{"id":102537,"date":"2026-10-20T13:56:48","date_gmt":"2026-10-20T13:56:48","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102537"},"modified":"2026-10-20T13:58:18","modified_gmt":"2026-10-20T13:58:18","slug":"work-in-process-inventory","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/","title":{"rendered":"\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/zh-hans\/\">\u9996\u9875<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/\">\u8d44\u6e90<\/a> &raquo; \u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\uff1a <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> \u5206\u949f<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\u5728\u5236\u54c1\u5e93\u5b58\uff08WIP\uff09\u662f\u6307\u5df2\u6295\u5165\u751f\u4ea7\u4f46\u5c1a\u672a\u5b8c\u5de5\u7684\u4ea7\u54c1\uff0c\u65e2\u5305\u62ec\u6b63\u5728\u52a0\u5de5\u7684\u96f6\u4ef6\uff0c\u4e5f\u5305\u62ec\u5728\u5de5\u5e8f\u4e4b\u95f4\u7b49\u5f85\u7684\u672a\u5b8c\u5de5\u4ea7\u54c1\u3002\u5728\u4f1a\u8ba1\u6838\u7b97\u4e2d\uff0cWIP \u4e5f\u6307\u8fd9\u4e9b\u672a\u5b8c\u5de5\u4ea7\u54c1\u622a\u81f3\u76ee\u524d\u5df2\u7d2f\u8ba1\u53d1\u751f\u7684\u751f\u4ea7\u6210\u672c\u3002<\/p>\n\n\n<p>\u8fd9\u4e24\u4e2a\u89c6\u89d2\u56de\u7b54\u7684\u662f\u4e0d\u540c\u95ee\u9898\uff1a\u6570\u91cf\u53cd\u6620\u6709\u591a\u5c11\u4ea7\u54c1\u5c1a\u672a\u5b8c\u5de5\uff0c\u6210\u672c\u91d1\u989d\u5219\u53cd\u6620\u8fd9\u4e9b\u4ea7\u54c1\u5df2\u5f52\u96c6\u4e86\u591a\u5c11\u751f\u4ea7\u6210\u672c\u3002\u4f46\u4ec5\u51ed\u5176\u4e2d\u4efb\u4f55\u4e00\u9879\uff0c\u90fd\u65e0\u6cd5\u89e3\u91ca\u4e3a\u4ec0\u4e48\u67d0\u4e2a\u6279\u6b21\u4ece\u5468\u4e00\u5c31\u4e00\u76f4\u5728\u7b49\u5f85\uff0c\u4e5f\u65e0\u6cd5\u5224\u65ad\u5b83\u7a76\u7adf\u4f55\u65f6\u624d\u80fd\u5b8c\u6210\u751f\u4ea7\u3002<\/p>\n\n\n<p>\u5bf9\u751f\u4ea7\u7ecf\u7406\u800c\u8a00\uff0c\u63a5\u4e0b\u6765\u771f\u6b63\u9700\u8981\u5f04\u6e05\u7684\u6b63\u662f\u8fd9\u4e9b\u95ee\u9898\u3002SkyPlanner APS \u5c06\u5269\u4f59\u5de5\u5e8f\u4e0e\u4ea7\u80fd\u3001\u7269\u6599\u5c31\u7eea\u60c5\u51b5\u53ca\u4f18\u5148\u7ea7\u7ed3\u5408\u8d77\u6765\uff0c\u5e2e\u52a9\u60a8\u63a8\u52a8\u5728\u5236\u54c1\u5b8c\u5de5\uff0c\u800c\u4e0d\u662f\u4e0d\u65ad\u589e\u52a0\u6392\u961f\u4efb\u52a1\u3002\u66f4\u5408\u7406\u5730\u5b89\u6392\u751f\u4ea7\u65f6\u95f4\uff0c\u80fd\u591f\u51cf\u5c11\u4e0d\u5fc5\u8981\u7684\u5728\u5236\u54c1\u53ca\u5176\u5360\u7528\u7684\u8d44\u91d1\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u54ea\u4e9b\u4ea7\u54c1\u5c5e\u4e8e\u5728\u5236\u54c1\uff1f<\/h2>\n\n\n<p>\u53ef\u4ee5\u6309\u751f\u4ea7\u6d41\u7a0b\u4e2d\u7684\u4e09\u4e2a\u9636\u6bb5\u6765\u533a\u5206\u5e93\u5b58\uff1a<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\u539f\u6750\u6599\uff1a<\/strong>\u7b49\u5f85\u6295\u5165\u751f\u4ea7\u7684\u6750\u6599\u548c\u5916\u8d2d\u96f6\u90e8\u4ef6\u3002<\/li><li><strong>\u5728\u5236\u54c1\uff1a<\/strong>\u5df2\u7ecf\u5f00\u59cb\u751f\u4ea7\uff0c\u4f46\u4ecd\u9700\u52a0\u5de5\u3001\u88c5\u914d\u6216\u5b8c\u6210\u89c4\u5b9a\u7684\u6700\u7ec8\u68c0\u9a8c\u7684\u4ea7\u54c1\u3002<\/li><li><strong>\u4ea7\u6210\u54c1\uff1a<\/strong>\u5df2\u7ecf\u5b8c\u5de5\u7684\u4ea7\u54c1\uff0c\u5373\u4f7f\u5c1a\u672a\u9500\u552e\u6216\u53d1\u8d27\uff0c\u4e5f\u5c5e\u4e8e\u4ea7\u6210\u54c1\u3002<\/li><\/ul>\n\n\n<p>\u5df2\u5b8c\u6210\u673a\u52a0\u5de5\u3001\u6b63\u5728\u7b49\u5f85\u6d82\u88c5\u7684\u58f3\u4f53\u5c5e\u4e8e\u5728\u5236\u54c1\u3002\u5df2\u5b8c\u6210\u88c5\u914d\u3001\u4f46\u8fd8\u5728\u7b49\u5f85\u5b8c\u5de5\u6240\u5fc5\u9700\u7684\u6700\u7ec8\u68c0\u9a8c\u7684\u4ea7\u54c1\uff0c\u4e5f\u5c5e\u4e8e\u5728\u5236\u54c1\u3002\u800c\u5df2\u7ecf\u5b8c\u5de5\u5e76\u9a8c\u6536\u5408\u683c\u3001\u53ea\u7b49\u88c5\u8f66\u53d1\u8fd0\u7684\u4ea7\u54c1\uff0c\u5219\u5c5e\u4e8e\u4ea7\u6210\u54c1\uff0c\u4e0d\u518d\u662f\u5728\u5236\u54c1\u3002<\/p>\n\n\n<p>\u672a\u5b8c\u5de5\u4ea7\u54c1\u5373\u4f7f\u5904\u4e8e\u7b49\u5f85\u72b6\u6001\uff0c\u4e5f\u4ecd\u5e94\u8ba1\u5165\u5728\u5236\u54c1\u6570\u91cf\u3002\u6392\u961f\u3001\u8f6c\u8fd0\u4ee5\u53ca\u6682\u505c\u6d41\u8f6c\u53ef\u80fd\u5360\u636e\u4ea7\u54c1\u751f\u4ea7\u8fc7\u7a0b\u4e2d\u7684\u5927\u90e8\u5206\u65f6\u95f4\uff0c\u5c3d\u7ba1\u5728\u8fd9\u4e9b\u65f6\u6bb5\u5e76\u6ca1\u6709\u8bbe\u5907\u5bf9\u5176\u8fdb\u884c\u52a0\u5de5\u3002<\/p>\n\n\n<p>\u60a8\u53ef\u80fd\u8fd8\u4f1a\u89c1\u5230<strong>work in progress<\/strong>\u8fd9\u4e00\u82f1\u8bed\u8bf4\u6cd5\u3002\u4e0d\u540c\u4f01\u4e1a\u548c\u884c\u4e1a\u7684\u7528\u6cd5\u6709\u6240\u5dee\u5f02\uff1b\u672c\u6307\u5357\u4e2d\u7684 WIP \u4e13\u6307\u5236\u9020\u8fc7\u7a0b\u4e2d\u5c1a\u672a\u5b8c\u5de5\u7684\u5e93\u5b58\uff0c\u4e0d\u6d89\u53ca\u9879\u76ee\u8ba1\u8d39\u6838\u7b97\uff0c\u4e5f\u4e0d\u662f\u8f6f\u4ef6\u56e2\u961f\u770b\u677f\u4e0a\u7684\u4efb\u52a1\u6570\u91cf\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u5982\u4f55\u8ba1\u91cf\u5728\u5236\u54c1\u7684\u5b9e\u7269\u6570\u91cf<\/h2>\n\n\n<p>\u9996\u5148\u660e\u786e\u7edf\u8ba1\u8fb9\u754c\uff0c\u4f8b\u5982\u67d0\u4e00\u4ea7\u54c1\u65cf\u4ece\u7b2c\u4e00\u9053\u751f\u4ea7\u5de5\u5e8f\u5230\u6700\u7ec8\u9a8c\u6536\u7684\u5168\u8fc7\u7a0b\u3002\u7136\u540e\u5728\u6307\u5b9a\u65f6\u70b9\uff0c\u7edf\u8ba1\u8be5\u8303\u56f4\u5185\u5c1a\u672a\u5b8c\u5de5\u7684\u4ea7\u54c1\u6570\u91cf\u3002\u5bf9\u4e8e\u6563\u88c5\u7269\u6599\u751f\u4ea7\uff0c\u9002\u7528\u7684\u8ba1\u91cf\u5355\u4f4d\u53ef\u80fd\u662f\u5343\u514b\u6216\u5347\uff