670\u7684\u53ef\u89c1\u6027\uff0c\u5bfc\u81f4\u4e86\u5ef6\u8fdf\u548c\u6548\u7387\u4f4e\u4e0b\u3002\u8fd9\u79cd\u60c5\u51b5\u53ef\u80fd\u4f1a\u6210\u5c31\u6216\u6bc1\u6389\u4e00\u5bb6\u516c\u53f8\u7684\u58f0\u8a89\u3002\u90a3\u4e48\uff0c\u89e3\u51b3\u65b9\u6848\u662f\u4ec0\u4e48\uff1fERP \u5236\u9020\u2014\u2014\u8fd9\u662f\u6bcf\u4e00\u4f4d\u751f\u4ea7\u8ba1\u5212\u5458\u90fd\u5e94\u8be5\u8003\u8651\u7684\u521b\u65b0\u5de5\u5177\u3002<\/p>\n\n\n\n<p>\u56e0\u6b64\uff0c\u5bf9\u4e8e\u751f\u4ea7\u8ba1\u5212\u9886\u57df\u7684\u4e13\u4e1a\u4eba\u58eb\u6765\u8bf4\uff0c\u73b0\u5728\u96be\u9053\u4e0d\u662f\u5c06 ERP \u5236\u9020\u4f5c\u4e3a\u60a8\u7684\u4e0b\u4e00\u4e2a\u6218\u7565\u4e3e\u63aa\u7684\u65f6\u5019\u5417\uff1f\u6df1\u5165\u4e86\u89e3\u5e76\u63a2\u7d22\u5176\u529f\u80fd\uff0c\u89c1\u8bc1\u60a8\u7684\u5236\u9020\u6d41\u7a0b\u5411\u66f4\u597d\u7684\u65b9\u5411\u8f6c\u53d8\u3002<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-f39176c8      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#\u4ec0\u4e48\u662f-erp-\u5236\u9020\" class=\"uagb-toc-link__trigger\">\u4ec0\u4e48\u662f ERP \u5236\u9020\uff1f<\/a><li class=\"uagb-toc__list\"><a href=\"#erp-\u5236\u9020\u7684\u5173\u952e\u4f5c\u7528\" class=\"uagb-toc-link__trigger\">ERP \u5236\u9020\u7684\u5173\u952e\u4f5c\u7528<\/a><li class=\"uagb-toc__list\"><a href=\"#erp-\u5236\u9020\u7684-8-\u5927\u4f18\u52bf\" class=\"uagb-toc-link__trigger\">ERP \u5236\u9020\u7684 8 \u5927\u4f18\u52bf<\/a><li class=\"uagb-toc__list\"><a href=\"#erp-\u5236\u9020\u7684\u5173\u952e\u7ec4\u4ef6\" class=\"uagb-toc-link__trigger\">ERP \u5236\u9020\u7684\u5173\u952e\u7ec4\u4ef6\u00a0<\/a><li class=\"uagb-toc__list\"><a href=\"#erp-\u5236\u9020\u7684\u672a\u6765\u8d8b\u52bf\" class=\"uagb-toc-link__trigger\">ERP \u5236\u9020\u7684\u672a\u6765\u8d8b\u52bf<\/a><li class=\"uagb-toc__list\"><a href=\"#\u53d7\u76ca\u4e8e\u6b64\u6a21\u5757\u7684\u884c\u4e1a\" class=\"uagb-toc-link__trigger\">\u53d7\u76ca\u4e8e\u6b64\u6a21\u5757\u7684\u884c\u4e1a<\/a><li class=\"uagb-toc__list\"><a href=\"#\u5c06-skyplanner-\u7b49-aps-\u4e0e-erp-\u5236\u9020\u96c6\u6210\" class=\"uagb-toc-link__trigger\">\u5c06 Skyplanner \u7b49 APS \u4e0e ERP \u5236\u9020\u96c6\u6210<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"gb-headline gb-headline-b76a692a gb-headline-text\">TL;DR<\/h2>\n\n\n\n<p>ERP \u5236\u9020\u662f\u5927\u578b <a href=\"https:\/\/skyplanner.ai\/zh-hans\/resources\/erp-modules\/\">ERP \u7cfb\u7edf\u4e2d\u4e0d\u53ef\u6216\u7f3a\u7684\u6a21\u5757<\/a>\uff0c\u4e13\u6ce8\u4e8e\u901a\u8fc7\u96c6\u4e2d\u6240\u6709\u4e0e\u751f\u4ea7\u76f8\u5173\u7684\u4fe1\u606f\u6765\u4f18\u5316\u5236\u9020\u6d41\u7a0b\u3002\u5b83\u7b80\u5316\u4e86\u4ece\u539f\u6750\u6599\u5230\u6210\u54c1\u7684\u751f\u4ea7\u8fc7\u7a0b\u3002\u4e3b\u8981\u4f18\u52bf\u5305\u62ec\u96c6\u4e2d\u6570\u636e\u7ba1\u7406\u3001\u5b9e\u65f6\u76d1\u63a7\u3001\u9ad8\u6548\u7684\u5e93\u5b58\u548c\u8ba2\u5355\u7ba1\u7406\u4ee5\u53ca\u964d\u4f4e\u6210\u672c\u3002\u8be5\u6a21\u5757\u7531\u751f\u4ea7\u8ba1\u5212\u3001\u5e93\u5b58\u7ba1\u7406\u3001BOM \u548c\u8d28\u91cf\u63a7\u5236\u7b49\u5173\u952e\u7ec4\u4ef6\u7ec4\u6210\u3002\u5c55\u671b\u672a\u6765\uff0c\u8be5\u6a21\u5757\u7684\u53d1\u5c55\u8d8b\u52bf\u5c06\u62e5\u62b1 IoT \u96c6\u6210\u3001AI\u3001\u4e91\u8ba1\u7b97\u548c\u53ef\u6301\u7eed\u5236\u9020\u3002\u5b83\u4f7f\u6c7d\u8f66\u3001\u5236\u836f\u3001\u822a\u7a7a\u822a\u5929\u3001\u7535\u5b50\u4ee5\u53ca\u98df\u54c1\u548c\u996e\u6599\u7b49\u884c\u4e1a\u663e\u8457\u53d7\u76ca\u3002\u5c06 Skyplanner \u7b49 APS \u7cfb\u7edf\u4e0e ERP \u5236\u9020\u96c6\u6210\u53ef\u4ee5\u8fdb\u4e00\u6b65\u63d0\u9ad8\u6548\u7387\u3002<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u4ec0\u4e48\u662f ERP \u5236\u9020\uff1f<\/h2>\n\n\n<div class=\"gb-container gb-container-zh-hans05\"><div class=\"gb-inside-container\">\n\n<p><strong>ERP \u5236\u9020\u662f\u4e00\u4e2a\u4e13\u95e8\u7684\u6a21\u5757\uff0c<\/strong><strong>\u4e3b\u8981\u4fa7\u91cd\u4e8e\u4f18\u5316\u5236\u9020\u548c\u751f\u4ea7\u6d41\u7a0b\u3002<\/strong>&nbsp;<\/p>\n\n<\/div><\/div>\n\n\n<p>\u968f\u7740\u751f\u4ea7\u590d\u6742\u6027\u7684\u4e0d\u65ad\u589e\u52a0\uff0c\u62e5\u6709\u4e00\u4e2a\u80fd\u591f\u89e3\u51b3\u7279\u5b9a\u5236\u9020\u6311\u6218\u7684\u4e13\u7528\u5de5\u5177\u53d8\u5f97\u4e0d\u53ef\u6216\u7f3a\u3002\u5728\u5b9e\u65bd\u8fc7\u7a0b\u4e2d\uff0cERP \u5236\u9020\u96c6\u4e2d\u4e86\u6240\u6709\u4e0e\u751f\u4ea7\u76f8\u5173\u7684\u4fe1\u606f\u2014\u2014\u4ece\u539f\u6750\u6599\u5230\u6210\u54c1\u3002<\/p>\n\n\n\n<p><strong>\u603b\u4f53\u800c\u8a00\uff0cERP \u5236\u9020\u662f\u9762\u5411\u5236\u9020\u5546\u7684\u5168\u9762\u89e3\u51b3\u65b9\u6848\u3002<\/strong>&nbsp;\u9664\u4e86\u5e2e\u52a9\u7b80\u5316\u6d41\u7a0b\u5916\uff0c\u5b83\u8fd8\u63d0\u4f9b\u4e86\u751f\u4ea7\u94fe\u7684\u8be6\u7ec6\u89c6\u56fe\uff0c\u4ece\u800c\u5b9e\u73b0\u53ca\u65f6\u7684\u51b3\u7b56\u3002ERP \u5236\u9020\u8d1f\u8d23\u5904\u7406\u7269\u6599\u6e05\u5355 (BOM)\uff0c\u4ee5\u786e\u4fdd\u6bcf\u4e2a\u751f\u4ea7\u9636\u6bb5\u90fd\u4e0e\u516c\u53f8\u7684\u76ee\u6807\u4fdd\u6301\u4e00\u81f4\u3002<\/p>\n\n\n\n<p>\u6b64\u5916\uff0c\u5bf9\u4e8e\u4e13\u95e8\u5bfb\u6c42\u50cf Skyplanner \u8fd9\u6837\u7684 <a href=\"https:\/\/skyplanner.ai\/zh-hans\/%e5%8a%9f%e8%83%bd\/\">APS \u7cfb\u7edf<\/a>\u6765\u8fdb\u884c\u9ad8\u7ea7\u751f\u4ea7\u8ba1\u5212\u4e0e\u6392\u7a0b\u7684\u751f\u4ea7\u8ba1\u5212\u5458\u6765\u8bf4\uff0c\u5c06\u5176\u4e0e