{"id":84831,"date":"2024-10-09T09:22:41","date_gmt":"2024-10-09T09:22:41","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=84831"},"modified":"2026-03-20T11:36:56","modified_gmt":"2026-03-20T11:36:56","slug":"lean-manufacturing-vs-six-sigma-which-is-right-for-you","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/","title":{"rendered":"\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f"},"content":{"rendered":"<div class=\"gb-container gb-container-zh-hans01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-lean-manufacturing-vs-six-sigma-which-is-right-for-you\">\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f<\/h1>\n\n\n<div class=\"gb-container gb-container-zh-hans02\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/\">\u9996\u9875<\/a>&nbsp;\u00bb&nbsp;<a href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/\">\u8d44\u6e90<\/a>&nbsp;\u00bb&nbsp;\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\uff1a <\/span><span class=\"yoast-reading-time__reading-time\">12<\/span><span class=\"yoast-reading-time__time-unit\"> \u5206\u949f<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-zh-hans03\">\n<div class=\"gb-container gb-container-zh-hans04\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\"><strong>\u603b\u4f53\u800c\u8a00\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u6d88\u9664\u6d6a\u8d39\u548c\u6539\u5584\u6d41\u7a0b\u7684\u65b9\u6cd5\uff0c\u800c\u516d\u897f\u683c\u739b\u5219\u662f\u4e00\u5957\u4e13\u6ce8\u4e8e\u51cf\u5c11\u7f3a\u9677\u7684\u6280\u672f\u3002<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>\u6700\u5927\u5316\u6548\u7387\u548c\u6700\u5c0f\u5316\u6d6a\u8d39\u5df2\u4e0d\u518d\u4ec5\u4ec5\u662f\u201c<em>\u9526\u4e0a\u6dfb\u82b1<\/em>\u201d\u2014\u2014\u5982\u679c\u60a8\u60f3\u5728\u5236\u9020\u4e1a\u4e2d\u751f\u5b58\uff0c\u5b83\u4eec\u662f\u5fc5\u4e0d\u53ef\u5c11\u7684\u3002\u968f\u7740\u964d\u4f4e\u6210\u672c\u3001\u63d0\u9ad8\u4ea7\u54c1\u8d28\u91cf\u548c\u7b80\u5316\u6d41\u7a0b\u7684\u9700\u6c42\u65e5\u76ca\u589e\u957f\uff0c\u5236\u9020\u5546\u7ecf\u5e38\u53d1\u73b0\u81ea\u5df1\u5728\u6bd4\u8f83\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\u3002\u8fd9\u4e24\u79cd\u65b9\u6cd5\u5df2\u5e2e\u52a9\u5168\u7403\u4f01\u4e1a\u4f18\u5316\u4e86\u8fd0\u8425\uff0c\u4f46\u54ea\u4e00\u79cd\u66f4\u9002\u5408\u60a8\u7684\u751f\u4ea7\uff1f<\/p>\n\n\n\n<p>\u5728\u672c\u6587\u4e2d\uff0c\u6211\u4eec\u5c06\u8be6\u7ec6\u89e3\u6790\u4ec0\u4e48\u662f\u7cbe\u76ca\u751f\u4ea7\u548c\u516d\u897f\u683c\u739b\uff0c\u7a81\u51fa\u5176\u5173\u952e\u533a\u522b\uff0c\u5e76\u5411\u60a8\u5c55\u793a\u751f\u4ea7\u8ba1\u5212\u4eba\u5458\u5982\u4f55\u901a\u8fc7\u96c6\u6210 <a href=\"https:\/\/skyplanner.ai\/zh-hans\/resources\/advanced-planning-and-scheduling\/\">\u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b<\/a> (APS) \u89e3\u51b3\u65b9\u6848\u6765\u7b80\u5316\u5de5\u4f5c\u3002<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-62514f8d      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\u54ea\u79cd\u66f4\u9002\u5408\u60a8\" class=\"uagb-toc-link__trigger\">\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f<\/a><ul class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\u7406\u89e3\u6838\u5fc3\u6982\u5ff5\" class=\"uagb-toc-link__trigger\">\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u7406\u89e3\u6838\u5fc3\u6982\u5ff5<\/a><ul class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#\u7cbe\u76ca\u751f\u4ea7\u901a\u5f80\u7cbe\u7b80\u6548\u7387\u4e4b\u8def\" class=\"uagb-toc-link__trigger\">\u7cbe\u76ca\u751f\u4ea7\uff1a\u901a\u5f80\u7cbe\u7b80\u6548\u7387\u4e4b\u8def<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#\u516d\u897f\u683c\u739b\u8ffd\u6c42\u6d41\u7a0b\u5b8c\u7f8e\u7684\u65b9\u6cd5\" class=\"uagb-toc-link__trigger\">\u516d\u897f\u683c\u739b\uff1a\u8ffd\u6c42\u6d41\u7a0b\u5b8c\u7f8e\u7684\u65b9\u6cd5<\/a><\/li><\/ul><li class=\"uagb-toc__list\"><a href=\"#\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\u5173\u952e\u533a\u522b\u662f\u4ec0\u4e48\" class=\"uagb-toc-link__trigger\">\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u5173\u952e\u533a\u522b\u662f\u4ec0\u4e48\uff1f<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#\u54ea\u79cd\u65b9\u6cd5\u66f4\u597d\" class=\"uagb-toc-link__trigger\">\u54ea\u79cd\u65b9\u6cd5\u66f4\u597d\uff1f<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#\u7cbe\u76ca\u751f\u4ea7\u516d\u897f\u683c\u739b\u4e0e-aps\u5b8c\u7f8e\u5951\u5408\" class=\"uagb-toc-link__trigger\">\u7cbe\u76ca\u751f\u4ea7\u3001\u516d\u897f\u683c\u739b\u4e0e APS\uff1a\u5b8c\u7f8e\u5951\u5408<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#\u5229\u7528-skyplanner-\u5b9e\u73b0\u6548\u7387\u4e0e\u7cbe\u5ea6\u7684\u6700\u5927\u5316\" class=\"uagb-toc-link__trigger\">\u5229\u7528 SkyPlanner \u5b9e\u73b0\u6548\u7387\u4e0e\u7cbe\u5ea6\u7684\u6700\u5927\u5316<\/a><\/ul><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"wp-block-heading\" id=\"h-lean-manufacturing-vs-six-sigma-understanding-the-concepts\">\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u7406\u89e3\u6838\u5fc3\u6982\u5ff5<\/h2>\n\n\n\n<p>\u5728\u6bd4\u8f83\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\u65f6\uff0c\u91cd\u8981\u7684\u662f\u8981\u7406\u89e3\u8fd9\u4e24\u79cd\u65b9\u6cd5\u8bba\u90fd\u65e8\u5728\u6539\u8fdb\u751f\u4ea7\u6d41\u7a0b\uff0c\u4f46\u5b83\u4eec\u5b9e\u73b0\u8fd9\u4e00\u76ee\u6807\u7684\u9014\u5f84\u4e0d\u540c\u3002<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\u7cbe\u76ca\u751f\u4ea7\uff1a\u901a\u5f80\u7cbe\u7b80\u6548\u7387\u4e4b\u8def<\/h3>\n\n\n\n<p><strong>\u7cbe\u76ca\u751f\u4ea7\u7684\u6838\u5fc3\u662f\u901a\u8fc7\u6d88\u9664\u4efb\u4f55\u4e0d\u4e3a\u751f\u4ea7\u8fc7\u7a0b\u589e\u52a0\u4ef7\u503c\u7684\u56e0\u7d20\u6765\u63d0\u9ad8\u6548\u7387<\/strong>\u3002\u5b83\u8d77\u6e90\u4e8e\u4e30\u7530\uff0c\u4e13\u6ce8\u4e8e\u4ee5\u66f4\u5c11\u7684\u6295\u5165\u5b9e\u73b0\u66f4\u591a\u7684\u4ea7\u51fa\u3002\u5176\u7406\u5ff5\u5f88\u7b80\u5355\uff1a\u53ea\u4f7f\u7528\u6ee1\u8db3\u5ba2\u6237\u9700\u6c42\u7edd\u5bf9\u5fc5\u8981\u7684\u8d44\u6e90\uff0c\u4e0d\u591a\u4e0d\u5c11\u3002\u8fd9\u79cd\u65b9\u6cd5\u4e0d\u4ec5\u6709\u52a9\u4e8e\u964d\u4f4e\u6210\u672c\uff0c\u8fd8\u80fd\u63d0\u9ad8\u8d28\u91cf\u5e76\u52a0\u5feb\u751f\u4ea7\u901f\u5ea6\u3002\u56e0\u6b64\uff0c\u5982\u679c\u60a8\u60f3\u5728\u5f53\u4eca\u7684\u5236\u9020\u4e1a\u4e16\u754c\u4e2d\u4fdd\u6301\u7ade\u4e89\u529b\uff0c\u8fd9\u662f\u4e00\u4e2a\u53cc\u8d62\u7684\u9009\u62e9\u3002<\/p>\n\n\n\n<p>\u7cbe\u76ca\u751f\u4ea7\u7684\u6838\u5fc3\u662f\u6301\u7eed\u6539\u8fdb\uff0c\u5373 <strong>Kaizen<\/strong>\uff08\u6539\u5584\uff09\uff0c\u8fd9\u6d89\u53ca\u516c\u53f8\u5185\u7684\u6bcf\u4e00\u4e2a\u4eba\u2014\u2014\u4ece\u9ad8\u5c42\u7ba1\u7406\u4eba\u5458\u5230\u751f\u4ea7\u7ebf\u5458\u5de5\u3002\u91cd\u70b9\u662f\u6d88\u9664\u516b\u79cd\u51cf\u7f13\u751f\u4ea7\u6216\u589e\u52a0\u6210\u672c\u7684\u7279\u5b9a\u7c7b\u578b\u6d6a\u8d39\u3002\u8fd9\u4e9b\u6d6a\u8d39\u5728\u82f1\u8bed\u4e2d\u88ab\u79f0\u4e3a <strong>TIMWOODS<\/strong>\uff08\u5176\u82f1\u6587\u9996\u5b57\u6bcd\u7f29\u5199\uff09\uff1a<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>T<\/strong> \u2013 <strong>\u8fd0\u8f93<\/strong>\uff1a\u7269\u6599\u6216\u4ea7\u54c1\u5728\u6d41\u7a0b\u4e4b\u95f4\u8fdb\u884c\u4e0d\u5fc5\u8981\u7684\u79fb\u52a8\u3002<\/li>\n\n\n\n<li>I \u2013 \u5e93\u5b58\uff1a\u8d85\u51fa\u5373\u65f6\u9700\u6c42\u7684\u591a\u4f59\u6750\u6599\u6216\u4ea7\u54c1\u3002<\/li>\n\n\n\n<li>M \u2013 \u52a8\u4f5c\uff1a\u4eba\u5458\u4e0d\u5fc5\u8981\u7684\u79fb\u52a8\uff0c\u4f8b\u5982\u5de5\u4eba\u5728\u5de5\u4f5c\u533a\u4f4e\u6548\u7387\u5730\u6765\u56de\u8d70\u52a8\u3002<\/li>\n\n\n\n<li><strong>W<\/strong> \u2013 <strong>\u7b49\u5f85<\/strong>\uff1a\u6d41\u7a0b\u6216\u4ea7\u54c1\u672a\u88ab\u5b9e\u9645\u5904\u7406\u65f6\u4ea7\u751f\u7684\u7a7a\u95f2\u65f6\u95f4\u3002<\/li>\n\n\n\n<li>O \u2013 \u8fc7\u5ea6\u751f\u4ea7\uff1a\u751f\u4ea7\u8d85\u51fa\u6240\u9700\u6570\u91cf\uff0c\u6216\u5728\u9700\u8981\u4e4b\u524d\u5c31\u63d0\u524d\u751f\u4ea7\u3002<\/li>\n\n\n\n<li>O \u2013 \u8fc7\u5ea6\u52a0\u5de5\uff1a\u6267\u884c\u8d85\u51fa\u6ee1\u8db3\u5ba2\u6237\u9700\u6c42\u6240\u5fc5\u8981\u7684\u5de5\u4f5c\uff0c\u6216\u6dfb\u52a0\u4e0d\u5fc5\u8981\u7684\u529f\u80fd\u3002<\/li>\n\n\n\n<li><strong>D<\/strong> \u2013 <strong>\u7f3a\u9677<\/strong>\uff1a\u751f\u4ea7\u51fa\u9700\u8981\u8fd4\u5de5\u6216\u7ea0\u6b63\u7684\u7f3a\u9677\u4ea7\u54c1\u3002<\/li>\n\n\n\n<li>S \u2013 \u6280\u80fd\uff08\u5458\u5de5\u624d\u80fd\u672a\u5145\u5206\u5229\u7528\uff09\uff1a\u672a\u80fd\u5145\u5206\u53d1\u6325\u5458\u5de5\u7684\u6280\u80fd\u3001\u7ecf\u9a8c\u6216\u77e5\u8bc6\u3002<\/li>\n<\/ol>\n\n\n\n<p>\u901a\u8fc7\u89e3\u51b3\u8fd9\u4e9b\u6d6a\u8d39\uff0c\u60a8\u53ef\u4ee5\u7b80\u5316\u8fd0\u8425\u5e76<a href=\"https:\/\/skyplanner.ai\/zh-hans\/resources\/production-efficiency-achieve-more-with-less-effort\/\">\u63d0\u9ad8\u751f\u4ea7\u6548\u7387<\/a>\u3002\u7cbe\u76ca\u751f\u4ea7\u5b9e\u73b0\u8fd9\u4e00\u76ee\u6807\u7684\u4e00\u79cd\u65b9\u5f0f\u662f\u901a\u8fc7\u201c<em>\u51c6\u65f6\u5316<\/em>\u201d\u7cfb\u7edf\u3002\u60a8\u4e0d\u518d\u5927\u91cf\u751f\u4ea7\u5e76\u8ba9\u4ea7\u54c1\u95f2\u7f6e\uff0c\u800c\u662f\u6839\u636e\u9700\u6c42\u7cbe\u786e\u5730\u751f\u4ea7\u6240\u9700\u7684\u4ea7\u54c1\u3002\u8fd9\u51cf\u5c11\u4e86\u591a\u4f59\u7684\u5e93\u5b58\uff0c\u5e76\u786e\u4fdd\u60a8\u660e\u667a\u5730\u4f7f\u7528\u8d44\u6e90\u3002\u7cbe\u76ca\u7684\u54f2\u5b66\u975e\u5e38\u76f4\u63a5\uff1a<em>\u6d41\u7a0b\u4e2d\u7684\u6bcf\u4e00\u6b65\u90fd\u5fc5\u987b\u589e\u52a0\u4ef7\u503c<\/em>\u3002\u5982\u679c\u6ca1\u6709\uff0c\u5c31\u9700\u8981\u6539\u53d8\u3002<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\u516d\u897f\u683c\u739b\uff1a\u8ffd\u6c42\u6d41\u7a0b\u5b8c\u7f8e\u7684\u65b9\u6cd5<\/h3>\n\n\n\n<p><strong>\u516d\u897f\u683c\u739b\u662f\u4e00\u79cd\u6570\u636e\u9a71\u52a8\u7684\u65b9\u6cd5\uff0c\u901a\u8fc7\u8bc6\u522b\u548c\u6d88\u9664\u7f3a\u9677\u539f\u56e0\u5e76\u51cf\u5c11\u5236\u9020\u4e2d\u7684\u6ce2\u52a8\u6765\u63d0\u9ad8\u6d41\u7a0b\u8d28\u91cf<\/strong>\u3002\u8be5\u65b9\u6cd5\u4e13\u6ce8\u4e8e\u51cf\u5c11\u9519\u8bef\u5e76\u786e\u4fdd\u4e00\u5207\u4fdd\u6301\u4e00\u81f4\u3002\u76ee\u6807\u662f\u4ec0\u4e48\uff1f\u5c3d\u53ef\u80fd\u63a5\u8fd1\u96f6\u7f3a\u9677\u3002<\/p>\n\n\n\n<p>\u516d\u897f\u683c\u739b\u4f7f\u7528\u4e00\u79cd\u7ed3\u6784\u975e\u5e38\u4e25\u8c28\u7684\u6d41\u7a0b\uff0c\u79f0\u4e3a <strong><span translate=\"no\">DMAIC<\/span><\/strong>\uff08\u5176\u82f1\u6587\u9996\u5b57\u6bcd\u7f29\u5199\uff09\u3002\u5176\u8fd0\u4f5c\u65b9\u5f0f\u5982\u4e0b\uff1a<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>D \u2013 \u5b9a\u4e49 \u2013 \u8bc6\u522b\u95ee\u9898\u5e76\u660e\u786e\u60a8\u5e0c\u671b\u8fbe\u6210\u7684\u76ee\u6807\u3002<\/li>\n\n\n\n<li>M \u2013 \u6d4b\u91cf \u2013 \u60a8\u9700\u8981\u6536\u96c6\u6240\u6709\u5173\u4e8e\u4e8b\u7269\u8fd0\u4f5c\u65b9\u5f0f\u7684\u4fe1\u606f\uff0c\u4ee5\u4e86\u89e3\u6d41\u7a0b\u7684\u73b0\u72b6\u3002<\/li>\n\n\n\n<li>A \u2013 \u5206\u6790 \u2013 \u8c03\u67e5\u6570\u636e\uff0c\u627e\u51fa\u7f3a\u9677\u6216\u95ee\u9898\u7684\u6839\u672c\u539f\u56e0\u3002<\/li>\n\n\n\n<li>I \u2013 \u6539\u8fdb \u2013 \u5b9e\u65bd\u89e3\u51b3\u65b9\u6848\uff0c\u6d88\u9664\u7f3a\u9677\u5e76\u63d0\u5347\u6d41\u7a0b\u7ee9\u6548\u3002<\/li>\n\n\n\n<li>C \u2013 \u63a7\u5236 \u2013 \u76d1\u63a7\u6539\u8fdb\u6548\u679c\uff0c\u786e\u4fdd\u957f\u671f\u6210\u529f\u548c\u4e00\u81f4\u6027\u3002<\/li>\n<\/ol>\n\n\n\n<p>\u516d\u897f\u683c\u739b\u5728\u73b0\u5b9e\u4e2d\u7684\u4e00\u4e2a\u5e94\u7528\u6848\u4f8b\u53ef\u89c1\u4e8e\u4e00\u5bb6\u53d1\u73b0\u5176\u67d0\u79cd\u4ea7\u54c1\u6301\u7eed\u51fa\u73b0\u7f3a\u9677\u7684\u5236\u9020\u516c\u53f8\u3002\u4ed6\u4eec\u4f7f\u7528 <strong><span translate=\"no\">DMAIC<\/span><\/strong> \u6d41\u7a0b\u6765\u4fee\u590d\u5b83\u3002\u9996\u5148\uff0c\u4ed6\u4eec<strong>\u5b9a\u4e49<\/strong> (Define) \u95ee\u9898\uff1b\u4f8b\u5982\uff0c\u751f\u4ea7\u7f3a\u9677\u7387\u8fc7\u9ad8\u3002\u7136\u540e\uff0c\u4ed6\u4eec\u901a\u8fc7\u67e5\u770b\u8fd1\u671f\u751f\u4ea7\u8fd0\u884c\u7684\u6570\u636e\u6765<strong>\u6d4b\u91cf<\/strong> (Measure) \u53d1\u751f\u4e86\u591a\u5c11\u7f3a\u9677\u3002\u5728<strong>\u5206\u6790<\/strong> (Analyze) \u6570\u636e\u540e\uff0c\u4ed6\u4eec\u627e\u5230\u4e86\u6839\u672c\u539f\u56e0\u2014\u2014\u4e00\u53f0\u673a\u5668\u5931\u51c6\u4e86\u3002\u4e8e\u662f\uff0c\u4ed6\u4eec\u901a\u8fc7\u91cd\u65b0\u6821\u51c6\u673a\u5668\u5e76\u5efa\u7acb\u5b9a\u671f\u68c0\u67e5\u6765<strong>\u6539\u8fdb<\/strong> (Improve) \u73b0\u72b6\u3002\u6700\u540e\uff0c\u4ed6\u4eec\u901a\u8fc7\u5b9a\u671f\u76d1\u63a7\u673a\u5668\u4ee5\u786e\u4fdd\u95ee\u9898\u4e0d\u518d\u53d1\u751f\u6765\u5bf9\u5176\u8fdb\u884c<strong>\u63a7\u5236<\/strong> (Control)\u3002<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-zh-hans05\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\" id=\"h-lean-manufacturing-vs-six-sigma-what-s-the-key-difference\">\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u5173\u952e\u533a\u522b\u662f\u4ec0\u4e48\uff1f<\/h2>\n\n\n<div