0c\u800c\u4e0d\u662f\u4ef6\u3002<\/p>\n\n\n<p>\u5047\u8bbe\u4e00\u5bb6\u5de5\u5382\u6b63\u5728\u8ddf\u8e2a\u4e00\u7ec4\u76f8\u540c\u58f3\u4f53\u7684\u751f\u4ea7\u60c5\u51b5\u3002\u5468\u4e94\u4e0b\u73ed\u65f6\uff0c\u7edf\u8ba1\u7ed3\u679c\u5982\u4e0b\uff1a<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u5f53\u524d\u6240\u5904\u73af\u8282<\/th><th>\u672a\u5b8c\u5de5\u58f3\u4f53\u6570\u91cf<\/th><th>\u5269\u4f59\u5de5\u4f5c<\/th><\/tr><\/thead><tbody><tr><td>\u673a\u52a0\u5de5\u4e2d<\/td><td>20<\/td><td>\u5b8c\u6210\u673a\u52a0\u5de5\u3001\u8868\u9762\u5904\u7406\u548c\u68c0\u9a8c<\/td><\/tr><tr><td>\u7b49\u5f85\u8868\u9762\u5904\u7406<\/td><td>60<\/td><td>\u8868\u9762\u5904\u7406\u548c\u68c0\u9a8c<\/td><\/tr><tr><td>\u7b49\u5f85\u6700\u7ec8\u68c0\u9a8c<\/td><td>20<\/td><td>\u68c0\u9a8c\u4e0e\u9a8c\u6536<\/td><\/tr><tr><td><strong>\u5728\u5236\u54c1\u5408\u8ba1<\/strong><\/td><td><strong>100<\/strong><\/td><td><strong>\u5404\u73af\u8282\u7684\u5269\u4f59\u5de5\u4f5c\u91cf\u4e0d\u540c<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u6bcf\u4ef6\u58f3\u4f53\u53ea\u6309\u5f53\u524d\u6240\u5904\u73af\u8282\u7edf\u8ba1\u4e00\u6b21\uff0c\u4e0d\u8981\u56e0\u4e3a\u540c\u4e00\u6279\u6b21\u7684\u5de5\u827a\u8def\u7ebf\u4e0a\u8fd8\u6709\u591a\u9053\u672a\u5b8c\u6210\u5de5\u5e8f\uff0c\u5c31\u5728\u6bcf\u9053\u5de5\u5e8f\u4e2d\u91cd\u590d\u8ba1\u6570\u3002<\/p>\n\n\n<p>\u60a8\u4e5f\u53ef\u4ee5\u901a\u8fc7\u7edf\u8ba1\u8fb9\u754c\u5185\u7684\u6d41\u5165\u548c\u6d41\u51fa\u6765\u6838\u5bf9\u6570\u91cf\u3002\u5047\u8bbe\u5468\u521d\u6709 120 \u4ef6\u672a\u5b8c\u5de5\u58f3\u4f53\uff0c\u672c\u5468\u53c8\u6709 480 \u4ef6\u6295\u5165\u751f\u4ea7\uff0c500 \u4ef6\u5b8c\u5de5\u8f6c\u4e3a\u4ea7\u6210\u54c1\u3002\u5728\u6ca1\u6709\u62a5\u5e9f\u6216\u5176\u4ed6\u51fa\u5165\u53d8\u52a8\u7684\u60c5\u51b5\u4e0b\uff1a<\/p>\n\n\n<p><strong>\u671f\u672b\u5728\u5236\u54c1\u6570\u91cf = 120 + 480 \u2212 500 = 100 \u4ef6\u58f3\u4f53<\/strong><\/p>\n\n\n<p>\u5982\u679c\u8ba1\u7b97\u7ed3\u679c\u4e0e\u5b9e\u7269\u76d8\u70b9\u4e0d\u7b26\uff0c\u5e94\u5148\u68c0\u67e5\u662f\u5426\u5b58\u5728\u5b8c\u5de5\u6f0f\u62a5\u3001\u8f6c\u79fb\u672a\u8bb0\u5f55\u3001\u62a5\u5e9f\u6216\u7edf\u8ba1\u622a\u6b62\u65f6\u70b9\u4e0d\u4e00\u81f4\u7b49\u95ee\u9898\uff0c\u518d\u5bf9\u751f\u4ea7\u8868\u73b0\u4f5c\u51fa\u5224\u65ad\u3002<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u5b9e\u7269\u6570\u91cf\u4e0d\u7b49\u4e8e\u5269\u4f59\u5de5\u4f5c\u91cf<\/h3>\n\n\n<p>\u8868\u4e2d\u5171\u6709 100 \u4ef6\u672a\u5b8c\u5de5\u4ea7\u54c1\uff0c\u4f46\u7b49\u5f85\u68c0\u9a8c\u7684 20 \u4ef6\u6240\u9700\u7684\u5269\u4f59\u5de5\u4f5c\uff0c\u8fdc\u5c11\u4e8e\u4ecd\u5728\u673a\u52a0\u5de5\u7684 20 \u4ef6\u3002\u56e0\u6b64\uff0c\u4e24\u4e2a\u6570\u91cf\u76f8\u540c\u7684\u5f85\u52a0\u5de5\u961f\u5217\uff0c\u5bf9\u4ea7\u80fd\u7684\u9700\u6c42\u53ef\u80fd\u622a\u7136\u4e0d\u540c\u3002<\/p>\n\n\n<p>\u5728\u591a\u54c1\u79cd\u751f\u4ea7\u7684\u5de5\u5382\u4e2d\uff0c\u5355\u770b\u5de5\u5355\u6570\u91cf\u66f4\u96be\u5224\u65ad\u5b9e\u9645\u60c5\u51b5\uff1a\u4e00\u5f20\u5de5\u5355\u53ef\u80fd\u53ea\u9700\u8fdb\u884c\u7b80\u77ed\u68c0\u9a8c\uff0c\u53e6\u4e00\u5f20\u5374\u9700\u8981\u5360\u7528\u591a\u4e2a\u8d44\u6e90\u3001\u5386\u65f6\u6570\u5929\u3002\u5e94\u6309\u4ea7\u54c1\u6216\u5408\u7406\u5212\u5206\u7684\u4ea7\u54c1\u65cf\u4fdd\u7559\u6570\u91cf\u8bb0\u5f55\uff0c\u518d\u6839\u636e\u5269\u4f59\u5de5\u5e8f\u7684\u65f6\u957f\u6765\u5224\u65ad\u8d1f\u8377\u3002\u8d1f\u8377\u5e94\u4ee5\u5c0f\u65f6\u6807\u793a\uff0c\u4e0d\u80fd\u5c06\u5176\u4e0e\u5728\u5236\u54c1\u6570\u91cf\u6216\u5728\u5236\u54c1\u4ef7\u503c\u6df7\u4e3a\u4e00\u8c08\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u5728\u5236\u54c1\u5e93\u5b58\u6210\u672c\u7684\u8ba1\u7b97\u516c\u5f0f<\/h2>\n\n\n<p>\u67d0\u4e00\u671f\u95f4\u7684\u6210\u672c\u7ed3\u8f6c\uff0c\u53ef\u7528\u4ee5\u4e0b\u7b80\u5316\u516c\u5f0f\u6838\u5bf9\uff1a<\/p>\n\n\n<p><strong>\u671f\u672b\u5728\u5236\u54c1\u6210\u672c = \u671f\u521d\u5728\u5236\u54c1\u6210\u672c + \u672c\u671f\u65b0\u589e\u751f\u4ea7\u6210\u672c \u2212 \u5b8c\u5de5\u4ea7\u54c1\u6210\u672c<\/strong><\/p>\n\n\n<p>\u672c\u671f\u65b0\u589e\u751f\u4ea7\u6210\u672c\u5305\u62ec\u8017\u7528\u7684\u76f4\u63a5\u6750\u6599\u3001\u76f4\u63a5\u4eba\u5de5\u53ca\u5206\u644a\u7684\u5236\u9020\u8d39\u7528\u3002<strong>\u5b8c\u5de5\u4ea7\u54c1\u6210\u672c\uff08COGM\uff09<\/strong>\u662f\u4ea7\u54c1\u5b8c\u5de5\u65f6\u4ece\u5728\u5236\u54c1\u4e2d\u8f6c\u51fa\u7684\u6210\u672c\uff0c\u65e2\u4e0d\u662f\u4ea7\u54c1\u552e\u4ef7\uff0c\u4e5f\u4e0d\u662f\u672c\u671f\u5df2\u552e\u4ea7\u54c1\u7684\u9500\u552e\u6210\u672c\u3002<\/p>\n\n\n<p>\u518d\u770b\u4e00\u4e2a\u72ec\u7acb\u7684\u6708\u5ea6\u6210\u672c\u793a\u4f8b\u3002\u671f\u521d\u5728\u5236\u54c1\u6210\u672c\u4e3a $18,000\uff0c\u672c\u6708\u65b0\u589e\u751f\u4ea7\u6210\u672c\u4e3a $72,000\uff0c\u6210\u672c\u4e3a $65,000 \u7684\u5b8c\u5de5\u4ea7\u54c1\u8f6c\u5165\u4ea7\u6210\u54c1\u5e93\u5b58\u3002\u5728\u6ca1\u6709\u5176\u4ed6\u8c03\u6574\u7684\u60c5\u51b5\u4e0b\uff1a<\/p>\n\n\n<p><strong>\u671f\u672b\u5728\u5236\u54c1\u6210\u672c = $18,000 + $72,000 \u2212 $65,000 = $25,000<\/strong><\/p>\n\n\n<p>\u8fd9\u662f\u6210\u672c\u4f59\u989d\uff0c\u4e0d\u4ee3\u8868 25,000 \u4ef6\u4ea7\u54c1\uff0c\u4e5f\u4e0d\u4ee3\u8868\u672a\u6765\u53ef\u83b7\u5f97 $25,000 \u7684\u5229\u6da6\u3002\u8fd9\u4e2a\u793a\u4f8b\u4e0e\u524d\u9762\u7684\u58f3\u4f53\u6570\u91cf\u793a\u4f8b\u76f8\u4e92\u72ec\u7acb\u3002<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u4e3a\u4ec0\u4e48\u4ec5\u51ed\u6570\u91cf\u65e0\u6cd5\u786e\u5b9a\u5728\u5236\u54c1\u4ef7\u503c<\/h3>\n\n\n<p>\u672a\u5b8c\u5de5\u4ea7\u54c1\u53ea\u5f52\u96c6\u4e86\u622a\u81f3\u76ee\u524d\u5e94\u8ba1\u5165\u8be5\u4ea7\u54c1\u7684\u6210\u672c\u3002\u5982\u679c\u5c06\u6bcf\u4ef6\u5728\u5236\u54c1\u90fd\u6309\u5b8c\u6574\u7684\u4ea7\u6210\u54c1\u6210\u672c\u8ba1\u4ef7\uff0c\u53ef\u80fd\u4f1a\u9ad8\u4f30\u6210\u672c\u4f59\u989d\u3002\u540c\u6837\uff0c\u201c\u5de5\u827a\u8def\u7ebf\u8d70\u5230\u4e00\u534a\u201d\u4e5f\u4e0d\u4e00\u5b9a\u610f\u5473\u7740\u5df2\u53d1\u751f\u4e00\u534a\u7684\u603b\u6210\u672c\uff1a\u6602\u8d35\u7684\u6750\u6599\u53ef\u80fd\u5728\u524d\u671f\u5c31\u5df2\u6295\u5165\uff0c\u800c\u4eba\u5de5\u548c\u52a0\u5de5\u6210\u672c\u5219\u5728\u540e\u7eed\u9010\u6b65\u7d2f\u79ef\u3002<\/p>\n\n\n<p>\u5e94\u4ee5\u8d22\u52a1\u56e2\u961f\u91c7\u7528\u7684\u6210\u672c\u6838\u7b97\u8bb0\u5f55\u548c\u4f1a\u8ba1\u653f\u7b56\u4e3a\u51c6\u3002\u4e0a\u8ff0\u7ed3\u8f6c\u6838\u5bf9\u8bf4\u660e\u7684\u662f\u6210\u672c\u53d8\u52a8\u60c5\u51b5\uff1b\u7f16\u5236\u8d22\u52a1\u62a5\u544a\u65f6\uff0c\u8fd8\u53ef\u80fd\u9700\u8981\u6309\u7167\u9002\u7528\u7684\u4f1a\u8ba1\u51c6\u5219\u8fdb\u884c\u4f30\u503c\u8c03\u6574\u3002<\/p>\n\n\n<p>\u5bf9\u4e8e\u751f\u4ea7\u51b3\u7b56\uff0c\u5173\u952e\u533a\u522b\u66f4\u76f4\u63a5\uff1a\u7d2f\u8ba1\u6210\u672c\u53cd\u6620\u5df2\u7ecf\u6295\u5165\u4e86\u4ec0\u4e48\uff0c\u5269\u4f59\u5de5\u827a\u8def\u7ebf\u5219\u53cd\u6620\u5b8c\u5de5\u524d\u8fd8\u9700\u8981\u505a\u4ec0\u4e48\u3002\u8fd9\u4e24\u4e2a\u89c6\u89d2\u7f3a\u4e00\u4e0d\u53ef\uff0c\u4e0d\u80fd\u4e92\u76f8\u66ff\u4ee3\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u5728\u5236\u54c1\u5e93\u5b58\u504f\u9ad8\u6216\u504f\u4f4e\uff0c\u7a76\u7adf\u8bf4\u660e\u4ec0\u4e48<\/h2>\n\n\n<p>\u5728\u5236\u54c1\u6570\u91cf\u504f\u9ad8\u503c\u5f97\u8c03\u67e5\uff0c\u4f46\u4ec5\u51ed\u8fd9\u4e00\u70b9\u8fd8\u4e0d\u80fd\u5224\u65ad\u539f\u56e0\u3002\u5b83\u53ef\u80fd\u6e90\u4e8e\u9700\u6c42\u589e\u957f\u3001\u4ea7\u54c1\u7ec4\u5408\u53d8\u5316\u3001\u4e3a\u4fdd\u969c\u4ea7\u80fd\u800c\u6709\u610f\u4fdd\u7559\u7684\u5728\u5236\u54c1\uff0c\u4e5f\u53ef\u80fd\u662f\u751f\u4ea7\u4e2d\u65ad\u540e\u79ef\u538b\u7684\u7ed3\u679c\u3002\u6570\u91cf\u504f\u4f4e\u53ef\u80fd\u8bf4\u660e\u751f\u4ea7\u6d41\u8f6c\u987a\u7545\uff0c\u4e5f\u53ef\u80fd\u610f\u5473\u7740\u5173\u952e\u8d44\u6e90\u524d\u7f3a\u5c11\u5df2\u5c31\u7eea\u7684\u4efb\u52a1\u3002<\/p>\n\n\n<p>\u76ee\u6807\u5e76\u4e0d\u662f\u8ba9\u5728\u5236\u54c1\u5f52\u96f6\uff0c\u800c\u662f\u4fdd\u6709\u9002\u91cf\u4e14\u5408\u9002\u7684\u5728\u5236\u4efb\u52a1\uff0c\u4ee5\u4fdd\u969c\u53ef\u9760\u5b8c\u5de5\uff0c\u540c\u65f6\u907f\u514d\u4e0d\u5fc5\u8981\u7684\u63d0\u524d\u5f00\u5de5\u3001\u7b49\u5f85\u548c\u642c\u8fd0\u3002<\/p>\n\n\n<p>\u518d\u770b\u90a3 60 \u4ef6\u7b49\u5f85\u8868\u9762\u5904\u7406\u7684\u58f3\u4f53\u3002\u5982\u679c\u5b83\u4eec\u4eca\u5929\u4e0a\u5348\u5b8c\u6210\u673a\u52a0\u5de5\uff0c\u6309\u8ba1\u5212\u5728\u4e0b\u5348\u8fdb\u884c\u8868\u9762\u5904\u7406\uff0c\u90a3\u4e48\u8fd9\u6bb5\u6392\u961f\u7b49\u5f85\u53ef\u80fd\u5b8c\u5168\u5408\u7406\u3002\u5982\u679c\u5b83\u4eec\u5df2\u7ecf\u7b49\u4e86\u4e00\u5468\uff0c\u800c\u8868\u9762\u5904\u7406\u8d44\u6e90\u4e00\u76f4\u5728\u52a0\u5de5\u5176\u4ed6\u8ba2\u5355\uff0c\u90a3\u4e48\u540c\u6837\u7684\u6570\u91cf\u53cd\u6620\u7684\u5c31\u662f\u53e6\u4e00\u79cd\u95ee\u9898\u3002<\/p>\n\n\n<p>\u8981\u5224\u65ad\u8fd9\u6279\u5728\u5236\u54c1\u7684\u7b49\u5f85\u60c5\u51b5\uff0c\u9700\u8981\u660e\u786e\uff1a<\/p>\n\n\n<p>1. <strong>\u5df2\u505c\u7559\u591a\u4e45\uff1a<\/strong>\u8fd9\u6279\u4ea7\u54c1\u4f55\u65f6\u6295\u5165\u751f\u4ea7\uff0c\u53c8\u5728\u8fd9\u91cc\u7b49\u5f85\u4e86\u591a\u957f\u65f6\u95f4\uff1f<\/p>\n\n\n<p>2. <strong>\u4e0b\u4e00\u9053\u5de5\u5e8f\uff1a<\/strong>\u7ee7\u7eed\u751f\u4ea7\u9700\u8981\u54ea\u4e9b\u8d44\u6e90\u3001\u7269\u6599\u6216\u5ba1\u6279\uff1f<\/p>\n\n\n<p>3. <strong>\u8ba1\u5212\u5b8c\u5de5\u65f6\u95f4\uff1a<\/strong>\u5269\u4f59\u5de5\u5e8f\u80fd\u5b89\u6392\u5728\u4ec0\u4e48\u65f6\u5019\uff0c\u80fd\u5426\u6ee1\u8db3\u8ba2\u5355\u627f\u8bfa\uff1f<\/p>\n\n\n<p>4. <strong>\u7b49\u5f85\u539f\u56e0\uff1a<\/strong>\u662f\u8ba1\u5212\u5185\u7684\u7f13\u51b2\u3001\u4ea7\u80fd\u51b2\u7a81\u3001\u7f3a\u6599\u3001\u8d28\u91cf\u539f\u56e0\u6682\u505c\u6d41\u8f6c\uff0c\u8fd8\u662f\u5176\u4ed6\u4e2d\u65ad\uff1f<\/p>\n\n\n<p>\u8fd9\u6837\u624d\u80fd\u628a\u201c\u5728\u5236\u54c1\u592a\u591a\u201d\u8f6c\u5316\u4e3a\u53ef\u4ee5\u843d\u5b9e\u7684\u51b3\u7b56\u3002\u7f3a\u5c11\u5916\u8d2d\u96f6\u90e8\u4ef6\u4e0e\u8868\u9762\u5904\u7406\u5de5\u4f5c\u4e2d\u5fc3\u8d85\u8d1f\u8377\uff0c\u9700\u8981\u91c7\u53d6\u4e0d\u540c\u7684\u5e94\u5bf9\u63aa\u65bd\u3002\u518d\u591a\u52a0\u5de5\u4e00\u6279\u58f3\u4f53\uff0c\u4e24\u79cd\u95ee\u9898\u90fd\u89e3\u51b3\u4e0d\u4e86\u3002<\/p>\n\n\n<p>\u8bc4\u4f30\u5728\u5236\u54c1\u65f6\uff0c\u5e94\u540c\u65f6\u67e5\u770b<a