{"id":84999,"date":"2023-09-17T11:44:12","date_gmt":"2023-09-17T11:44:12","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=84999"},"modified":"2026-10-09T23:46:54","modified_gmt":"2026-10-09T23:46:54","slug":"erp-bom-bill-of-materials","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/","title":{"rendered":"ERP BOM (\u7269\u6599\u6e05\u5355)"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"gb-headline gb-headline-70a68819 gb-headline-text\">ERP BOM (\u7269\u6599\u6e05\u5355)<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/zh-hans\/\">\u9996\u9875<\/a>&nbsp;\u00bb&nbsp;<a href=\"\/zh-hans\/%e8%b5%84%e6%ba%90\/\">\u8d44\u6e90<\/a>&nbsp;\u00bb&nbsp;ERP BOM (\u7269\u6599\u6e05\u5355)<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\uff1a <\/span><span class=\"yoast-reading-time__reading-time\">0<\/span><span class=\"yoast-reading-time__time-unit\"> \u5206\u949f<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>\u5728\u5236\u9020\u4e1a\u7684\u4e16\u754c\u4e2d\u822a\u884c\uff0c\u6709\u65f6\u611f\u89c9\u5c31\u50cf\u5750\u8fc7\u5c71\u8f66\u3002\u524d\u4e00\u79d2\u4e00\u5207\u8fd0\u884c\u987a\u7545\uff1b\u4e0b\u4e00\u79d2\uff0c\u60a8\u53ef\u80fd\u5c31\u5728\u5904\u7406\u79ef\u538b\u7684\u5e93\u5b58\uff0c\u6216\u8005\u610f\u8bc6\u5230\u4ea7\u54c1\u96f6\u4ef6\u7684\u4e00\u4e2a\u5fae\u5c0f\u53d8\u5316\u5bfc\u81f4\u4e86\u6574\u4f53\u8d28\u91cf\u7684\u4e0b\u964d\u3002\u800c\u5f53\u4ea7\u54c1\u8d28\u91cf\u53d7\u5230\u5f71\u54cd\u65f6\uff0c\u8bf7\u76f8\u4fe1\u6211\u4eec\uff0c\u54c1\u724c\u7684\u58f0\u8a89\u4e5f\u4f1a\u968f\u4e4b\u53d7\u635f\u3002<\/p>\n\n\n\n<p>\u5e78\u8fd0\u7684\u662f\uff0c\u6709\u4e00\u9879 <a href=\"\/zh-hans\/resources\/erp-features\/\">ERP \u529f\u80fd<\/a> \u5c31\u50cf\u4e00\u5f20\u4fbf\u6377\u7684\u5730\u56fe\uff0c\u5f15\u5bfc\u60a8\u5ea6\u8fc7\u8fd9\u4e9b\u8d77\u4f0f\u3002\u5b83\u5c31\u662f ERP BOM\u3002\u5982\u679c\u60a8\u70ed\u8877\u4e8e\u786e\u4fdd\u751f\u4ea7\u6d41\u7a0b\u4fdd\u6301\u7cbe\u7b80\uff0c\u5e76\u8ba9\u60a8\u7684\u4ea7\u54c1\u59cb\u7ec8\u901a\u8fc7\u8d28\u91cf\u6d4b\u8bd5\uff0c\u90a3\u4e48\u60a8\u5373\u5c06\u627e\u5230\u4e00\u4f4d\u65b0\u7684\u5f97\u529b\u52a9\u624b\u3002<\/p>\n\n\n\n<p>\u672c\u6587\u5c06\u8ba8\u8bba ERP \u7269\u6599\u6e05\u5355\uff0c\u8fd9\u662f\u66f4\u5e7f\u6cdb\u7684\u4f01\u4e1a\u8d44\u6e90\u8ba1\u5212\u7cfb\u7edf\u4e2d\u4e0d\u53ef\u6216\u7f3a\u7684\u5de5\u5177\u3002\u8bf7\u7ee7\u7eed\u9605\u8bfb\uff0c\u6211\u4eec\u5c06\u5e26\u60a8\u4e86\u89e3\u5176\u7ec6\u8282\uff0c\u786e\u4fdd\u60a8\u638c\u63e1\u5176\u5728 <a href=\"\/zh-hans\/resources\/erp-manufacturing\/\">ERP \u5236\u9020\u6a21\u5757<\/a> \u4e2d\u7684\u5173\u952e\u4f5c\u7528\u3002\u51c6\u5907\u597d\u63a2\u7d22 ERP \u7269\u6599\u6e05\u5355\u5982\u4f55\u6210\u4e3a\u60a8\u5236\u9020\u4f53\u7cfb\u671f\u5f85\u5df2\u4e45\u7684\u53d8\u9769\u8005\u4e86\u5417\uff1f\u8ba9\u6211\u4eec\u5f00\u59cb\u5427\uff01<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-25e69fc1      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#\u4ec0\u4e48\u662f-erp-\u7269\u6599\u6e05\u5355\" class=\"uagb-toc-link__trigger\">\u4ec0\u4e48\u662f ERP \u7269\u6599\u6e05\u5355\uff1f<\/a><li class=\"uagb-toc__list\"><a href=\"#erp-bom-\u7684\u91cd\u8981\u6027\" class=\"uagb-toc-link__trigger\">ERP BOM \u7684\u91cd\u8981\u6027<\/a><li class=\"uagb-toc__list\"><a href=\"#erp-bom-\u5728-erp-\u5236\u9020\u6a21\u5757\u4e2d\u7684\u529f\u80fd\" class=\"uagb-toc-link__trigger\">ERP BOM \u5728 ERP \u5236\u9020\u6a21\u5757\u4e2d\u7684\u529f\u80fd<\/a><li class=\"uagb-toc__list\"><a href=\"#erp-\u7269\u6599\u6e05\u5355\u7684\u4f18\u52bf\" class=\"uagb-toc-link__trigger\">ERP \u7269\u6599\u6e05\u5355\u7684\u4f18\u52bf<\/a><li class=\"uagb-toc__list\"><a href=\"#\u53d7\u76ca\u4e8e-erp-bom-\u7684\u884c\u4e1a\" class=\"uagb-toc-link__trigger\">\u53d7\u76ca\u4e8e ERP BOM \u7684\u884c\u4e1a\uff1a<\/a><li class=\"uagb-toc__list\"><a href=\"#\u4f7f\u7528-erp-bom-\u7684\u5efa\u8bae\" class=\"uagb-toc-link__trigger\">\u4f7f\u7528 ERP BOM \u7684\u5efa\u8bae<\/a><li class=\"uagb-toc__list\"><a href=\"#skyplanner\u589e\u5f3a-erp-bom-\u7684\u529b\u91cf\" class=\"uagb-toc-link__trigger\">Skyplanner\uff1a\u589e\u5f3a ERP BOM \u7684\u529b\u91cf<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"gb-headline gb-headline-0fb6f0ea gb-headline-text\">TL;DR<\/h2>\n\n\n\n<p><strong>ERP \u7269\u6599\u6e05\u5355 (ERP BOM) \u662f\u4f01\u4e1a\u8d44\u6e90\u8ba1\u5212\u7cfb\u7edf\u4e2d\u7684\u4e00\u9879\u5173\u952e\u529f\u80fd\uff0c\u5b83\u63d0\u4f9b\u4e86\u4e00\u4efd\u8be6\u7ec6\u5217\u51fa\u751f\u4ea7\u7279\u5b9a\u4ea7\u54c1\u6240\u9700\u7684\u6750\u6599\u3001\u7ec4\u4ef6\u548c\u7ec4\u4ef6\u7684\u7efc\u5408\u6e05\u5355\u3002<\/strong>\u5b83\u4e0d\u4ec5\u4ec5\u662f\u4e00\u4efd\u6e05\u5355\uff0cERP BOM \u5728\u4f18\u5316\u5236\u9020\u6d41\u7a0b\u3001\u786e\u4fdd\u4ea7\u54c1\u8d28\u91cf\u4e00\u81f4\u6027\u548c\u54c1\u724c\u4fe1\u8a89\u65b9\u9762\u81f3\u5173\u91cd\u8981\u3002\u5b83\u63d0\u4f9b\u7cbe\u786e\u7684\u7ec4\u4ef6\u5217\u8868\u3001\u6210\u672c\u4f30\u7b97\u3001\u5e93\u5b58\u7ba1\u7406\u3001\u8d28\u91cf\u4fdd\u8bc1\u4ee5\u53ca\u4e0e APS \u7cfb\u7edf\u7684\u96c6\u6210\u7b49\u529f\u80fd\u3002ERP BOM \u5177\u6709\u63d0\u9ad8\u6548\u7387\u3001\u8282\u7701\u6210\u672c\u3001\u8f85\u52a9\u51c6\u786e\u9884\u6d4b\u3001\u786e\u4fdd\u4ea7\u54c1\u8d28\u91cf\u4e00\u81f4\u4ee5\u53ca\u6539\u5584\u4f9b\u5e94\u5546\u5173\u7cfb\u7b49\u8bf8\u591a\u4f18\u52bf\u3002\u4ece\u6c7d\u8f66\u5230\u65f6\u5c1a\uff0c\u5404\u884c\u5404\u4e1a\u90fd\u4f9d\u9760 