class=\"gb-container gb-container-zh-hans06\">\n\n<p><strong>\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\u4e4b\u95f4\u7684\u4e3b\u8981\u533a\u522b\u5728\u4e8e\u5b83\u4eec\u7684\u4fa7\u91cd\u70b9<\/strong>\u3002\u7cbe\u76ca\u751f\u4ea7\u81f4\u529b\u4e8e\u786e\u4fdd\u6574\u4e2a\u7cfb\u7edf\u9ad8\u6548\u8fd0\u884c\u3002\u60a8\u524a\u51cf\u4efb\u4f55\u6d6a\u8d39\u65f6\u95f4\u6216\u8d44\u6e90\u7684\u4e1c\u897f\u2014\u2014\u8fd9\u662f\u4e00\u79cd\u5927\u5c40\u89c2\u65b9\u6cd5\u3002\u60a8\u5173\u6ce8\u7684\u662f\u5982\u4f55\u7cbe\u7b80\u6574\u4e2a\u751f\u4ea7\u6d41\u7a0b\u3002\u800c\u516d\u897f\u683c\u739b\u5219\u7565\u6709\u4e0d\u540c\u3002\u5b83\u66f4\u4e13\u6ce8\u4e8e\u6df1\u5165\u7814\u7a76\u7279\u5b9a\u95ee\u9898\uff0c\u627e\u51fa\u5bfc\u81f4\u7f3a\u9677\u7684\u786e\u5207\u539f\u56e0\u5e76\u52a0\u4ee5\u4fee\u590d\u3002<\/p>\n\n\n\n<p><strong>\u603b\u4f53\u800c\u8a00\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u6d88\u9664\u6d6a\u8d39\u548c\u6539\u5584\u6d41\u7a0b\u7684\u65b9\u6cd5\uff0c\u800c\u516d\u897f\u683c\u739b\u5219\u662f\u4e00\u5957\u4e13\u6ce8\u4e8e\u51cf\u5c11\u7f3a\u9677\u7684\u6280\u672f\u3002<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u54ea\u79cd\u65b9\u6cd5\u66f4\u597d\uff1f<\/h2>\n\n\n\n<p>\u51b3\u5b9a <strong>\u7cbe\u76ca\u751f\u4ea7<\/strong> <strong>\u8fd8\u662f<\/strong> <strong>\u516d\u897f\u683c\u739b<\/strong> \u66f4\u597d\uff0c\u5b9e\u9645\u4e0a\u53d6\u51b3\u4e8e\u60a8\u516c\u53f8\u7684\u9700\u6c42\u3002\u5982\u679c\u6d41\u7a0b\u770b\u8d77\u6765\u6548\u7387\u4f4e\u4e0b\uff0c\u4f8b\u5982\u5b58\u5728\u8fc7\u591a\u7684\u65f6\u95f4\u6d6a\u8d39\u3001\u8fc7\u591a\u7684\u5e93\u5b58\u79ef\u538b\u5bfc\u81f4\u6210\u672c\u589e\u52a0\uff0c\u6216\u8005\u4ec5\u4ec5\u662f\u5b58\u5728\u592a\u591a\u4e0d\u5fc5\u8981\u7684\u6b65\u9aa4\u2014\u2014<strong>\u7cbe\u76ca\u751f\u4ea7<\/strong> \u662f\u60a8\u7684\u6700\u4f73\u9009\u62e9\u3002\u5b83\u80fd\u8ba9\u6574\u4e2a\u7cfb\u7edf\u8fd0\u884c\u5f97\u66f4\u5feb\u3001\u66f4\u987a\u7545\u3002\u56e0\u6b64\uff0c\u5982\u679c\u60a8\u60f3\u63d0\u9ad8\u6548\u7387\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u60a8\u7684\u9996\u9009\u3002<\/p>\n\n\n\n<p>\u4f46\u662f\uff0c\u5982\u679c\u60a8\u7684\u516c\u53f8\u66f4\u62c5\u5fc3\u8d28\u91cf\u95ee\u9898\u2014\u2014\u4f8b\u5982\uff0c\u60a8\u53d1\u73b0\u7f3a\u9677\u9891\u53d1\u6216\u4ea7\u54c1\u4e0d\u4e00\u81f4\u2014\u2014\u90a3\u4e48\u516d\u897f\u683c\u739b\u5c31\u662f\u60a8\u9700\u8981\u5173\u6ce8\u7684\u91cd\u70b9\u3002\u516d\u897f\u683c\u739b\u7cbe\u51c6\u5730\u4e13\u6ce8\u4e8e\u63d0\u9ad8\u8d28\u91cf\u3002\u5b83\u6df1\u5165\u7ec6\u8282\uff0c\u627e\u51fa\u95ee\u9898\u7684\u786e\u5207\u6240\u5728\u5e76\u4e88\u4ee5\u89e3\u51b3\u3002\u5bf9\u4e8e\u7cbe\u5ea6\u81f3\u5173\u91cd\u8981\u7684\u884c\u4e1a\uff08\u5982\u5236\u836f\u6216\u7535\u5b50\u884c\u4e1a\uff09\uff0c\u5b83\u662f\u6781\u4f73\u7684\u9009\u62e9\uff0c\u56e0\u4e3a\u5728\u8fd9\u4e9b\u884c\u4e1a\u4e2d\u60a8\u65e0\u6cd5\u627f\u53d7\u4efb\u4f55\u9519\u8bef\u3002<\/p>\n\n\n\n<p>\u7136\u800c\uff0c\u60a8\u4e0d\u4e00\u5b9a\u975e\u8981\u505a\u51fa\u9009\u62e9\u3002\u5c3d\u7ba1\u7cbe\u76ca\u751f\u4ea7\u548c\u516d\u897f\u683c\u739b\u91c7\u53d6\u4e0d\u540c\u7684\u65b9\u6cd5\uff0c\u4f46\u4e00\u4e9b\u5236\u9020\u5546\u4f1a\u5c06\u4e24\u8005\u7ed3\u5408\u4f7f\u7528\uff0c\u521b\u5efa\u4e00\u79cd\u6df7\u5408\u65b9\u6cd5\u3002\u9996\u5148\uff0c\u4ece\u7cbe\u76ca\u751f\u4ea7\u5f00\u59cb\uff0c\u7b80\u5316\u5e76\u52a0\u901f\u6d41\u7a0b\uff0c\u8fd9\u5bf9\u63d0\u9ad8\u6548\u7387\u975e\u5e38\u6709\u76ca\u3002\u7136\u540e\uff0c\u5f15\u5165\u516d\u897f\u683c\u739b\u4ee5\u786e\u4fdd\u8fd9\u4e9b\u66f4\u5feb\u7684\u6d41\u7a0b\u80fd\u591f\u4fdd\u6301\u9ad8\u8d28\u91cf\u548c\u4e00\u81f4\u6027\u3002\u5c06\u8fd9\u4e24\u8005\u7ed3\u5408\u4e3a\u60a8\u63d0\u4f9b\u4e86\u4e00\u4e2a\u5f3a\u5927\u7684\u6218\u7565\uff0c\u65e2\u80fd\u63d0\u9ad8\u6548\u7387\u53c8\u80fd\u63d0\u5347\u8d28\u91cf\u3002\u8fd9\u5c31\u50cf\u4e00\u77f3\u4e8c\u9e1f\u3002<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u7cbe\u76ca\u751f\u4ea7\u3001\u516d\u897f\u683c\u739b\u4e0e APS\uff1a\u5b8c\u7f8e\u5951\u5408<\/h2>\n\n\n\n<p>\u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b\u7cfb\u7edf\u5bf9\u4e8e\u4efb\u4f55\u4f7f\u7528 <strong>\u7cbe\u76ca\u751f\u4ea7<\/strong> \u6216 <strong>\u516d\u897f\u683c\u739b<\/strong> \u7684\u751f\u4ea7\u8ba1\u5212\u4eba\u5458\u6765\u8bf4\u90fd\u662f\u4e00\u4e2a\u6781\u4f73\u7684\u5de5\u5177\u3002\u901a\u8fc7 APS\uff0c\u60a8\u53ef\u4ee5\u786e\u4fdd\u8d44\u6e90\u7684\u6709\u6548\u5229\u7528\uff0c\u5728\u9700\u8981\u7684\u5730\u65b9\u7cbe\u786e\u524a\u51cf\u6d6a\u8d39\u3002\u5bf9\u4e8e <strong>\u516d\u897f\u683c\u739b<\/strong>\uff0cAPS \u901a\u8fc7\u51cf\u5c11\u7f3a\u9677\u5e2e\u52a9\u60a8\u4fdd\u6301\u9ad8\u8d28\u91cf\uff0c\u4ece\u800c\u5b9e\u73b0\u66f4\u987a\u7545\u7684\u8fd0\u8425\u5e76<a href=\"https:\/\/skyplanner.ai\/zh-hans\/resources\/prevent-customer-dissatisfaction-with-an-aps-system\/\">\u9632\u6b62\u5ba2\u6237\u4e0d\u6ee1<\/a>\u3002\u5b83\u4e3a\u60a8\u63d0\u4f9b\u4e86\u4fdd\u6301\u4e00\u5207\u987a\u5229\u8fd0\u884c\u6240\u9700\u7684\u4e00\u81f4\u6027\u548c\u6548\u7387\u3002<\/p>\n\n\n\n<p>\u5982\u679c\u60a8\u540c\u65f6\u4f7f\u7528\u7cbe\u76ca\u548c\u516d\u897f\u683c\u739b\uff0cAPS \u4f1a\u53d8\u5f97\u66f4\u52a0\u4e0d\u53ef\u6216\u7f3a\u3002\u5b83\u901a\u8fc7\u5b9e\u65f6\u66f4\u65b0\u3001\u4f18\u5316\u7684\u5de5\u4f5c\u6d41\u548c\u81ea\u52a8\u5316\u5e2e\u52a9\u60a8\u5e73\u8861\u6548\u7387\u4e0e\u8d28\u91cf\u3002\u8fd9\u610f\u5473\u7740\u60a8\u4e0d\u4ec5\u5728\u524a\u51cf\u6d6a\u8d39\uff0c\u8fd8\u5728\u4fdd\u6301\u9ad8\u6c34\u5e73\u7684\u8d28\u91cf\u3002\u8fd9\u662f\u4e24\u4e2a\u5173\u952e\u7684 <a href=\"https:\/\/skyplanner.ai\/zh-hans\/resources\/aps-system-benefits\/\">APS \u7cfb\u7edf\u4f18\u52bf<\/a>\uff0c\u53ef\u5e2e\u52a9\u60a8\u4ee5\u66f4\u5c11\u7684\u9ebb\u70e6\u548c\u66f4\u591a\u7684\u63a7\u5236\uff0c\u9ad8\u6548\u4e14\u6709\u6548\u5730\u8fd0\u884c\u4e00\u5207\u3002<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u5229\u7528 SkyPlanner \u5b9e\u73b0\u6548\u7387\u4e0e\u7cbe\u5ea6\u7684\u6700\u5927\u5316<\/h2>\n\n\n\n<p>\u663e\u800c\u6613\u89c1\uff0c\u5728\u5e94\u7528\u7cbe\u76ca\u751f\u4ea7\u6216\u516d\u897f\u683c\u739b\u65f6\uff0c\u6548\u7387\u548c\u8d28\u91cf\u81f3\u5173\u91cd\u8981\u3002\u901a\u8fc7 <a href=\"https:\/\/skyplanner.ai\/\">Skyplanner \u5e26\u6709 AI \u7684\u751f\u4ea7\u6392\u7a0b<\/a>\uff0c\u60a8\u53ef\u4ee5\u540c\u65f6\u589e\u5f3a\u8fd9\u4e24\u8005\u3002\u5b83\u901a\u8fc7\u6709\u6548\u5229\u7528\u8d44\u6e90\u4e3a\u7cbe\u76ca\u751f\u4ea7\u4f18\u5316\u751f\u4ea7\u6d41\uff0c\u5e76\u4e3a\u516d\u897f\u683c\u739b\u51cf\u5c11\u7f3a\u9677\u4ee5\u7ef4\u6301\u8d28\u91cf\u3002\u5728 AI \u5904\u7406\u7ec6\u8282\u7684\u540c\u65f6\uff0c\u60a8\u7684\u56e2\u961f\u53ef\u4ee5\u4e13\u6ce8\u4e8e\u89e3\u51b3\u66f4\u91cd\u5927\u7684\u95ee\u9898\u3002\u901a\u8fc7\u8fd9\u79cd\u65b9\u5f0f\uff0c\u60a8\u53ef\u4ee5\u5728\u6d88\u9664\u4f4e\u6548\u7684\u540c\u65f6\u4fdd\u6301\u4e00\u5207\u4ee5\u6700\u4f73\u72b6\u6001\u8fd0\u884c\u3002<\/p>\n\n\n\n<p>\u544a\u522b <a href=\"https:\/\/skyplanner.ai\/zh-hans\/resources\/excel-production-planning-challenges-and-the-superior-alternative-skyplanner-aps\/\">Excel \u751f\u4ea7\u8ba1\u5212<\/a> \u548c\u624b\u52a8\u5de5\u4f5c\u7684\u70e6\u607c\u3002Skyplanner \u786e\u4fdd\u673a\u5668\u7684\u5145\u5206\u5229\u7528\u5e76\u4f18\u5316\u5de5\u4f5c\u961f\u5217\u3002\u51c6\u5907\u597d\u53d8\u9769\u60a8\u7684\u751f\u4ea7\u4e86\u5417\uff1f\u4e3a\u4ec0\u4e48\u4e0d\u4eb2\u81ea\u6d4b\u8bd5\u4e00\u4e0b\uff1f\u8bd5\u7528\u6211\u4eec\u7684 14 \u5929\u514d\u8d39\u8bd5\u7528\uff0c\u4eb2\u8eab\u4f53\u9a8c <a href=\"https:\/\/skyplanner.ai\/zh-hans\/%e5%8a%9f%e8%83%bd\/\">Skyplanner \u7684\u529f\u80fd<\/a> \u5982\u4f55\u6539\u8fdb\u60a8\u7684\u7cbe\u76ca\u548c\u516d\u897f\u683c\u739b\u6d41\u7a0b\u3002\u6211\u4eec\u7684\u56e2\u961f\u5c06\u5168\u7a0b\u4e3a\u60a8\u63d0\u4f9b\u6307\u5bfc\uff01<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-zh-hans07\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-zh-hans08\">\n<div class=\"gb-grid-column gb-grid-column-zh-hans09\"><div class=\"gb-container gb-container-zh-hans09\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-zh-hans10\"><div class=\"gb-container gb-container-zh-hans10\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f \u9996\u9875&nbsp;\u00bb&nbsp;\u8d44\u6e90&nbsp;\u00bb&nbsp;\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f \u603b\u4f53\u800c\u8a00\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u6d88\u9664\u6d6a\u8d39\u548c\u6539\u5584\u6d41\u7a0b\u7684\u65b9\u6cd5\uff0c\u800c\u516d\u897f\u683c\u739b\u5219\u662f\u4e00\u5957\u4e13\u6ce8\u4e8e\u51cf\u5c11\u7f3a\u9677\u7684\u6280\u672f\u3002 \u6700\u5927\u5316\u6548\u7387\u548c\u6700\u5c0f\u5316\u6d6a\u8d39\u5df2\u4e0d\u518d\u4ec5\u4ec5\u662f\u201c\u9526\u4e0a\u6dfb\u82b1\u201d\u2014\u2014\u5982\u679c\u60a8\u60f3\u5728\u5236\u9020\u4e1a\u4e2d\u751f\u5b58\uff0c\u5b83\u4eec\u662f\u5fc5\u4e0d\u53ef\u5c11\u7684\u3002\u968f\u7740\u964d\u4f4e\u6210\u672c\u3001\u63d0\u9ad8\u4ea7\u54c1\u8d28\u91cf\u548c\u7b80\u5316\u6d41\u7a0b\u7684\u9700\u6c42\u65e5\u76ca\u589e\u957f\uff0c\u5236\u9020\u5546\u7ecf\u5e38\u53d1\u73b0\u81ea\u5df1\u5728\u6bd4\u8f83\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\u3002\u8fd9\u4e24\u79cd\u65b9\u6cd5\u5df2\u5e2e\u52a9\u5168\u7403\u4f01\u4e1a\u4f18\u5316\u4e86\u8fd0\u8425\uff0c\u4f46\u54ea\u4e00\u79cd\u66f4\u9002\u5408\u60a8\u7684\u751f\u4ea7\uff1f \u5728\u672c\u6587\u4e2d\uff0c\u6211\u4eec\u5c06\u8be6\u7ec6\u89e3\u6790\u4ec0\u4e48\u662f\u7cbe\u76ca\u751f\u4ea7\u548c\u516d\u897f\u683c\u739b\uff0c\u7a81\u51fa\u5176\u5173\u952e\u533a\u522b\uff0c\u5e76\u5411\u60a8\u5c55\u793a\u751f\u4ea7\u8ba1\u5212\u4eba\u5458\u5982\u4f55\u901a\u8fc7\u96c6\u6210 \u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b (APS) \u89e3\u51b3\u65b9\u6848\u6765\u7b80\u5316\u5de5\u4f5c\u3002 \u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u7406\u89e3\u6838\u5fc3\u6982\u5ff5 \u5728\u6bd4\u8f83\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\u65f6\uff0c\u91cd\u8981\u7684\u662f\u8981\u7406\u89e3\u8fd9\u4e24\u79cd\u65b9\u6cd5\u8bba\u90fd\u65e8\u5728\u6539\u8fdb\u751f\u4ea7\u6d41\u7a0b\uff0c\u4f46\u5b83\u4eec\u5b9e\u73b0\u8fd9\u4e00\u76ee\u6807\u7684\u9014\u5f84\u4e0d\u540c\u3002 \u7cbe\u76ca\u751f\u4ea7\uff1a\u901a\u5f80\u7cbe\u7b80\u6548\u7387\u4e4b\u8def \u7cbe\u76ca\u751f\u4ea7\u7684\u6838\u5fc3\u662f\u901a\u8fc7\u6d88\u9664\u4efb\u4f55\u4e0d\u4e3a\u751f\u4ea7\u8fc7\u7a0b\u589e\u52a0\u4ef7\u503c\u7684\u56e0\u7d20\u6765\u63d0\u9ad8\u6548\u7387\u3002\u5b83\u8d77\u6e90\u4e8e\u4e30\u7530\uff0c\u4e13\u6ce8\u4e8e\u4ee5\u66f4\u5c11\u7684\u6295\u5165\u5b9e\u73b0\u66f4\u591a\u7684\u4ea7\u51fa\u3002\u5176\u7406\u5ff5\u5f88\u7b80\u5355\uff1a\u53ea\u4f7f\u7528\u6ee1\u8db3\u5ba2\u6237\u9700\u6c42\u7edd\u5bf9\u5fc5\u8981\u7684\u8d44\u6e90\uff0c\u4e0d\u591a\u4e0d\u5c11\u3002\u8fd9\u79cd\u65b9\u6cd5\u4e0d\u4ec5\u6709\u52a9\u4e8e\u964d\u4f4e\u6210\u672c\uff0c\u8fd8\u80fd\u63d0\u9ad8\u8d28\u91cf\u5e76\u52a0\u5feb\u751f\u4ea7\u901f\u5ea6\u3002\u56e0\u6b64\uff0c\u5982\u679c\u60a8\u60f3\u5728\u5f53\u4eca\u7684\u5236\u9020\u4e1a\u4e16\u754c\u4e2d\u4fdd\u6301\u7ade\u4e89\u529b\uff0c\u8fd9\u662f\u4e00\u4e2a\u53cc\u8d62\u7684\u9009\u62e9\u3002 \u7cbe\u76ca\u751f\u4ea7\u7684\u6838\u5fc3\u662f\u6301\u7eed\u6539\u8fdb\uff0c\u5373 Kaizen\uff08\u6539\u5584\uff09\uff0c\u8fd9\u6d89\u53ca\u516c\u53f8\u5185\u7684\u6bcf\u4e00\u4e2a\u4eba\u2014\u2014\u4ece\u9ad8\u5c42\u7ba1\u7406\u4eba\u5458\u5230\u751f\u4ea7\u7ebf\u5458\u5de5\u3002\u91cd\u70b9\u662f\u6d88\u9664\u516b\u79cd\u51cf\u7f13\u751f\u4ea7\u6216\u589e\u52a0\u6210\u672c\u7684\u7279\u5b9a\u7c7b\u578b\u6d6a\u8d39\u3002\u8fd9\u4e9b\u6d6a\u8d39\u5728\u82f1\u8bed\u4e2d\u88ab\u79f0\u4e3a TIMWOODS\uff08\u5176\u82f1\u6587\u9996\u5b57\u6bcd\u7f29\u5199\uff09\uff1a \u901a\u8fc7\u89e3\u51b3\u8fd9\u4e9b\u6d6a\u8d39\uff0c\u60a8\u53ef\u4ee5\u7b80\u5316\u8fd0\u8425\u5e76\u63d0\u9ad8\u751f\u4ea7\u6548\u7387\u3002\u7cbe\u76ca\u751f\u4ea7\u5b9e\u73b0\u8fd9\u4e00\u76ee\u6807\u7684\u4e00\u79cd\u65b9\u5f0f\u662f\u901a\u8fc7\u201c\u51c6\u65f6\u5316\u201d\u7cfb\u7edf\u3002\u60a8\u4e0d\u518d\u5927\u91cf\u751f\u4ea7\u5e76\u8ba9\u4ea7\u54c1\u95f2\u7f6e\uff0c\u800c\u662f\u6839\u636e\u9700\u6c42\u7cbe\u786e\u5730\u751f\u4ea7\u6240\u9700\u7684\u4ea7\u54c1\u3002\u8fd9\u51cf\u5c11\u4e86\u591a\u4f59\u7684\u5e93\u5b58\uff0c\u5e76\u786e\u4fdd\u60a8\u660e\u667a\u5730\u4f7f\u7528\u8d44\u6e90\u3002\u7cbe\u76ca\u7684\u54f2\u5b66\u975e\u5e38\u76f4\u63a5\uff1a\u6d41\u7a0b\u4e2d\u7684\u6bcf\u4e00\u6b65\u90fd\u5fc5\u987b\u589e\u52a0\u4ef7\u503c\u3002\u5982\u679c\u6ca1\u6709\uff0c\u5c31\u9700\u8981\u6539\u53d8\u3002 \u516d\u897f\u683c\u739b\uff1a\u8ffd\u6c42\u6d41\u7a0b\u5b8c\u7f8e\u7684\u65b9\u6cd5 \u516d\u897f\u683c\u739b\u662f\u4e00\u79cd\u6570\u636e\u9a71\u52a8\u7684\u65b9\u6cd5\uff0c\u901a\u8fc7\u8bc6\u522b\u548c\u6d88\u9664\u7f3a\u9677\u539f\u56e0\u5e76\u51cf\u5c11\u5236\u9020\u4e2d\u7684\u6ce2\u52a8\u6765\u63d0\u9ad8\u6d41\u7a0b\u8d28\u91cf\u3002\u8be5\u65b9\u6cd5\u4e13\u6ce8\u4e8e\u51cf\u5c11\u9519\u8bef\u5e76\u786e\u4fdd\u4e00\u5207\u4fdd\u6301\u4e00\u81f4\u3002\u76ee\u6807\u662f\u4ec0\u4e48\uff1f\u5c3d\u53ef\u80fd\u63a5\u8fd1\u96f6\u7f3a\u9677\u3002 \u516d\u897f\u683c\u739b\u4f7f\u7528\u4e00\u79cd\u7ed3\u6784\u975e\u5e38\u4e25\u8c28\u7684\u6d41\u7a0b\uff0c\u79f0\u4e3a DMAIC\uff08\u5176\u82f1\u6587\u9996\u5b57\u6bcd\u7f29\u5199\uff09\u3002\u5176\u8fd0\u4f5c\u65b9\u5f0f\u5982\u4e0b\uff1a \u516d\u897f\u683c\u739b\u5728\u73b0\u5b9e\u4e2d\u7684\u4e00\u4e2a\u5e94\u7528\u6848\u4f8b\u53ef\u89c1\u4e8e\u4e00\u5bb6\u53d1\u73b0\u5176\u67d0\u79cd\u4ea7\u54c1\u6301\u7eed\u51fa\u73b0\u7f3a\u9677\u7684\u5236\u9020\u516c\u53f8\u3002\u4ed6\u4eec\u4f7f\u7528 DMAIC \u6d41\u7a0b\u6765\u4fee\u590d\u5b83\u3002\u9996\u5148\uff0c\u4ed6\u4eec\u5b9a\u4e49 (Define) \u95ee\u9898\uff1b\u4f8b\u5982\uff0c\u751f\u4ea7\u7f3a\u9677\u7387\u8fc7\u9ad8\u3002\u7136\u540e\uff0c\u4ed6\u4eec\u901a\u8fc7\u67e5\u770b\u8fd1\u671f\u751f\u4ea7\u8fd0\u884c\u7684\u6570\u636e\u6765\u6d4b\u91cf (Measure) \u53d1\u751f\u4e86\u591a\u5c11\u7f3a\u9677\u3002\u5728\u5206\u6790 (Analyze) \u6570\u636e\u540e\uff0c\u4ed6\u4eec\u627e\u5230\u4e86\u6839\u672c\u539f\u56e0\u2014\u2014\u4e00\u53f0\u673a\u5668\u5931\u51c6\u4e86\u3002\u4e8e\u662f\uff0c\u4ed6\u4eec\u901a\u8fc7\u91cd\u65b0\u6821\u51c6\u673a\u5668\u5e76\u5efa\u7acb\u5b9a\u671f\u68c0\u67e5\u6765\u6539\u8fdb (Improve) \u73b0\u72b6\u3002\u6700\u540e\uff0c\u4ed6\u4eec\u901a\u8fc7\u5b9a\u671f\u76d1\u63a7\u673a\u5668\u4ee5\u786e\u4fdd\u95ee\u9898\u4e0d\u518d\u53d1\u751f\u6765\u5bf9\u5176\u8fdb\u884c\u63a7\u5236 (Control)\u3002 \u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u5173\u952e\u533a\u522b\u662f\u4ec0\u4e48\uff1f \u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\u4e4b\u95f4\u7684\u4e3b\u8981\u533a\u522b\u5728\u4e8e\u5b83\u4eec\u7684\u4fa7\u91cd\u70b9\u3002\u7cbe\u76ca\u751f\u4ea7\u81f4\u529b\u4e8e\u786e\u4fdd\u6574\u4e2a\u7cfb\u7edf\u9ad8\u6548\u8fd0\u884c\u3002\u60a8\u524a\u51cf\u4efb\u4f55\u6d6a\u8d39\u65f6\u95f4\u6216\u8d44\u6e90\u7684\u4e1c\u897f\u2014\u2014\u8fd9\u662f\u4e00\u79cd\u5927\u5c40\u89c2\u65b9\u6cd5\u3002\u60a8\u5173\u6ce8\u7684\u662f\u5982\u4f55\u7cbe\u7b80\u6574\u4e2a\u751f\u4ea7\u6d41\u7a0b\u3002\u800c\u516d\u897f\u683c\u739b\u5219\u7565\u6709\u4e0d\u540c\u3002\u5b83\u66f4\u4e13\u6ce8\u4e8e\u6df1\u5165\u7814\u7a76\u7279\u5b9a\u95ee\u9898\uff0c\u627e\u51fa\u5bfc\u81f4\u7f3a\u9677\u7684\u786e\u5207\u539f\u56e0\u5e76\u52a0\u4ee5\u4fee\u590d\u3002 \u603b\u4f53\u800c\u8a00\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u6d88\u9664\u6d6a\u8d39\u548c\u6539\u5584\u6d41\u7a0b\u7684\u65b9\u6cd5\uff0c\u800c\u516d\u897f\u683c\u739b\u5219\u662f\u4e00\u5957\u4e13\u6ce8\u4e8e\u51cf\u5c11\u7f3a\u9677\u7684\u6280\u672f\u3002 \u54ea\u79cd\u65b9\u6cd5\u66f4\u597d\uff1f \u51b3\u5b9a \u7cbe\u76ca\u751f\u4ea7 \u8fd8\u662f \u516d\u897f\u683c\u739b \u66f4\u597d\uff0c\u5b9e\u9645\u4e0a\u53d6\u51b3\u4e8e\u60a8\u516c\u53f8\u7684\u9700\u6c42\u3002\u5982\u679c\u6d41\u7a0b\u770b\u8d77\u6765\u6548\u7387\u4f4e\u4e0b\uff0c\u4f8b\u5982\u5b58\u5728\u8fc7\u591a\u7684\u65f6\u95f4\u6d6a\u8d39\u3001\u8fc7\u591a\u7684\u5e93\u5b58\u79ef\u538b\u5bfc\u81f4\u6210\u672c\u589e\u52a0\uff0c\u6216\u8005\u4ec5\u4ec5\u662f\u5b58\u5728\u592a\u591a\u4e0d\u5fc5\u8981\u7684\u6b65\u9aa4\u2014\u2014\u7cbe\u76ca\u751f\u4ea7 \u662f\u60a8\u7684\u6700\u4f73\u9009\u62e9\u3002\u5b83\u80fd\u8ba9\u6574\u4e2a\u7cfb\u7edf\u8fd0\u884c\u5f97\u66f4\u5feb\u3001\u66f4\u987a\u7545\u3002\u56e0\u6b64\uff0c\u5982\u679c\u60a8\u60f3\u63d0\u9ad8\u6548\u7387\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u60a8\u7684\u9996\u9009\u3002 \u4f46\u662f\uff0c\u5982\u679c\u60a8\u7684\u516c\u53f8\u66f4\u62c5\u5fc3\u8d28\u91cf\u95ee\u9898\u2014\u2014\u4f8b\u5982\uff0c\u60a8\u53d1\u73b0\u7f3a\u9677\u9891\u53d1\u6216\u4ea7\u54c1\u4e0d\u4e00\u81f4\u2014\u2014\u90a3\u4e48\u516d\u897f\u683c\u739b\u5c31\u662f\u60a8\u9700\u8981\u5173\u6ce8\u7684\u91cd\u70b9\u3002\u516d\u897f\u683c\u739b\u7cbe\u51c6\u5730\u4e13\u6ce8\u4e8e\u63d0\u9ad8\u8d28\u91cf\u3002\u5b83\u6df1\u5165\u7ec6\u8282\uff0c\u627e\u51fa\u95ee\u9898\u7684\u786e\u5207\u6240\u5728\u5e76\u4e88\u4ee5\u89e3\u51b3\u3002\u5bf9\u4e8e\u7cbe\u5ea6\u81f3\u5173\u91cd\u8981\u7684\u884c\u4e1a\uff08\u5982\u5236\u836f\u6216\u7535\u5b50\u884c\u4e1a\uff09\uff0c\u5b83\u662f\u6781\u4f73\u7684\u9009\u62e9\uff0c\u56e0\u4e3a\u5728\u8fd9\u4e9b\u884c\u4e1a\u4e2d\u60a8\u65e0\u6cd5\u627f\u53d7\u4efb\u4f55\u9519\u8bef\u3002 \u7136\u800c\uff0c\u60a8\u4e0d\u4e00\u5b9a\u975e\u8981\u505a\u51fa\u9009\u62e9\u3002\u5c3d\u7ba1\u7cbe\u76ca\u751f\u4ea7\u548c\u516d\u897f\u683c\u739b\u91c7\u53d6\u4e0d\u540c\u7684\u65b9\u6cd5\uff0c\u4f46\u4e00\u4e9b\u5236\u9020\u5546\u4f1a\u5c06\u4e24\u8005\u7ed3\u5408\u4f7f\u7528\uff0c\u521b\u5efa\u4e00\u79cd\u6df7\u5408\u65b9\u6cd5\u3002\u9996\u5148\uff0c\u4ece\u7cbe\u76ca\u751f\u4ea7\u5f00\u59cb\uff0c\u7b80\u5316\u5e76\u52a0\u901f\u6d41\u7a0b\uff0c\u8fd9\u5bf9\u63d0\u9ad8\u6548\u7387\u975e\u5e38\u6709\u76ca\u3002\u7136\u540e\uff0c\u5f15\u5165\u516d\u897f\u683c\u739b\u4ee5\u786e\u4fdd\u8fd9\u4e9b\u66f4\u5feb\u7684\u6d41\u7a0b\u80fd\u591f\u4fdd\u6301\u9ad8\u8d28\u91cf\u548c\u4e00\u81f4\u6027\u3002\u5c06\u8fd9\u4e24\u8005\u7ed3\u5408\u4e3a\u60a8\u63d0\u4f9b\u4e86\u4e00\u4e2a\u5f3a\u5927\u7684\u6218\u7565\uff0c\u65e2\u80fd\u63d0\u9ad8\u6548\u7387\u53c8\u80fd\u63d0\u5347\u8d28\u91cf\u3002\u8fd9\u5c31\u50cf\u4e00\u77f3\u4e8c\u9e1f\u3002 \u7cbe\u76ca\u751f\u4ea7\u3001\u516d\u897f\u683c\u739b\u4e0e APS\uff1a\u5b8c\u7f8e\u5951\u5408 \u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b\u7cfb\u7edf\u5bf9\u4e8e\u4efb\u4f55\u4f7f\u7528 \u7cbe\u76ca\u751f\u4ea7 \u6216 \u516d\u897f\u683c\u739b \u7684\u751f\u4ea7\u8ba1\u5212\u4eba\u5458\u6765\u8bf4\u90fd\u662f\u4e00\u4e2a\u6781\u4f73\u7684\u5de5\u5177\u3002\u901a\u8fc7 APS\uff0c\u60a8\u53ef\u4ee5\u786e\u4fdd\u8d44\u6e90\u7684\u6709\u6548\u5229\u7528\uff0c\u5728\u9700\u8981\u7684\u5730\u65b9\u7cbe\u786e\u524a\u51cf\u6d6a\u8d39\u3002\u5bf9\u4e8e \u516d\u897f\u683c\u739b\uff0cAPS \u901a\u8fc7\u51cf\u5c11\u7f3a\u9677\u5e2e\u52a9\u60a8\u4fdd\u6301\u9ad8\u8d28\u91cf\uff0c\u4ece\u800c\u5b9e\u73b0\u66f4\u987a\u7545\u7684\u8fd0\u8425\u5e76\u9632\u6b62\u5ba2\u6237\u4e0d\u6ee1\u3002\u5b83\u4e3a\u60a8\u63d0\u4f9b\u4e86\u4fdd\u6301\u4e00\u5207\u987a\u5229\u8fd0\u884c\u6240\u9700\u7684\u4e00\u81f4\u6027\u548c\u6548\u7387\u3002 \u5982\u679c\u60a8\u540c\u65f6\u4f7f\u7528\u7cbe\u76ca\u548c\u516d\u897f\u683c\u739b\uff0cAPS &#8230; <a title=\"\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/\" aria-label=\"Read more about \u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f\">\u9605\u8bfb\u66f4\u591a<\/a><\/p>\n","protected":false},"author":0,"featured_media":43729,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2545,2517],"tags":[],"class_list":["post-84831","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-2545","category-2517","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u603b\u4f53\u800c\u8a00\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u6d88\u9664\u6d6a\u8d39\u548c\u6539\u5584\u6d41\u7a0b\u7684\u65b9\u6cd5\uff0c\u800c\u516d\u897f\u683c\u739b\u5219\u662f\u4e00\u5957\u4e13\u6ce8\u4e8e\u51cf\u5c11\u7f3a\u9677\u7684\u6280\u672f\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f\" \/>\n<meta property=\"og:description\" content=\"\u603b\u4f53\u800c\u8a00\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u6d88\u9664\u6d6a\u8d39\u548c\u6539\u5584\u6d41\u7a0b\u7684\u65b9\u6cd5\uff0c\u800c\u516d\u897f\u683c\u739b\u5219\u662f\u4e00\u5957\u4e13\u6ce8\u4e8e\u51cf\u5c11\u7f3a\u9677\u7684\u6280\u672f\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-09T09:22:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-20T11:36:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\\\/\"},\"author\":{\"name\":\"\",\"@id\":\"\"},\"headline\":\"\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f\",\"datePublished\":\"2024-10-09T09:22:41+00:00\",\"dateModified\":\"2026-03-20T11:36:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\\\/\"},\"wordCount\":39,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Lean-Manufacturing-vs-Six-Sigma-1.png\",\"articleSection\":[\"\u5236\u9020\u6548\u7387\",\"\u8d44\u6e90\"],\"inLanguage\":\"zh-CN\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\\\/\",\"name\":\"\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Lean-Manufacturing-vs-Six-Sigma-1.png\",\"datePublished\":\"2024-10-09T09:22:41+00:00\",\"dateModified\":\"2026-03-20T11:36:56+00:00\",\"description\":\"\u603b\u4f53\u800c\u8a00\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u6d88\u9664\u6d6a\u8d39\u548c\u6539\u5584\u6d41\u7a0b\u7684\u65b9\u6cd5\uff0c\u800c\u516d\u897f\u683c\u739b\u5219\u662f\u4e00\u5957\u4e13\u6ce8\u4e8e\u51cf\u5c11\u7f3a\u9677\u7684\u6280\u672f\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\\\/#breadcrumb\"},\"inLanguage\":\"zh-CN\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Lean-Manufacturing-vs-Six-Sigma-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Lean-Manufacturing-vs-Six-Sigma-1.png\",\"width\":4990,\"height\":3327,\"caption\":\"Lean Manufacturing vs Six Sigma. Image for Illustrative purposes.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-CN\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f &#8211; SkyPlanner","description":"\u603b\u4f53\u800c\u8a00\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u6d88\u9664\u6d6a\u8d39\u548c\u6539\u5584\u6d41\u7a0b\u7684\u65b9\u6cd5\uff0c\u800c\u516d\u897f\u683c\u739b\u5219\u662f\u4e00\u5957\u4e13\u6ce8\u4e8e\u51cf\u5c11\u7f3a\u9677\u7684\u6280\u672f\u3002","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/","og_locale":"zh_CN","og_type":"article","og_title":"\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f","og_description":"\u603b\u4f53\u800c\u8a00\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u6d88\u9664\u6d6a\u8d39\u548c\u6539\u5584\u6d41\u7a0b\u7684\u65b9\u6cd5\uff0c\u800c\u516d\u897f\u683c\u739b\u5219\u662f\u4e00\u5957\u4e13\u6ce8\u4e8e\u51cf\u5c11\u7f3a\u9677\u7684\u6280\u672f\u3002","og_url":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/","og_site_name":"SkyPlanner","article_published_time":"2024-10-09T09:22:41+00:00","article_modified_time":"2026-03-20T11:36:56+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-1024x683.png","type":"image\/png"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/"},"author":{"name":"","@id":""},"headline":"\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f","datePublished":"2024-10-09T09:22:41+00:00","dateModified":"2026-03-20T11:36:56+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/"},"wordCount":39,"publisher":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1.png","articleSection":["\u5236\u9020\u6548\u7387","\u8d44\u6e90"],"inLanguage":"zh-CN"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/","url":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/","name":"\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1.png","datePublished":"2024-10-09T09:22:41+00:00","dateModified":"2026-03-20T11:36:56+00:00","description":"\u603b\u4f53\u800c\u8a00\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u6d88\u9664\u6d6a\u8d39\u548c\u6539\u5584\u6d41\u7a0b\u7684\u65b9\u6cd5\uff0c\u800c\u516d\u897f\u683c\u739b\u5219\u662f\u4e00\u5957\u4e13\u6ce8\u4e8e\u51cf\u5c11\u7f3a\u9677\u7684\u6280\u672f\u3002","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/#breadcrumb"},"inLanguage":"zh-CN","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/"]}]},{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1.png","width":4990,"height":3327,"caption":"Lean Manufacturing vs Six Sigma. Image for Illustrative purposes."