{"id":39906,"date":"2023-06-27T16:59:05","date_gmt":"2023-06-27T16:59:05","guid":{"rendered":""},"modified":"2026-10-15T08:45:47","modified_gmt":"2026-10-15T08:45:47","slug":"%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/","title":{"rendered":"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89\">\n\n<h1 class=\"wp-block-heading\" id=\"h-lean-manufacturing-efficiency-unlocked\">\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/uk\/\">\u0413\u043e\u043b\u043e\u0432\u043d\u0430<\/a> &#8221; <a href=\"\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/\">\u0420\u0435\u0441\u0443\u0440\u0441\u0438<\/a> &#8221; \u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\u041e\u0440\u0456\u0454\u043d\u0442\u043e\u0432\u043d\u0438\u0439 \u0447\u0430\u0441 \u0447\u0438\u0442\u0430\u043d\u043d\u044f: <\/span><span class=\"yoast-reading-time__reading-time\">23<\/span><span class=\"yoast-reading-time__time-unit\"> \u0445\u0432\u0438\u043b\u0438\u043d\u0438<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>\u0423\u044f\u0432\u0456\u0442\u044c \u0441\u043e\u0431\u0456: \u0412\u0430\u0448\u0430 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0430 \u043b\u0456\u043d\u0456\u044f \u0437\u0430\u0441\u0442\u0440\u044f\u0433\u043b\u0430.\n\u0417\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u043d\u0430\u043a\u043e\u043f\u0438\u0447\u0443\u044e\u0442\u044c\u0441\u044f.\n\u0412\u0456\u0434 \u0437\u0432\u0443\u043a\u0443 \u043c\u0430\u0448\u0438\u043d, \u0449\u043e \u0437\u0443\u043f\u0438\u043d\u044f\u044e\u0442\u044c\u0441\u044f, \u0443 \u0432\u0430\u0441 \u0431\u043e\u043b\u0438\u0442\u044c \u0433\u043e\u043b\u043e\u0432\u0430.\n\u0412\u0430\u0448\u0430 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f \u0441\u0442\u0438\u043a\u0430\u0454\u0442\u044c\u0441\u044f \u0437 \u0432\u0443\u0437\u044c\u043a\u0438\u043c\u0438 \u043c\u0456\u0441\u0446\u044f\u043c\u0438, \u044f\u043a\u0456 \u0437\u043d\u0438\u0436\u0443\u044e\u0442\u044c \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c.\n\u042f\u043a\u0449\u043e \u0446\u0435\u0439 \u0441\u0446\u0435\u043d\u0430\u0440\u0456\u0439 \u0437\u0432\u0443\u0447\u0438\u0442\u044c \u043d\u0430\u0434\u0442\u043e \u0437\u043d\u0430\u0439\u043e\u043c\u043e, \u0442\u043e \u0441\u0430\u043c\u0435 \u0447\u0430\u0441 \u043f\u043e\u0437\u043d\u0430\u0439\u043e\u043c\u0438\u0442\u0438\u0441\u044f \u0437 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0438\u043c \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e\u043c.    <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">TL;DR<\/h2>\n\n\n\n<p><strong>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e &#8211; \u0446\u0435 \u043c\u0435\u0442\u043e\u0434, \u0441\u043f\u0440\u044f\u043c\u043e\u0432\u0430\u043d\u0438\u0439 \u043d\u0430 \u043c\u0456\u043d\u0456\u043c\u0456\u0437\u0430\u0446\u0456\u044e \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432 \u0456 \u043c\u0430\u043a\u0441\u0438\u043c\u0456\u0437\u0430\u0446\u0456\u044e \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430<\/strong>.\n\u0412\u0456\u043d \u0432\u043a\u043b\u044e\u0447\u0430\u0454 \u0432 \u0441\u0435\u0431\u0435 \u043f\u0440\u0438\u043d\u0446\u0438\u043f\u0438 \u0431\u0435\u0437\u043f\u0435\u0440\u0435\u0440\u0432\u043d\u043e\u0433\u043e \u0432\u0434\u043e\u0441\u043a\u043e\u043d\u0430\u043b\u0435\u043d\u043d\u044f, \u0437\u0430\u0434\u043e\u0432\u043e\u043b\u0435\u043d\u043d\u044f \u043f\u043e\u0442\u0440\u0435\u0431 \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432 \u0442\u0430 \u0456\u043d\u0442\u0435\u043b\u0435\u043a\u0442\u0443\u0430\u043b\u044c\u043d\u043e\u0433\u043e \u043f\u0440\u0438\u0439\u043d\u044f\u0442\u0442\u044f \u0440\u0456\u0448\u0435\u043d\u044c.\n\u0412\u0456\u043d \u043c\u043e\u0436\u0435 \u0437\u043d\u0430\u0447\u043d\u043e \u043f\u0456\u0434\u0432\u0438\u0449\u0438\u0442\u0438 \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0443 \u043f\u043e\u0454\u0434\u043d\u0430\u043d\u043d\u0456 \u0437 \u0441\u0438\u0441\u0442\u0435\u043c\u043e\u044e \u0432\u0434\u043e\u0441\u043a\u043e\u043d\u0430\u043b\u0435\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0442\u0430 \u0441\u043a\u043b\u0430\u0434\u0430\u043d\u043d\u044f \u0433\u0440\u0430\u0444\u0456\u043a\u0456\u0432 (APS), \u044f\u043a-\u043e\u0442 Skyplanner.\n\u041e\u0441\u043d\u043e\u0432\u043d\u0456 \u043f\u0435\u0440\u0435\u0432\u0430\u0433\u0438 \u0432\u043a\u043b\u044e\u0447\u0430\u044e\u0442\u044c \u0435\u043a\u043e\u043d\u043e\u043c\u0456\u044e \u043a\u043e\u0448\u0442\u0456\u0432, \u043a\u0440\u0430\u0449\u0443 \u044f\u043a\u0456\u0441\u0442\u044c \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u0457, \u0437\u0430\u043b\u0443\u0447\u0435\u043d\u043d\u044f \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0456\u0432, \u0433\u043d\u0443\u0447\u043a\u0456\u0441\u0442\u044c, \u0435\u043a\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0443 \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u043b\u044c\u043d\u0456\u0441\u0442\u044c \u0442\u0430 \u043a\u043e\u043d\u043a\u0443\u0440\u0435\u043d\u0442\u043d\u0443 \u043f\u0435\u0440\u0435\u0432\u0430\u0433\u0443.\n\u041e\u0434\u043d\u0430\u043a \u0432\u043e\u043d\u0430 \u043c\u043e\u0436\u0435 \u043d\u0435 \u0431\u0443\u0442\u0438 \u0456\u0434\u0435\u0430\u043b\u044c\u043d\u043e\u044e \u0434\u043b\u044f \u0432\u0438\u0441\u043e\u043a\u043e\u0456\u043d\u0434\u0438\u0432\u0456\u0434\u0443\u0430\u043b\u0456\u0437\u043e\u0432\u0430\u043d\u0438\u0445 \u0430\u0431\u043e \u043c\u0430\u043b\u043e\u0441\u0435\u0440\u0456\u0439\u043d\u0438\u0445 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432.\n\u0422\u0430\u043a\u0456 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438, \u044f\u043a \u043a\u0430\u0440\u0442\u0443\u0432\u0430\u043d\u043d\u044f \u043f\u043e\u0442\u043e\u043a\u0456\u0432 \u0441\u0442\u0432\u043e\u0440\u0435\u043d\u043d\u044f \u0446\u0456\u043d\u043d\u043e\u0441\u0442\u0456, \u043a\u0430\u0439\u0434\u0437\u0435\u043d \u0456 \u043a\u0430\u043d\u0431\u0430\u043d, \u0434\u043e\u043f\u043e\u0432\u043d\u044e\u044e\u0442\u044c \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e, \u0434\u043e\u043f\u043e\u043c\u0430\u0433\u0430\u044e\u0447\u0438 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f\u043c \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0443\u0432\u0430\u0442\u0438 \u043f\u0440\u043e\u0446\u0435\u0441\u0438 \u0456 \u043f\u0440\u043e\u0446\u0432\u0456\u0442\u0430\u0442\u0438 \u043d\u0430 \u0441\u0443\u0447\u0430\u0441\u043d\u043e\u043c\u0443 \u0440\u0438\u043d\u043a\u0443.     <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u0429\u043e \u0442\u0430\u043a\u0435 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e?<\/h2>\n\n\n<div class=\"gb-container gb-container-51461b32\"><div class=\"gb-inside-container\">\n\n<p><strong>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e &#8211; \u0446\u0435 \u0441\u0438\u0441\u0442\u0435\u043c\u043d\u0438\u0439 \u043f\u0456\u0434\u0445\u0456\u0434, \u0441\u043f\u0440\u044f\u043c\u043e\u0432\u0430\u043d\u0438\u0439 \u043d\u0430 \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456, \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0442\u0430 \u0446\u0456\u043d\u043d\u043e\u0441\u0442\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>\u0417\u043e\u0441\u0435\u0440\u0435\u0434\u0436\u0435\u043d\u043d\u044f \u043d\u0430 \u043c\u0456\u043d\u0456\u043c\u0456\u0437\u0430\u0446\u0456\u0457 \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432 \u043f\u0440\u0438 \u0437\u0431\u0435\u0440\u0435\u0436\u0435\u043d\u043d\u0456 \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0443\u0454 \u0440\u043e\u0431\u043e\u0442\u0443 \u0456, \u0437\u0440\u0435\u0448\u0442\u043e\u044e, \u0437\u0431\u0456\u043b\u044c\u0448\u0443\u0454 \u043f\u0440\u0438\u0431\u0443\u0442\u043e\u043a.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-dcc34a4f gb-headline-text\">\u0426\u0456\u043b\u0456\u0441\u043d\u0438\u0439 \u043f\u0456\u0434\u0445\u0456\u0434<\/h4>\n\n\n<div class=\"gb-container gb-container-ffff5164\"><div class=\"gb-inside-container\">\n\n<p><strong>\u0417\u0430\u0433\u0430\u043b\u043e\u043c, \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e &#8211; \u0446\u0435 \u0431\u0456\u043b\u044c\u0448\u0435, \u043d\u0456\u0436 \u043f\u0440\u043e\u0441\u0442\u043e \u043c\u0435\u0442\u043e\u0434\u043e\u043b\u043e\u0433\u0456\u044f; \u0446\u0435 \u0444\u0456\u043b\u043e\u0441\u043e\u0444\u0456\u044f, \u0449\u043e \u0491\u0440\u0443\u043d\u0442\u0443\u0454\u0442\u044c\u0441\u044f \u043d\u0430 \u043f\u043e\u0441\u0442\u0456\u0439\u043d\u043e\u043c\u0443 \u0432\u0434\u043e\u0441\u043a\u043e\u043d\u0430\u043b\u0435\u043d\u043d\u0456 \u0442\u0430 \u0437\u0430\u0434\u043e\u0432\u043e\u043b\u0435\u043d\u043d\u0456 \u043f\u043e\u0442\u0440\u0435\u0431 \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>\u0412\u043e\u043d\u043e \u0491\u0440\u0443\u043d\u0442\u0443\u0454\u0442\u044c\u0441\u044f \u043d\u0430 \u043f\u0440\u0438\u0439\u043d\u044f\u0442\u0442\u0456 \u0440\u043e\u0437\u0443\u043c\u043d\u0438\u0445 \u0440\u0456\u0448\u0435\u043d\u044c, \u044f\u043a\u0456 \u043f\u0440\u0438\u043d\u043e\u0441\u044f\u0442\u044c \u043a\u043e\u0440\u0438\u0441\u0442\u044c \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u0457, \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0430\u043c \u0456 \u043a\u043b\u0456\u0454\u043d\u0442\u0430\u043c, \u0437\u043d\u0438\u0436\u0443\u044e\u0447\u0438 \u0432\u0438\u0442\u0440\u0430\u0442\u0438 \u0456 \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0443\u044e\u0447\u0438 \u0441\u0432\u043e\u0454\u0447\u0430\u0441\u043d\u0435 \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043d\u043d\u044f \u044f\u043a\u0456\u0441\u043d\u043e\u0457 \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u0457.\n\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0454 \u0434\u0443\u0436\u0435 \u043a\u043e\u0440\u0438\u0441\u043d\u0438\u043c, \u043a\u043e\u043b\u0438 \u0432\u043e\u043d\u043e \u0456\u043d\u0442\u0435\u0433\u0440\u043e\u0432\u0430\u043d\u0435 \u0437 <a href=\"\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d1%81%d0%b8%d1%81%d1%82%d0%b5%d0%bc%d0%b0-mes-%d1%89%d0%be-%d1%86%d0%b5-%d1%82%d0%b0%d0%ba%d0%b5-%d1%96-%d1%89%d0%be-%d0%b2%d0%be%d0%bd%d0%b0-%d1%80%d0%be%d0%b1%d0%b8%d1%82%d1%8c\/\">\u0441\u0438\u0441\u0442\u0435\u043c\u043e\u044e \u0443\u043f\u0440\u0430\u0432\u043b\u0456\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e\u043c<\/a> (MES). <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-b9e25e36 gb-headline-text\">\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u043f\u0440\u043e\u0442\u0438 \u043c\u0435\u0442\u043e\u0434\u043e\u043b\u043e\u0433\u0456\u0457 &#8220;\u0442\u043e\u0447\u043d\u043e \u0432 \u0441\u0442\u0440\u043e\u043a<\/h4>\n\n\n\n<p>\u0425\u043e\u0447\u0430 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0442\u0430 &#8221; <a href=\"\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%82%d0%be%d1%87%d0%bd%d0%be-%d0%b2-%d1%81%d1%82%d1%80%d0%be%d0%ba\/\">\u0442\u043e\u0447\u043d\u043e \u0432 \u0441\u0442\u0440\u043e\u043a<\/a> &#8221; (JIT) \u043c\u0430\u044e\u0442\u044c \u043d\u0430 \u043c\u0435\u0442\u0456 \u0437\u043c\u0435\u043d\u0448\u0438\u0442\u0438 \u0432\u0456\u0434\u0445\u043e\u0434\u0438, \u0432\u043e\u043d\u0438 \u0432\u0456\u0434\u0440\u0456\u0437\u043d\u044f\u044e\u0442\u044c\u0441\u044f.\nJIT \u0432 \u043f\u0435\u0440\u0448\u0443 \u0447\u0435\u0440\u0433\u0443 \u0444\u043e\u043a\u0443\u0441\u0443\u0454\u0442\u044c\u0441\u044f \u043d\u0430 \u0441\u043a\u043e\u0440\u043e\u0447\u0435\u043d\u043d\u0456 \u0437\u0430\u043f\u0430\u0441\u0456\u0432 \u0456 \u043f\u0440\u0438\u0441\u043a\u043e\u0440\u0435\u043d\u043d\u0456 \u0442\u043e\u0432\u0430\u0440\u043e\u043f\u043e\u0442\u043e\u043a\u0443.\n\u0412\u043e\u0434\u043d\u043e\u0447\u0430\u0441, \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0432\u0438\u0445\u043e\u0434\u0438\u0442\u044c \u0437\u0430 \u0440\u0430\u043c\u043a\u0438 \u0446\u044c\u043e\u0433\u043e \u0456 \u043e\u0445\u043e\u043f\u043b\u044e\u0454 \u0432\u0441\u0456 \u0430\u0441\u043f\u0435\u043a\u0442\u0438 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u043f\u0440\u043e\u0446\u0435\u0441\u0443, \u0432\u043a\u043b\u044e\u0447\u043d\u043e \u0437 \u0443\u043f\u0440\u0430\u0432\u043b\u0456\u043d\u043d\u044f\u043c \u043f\u0435\u0440\u0441\u043e\u043d\u0430\u043b\u043e\u043c \u0442\u0430 \u0432\u0456\u0434\u043d\u043e\u0441\u0438\u043d\u0430\u043c\u0438 \u0437 \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043b\u044c\u043d\u0438\u043a\u0430\u043c\u0438.  <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u042f\u043a \u043f\u0440\u0430\u0446\u044e\u0454 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e?  <\/h2>\n\n\n\n<p>\u0421\u0443\u0447\u0430\u0441\u043d\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u0457 \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u044e\u0442\u044c \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0434\u043b\u044f \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0430\u0446\u0456\u0457 \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432, \u0442\u0438\u043c \u0441\u0430\u043c\u0438\u043c \u0441\u043f\u0440\u0438\u044f\u044e\u0447\u0438 \u0441\u0442\u0430\u043b\u043e\u043c\u0443 \u0440\u043e\u0437\u0432\u0438\u0442\u043a\u0443.\n\u0417\u043c\u0435\u043d\u0448\u0443\u044e\u0447\u0438 \u043a\u0456\u043b\u044c\u043a\u0456\u0441\u0442\u044c \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432, \u0446\u0435\u0439 \u0442\u0438\u043f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u0454 \u0435\u043a\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0456 \u0456\u043d\u0456\u0446\u0456\u0430\u0442\u0438\u0432\u0438, \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0443\u044e\u0447\u0438 \u0435\u043a\u043e\u043d\u043e\u043c\u0456\u0447\u043d\u0435 \u043f\u0440\u043e\u0446\u0432\u0456\u0442\u0430\u043d\u043d\u044f \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u0439 \u0442\u0430 \u043f\u043e\u0437\u0438\u0442\u0438\u0432\u043d\u0438\u0439 \u0432\u043f\u043b\u0438\u0432 \u043d\u0430 \u043d\u0430\u0432\u043a\u043e\u043b\u0438\u0448\u043d\u0454 \u0441\u0435\u0440\u0435\u0434\u043e\u0432\u0438\u0449\u0435. <br\/><br\/>\u0414\u043b\u044f \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043b\u044c\u043d\u0438\u043a\u0456\u0432 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0441\u0438\u0441\u0442\u0435\u043c\u0430 \u0432\u0434\u043e\u0441\u043a\u043e\u043d\u0430\u043b\u0435\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0456 \u0441\u043a\u043b\u0430\u0434\u0430\u043d\u043d\u044f \u0433\u0440\u0430\u0444\u0456\u043a\u0456\u0432 (APS), \u0442\u0430\u043a\u0430 \u044f\u043a <a href=\"\/uk\/%d1%84%d1%83%d0%bd%d0%ba%d1%86%d1%96%d1%97\/\">Skyplanner<\/a>, \u0454 \u0456\u0434\u0435\u0430\u043b\u044c\u043d\u0438\u043c \u043f\u043e\u043c\u0456\u0447\u043d\u0438\u043a\u043e\u043c \u0443 \u0446\u0456\u0439 \u043c\u0435\u0442\u043e\u0434\u043e\u043b\u043e\u0433\u0456\u0457.\n\u041f\u0440\u043e\u0433\u0440\u0430\u043c\u043d\u0435 \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0435\u043d\u043d\u044f APS \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0443\u0454 \u0431\u0435\u0437\u043f\u0435\u0440\u0435\u0431\u0456\u0439\u043d\u0438\u0439 \u043f\u043e\u0442\u0456\u043a \u0456\u043d\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u0457, \u0449\u043e \u043c\u0430\u0454 \u0432\u0438\u0440\u0456\u0448\u0430\u043b\u044c\u043d\u0435 \u0437\u043d\u0430\u0447\u0435\u043d\u043d\u044f \u0434\u043b\u044f \u043f\u0440\u0438\u0439\u043d\u044f\u0442\u0442\u044f \u0448\u0432\u0438\u0434\u043a\u0438\u0445 \u0456 \u043e\u0431\u0491\u0440\u0443\u043d\u0442\u043e\u0432\u0430\u043d\u0438\u0445 \u0440\u0456\u0448\u0435\u043d\u044c, \u043d\u0435\u043e\u0431\u0445\u0456\u0434\u043d\u0438\u0445 \u0432 \u0443\u043c\u043e\u0432\u0430\u0445 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430. <br\/><br\/><a href=\"\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/problemy-planuvannya-v-excel-ta-perevahy-skyplanner-aps\/\">\u041e\u0431\u043c\u0435\u0436\u0435\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432 Excel<\/a> \u043c\u043e\u0436\u0443\u0442\u044c \u043d\u0435\u0433\u0430\u0442\u0438\u0432\u043d\u043e \u0432\u043f\u043b\u0438\u043d\u0443\u0442\u0438 \u043d\u0430 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e, \u043f\u0440\u0438\u0437\u0432\u043e\u0434\u044f\u0447\u0438 \u0434\u043e \u043d\u0435\u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0442\u0430 \u043f\u043e\u043c\u0438\u043b\u043e\u043a.\n\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u043d\u0430\u0433\u043e\u043b\u043e\u0448\u0443\u0454 \u043d\u0430 \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0430\u0446\u0456\u0457 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432 \u0456 \u0437\u043c\u0435\u043d\u0448\u0435\u043d\u043d\u0456 \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432, \u0430\u043b\u0435 Excel, \u043a\u043e\u043b\u0438 \u0439\u043e\u0433\u043e \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u044e\u0442\u044c \u0434\u043b\u044f \u0441\u043a\u043b\u0430\u0434\u043d\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f, \u043c\u043e\u0436\u0435 \u0431\u0443\u0442\u0438 \u0441\u0445\u0438\u043b\u044c\u043d\u0438\u0439 \u0434\u043e \u043f\u043e\u043c\u0438\u043b\u043e\u043a \u0440\u0443\u0447\u043d\u043e\u0433\u043e \u0432\u0432\u0435\u0434\u0435\u043d\u043d\u044f \u0434\u0430\u043d\u0438\u0445, \u0432\u0456\u0434\u0441\u0443\u0442\u043d\u043e\u0441\u0442\u0456 \u043e\u043d\u043e\u0432\u043b\u0435\u043d\u044c \u0443 \u0440\u0435\u0430\u043b\u044c\u043d\u043e\u043c\u0443 \u0447\u0430\u0441\u0456, \u0430 \u0442\u0430\u043a\u043e\u0436 \u0442\u0440\u0443\u0434\u043d\u043e\u0449\u0456\u0432 \u0443 \u0441\u043f\u0456\u043b\u044c\u043d\u043e\u043c\u0443 \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u043d\u043d\u0456 \u0442\u0430 \u0441\u043f\u0456\u043b\u044c\u043d\u0456\u0439 \u0440\u043e\u0431\u043e\u0442\u0456.\n\u0426\u0456 \u043d\u0435\u0434\u043e\u043b\u0456\u043a\u0438 \u043c\u043e\u0436\u0443\u0442\u044c \u043f\u0440\u043e\u0442\u0438\u0434\u0456\u044f\u0442\u0438 \u043f\u0440\u0438\u043d\u0446\u0438\u043f\u0430\u043c \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430, \u0441\u043f\u0440\u0438\u0447\u0438\u043d\u044f\u044e\u0447\u0438 \u0437\u0430\u0442\u0440\u0438\u043c\u043a\u0438, \u043d\u0435\u0440\u0430\u0446\u0456\u043e\u043d\u0430\u043b\u044c\u043d\u0438\u0439 \u0440\u043e\u0437\u043f\u043e\u0434\u0456\u043b \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432 \u0456 \u043d\u0435\u043c\u043e\u0436\u043b\u0438\u0432\u0456\u0441\u0442\u044c \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0433\u043e \u043c\u043e\u043d\u0456\u0442\u043e\u0440\u0438\u043d\u0433\u0443 \u0442\u0430 \u0441\u043a\u043e\u0440\u043e\u0447\u0435\u043d\u043d\u044f \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432.\n\u042f\u043a \u043d\u0430\u0441\u043b\u0456\u0434\u043e\u043a, \u0446\u0435 \u043f\u0435\u0440\u0435\u0448\u043a\u043e\u0434\u0436\u0430\u0454 \u0434\u043e\u0441\u044f\u0433\u043d\u0435\u043d\u043d\u044e \u0446\u0456\u043b\u0435\u0439 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430, \u0442\u0430\u043a\u0438\u0445 \u044f\u043a \u043f\u043e\u0441\u0442\u0456\u0439\u043d\u0435 \u0432\u0434\u043e\u0441\u043a\u043e\u043d\u0430\u043b\u0435\u043d\u043d\u044f \u0442\u0430 \u043c\u0430\u043a\u0441\u0438\u043c\u0430\u043b\u044c\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c.   <\/p>\n\n\n\n<figure class=\"gb-block-image gb-block-image-2ccb3349\"><img decoding=\"async\" width=\"2160\" height=\"1131\" class=\"gb-image gb-image-2ccb3349\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5.png\" alt=\"\" title=\"\u0428\u0438\u0440\u0438\u043d\u0430 \u0434\u0438\u0441\u043f\u043b\u0435\u044f 5\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5.png 2160w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 2160px) 100vw, 2160px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">8 \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-f14e67cc gb-headline-text\">1 &#8211; \u0414\u0435\u0444\u0435\u043a\u0442\u0438<\/h4>\n\n\n\n<p>\u0414\u0435\u0444\u0435\u043a\u0442\u0438 \u0432 \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0430\u0445 \u0430\u0431\u043e \u043f\u0440\u043e\u0446\u0435\u0441\u0430\u0445 &#8211; \u0446\u0435 \u0437\u043d\u0430\u0447\u043d\u0456 \u0432\u0442\u0440\u0430\u0442\u0438.\n\u0412\u043e\u043d\u0438 \u043f\u0440\u0438\u0437\u0432\u043e\u0434\u044f\u0442\u044c \u0434\u043e \u043f\u0435\u0440\u0435\u0440\u043e\u0431\u043e\u043a, \u0431\u0440\u0443\u0445\u0442\u0443 \u0442\u0430 \u043d\u0435\u0437\u0430\u0434\u043e\u0432\u043e\u043b\u0435\u043d\u0438\u0445 \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432.\n\u041c\u0435\u0442\u043e\u0434\u043e\u043b\u043e\u0433\u0456\u044f \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0432\u0438\u044f\u0432\u043b\u044f\u0454 \u0442\u0430 \u0443\u0441\u0443\u0432\u0430\u0454 \u043f\u0435\u0440\u0448\u043e\u043f\u0440\u0438\u0447\u0438\u043d\u0438 \u0434\u0435\u0444\u0435\u043a\u0442\u0456\u0432.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-711103e5 gb-headline-text\">2 &#8211; \u041f\u0435\u0440\u0435\u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e<\/h4>\n\n\n\n<p>\u0412\u0438\u0440\u043e\u0431\u043b\u044f\u0442\u0438 \u0431\u0456\u043b\u044c\u0448\u0435, \u043d\u0456\u0436 \u043f\u043e\u0442\u0440\u0456\u0431\u043d\u043e, &#8211; \u043c\u0430\u0440\u043d\u043e\u0442\u0440\u0430\u0442\u043d\u043e.\n\u0426\u044f \u043c\u0435\u0442\u043e\u0434\u043e\u043b\u043e\u0433\u0456\u044f \u0444\u043e\u043a\u0443\u0441\u0443\u0454\u0442\u044c\u0441\u044f \u043d\u0430 \u0441\u0442\u0432\u043e\u0440\u0435\u043d\u043d\u0456 \u0441\u0430\u043c\u0435 \u0442\u043e\u0433\u043e, \u0449\u043e \u043f\u043e\u0442\u0440\u0456\u0431\u043d\u043e, \u0432\u0438\u0445\u043e\u0434\u044f\u0447\u0438 \u0437 \u043f\u043e\u043f\u0438\u0442\u0443 \u0441\u043f\u043e\u0436\u0438\u0432\u0430\u0447\u0456\u0432. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-914dffb1 gb-headline-text\">3 &#8211; \u041e\u0447\u0456\u043a\u0443\u0432\u0430\u043d\u043d\u044f<\/h4>\n\n\n\n<p>\u0427\u0430\u0441 \u043f\u0440\u043e\u0441\u0442\u043e\u044e, \u043a\u043e\u043b\u0438 \u0440\u0435\u0441\u0443\u0440\u0441\u0438 \u043d\u0435 \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u044e\u0442\u044c\u0441\u044f, \u0454 \u043c\u0430\u0440\u043d\u043e\u0442\u0440\u0430\u0442\u0441\u0442\u0432\u043e\u043c.\n\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u043c\u0430\u0454 \u043d\u0430 \u043c\u0435\u0442\u0456 \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0438\u0442\u0438 \u0431\u0435\u0437\u043f\u0435\u0440\u0435\u0431\u0456\u0439\u043d\u0438\u0439 \u043f\u0440\u043e\u0446\u0435\u0441 \u0431\u0435\u0437 \u0437\u0430\u0442\u0440\u0438\u043c\u043e\u043a \u0456 \u0432\u0443\u0437\u044c\u043a\u0438\u0445 \u043c\u0456\u0441\u0446\u044c. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a901716e gb-headline-text\">4.- \u041d\u0435\u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u043d\u043d\u044f \u0442\u0430\u043b\u0430\u043d\u0442\u0456\u0432<\/h4>\n\n\n\n<p>\u041d\u0435\u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u043d\u043d\u044f \u043d\u0430\u0432\u0438\u0447\u043e\u043a \u0456 \u0442\u0430\u043b\u0430\u043d\u0442\u0456\u0432 \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0456\u0432 \u043f\u0440\u0438\u0437\u0432\u043e\u0434\u0438\u0442\u044c \u0434\u043e \u043c\u0430\u0440\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u043b\u044e\u0434\u0441\u044c\u043a\u0438\u0445 \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432.\n\u0426\u0435\u0439 \u043c\u0435\u0442\u043e\u0434 \u0432\u043a\u043b\u044e\u0447\u0430\u0454 \u0432 \u0441\u0435\u0431\u0435 \u0437\u0430\u043b\u0443\u0447\u0435\u043d\u043d\u044f \u0442\u0430 \u0440\u043e\u0437\u0448\u0438\u0440\u0435\u043d\u043d\u044f \u043c\u043e\u0436\u043b\u0438\u0432\u043e\u0441\u0442\u0435\u0439 \u0440\u043e\u0431\u043e\u0447\u043e\u0457 \u0441\u0438\u043b\u0438. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-ae582ff9 gb-headline-text\">5 &#8211; \u0422\u0440\u0430\u043d\u0441\u043f\u043e\u0440\u0442\u0443\u0432\u0430\u043d\u043d\u044f<\/h4>\n\n\n\n<p>\u041d\u0435\u043f\u043e\u0442\u0440\u0456\u0431\u043d\u0435 \u043f\u0435\u0440\u0435\u043c\u0456\u0449\u0435\u043d\u043d\u044f \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0456\u0432 \u0437\u0431\u0456\u043b\u044c\u0448\u0443\u0454 \u0432\u0438\u0442\u0440\u0430\u0442\u0438 \u0442\u0430 \u0440\u0438\u0437\u0438\u043a\u0438.\n\u0426\u0435\u0439 \u043f\u0456\u0434\u0445\u0456\u0434 \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0443\u0454 \u043f\u0435\u0440\u0435\u043c\u0456\u0449\u0435\u043d\u043d\u044f \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0456\u0432 \u0437\u0430 \u0440\u0430\u0445\u0443\u043d\u043e\u043a \u043f\u043e\u043a\u0440\u0430\u0449\u0435\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0442\u0430 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u043e\u0433\u043e \u043f\u0440\u043e\u0446\u0435\u0441\u0443. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-3e0d3250 gb-headline-text\">6 &#8211; \u0406\u043d\u0432\u0435\u043d\u0442\u0430\u0440\u0438\u0437\u0430\u0446\u0456\u044f<\/h4>\n\n\n\n<p>\u041d\u0430\u0434\u043b\u0438\u0448\u043a\u043e\u0432\u0456 \u0437\u0430\u043f\u0430\u0441\u0438 \u0437\u0432&#8217;\u044f\u0437\u0443\u044e\u0442\u044c \u043a\u0430\u043f\u0456\u0442\u0430\u043b \u0456 \u043f\u0440\u043e\u0441\u0442\u0456\u0440.