ERP BOM \u6765\u5e94\u5bf9\u5176\u751f\u4ea7\u7684\u590d\u6742\u6027\u3002\u4e3a\u4e86\u5145\u5206\u5229\u7528 ERP BOM\uff0c\u5efa\u8bae\u4f01\u4e1a\u4f18\u5148\u8003\u8651\u6570\u636e\u51c6\u786e\u6027\u3001\u4e0e\u5176\u4ed6\u7cfb\u7edf\u96c6\u6210\u3001\u57f9\u8bad\u5458\u5de5\u5e76\u5907\u4efd\u6570\u636e\u3002Skyplanner \u662f\u4e00\u6b3e\u5148\u8fdb\u7684 APS \u7cfb\u7edf\uff0c\u53ef\u4e0e ERP BOM \u914d\u5408\u4f7f\u7528\uff0c\u63d0\u4f9b\u5b9e\u65f6\u540c\u6b65\u3001\u4f18\u5316\u8d44\u6e90\u5206\u914d\u548c\u81ea\u52a8\u6392\u7a0b\u7b49\u529f\u80fd\uff0c\u4ece\u800c\u589e\u5f3a\u5176\u529f\u80fd\u3002<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-610fc087 gb-headline-text\">\u4ec0\u4e48\u662f ERP \u7269\u6599\u6e05\u5355\uff1f<\/h2>\n\n\n\n<p><strong>ERP \u7269\u6599\u6e05\u5355<\/strong>\uff0c\u901a\u5e38\u7b80\u79f0\u4e3a <strong>ERP BOM<\/strong>\uff0c\u662f\u6307 <a href=\"\/zh-hans\/resources\/what-is-erp\/\">\u4f01\u4e1a\u8d44\u6e90\u8ba1\u5212\u7cfb\u7edf<\/a> \u4e2d\u7684\u7269\u6599\u6e05\u5355\u529f\u80fd\u3002 <\/p>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>ERP BOM \u662f\u751f\u4ea7\u7279\u5b9a\u4ea7\u54c1\u6240\u9700\u7684\u539f\u6750\u6599\u3001\u7ec4\u4ef6\u3001\u90e8\u4ef6\u548c\u5176\u4ed6\u5fc5\u9700\u7269\u54c1\u7684\u7efc\u5408\u6e05\u5355\u3002<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>\u9664\u4e86\u5217\u51fa\u8fd9\u4e9b\u9879\u76ee\u5916\uff0cBOM \u8fd8\u63d0\u4f9b\u4e86\u6bcf\u79cd\u6240\u9700\u6750\u6599\u6216\u7ec4\u4ef6\u7cbe\u786e\u6570\u91cf\u7684\u8be6\u7ec6\u4fe1\u606f\u3002<\/p>\n\n\n\n<p><strong>\u603b\u4f53\u800c\u8a00\uff0cERP \u7269\u6599\u6e05\u5355\u4e0d\u4ec5\u4ec5\u662f\u4e00\u4efd\u6e05\u5355\u3002\u5b83\u662f ERP \u5236\u9020\u6a21\u5757\u4e2d\u4e0d\u53ef\u6216\u7f3a\u7684\u529f\u80fd\uff0c\u80fd\u591f\u4f18\u5316\u751f\u4ea7\u8ba1\u5212\u5e76\u786e\u4fdd\u6bcf\u4ef6\u4ea7\u54c1\u7684\u8d28\u91cf\u548c\u529f\u80fd\u4fdd\u6301\u4e00\u81f4\u3002<\/strong>\u8fd9\u53cd\u8fc7\u6765\u53c8\u786e\u4fdd\u4e86\u516c\u53f8\u5728\u5e02\u573a\u4e0a\u7ef4\u62a4\u5176\u54c1\u724c\u7684\u4fe1\u8a89\u548c\u58f0\u8a89\u3002<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"gb-headline gb-headline-bf17eb4a gb-headline-text\">ERP BOM \u7684\u91cd\u8981\u6027<\/h2>\n\n\n\n<p>\u5176\u6838\u5fc3\u5728\u4e8e\uff0c<strong>ERP BOM \u7684\u4e3b\u8981\u76ee\u6807\u662f\u7cbe\u7b80\u548c\u7ec4\u7ec7\u5236\u9020\u6d41\u7a0b\u3002<\/strong>\u5b83\u4f5c\u4e3a\u4e00\u4e2a\u5173\u952e\u7684\u53c2\u8003\u70b9\uff0c\u786e\u4fdd\u6bcf\u4e2a\u7ec4\u4ef6\u90fd\u5f97\u5230\u6838\u7b97\u4e14\u6570\u91cf\u6b63\u786e\uff0c\u4ece\u800c\u4fdd\u8bc1\u4ea7\u54c1\u8d28\u91cf\u548c\u4ea7\u51fa\u7684\u4e00\u81f4\u6027\u3002<\/p>\n\n\n\n<p>\u4f46\u662f\uff0c\u662f\u4ec0\u4e48\u8ba9 ERP \u7269\u6599\u6e05\u5355\u5982\u6b64\u4e0d\u53ef\u6216\u7f3a\u5462\uff1f<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-05044a81 gb-headline-text\">ERP BOM \u5728 ERP \u5236\u9020\u6a21\u5757\u4e2d\u7684\u529f\u80fd<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>\u5168\u9762\u7684\u7269\u6599\u6e05\u5355\uff1aERP BOM\uff08\u7269\u6599\u6e05\u5355\uff09\u63d0\u4f9b\u5236\u9020\u4ea7\u54c1\u6240\u9700\u6bcf\u79cd\u539f\u6750\u6599\u3001\u96f6\u90e8\u4ef6\u548c\u7ec4\u4ef6\u7684\u8be6\u7ec6\u5217\u8868\u3002<\/li>\n\n\n\n<li>\u6570\u91cf\u7cbe\u786e\uff1a\u5b83\u786e\u4fdd\u6bcf\u4e2a\u96f6\u90e8\u4ef6\u7684\u7528\u91cf\u7cbe\u51c6\u65e0\u8bef\uff0c\u6d88\u9664\u4f30\u7b97\u504f\u5dee\uff0c\u9632\u6b62\u8d44\u6e90\u6d6a\u8d39\u3002<\/li>\n\n\n\n<li>\u7248\u672c\u63a7\u5236\uff1a\u968f\u7740\u4ea7\u54c1\u7684\u6301\u7eed\u8fed\u4ee3\uff0cBOM\u968f\u4e4b\u66f4\u65b0\uff0c\u5e2e\u52a9\u5236\u9020\u5546\u8ffd\u8e2a\u4e0d\u540c\u4ea7\u54c1\u7248\u672c\u53ca\u5176\u5bf9\u5e94\u7684\u96f6\u90e8\u4ef6\u3002<\/li>\n\n\n\n<li>\u6210\u672c\u4f30\u7b97\uff1a\u901a\u8fc7\u8ffd\u8e2a\u6240\u6709\u96f6\u90e8\u4ef6\u53ca\u5176\u6210\u672c\uff0cERP BOM\uff08\u7269\u6599\u6e05\u5355\uff09\u6709\u52a9\u4e8e\u4e3a\u5236\u9020\u6d41\u7a0b\u63d0\u4f9b\u51c6\u786e\u7684\u6210\u672c\u4f30\u7b97\u3002<\/li>\n\n\n\n<li><strong>\u4e0e\u5de5\u827a\u8def\u7ebf\u914d\u5408\u4f7f\u7528\uff1a<\/strong>&nbsp;BOM\u5217\u51fa\u4ea7\u54c1\u6240\u9700\u7684\u7269\u6599\u3001\u96f6\u90e8\u4ef6\u53ca\u5176\u6570\u91cf\u3002\u5de5\u827a\u8def\u7ebf\u5219\u5355\u72ec\u5b9a\u4e49\u5236\u9020\u6240\u9700\u7684\u5de5\u5e8f\u3001\u5de5\u5e8f\u987a\u5e8f\u548c\u8d44\u6e90\u3002ERP\u7cfb\u7edf\u53ef\u4ee5\u7ed3\u5408BOM\u548c\u5de5\u827a\u8def\u7ebf\u5236\u5b9a\u751f\u4ea7\u8ba1\u5212\u3002<\/li>\n\n\n\n<li>\u5e93\u5b58\u7ba1\u7406\uff1aERP BOM\uff08\u7269\u6599\u6e05\u5355\uff09\u6709\u52a9\u4e8e\u7cbe\u786e\u8ffd\u8e2a\u5e93\u5b58\u6c34\u5e73\uff0c\u786e\u4fdd\u6240\u9700\u96f6\u90e8\u4ef6\u59cb\u7ec8\u6709\u8d27\uff0c\u540c\u65f6\u9632\u6b62\u8fc7\u5ea6\u5907\u8d27\u3002<\/li>\n\n\n\n<li>\u4e0eAPS\u7cfb\u7edf\u96c6\u6210\uff1a\u968f\u7740\u751f\u4ea7\u8ba1\u5212\u4eba\u5458\u81f4\u529b\u4e8e\u4f18\u5316\u6392\u7a0b\uff0cERP BOM\u4e0eAPS\u7cfb\u7edf\u7684\u65e0\u7f1d\u96c6\u6210\u53d8\u5f97\u4e0d\u53ef\u6216\u7f3a\u3002<\/li>\n\n\n\n<li>\u4f9b\u5e94\u5546\u7ba1\u7406\uff1a\u5b83\u6709\u52a9\u4e8e\u8ffd\u8e2a\u6bcf\u4e2a\u96f6\u90e8\u4ef6\u7684\u4f9b\u5e94\u5546\uff0c\u4fc3\u8fdb\u66f4\u987a\u7545\u7684\u91c7\u8d2d\u6d41\u7a0b\u548c\u66f4\u826f\u597d\u7684\u4f9b\u5e94\u5546\u5173\u7cfb\u3002<\/li>\n\n\n\n<li>\u8d28\u91cf\u4fdd\u8bc1\uff1aERP