href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/manufacturing-throughput\/\">\u5b8c\u5de5\u4ea7\u51fa<\/a>\u548c\u4ea4\u4ed8\u8868\u73b0\u3002\u5728\u6ca1\u6709\u5176\u4ed6\u6d41\u51fa\u9014\u5f84\u7684\u60c5\u51b5\u4e0b\uff0c\u5982\u679c\u6295\u5165\u751f\u4ea7\u7684\u6570\u91cf\u591a\u4e8e\u5b8c\u5de5\u8f6c\u51fa\u7684\u6570\u91cf\uff0c\u5728\u5236\u54c1\u5e93\u5b58\u5c31\u4f1a\u4e0d\u65ad\u589e\u52a0\u3002\u5982\u679c\u5728\u5236\u54c1\u51cf\u5c11\u4ec5\u4ec5\u662f\u56e0\u4e3a\u751f\u4ea7\u7aef\u4e0d\u518d\u63a5\u6536\u8ba2\u5355\uff0c\u4e5f\u4e0d\u80fd\u636e\u6b64\u8ba4\u5b9a\u6d41\u7a0b\u5f97\u5230\u4e86\u6539\u5584\u3002\u5e94\u6bd4\u8f83\u76f8\u8fd1\u671f\u95f4\u548c\u540c\u7c7b\u4ea7\u54c1\u65cf\uff0c\u907f\u514d\u628a\u4ea7\u54c1\u7ec4\u5408\u53d8\u5316\u8bef\u8ba4\u4e3a\u6539\u5584\u6210\u679c\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u7528 SkyPlanner \u4e3a\u5728\u5236\u54c1\u5b89\u6392\u6e05\u6670\u7684\u5b8c\u5de5\u8def\u5f84<\/h2>\n\n\n<p>\u660e\u786e\u4e86\u4ea7\u54c1\u5728\u54ea\u4e2a\u73af\u8282\u7b49\u5f85\uff0c\u6392\u7a0b\u95ee\u9898\u5c31\u53d8\u5f97\u5177\u4f53\u4e86\uff1a\u5982\u4f55\u628a\u5b83\u7684\u5269\u4f59\u5de5\u5e8f\uff0c\u4e0e\u5de5\u5382\u5176\u4ed6\u5f85\u5b8c\u6210\u4efb\u52a1\u4e00\u8d77\u5408\u7406\u5b89\u6392\uff1f<\/p>\n\n\n<p>SkyPlanner \u5c06\u5de5\u4f5c\u4e2d\u5fc3\u3001\u73ed\u6b21\u3001\u64cd\u4f5c\u4eba\u5458\u3001\u5de5\u5e8f\u53ca\u5176\u65f6\u957f\u7eb3\u5165<a href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/production-scheduling\/\">\u7edf\u4e00\u7684\u751f\u4ea7\u6392\u7a0b<\/a>\u3002\u5176\u4eba\u5de5\u667a\u80fd\u6392\u7a0b\u5f15\u64ce Arcturus \u6839\u636e\u914d\u7f6e\u7684\u4ea7\u80fd\u3001\u5de5\u5e8f\u4f9d\u8d56\u5173\u7cfb\u548c\u4f18\u5148\u7ea7\u5b89\u6392\u5404\u9053\u5de5\u5e8f\u3002Gantt \u89c6\u56fe\u5c55\u793a\u5404\u8d44\u6e90\u4e0a\u7684\u6392\u7a0b\u987a\u5e8f\uff0c\u8ba9\u5404\u90e8\u95e8\u4e0d\u5fc5\u518d\u5404\u81ea\u7ef4\u62a4\u5f85\u52a0\u5de5\u961f\u5217\u3002<\/p>\n\n\n<p>\u5bf9\u4e8e\u7b49\u5f85\u4e2d\u7684\u58f3\u4f53\uff0c\u60a8\u53ef\u4ee5\u7ed3\u5408\u524d\u540e\u5de5\u5e8f\u6765\u67e5\u770b\u8868\u9762\u5904\u7406\u7684\u5b89\u6392\uff1a\u6240\u9700\u8d44\u6e90\u662f\u5426\u5df2\u88ab\u66f4\u65e9\u627f\u8bfa\u7684\u4efb\u52a1\u5360\u7528\uff1f\u540e\u7eed\u68c0\u9a8c\u80fd\u5426\u63a5\u7eed\u5b89\u6392\uff1f\u73b0\u5728\u518d\u6295\u4ea7\u4e00\u6279\u58f3\u4f53\uff0c\u4f1a\u4e0d\u4f1a\u53ea\u662f\u589e\u52a0\u66f4\u591a\u7b49\u5f85\u4e2d\u7684\u5728\u5236\u54c1\uff1f<\/p>\n\n\n<p>\u542f\u7528\u8003\u8651\u7269\u6599\u53ef\u7528\u6027\u7684\u6392\u7a0b\u529f\u80fd\u540e\uff0cArcturus \u8fd8\u4f1a\u5c06\u5e93\u5b58\u548c\u6765\u6599\u53ef\u7528\u60c5\u51b5\u7eb3\u5165\u8003\u8651\u3002\u5f53\u540e\u7eed\u5de5\u5e8f\u9700\u8981\u5916\u8d2d\u96f6\u90e8\u4ef6\u65f6\uff0c\u8fd9\u4e00\u70b9\u5c24\u4e3a\u91cd\u8981\uff1a\u5982\u679c\u8ba2\u5355\u65e0\u6cd5\u7ee7\u7eed\u5b8c\u6210\u88c5\u914d\uff0c\u4ec5\u6709\u9996\u9053\u5de5\u5e8f\u7684\u8bbe\u5907\u7a7a\u95f2\u4e5f\u4e0d\u591f\u3002<\/p>\n\n\n<p>\u53ca\u65f6\u66f4\u65b0\u751f\u4ea7\u8fdb\u5ea6\uff0c\u624d\u80fd\u8ba9\u8ba1\u5212\u4fdd\u6301\u5b9e\u7528\u3002SkyPlanner \u7684 Timer \u8bb0\u5f55\u5f00\u5de5\u3001\u505c\u5de5\u548c\u751f\u4ea7\u6570\u91cf\uff0c\u5176\u5f00\u653e\u7684 REST API \u53ef\u4e0e\u4efb\u4f55 ERP \u6216 MES \u5bf9\u63a5\u3002\u5f53\u8fdb\u5ea6\u3001\u8d44\u6e90\u6216\u7269\u6599\u53ef\u7528\u60c5\u51b5\u3001\u4f18\u5148\u7ea7\u53d1\u751f\u53d8\u5316\u65f6\uff0cArcturus \u53ef\u6839\u636e\u66f4\u65b0\u540e\u7684\u4fe1\u606f\u91cd\u65b0\u8ba1\u7b97\u6392\u7a0b\u3002\u60a8\u8d1f\u8d23\u8bbe\u5b9a\u4f18\u5148\u7ea7\uff0c\u4eba\u5de5\u667a\u80fd\u8d1f\u8d23\u6392\u7a0b\u8ba1\u7b97\u3002<\/p>\n\n\n<p>\u8fd9\u6837\u4e00\u6765\uff0c\u6bcf\u5929\u9010\u53f0\u8c03\u6574\u8bbe\u5907\u4f5c\u4e1a\u961f\u5217\u7684\u5de5\u4f5c\u5c31\u80fd\u51cf\u5c11\uff0c\u51b3\u5b9a\u54ea\u4e9b\u4f5c\u4e1a\u5e94\u7ee7\u7eed\u63a8\u8fdb\u65f6\u4e5f\u6709\u4e86\u66f4\u6e05\u6670\u7684\u4f9d\u636e\u3002\u60a8\u53ef\u4ee5\u907f\u514d\u8fc7\u65e9\u5411\u8ba2\u5355\u6295\u5165\u66f4\u591a\u7269\u6599\u548c\u4eba\u529b\uff0c\u628a\u6ce8\u610f\u529b\u96c6\u4e2d\u5728\u4ea4\u4ed8\u6240\u9700\u7684\u672a\u5b8c\u6210\u751f\u4ea7\u4efb\u52a1\u4e0a\u3002<\/p>\n\n\n<p>\u5b8c\u5de5\u672c\u8eab\u5e76\u4e0d\u610f\u5473\u7740\u8d44\u91d1\u5f97\u5230\u91ca\u653e\uff1a\u4ea7\u54c1\u4ece\u5728\u5236\u54c1\u8f6c\u4e3a\u6210\u54c1\u5e93\u5b58\uff0c\u53ea\u662f\u72b6\u6001\u53d1\u751f\u4e86\u53d8\u5316\uff0c\u4ecd\u7136\u5c5e\u4e8e\u5e93\u5b58\u3002\u8d22\u52a1\u4e0a\u7684\u6536\u76ca\u6765\u81ea\u51cf\u5c11\u4e0d\u5fc5\u8981\u7684\u5e93\u5b58\uff0c\u5e76\u63a8\u52a8\u771f\u6b63\u6ee1\u8db3\u5ba2\u6237\u9700\u6c42\u7684\u4f5c\u4e1a\u5b8c\u6210\uff0c\u800c\u4e0d\u53ea\u662f\u8ba9\u8d26\u9762\u4e0a\u7684\u5728\u5236\u54c1\u91d1\u989d\u53d8\u5c0f\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u66f4\u5408\u7406\u7684\u751f\u4ea7\u65f6\u95f4\u5b89\u6392\u4e3a Mamec \u5e26\u6765\u4e86\u54ea\u4e9b\u53d8\u5316<\/h2>\n\n\n<p>Mamec \u662f\u4e00\u5bb6\u82ac\u5170\u5236\u9020\u5546\uff0c\u751f\u4ea7\u5de5\u4e1a\u6405\u62cc\u8bbe\u5907\uff0c\u5e76\u627f\u63a5\u9ad8\u79d1\u6280\u4ea7\u54c1\u7684\u5408\u540c\u5236\u9020\u3002\u8fc7\u53bb\uff0c\u516c\u53f8\u4f9d\u636e\u7eb8\u8d28\u8ba2\u5355\u4e0a\u7684\u4ea4\u8d27\u65e5\u671f\uff0c\u4e3a\u6570\u5343\u5f20\u76f8\u4e92\u5173\u8054\u7684\u5de5\u5355\u5b89\u6392\u4f18\u5148\u987a\u5e8f\u3002ERP \u4e2d\u7684\u8ba1\u5212\u65e0\u6cd5\u5448\u73b0\u751f\u4ea7\u5168\u8c8c\uff0c\u7ba1\u7406\u5c42\u5bf9\u751f\u4ea7\u8d1f\u8377\u7684\u5224\u65ad\u4e5f\u4f9d\u8d56\u4e3b\u89c2\u4f30\u8ba1\u3002<\/p>\n\n\n<p>\u5c06 SkyPlanner \u96c6\u6210\u5230 Oscar ERP \u73af\u5883\u540e\uff0cMamec \u5b9e\u73b0\u4e86\u6709\u9650\u4ea7\u80fd\u6392\u7a0b\uff0c\u5458\u5de5\u4e5f\u80fd\u5171\u540c\u67e5\u770b\u8ba2\u5355\u7684\u5f53\u524d\u8fdb\u5ea6\u548c\u6392\u7a0b\u5b89\u6392\u3002\u5927\u5bb6\u53ef\u4ee5\u76f4\u63a5\u67e5\u8be2\u8ba2\u5355\uff0c\u4e0d\u5fc5\u518d\u4f9d\u8d56\u5404\u4eba\u5bf9\u73b0\u573a\u60c5\u51b5\u7684\u4e0d\u540c\u5224\u65ad\u3002<\/p>\n\n\n<p><a href=\"\/zh-hans\/%e5%ae%a2%e6%88%b7%e6%a1%88%e4%be%8b\/mamec\/\">\u636e Mamec \u4ecb\u7ecd<\/a>\uff0c\u7531\u4e8e\u4f5c\u4e1a\u80fd\u591f\u9002\u65f6\u5f00\u5de5\uff0c\u751f\u4ea7\u63d0\u524d\u671f\u66f4\u52a0\u5408\u7406\uff0c\u8ba1\u5212\u5de5\u4f5c\u91cf\u6709\u6240\u51cf\u8f7b\uff0c\u5728\u5236\u54c1\u5bf9\u6d41\u52a8\u8d44\u91d1\u7684\u4e0d\u5fc5\u8981\u5360\u7528\u4e5f\u51cf\u5c11\u4e86\u3002\u8fd9\u6b63\u662f\u5728\u5236\u54c1\u5e93\u5b58\u4e0e\u6392\u7a0b\u4e4b\u95f4\u7684\u5b9e\u9645\u8054\u7cfb\uff1a\u5de5\u5382\u4ecd\u7136\u6709\u5728\u5236\u4efb\u52a1\uff0c\u4f46\u5728\u5224\u65ad\u8fd9\u4e9b\u4efb\u52a1\u4f55\u65f6\u5e94\u8fdb\u5165\u751f\u4ea7\u65f6\uff0c\u6709\u4e86\u66f4\u5145\u5206\u7684\u4f9d\u636e\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u4ece\u4e00\u4e2a\u7b49\u5f85\u8fc7\u4e45\u7684\u6279\u6b21\u5165\u624b<\/h2>\n\n\n<p>\u9009\u4e00\u5f20\u5c1a\u672a\u5b8c\u6210\u3001\u4e14\u56e2\u961f\u5bf9\u5176\u5ef6\u8bef\u60c5\u51b5\u5341\u5206\u4e86\u89e3\u7684\u8ba2\u5355\u3002\u53c2\u52a0 SkyPlanner \u6f14\u793a\u65f6\uff0c\u5e26\u4e0a\u8be5\u8ba2\u5355\u7684\u5f53\u524d\u751f\u4ea7\u4f4d\u7f6e\u3001\u5269\u4f59\u5de5\u827a\u8def\u7ebf\u3001\u7269\u6599\u9700\u6c42\u548c\u627f\u8bfa\u4ea4\u671f\u3002\u5173\u952e\u662f\u770b\u60a8\u80fd\u5426\u83b7\u5f97\u4e00\u4efd\u8854\u63a5\u5b8c\u6574\u7684\u5b8c\u5de5\u8ba1\u5212\uff0c\u540c\u65f6\u5c06\u4e89\u7528\u76f8\u540c\u8d44\u6e90\u7684\u5176\u4ed6\u8ba2\u5355\u7eb3\u5165\u8003\u8651\u3002<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%81%94%e7%b3%bb%e9%94%80%e5%94%ae\/\">\u9884\u7ea6 SkyPlanner \u6f14\u793a<\/a>\uff0c\u7ed3\u5408\u60a8\u5b9e\u9645\u7684\u751f\u4ea7\u60c5\u51b5\u63a2\u8ba8\u8fd9\u4efd\u8ba1\u5212\uff0c\u6216\u5148<a href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%af%95%e7%94%a8\/\">\u4f7f\u7528\u6f14\u793a\u6570\u636e\u8bd5\u7528 SkyPlanner<\/a>\u3002\u8981\u6539\u5584\u5728\u5236\u54c1\u5e93\u5b58\u6307\u6807\uff0c\u9996\u5148\u8981\u4e86\u89e3\u5c1a\u672a\u5b8c\u6210\u7684\u751f\u4ea7\u4efb\u52a1\uff1b\u66f4\u5408\u7406\u7684\u751f\u4ea7\u6392\u7a0b\u5219\u80fd\u5e2e\u52a9\u60a8\u91c7\u53d6\u884c\u52a8\u3002<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236 \u9996\u9875 &raquo; \u8d44\u6e90 &raquo; \u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236 \u5728\u5236\u54c1\u5e93\u5b58\uff08WIP\uff09\u662f\u6307\u5df2\u6295\u5165\u751f\u4ea7\u4f46\u5c1a\u672a\u5b8c\u5de5\u7684\u4ea7\u54c1\uff0c\u65e2\u5305\u62ec\u6b63\u5728\u52a0\u5de5\u7684\u96f6\u4ef6\uff0c\u4e5f\u5305\u62ec\u5728\u5de5\u5e8f\u4e4b\u95f4\u7b49\u5f85\u7684\u672a\u5b8c\u5de5\u4ea7\u54c1\u3002\u5728\u4f1a\u8ba1\u6838\u7b97\u4e2d\uff0cWIP \u4e5f\u6307\u8fd9\u4e9b\u672a\u5b8c\u5de5\u4ea7\u54c1\u622a\u81f3\u76ee\u524d\u5df2\u7d2f\u8ba1\u53d1\u751f\u7684\u751f\u4ea7\u6210\u672c\u3002 \u8fd9\u4e24\u4e2a\u89c6\u89d2\u56de\u7b54\u7684\u662f\u4e0d\u540c\u95ee\u9898\uff1a\u6570\u91cf\u53cd\u6620\u6709\u591a\u5c11\u4ea7\u54c1\u5c1a\u672a\u5b8c\u5de5\uff0c\u6210\u672c\u91d1\u989d\u5219\u53cd\u6620\u8fd9\u4e9b\u4ea7\u54c1\u5df2\u5f52\u96c6\u4e86\u591a\u5c11\u751f\u4ea7\u6210\u672c\u3002\u4f46\u4ec5\u51ed\u5176\u4e2d\u4efb\u4f55\u4e00\u9879\uff0c\u90fd\u65e0\u6cd5\u89e3\u91ca\u4e3a\u4ec0\u4e48\u67d0\u4e2a\u6279\u6b21\u4ece\u5468\u4e00\u5c31\u4e00\u76f4\u5728\u7b49\u5f85\uff0c\u4e5f\u65e0\u6cd5\u5224\u65ad\u5b83\u7a76\u7adf\u4f55\u65f6\u624d\u80fd\u5b8c\u6210\u751f\u4ea7\u3002 \u5bf9\u751f\u4ea7\u7ecf\u7406\u800c\u8a00\uff0c\u63a5\u4e0b\u6765\u771f\u6b63\u9700\u8981\u5f04\u6e05\u7684\u6b63\u662f\u8fd9\u4e9b\u95ee\u9898\u3002SkyPlanner APS \u5c06\u5269\u4f59\u5de5\u5e8f\u4e0e\u4ea7\u80fd\u3001\u7269\u6599\u5c31\u7eea\u60c5\u51b5\u53ca\u4f18\u5148\u7ea7\u7ed3\u5408\u8d77\u6765\uff0c\u5e2e\u52a9\u60a8\u63a8\u52a8\u5728\u5236\u54c1\u5b8c\u5de5\uff0c\u800c\u4e0d\u662f\u4e0d\u65ad\u589e\u52a0\u6392\u961f\u4efb\u52a1\u3002\u66f4\u5408\u7406\u5730\u5b89\u6392\u751f\u4ea7\u65f6\u95f4\uff0c\u80fd\u591f\u51cf\u5c11\u4e0d\u5fc5\u8981\u7684\u5728\u5236\u54c1\u53ca\u5176\u5360\u7528\u7684\u8d44\u91d1\u3002 \u54ea\u4e9b\u4ea7\u54c1\u5c5e\u4e8e\u5728\u5236\u54c1\uff1f \u53ef\u4ee5\u6309\u751f\u4ea7\u6d41\u7a0b\u4e2d\u7684\u4e09\u4e2a\u9636\u6bb5\u6765\u533a\u5206\u5e93\u5b58\uff1a \u539f\u6750\u6599\uff1a\u7b49\u5f85\u6295\u5165\u751f\u4ea7\u7684\u6750\u6599\u548c\u5916\u8d2d\u96f6\u90e8\u4ef6\u3002 \u5728\u5236\u54c1\uff1a\u5df2\u7ecf\u5f00\u59cb\u751f\u4ea7\uff0c\u4f46\u4ecd\u9700\u52a0\u5de5\u3001\u88c5\u914d\u6216\u5b8c\u6210\u89c4\u5b9a\u7684\u6700\u7ec8\u68c0\u9a8c\u7684\u4ea7\u54c1\u3002 \u4ea7\u6210\u54c1\uff1a\u5df2\u7ecf\u5b8c\u5de5\u7684\u4ea7\u54c1\uff0c\u5373\u4f7f\u5c1a\u672a\u9500\u552e\u6216\u53d1\u8d27\uff0c\u4e5f\u5c5e\u4e8e\u4ea7\u6210\u54c1\u3002 \u5df2\u5b8c\u6210\u673a\u52a0\u5de5\u3001\u6b63\u5728\u7b49\u5f85\u6d82\u88c5\u7684\u58f3\u4f53\u5c5e\u4e8e\u5728\u5236\u54c1\u3002\u5df2\u5b8c\u6210\u88c5\u914d\u3001\u4f46\u8fd8\u5728\u7b49\u5f85\u5b8c\u5de5\u6240\u5fc5\u9700\u7684\u6700\u7ec8\u68c0\u9a8c\u7684\u4ea7\u54c1\uff0c\u4e5f\u5c5e\u4e8e\u5728\u5236\u54c1\u3002\u800c\u5df2\u7ecf\u5b8c\u5de5\u5e76\u9a8c\u6536\u5408\u683c\u3001\u53ea\u7b49\u88c5\u8f66\u53d1\u8fd0\u7684\u4ea7\u54c1\uff0c\u5219\u5c5e\u4e8e\u4ea7\u6210\u54c1\uff0c\u4e0d\u518d\u662f\u5728\u5236\u54c1\u3002 \u672a\u5b8c\u5de5\u4ea7\u54c1\u5373\u4f7f\u5904\u4e8e\u7b49\u5f85\u72b6\u6001\uff0c\u4e5f\u4ecd\u5e94\u8ba1\u5165\u5728\u5236\u54c1\u6570\u91cf\u3002\u6392\u961f\u3001\u8f6c\u8fd0\u4ee5\u53ca\u6682\u505c\u6d41\u8f6c\u53ef\u80fd\u5360\u636e\u4ea7\u54c1\u751f\u4ea7\u8fc7\u7a0b\u4e2d\u7684\u5927\u90e8\u5206\u65f6\u95f4\uff0c\u5c3d\u7ba1\u5728\u8fd9\u4e9b\u65f6\u6bb5\u5e76\u6ca1\u6709\u8bbe\u5907\u5bf9\u5176\u8fdb\u884c\u52a0\u5de5\u3002 \u60a8\u53ef\u80fd\u8fd8\u4f1a\u89c1\u5230work in progress\u8fd9\u4e00\u82f1\u8bed\u8bf4\u6cd5\u3002\u4e0d\u540c\u4f01\u4e1a\u548c\u884c\u4e1a\u7684\u7528\u6cd5\u6709\u6240\u5dee\u5f02\uff1b\u672c\u6307\u5357\u4e2d\u7684 WIP \u4e13\u6307\u5236\u9020\u8fc7\u7a0b\u4e2d\u5c1a\u672a\u5b8c\u5de5\u7684\u5e93\u5b58\uff0c\u4e0d\u6d89\u53ca\u9879\u76ee\u8ba1\u8d39\u6838\u7b97\uff0c\u4e5f\u4e0d\u662f\u8f6f\u4ef6\u56e2\u961f\u770b\u677f\u4e0a\u7684\u4efb\u52a1\u6570\u91cf\u3002 \u5982\u4f55\u8ba1\u91cf\u5728\u5236\u54c1\u7684\u5b9e\u7269\u6570\u91cf \u9996\u5148\u660e\u786e\u7edf\u8ba1\u8fb9\u754c\uff0c\u4f8b\u5982\u67d0\u4e00\u4ea7\u54c1\u65cf\u4ece\u7b2c\u4e00\u9053\u751f\u4ea7\u5de5\u5e8f\u5230\u6700\u7ec8\u9a8c\u6536\u7684\u5168\u8fc7\u7a0b\u3002\u7136\u540e\u5728\u6307\u5b9a\u65f6\u70b9\uff0c\u7edf\u8ba1\u8be5\u8303\u56f4\u5185\u5c1a\u672a\u5b8c\u5de5\u7684\u4ea7\u54c1\u6570\u91cf\u3002\u5bf9\u4e8e\u6563\u88c5\u7269\u6599\u751f\u4ea7\uff0c\u9002\u7528\u7684\u8ba1\u91cf\u5355\u4f4d\u53ef\u80fd\u662f\u5343\u514b\u6216\u5347\uff0c\u800c\u4e0d\u662f\u4ef6\u3002 \u5047\u8bbe\u4e00\u5bb6\u5de5\u5382\u6b63\u5728\u8ddf\u8e2a\u4e00\u7ec4\u76f8\u540c\u58f3\u4f53\u7684\u751f\u4ea7\u60c5\u51b5\u3002\u5468\u4e94\u4e0b\u73ed\u65f6\uff0c\u7edf\u8ba1\u7ed3\u679c\u5982\u4e0b\uff1a \u5f53\u524d\u6240\u5904\u73af\u8282 \u672a\u5b8c\u5de5\u58f3\u4f53\u6570\u91cf \u5269\u4f59\u5de5\u4f5c \u673a\u52a0\u5de5\u4e2d 20 \u5b8c\u6210\u673a\u52a0\u5de5\u3001\u8868\u9762\u5904\u7406\u548c\u68c0\u9a8c \u7b49\u5f85\u8868\u9762\u5904\u7406 60 \u8868\u9762\u5904\u7406\u548c\u68c0\u9a8c \u7b49\u5f85\u6700\u7ec8\u68c0\u9a8c 20 \u68c0\u9a8c\u4e0e\u9a8c\u6536 \u5728\u5236\u54c1\u5408\u8ba1 100 \u5404\u73af\u8282\u7684\u5269\u4f59\u5de5\u4f5c\u91cf\u4e0d\u540c \u6bcf\u4ef6\u58f3\u4f53\u53ea\u6309\u5f53\u524d\u6240\u5904\u73af\u8282\u7edf\u8ba1\u4e00\u6b21\uff0c\u4e0d\u8981\u56e0\u4e3a\u540c\u4e00\u6279\u6b21\u7684\u5de5\u827a\u8def\u7ebf\u4e0a\u8fd8\u6709\u591a\u9053\u672a\u5b8c\u6210\u5de5\u5e8f\uff0c\u5c31\u5728\u6bcf\u9053\u5de5\u5e8f\u4e2d\u91cd\u590d\u8ba1\u6570\u3002 \u60a8\u4e5f\u53ef\u4ee5\u901a\u8fc7\u7edf\u8ba1\u8fb9\u754c\u5185\u7684\u6d41\u5165\u548c\u6d41\u51fa\u6765\u6838\u5bf9\u6570\u91cf\u3002\u5047\u8bbe\u5468\u521d\u6709 120 \u4ef6\u672a\u5b8c\u5de5\u58f3\u4f53\uff0c\u672c\u5468\u53c8\u6709 480 \u4ef6\u6295\u5165\u751f\u4ea7\uff0c500 \u4ef6\u5b8c\u5de5\u8f6c\u4e3a\u4ea7\u6210\u54c1\u3002\u5728\u6ca1\u6709\u62a5\u5e9f\u6216\u5176\u4ed6\u51fa\u5165\u53d8\u52a8\u7684\u60c5\u51b5\u4e0b\uff1a \u671f\u672b\u5728\u5236\u54c1\u6570\u91cf = 120 + 480 \u2212 &#8230; <a title=\"\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/\" aria-label=\"Read more about \u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236\">\u9605\u8bfb\u66f4\u591a<\/a><\/p>\n","protected":false},"author":3,"featured_media":102580,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2545,2517],"tags":[],"class_list":["post-102537","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-2545","category-2517","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236<\/title>\n<meta name=\"description\" content=\"\u4e86\u89e3\u5728\u5236\u54c1\u5e93\u5b58\uff0c\u8ba1\u7b97\u5176\u6210\u672c\uff0c\u627e\u51fa\u963b\u788d\u5b8c\u5de5\u7684\u539f\u56e0\u3002\u770b\u770b SkyPlanner \u5982\u4f55\u5e2e\u52a9\u51cf\u5c11\u4e0d\u5fc5\u8981\u7684\u5728\u5236\u54c1\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236\" \/>\n<meta property=\"og:description\" content=\"\u4e86\u89e3\u5728\u5236\u54c1\u5e93\u5b58\uff0c\u8ba1\u7b97\u5176\u6210\u672c\uff0c\u627e\u51fa\u963b\u788d\u5b8c\u5de5\u7684\u539f\u56e0\u3002\u770b\u770b SkyPlanner \u5982\u4f55\u5e2e\u52a9\u51cf\u5c11\u4e0d\u5fc5\u8981\u7684\u5728\u5236\u54c1\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T13:56:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T13:58:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1984\" \/>\n\t<meta property=\"og:image:height\" content=\"1116\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u4f5c\u8005\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/work-in-process-inventory\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/work-in-process-inventory\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:58:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/work-in-process-inventory\\\/\"},\"wordCount\":34,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/work-in-process-inventory\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"articleSection\":[\"\u5236\u9020\u6548\u7387\",\"\u8d44\u6e90\"],\"inLanguage\":\"zh-CN\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/work-in-process-inventory\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/work-in-process-inventory\\\/\",\"name\":\"\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/work-in-process-inventory\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/work-in-process-inventory\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:58:18+00:00\",\"description\":\"\u4e86\u89e3\u5728\u5236\u54c1\u5e93\u5b58\uff0c\u8ba1\u7b97\u5176\u6210\u672c\uff0c\u627e\u51fa\u963b\u788d\u5b8c\u5de5\u7684\u539f\u56e0\u3002\u770b\u770b