\n\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0444\u043e\u043a\u0443\u0441\u0443\u0454\u0442\u044c\u0441\u044f \u043d\u0430 \u0441\u043a\u043e\u0440\u043e\u0447\u0435\u043d\u043d\u0456 \u0437\u0430\u043f\u0430\u0441\u0456\u0432 \u0434\u043e \u043c\u0456\u043d\u0456\u043c\u0443\u043c\u0443, \u043d\u0435\u043e\u0431\u0445\u0456\u0434\u043d\u043e\u0433\u043e \u0434\u043b\u044f \u0431\u0435\u0437\u043f\u0435\u0440\u0435\u0431\u0456\u0439\u043d\u043e\u0457 \u0440\u043e\u0431\u043e\u0442\u0438. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-aa772230 gb-headline-text\">7 &#8211; \u0420\u0443\u0445<\/h4>\n\n\n\n<p>\u0412\u0456\u0434\u0445\u043e\u0434\u0438 \u0443 \u0432\u0438\u0433\u043b\u044f\u0434\u0456 \u043d\u0435\u043f\u043e\u0442\u0440\u0456\u0431\u043d\u0438\u0445 \u0440\u0443\u0445\u0456\u0432 \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0456\u0432 \u043e\u0447\u0456\u043a\u0443\u0432\u0430\u043d\u043e \u0432\u0438\u043d\u0438\u043a\u0430\u044e\u0442\u044c.\n\u041c\u0435\u0442\u043e\u0434\u043e\u043b\u043e\u0433\u0456\u044f Lean \u043f\u0456\u0434\u0432\u0438\u0449\u0443\u0454 \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0437\u0430 \u0440\u0430\u0445\u0443\u043d\u043e\u043a \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0430\u0446\u0456\u0457 \u0440\u043e\u0431\u043e\u0447\u0438\u0445 \u043c\u0456\u0441\u0446\u044c \u0442\u0430 \u0437\u043c\u0435\u043d\u0448\u0435\u043d\u043d\u044f \u0432\u0442\u0440\u0430\u0442 \u0440\u0443\u0445\u0443. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-cbdb11f2 gb-headline-text\">8 &#8211; \u041f\u0435\u0440\u0435\u0440\u043e\u0431\u043a\u0430 \u043d\u0430\u0434\u043b\u0438\u0448\u043a\u0456\u0432<\/h4>\n\n\n\n<p>\u0420\u043e\u0431\u0438\u0442\u0438 \u0431\u0456\u043b\u044c\u0448\u0435, \u043d\u0456\u0436 \u043f\u043e\u0442\u0440\u0456\u0431\u043d\u043e, \u043d\u0430\u043f\u0440\u0438\u043a\u043b\u0430\u0434, \u043d\u0430\u0434\u043c\u0456\u0440\u043d\u043e \u0443\u0441\u043a\u043b\u0430\u0434\u043d\u044e\u0432\u0430\u0442\u0438 \u043f\u0440\u043e\u0434\u0443\u043a\u0442 &#8211; \u0446\u0435 \u043c\u0430\u0440\u043d\u043e\u0442\u0440\u0430\u0442\u0441\u0442\u0432\u043e.\n\u0426\u0435\u0439 \u043f\u0456\u0434\u0445\u0456\u0434 \u0443\u0441\u0443\u0432\u0430\u0454 \u0457\u0445, \u0437\u043e\u0441\u0435\u0440\u0435\u0434\u0436\u0443\u044e\u0447\u0438\u0441\u044c \u043d\u0430 \u0432\u0438\u043c\u043e\u0433\u0430\u0445 \u043a\u043b\u0456\u0454\u043d\u0442\u0430. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u0420\u043e\u0437\u043a\u0440\u0438\u0442\u0442\u044f \u043f\u0435\u0440\u0435\u0432\u0430\u0433 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-99e5be4f gb-headline-text\">\u041f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456<\/h4>\n\n\n\n<p>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0437\u043d\u0430\u0447\u043d\u043e \u043f\u0456\u0434\u0432\u0438\u0449\u0443\u0454 \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0437\u0430\u0432\u0434\u044f\u043a\u0438 \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0430\u0446\u0456\u0457 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432 \u0442\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u043c\u0443 \u0440\u043e\u0437\u043f\u043e\u0434\u0456\u043b\u0443 \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432.\n\u0426\u0435 \u0434\u043e\u0441\u044f\u0433\u0430\u0454\u0442\u044c\u0441\u044f \u0437\u0430 \u0440\u0430\u0445\u0443\u043d\u043e\u043a \u0441\u043a\u043e\u0440\u043e\u0447\u0435\u043d\u043d\u044f \u0447\u0430\u0441\u0443 \u043e\u0447\u0456\u043a\u0443\u0432\u0430\u043d\u043d\u044f, \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0435\u043d\u043d\u044f \u0431\u0435\u0437\u043f\u0435\u0440\u0435\u0431\u0456\u0439\u043d\u043e\u0433\u043e \u043f\u043e\u0442\u043e\u043a\u0443 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0456\u0432 \u0456 \u0433\u0430\u0440\u0430\u043d\u0442\u0443\u0432\u0430\u043d\u043d\u044f \u0442\u043e\u0433\u043e, \u0449\u043e \u043a\u043e\u0436\u043d\u0430 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u044f \u0432\u0438\u043a\u043e\u043d\u0443\u0454\u0442\u044c\u0441\u044f \u0448\u0432\u0438\u0434\u043a\u043e \u0442\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e.\n\u041a\u0440\u0456\u043c \u0442\u043e\u0433\u043e, \u0437\u0430\u0432\u0434\u044f\u043a\u0438 \u043f\u0456\u0434\u0445\u043e\u0434\u0443 \u0431\u0435\u0437\u043f\u0435\u0440\u0435\u0440\u0432\u043d\u043e\u0433\u043e \u0432\u0434\u043e\u0441\u043a\u043e\u043d\u0430\u043b\u0435\u043d\u043d\u044f, \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0446\u0438\u043a\u043b\u0438 \u043f\u043e\u0441\u0442\u0456\u0439\u043d\u043e \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0443\u044e\u0442\u044c\u0441\u044f.\n\u041a\u0456\u043d\u0446\u0435\u0432\u0438\u0439 \u0435\u0444\u0435\u043a\u0442 \u043f\u043e\u043b\u044f\u0433\u0430\u0454 \u0432 \u0442\u043e\u043c\u0443, \u0449\u043e \u0437\u0430 \u0442\u043e\u0439 \u0441\u0430\u043c\u0438\u0439 \u043f\u0440\u043e\u043c\u0456\u0436\u043e\u043a \u0447\u0430\u0441\u0443 \u0432\u0438\u0440\u043e\u0431\u043b\u044f\u0454\u0442\u044c\u0441\u044f \u0431\u0456\u043b\u044c\u0448\u0435 \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u0457, \u0430 \u0446\u0435 \u043e\u0437\u043d\u0430\u0447\u0430\u0454 \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0456, \u0437\u0440\u0435\u0448\u0442\u043e\u044e, \u0437\u0431\u0456\u043b\u044c\u0448\u0435\u043d\u043d\u044f \u043f\u0440\u043e\u0434\u0430\u0436\u0456\u0432.     <a href=\"\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d1%8f%d0%ba-%d0%be%d0%bf%d1%82%d0%b8%d0%bc%d1%96%d0%b7%d1%83%d0%b2%d0%b0%d1%82%d0%b8-%d1%87%d0%b0%d1%81-%d0%b2%d0%b8%d0%ba%d0%be%d0%bd%d0%b0%d0%bd%d0%bd%d1%8f-%d0%b7%d0%b0%d0%bc%d0%be%d0%b2%d0%bb\/\"><\/a><a href=\"\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d1%8f%d0%ba-%d0%be%d0%bf%d1%82%d0%b8%d0%bc%d1%96%d0%b7%d1%83%d0%b2%d0%b0%d1%82%d0%b8-%d1%87%d0%b0%d1%81-%d0%b2%d0%b8%d0%ba%d0%be%d0%bd%d0%b0%d0%bd%d0%bd%d1%8f-%d0%b7%d0%b0%d0%bc%d0%be%d0%b2%d0%bb\/\">\u0414\u0456\u0437\u043d\u0430\u0439\u0442\u0435\u0441\u044f \u043f\u0440\u043e \u043f\u0435\u0440\u0435\u0432\u0430\u0433\u0438 \u0441\u043a\u043e\u0440\u043e\u0447\u0435\u043d\u043d\u044f \u0442\u0435\u0440\u043c\u0456\u043d\u0456\u0432 \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f. <\/a> <br\/><br\/>\u041f\u0440\u044f\u043c\u0438\u043c \u043d\u0430\u0441\u043b\u0456\u0434\u043a\u043e\u043c \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0454 \u0437\u0434\u0430\u0442\u043d\u0456\u0441\u0442\u044c \u0448\u0432\u0438\u0434\u043a\u043e \u0440\u0435\u0430\u0433\u0443\u0432\u0430\u0442\u0438 \u043d\u0430 \u0437\u0430\u043f\u0438\u0442\u0438 \u0440\u0438\u043d\u043a\u0443.