BOM\uff08\u7269\u6599\u6e05\u5355\uff09\u5728\u8de8\u6279\u6b21\u7ef4\u6301\u4ea7\u54c1\u8d28\u91cf\u65b9\u9762\u53d1\u6325\u5173\u952e\u4f5c\u7528\uff0c\u786e\u4fdd\u96f6\u90e8\u4ef6\u4ee5\u6b63\u786e\u7684\u6570\u91cf\u88ab\u4e00\u81f4\u4f7f\u7528\u3002<\/li>\n\n\n\n<li>\u9884\u6d4b\u4e0e\u89c4\u5212\uff1a\u51ed\u501f\u5176\u5168\u9762\u7684\u6570\u636e\uff0cERP BOM\uff08\u7269\u6599\u6e05\u5355\uff09\u6709\u52a9\u4e8e\u9884\u6d4b\u672a\u6765\u7684\u7269\u6599\u9700\u6c42\uff0c\u786e\u4fdd\u4f01\u4e1a\u4e3a\u5e02\u573a\u9700\u6c42\u505a\u597d\u51c6\u5907\u3002<\/li>\n<\/ol>\n\n\n\n<p>\u901a\u8fc7\u5c65\u884c\u8fd9\u4e9b\u91cd\u8981\u529f\u80fd\u53ca\u66f4\u591a\u529f\u80fd\uff0cERP \u7269\u6599\u6e05\u5355\u4e0d\u4ec5\u5145\u5f53\u6e05\u5355\uff0c\u800c\u4e14\u5145\u5f53 ERP \u5236\u9020\u6a21\u5757\u7684\u652f\u67f1\uff0c\u786e\u4fdd\u5236\u9020\u6d41\u7a0b\u4fdd\u6301\u9ad8\u6548\u3001\u5177\u6709\u6210\u672c\u6548\u76ca\u4e14\u8d28\u91cf\u4e00\u6d41\u3002<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner \u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b Solutions to production problems\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"gb-headline gb-headline-4902bde4 gb-headline-text\">ERP \u7269\u6599\u6e05\u5355\u7684\u4f18\u52bf<\/h2>\n\n\n\n<p>ERP \u7269\u6599\u6e05\u5355\u4e0d\u4ec5\u662f\u4e00\u4e2a\u5de5\u5177\uff0c\u66f4\u662f\u7e41\u5fd9\u5236\u9020\u9886\u57df\u53d8\u9769\u7684\u50ac\u5316\u5242\u3002\u6df1\u5165\u7814\u7a76\u5176\u4f18\u52bf\u5c06\u63ed\u793a\u5176\u5173\u952e\u4f5c\u7528\uff1a<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-92a3b4f4 gb-headline-text\">\u63d0\u9ad8\u6548\u7387\uff1a<\/h4>\n\n\n\n<p>ERP BOM \u4e3a\u751f\u4ea7\u63d0\u4f9b\u4e86\u7cbe\u7b80\u4e14\u6709\u6761\u7406\u7684\u8def\u7ebf\u56fe\u3002\u901a\u8fc7\u660e\u786e\u5217\u51fa\u6bcf\u4e2a\u7ec4\u4ef6\u548c\u6750\u6599\uff0c\u5b83\u786e\u4fdd\u6ca1\u6709\u4efb\u4f55\u5185\u5bb9\u88ab\u9057\u6f0f\uff0c\u4ece\u800c\u4f7f\u5236\u9020\u8fc7\u7a0b\u66f4\u52a0\u987a\u7545\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-c5f59daa gb-headline-text\">\u6210\u672c\u8282\u7ea6\uff1a<\/h4>\n\n\n\n<p>\u5b83\u901a\u8fc7\u51c6\u786e\u5217\u51fa\u7ec4\u4ef6\u53ca\u5176\u5404\u81ea\u7684\u6570\u91cf\u6765\u6700\u5927\u9650\u5ea6\u5730\u51cf\u5c11\u6d6a\u8d39\u3002\u8fd9\u79cd\u7cbe\u786e\u6027\u8f6c\u5316\u4e3a\u5207\u5b9e\u7684\u6210\u672c\u8282\u7ea6\uff0c\u56e0\u4e3a\u51cf\u5c11\u4e86\u8fc7\u5ea6\u91c7\u8d2d\u6216\u8d44\u6e90\u6d6a\u8d39\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-b1b66851 gb-headline-text\">\u51c6\u786e\u9884\u6d4b\uff1a<\/h4>\n\n\n\n<p>\u51ed\u501f\u5176\u5168\u9762\u7684\u6570\u636e\uff0c\u4f01\u4e1a\u53ef\u4ee5\u9884\u89c1\u672a\u6765\u7684\u6750\u6599\u9700\u6c42\uff0c\u786e\u4fdd\u4e3a\u5373\u5c06\u5230\u6765\u7684\u751f\u4ea7\u9700\u6c42\u505a\u597d\u5145\u5206\u51c6\u5907\uff0c\u800c\u4e0d\u4f1a\u51fa\u73b0\u6700\u540e\u4e00\u523b\u91c7\u8d2d\u7684\u6050\u614c\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-13f91a07 gb-headline-text\">\u4e00\u81f4\u7684\u4ea7\u54c1\u8d28\u91cf\uff1a<\/h4>\n\n\n\n<p>\u7531\u4e8e ERP \u7269\u6599\u6e05\u5355\u786e\u4fdd\u6bcf\u6279\u6b21\u90fd\u4f7f\u7528\u76f8\u540c\u7684\u7ec4\u4ef6\u548c\u7cbe\u786e\u7684\u6570\u91cf\uff0c\u56e0\u6b64\u4ea7\u54c1\u8d28\u91cf\u4fdd\u6301\u4e00\u81f4\uff0c\u4ece\u800c\u589e\u5f3a\u4e86\u54c1\u724c\u7684\u53ef\u9760\u6027\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a157e970 gb-headline-text\">\u4f18\u5316\u7684\u5e93\u5b58\u6c34\u5e73\uff1a<\/h4>\n\n\n\n<p>\u6e05\u6670\u4e86\u89e3\u6240\u9700\u7269\u54c1\u6709\u52a9\u4e8e\u7ef4\u6301\u6700\u4f73\u5e93\u5b58\u6c34\u5e73\u3002\u8fd9\u610f\u5473\u7740\u4e0d\u4f1a\u4ea7\u751f\u8fc7\u9ad8\u7684\u5e93\u5b58\u6210\u672c\uff0c\u4e5f\u4e0d\u4f1a\u51fa\u73b0\u53ef\u80fd\u5ef6\u8bef\u751f\u4ea7\u7684\u7f3a\u8d27\u60c5\u51b5\u3002 <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-878bb084 gb-headline-text\">\u6539\u5584\u4f9b\u5e94\u5546\u5173\u7cfb\uff1a<\/h4>\n\n\n\n<p>\u901a\u8fc7\u6e05\u6670\u7684\u6e05\u5355\u548c\u5b9a\u671f\u7684\u9700\u6c42\uff0c\u4f01\u4e1a\u53ef\u4ee5\u4e0e\u4f9b\u5e94\u5546\u5efa\u7acb\u66f4\u597d\u7684\u6761\u6b3e\u548c\u5173\u7cfb\uff0c\u786e\u4fdd\u53ca\u65f6\u4ea4\u8d27\uff0c\u751a\u81f3\u53ef\u80fd\u83b7\u5f97\u6210\u672c\u4f18\u52bf\u3002<a href=\"\/zh-hans\/resources\/supplier-management-software\/\">\u4e86\u89e3\u5982\u4f55\u901a\u8fc7\u4f9b\u5e94\u5546\u7ba1\u7406\u8f6f\u4ef6\u63d0\u5347\u60a8\u7684\u751f\u4ea7\u3002<\/a><\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-78c9dfe6 gb-headline-text\">\u66f4\u597d\u7684\u53ef\u6269\u5c55\u6027\uff1a<\/h4>\n\n\n\n<p>\u968f\u7740\u516c\u53f8\u7684\u6210\u957f\uff0cERP \u7269\u6599\u6e05\u5355\u4e5f\u968f\u4e4b\u6210\u957f\u3002\u5b83\u53ef\u4ee5\u5bb9\u7eb3\u4e0d\u65ad\u589e\u52a0\u7684\u7ec4\u4ef6\u548c\u4ea7\u54c1\uff0c\u786e\u4fdd\u4f01\u4e1a\u5373\u4f7f\u5728\u89c4\u6a21\u6269\u5927\u65f6\u4e5f\u80fd\u4fdd\u6301\u4e95\u7136\u6709\u5e8f\u3002<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-e45e11bd gb-headline-text\">\u7f29\u77ed\u4ea4\u8d27\u671f\uff1a<\/h4>\n\n\n\n<p>\u901a\u8fc7\u6709\u7ec4\u7ec7\u7684\u751f\u4ea7\u8def\u7ebf\u548c\u4f18\u5316\u7684\u5e93\u5b58\uff0c\u4ea7\u54c1\u53ef\u4ee5\u66f4\u5feb\u5730\u5236\u9020\u548c\u4ea4\u4ed8\uff0c\u4ece\u800c\u63d0\u9ad8\u5ba2\u6237\u6ee1\u610f\u5ea6\u5e76\u589e\u52a0\u9500\u552e\u989d\u3002<a