ERP \u5236\u9020\u96c6\u6210\u88ab\u8bc1\u660e\u662f\u6709\u76ca\u7684\u3002\u53ea\u8981 APS \u7cfb\u7edf\u4e0e ERP \u5236\u9020\u6a21\u5757\u534f\u540c\u5de5\u4f5c\uff0c\u4f01\u4e1a\u5c31\u53ef\u4ee5\u9884\u89c1\u751f\u4ea7\u6311\u6218\u5e76\u505a\u51fa\u524d\u77bb\u6027\u51b3\u7b56\u3002<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">ERP \u5236\u9020\u7684\u5173\u952e\u4f5c\u7528<\/h2>\n\n\n\n<p>\u5728\u73b0\u4ee3\u5236\u9020\u4e1a\u9519\u7efc\u590d\u6742\u7684\u8ff7\u5bab\u4e2d\uff0c\u4fdd\u6301\u9886\u5148\u5730\u4f4d\u5df2\u4e0d\u518d\u4ec5\u4ec5\u5173\u4e4e\u751f\u4ea7\u9ad8\u8d28\u91cf\u7684\u4ea7\u54c1\uff0c\u8fd8\u5173\u4e4e\u4f18\u5316\u8fd9\u4e9b\u4ea7\u54c1\u8bde\u751f\u7684\u8fc7\u7a0b\u3002\u8fd9\u5c31\u662f ERP \u5236\u9020\u4f5c\u4e3a ERP \u6a21\u5757\u53d1\u6325\u4f5c\u7528\u7684\u5730\u65b9\u3002\u5728\u6784\u6210\u5b8c\u6574 <a href=\"https:\/\/skyplanner.ai\/zh-hans\/resources\/what-is-erp\/\">\u4f01\u4e1a\u8d44\u6e90\u8ba1\u5212 (ERP) \u7cfb\u7edf<\/a>\u7684\u4f17\u591a\u6a21\u5757\u4e2d\uff0c\u5236\u9020\u6a21\u5757\u8131\u9896\u800c\u51fa\u3002\u5b83\u89e3\u51b3\u4e86\u5236\u9020\u884c\u4e1a\u72ec\u7279\u7684\u6311\u6218\u3001\u590d\u6742\u6027\u548c\u9700\u6c42\u3002<\/p>\n\n\n\n<p><strong>ERP \u5236\u9020\u7684\u4e3b\u8981\u76ee\u6807\u662f\u7b80\u5316\u6574\u4e2a\u751f\u4ea7\u6d41\u7a0b\u3002<\/strong>&nbsp;\u8fd9\u786e\u4fdd\u4e86\u4ea7\u54c1\u7684\u9ad8\u6548\u4ea7\u51fa\uff0c\u5e76\u4fdd\u8bc1\u4e86\u8d44\u6e90\u7684\u4f18\u5316\u5229\u7528\u4ee5\u53ca\u6210\u672c\u7684\u6700\u5c0f\u5316\u3002<\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-0f292d6b wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"uag-image-6463\" width=\"1024\" height=\"536\" title=\"\" loading=\"lazy\" role=\"img\" \/><\/figure><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">ERP \u5236\u9020\u7684 8 \u5927\u4f18\u52bf<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-dcbbdfad gb-headline-text\">\u96c6\u4e2d\u6570\u636e\u7ba1\u7406<\/h4>\n\n\n\n<p>ERP \u5236\u9020\u7684\u6838\u5fc3\u4f18\u52bf\u4e4b\u4e00\u662f\u6570\u636e\u7684\u96c6\u4e2d\u5316\u3002\u4ece\u539f\u6750\u6599\u5230\u52b3\u52a8\u529b\u6392\u7a0b\u7684\u6240\u6709\u76f8\u5173\u4fe1\u606f\u90fd\u5b58\u50a8\u5728\u5355\u4e00\u7cfb\u7edf\u4e2d\u3002\u8fd9\u4fbf\u4e8e\u8f7b\u677e\u8bbf\u95ee\uff0c\u5e76\u786e\u4fdd\u51b3\u7b56\u8005\u80fd\u591f\u968f\u65f6\u638c\u63e1\u6240\u9700\u7684\u6240\u6709\u7ec6\u8282\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-db239145 gb-headline-text\">\u5b9e\u65f6\u76d1\u63a7<\/h4>\n\n\n\n<p>\u901a\u8fc7 ERP \u5236\u9020\uff0c\u516c\u53f8\u53ef\u4ee5\u5b9e\u65f6\u76d1\u63a7\u751f\u4ea7\u6d41\u7a0b\u3002\u8fd9\u4f7f\u5f97\u5728\u51fa\u73b0\u4efb\u4f55\u504f\u5dee\u6216\u95ee\u9898\u65f6\u80fd\u591f\u53ca\u65f6\u5e72\u9884\uff0c\u4ece\u800c\u786e\u4fdd\u5e72\u6270\u6700\u5c0f\u5316\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-b022bae5 gb-headline-text\">\u589e\u5f3a\u5e93\u5b58\u7ba1\u7406<\/h4>\n\n\n\n<p>\u9ad8\u6548\u7ba1\u7406\u5e93\u5b58\u5bf9\u4e8e\u5236\u9020\u4e1a\u81f3\u5173\u91cd\u8981\u3002ERP \u5236\u9020\u63d0\u4f9b\u4e86\u5e93\u5b58\u6c34\u5e73\u7684\u8be6\u7ec6\u89c6\u56fe\uff0c\u786e\u4fdd\u53ca\u65f6\u8865\u8d27\u5e76\u51cf\u5c11\u5e93\u5b58\u79ef\u538b\u6216\u77ed\u7f3a\u7684\u60c5\u51b5\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4d1c967e gb-headline-text\">\u51c6\u786e\u9884\u6d4b<\/h4>\n\n\n\n<p>ERP \u5236\u9020\u4f7f\u4f01\u4e1a\u80fd\u591f\u901a\u8fc7\u8bc4\u4f30\u5386\u53f2\u6570\u636e\u548c\u5f53\u524d\u5e02\u573a\u8d8b\u52bf\u6765\u51c6\u786e\u9884\u6d4b\u9700\u6c42\u3002\u8fd9\u786e\u4fdd\u4e86\u751f\u4ea7\u59cb\u7ec8\u4e0e\u5e02\u573a\u9700\u6c42\u4fdd\u6301\u4e00\u81f4\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-090a7842 gb-headline-text\">\u7cbe\u7b80\u7269\u6599\u6e05\u5355 (BOM)<\/h4>\n\n\n\n<p>BOM \u662f\u5236\u9020\u4e1a\u7684\u57fa\u7840\u6587\u4ef6\uff0c\u53ef\u4ee5\u5b9e\u73b0\u65e0\u7f1d\u7ba1\u7406\u3002\u7cfb\u7edf\u786e\u4fdd\u7ec4\u4ef6\u6216\u6d41\u7a0b\u7684\u4efb\u4f55\u66f4\u6539\u90fd\u80fd\u7acb\u5373\u53cd\u6620\u51fa\u6765\uff0c\u4fdd\u8bc1\u6bcf\u4e2a\u4eba\u90fd\u6839\u636e\u6700\u65b0\u4e14\u51c6\u786e\u7684 BOM \u8fdb\u884c\u5de5\u4f5c\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-189a1f56 gb-headline-text\">\u964d\u4f4e\u6210\u672c<\/h4>\n\n\n\n<p>\u4efb\u4f55\u5236\u9020\u90e8\u95e8\u7684\u4e3b\u8981\u76ee\u6807\u4e4b\u4e00\u90fd\u662f\u5728\u4e0d\u727a\u7272\u8d28\u91cf\u7684\u524d\u63d0\u4e0b\u964d\u4f4e\u6210\u672c\u3002ERP \u5236\u9020\u6709\u52a9\u4e8e\u8bc6\u522b\u74f6\u9888\u6216\u6d6a\u8d39\uff0c\u4e3a\u5177\u6709\u6210\u672c\u6548\u76ca\u7684\u751f\u4ea7\u94fa\u5e73\u9053\u8def\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-28768607 gb-headline-text\">\u8d28\u91cf\u4fdd\u8bc1<\/h4>\n\n\n\n<p>ERP \u5236\u9020\u96c6\u6210\u4e86\u8d28\u91cf\u68c0\u67e5\u6a21\u5757\u3002\u8fd9\u610f\u5473\u7740\u5728\u751f\u4ea7\u8fc7\u7a0b\u7684\u6bcf\u4e2a\u9636\u6bb5\u90fd\u9075\u5faa\u8d28\u91cf\u6807\u51c6\uff0c\u786e\u4fdd\u6700\u7ec8\u4ea7\u54c1\u8fbe\u5230\u6216\u8d85\u8fc7\u9884\u671f\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4b1ea3a2 gb-headline-text\">\u53ef\u6269\u5c55\u6027<\/h4>\n\n\n\n<p>\u968f\u7740\u4e1a\u52a1\u7684\u589e\u957f\uff0c\u6311\u6218\u4e5f\u968f\u4e4b\u589e\u52a0\u3002ERP \u5236\u9020\u65e8\u5728\u9002\u5e94\u65e5\u76ca\u589e\u52a0\u7684\u590d\u6742\u6027\uff0c\u4f7f\u516c\u53f8\u80fd\u591f\u66f4\u8f7b\u677e\u5730\u6269\u5c55\u4e1a\u52a1\u89c4\u6a21\uff0c\u800c\u65e0\u9700\u5f7b\u5e95\u66f4\u6362\u7cfb\u7edf\u3002<\/p>\n\n\n\n<p>\u4ece\u672c\u8d28\u4e0a\u8bb2\uff0c\u91c7\u7528 ERP \u5236\u9020\u4f5c\u4e3a <a href=\"https:\/\/skyplanner.ai\/zh-hans\/resources\/erp-modules\/\">ERP \u6a21\u5757<\/a>\u4e0d\u4ec5\u662f\u5b9e\u73b0\u5f53\u524d\u6548\u7387\u7684\u6218\u7565\u4e3e\u63aa\uff1b\u8fd9\u4e5f\u662f\u4e00\u4e2a\u524d\u77bb\u6027\u7684\u51b3\u5b9a\uff0c\u4e3a\u5728\u4e0d\u65ad\u53d8\u5316\u7684\u5236\u9020\u683c\u5c40\u4e2d\u5b9e\u73b0\u53ef\u6301\u7eed\u589e\u957f\u3001\u9002\u5e94\u6027\u548c\u76c8\u5229\u80fd\u529b\u94fa\u5e73\u4e86\u9053\u8def\u3002<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-zh-hans14\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-zh-hans15\">\n\n<h2 class=\"wp-block-heading\">ERP \u5236\u9020\u7684\u5173\u952e\u7ec4\u4ef6&nbsp;<\/h2>\n\n\n\n<p>\u8be5\u5de5\u5177\u62e5\u6709\u4e00\u7cfb\u5217\u4e13\u4e3a\u6ee1\u8db3\u5236\u9020\u884c\u4e1a\u591a\u65b9\u9762\u9700\u6c42\u800c\u5b9a\u5236\u7684\u7ec4\u4ef6\u3002\u6bcf\u4e2a\u7ec4\u4ef6\u90fd\u81f3\u5173\u91cd\u8981\uff0c\u786e\u4fdd\u4e86\u65e0\u7f1d\u8fd0\u8425\u3001\u6570\u636e\u9a71\u52a8\u7684\u51b3\u7b56\u548c\u4f18\u5316\u7684\u8d44\u6e90\u5229\u7528\u3002\u4ee5\u4e0b\u662f\u5bf9\u8fd9\u4e9b\u7ec4\u4ef6\u7684\u8be6\u7ec6\u89c1\u89e3\uff1a<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-3dcf295b gb-headline-text\">\u751f\u4ea7\u8ba1\u5212<\/h4>\n\n\n\n<p>\u4f5c\u4e3a\u4efb\u4f55\u5236\u9020\u6d41\u7a0b\u7684\u652f\u67f1\uff0c\u751f\u4ea7\u8ba1\u5212\u786e\u4fdd\u4e86\u6700\u4f73\u7684\u8d44\u6e90\u5206\u914d\u3001\u4efb\u52a1\u6392\u5e8f\u548c\u5bf9\u65f6\u95f4\u8282\u70b9\u7684\u9075\u5b88\u3002\u5b83\u4f7f\u4f01\u4e1a\u80fd\u591f\u6839\u636e\u9700\u6c42\u9884\u6d4b\u751f\u4ea7\u9700\u6c42\uff0c\u786e\u4fdd\u51c6\u65f6\u4ea4\u8d27\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-edabd0a3 gb-headline-text\">\u5e93\u5b58\u7ba1\u7406<\/h4>\n\n\n\n<p>\u901a\u8fc7\u8be5\u7ec4\u4ef6\uff0c\u5236\u9020\u5546\u53ef\u4ee5\u4fdd\u6301\u6700\u4f73\u5e93\u5b58\u6c34\u5e73\uff0c\u786e\u4fdd\u65e2\u4e0d\u4f1a\u51fa\u73b0\u5e93\u5b58\u79ef\u538b\uff0c\u4e5f\u4e0d\u4f1a\u51fa\u73b0\u7f3a\u8d27\u3002\u5b83\u8ddf\u8e2a\u4ece\u5165\u5e93\u5230\u53d1\u8d27\u7684\u4ea7\u54c1\uff0c\u6709\u52a9\u4e8e\u964d\u4f4e\u6301\u6709\u6210\u672c\u5e76\u6539\u5584\u73b0\u91d1\u6d41\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-b3c5e6b9 gb-headline-text\">\u4f9b\u5e94\u94fe\u7ba1\u7406<\/h4>\n\n\n\n<p>\u8fd9\u4fc3\u8fdb\u4e86\u4f9b\u5e94\u5546\u3001\u5236\u9020\u5546\u548c\u5206\u9500\u5546\u4e4b\u95f4\u7684\u65e0\u7f1d\u534f\u4f5c\u3002\u5b83\u786e\u4fdd\u4e86\u539f\u6750\u6599\u7684\u53ca\u65f6\u91c7\u8d2d\u3001\u9ad8\u6548\u751f\u4ea7\u548c\u8fc5\u901f\u5206\u9500\uff0c\u4f18\u5316\u4e86\u6574\u4e2a\u4f9b\u5e94\u94fe\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-c515ea69 gb-headline-text\">BOM\uff08\u7269\u6599\u6e05\u5355\uff09<\/h4>\n\n\n\n<p>\u7269\u6599\u6e05\u5355\u662f\u751f\u4ea7\u6240\u9700\u7684\u539f\u6750\u6599\u3001\u7ec4\u4ef6\u548c\u7ec4\u4ef6\u7684\u8be6\u5c3d\u5217\u8868\u3002\u8be5\u7ec4\u4ef6\u786e\u4fdd\u4e86\u51c6\u786e\u6027\uff0c\u5b9e\u65f6\u66f4\u65b0\uff0c\u5e76\u5141\u8bb8\u8f7b\u677e\u4fee\u6539\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-8941e7ff gb-headline-text\">\u8d28\u91cf\u63a7\u5236<\/h4>\n\n\n\n<p>\u8d28\u91cf\u4fdd\u8bc1\u5728\u5236\u9020\u4e1a\u4e2d\u81f3\u5173\u91cd\u8981\u3002\u8be5\u7ec4\u4ef6\u901a\u8fc7\u5728\u751f\u4ea7\u8fc7\u7a0b\u7684\u4e0d\u540c\u9636\u6bb5\u8fdb\u884c\u5b9a\u671f\u68c0\u67e5\uff0c\u786e\u4fdd\u4ea7\u54c1\u7b26\u5408\u8bbe\u5b9a\u7684\u8d28\u91cf\u6807\u51c6\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-5e8b610b gb-headline-text\">\u8ba2\u5355\u7ba1\u7406<\/h4>\n\n\n\n<p>\u4ece\u8ba2\u5355\u63a5\u6536\u5230\u53d1\u8d27\uff0c\u8be5\u7ec4\u4ef6\u7b80\u5316\u4e86\u6574\u4e2a\u4ece\u8ba2\u5355\u5230\u73b0\u91d1\u7684\u5468\u671f\uff0c\u786e\u4fdd\u51c6\u65f6\u4ea4\u8d27\u3001\u51c6\u786e\u5f00\u7968\u548c\u53ca\u65f6\u4ed8\u6b3e\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-540130ee gb-headline-text\">\u91c7\u8d2d<\/h4>\n\n\n\n<p>\u8fd9\u7ba1\u7406\u7740\u539f\u6750\u6599\u548c\u5176\u4ed6\u57fa\u672c\u7ec4\u4ef6\u7684\u91c7\u8d2d\u3002\u5b83\u786e\u4fdd\u4ee5\u5177\u6709\u7ade\u4e89\u529b\u7684\u4ef7\u683c\u91c7\u8d2d\u5230\u6700\u4f18\u8d28\u7684\u6750\u6599\uff0c\u4ece\u800c\u63d0\u9ad8\u6210\u672c\u6548\u7387\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-b3cd2164 gb-headline-text\">\u4ea7\u54c1\u751f\u547d\u5468\u671f\u7ba1\u7406 (PLM)<\/h4>\n\n\n\n<p>PLM \u76d1\u63a7\u4ea7\u54c1\u4ece\u6784\u601d\u3001\u8bbe\u8ba1\u3001\u5236\u9020\u5230\u670d\u52a1\u548c\u5904\u7f6e\u7684\u5168\u8fc7\u7a0b\u3002\u5b83\u6709\u52a9\u4e8e\u5728\u4ea7\u54c1\u5f00\u53d1\u548c\u4fee\u6539\u65b9\u9762\u505a\u51fa\u660e\u667a\u7684\u51b3\u7b56\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-fd3eb392 gb-headline-text\">\u4ed3\u5e93\u7ba1\u7406<\/h4>\n\n\n\n<p>\u9664\u4e86\u5b58\u50a8\u4e4b\u5916\uff0c\u6709\u6548\u7684\u4ed3\u5e93\u7ba1\u7406\u8fd8\u80fd\u786e\u4fdd\u9ad8\u6548\u7684\u5e93\u5b58\u68c0\u7d22\u3001\u51cf\u5c11\u6d6a\u8d39\u5e76\u7b80\u5316\u53d1\u8d27\u6d41\u7a0b\uff0c\u4ece\u800c\u5b9e\u73b0\u66f4\u5feb\u7684\u5ba2\u6237\u4ea4\u4ed8\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-bc519057 