\n\u0426\u0435 \u043e\u0441\u043e\u0431\u043b\u0438\u0432\u043e \u0432\u0430\u0436\u043b\u0438\u0432\u043e \u043d\u0430 \u0448\u0432\u0438\u0434\u043a\u043e\u0437\u043c\u0456\u043d\u043d\u043e\u043c\u0443 \u0440\u0438\u043d\u043a\u0443, \u0434\u0435 \u0432\u043f\u043e\u0434\u043e\u0431\u0430\u043d\u043d\u044f \u0441\u043f\u043e\u0436\u0438\u0432\u0430\u0447\u0456\u0432 \u043f\u043e\u0441\u0442\u0456\u0439\u043d\u043e \u0437\u043c\u0456\u043d\u044e\u044e\u0442\u044c\u0441\u044f.\n\u041f\u043b\u0430\u043d\u0443\u0432\u0430\u043b\u044c\u043d\u0438\u043a\u0438 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430, \u044f\u043a\u0456 \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u044e\u0442\u044c \u043f\u0440\u0438\u043d\u0446\u0438\u043f\u0438 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430, \u043c\u043e\u0436\u0443\u0442\u044c \u0448\u0432\u0438\u0434\u043a\u043e \u0430\u0434\u0430\u043f\u0442\u0443\u0432\u0430\u0442\u0438\u0441\u044f \u0434\u043e \u0437\u043c\u0456\u043d, \u0433\u0430\u0440\u0430\u043d\u0442\u0443\u044e\u0447\u0438, \u0449\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u043f\u0440\u043e\u0446\u0435\u0441\u0438 \u0437\u0430\u0432\u0436\u0434\u0438 \u0431\u0443\u0434\u0443\u0442\u044c \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u0442\u0438 \u043f\u043e\u0442\u0440\u0435\u0431\u0430\u043c \u0440\u0438\u043d\u043a\u0443 \u0456 \u0449\u043e \u043c\u043e\u0436\u043b\u0438\u0432\u043e\u0441\u0442\u0456 \u043d\u0456\u043a\u043e\u043b\u0438 \u043d\u0435 \u0431\u0443\u0434\u0443\u0442\u044c \u0432\u0442\u0440\u0430\u0447\u0435\u043d\u0456.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-25cb9422 gb-headline-text\">\u0417\u043c\u0435\u043d\u0448\u0435\u043d\u043d\u044f \u0432\u0438\u0442\u0440\u0430\u0442<\/h4>\n\n\n\n<p>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0437\u0430 \u0441\u0432\u043e\u0454\u044e \u0441\u0443\u0442\u0442\u044e \u043c\u0430\u0454 \u043d\u0430 \u043c\u0435\u0442\u0456 \u0437\u043c\u0435\u043d\u0448\u0438\u0442\u0438 \u0440\u0456\u0437\u043d\u0456 \u0444\u043e\u0440\u043c\u0438 \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432 \u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u043c\u0443 \u043f\u0440\u043e\u0446\u0435\u0441\u0456.\n\u0421\u043a\u043e\u0440\u043e\u0447\u0435\u043d\u043d\u044f \u0446\u0438\u0445 \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432 \u043f\u0440\u0438\u0437\u0432\u043e\u0434\u0438\u0442\u044c \u0434\u043e \u0437\u043d\u0438\u0436\u0435\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u0432\u0438\u0442\u0440\u0430\u0442, \u0447\u0438 \u0442\u043e \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432 \u0447\u0435\u0440\u0435\u0437 \u043f\u0435\u0440\u0435\u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e, \u0434\u0435\u0444\u0435\u043a\u0442\u0456\u0432, \u0447\u0438 \u043d\u0435\u043f\u043e\u0442\u0440\u0456\u0431\u043d\u0438\u0445 \u043f\u0435\u0440\u0435\u043c\u0456\u0449\u0435\u043d\u044c \u0456 \u0442\u0440\u0430\u043d\u0441\u043f\u043e\u0440\u0442\u0443\u0432\u0430\u043d\u043d\u044f.\n\u041a\u0440\u0456\u043c \u0442\u043e\u0433\u043e, \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0443\u044e\u0447\u0438 \u0440\u0456\u0432\u0435\u043d\u044c \u0437\u0430\u043f\u0430\u0441\u0456\u0432, \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u0457 \u043c\u043e\u0436\u0443\u0442\u044c \u0432\u0438\u0432\u0456\u043b\u044c\u043d\u0438\u0442\u0438 \u043a\u0430\u043f\u0456\u0442\u0430\u043b, \u044f\u043a\u0438\u0439 \u0456\u043d\u0430\u043a\u0448\u0435 \u0431\u0443\u0432 \u0431\u0438 \u043f\u043e\u0432&#8217;\u044f\u0437\u0430\u043d\u0438\u0439 \u0456\u0437 \u0437\u0430\u043f\u0430\u0441\u0430\u043c\u0438.\n\u0426\u0435 \u0434\u043e\u043f\u043e\u043c\u0430\u0433\u0430\u0454 \u0437\u043c\u0435\u043d\u0448\u0438\u0442\u0438 \u0432\u0438\u0442\u0440\u0430\u0442\u0438 \u043d\u0430 \u043e\u0431\u0440\u043e\u0431\u043a\u0443 \u0442\u0430 \u0437\u0431\u0435\u0440\u0456\u0433\u0430\u043d\u043d\u044f \u0456 \u043c\u0456\u043d\u0456\u043c\u0456\u0437\u0443\u0454 \u0440\u0438\u0437\u0438\u043a\u0438, \u043f\u043e\u0432&#8217;\u044f\u0437\u0430\u043d\u0456 \u0437 \u0430\u043c\u043e\u0440\u0442\u0438\u0437\u0430\u0446\u0456\u0454\u044e \u0430\u0431\u043e \u0437\u0430\u0441\u0442\u0430\u0440\u0456\u0432\u0430\u043d\u043d\u044f\u043c \u0437\u0430\u043f\u0430\u0441\u0456\u0432.     <br\/><br\/>\u0406\u043d\u0448\u0438\u0439 \u0430\u0441\u043f\u0435\u043a\u0442 \u0441\u043a\u043e\u0440\u043e\u0447\u0435\u043d\u043d\u044f \u0432\u0438\u0442\u0440\u0430\u0442 \u043f\u043e\u043b\u044f\u0433\u0430\u0454 \u0432 \u0435\u043a\u043e\u043d\u043e\u043c\u0456\u0457 \u0435\u043d\u0435\u0440\u0433\u0456\u0457.\n\u041e\u0441\u043a\u0456\u043b\u044c\u043a\u0438 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u043d\u0430\u0433\u043e\u043b\u043e\u0448\u0443\u0454 \u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u043c\u0443 \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u043d\u043d\u0456 \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432, \u0432\u043e\u043d\u043e \u0437\u0430 \u0441\u0432\u043e\u0454\u044e \u0441\u0443\u0442\u0442\u044e \u0441\u043f\u0440\u0438\u044f\u0454 \u0435\u043d\u0435\u0440\u0433\u043e\u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0438\u043c \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u044f\u043c.\n\u0426\u0435 \u043c\u043e\u0436\u0435 \u0432\u0456\u0434\u0431\u0443\u0432\u0430\u0442\u0438\u0441\u044f \u0437\u0430 \u0440\u0430\u0445\u0443\u043d\u043e\u043a \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0430\u0446\u0456\u0457 \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u043d\u043d\u044f \u043e\u0431\u043b\u0430\u0434\u043d\u0430\u043d\u043d\u044f, \u0437\u043c\u0435\u043d\u0448\u0435\u043d\u043d\u044f \u043a\u0456\u043b\u044c\u043a\u043e\u0441\u0442\u0456 \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432, \u0449\u043e \u043f\u0440\u0438\u0437\u0432\u043e\u0434\u0438\u0442\u044c \u0434\u043e \u0437\u043c\u0435\u043d\u0448\u0435\u043d\u043d\u044f \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u043d\u043d\u044f \u0441\u0438\u0440\u043e\u0432\u0438\u043d\u0438, \u0430\u0431\u043e \u043d\u0430\u0432\u0456\u0442\u044c \u0437\u0430 \u0440\u0430\u0445\u0443\u043d\u043e\u043a \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0430\u0446\u0456\u0457 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f, \u0449\u043e \u0437\u043c\u0435\u043d\u0448\u0443\u0454 \u0432\u0438\u0442\u0440\u0430\u0442\u0438 \u043d\u0430 \u0435\u043b\u0435\u043a\u0442\u0440\u043e\u0435\u043d\u0435\u0440\u0433\u0456\u044e.