href=\"\/zh-hans\/resources\/how-to-optimize-lead-time-in-manufacturing\/\">\u4e86\u89e3\u66f4\u591a\u4f18\u5316\u4ea4\u8d27\u671f\u7684\u65b9\u6cd5\u3002<\/a> <\/p>\n\n\n\n<p><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"gb-headline gb-headline-fe71ed9a gb-headline-text\">\u53d7\u76ca\u4e8e ERP BOM \u7684\u884c\u4e1a\uff1a<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>\u6c7d\u8f66\u884c\u4e1a\uff1a\u6c7d\u8f66\u662f\u7531\u6570\u5343\u4e2a\u96f6\u4ef6\u6784\u6210\u7684\u590d\u6742\u673a\u5668\u3002ERP BOM\uff08\u7269\u6599\u6e05\u5355\uff09\u786e\u4fdd\u6bcf\u4e2a\u96f6\u4ef6\u2014\u2014\u4ece\u5fae\u5c0f\u7684\u87ba\u6813\u5230\u91cd\u8981\u7684\u53d1\u52a8\u673a\u90e8\u4ef6\u2014\u2014\u90fd\u88ab\u8be6\u7ec6\u5217\u51fa\u3002\u8fd9\u6d88\u9664\u4e86\u9519\u8bef\uff0c\u786e\u4fdd\u6bcf\u8f86\u8f66\u7b26\u5408\u4e25\u683c\u7684\u5b89\u5168\u6807\u51c6\u3002<\/li>\n\n\n\n<li>\u7535\u5b50\u5236\u9020\uff1a\u968f\u7740\u79d1\u6280\u4ea7\u54c1\u65e5\u8d8b\u590d\u6742\uff0cERP BOM\uff08\u7269\u6599\u6e05\u5355\uff09\u6709\u52a9\u4e8e\u8ffd\u8e2a\u6bcf\u4e2a\u96f6\u90e8\u4ef6\uff0c\u786e\u4fdd\u8d28\u91cf\u548c\u529f\u80fd\u6b63\u5e38\u3002\u4f8b\u5982\uff0c\u9057\u6f0f\u4e00\u4e2a\u5c0f\u7535\u963b\u53ef\u80fd\u5bfc\u81f4\u8bbe\u5907\u6545\u969c\u3002<\/li>\n\n\n\n<li>\u822a\u7a7a\u822a\u5929\u4e0e\u56fd\u9632\uff1a\u8be5\u884c\u4e1a\u5bf9\u7cbe\u5ea6\u7684\u8981\u6c42\u81f3\u5173\u91cd\u8981\u3002ERP BOM\uff08\u7269\u6599\u6e05\u5355\uff09\u6709\u52a9\u4e8e\u8ffd\u8e2a\u98de\u673a\u6216\u56fd\u9632\u8bbe\u5907\u7684\u6bcf\u4e2a\u96f6\u90e8\u4ef6\uff0c\u786e\u4fdd\u5b89\u5168\u6027\u3001\u529f\u80fd\u6027\u4ee5\u53ca\u7b26\u5408\u56fd\u9645\u6807\u51c6\u3002<\/li>\n\n\n\n<li>\u5236\u836f\u884c\u4e1a\uff1a\u4e00\u81f4\u6027\u81f3\u5173\u91cd\u8981\u3002ERP BOM\uff08\u7269\u6599\u6e05\u5355\uff09\u786e\u4fdd\u6bcf\u79cd\u836f\u54c1\u5177\u6709\u6b63\u786e\u6bd4\u4f8b\u7684\u6210\u5206\uff0c\u76f4\u63a5\u5f71\u54cd\u516c\u4f17\u5065\u5eb7\u3002<\/li>\n\n\n\n<li>\u65f6\u5c1a\u4e0e\u670d\u88c5\uff1a\u5b63\u8282\u6027\u7cfb\u5217\u3001\u591a\u6837\u5316\u7684\u6750\u6599\u548c\u5404\u79cd\u8bbe\u8ba1\u53ef\u80fd\u5e26\u6765\u7269\u6d41\u6311\u6218\u3002ERP BOM\uff08\u7269\u6599\u6e05\u5355\uff09\u6574\u7406\u8fd9\u4e9b\u590d\u6742\u6027\uff0c\u786e\u4fdd\u6bcf\u4ef6\u670d\u88c5\u6309\u8bbe\u8ba1\u89c4\u683c\u751f\u4ea7\uff0c\u7ef4\u62a4\u54c1\u724c\u58f0\u8a89\u3002<\/li>\n<\/ol>\n\n\n\n<p>ERP \u7269\u6599\u6e05\u5355\u5145\u5f53\u8fd9\u4e9b\u884c\u4e1a\u7684\u6307\u5357\u9488\uff0c\u5f15\u5bfc\u5b83\u4eec\u7a7f\u8fc7\u590d\u6742\u7684\u751f\u4ea7\u8ff7\u5bab\u3002\u901a\u8fc7\u89e3\u51b3\u5404\u884c\u4e1a\u56fa\u6709\u7684\u7279\u5b9a\u6311\u6218\uff0c\u5b83\u4fdd\u8bc1\u4e86\u8d28\u91cf\u3001\u6548\u7387\u548c\u6210\u672c\u6548\u76ca\u3002<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-d474bce5 gb-headline-text\">\u4f7f\u7528 ERP BOM \u7684\u5efa\u8bae<\/h2>\n\n\n\n<p>\u6b63\u786e\u5229\u7528 ERP \u7269\u6599\u6e05\u5355\u5bf9\u4e8e\u987a\u7545\u9ad8\u6548\u7684\u751f\u4ea7\u6d41\u7a0b\u81f3\u5173\u91cd\u8981\u3002\u4ee5\u4e0b\u662f\u5173\u4e8e\u5982\u4f55\u5145\u5206\u5229\u7528\u8fd9\u4e00\u5f3a\u5927\u5de5\u5177\u7684\u4e00\u4e9b\u5efa\u8bae\uff1a<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>\u4e86\u89e3\u5176\u7ed3\u6784\uff1a\u786e\u4fdd\u60a8\u7406\u89e3BOM\u7684\u591a\u5c42\u7ea7\u5c42\u6b21\u7ed3\u6784\u3002\u8bf7\u719f\u6089\u7236\u9879\u3001\u96f6\u90e8\u4ef6\u3001\u5b50\u96f6\u90e8\u4ef6\u4ee5\u53ca\u5b83\u4eec\u4e4b\u95f4\u7684\u76f8\u4e92\u5173\u8054\u65b9\u5f0f\u3002<\/li>\n\n\n\n<li>\u4f18\u5148\u4fdd\u8bc1\u6570\u636e\u51c6\u786e\u6027\uff1a\u59cb\u7ec8\u8f93\u5165\u51c6\u786e\u7684\u6570\u636e\u3002\u4e0d\u6b63\u786e\u7684BOM\u53ef\u80fd\u5bfc\u81f4\u751f\u4ea7\u95ee\u9898\u3001\u6750\u6599\u6d6a\u8d39\u548c\u989d\u5916\u6210\u672c\u3002\u5b9a\u671f\u5ba1\u67e5\u548c\u66f4\u65b0BOM\uff0c\u4ee5\u786e\u4fdd\u5176\u6301\u7eed\u51c6\u786e\u3002<\/li>\n\n\n\n<li>\u5b9e\u65bd\u7248\u672c\u63a7\u5236\uff1a\u4ea7\u54c1\u4e0d\u65ad\u6f14\u8fdb\uff0c\u5bfc\u81f4BOM\u66f4\u65b0\u3002\u4f7f\u7528\u7248\u672c\u63a7\u5236\u8ffd\u8e2a\u53d8\u66f4\u81f3\u5173\u91cd\u8981\u3002\u8fd9\u786e\u4fdd\u56e2\u961f\u59cb\u7ec8\u57fa\u4e8e\u6700\u65b0\u4e14\u51c6\u786e\u7684BOM\u5f00\u5c55\u5de5\u4f5c\u3002<\/li>\n\n\n\n<li>\u5b9a\u671f\u5ba1\u67e5\u4e0e\u66f4\u65b0\uff1a\u4e3a\u4fdd\u6301BOM\u7684\u65f6\u6548\u6027\uff0c\u5b9a\u671f\u8fdb\u884c\u5ba1\u8ba1\uff0c\u5c24\u5176\u662f\u5728\u4ea7\u54c1\u4fee\u6539\u4e4b\u540e\u3002<\/li>\n\n\n\n<li>\u57f9\u8bad\u662f\u5173\u952e\uff1a\u786e\u4fdd\u6240\u6709\u53c2\u4e0e\u751f\u4ea7\u548c\u89c4\u5212\u7684\u4eba\u5458\u90fd\u7ecf\u8fc7\u5145\u5206\u57f9\u8bad\uff0c\u4e86\u89e3\u5982\u4f55\u4f7f\u7528\u548c\u89e3\u8bfbBOM\u3002\u8fd9\u6709\u52a9\u4e8e\u4fdd\u6301\u4e00\u81f4\u6027\u5e76\u51cf\u5c11\u9519\u8bef\u3002<\/li>\n\n\n\n<li>\u4fdd\u6301\u8be6\u7ec6\u4f46\u6613\u4e8e\u7406\u89e3\uff1a\u867d\u7136\u62e5\u6709\u8be6\u7ec6\u7684BOM\u81f3\u5173\u91cd\u8981\uff0c\u4f46\u4e5f\u5e94\u4f7f\u5176\u8db3\u591f\u7b80\u6d01\uff0c\u4fbf\u4e8e\u7528\u6237\u7406\u89e3\u3002<\/li>\n\n\n\n<li>\u4e0e\u5176\u4ed6\u7cfb\u7edf\u96c6\u6210\uff1aERP