SkyPlanner \u5982\u4f55\u5e2e\u52a9\u51cf\u5c11\u4e0d\u5fc5\u8981\u7684\u5728\u5236\u54c1\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/work-in-process-inventory\\\/#breadcrumb\"},\"inLanguage\":\"zh-CN\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/work-in-process-inventory\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/work-in-process-inventory\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"width\":1984,\"height\":1116,\"caption\":\"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/%e8%b5%84%e6%ba%90\\\/work-in-process-inventory\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-CN\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/zh-hans\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-CN\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236","description":"\u4e86\u89e3\u5728\u5236\u54c1\u5e93\u5b58\uff0c\u8ba1\u7b97\u5176\u6210\u672c\uff0c\u627e\u51fa\u963b\u788d\u5b8c\u5de5\u7684\u539f\u56e0\u3002\u770b\u770b SkyPlanner \u5982\u4f55\u5e2e\u52a9\u51cf\u5c11\u4e0d\u5fc5\u8981\u7684\u5728\u5236\u54c1\u3002","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/","og_locale":"zh_CN","og_type":"article","og_title":"\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236","og_description":"\u4e86\u89e3\u5728\u5236\u54c1\u5e93\u5b58\uff0c\u8ba1\u7b97\u5176\u6210\u672c\uff0c\u627e\u51fa\u963b\u788d\u5b8c\u5de5\u7684\u539f\u56e0\u3002\u770b\u770b SkyPlanner \u5982\u4f55\u5e2e\u52a9\u51cf\u5c11\u4e0d\u5fc5\u8981\u7684\u5728\u5236\u54c1\u3002","og_url":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T13:56:48+00:00","article_modified_time":"2026-10-20T13:58:18+00:00","og_image":[{"width":1984,"height":1116,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\u4f5c\u8005":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:58:18+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/"},"wordCount":34,"publisher":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","articleSection":["\u5236\u9020\u6548\u7387","\u8d44\u6e90"],"inLanguage":"zh-CN"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/","url":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/","name":"\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236","isPartOf":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:58:18+00:00","description":"\u4e86\u89e3\u5728\u5236\u54c1\u5e93\u5b58\uff0c\u8ba1\u7b97\u5176\u6210\u672c\uff0c\u627e\u51fa\u963b\u788d\u5b8c\u5de5\u7684\u539f\u56e0\u3002\u770b\u770b SkyPlanner \u5982\u4f55\u5e2e\u52a9\u51cf\u5c11\u4e0d\u5fc5\u8981\u7684\u5728\u5236\u54c1\u3002","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/#breadcrumb"},"inLanguage":"zh-CN","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/"]}]},{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","width":1984,"height":1116,"caption":"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/zh-hans\/%e8%b5%84%e6%ba%90\/work-in-process-inventory\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/zh-hans\/"},{"@type":"ListItem","position":2,"name":"\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/zh-hans\/#website","url":"https:\/\/skyplanner.ai\/zh-hans\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/zh-hans\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-CN"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/zh-hans\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/zh-hans\/","logo":{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/zh-hans\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"zh-CN","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/zh-hans\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236 \u9996\u9875 &raquo; \u8d44\u6e90 &raquo; \u5728\u5236\u54c1\u5e93\u5b58\uff1a\u6570\u91cf\u3001\u6210\u672c\u4e0e\u63a7\u5236 \u5728\u5236\u54c1\u5e93\u5b58\uff08WIP\uff09\u662f\u6307\u5df2\u6295\u5165\u751f\u4ea7\u4f46\u5c1a\u672a\u5b8c\u5de5\u7684\u4ea7\u54c1\uff0c\u65e2\u5305\u62ec\u6b63\u5728\u52a0\u5de5\u7684\u96f6\u4ef6\uff0c\u4e5f\u5305\u62ec\u5728\u5de5\u5e8f\u4e4b\u95f4\u7b49\u5f85\u7684\u672a\u5b8c\u5de5\u4ea7\u54c1\u3002\u5728\u4f1a\u8ba1\u6838\u7b97\u4e2d\uff0cWIP \u4e5f\u6307\u8fd9\u4e9b\u672a\u5b8c\u5de5\u4ea7\u54c1\u622a\u81f3\u76ee\u524d\u5df2\u7d2f\u8ba1\u53d1\u751f\u7684\u751f\u4ea7\u6210\u672c\u3002 \u8fd9\u4e24\u4e2a\u89c6\u89d2\u56de\u7b54\u7684\u662f\u4e0d\u540c\u95ee\u9898\uff1a\u6570\u91cf\u53cd\u6620\u6709\u591a\u5c11\u4ea7\u54c1\u5c1a\u672a\u5b8c\u5de5\uff0c\u6210\u672c\u91d1\u989d\u5219\u53cd\u6620\u8fd9\u4e9b\u4ea7\u54c1\u5df2\u5f52\u96c6\u4e86\u591a\u5c11\u751f\u4ea7\u6210\u672c\u3002\u4f46\u4ec5\u51ed\u5176\u4e2d\u4efb\u4f55\u4e00\u9879\uff0c\u90fd\u65e0\u6cd5\u89e3\u91ca\u4e3a\u4ec0\u4e48\u67d0\u4e2a\u6279\u6b21\u4ece\u5468\u4e00\u5c31\u4e00\u76f4\u5728\u7b49\u5f85\uff0c\u4e5f\u65e0\u6cd5\u5224\u65ad\u5b83\u7a76\u7adf\u4f55\u65f6\u624d\u80fd\u5b8c\u6210\u751f\u4ea7\u3002 \u5bf9\u751f\u4ea7\u7ecf\u7406\u800c\u8a00\uff0c\u63a5\u4e0b\u6765\u771f\u6b63\u9700\u8981\u5f04\u6e05\u7684\u6b63\u662f\u8fd9\u4e9b\u95ee\u9898\u3002SkyPlanner