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/lean-manufacturing-vs-six-sigma-which-is-right-for-you\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/zh-hans\/"},{"@type":"ListItem","position":2,"name":"\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/zh-hans\/#website","url":"https:\/\/skyplanner.ai\/zh-hans\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/zh-hans\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-CN"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/zh-hans\/","logo":{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Lean-Manufacturing-vs-Six-Sigma-1.png",360,240,false]},"uagb_author_info":{"display_name":"","author_link":"https:\/\/skyplanner.ai\/zh-hans\/author\/"},"uagb_comment_info":0,"uagb_excerpt":"\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f \u9996\u9875&nbsp;\u00bb&nbsp;\u8d44\u6e90&nbsp;\u00bb&nbsp;\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u54ea\u79cd\u66f4\u9002\u5408\u60a8\uff1f \u603b\u4f53\u800c\u8a00\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u6d88\u9664\u6d6a\u8d39\u548c\u6539\u5584\u6d41\u7a0b\u7684\u65b9\u6cd5\uff0c\u800c\u516d\u897f\u683c\u739b\u5219\u662f\u4e00\u5957\u4e13\u6ce8\u4e8e\u51cf\u5c11\u7f3a\u9677\u7684\u6280\u672f\u3002 \u6700\u5927\u5316\u6548\u7387\u548c\u6700\u5c0f\u5316\u6d6a\u8d39\u5df2\u4e0d\u518d\u4ec5\u4ec5\u662f\u201c\u9526\u4e0a\u6dfb\u82b1\u201d\u2014\u2014\u5982\u679c\u60a8\u60f3\u5728\u5236\u9020\u4e1a\u4e2d\u751f\u5b58\uff0c\u5b83\u4eec\u662f\u5fc5\u4e0d\u53ef\u5c11\u7684\u3002\u968f\u7740\u964d\u4f4e\u6210\u672c\u3001\u63d0\u9ad8\u4ea7\u54c1\u8d28\u91cf\u548c\u7b80\u5316\u6d41\u7a0b\u7684\u9700\u6c42\u65e5\u76ca\u589e\u957f\uff0c\u5236\u9020\u5546\u7ecf\u5e38\u53d1\u73b0\u81ea\u5df1\u5728\u6bd4\u8f83\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\u3002\u8fd9\u4e24\u79cd\u65b9\u6cd5\u5df2\u5e2e\u52a9\u5168\u7403\u4f01\u4e1a\u4f18\u5316\u4e86\u8fd0\u8425\uff0c\u4f46\u54ea\u4e00\u79cd\u66f4\u9002\u5408\u60a8\u7684\u751f\u4ea7\uff1f \u5728\u672c\u6587\u4e2d\uff0c\u6211\u4eec\u5c06\u8be6\u7ec6\u89e3\u6790\u4ec0\u4e48\u662f\u7cbe\u76ca\u751f\u4ea7\u548c\u516d\u897f\u683c\u739b\uff0c\u7a81\u51fa\u5176\u5173\u952e\u533a\u522b\uff0c\u5e76\u5411\u60a8\u5c55\u793a\u751f\u4ea7\u8ba1\u5212\u4eba\u5458\u5982\u4f55\u901a\u8fc7\u96c6\u6210 \u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b (APS) \u89e3\u51b3\u65b9\u6848\u6765\u7b80\u5316\u5de5\u4f5c\u3002 \u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u7406\u89e3\u6838\u5fc3\u6982\u5ff5 \u5728\u6bd4\u8f83\u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\u65f6\uff0c\u91cd\u8981\u7684\u662f\u8981\u7406\u89e3\u8fd9\u4e24\u79cd\u65b9\u6cd5\u8bba\u90fd\u65e8\u5728\u6539\u8fdb\u751f\u4ea7\u6d41\u7a0b\uff0c\u4f46\u5b83\u4eec\u5b9e\u73b0\u8fd9\u4e00\u76ee\u6807\u7684\u9014\u5f84\u4e0d\u540c\u3002 \u7cbe\u76ca\u751f\u4ea7\uff1a\u901a\u5f80\u7cbe\u7b80\u6548\u7387\u4e4b\u8def \u7cbe\u76ca\u751f\u4ea7\u7684\u6838\u5fc3\u662f\u901a\u8fc7\u6d88\u9664\u4efb\u4f55\u4e0d\u4e3a\u751f\u4ea7\u8fc7\u7a0b\u589e\u52a0\u4ef7\u503c\u7684\u56e0\u7d20\u6765\u63d0\u9ad8\u6548\u7387\u3002\u5b83\u8d77\u6e90\u4e8e\u4e30\u7530\uff0c\u4e13\u6ce8\u4e8e\u4ee5\u66f4\u5c11\u7684\u6295\u5165\u5b9e\u73b0\u66f4\u591a\u7684\u4ea7\u51fa\u3002\u5176\u7406\u5ff5\u5f88\u7b80\u5355\uff1a\u53ea\u4f7f\u7528\u6ee1\u8db3\u5ba2\u6237\u9700\u6c42\u7edd\u5bf9\u5fc5\u8981\u7684\u8d44\u6e90\uff0c\u4e0d\u591a\u4e0d\u5c11\u3002\u8fd9\u79cd\u65b9\u6cd5\u4e0d\u4ec5\u6709\u52a9\u4e8e\u964d\u4f4e\u6210\u672c\uff0c\u8fd8\u80fd\u63d0\u9ad8\u8d28\u91cf\u5e76\u52a0\u5feb\u751f\u4ea7\u901f\u5ea6\u3002\u56e0\u6b64\uff0c\u5982\u679c\u60a8\u60f3\u5728\u5f53\u4eca\u7684\u5236\u9020\u4e1a\u4e16\u754c\u4e2d\u4fdd\u6301\u7ade\u4e89\u529b\uff0c\u8fd9\u662f\u4e00\u4e2a\u53cc\u8d62\u7684\u9009\u62e9\u3002 \u7cbe\u76ca\u751f\u4ea7\u7684\u6838\u5fc3\u662f\u6301\u7eed\u6539\u8fdb\uff0c\u5373 Kaizen\uff08\u6539\u5584\uff09\uff0c\u8fd9\u6d89\u53ca\u516c\u53f8\u5185\u7684\u6bcf\u4e00\u4e2a\u4eba\u2014\u2014\u4ece\u9ad8\u5c42\u7ba1\u7406\u4eba\u5458\u5230\u751f\u4ea7\u7ebf\u5458\u5de5\u3002\u91cd\u70b9\u662f\u6d88\u9664\u516b\u79cd\u51cf\u7f13\u751f\u4ea7\u6216\u589e\u52a0\u6210\u672c\u7684\u7279\u5b9a\u7c7b\u578b\u6d6a\u8d39\u3002\u8fd9\u4e9b\u6d6a\u8d39\u5728\u82f1\u8bed\u4e2d\u88ab\u79f0\u4e3a TIMWOODS\uff08\u5176\u82f1\u6587\u9996\u5b57\u6bcd\u7f29\u5199\uff09\uff1a \u901a\u8fc7\u89e3\u51b3\u8fd9\u4e9b\u6d6a\u8d39\uff0c\u60a8\u53ef\u4ee5\u7b80\u5316\u8fd0\u8425\u5e76\u63d0\u9ad8\u751f\u4ea7\u6548\u7387\u3002\u7cbe\u76ca\u751f\u4ea7\u5b9e\u73b0\u8fd9\u4e00\u76ee\u6807\u7684\u4e00\u79cd\u65b9\u5f0f\u662f\u901a\u8fc7\u201c\u51c6\u65f6\u5316\u201d\u7cfb\u7edf\u3002\u60a8\u4e0d\u518d\u5927\u91cf\u751f\u4ea7\u5e76\u8ba9\u4ea7\u54c1\u95f2\u7f6e\uff0c\u800c\u662f\u6839\u636e\u9700\u6c42\u7cbe\u786e\u5730\u751f\u4ea7\u6240\u9700\u7684\u4ea7\u54c1\u3002\u8fd9\u51cf\u5c11\u4e86\u591a\u4f59\u7684\u5e93\u5b58\uff0c\u5e76\u786e\u4fdd\u60a8\u660e\u667a\u5730\u4f7f\u7528\u8d44\u6e90\u3002\u7cbe\u76ca\u7684\u54f2\u5b66\u975e\u5e38\u76f4\u63a5\uff1a\u6d41\u7a0b\u4e2d\u7684\u6bcf\u4e00\u6b65\u90fd\u5fc5\u987b\u589e\u52a0\u4ef7\u503c\u3002\u5982\u679c\u6ca1\u6709\uff0c\u5c31\u9700\u8981\u6539\u53d8\u3002 \u516d\u897f\u683c\u739b\uff1a\u8ffd\u6c42\u6d41\u7a0b\u5b8c\u7f8e\u7684\u65b9\u6cd5 \u516d\u897f\u683c\u739b\u662f\u4e00\u79cd\u6570\u636e\u9a71\u52a8\u7684\u65b9\u6cd5\uff0c\u901a\u8fc7\u8bc6\u522b\u548c\u6d88\u9664\u7f3a\u9677\u539f\u56e0\u5e76\u51cf\u5c11\u5236\u9020\u4e2d\u7684\u6ce2\u52a8\u6765\u63d0\u9ad8\u6d41\u7a0b\u8d28\u91cf\u3002\u8be5\u65b9\u6cd5\u4e13\u6ce8\u4e8e\u51cf\u5c11\u9519\u8bef\u5e76\u786e\u4fdd\u4e00\u5207\u4fdd\u6301\u4e00\u81f4\u3002\u76ee\u6807\u662f\u4ec0\u4e48\uff1f\u5c3d\u53ef\u80fd\u63a5\u8fd1\u96f6\u7f3a\u9677\u3002 \u516d\u897f\u683c\u739b\u4f7f\u7528\u4e00\u79cd\u7ed3\u6784\u975e\u5e38\u4e25\u8c28\u7684\u6d41\u7a0b\uff0c\u79f0\u4e3a DMAIC\uff08\u5176\u82f1\u6587\u9996\u5b57\u6bcd\u7f29\u5199\uff09\u3002\u5176\u8fd0\u4f5c\u65b9\u5f0f\u5982\u4e0b\uff1a \u516d\u897f\u683c\u739b\u5728\u73b0\u5b9e\u4e2d\u7684\u4e00\u4e2a\u5e94\u7528\u6848\u4f8b\u53ef\u89c1\u4e8e\u4e00\u5bb6\u53d1\u73b0\u5176\u67d0\u79cd\u4ea7\u54c1\u6301\u7eed\u51fa\u73b0\u7f3a\u9677\u7684\u5236\u9020\u516c\u53f8\u3002\u4ed6\u4eec\u4f7f\u7528 DMAIC \u6d41\u7a0b\u6765\u4fee\u590d\u5b83\u3002\u9996\u5148\uff0c\u4ed6\u4eec\u5b9a\u4e49 (Define) \u95ee\u9898\uff1b\u4f8b\u5982\uff0c\u751f\u4ea7\u7f3a\u9677\u7387\u8fc7\u9ad8\u3002\u7136\u540e\uff0c\u4ed6\u4eec\u901a\u8fc7\u67e5\u770b\u8fd1\u671f\u751f\u4ea7\u8fd0\u884c\u7684\u6570\u636e\u6765\u6d4b\u91cf (Measure) \u53d1\u751f\u4e86\u591a\u5c11\u7f3a\u9677\u3002\u5728\u5206\u6790 (Analyze) \u6570\u636e\u540e\uff0c\u4ed6\u4eec\u627e\u5230\u4e86\u6839\u672c\u539f\u56e0\u2014\u2014\u4e00\u53f0\u673a\u5668\u5931\u51c6\u4e86\u3002\u4e8e\u662f\uff0c\u4ed6\u4eec\u901a\u8fc7\u91cd\u65b0\u6821\u51c6\u673a\u5668\u5e76\u5efa\u7acb\u5b9a\u671f\u68c0\u67e5\u6765\u6539\u8fdb (Improve) \u73b0\u72b6\u3002\u6700\u540e\uff0c\u4ed6\u4eec\u901a\u8fc7\u5b9a\u671f\u76d1\u63a7\u673a\u5668\u4ee5\u786e\u4fdd\u95ee\u9898\u4e0d\u518d\u53d1\u751f\u6765\u5bf9\u5176\u8fdb\u884c\u63a7\u5236 (Control)\u3002 \u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\uff1a\u5173\u952e\u533a\u522b\u662f\u4ec0\u4e48\uff1f \u7cbe\u76ca\u751f\u4ea7\u4e0e\u516d\u897f\u683c\u739b\u4e4b\u95f4\u7684\u4e3b\u8981\u533a\u522b\u5728\u4e8e\u5b83\u4eec\u7684\u4fa7\u91cd\u70b9\u3002\u7cbe\u76ca\u751f\u4ea7\u81f4\u529b\u4e8e\u786e\u4fdd\u6574\u4e2a\u7cfb\u7edf\u9ad8\u6548\u8fd0\u884c\u3002\u60a8\u524a\u51cf\u4efb\u4f55\u6d6a\u8d39\u65f6\u95f4\u6216\u8d44\u6e90\u7684\u4e1c\u897f\u2014\u2014\u8fd9\u662f\u4e00\u79cd\u5927\u5c40\u89c2\u65b9\u6cd5\u3002\u60a8\u5173\u6ce8\u7684\u662f\u5982\u4f55\u7cbe\u7b80\u6574\u4e2a\u751f\u4ea7\u6d41\u7a0b\u3002\u800c\u516d\u897f\u683c\u739b\u5219\u7565\u6709\u4e0d\u540c\u3002\u5b83\u66f4\u4e13\u6ce8\u4e8e\u6df1\u5165\u7814\u7a76\u7279\u5b9a\u95ee\u9898\uff0c\u627e\u51fa\u5bfc\u81f4\u7f3a\u9677\u7684\u786e\u5207\u539f\u56e0\u5e76\u52a0\u4ee5\u4fee\u590d\u3002 \u603b\u4f53\u800c\u8a00\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u4e00\u79cd\u6d88\u9664\u6d6a\u8d39\u548c\u6539\u5584\u6d41\u7a0b\u7684\u65b9\u6cd5\uff0c\u800c\u516d\u897f\u683c\u739b\u5219\u662f\u4e00\u5957\u4e13\u6ce8\u4e8e\u51cf\u5c11\u7f3a\u9677\u7684\u6280\u672f\u3002 \u54ea\u79cd\u65b9\u6cd5\u66f4\u597d\uff1f \u51b3\u5b9a \u7cbe\u76ca\u751f\u4ea7 \u8fd8\u662f \u516d\u897f\u683c\u739b \u66f4\u597d\uff0c\u5b9e\u9645\u4e0a\u53d6\u51b3\u4e8e\u60a8\u516c\u53f8\u7684\u9700\u6c42\u3002\u5982\u679c\u6d41\u7a0b\u770b\u8d77\u6765\u6548\u7387\u4f4e\u4e0b\uff0c\u4f8b\u5982\u5b58\u5728\u8fc7\u591a\u7684\u65f6\u95f4\u6d6a\u8d39\u3001\u8fc7\u591a\u7684\u5e93\u5b58\u79ef\u538b\u5bfc\u81f4\u6210\u672c\u589e\u52a0\uff0c\u6216\u8005\u4ec5\u4ec5\u662f\u5b58\u5728\u592a\u591a\u4e0d\u5fc5\u8981\u7684\u6b65\u9aa4\u2014\u2014\u7cbe\u76ca\u751f\u4ea7 \u662f\u60a8\u7684\u6700\u4f73\u9009\u62e9\u3002\u5b83\u80fd\u8ba9\u6574\u4e2a\u7cfb\u7edf\u8fd0\u884c\u5f97\u66f4\u5feb\u3001\u66f4\u987a\u7545\u3002\u56e0\u6b64\uff0c\u5982\u679c\u60a8\u60f3\u63d0\u9ad8\u6548\u7387\uff0c\u7cbe\u76ca\u751f\u4ea7\u662f\u60a8\u7684\u9996\u9009\u3002 \u4f46\u662f\uff0c\u5982\u679c\u60a8\u7684\u516c\u53f8\u66f4\u62c5\u5fc3\u8d28\u91cf\u95ee\u9898\u2014\u2014\u4f8b\u5982\uff0c\u60a8\u53d1\u73b0\u7f3a\u9677\u9891\u53d1\u6216\u4ea7\u54c1\u4e0d\u4e00\u81f4\u2014\u2014\u90a3\u4e48\u516d\u897f\u683c\u739b\u5c31\u662f\u60a8\u9700\u8981\u5173\u6ce8\u7684\u91cd\u70b9\u3002\u516d\u897f\u683c\u739b\u7cbe\u51c6\u5730\u4e13\u6ce8\u4e8e\u63d0\u9ad8\u8d28\u91cf\u3002\u5b83\u6df1\u5165\u7ec6\u8282\uff0c\u627e\u51fa\u95ee\u9898\u7684\u786e\u5207\u6240\u5728\u5e76\u4e88\u4ee5\u89e3\u51b3\u3002\u5bf9\u4e8e\u7cbe\u5ea6\u81f3\u5173\u91cd\u8981\u7684\u884c\u4e1a\uff08\u5982\u5236\u836f\u6216\u7535\u5b50\u884c\u4e1a\uff09\uff0c\u5b83\u662f\u6781\u4f73\u7684\u9009\u62e9\uff0c\u56e0\u4e3a\u5728\u8fd9\u4e9b\u884c\u4e1a\u4e2d\u60a8\u65e0\u6cd5\u627f\u53d7\u4efb\u4f55\u9519\u8bef\u3002 \u7136\u800c\uff0c\u60a8\u4e0d\u4e00\u5b9a\u975e\u8981\u505a\u51fa\u9009\u62e9\u3002\u5c3d\u7ba1\u7cbe\u76ca\u751f\u4ea7\u548c\u516d\u897f\u683c\u739b\u91c7\u53d6\u4e0d\u540c\u7684\u65b9\u6cd5\uff0c\u4f46\u4e00\u4e9b\u5236\u9020\u5546\u4f1a\u5c06\u4e24\u8005\u7ed3\u5408\u4f7f\u7528\uff0c\u521b\u5efa\u4e00\u79cd\u6df7\u5408\u65b9\u6cd5\u3002\u9996\u5148\uff0c\u4ece\u7cbe\u76ca\u751f\u4ea7\u5f00\u59cb\uff0c\u7b80\u5316\u5e76\u52a0\u901f\u6d41\u7a0b\uff0c\u8fd9\u5bf9\u63d0\u9ad8\u6548\u7387\u975e\u5e38\u6709\u76ca\u3002\u7136\u540e\uff0c\u5f15\u5165\u516d\u897f\u683c\u739b\u4ee5\u786e\u4fdd\u8fd9\u4e9b\u66f4\u5feb\u7684\u6d41\u7a0b\u80fd\u591f\u4fdd\u6301\u9ad8\u8d28\u91cf\u548c\u4e00\u81f4\u6027\u3002\u5c06\u8fd9\u4e24\u8005\u7ed3\u5408\u4e3a\u60a8\u63d0\u4f9b\u4e86\u4e00\u4e2a\u5f3a\u5927\u7684\u6218\u7565\uff0c\u65e2\u80fd\u63d0\u9ad8\u6548\u7387\u53c8\u80fd\u63d0\u5347\u8d28\u91cf\u3002\u8fd9\u5c31\u50cf\u4e00\u77f3\u4e8c\u9e1f\u3002 \u7cbe\u76ca\u751f\u4ea7\u3001\u516d\u897f\u683c\u739b\u4e0e APS\uff1a\u5b8c\u7f8e\u5951\u5408 \u9ad8\u7ea7\u8ba1\u5212\u4e0e\u6392\u7a0b\u7cfb\u7edf\u5bf9\u4e8e\u4efb\u4f55\u4f7f\u7528 \u7cbe\u76ca\u751f\u4ea7 \u6216 \u516d\u897f\u683c\u739b \u7684\u751f\u4ea7\u8ba1\u5212\u4eba\u5458\u6765\u8bf4\u90fd\u662f\u4e00\u4e2a\u6781\u4f73\u7684\u5de5\u5177\u3002\u901a\u8fc7 APS\uff0c\u60a8\u53ef\u4ee5\u786e\u4fdd\u8d44\u6e90\u7684\u6709\u6548\u5229\u7528\uff0c\u5728\u9700\u8981\u7684\u5730\u65b9\u7cbe\u786e\u524a\u51cf\u6d6a\u8d39\u3002\u5bf9\u4e8e \u516d\u897f\u683c\u739b\uff0cAPS \u901a\u8fc7\u51cf\u5c11\u7f3a\u9677\u5e2e\u52a9\u60a8\u4fdd\u6301\u9ad8\u8d28\u91cf\uff0c\u4ece\u800c\u5b9e\u73b0\u66f4\u987a\u7545\u7684\u8fd0\u8425\u5e76\u9632\u6b62\u5ba2\u6237\u4e0d\u6ee1\u3002\u5b83\u4e3a\u60a8\u63d0\u4f9b\u4e86\u4fdd\u6301\u4e00\u5207\u987a\u5229\u8fd0\u884c\u6240\u9700\u7684\u4e00\u81f4\u6027\u548c\u6548\u7387\u3002 \u5982\u679c\u60a8\u540c\u65f6\u4f7f\u7528\u7cbe\u76ca\u548c\u516d\u897f\u683c\u739b\uff0cAPS&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/84831","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/comments?post=84831"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/84831\/revisions"}],"predecessor-version":[{"id":84832,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/84831\/revisions\/84832"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/media\/43729"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/media?parent=84831"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/categories?post=84831"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/tags?post=84831"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}