BOM\uff08\u7269\u6599\u6e05\u5355\uff09\u7684\u771f\u6b63\u5a01\u529b\u5728\u4e8e\u4e0e\u5176\u4ed6\u7cfb\u7edf\uff08\u5982APS\u3001CRM\u548c\u5e93\u5b58\u7ba1\u7406\uff09\u96c6\u6210\u65f6\u5f97\u5230\u5145\u5206\u4f53\u73b0\u3002\u8fd9\u5b9e\u73b0\u4e86\u5b9e\u65f6\u66f4\u65b0\u548c\u65e0\u7f1d\u8fd0\u8425\u3002<\/li>\n\n\n\n<li>\u5173\u6ce8\u53ef\u6269\u5c55\u6027\uff1a\u968f\u7740\u4e1a\u52a1\u589e\u957f\uff0c\u60a8\u7684BOM\u9700\u6c42\u53ef\u80fd\u4f1a\u53d1\u751f\u53d8\u5316\u3002\u9009\u62e9\u4e00\u4e2a\u53ef\u6269\u5c55\u7684ERP\u7cfb\u7edf\uff0c\u80fd\u591f\u6839\u636e\u9700\u8981\u5bb9\u7eb3\u66f4\u590d\u6742\u7684BOM\u3002<\/li>\n\n\n\n<li>\u8bbe\u7f6e\u8bbf\u95ee\u6743\u9650\uff1a\u5e76\u975e\u6240\u6709\u4eba\u90fd\u9700\u8981\u8bbf\u95ee\u5b8c\u6574\u7684BOM\u3002\u8bbe\u7f6e\u6743\u9650\uff0c\u4f7f\u5458\u5de5\u53ea\u80fd\u8bbf\u95ee\u548c\u4fee\u6539\u4e0e\u5176\u804c\u8d23\u76f8\u5173\u7684\u90e8\u5206\u3002<\/li>\n\n\n\n<li>\u5145\u5206\u5229\u7528\u62a5\u544a\u529f\u80fd\uff1a\u8bb8\u591aERP\u7cfb\u7edf\u63d0\u4f9b\u57fa\u4e8eBOM\u6570\u636e\u7684\u8be6\u7ec6\u62a5\u544a\u3002\u5229\u7528\u8fd9\u4e9b\u62a5\u544a\u6df1\u5165\u4e86\u89e3\u751f\u4ea7\u6548\u7387\u3001\u6210\u672c\u4ee5\u53ca\u6539\u8fdb\u7a7a\u95f4\u3002<\/li>\n\n\n\n<li>\u505a\u597d\u5907\u4efd\uff1a\u5b9a\u671f\u5907\u4efd\u60a8\u7684BOM\u6570\u636e\u3002\u8fd9\u786e\u4fdd\u5728\u6570\u636e\u4e22\u5931\u6216\u7cfb\u7edf\u6545\u969c\u7684\u60c5\u51b5\u4e0b\u80fd\u591f\u5feb\u901f\u6062\u590d\u3002<\/li>\n\n\n\n<li>\u5bfb\u6c42\u53cd\u9988\uff1a\u5b9a\u671f\u5f81\u8be2\u7528\u6237\u5bf9BOM\u6d41\u7a0b\u7684\u610f\u89c1\u3002\u4ed6\u4eec\u7684\u4e00\u7ebf\u6d1e\u5bdf\u53ef\u4ee5\u53d1\u73b0\u6f5c\u5728\u7684\u6539\u8fdb\u4e4b\u5904\u3002<\/li>\n\n\n\n<li>\u4fdd\u6301\u66f4\u65b0\uff1aERP\u7cfb\u7edf\uff08\u5305\u62ecBOM\u529f\u80fd\uff09\u5728\u6301\u7eed\u6f14\u8fdb\u3002\u53ca\u65f6\u4e86\u89e3\u6700\u65b0\u529f\u80fd\u548c\u6700\u4f73\u5b9e\u8df5\u3002<\/li>\n<\/ol>\n\n\n\n<p>\u901a\u8fc7\u91c7\u7528\u8fd9\u4e9b\u6700\u4f73\u5b9e\u8df5\uff0c\u4f01\u4e1a\u53ef\u4ee5\u53d1\u6325 ERP \u7269\u6599\u6e05\u5355\u7684\u5168\u90e8\u6f5c\u529b\uff0c\u786e\u4fdd\u66f4\u987a\u7545\u7684\u751f\u4ea7\u6d41\u7a0b\u548c\u66f4\u597d\u7684\u8d44\u6e90\u7ba1\u7406\u3002\u8bf7\u8bb0\u4f4f\uff0c\u7ba1\u7406\u826f\u597d\u7684 BOM \u662f\u9ad8\u6548\u5236\u9020\u7684\u6838\u5fc3\u3002<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"667\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Tilted-old-production-chains-1-1024x667.png\" alt=\"SkyPlanner APS \u751f\u4ea7\u8ba1\u5212\u751f\u6001\u7cfb\u7edf\" class=\"wp-image-2170\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Tilted-old-production-chains-1-1024x667.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Tilted-old-production-chains-1-300x195.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Tilted-old-production-chains-1-768x500.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Tilted-old-production-chains-1-1536x1000.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Tilted-old-production-chains-1-2048x1334.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"gb-headline gb-headline-c43a6b6c gb-headline-text\">Skyplanner\uff1a\u589e\u5f3a ERP BOM \u7684\u529b\u91cf<\/h2>\n\n\n\n<p>\u73b0\u4ee3\u5236\u9020\u4e1a\u7684\u9ad8\u8981\u6c42\u8282\u594f\u8ba9\u4eba\u611f\u5230\u5e94\u63a5\u4e0d\u6687\uff0c\u4ec5\u62e5\u6709\u5f3a\u5927\u7684 ERP \u7269\u6599\u6e05\u5355\u53ef\u80fd\u8fd8\u4e0d\u591f\u3002\u4e3a\u4e86\u771f\u6b63\u53d1\u6325\u5176\u6f5c\u529b\uff0c\u5b83\u9700\u8981\u4e00\u4e2a\u80fd\u591f\u63d0\u5347\u5176\u529f\u80fd\u5e76\u7cbe\u7b80\u5236\u9020\u6d41\u7a0b\u7684\u4f19\u4f34\u3002<a href=\"\/zh-hans\/\">Skyplanner \u767b\u573a\uff0c\u8fd9\u662f\u4e00\u6b3e\u5148\u8fdb\u7684 APS (\u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b) \u7cfb\u7edf\u3002<\/a><\/p>\n\n\n\n<p>\u90a3\u4e48\uff0c<a href=\"\/zh-hans\/%e5%8a%9f%e8%83%bd\/\">Skyplanner<\/a> \u5982\u4f55\u8ba9 ERP BOM \u53d8\u5f97\u66f4\u597d\u5462\uff1f<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>\u5b9e\u65f6\u540c\u6b65\uff1aSkyPlanner\u786e\u4fdd\u60a8\u7684ERP BOM\uff08\u7269\u6599\u6e05\u5355\uff09\u59cb\u7ec8\u4e0e\u5b9e\u65f6\u6570\u636e\u4fdd\u6301\u540c\u6b65\u66f4\u65b0\u3002\u8fd9\u610f\u5473\u7740\u751f\u4ea7\u8ba1\u5212\u6216\u7269\u6599\u7684\u4efb\u4f55\u53d8\u66f4\u90fd\u4f1a\u5373\u65f6\u53cd\u6620\uff0c\u652f\u6301\u5feb\u901f\u51b3\u7b56\u3002<\/li>\n\n\n\n<li>\u4f18\u5316\u8d44\u6e90\u5206\u914d\uff1a\u501f\u52a9SkyPlanner\u7684\u667a\u80fd\u7b97\u6cd5\uff0c\u8d44\u6e90\u6839\u636eBOM\uff08\u7269\u6599\u6e05\u5355\uff09\u5f97\u5230\u9ad8\u6548\u5206\u914d\u3002\u8fd9\u786e\u4fdd\u4e86\u6700\u5927\u5316\u5229\u7528\u7387\u5e76\u51cf\u5c11\u505c\u673a\u65f6\u95f4\u3002<\/li>\n\n\n\n<li>\u589e\u5f3a\u9884\u6d4b\u80fd\u529b\uff1a\u901a\u8fc7\u4e0eERP BOM\uff08\u7269\u6599\u6e05\u5355\uff09\u96c6\u6210\uff0cSkyPlanner\u80fd\u591f\u5229\u7528\u5386\u53f2\u6570\u636e\u8fdb\u884c\u66f4\u4f18\u8d28\u7684\u751f\u4ea7\u9884\u6d4b\uff0c\u786e\u4fdd\u4f01\u4e1a\u59cb\u7ec8\u4e3a\u672a\u6765\u9700\u6c42\u505a\u597d\u51c6\u5907\u3002<\/li>\n\n\n\n<li>\u65e0\u7f1d\u96c6\u6210\uff1aSkyPlanner\u4e13\u4e3a\u4e0eERP\u7cfb\u7edf\u65e0\u7f1d\u96c6\u6210\u800c\u6784\u5efa\u3002\u8fd9\u610f\u5473\u7740\u4f01\u4e1a\u53ef\u4ee5\u62e5\u6709\u4e00\u4e2a\u7edf\u4e00\u7684\u5e73\u53f0\uff0c\u5c06\u89c4\u5212\u4e0e\u7269\u6599\u7ba1\u7406\u7d27\u5bc6\u7ed3\u5408\uff0c\u5b9e\u73b0\u66f4\u987a\u7545\u7684\u8fd0\u8425\u3002<\/li>\n\n\n\n<li>\u81ea\u52a8\u6392\u7a0b\uff1a\u57fa\u4e8eBOM\uff08\u7269\u6599\u6e05\u5355\uff09\uff0cSkyPlanner\u80fd\u591f\u81ea\u52a8\u5b89\u6392\u751f\u4ea7\u8fd0\u884c\uff0c\u7efc\u5408\u8003\u8651\u8d44\u6e90\u53ef\u7528\u6027\u3001\u622a\u6b62\u65e5\u671f\u548c\u4f18\u5148\u8ba2\u5355\u3002<\/li>\n<\/ol>\n\n\n\n<p>\u7b80\u5355\u6765\u8bf4\uff0c\u5982\u679c