\n\u0423 \u0434\u043e\u0432\u0433\u043e\u0441\u0442\u0440\u043e\u043a\u043e\u0432\u0456\u0439 \u043f\u0435\u0440\u0441\u043f\u0435\u043a\u0442\u0438\u0432\u0456 \u0446\u0456 \u0437\u0430\u043e\u0449\u0430\u0434\u0436\u0435\u043d\u043d\u044f \u0441\u0443\u0442\u0442\u0454\u0432\u043e \u0432\u043f\u043b\u0438\u0432\u0430\u044e\u0442\u044c \u043d\u0430 \u0444\u0456\u043d\u0430\u043d\u0441\u043e\u0432\u0438\u0439 \u0441\u0442\u0430\u043d \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u0457.   <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-04bb9277 gb-headline-text\">\u041f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u0440\u0456\u0432\u043d\u044f \u0437\u0430\u0434\u043e\u0432\u043e\u043b\u0435\u043d\u043e\u0441\u0442\u0456 \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432  <\/h4>\n\n\n\n<p>\u0412 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u043c\u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0456 \u0432 \u0446\u0435\u043d\u0442\u0440\u0456 \u0443\u0432\u0430\u0433\u0438 \u0437\u043d\u0430\u0445\u043e\u0434\u0438\u0442\u044c\u0441\u044f \u043a\u043b\u0456\u0454\u043d\u0442.\n\u0417\u043e\u0441\u0435\u0440\u0435\u0434\u0436\u0443\u044e\u0447\u0438\u0441\u044c \u043d\u0430 \u0441\u0442\u0432\u043e\u0440\u0435\u043d\u043d\u0456 \u0446\u0456\u043d\u043d\u043e\u0441\u0442\u0456 \u0434\u043b\u044f \u043a\u043b\u0456\u0454\u043d\u0442\u0430, \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u0457 \u0433\u0430\u0440\u0430\u043d\u0442\u0443\u044e\u0442\u044c, \u0449\u043e \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u044f \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u0454 \u0430\u0431\u043e \u043d\u0430\u0432\u0456\u0442\u044c \u043f\u0435\u0440\u0435\u0432\u0435\u0440\u0448\u0443\u0454 \u0439\u043e\u0433\u043e \u043e\u0447\u0456\u043a\u0443\u0432\u0430\u043d\u043d\u044f.\n\u0426\u0435 \u0432\u043a\u043b\u044e\u0447\u0430\u0454 \u0432 \u0441\u0435\u0431\u0435 \u0432\u0438\u0441\u043e\u043a\u043e\u044f\u043a\u0456\u0441\u043d\u0443 \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u044e, \u0441\u0432\u043e\u0454\u0447\u0430\u0441\u043d\u0456 \u043f\u043e\u0441\u0442\u0430\u0432\u043a\u0438 \u0456 \u043d\u0430\u0432\u0456\u0442\u044c \u0435\u043a\u043e\u043d\u043e\u043c\u0456\u044e \u0432\u0438\u0442\u0440\u0430\u0442, \u044f\u043a\u0430 \u043c\u043e\u0436\u0435 \u0431\u0443\u0442\u0438 \u043f\u0435\u0440\u0435\u0434\u0430\u043d\u0430 \u043a\u043b\u0456\u0454\u043d\u0442\u0443 \u0447\u0435\u0440\u0435\u0437 \u043a\u043e\u043d\u043a\u0443\u0440\u0435\u043d\u0442\u043d\u0456 \u0446\u0456\u043d\u0438.    <br\/><br\/>\u041a\u0440\u0456\u043c \u0442\u043e\u0433\u043e, \u0437\u0430\u0432\u0434\u044f\u043a\u0438 \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u0456\u0439 \u0433\u043d\u0443\u0447\u043a\u043e\u0441\u0442\u0456, \u044f\u043a\u0443 \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0443\u0454 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e, \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u0457 \u043c\u043e\u0436\u0443\u0442\u044c \u0448\u0432\u0438\u0434\u043a\u043e \u0430\u0434\u0430\u043f\u0442\u0443\u0432\u0430\u0442\u0438\u0441\u044f \u0434\u043e \u043c\u0456\u043d\u043b\u0438\u0432\u0438\u0445 \u043f\u043e\u0442\u0440\u0435\u0431 \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432.\n\u0411\u0443\u0434\u044c \u0442\u043e \u043c\u043e\u0434\u0438\u0444\u0456\u043a\u0430\u0446\u0456\u044f \u0445\u0430\u0440\u0430\u043a\u0442\u0435\u0440\u0438\u0441\u0442\u0438\u043a \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0443 \u0430\u0431\u043e \u0442\u0435\u0440\u043c\u0456\u043d\u043e\u0432\u0435 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f, \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0456 \u043f\u0440\u043e\u0446\u0435\u0441\u0438 \u0434\u043e\u0437\u0432\u043e\u043b\u044f\u044e\u0442\u044c \u0431\u0435\u0437\u043f\u0435\u0440\u0435\u0448\u043a\u043e\u0434\u043d\u043e \u0432\u043d\u043e\u0441\u0438\u0442\u0438 \u0442\u0430\u043a\u0456 \u0437\u043c\u0456\u043d\u0438.\n\u0422\u0430\u043a\u0430 \u0433\u043d\u0443\u0447\u043a\u0456\u0441\u0442\u044c \u0437\u0431\u0435\u0440\u0456\u0433\u0430\u0454 \u0437\u0430\u0434\u043e\u0432\u043e\u043b\u0435\u043d\u0456\u0441\u0442\u044c \u043d\u0438\u043d\u0456\u0448\u043d\u0456\u0445 \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432 \u0456 \u0440\u043e\u0431\u0438\u0442\u044c \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044e \u0431\u0456\u043b\u044c\u0448 \u043f\u0440\u0438\u0432\u0430\u0431\u043b\u0438\u0432\u043e\u044e \u0434\u043b\u044f \u043f\u043e\u0442\u0435\u043d\u0446\u0456\u0439\u043d\u0438\u0445 \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-ff570909 gb-headline-text\">\u041f\u043e\u043a\u0440\u0430\u0449\u0435\u043d\u0430 \u044f\u043a\u0456\u0441\u0442\u044c<\/h4>\n\n\n\n<p>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0454 \u0441\u0438\u043d\u043e\u043d\u0456\u043c\u043e\u043c \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u044f\u043a\u043e\u0441\u0442\u0456.\n\u0412\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u044e\u0447\u0438 \u0442\u0430\u043a\u0456 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438, \u044f\u043a \u0430\u043d\u0430\u043b\u0456\u0437 \u043f\u0435\u0440\u0448\u043e\u043f\u0440\u0438\u0447\u0438\u043d \u0456 \u043a\u043e\u043d\u0442\u0440\u043e\u043b\u044c \u044f\u043a\u043e\u0441\u0442\u0456 \u043d\u0430 \u043a\u043e\u0436\u043d\u043e\u043c\u0443 \u0435\u0442\u0430\u043f\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u043f\u0440\u043e\u0446\u0435\u0441\u0443, Lean \u0433\u0430\u0440\u0430\u043d\u0442\u0443\u0454, \u0449\u043e \u0434\u0435\u0444\u0435\u043a\u0442\u0438 \u0431\u0443\u0434\u0443\u0442\u044c \u0443\u0441\u0443\u043d\u0435\u043d\u0456 \u0430\u0431\u043e \u0432\u0438\u044f\u0432\u043b\u0435\u043d\u0456 \u043d\u0430 \u0440\u0430\u043d\u043d\u0456\u0445 \u0441\u0442\u0430\u0434\u0456\u044f\u0445, \u043f\u0435\u0440\u0448 \u043d\u0456\u0436 \u0432\u043e\u043d\u0438 \u0441\u0442\u0430\u043d\u0443\u0442\u044c \u0437\u0430\u043d\u0430\u0434\u0442\u043e \u0434\u043e\u0440\u043e\u0433\u0438\u043c\u0438.