APS \u5c06\u5269\u4f59\u5de5\u5e8f\u4e0e\u4ea7\u80fd\u3001\u7269\u6599\u5c31\u7eea\u60c5\u51b5\u53ca\u4f18\u5148\u7ea7\u7ed3\u5408\u8d77\u6765\uff0c\u5e2e\u52a9\u60a8\u63a8\u52a8\u5728\u5236\u54c1\u5b8c\u5de5\uff0c\u800c\u4e0d\u662f\u4e0d\u65ad\u589e\u52a0\u6392\u961f\u4efb\u52a1\u3002\u66f4\u5408\u7406\u5730\u5b89\u6392\u751f\u4ea7\u65f6\u95f4\uff0c\u80fd\u591f\u51cf\u5c11\u4e0d\u5fc5\u8981\u7684\u5728\u5236\u54c1\u53ca\u5176\u5360\u7528\u7684\u8d44\u91d1\u3002 \u54ea\u4e9b\u4ea7\u54c1\u5c5e\u4e8e\u5728\u5236\u54c1\uff1f \u53ef\u4ee5\u6309\u751f\u4ea7\u6d41\u7a0b\u4e2d\u7684\u4e09\u4e2a\u9636\u6bb5\u6765\u533a\u5206\u5e93\u5b58\uff1a \u539f\u6750\u6599\uff1a\u7b49\u5f85\u6295\u5165\u751f\u4ea7\u7684\u6750\u6599\u548c\u5916\u8d2d\u96f6\u90e8\u4ef6\u3002 \u5728\u5236\u54c1\uff1a\u5df2\u7ecf\u5f00\u59cb\u751f\u4ea7\uff0c\u4f46\u4ecd\u9700\u52a0\u5de5\u3001\u88c5\u914d\u6216\u5b8c\u6210\u89c4\u5b9a\u7684\u6700\u7ec8\u68c0\u9a8c\u7684\u4ea7\u54c1\u3002 \u4ea7\u6210\u54c1\uff1a\u5df2\u7ecf\u5b8c\u5de5\u7684\u4ea7\u54c1\uff0c\u5373\u4f7f\u5c1a\u672a\u9500\u552e\u6216\u53d1\u8d27\uff0c\u4e5f\u5c5e\u4e8e\u4ea7\u6210\u54c1\u3002 \u5df2\u5b8c\u6210\u673a\u52a0\u5de5\u3001\u6b63\u5728\u7b49\u5f85\u6d82\u88c5\u7684\u58f3\u4f53\u5c5e\u4e8e\u5728\u5236\u54c1\u3002\u5df2\u5b8c\u6210\u88c5\u914d\u3001\u4f46\u8fd8\u5728\u7b49\u5f85\u5b8c\u5de5\u6240\u5fc5\u9700\u7684\u6700\u7ec8\u68c0\u9a8c\u7684\u4ea7\u54c1\uff0c\u4e5f\u5c5e\u4e8e\u5728\u5236\u54c1\u3002\u800c\u5df2\u7ecf\u5b8c\u5de5\u5e76\u9a8c\u6536\u5408\u683c\u3001\u53ea\u7b49\u88c5\u8f66\u53d1\u8fd0\u7684\u4ea7\u54c1\uff0c\u5219\u5c5e\u4e8e\u4ea7\u6210\u54c1\uff0c\u4e0d\u518d\u662f\u5728\u5236\u54c1\u3002 \u672a\u5b8c\u5de5\u4ea7\u54c1\u5373\u4f7f\u5904\u4e8e\u7b49\u5f85\u72b6\u6001\uff0c\u4e5f\u4ecd\u5e94\u8ba1\u5165\u5728\u5236\u54c1\u6570\u91cf\u3002\u6392\u961f\u3001\u8f6c\u8fd0\u4ee5\u53ca\u6682\u505c\u6d41\u8f6c\u53ef\u80fd\u5360\u636e\u4ea7\u54c1\u751f\u4ea7\u8fc7\u7a0b\u4e2d\u7684\u5927\u90e8\u5206\u65f6\u95f4\uff0c\u5c3d\u7ba1\u5728\u8fd9\u4e9b\u65f6\u6bb5\u5e76\u6ca1\u6709\u8bbe\u5907\u5bf9\u5176\u8fdb\u884c\u52a0\u5de5\u3002 \u60a8\u53ef\u80fd\u8fd8\u4f1a\u89c1\u5230work in progress\u8fd9\u4e00\u82f1\u8bed\u8bf4\u6cd5\u3002\u4e0d\u540c\u4f01\u4e1a\u548c\u884c\u4e1a\u7684\u7528\u6cd5\u6709\u6240\u5dee\u5f02\uff1b\u672c\u6307\u5357\u4e2d\u7684 WIP \u4e13\u6307\u5236\u9020\u8fc7\u7a0b\u4e2d\u5c1a\u672a\u5b8c\u5de5\u7684\u5e93\u5b58\uff0c\u4e0d\u6d89\u53ca\u9879\u76ee\u8ba1\u8d39\u6838\u7b97\uff0c\u4e5f\u4e0d\u662f\u8f6f\u4ef6\u56e2\u961f\u770b\u677f\u4e0a\u7684\u4efb\u52a1\u6570\u91cf\u3002 \u5982\u4f55\u8ba1\u91cf\u5728\u5236\u54c1\u7684\u5b9e\u7269\u6570\u91cf \u9996\u5148\u660e\u786e\u7edf\u8ba1\u8fb9\u754c\uff0c\u4f8b\u5982\u67d0\u4e00\u4ea7\u54c1\u65cf\u4ece\u7b2c\u4e00\u9053\u751f\u4ea7\u5de5\u5e8f\u5230\u6700\u7ec8\u9a8c\u6536\u7684\u5168\u8fc7\u7a0b\u3002\u7136\u540e\u5728\u6307\u5b9a\u65f6\u70b9\uff0c\u7edf\u8ba1\u8be5\u8303\u56f4\u5185\u5c1a\u672a\u5b8c\u5de5\u7684\u4ea7\u54c1\u6570\u91cf\u3002\u5bf9\u4e8e\u6563\u88c5\u7269\u6599\u751f\u4ea7\uff0c\u9002\u7528\u7684\u8ba1\u91cf\u5355\u4f4d\u53ef\u80fd\u662f\u5343\u514b\u6216\u5347\uff0c\u800c\u4e0d\u662f\u4ef6\u3002 \u5047\u8bbe\u4e00\u5bb6\u5de5\u5382\u6b63\u5728\u8ddf\u8e2a\u4e00\u7ec4\u76f8\u540c\u58f3\u4f53\u7684\u751f\u4ea7\u60c5\u51b5\u3002\u5468\u4e94\u4e0b\u73ed\u65f6\uff0c\u7edf\u8ba1\u7ed3\u679c\u5982\u4e0b\uff1a \u5f53\u524d\u6240\u5904\u73af\u8282 \u672a\u5b8c\u5de5\u58f3\u4f53\u6570\u91cf \u5269\u4f59\u5de5\u4f5c \u673a\u52a0\u5de5\u4e2d 20 \u5b8c\u6210\u673a\u52a0\u5de5\u3001\u8868\u9762\u5904\u7406\u548c\u68c0\u9a8c \u7b49\u5f85\u8868\u9762\u5904\u7406 60 \u8868\u9762\u5904\u7406\u548c\u68c0\u9a8c \u7b49\u5f85\u6700\u7ec8\u68c0\u9a8c 20 \u68c0\u9a8c\u4e0e\u9a8c\u6536 \u5728\u5236\u54c1\u5408\u8ba1 100 \u5404\u73af\u8282\u7684\u5269\u4f59\u5de5\u4f5c\u91cf\u4e0d\u540c \u6bcf\u4ef6\u58f3\u4f53\u53ea\u6309\u5f53\u524d\u6240\u5904\u73af\u8282\u7edf\u8ba1\u4e00\u6b21\uff0c\u4e0d\u8981\u56e0\u4e3a\u540c\u4e00\u6279\u6b21\u7684\u5de5\u827a\u8def\u7ebf\u4e0a\u8fd8\u6709\u591a\u9053\u672a\u5b8c\u6210\u5de5\u5e8f\uff0c\u5c31\u5728\u6bcf\u9053\u5de5\u5e8f\u4e2d\u91cd\u590d\u8ba1\u6570\u3002 \u60a8\u4e5f\u53ef\u4ee5\u901a\u8fc7\u7edf\u8ba1\u8fb9\u754c\u5185\u7684\u6d41\u5165\u548c\u6d41\u51fa\u6765\u6838\u5bf9\u6570\u91cf\u3002\u5047\u8bbe\u5468\u521d\u6709 120 \u4ef6\u672a\u5b8c\u5de5\u58f3\u4f53\uff0c\u672c\u5468\u53c8\u6709 480 \u4ef6\u6295\u5165\u751f\u4ea7\uff0c500 \u4ef6\u5b8c\u5de5\u8f6c\u4e3a\u4ea7\u6210\u54c1\u3002\u5728\u6ca1\u6709\u62a5\u5e9f\u6216\u5176\u4ed6\u51fa\u5165\u53d8\u52a8\u7684\u60c5\u51b5\u4e0b\uff1a \u671f\u672b\u5728\u5236\u54c1\u6570\u91cf = 120 + 480 \u2212&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/102537","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/comments?post=102537"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/102537\/revisions"}],"predecessor-version":[{"id":102656,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/posts\/102537\/revisions\/102656"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/media\/102580"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/media?parent=102537"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/categories?post=102537"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/zh-hans\/wp-json\/wp\/v2\/tags?post=102537"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}