ERP \u7269\u6599\u6e05\u5355\u4e3a\u60a8\u63d0\u4f9b\u4e86\u8def\u7ebf\u56fe\uff0c\u90a3\u4e48 Skyplanner \u5219\u786e\u4fdd\u60a8\u4ee5\u6700\u9ad8\u7684\u6548\u7387\u548c\u6700\u5c11\u7684\u969c\u788d\u5728\u8def\u7ebf\u4e0a\u884c\u9a76\u3002<\/p>\n\n\n\n<p>\u5bf9\u4e8e\u6e34\u671b\u5229\u7528 ERP \u7269\u6599\u6e05\u5355\u548c Skyplanner \u7ed3\u5408\u529b\u91cf\u7684\u4f01\u4e1a\u6765\u8bf4\uff0c\u6709\u4e00\u4e2a\u597d\u6d88\u606f\uff01Skyplanner \u7684\u4e13\u4e1a\u56e2\u961f\u5df2\u51c6\u5907\u597d\u5f15\u5bfc\u60a8\u5b8c\u6210\u8fd9\u4e00\u8f6c\u578b\u4e4b\u65c5\u3002\u51ed\u501f\u4ed6\u4eec\u7684\u4e13\u4e1a\u77e5\u8bc6\uff0c\u60a8\u7684\u5236\u9020\u6d41\u7a0b\u5c06\u89c1\u8bc1\u65e0\u4e0e\u4f26\u6bd4\u7684\u6548\u7387\u548c\u751f\u4ea7\u529b\u3002\u4e0d\u8981\u7b49\u5f85\uff0c\u5236\u9020\u4e1a\u7684\u672a\u6765\u5728\u53ec\u5524\u3002<a href=\"\/zh-hans\/%e8%81%94%e7%b3%bb%e9%94%80%e5%94%ae\/\">\u8054\u7cfb\u6211\u4eec\uff01\u6211\u4eec\u7684\u4e13\u5bb6\u56e2\u961f\u968f\u65f6\u51c6\u5907\u4e3a\u60a8\u63d0\u4f9b\u5e2e\u52a9\u3002<\/a><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>ERP BOM (\u7269\u6599\u6e05\u5355) \u9996\u9875&nbsp;\u00bb&nbsp;\u8d44\u6e90&nbsp;\u00bb&nbsp;ERP BOM (\u7269\u6599\u6e05\u5355) \u5728\u5236\u9020\u4e1a\u7684\u4e16\u754c\u4e2d\u822a\u884c\uff0c\u6709\u65f6\u611f\u89c9\u5c31\u50cf\u5750\u8fc7\u5c71\u8f66\u3002\u524d\u4e00\u79d2\u4e00\u5207\u8fd0\u884c\u987a\u7545\uff1b\u4e0b\u4e00\u79d2\uff0c\u60a8\u53ef\u80fd\u5c31\u5728\u5904\u7406\u79ef\u538b\u7684\u5e93\u5b58\uff0c\u6216\u8005\u610f\u8bc6\u5230\u4ea7\u54c1\u96f6\u4ef6\u7684\u4e00\u4e2a\u5fae\u5c0f\u53d8\u5316\u5bfc\u81f4\u4e86\u6574\u4f53\u8d28\u91cf\u7684\u4e0b\u964d\u3002\u800c\u5f53\u4ea7\u54c1\u8d28\u91cf\u53d7\u5230\u5f71\u54cd\u65f6\uff0c\u8bf7\u76f8\u4fe1\u6211\u4eec\uff0c\u54c1\u724c\u7684\u58f0\u8a89\u4e5f\u4f1a\u968f\u4e4b\u53d7\u635f\u3002 \u5e78\u8fd0\u7684\u662f\uff0c\u6709\u4e00\u9879 ERP \u529f\u80fd \u5c31\u50cf\u4e00\u5f20\u4fbf\u6377\u7684\u5730\u56fe\uff0c\u5f15\u5bfc\u60a8\u5ea6\u8fc7\u8fd9\u4e9b\u8d77\u4f0f\u3002\u5b83\u5c31\u662f ERP BOM\u3002\u5982\u679c\u60a8\u70ed\u8877\u4e8e\u786e\u4fdd\u751f\u4ea7\u6d41\u7a0b\u4fdd\u6301\u7cbe\u7b80\uff0c\u5e76\u8ba9\u60a8\u7684\u4ea7\u54c1\u59cb\u7ec8\u901a\u8fc7\u8d28\u91cf\u6d4b\u8bd5\uff0c\u90a3\u4e48\u60a8\u5373\u5c06\u627e\u5230\u4e00\u4f4d\u65b0\u7684\u5f97\u529b\u52a9\u624b\u3002 \u672c\u6587\u5c06\u8ba8\u8bba ERP \u7269\u6599\u6e05\u5355\uff0c\u8fd9\u662f\u66f4\u5e7f\u6cdb\u7684\u4f01\u4e1a\u8d44\u6e90\u8ba1\u5212\u7cfb\u7edf\u4e2d\u4e0d\u53ef\u6216\u7f3a\u7684\u5de5\u5177\u3002\u8bf7\u7ee7\u7eed\u9605\u8bfb\uff0c\u6211\u4eec\u5c06\u5e26\u60a8\u4e86\u89e3\u5176\u7ec6\u8282\uff0c\u786e\u4fdd\u60a8\u638c\u63e1\u5176\u5728 ERP \u5236\u9020\u6a21\u5757 \u4e2d\u7684\u5173\u952e\u4f5c\u7528\u3002\u51c6\u5907\u597d\u63a2\u7d22 ERP \u7269\u6599\u6e05\u5355\u5982\u4f55\u6210\u4e3a\u60a8\u5236\u9020\u4f53\u7cfb\u671f\u5f85\u5df2\u4e45\u7684\u53d8\u9769\u8005\u4e86\u5417\uff1f\u8ba9\u6211\u4eec\u5f00\u59cb\u5427\uff01 TL;DR ERP \u7269\u6599\u6e05\u5355 (ERP BOM) \u662f\u4f01\u4e1a\u8d44\u6e90\u8ba1\u5212\u7cfb\u7edf\u4e2d\u7684\u4e00\u9879\u5173\u952e\u529f\u80fd\uff0c\u5b83\u63d0\u4f9b\u4e86\u4e00\u4efd\u8be6\u7ec6\u5217\u51fa\u751f\u4ea7\u7279\u5b9a\u4ea7\u54c1\u6240\u9700\u7684\u6750\u6599\u3001\u7ec4\u4ef6\u548c\u7ec4\u4ef6\u7684\u7efc\u5408\u6e05\u5355\u3002\u5b83\u4e0d\u4ec5\u4ec5\u662f\u4e00\u4efd\u6e05\u5355\uff0cERP BOM \u5728\u4f18\u5316\u5236\u9020\u6d41\u7a0b\u3001\u786e\u4fdd\u4ea7\u54c1\u8d28\u91cf\u4e00\u81f4\u6027\u548c\u54c1\u724c\u4fe1\u8a89\u65b9\u9762\u81f3\u5173\u91cd\u8981\u3002\u5b83\u63d0\u4f9b\u7cbe\u786e\u7684\u7ec4\u4ef6\u5217\u8868\u3001\u6210\u672c\u4f30\u7b97\u3001\u5e93\u5b58\u7ba1\u7406\u3001\u8d28\u91cf\u4fdd\u8bc1\u4ee5\u53ca\u4e0e APS \u7cfb\u7edf\u7684\u96c6\u6210\u7b49\u529f\u80fd\u3002ERP BOM \u5177\u6709\u63d0\u9ad8\u6548\u7387\u3001\u8282\u7701\u6210\u672c\u3001\u8f85\u52a9\u51c6\u786e\u9884\u6d4b\u3001\u786e\u4fdd\u4ea7\u54c1\u8d28\u91cf\u4e00\u81f4\u4ee5\u53ca\u6539\u5584\u4f9b\u5e94\u5546\u5173\u7cfb\u7b49\u8bf8\u591a\u4f18\u52bf\u3002\u4ece\u6c7d\u8f66\u5230\u65f6\u5c1a\uff0c\u5404\u884c\u5404\u4e1a\u90fd\u4f9d\u9760 ERP BOM \u6765\u5e94\u5bf9\u5176\u751f\u4ea7\u7684\u590d\u6742\u6027\u3002\u4e3a\u4e86\u5145\u5206\u5229\u7528 ERP BOM\uff0c\u5efa\u8bae\u4f01\u4e1a\u4f18\u5148\u8003\u8651\u6570\u636e\u51c6\u786e\u6027\u3001\u4e0e\u5176\u4ed6\u7cfb\u7edf\u96c6\u6210\u3001\u57f9\u8bad\u5458\u5de5\u5e76\u5907\u4efd\u6570\u636e\u3002Skyplanner \u662f\u4e00\u6b3e\u5148\u8fdb\u7684 APS \u7cfb\u7edf\uff0c\u53ef\u4e0e ERP BOM \u914d\u5408\u4f7f\u7528\uff0c\u63d0\u4f9b\u5b9e\u65f6\u540c\u6b65\u3001\u4f18\u5316\u8d44\u6e90\u5206\u914d\u548c\u81ea\u52a8\u6392\u7a0b\u7b49\u529f\u80fd\uff0c\u4ece\u800c\u589e\u5f3a\u5176\u529f\u80fd\u3002 \u4ec0\u4e48\u662f ERP \u7269\u6599\u6e05\u5355\uff1f ERP \u7269\u6599\u6e05\u5355\uff0c\u901a\u5e38\u7b80\u79f0\u4e3a ERP BOM\uff0c\u662f\u6307 \u4f01\u4e1a\u8d44\u6e90\u8ba1\u5212\u7cfb\u7edf \u4e2d\u7684\u7269\u6599\u6e05\u5355\u529f\u80fd\u3002 ERP BOM &#8230; <a title=\"ERP BOM (\u7269\u6599\u6e05\u5355)\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/\" aria-label=\"Read more about ERP BOM (\u7269\u6599\u6e05\u5355)\">\u9605\u8bfb\u66f4\u591a<\/a><\/p>\n","protected":false},"author":0,"featured_media":16690,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2719,2517],"tags":[],"class_list":["post-84999","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-erp-zh-hans","category-2517","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ERP