gb-headline-text\">\u8f66\u95f4\u63a7\u5236<\/h4>\n\n\n\n<p>\u8be5\u7ec4\u4ef6\u63d0\u4f9b\u4e86\u8f66\u95f4\u6d3b\u52a8\u7684\u5b9e\u65f6\u89c6\u56fe\uff0c\u4ece\u673a\u5668\u8fd0\u884c\u5230\u5458\u5de5\u751f\u4ea7\u529b\u3002\u5b83\u6709\u52a9\u4e8e\u8bc6\u522b\u74f6\u9888\u5e76\u4f18\u5316\u751f\u4ea7\u6d41\u7a0b\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-ba1ba308 gb-headline-text\">\u7ef4\u62a4\u7ba1\u7406<\/h4>\n\n\n\n<p>\u786e\u4fdd\u673a\u68b0\u8bbe\u5907\u5904\u4e8e\u6700\u4f73\u72b6\u6001\u81f3\u5173\u91cd\u8981\u3002\u8be5\u7ec4\u4ef6\u5b89\u6392\u5b9a\u671f\u7ef4\u62a4\uff0c\u51cf\u5c11\u8ba1\u5212\u5916\u505c\u673a\u65f6\u95f4\u5e76\u5ef6\u957f\u8bbe\u5907\u5bff\u547d\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6c0468bd gb-headline-text\">\u4eba\u529b\u8d44\u6e90<\/h4>\n\n\n\n<p>\u673a\u5668\u80cc\u540e\u7684\u4eba\u540c\u6837\u91cd\u8981\u3002\u8be5\u7ec4\u4ef6\u7ba1\u7406\u4ece\u62db\u8058\u5230\u57f9\u8bad\u3001\u85aa\u8d44\u548c\u7ee9\u6548\u8bc4\u4f30\u7684\u4e00\u5207\u4e8b\u52a1\uff0c\u786e\u4fdd\u62e5\u6709\u4e00\u652f\u79ef\u6781\u8fdb\u53d6\u4e14\u6280\u80fd\u5a34\u719f\u7684\u5458\u5de5\u961f\u4f0d\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f71f7e53 gb-headline-text\">\u8d22\u52a1\u7ba1\u7406<\/h4>\n\n\n\n<p>\u63d0\u4f9b\u4e1a\u52a1\u8d22\u52a1\u72b6\u51b5\u7684\u5168\u9762\u89c6\u56fe\uff0c\u4ece\u652f\u51fa\u5230\u6536\u5165\u3001\u8d44\u4ea7\u548c\u8d1f\u503a\u3002\u5b83\u6709\u52a9\u4e8e\u9884\u7b97\u7f16\u5236\u3001\u8d22\u52a1\u89c4\u5212\u548c\u5ba1\u8ba1\u51c6\u5907\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-9c337c56 gb-headline-text\">\u5ba2\u6237\u5173\u7cfb\u7ba1\u7406 (CRM)<\/h4>\n\n\n\n<p>\u5efa\u7acb\u548c\u7ef4\u62a4\u7a33\u56fa\u7684\u5ba2\u6237\u5173\u7cfb\u5bf9\u4e8e\u6301\u7eed\u589e\u957f\u81f3\u5173\u91cd\u8981\u3002CRM \u786e\u4fdd\u6709\u6548\u7684\u5ba2\u6237\u6c9f\u901a\uff0c\u9ad8\u6548\u5904\u7406\u54a8\u8be2\u3001\u6295\u8bc9\u548c\u53cd\u9988\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-e6b48ea8 gb-headline-text\">\u5206\u6790\u4e0e\u62a5\u544a<\/h4>\n\n\n\n<p>\u6570\u636e\u9a71\u52a8\u7684\u51b3\u7b56\u662f\u73b0\u4ee3\u5236\u9020\u4e1a\u7684\u57fa\u77f3\u3002\u8be5\u7ec4\u4ef6\u63d0\u4f9b\u53ef\u64cd\u4f5c\u7684\u89c1\u89e3\u3001\u8be6\u7ec6\u62a5\u544a\u548c\u5206\u6790\uff0c\u4e3a\u4e1a\u52a1\u6218\u7565\u63d0\u4f9b\u4fe1\u606f\u3002<\/p>\n\n\n\n<p>\u5f53\u96c6\u6210\u5728 ERP \u5236\u9020\u6a21\u5757\u4e2d\u65f6\uff0c\u8fd9\u4e9b\u7ec4\u4ef6\u4e2d\u7684\u6bcf\u4e00\u4e2a\u90fd\u4e3a\u5236\u9020\u5546\u63d0\u4f9b\u4e86\u9ad8\u6548\u8fd0\u8425\u3001\u9002\u5e94\u5e02\u573a\u53d8\u5316\u5e76\u786e\u4fdd\u5728\u7ade\u4e89\u683c\u5c40\u4e2d\u5b9e\u73b0\u53ef\u6301\u7eed\u589e\u957f\u6240\u9700\u7684\u5de5\u5177\u3002<\/p>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-e73c263c wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner \u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b Solutions to production problems\" class=\"uag-image-4232\" width=\"1024\" height=\"302\" title=\"\" loading=\"lazy\" role=\"img\" \/><\/figure><\/div>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">ERP \u5236\u9020\u7684\u672a\u6765\u8d8b\u52bf<\/h2>\n\n\n\n<p>\u5236\u9020\u683c\u5c40\u4e00\u76f4\u5f88\u590d\u6742\uff0c\u4f46\u8fd1\u5e74\u6765\uff0c\u5728\u5de5\u4e1a 4.0\u3001\u6570\u5b57\u5316\u548c\u4e0d\u65ad\u53d8\u5316\u7684\u6d88\u8d39\u8005\u9700\u6c42\u7684\u63a8\u52a8\u4e0b\uff0c\u5b83\u9762\u4e34\u7740\u5feb\u901f\u8f6c\u578b\u3002\u4ee5\u4e0b\u662f\u4e00\u4e9b\u9884\u793a ERP \u5236\u9020\u672a\u6765\u65b9\u5411\u7684\u65b0\u5174\u8d8b\u52bf\uff1a<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><a href=\"https:\/\/skyplanner.ai\/zh-hans\/resources\/internet-of-things-empowering-manufacturing\/\">IoT<\/a>\uff08\u7269\u8054\u7f51\uff09\u7684\u96c6\u6210\uff1a\u968f\u7740\u8bbe\u5907\u65e5\u76ca\u667a\u80fd\u5316\uff0c\u8bbe\u5907\u4e4b\u95f4\u7684\u4e92\u8054\u4e92\u901a\u5c06\u53d1\u6325\u5173\u952e\u4f5c\u7528\u3002\u5c06 IoT \u96c6\u6210\u5230 ERP Manufacturing \u4e2d\uff0c\u5c06\u5b9e\u73b0\u5b9e\u65f6\u6570\u636e\u91c7\u96c6\uff0c\u63d0\u4f9b\u5b9d\u8d35\u6d1e\u5bdf\uff0c\u5e76\u63a8\u52a8\u4e3b\u52a8\u51b3\u7b56\u3002<\/li>\n\n\n\n<li>AI \u4e0e\u673a\u5668\u5b66\u4e60\uff1a\u8fd9\u4e9b\u6280\u672f\u5c06\u91cd\u65b0\u5b9a\u4e49\u6d41\u7a0b\u81ea\u52a8\u5316\u3002ERP Manufacturing \u5f88\u53ef\u80fd\u501f\u52a9 AI \u5b9e\u73b0\u9884\u6d4b\u5206\u6790\uff0c\u66f4\u7cbe\u51c6\u5730\u9884\u6d4b\u9700\u6c42\uff0c\u5e76\u4f18\u5316\u8d44\u6e90\u5206\u914d\u3002<\/li>\n\n\n\n<li>\u57fa\u4e8e\u4e91\u7684\u89e3\u51b3\u65b9\u6848\uff1a\u5411\u4e91\u8ba1\u7b97\u7684\u8f6c\u53d8\u5c06\u6301\u7eed\u63a8\u8fdb\uff0c\u56e0\u4e3a\u5b83\u63d0\u4f9b\u53ef\u6269\u5c55\u6027\u3001\u5b9e\u65f6\u66f4\u65b0\u4ee5\u53ca\u968f\u65f6\u968f\u5730\u8bbf\u95ee\u7684\u80fd\u529b\u3002\u57fa\u4e8e\u4e91\u7684 ERP Manufacturing \u7cfb\u7edf\u5c06\u51cf\u5c11\u5bf9\u672c\u5730 IT \u57fa\u7840\u8bbe\u65bd\u7684\u4f9d\u8d56\uff0c\u4ece\u800c\u8282\u7ea6\u6210\u672c\u3002<\/li>\n\n\n\n<li>\u865a\u62df\u73b0\u5b9e\u4e0e\u589e\u5f3a\u73b0\u5b9e\uff1a\u8fd9\u4e9b\u65b0\u6280\u672f\u5de5\u5177\u53ef\u63d0\u5347\u57f9\u8bad\u6d41\u7a0b\u3001\u5b9e\u73b0\u5236\u9020\u5de5\u5382\u7684\u865a\u62df\u53c2\u89c2\uff0c\u5e76\u63d0\u4f9b\u5b9e\u65f6\u6a21\u62df\uff0c\u4ece\u800c\u63d0\u9ad8\u751f\u4ea7\u6548\u7387\u3001\u51cf\u5c11\u9519\u8bef\u3002<\/li>\n\n\n\n<li>\u53ef\u6301\u7eed\u53d1\u5c55\u4e0e\u7eff\u8272\u5236\u9020\uff1a\u968f\u7740\u5168\u7403\u5bf9\u53ef\u6301\u7eed\u53d1\u5c55\u7684\u91cd\u89c6\u7a0b\u5ea6\u4e0d\u65ad\u63d0\u9ad8\uff0cERP Manufacturing \u6a21\u5757\u5c06\u878d\u5165\u4f18\u5148\u91c7\u7528\u73af\u4fdd\u751f\u4ea7\u65b9\u5f0f\u3001\u51cf\u5c11\u5e9f\u6599\u53ca\u63d0\u5347\u80fd\u6e90\u6548\u7387\u7b49\u529f\u80fd\u3002<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">\u53d7\u76ca\u4e8e\u6b64\u6a21\u5757\u7684\u884c\u4e1a<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>\u6c7d\u8f66\u884c\u4e1a\uff1a\u9762\u5bf9\u7e41\u591a\u7684\u96f6\u90e8\u4ef6\u3001\u4e25\u683c\u7684\u8d28\u91cf\u7ba1\u63a7\u548c\u5e9e\u5927\u7684\u4f9b\u5e94\u94fe\uff0c\u6c7d\u8f66\u884c\u4e1a\u5728\u6d41\u7a0b\u4f18\u5316\u3001\u5e93\u5b58\u7ba1\u7406\u548c\u5b9e\u65f6\u76d1\u63a7\u65b9\u9762\u9ad8\u5ea6\u4f9d\u8d56 ERP Manufacturing\u3002<\/li>\n\n\n\n<li>\u5236\u836f\u884c\u4e1a\uff1a\u5728\u786e\u4fdd\u6cd5\u89c4\u5408\u89c4\u3001\u7ba1\u7406\u590d\u6742\u914d\u65b9\u4ee5\u53ca\u7ef4\u62a4\u8d28\u91cf\u6807\u51c6\u65b9\u9762\uff0cERP Manufacturing \u5bf9\u5236\u836f\u884c\u4e1a\u4e0d\u53ef\u6216\u7f3a\u3002<\/li>\n\n\n\n<li>\u822a\u7a7a\u822a\u5929\u4e0e\u56fd\u9632\uff1a\u9762\u5bf9\u590d\u6742\u7684\u88c5\u914d\u5de5\u827a\u548c\u7cbe\u5ea6\u8981\u6c42\uff0cERP Manufacturing \u6709\u52a9\u4e8e\u4f18\u5316\u751f\u4ea7\u6392\u7a0b\u3001\u7ba1\u7406 BOM\uff0c\u5e76\u786e\u4fdd\u4e25\u683c\u7684\u8d28\u91cf\u68c0\u9a8c\u3002<\/li>\n\n\n\n<li>\u7535\u5b50\u884c\u4e1a\uff1a\u7535\u5b50\u6280\u672f\u7684\u5feb\u901f\u8fed\u4ee3\u8981\u6c42\u9ad8\u6548\u7684\u751f\u4ea7\u8ba1\u5212\u3001\u5e93\u5b58\u7ba1\u7406\u4ee5\u53ca\u5bf9\u5e02\u573a\u8d8b\u52bf\u7684\u5feb\u901f\u9002\u5e94\uff0c\u8fd9\u4e00\u5207\u5747\u7531 ERP Manufacturing \u63d0\u4f9b\u652f\u6301\u3002<\/li>\n\n\n\n<li>\u98df\u54c1\u4e0e\u996e\u6599\uff1a\u9762\u5bf9\u6613\u8150\u5546\u54c1\u3001\u4e25\u683c\u7684\u8d28\u91cf\u7ba1\u63a7\u548c\u591a\u53d8\u7684\u6d88\u8d39\u8005\u9700\u6c42\uff0c\u98df\u54c1\u4e0e\u996e\u6599\u884c\u4e1a\u4f9d\u6258 ERP Manufacturing \u5b9e\u73b0\u9ad8\u6548\u7684\u5e93\u5b58\u7ba1\u7406\u3001\u8d28\u91cf\u68c0\u9a8c\u548c\u53ca\u65f6\u4ea4\u8d27\u3002<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">\u5c06 Skyplanner \u7b49 APS \u4e0e ERP \u5236\u9020\u96c6\u6210<\/h2>\n\n\n\n<p>\u5bf9\u4e8e\u90a3\u4e9b\u5df2\u7ecf\u5229\u7528\u6216\u6b63\u5728\u8003\u8651 ERP \u5236\u9020\u7684\u4f01\u4e1a\uff0c\u50cf Skyplanner \u8fd9\u6837\u7684\u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b (APS) \u7cfb\u7edf\u53ef\u4ee5\u5c06\u8fd0\u8425\u6548\u7387\u63d0\u5347\u5230\u65b0\u7684\u9ad8\u5ea6\u3002<a href=\"https:\/\/skyplanner.ai\/\">Skyplanner<\/a> \u4e0d\u4ec5\u534f\u52a9\u8be6\u7ec6\u7684\u751f\u4ea7\u6392\u7a0b\uff0c\u8fd8\u63d0\u4f9b\u6709\u52a9\u4e8e\u4f18\u5316\u8d44\u6e90\u5206\u914d\u3001\u7f29\u77ed\u4ea4\u8d27\u671f\u5e76\u786e\u4fdd\u51c6\u65f6\u4ea4\u8d27\u7684\u89c1\u89e3\u3002\u4e0e ERP \u5236\u9020\u96c6\u6210\u53ef\u63d0\u4f9b\u751f\u4ea7\u683c\u5c40\u7684\u5168\u666f\u89c6\u56fe\uff0c\u4f7f\u4f01\u4e1a\u80fd\u591f\u4fdd\u6301\u654f\u6377\u5e76\u5bf9\u5e02\u573a\u6ce2\u52a8\u505a\u51fa\u54cd\u5e94\u3002<\/p>\n\n\n\n<p>\u5982\u679c\u7b80\u5316\u8fd0\u8425\u3001\u63d0\u9ad8\u6548\u7387\u548c\u5728\u7ade\u4e89\u4e2d\u4fdd\u6301\u9886\u5148\u662f\u60a8\u7684\u76ee\u6807\uff0c\u90a3\u4e48\u73b0\u5728\u662f\u65f6\u5019\u5229\u7528 ERP \u5236\u9020\u548c Skyplanner \u7684\u7ed3\u5408\u529b\u91cf\u4e86\u3002<a href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%81%94%e7%b3%bb%e9%94%80%e5%94%ae\/\">\u7acb\u5373\u8054\u7cfb\u6211\u4eec\uff0c\u8ba9\u6211\u4eec\u5171\u540c\u63a2\u8ba8\u5982\u4f55\u6839\u636e\u60a8\u72ec\u7279\u7684\u5236\u9020\u9700\u6c42\u91cf\u8eab\u5b9a\u5236\u89e3\u51b3\u65b9\u6848<\/a>\uff0c\u5e76\u52a9\u60a8\u8d70\u4e0a\u6301\u7eed\u589e\u957f\u4e4b\u8def\u3002<\/p>\n\n\n\n<p><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-zh-hans31\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-zh-hans32\">\n<div class=\"gb-grid-column gb-grid-column-zh-hans33\"><div class=\"gb-container gb-container-zh-hans33\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-zh-hans34\"><div class=\"gb-container gb-container-zh-hans34\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>ERP \u5236\u9020 \u9996\u9875&nbsp;\u00bb&nbsp;\u8d44\u6e90&nbsp;\u00bb&nbsp;ERP \u5236\u9020 \u6bcf\u4e00\u4f4d\u751f\u4ea7\u8ba1\u5212\u5458\u90fd\u6df1\u77e5\u5176\u4e2d\u7684\u6311\u6218\uff1a\u60a8\u6536\u5230\u4e86\u8ba2\u5355\uff0c\u4f46\u60a8\u662f\u5426\u6709\u80fd\u529b\u9ad8\u6548\u5730\u5b8c\u6210\u5b83\uff1f\u60f3\u8c61\u4e00\u4e0b\u8fd9\u6837\u7684\u573a\u666f\uff1a\u9700\u6c42\u6b63\u5728\u589e\u957f\uff0c\u4f46\u7531\u4e8e\u5bf9\u751f\u4ea7\u80fd\u529b\u3001\u539f\u6750\u6599\u5e93\u5b58\u751a\u81f3\u7269\u6599\u6e05\u5355 (BOM) \u7f3a\u4e4f\u6e05\u6670\u7684\u53ef\u89c1\u6027\uff0c\u5bfc\u81f4\u4e86\u5ef6\u8fdf\u548c\u6548\u7387\u4f4e\u4e0b\u3002\u8fd9\u79cd\u60c5\u51b5\u53ef\u80fd\u4f1a\u6210\u5c31\u6216\u6bc1\u6389\u4e00\u5bb6\u516c\u53f8\u7684\u58f0\u8a89\u3002\u90a3\u4e48\uff0c\u89e3\u51b3\u65b9\u6848\u662f\u4ec0\u4e48\uff1fERP \u5236\u9020\u2014\u2014\u8fd9\u662f\u6bcf\u4e00\u4f4d\u751f\u4ea7\u8ba1\u5212\u5458\u90fd\u5e94\u8be5\u8003\u8651\u7684\u521b\u65b0\u5de5\u5177\u3002 \u56e0\u6b64\uff0c\u5bf9\u4e8e\u751f\u4ea7\u8ba1\u5212\u9886\u57df\u7684\u4e13\u4e1a\u4eba\u58eb\u6765\u8bf4\uff0c\u73b0\u5728\u96be\u9053\u4e0d\u662f\u5c06 ERP \u5236\u9020\u4f5c\u4e3a\u60a8\u7684\u4e0b\u4e00\u4e2a\u6218\u7565\u4e3e\u63aa\u7684\u65f6\u5019\u5417\uff1f\u6df1\u5165\u4e86\u89e3\u5e76\u63a2\u7d22\u5176\u529f\u80fd\uff0c\u89c1\u8bc1\u60a8\u7684\u5236\u9020\u6d41\u7a0b\u5411\u66f4\u597d\u7684\u65b9\u5411\u8f6c\u53d8\u3002 TL;DR ERP \u5236\u9020\u662f\u5927\u578b ERP \u7cfb\u7edf\u4e2d\u4e0d\u53ef\u6216\u7f3a\u7684\u6a21\u5757\uff0c\u4e13\u6ce8\u4e8e\u901a\u8fc7\u96c6\u4e2d\u6240\u6709\u4e0e\u751f\u4ea7\u76f8\u5173\u7684\u4fe1\u606f\u6765\u4f18\u5316\u5236\u9020\u6d41\u7a0b\u3002\u5b83\u7b80\u5316\u4e86\u4ece\u539f\u6750\u6599\u5230\u6210\u54c1\u7684\u751f\u4ea7\u8fc7\u7a0b\u3002\u4e3b\u8981\u4f18\u52bf\u5305\u62ec\u96c6\u4e2d\u6570\u636e\u7ba1\u7406\u3001\u5b9e\u65f6\u76d1\u63a7\u3001\u9ad8\u6548\u7684\u5e93\u5b58\u548c\u8ba2\u5355\u7ba1\u7406\u4ee5\u53ca\u964d\u4f4e\u6210\u672c\u3002\u8be5\u6a21\u5757\u7531\u751f\u4ea7\u8ba1\u5212\u3001\u5e93\u5b58\u7ba1\u7406\u3001BOM \u548c\u8d28\u91cf\u63a7\u5236\u7b49\u5173\u952e\u7ec4\u4ef6\u7ec4\u6210\u3002\u5c55\u671b\u672a\u6765\uff0c\u8be5\u6a21\u5757\u7684\u53d1\u5c55\u8d8b\u52bf\u5c06\u62e5\u62b1 IoT \u96c6\u6210\u3001AI\u3001\u4e91\u8ba1\u7b97\u548c\u53ef\u6301\u7eed\u5236\u9020\u3002\u5b83\u4f7f\u6c7d\u8f66\u3001\u5236\u836f\u3001\u822a\u7a7a\u822a\u5929\u3001\u7535\u5b50\u4ee5\u53ca\u98df\u54c1\u548c\u996e\u6599\u7b49\u884c\u4e1a\u663e\u8457\u53d7\u76ca\u3002\u5c06 Skyplanner \u7b49 APS \u7cfb\u7edf\u4e0e ERP \u5236\u9020\u96c6\u6210\u53ef\u4ee5\u8fdb\u4e00\u6b65\u63d0\u9ad8\u6548\u7387\u3002 \u4ec0\u4e48\u662f ERP \u5236\u9020\uff1f ERP \u5236\u9020\u662f\u4e00\u4e2a\u4e13\u95e8\u7684\u6a21\u5757\uff0c\u4e3b\u8981\u4fa7\u91cd\u4e8e\u4f18\u5316\u5236\u9020\u548c\u751f\u4ea7\u6d41\u7a0b\u3002&nbsp; \u968f\u7740\u751f\u4ea7\u590d\u6742\u6027\u7684\u4e0d\u65ad\u589e\u52a0\uff0c\u62e5\u6709\u4e00\u4e2a\u80fd\u591f\u89e3\u51b3\u7279\u5b9a\u5236\u9020\u6311\u6218\u7684\u4e13\u7528\u5de5\u5177\u53d8\u5f97\u4e0d\u53ef\u6216\u7f3a\u3002\u5728\u5b9e\u65bd\u8fc7\u7a0b\u4e2d\uff0cERP \u5236\u9020\u96c6\u4e2d\u4e86\u6240\u6709\u4e0e\u751f\u4ea7\u76f8\u5173\u7684\u4fe1\u606f\u2014\u2014\u4ece\u539f\u6750\u6599\u5230\u6210\u54c1\u3002 \u603b\u4f53\u800c\u8a00\uff0cERP \u5236\u9020\u662f\u9762\u5411\u5236\u9020\u5546\u7684\u5168\u9762\u89e3\u51b3\u65b9\u6848\u3002&nbsp;\u9664\u4e86\u5e2e\u52a9\u7b80\u5316\u6d41\u7a0b\u5916\uff0c\u5b83\u8fd8\u63d0\u4f9b\u4e86\u751f\u4ea7\u94fe\u7684\u8be6\u7ec6\u89c6\u56fe\uff0c\u4ece\u800c\u5b9e\u73b0\u53ca\u65f6\u7684\u51b3\u7b56\u3002ERP \u5236\u9020\u8d1f\u8d23\u5904\u7406\u7269\u6599\u6e05\u5355 (BOM)\uff0c\u4ee5\u786e\u4fdd\u6bcf\u4e2a\u751f\u4ea7\u9636\u6bb5\u90fd\u4e0e\u516c\u53f8\u7684\u76ee\u6807\u4fdd\u6301\u4e00\u81f4\u3002 \u6b64\u5916\uff0c\u5bf9\u4e8e\u4e13\u95e8\u5bfb\u6c42\u50cf Skyplanner \u8fd9\u6837\u7684 APS \u7cfb\u7edf\u6765\u8fdb\u884c\u9ad8\u7ea7\u751f\u4ea7\u8ba1\u5212\u4e0e\u6392\u7a0b\u7684\u751f\u4ea7\u8ba1\u5212\u5458\u6765\u8bf4\uff0c\u5c06\u5176\u4e0e ERP \u5236\u9020\u96c6\u6210\u88ab\u8bc1\u660e\u662f\u6709\u76ca\u7684\u3002\u53ea\u8981 APS \u7cfb\u7edf\u4e0e ERP \u5236\u9020\u6a21\u5757\u534f\u540c\u5de5\u4f5c\uff0c\u4f01\u4e1a\u5c31\u53ef\u4ee5\u9884\u89c1\u751f\u4ea7\u6311\u6218\u5e76\u505a\u51fa\u524d\u77bb\u6027\u51b3\u7b56\u3002 ERP \u5236\u9020\u7684\u5173\u952e\u4f5c\u7528 \u5728\u73b0\u4ee3\u5236\u9020\u4e1a\u9519\u7efc\u590d\u6742\u7684\u8ff7\u5bab\u4e2d\uff0c\u4fdd\u6301\u9886\u5148\u5730\u4f4d\u5df2\u4e0d\u518d\u4ec5\u4ec5\u5173\u4e4e\u751f\u4ea7\u9ad8\u8d28\u91cf\u7684\u4ea7\u54c1\uff0c\u8fd8\u5173\u4e4e\u4f18\u5316\u8fd9\u4e9b\u4ea7\u54c1\u8bde\u751f\u7684\u8fc7\u7a0b\u3002\u8fd9\u5c31\u662f ERP \u5236\u9020\u4f5c\u4e3a ERP \u6a21\u5757\u53d1\u6325\u4f5c\u7528\u7684\u5730\u65b9\u3002\u5728\u6784\u6210\u5b8c\u6574 \u4f01\u4e1a\u8d44\u6e90\u8ba1\u5212 &#8230; <a title=\"ERP \u5236\u9020\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/\" aria-label=\"Read more about ERP \u5236\u9020\">\u9605\u8bfb\u66f4\u591a<\/a><\/p>\n","protected":false},"author":0,"featured_media":15643,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2719,2517],"tags":[],"class_list":["post-85013","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-erp-zh-hans","category-2517","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ERP \u5236\u9020 &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"ERP \u5236\u9020\u662f\u4e00\u4e2a\u4e13\u95e8\u7684\u6a21\u5757\uff0c\u4e3b\u8981\u4fa7\u91cd\u4e8e\u4f18\u5316\u5236\u9020\u548c\u751f\u4ea7\u6d41\u7a0b\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ERP \u5236\u9020\" \/>\n<meta property=\"og:description\" content=\"ERP \u5236\u9020\u662f\u4e00\u4e2a\u4e13\u95e8\u7684\u6a21\u5757\uff0c\u4e3b\u8981\u4fa7\u91cd\u4e8e\u4f18\u5316\u5236\u9020\u548c\u751f\u4ea7\u6d41\u7a0b\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-02T15:23:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-20T15:42:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Manufacturing-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1717\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-manufacturing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-manufacturing\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"ERP \u5236\u9020\",\"datePublished\":\"2023-09-02T15:23:09+00:00\",\"dateModified\":\"2026-03-20T15:42:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-manufacturing\\\/\"},\"wordCount\":96,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/ERP-Manufacturing-scaled.jpg\",\"articleSection\":[\"ERP\",\"\u8d44\u6e90\"],\"inLanguage\":\"zh-CN\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-manufacturing\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-manufacturing\\\/\",\"name\":\"ERP \u5236\u9020 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-manufacturing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/ERP-Manufacturing-scaled.jpg\",\"datePublished\":\"2023-09-02T15:23:09+00:00\",\"dateModified\":\"2026-03-20T15:42:20+00:00\",\"description\":\"ERP \u5236\u9020\u662f\u4e00\u4e2a\u4e13\u95e8\u7684\u6a21\u5757\uff0c\u4e3b\u8981\u4fa7\u91cd\u4e8e\u4f18\u5316\u5236\u9020\u548c\u751f\u4ea7\u6d41\u7a0b\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-manufacturing\\\/#breadcrumb\"},\"inLanguage\":\"zh-CN\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-manufacturing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-manufacturing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/ERP-Manufacturing-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/ERP-Manufacturing-scaled.jpg\",\"width\":2560,\"height\":1717,\"caption\":\"ERP Manufacturing\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-manufacturing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP \u5236\u9020\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-CN\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ERP \u5236\u9020 &#8211; SkyPlanner","description":"ERP \u5236\u9020\u662f\u4e00\u4e2a\u4e13\u95e8\u7684\u6a21\u5757\uff0c\u4e3b\u8981\u4fa7\u91cd\u4e8e\u4f18\u5316\u5236\u9020\u548c\u751f\u4ea7\u6d41\u7a0b\u3002","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/","og_locale":"zh_CN","og_type":"article","og_title":"ERP \u5236\u9020","og_description":"ERP \u5236\u9020\u662f\u4e00\u4e2a\u4e13\u95e8\u7684\u6a21\u5757\uff0c\u4e3b\u8981\u4fa7\u91cd\u4e8e\u4f18\u5316\u5236\u9020\u548c\u751f\u4ea7\u6d41\u7a0b\u3002","og_url":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/","og_site_name":"SkyPlanner","article_published_time":"2023-09-02T15:23:09+00:00","article_modified_time":"2026-03-20T15:42:20+00:00","og_image":[{"width":2560,"height":1717,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Manufacturing-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/"},"author":{"name":"","@id":""},"headline":"ERP \u5236\u9020","datePublished":"2023-09-02T15:23:09+00:00","dateModified":"2026-03-20T15:42:20+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/"},"wordCount":96,"publisher":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Manufacturing-scaled.jpg","articleSection":["ERP","\u8d44\u6e90"],"inLanguage":"zh-CN"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/","url":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/","name":"ERP \u5236\u9020 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Manufacturing-scaled.jpg","datePublished":"2023-09-02T15:23:09+00:00","dateModified":"2026-03-20T15:42:20+00:00","description":"ERP \u5236\u9020\u662f\u4e00\u4e2a\u4e13\u95e8\u7684\u6a21\u5757\uff0c\u4e3b\u8981\u4fa7\u91cd\u4e8e\u4f18\u5316\u5236\u9020\u548c\u751f\u4ea7\u6d41\u7a0b\u3002","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/#breadcrumb"},"inLanguage":"zh-CN","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/"]}]},{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Manufacturing-scaled.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Manufacturing-scaled.jpg","width":2560,"height":1717,"caption":"ERP Manufacturing"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-manufacturing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/zh-hans\/"},{"@type":"ListItem","position":2,"name":"ERP \u5236\u9020"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/zh-hans\/#website","url":"https:\/\/skyplanner.ai\/zh-hans\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/zh-hans\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-CN"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/zh-hans\/","logo":{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Manufacturing-scaled.jpg",2560,1717,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Manufacturing-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Manufacturing-300x201.jpg",300,201,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Manufacturing-768x515.jpg",768,515,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Manufacturing-1024x687.jpg",1024,687,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Manufacturing-1536x1030.jpg",1536,1030,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Manufacturing-2048x1374.jpg",2048,1374,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Manufacturing-scaled.jpg",360,241,false]},"uagb_author_info":{"display_name":"","author_link":"https:\/\/skyplanner.ai\/zh-hans\/author\/"},"uagb_comment_info":0,"uagb_excerpt":"ERP \u5236\u9020 \u9996\u9875&nbsp;\u00bb&nbsp;\u8d44\u6e90&nbsp;\u00bb&nbsp;ERP \u5236\u9020 \u6bcf\u4e00\u4f4d\u751f\u4ea7\u8ba1\u5212\u5458\u90fd\u6df1\u77e5\u5176\u4e2d\u7684\u6311\u6218\uff1a\u60a8\u6536\u5230\u4e86\u8ba2\u5355\uff0c\u4f46\u60a8\u662f\u5426\u6709\u80fd\u529b\u9ad8\u6548\u5730\u5b8c\u6210\u5b83\uff1f\u60f3\u8c61\u4e00\u4e0b\u8fd9\u6837\u7684\u573a\u666f\uff1a\u9700\u6c42\u6b63\u5728\u589e\u957f\uff0c\u4f46\u7531\u4e8e\u5bf9\u751f\u4ea7\u80fd\u529b\u3001\u539f\u6750\u6599\u5e93\u5b58\u751a\u81f3\u7269\u6599\u6e05\u5355 (BOM) \u7f3a\u4e4f\u6e05\u6670\u7684\u53ef\u89c1\u6027\uff0c\u5bfc\u81f4\u4e86\u5ef6\u8fdf\u548c\u6548\u7387\u4f4e\u4e0b\u3002\u8fd9\u79cd\u60c5\u51b5\u53ef\u80fd\u4f1a\u6210\u5c31\u6216\u6bc1\u6389\u4e00\u5bb6\u516c\u53f8\u7684\u58f0\u8a89\u3002\u90a3\u4e48\uff0c\u89e3\u51b3\u65b9\u6848\u662f\u4ec0\u4e48\uff1fERP \u5236\u9020\u2014\u2014\u8fd9\u662f\u6bcf\u4e00\u4f4d\u751f\u4ea7\u8ba1\u5212\u5458\u90fd\u5e94\u8be5\u8003\u8651\u7684\u521b\u65b0\u5de5\u5177\u3002 \u56e0\u6b64\uff0c\u5bf9\u4e8e\u751f\u4ea7\u8ba1\u5212\u9886\u57df\u7684\u4e13\u4e1a\u4eba\u58eb\u6765\u8bf4\uff0c\u73b0\u5728\u96be\u9053\u4e0d\u662f\u5c06 ERP \u5236\u9020\u4f5c\u4e3a\u60a8\u7684\u4e0b\u4e00\u4e2a\u6218\u7565\u4e3e\u63aa\u7684\u65f6\u5019\u5417\uff1f\u6df1\u5165\u4e86\u89e3\u5e76\u63a2\u7d22\u5176\u529f\u80fd\uff0c\u89c1\u8bc1\u60a8\u7684\u5236\u9020\u6d41\u7a0b\u5411\u66f4\u597d\u7684\u65b9\u5411\u8f6c\u53d8\u3002 TL;DR ERP \u5236\u9020\u662f\u5927\u578b ERP \u7cfb\u7edf\u4e2d\u4e0d\u53ef\u6216\u7f3a\u7684\u6a21\u5757\uff0c\u4e13\u6ce8\u4e8e\u901a\u8fc7\u96c6\u4e2d\u6240\u6709\u4e0e\u751f\u4ea7\u76f8\u5173\u7684\u4fe1\u606f\u6765\u4f18\u5316\u5236\u9020\u6d41\u7a0b\u3002\u5b83\u7b80\u5316\u4e86\u4ece\u539f\u6750\u6599\u5230\u6210\u54c1\u7684\u751f\u4ea7\u8fc7\u7a0b\u3002\u4e3b\u8981\u4f18\u52bf\u5305\u62ec\u96c6\u4e2d\u6570\u636e\u7ba1\u7406\u3001\u5b9e\u65f6\u76d1\u63a7\u3001\u9ad8\u6548\u7684\u5e93\u5b58\u548c\u8ba2\u5355\u7ba1\u7406\u4ee5\u53ca\u964d\u4f4e\u6210\u672c\u3002\u8be5\u6a21\u5757\u7531\u751f\u4ea7\u8ba1\u5212\u3001\u5e93\u5b58\u7ba1\u7406\u3001BOM \u548c\u8d28\u91cf\u63a7\u5236\u7b49\u5173\u952e\u7ec4\u4ef6\u7ec4\u6210\u3002\u5c55\u671b\u672a\u6765\uff0c\u8be5\u6a21\u5757\u7684\u53d1\u5c55\u8d8b\u52bf\u5c06\u62e5\u62b1 IoT \u96c6\u6210\u3001AI\u3001\u4e91\u8ba1\u7b97\u548c\u53ef\u6301\u7eed\u5236\u9020\u3002\u5b83\u4f7f\u6c7d\u8f66\u3001\u5236\u836f\u3001\u822a\u7a7a\u822a\u5929\u3001\u7535\u5b50\u4ee5\u53ca\u98df\u54c1\u548c\u996e\u6599\u7b49\u884c\u4e1a\u663e\u8457\u53d7\u76ca\u3002\u5c06 Skyplanner \u7b49 APS \u7cfb\u7edf\u4e0e ERP \u5236\u9020\u96c6\u6210\u53ef\u4ee5\u8fdb\u4e00\u6b65\u63d0\u9ad8\u6548\u7387\u3002 \u4ec0\u4e48\u662f ERP \u5236\u9020\uff1f ERP \u5236\u9020\u662f\u4e00\u4e2a\u4e13\u95e8\u7684\u6a21\u5757\uff0c\u4e3b\u8981\u4fa7\u91cd\u4e8e\u4f18\u5316\u5236\u9020\u548c\u751f\u4ea7\u6d41\u7a0b\u3002&nbsp; \u968f\u7740\u751f\u4ea7\u590d\u6742\u6027\u7684\u4e0d\u65ad\u589e\u52a0\uff0c\u62e5\u6709\u4e00\u4e2a\u80fd\u591f\u89e3\u51b3\u7279\u5b9a\u5236\u9020\u6311\u6218\u7684\u4e13\u7528\u5de5\u5177\u53d8\u5f97\u4e0d\u53ef\u6216\u7f3a\u3002\u5728\u5b9e\u65bd\u8fc7\u7a0b\u4e2d\uff0cERP \u5236\u9020\u96c6\u4e2d\u4e86\u6240\u6709\u4e0e\u751f\u4ea7\u76f8\u5173\u7684\u4fe1\u606f\u2014\u2014\u4ece\u539f\u6750\u6599\u5230\u6210\u54c1\u3002 \u603b\u4f53\u800c\u8a00\uff0cERP \u5236\u9020\u662f\u9762\u5411\u5236\u9020\u5546\u7684\u5168\u9762\u89e3\u51b3\u65b9\u6848\u3002&nbsp;\u9664\u4e86\u5e2e\u52a9\u7b80\u5316\u6d41\u7a0b\u5916\uff0c\u5b83\u8fd8\u63d0\u4f9b\u4e86\u751f\u4ea7\u94fe\u7684\u8be6\u7ec6\u89c6\u56fe\uff0c\u4ece\u800c\u5b9e\u73b0\u53ca\u65f6\u7684\u51b3\u7b56\u3002ERP \u5236\u9020\u8d1f\u8d23\u5904\u7406\u7269\u6599\u6e05\u5355 (BOM)\uff0c\u4ee5\u786e\u4fdd\u6bcf\u4e2a\u751f\u4ea7\u9636\u6bb5\u90fd\u4e0e\u516c\u53f8\u7684\u76ee\u6807\u4fdd\u6301\u4e00\u81f4\u3002 \u6b64\u5916\uff0c\u5bf9\u4e8e\u4e13\u95e8\u5bfb\u6c42\u50cf Skyplanner \u8fd9\u6837\u7684 APS \u7cfb\u7edf\u6765\u8fdb\u884c\u9ad8\u7ea7\u751f\u4ea7\u8ba1\u5212\u4e0e\u6392\u7a0b\u7684\u751f\u4ea7\u8ba1\u5212\u5458\u6765\u8bf4\uff0c\u5c06\u5176\u4e0e ERP \u5236\u9020\u96c6\u6210\u88ab\u8bc1\u660e\u662f\u6709\u76ca\u7684\u3002\u53ea\u8981 APS \u7cfb\u7edf\u4e0e ERP \u5236\u9020\u6a21\u5757\u534f\u540c\u5de5\u4f5c\uff0c\u4f01\u4e1a\u5c31\u53ef\u4ee5\u9884\u89c1\u751f\u4ea7\u6311\u6218\u5e76\u505a\u51fa\u524d\u77bb\u6027\u51b3\u7b56\u3002 ERP \u5236\u9020\u7684\u5173\u952e\u4f5c\u7528 \u5728\u73b0\u4ee3\u5236\u9020\u4e1a\u9519\u7efc\u590d\u6742\u7684\u8ff7\u5bab\u4e2d\uff0c\u4fdd\u6301\u9886\u5148\u5730\u4f4d\u5df2\u4e0d\u518d\u4ec5\u4ec5\u5173\u4e4e\u751f\u4ea7\u9ad8\u8d28\u91cf\u7684\u4ea7\u54c1\uff0c\u8fd8\u5173\u4e4e\u4f18\u5316\u8fd9\u4e9b\u4ea7\u54c1\u8bde\u751f\u7684\u8fc7\u7a0b\u3002\u8fd9\u5c31\u662f ERP \u5236\u9020\u4f5c\u4e3a ERP \u6a21\u5757\u53d1\u6325\u4f5c\u7528\u7684\u5730\u65b9\u3002\u5728\u6784\u6210\u5b8c\u6574 \u4f01\u4e1a\u8d44\u6e90\u8ba1\u5212&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/85013","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/comments?post=85013"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/85013\/revisions"}],"predecessor-version":[{"id":85241,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/85013\/revisions\/85241"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/media\/15643"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/media?parent=85013"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/categories?post=85013"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/tags?post=85013"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}