BOM (\u7269\u6599\u6e05\u5355)<\/title>\n<meta name=\"description\" content=\"ERP BOM \u662f\u751f\u4ea7\u7279\u5b9a\u4ea7\u54c1\u6240\u9700\u7684\u539f\u6750\u6599\u3001\u7ec4\u4ef6\u3001\u90e8\u4ef6\u4ee5\u53ca\u5176\u4ed6\u5fc5\u9700\u7269\u54c1\u7684\u5b8c\u6574\u6e05\u5355\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ERP BOM (\u7269\u6599\u6e05\u5355)\" \/>\n<meta property=\"og:description\" content=\"ERP BOM \u662f\u751f\u4ea7\u7279\u5b9a\u4ea7\u54c1\u6240\u9700\u7684\u539f\u6750\u6599\u3001\u7ec4\u4ef6\u3001\u90e8\u4ef6\u4ee5\u53ca\u5176\u4ed6\u5fc5\u9700\u7269\u54c1\u7684\u5b8c\u6574\u6e05\u5355\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-17T11:44:12+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-09T23:46:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-BOM-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-bom-bill-of-materials\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-bom-bill-of-materials\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"ERP BOM (\u7269\u6599\u6e05\u5355)\",\"datePublished\":\"2023-09-17T11:44:12+00:00\",\"dateModified\":\"2026-10-09T23:46:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-bom-bill-of-materials\\\/\"},\"wordCount\":144,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-bom-bill-of-materials\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/ERP-BOM.png\",\"articleSection\":[\"ERP\",\"\u8d44\u6e90\"],\"inLanguage\":\"zh-CN\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-bom-bill-of-materials\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-bom-bill-of-materials\\\/\",\"name\":\"ERP BOM (\u7269\u6599\u6e05\u5355)\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-bom-bill-of-materials\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-bom-bill-of-materials\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/ERP-BOM.png\",\"datePublished\":\"2023-09-17T11:44:12+00:00\",\"dateModified\":\"2026-10-09T23:46:54+00:00\",\"description\":\"ERP BOM \u662f\u751f\u4ea7\u7279\u5b9a\u4ea7\u54c1\u6240\u9700\u7684\u539f\u6750\u6599\u3001\u7ec4\u4ef6\u3001\u90e8\u4ef6\u4ee5\u53ca\u5176\u4ed6\u5fc5\u9700\u7269\u54c1\u7684\u5b8c\u6574\u6e05\u5355\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-bom-bill-of-materials\\\/#breadcrumb\"},\"inLanguage\":\"zh-CN\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-bom-bill-of-materials\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-bom-bill-of-materials\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/ERP-BOM.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/ERP-BOM.png\",\"width\":4990,\"height\":3327,\"caption\":\"ERP BOM\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/erp-bom-bill-of-materials\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP BOM (\u7269\u6599\u6e05\u5355)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-CN\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ERP BOM (\u7269\u6599\u6e05\u5355)","description":"ERP BOM \u662f\u751f\u4ea7\u7279\u5b9a\u4ea7\u54c1\u6240\u9700\u7684\u539f\u6750\u6599\u3001\u7ec4\u4ef6\u3001\u90e8\u4ef6\u4ee5\u53ca\u5176\u4ed6\u5fc5\u9700\u7269\u54c1\u7684\u5b8c\u6574\u6e05\u5355\u3002","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/","og_locale":"zh_CN","og_type":"article","og_title":"ERP BOM (\u7269\u6599\u6e05\u5355)","og_description":"ERP BOM \u662f\u751f\u4ea7\u7279\u5b9a\u4ea7\u54c1\u6240\u9700\u7684\u539f\u6750\u6599\u3001\u7ec4\u4ef6\u3001\u90e8\u4ef6\u4ee5\u53ca\u5176\u4ed6\u5fc5\u9700\u7269\u54c1\u7684\u5b8c\u6574\u6e05\u5355\u3002","og_url":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/","og_site_name":"SkyPlanner","article_published_time":"2023-09-17T11:44:12+00:00","article_modified_time":"2026-10-09T23:46:54+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-BOM-1024x683.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/"},"author":{"name":"","@id":""},"headline":"ERP BOM (\u7269\u6599\u6e05\u5355)","datePublished":"2023-09-17T11:44:12+00:00","dateModified":"2026-10-09T23:46:54+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/"},"wordCount":144,"publisher":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-BOM.png","articleSection":["ERP","\u8d44\u6e90"],"inLanguage":"zh-CN"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/","url":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/","name":"ERP BOM (\u7269\u6599\u6e05\u5355)","isPartOf":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-BOM.png","datePublished":"2023-09-17T11:44:12+00:00","dateModified":"2026-10-09T23:46:54+00:00","description":"ERP BOM \u662f\u751f\u4ea7\u7279\u5b9a\u4ea7\u54c1\u6240\u9700\u7684\u539f\u6750\u6599\u3001\u7ec4\u4ef6\u3001\u90e8\u4ef6\u4ee5\u53ca\u5176\u4ed6\u5fc5\u9700\u7269\u54c1\u7684\u5b8c\u6574\u6e05\u5355\u3002","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/#breadcrumb"},"inLanguage":"zh-CN","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/"]}]},{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-BOM.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-BOM.png","width":4990,"height":3327,"caption":"ERP BOM"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/erp-bom-bill-of-materials\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/zh-hans\/"},{"@type":"ListItem","position":2,"name":"ERP BOM (\u7269\u6599\u6e05\u5355)"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/zh-hans\/#website","url":"https:\/\/skyplanner.ai\/zh-hans\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/zh-hans\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-CN"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/zh-hans\/","logo":{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-BOM.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-BOM-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-BOM-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-BOM-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-BOM-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-BOM-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-BOM-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-BOM.png",360,240,false]},"uagb_author_info":{"display_name":"","author_link":"https:\/\/skyplanner.ai\/zh-hans\/author\/"},"uagb_comment_info":0,"uagb_excerpt":"ERP BOM (\u7269\u6599\u6e05\u5355) \u9996\u9875&nbsp;\u00bb&nbsp;\u8d44\u6e90&nbsp;\u00bb&nbsp;ERP BOM (\u7269\u6599\u6e05\u5355) \u5728\u5236\u9020\u4e1a\u7684\u4e16\u754c\u4e2d\u822a\u884c\uff0c\u6709\u65f6\u611f\u89c9\u5c31\u50cf\u5750\u8fc7\u5c71\u8f66\u3002\u524d\u4e00\u79d2\u4e00\u5207\u8fd0\u884c\u987a\u7545\uff1b\u4e0b\u4e00\u79d2\uff0c\u60a8\u53ef\u80fd\u5c31\u5728\u5904\u7406\u79ef\u538b\u7684\u5e93\u5b58\uff0c\u6216\u8005\u610f\u8bc6\u5230\u4ea7\u54c1\u96f6\u4ef6\u7684\u4e00\u4e2a\u5fae\u5c0f\u53d8\u5316\u5bfc\u81f4\u4e86\u6574\u4f53\u8d28\u91cf\u7684\u4e0b\u964d\u3002\u800c\u5f53\u4ea7\u54c1\u8d28\u91cf\u53d7\u5230\u5f71\u54cd\u65f6\uff0c\u8bf7\u76f8\u4fe1\u6211\u4eec\uff0c\u54c1\u724c\u7684\u58f0\u8a89\u4e5f\u4f1a\u968f\u4e4b\u53d7\u635f\u3002 \u5e78\u8fd0\u7684\u662f\uff0c\u6709\u4e00\u9879 ERP \u529f\u80fd \u5c31\u50cf\u4e00\u5f20\u4fbf\u6377\u7684\u5730\u56fe\uff0c\u5f15\u5bfc\u60a8\u5ea6\u8fc7\u8fd9\u4e9b\u8d77\u4f0f\u3002\u5b83\u5c31\u662f ERP BOM\u3002\u5982\u679c\u60a8\u70ed\u8877\u4e8e\u786e\u4fdd\u751f\u4ea7\u6d41\u7a0b\u4fdd\u6301\u7cbe\u7b80\uff0c\u5e76\u8ba9\u60a8\u7684\u4ea7\u54c1\u59cb\u7ec8\u901a\u8fc7\u8d28\u91cf\u6d4b\u8bd5\uff0c\u90a3\u4e48\u60a8\u5373\u5c06\u627e\u5230\u4e00\u4f4d\u65b0\u7684\u5f97\u529b\u52a9\u624b\u3002 \u672c\u6587\u5c06\u8ba8\u8bba ERP \u7269\u6599\u6e05\u5355\uff0c\u8fd9\u662f\u66f4\u5e7f\u6cdb\u7684\u4f01\u4e1a\u8d44\u6e90\u8ba1\u5212\u7cfb\u7edf\u4e2d\u4e0d\u53ef\u6216\u7f3a\u7684\u5de5\u5177\u3002\u8bf7\u7ee7\u7eed\u9605\u8bfb\uff0c\u6211\u4eec\u5c06\u5e26\u60a8\u4e86\u89e3\u5176\u7ec6\u8282\uff0c\u786e\u4fdd\u60a8\u638c\u63e1\u5176\u5728 ERP \u5236\u9020\u6a21\u5757 \u4e2d\u7684\u5173\u952e\u4f5c\u7528\u3002\u51c6\u5907\u597d\u63a2\u7d22 ERP \u7269\u6599\u6e05\u5355\u5982\u4f55\u6210\u4e3a\u60a8\u5236\u9020\u4f53\u7cfb\u671f\u5f85\u5df2\u4e45\u7684\u53d8\u9769\u8005\u4e86\u5417\uff1f\u8ba9\u6211\u4eec\u5f00\u59cb\u5427\uff01 TL;DR ERP \u7269\u6599\u6e05\u5355 (ERP BOM) \u662f\u4f01\u4e1a\u8d44\u6e90\u8ba1\u5212\u7cfb\u7edf\u4e2d\u7684\u4e00\u9879\u5173\u952e\u529f\u80fd\uff0c\u5b83\u63d0\u4f9b\u4e86\u4e00\u4efd\u8be6\u7ec6\u5217\u51fa\u751f\u4ea7\u7279\u5b9a\u4ea7\u54c1\u6240\u9700\u7684\u6750\u6599\u3001\u7ec4\u4ef6\u548c\u7ec4\u4ef6\u7684\u7efc\u5408\u6e05\u5355\u3002\u5b83\u4e0d\u4ec5\u4ec5\u662f\u4e00\u4efd\u6e05\u5355\uff0cERP BOM \u5728\u4f18\u5316\u5236\u9020\u6d41\u7a0b\u3001\u786e\u4fdd\u4ea7\u54c1\u8d28\u91cf\u4e00\u81f4\u6027\u548c\u54c1\u724c\u4fe1\u8a89\u65b9\u9762\u81f3\u5173\u91cd\u8981\u3002\u5b83\u63d0\u4f9b\u7cbe\u786e\u7684\u7ec4\u4ef6\u5217\u8868\u3001\u6210\u672c\u4f30\u7b97\u3001\u5e93\u5b58\u7ba1\u7406\u3001\u8d28\u91cf\u4fdd\u8bc1\u4ee5\u53ca\u4e0e APS \u7cfb\u7edf\u7684\u96c6\u6210\u7b49\u529f\u80fd\u3002ERP BOM \u5177\u6709\u63d0\u9ad8\u6548\u7387\u3001\u8282\u7701\u6210\u672c\u3001\u8f85\u52a9\u51c6\u786e\u9884\u6d4b\u3001\u786e\u4fdd\u4ea7\u54c1\u8d28\u91cf\u4e00\u81f4\u4ee5\u53ca\u6539\u5584\u4f9b\u5e94\u5546\u5173\u7cfb\u7b49\u8bf8\u591a\u4f18\u52bf\u3002\u4ece\u6c7d\u8f66\u5230\u65f6\u5c1a\uff0c\u5404\u884c\u5404\u4e1a\u90fd\u4f9d\u9760 ERP BOM \u6765\u5e94\u5bf9\u5176\u751f\u4ea7\u7684\u590d\u6742\u6027\u3002\u4e3a\u4e86\u5145\u5206\u5229\u7528 ERP BOM\uff0c\u5efa\u8bae\u4f01\u4e1a\u4f18\u5148\u8003\u8651\u6570\u636e\u51c6\u786e\u6027\u3001\u4e0e\u5176\u4ed6\u7cfb\u7edf\u96c6\u6210\u3001\u57f9\u8bad\u5458\u5de5\u5e76\u5907\u4efd\u6570\u636e\u3002Skyplanner \u662f\u4e00\u6b3e\u5148\u8fdb\u7684 APS \u7cfb\u7edf\uff0c\u53ef\u4e0e ERP BOM \u914d\u5408\u4f7f\u7528\uff0c\u63d0\u4f9b\u5b9e\u65f6\u540c\u6b65\u3001\u4f18\u5316\u8d44\u6e90\u5206\u914d\u548c\u81ea\u52a8\u6392\u7a0b\u7b49\u529f\u80fd\uff0c\u4ece\u800c\u589e\u5f3a\u5176\u529f\u80fd\u3002 \u4ec0\u4e48\u662f ERP \u7269\u6599\u6e05\u5355\uff1f ERP \u7269\u6599\u6e05\u5355\uff0c\u901a\u5e38\u7b80\u79f0\u4e3a ERP BOM\uff0c\u662f\u6307 \u4f01\u4e1a\u8d44\u6e90\u8ba1\u5212\u7cfb\u7edf \u4e2d\u7684\u7269\u6599\u6e05\u5355\u529f\u80fd\u3002 ERP BOM&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/84999","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/comments?post=84999"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/84999\/revisions"}],"predecessor-version":[{"id":85232,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/84999\/revisions\/85232"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/media\/16690"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/media?parent=84999"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/categories?post=84999"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/tags?post=84999"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}