\n\u0411\u0435\u0437\u043f\u0435\u0440\u0435\u0440\u0432\u043d\u0435 \u0432\u0434\u043e\u0441\u043a\u043e\u043d\u0430\u043b\u0435\u043d\u043d\u044f, \u0449\u043e \u0454 \u043d\u0430\u0440\u0456\u0436\u043d\u0438\u043c \u043a\u0430\u043c\u0435\u043d\u0435\u043c Lean, \u0442\u0430\u043a\u043e\u0436 \u0433\u0430\u0440\u0430\u043d\u0442\u0443\u0454, \u0449\u043e \u043f\u0440\u043e\u0446\u0435\u0441\u0438 \u043f\u043e\u0441\u0442\u0456\u0439\u043d\u043e \u0440\u043e\u0437\u0432\u0438\u0432\u0430\u044e\u0442\u044c\u0441\u044f \u0456 \u0430\u0434\u0430\u043f\u0442\u0443\u044e\u0442\u044c\u0441\u044f, \u0449\u043e\u0431 \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u0442\u0438 \u043d\u0430\u0439\u0432\u0438\u0449\u0438\u043c \u0441\u0442\u0430\u043d\u0434\u0430\u0440\u0442\u0430\u043c \u044f\u043a\u043e\u0441\u0442\u0456.    <br\/><br\/>\u041f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u044f\u043a\u043e\u0441\u0442\u0456 \u043d\u0435 \u043b\u0438\u0448\u0435 \u0437\u043c\u0435\u043d\u0448\u0443\u0454 \u0432\u0438\u0442\u0440\u0430\u0442\u0438, \u043f\u043e\u0432&#8217;\u044f\u0437\u0430\u043d\u0456 \u0437 \u0431\u0440\u0430\u043a\u043e\u043c \u0456 \u043f\u0435\u0440\u0435\u0440\u043e\u0431\u043a\u043e\u044e, \u0430\u043b\u0435 \u0439 \u0437\u043c\u0456\u0446\u043d\u044e\u0454 \u0440\u0435\u043f\u0443\u0442\u0430\u0446\u0456\u044e \u0431\u0440\u0435\u043d\u0434\u0443 \u043d\u0430 \u0440\u0438\u043d\u043a\u0443.\n\u041a\u043e\u043c\u043f\u0430\u043d\u0456\u044f, \u0432\u0456\u0434\u043e\u043c\u0430 \u0442\u0438\u043c, \u0449\u043e \u0432\u0438\u0440\u043e\u0431\u043b\u044f\u0454 \u0432\u0438\u0441\u043e\u043a\u043e\u044f\u043a\u0456\u0441\u043d\u0443 \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u044e, \u0448\u0432\u0438\u0434\u0448\u0435 \u0437\u0430 \u0432\u0441\u0435, \u043f\u0440\u0438\u0432\u0435\u0440\u043d\u0435 \u0431\u0456\u043b\u044c\u0448\u0435 \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432 \u0456 \u0447\u0430\u0441\u0442\u043e \u043c\u043e\u0436\u0435 \u0432\u0438\u043c\u0430\u0433\u0430\u0442\u0438 \u043f\u0440\u0435\u043c\u0456\u0430\u043b\u044c\u043d\u0443 \u0446\u0456\u043d\u0443 \u0437\u0430 \u0441\u0432\u043e\u044e \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u044e, \u0449\u043e \u043c\u043e\u0436\u0435 \u0441\u0443\u0442\u0442\u0454\u0432\u043e \u0432\u043f\u043b\u0438\u043d\u0443\u0442\u0438 \u043d\u0430 \u0444\u0456\u043d\u0430\u043d\u0441\u043e\u0432\u0438\u0439 \u0440\u0435\u0437\u0443\u043b\u044c\u0442\u0430\u0442. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-412aa6c4 gb-headline-text\">\u041f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u043c\u043e\u0440\u0430\u043b\u044c\u043d\u043e\u0433\u043e \u0434\u0443\u0445\u0443 \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0456\u0432  <\/h4>\n\n\n\n<p>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0437\u0430\u043b\u0443\u0447\u0430\u0454 \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0456\u0432 \u043d\u0430 \u0432\u0441\u0456\u0445 \u0440\u0456\u0432\u043d\u044f\u0445.\n\u041d\u0430\u0434\u0430\u043d\u043d\u044f \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0430\u043c \u043c\u043e\u0436\u043b\u0438\u0432\u043e\u0441\u0442\u0456 \u0431\u0440\u0430\u0442\u0438 \u0443\u0447\u0430\u0441\u0442\u044c \u0443 \u0432\u0438\u0440\u0456\u0448\u0435\u043d\u043d\u0456 \u043f\u0440\u043e\u0431\u043b\u0435\u043c \u0456 \u0437\u0430\u043e\u0445\u043e\u0447\u0435\u043d\u043d\u044f \u0457\u0445 \u0434\u043e \u0432\u043d\u0435\u0441\u0435\u043d\u043d\u044f \u043f\u0440\u043e\u043f\u043e\u0437\u0438\u0446\u0456\u0439 \u0449\u043e\u0434\u043e \u0432\u0434\u043e\u0441\u043a\u043e\u043d\u0430\u043b\u0435\u043d\u043d\u044f \u0434\u043e\u0437\u0432\u043e\u043b\u044f\u0454 \u0457\u043c \u0432\u0456\u0434\u0447\u0443\u0442\u0438, \u0449\u043e \u0457\u0445 \u0446\u0456\u043d\u0443\u044e\u0442\u044c \u0456 \u0449\u043e \u0432\u043e\u043d\u0438 \u0454 \u043d\u0435\u0432\u0456\u0434&#8217;\u0454\u043c\u043d\u043e\u044e \u0447\u0430\u0441\u0442\u0438\u043d\u043e\u044e \u043e\u0440\u0433\u0430\u043d\u0456\u0437\u0430\u0446\u0456\u0457.\n\u0422\u0430\u043a\u0435 \u0432\u0456\u0434\u0447\u0443\u0442\u0442\u044f \u043f\u0440\u0438\u0447\u0435\u0442\u043d\u043e\u0441\u0442\u0456 \u0442\u0430 \u0432\u043d\u0435\u0441\u043a\u0443 \u043f\u0440\u0438\u0437\u0432\u043e\u0434\u0438\u0442\u044c \u0434\u043e \u0431\u0456\u043b\u044c\u0448\u043e\u0457 \u0437\u0430\u0434\u043e\u0432\u043e\u043b\u0435\u043d\u043e\u0441\u0442\u0456 \u0440\u043e\u0431\u043e\u0442\u043e\u044e.\n\u041a\u0440\u0456\u043c \u0442\u043e\u0433\u043e, \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0447\u0430\u0441\u0442\u043e \u043f\u0440\u0438\u0437\u0432\u043e\u0434\u0438\u0442\u044c \u0434\u043e \u0441\u0442\u0432\u043e\u0440\u0435\u043d\u043d\u044f \u0431\u0456\u043b\u044c\u0448 \u0431\u0435\u0437\u043f\u0435\u0447\u043d\u043e\u0433\u043e \u0442\u0430 \u043e\u0440\u0433\u0430\u043d\u0456\u0437\u043e\u0432\u0430\u043d\u043e\u0433\u043e \u0440\u043e\u0431\u043e\u0447\u043e\u0433\u043e \u0441\u0435\u0440\u0435\u0434\u043e\u0432\u0438\u0449\u0430.     <br\/><br\/>\u0417\u0430\u0432\u0434\u044f\u043a\u0438 \u0442\u0430\u043a\u0438\u043c \u043f\u0440\u0430\u043a\u0442\u0438\u043a\u0430\u043c, \u044f\u043a 5S, \u0440\u043e\u0431\u043e\u0447\u0456 \u043c\u0456\u0441\u0446\u044f \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u044e\u0442\u044c\u0441\u044f \u0432 \u0447\u0438\u0441\u0442\u043e\u0442\u0456 \u0442\u0430 \u043f\u043e\u0440\u044f\u0434\u043a\u0443, \u0449\u043e \u043f\u0456\u0434\u0432\u0438\u0449\u0443\u0454 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0456 \u0441\u043f\u0440\u0438\u044f\u0454 \u0434\u043e\u0431\u0440\u043e\u0431\u0443\u0442\u0443 \u0441\u043f\u0456\u0432\u0440\u043e\u0431\u0456\u0442\u043d\u0438\u043a\u0456\u0432.\n\u041c\u043e\u0442\u0438\u0432\u043e\u0432\u0430\u043d\u0430 \u0456 \u0437\u0430\u0434\u043e\u0432\u043e\u043b\u0435\u043d\u0430 \u0440\u043e\u0431\u043e\u0447\u0430 \u0441\u0438\u043b\u0430 \u0454 \u0431\u0456\u043b\u044c\u0448 \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u044e \u0456 \u043c\u0435\u043d\u0448 \u0441\u0445\u0438\u043b\u044c\u043d\u043e\u044e \u0434\u043e \u043f\u043b\u0438\u043d\u043d\u043e\u0441\u0442\u0456 \u043a\u0430\u0434\u0440\u0456\u0432, \u0449\u043e \u0441\u043f\u0440\u0438\u044f\u0442\u043b\u0438\u0432\u043e \u0432\u043f\u043b\u0438\u0432\u0430\u0454 \u043d\u0430 \u0434\u043e\u0432\u0433\u043e\u0441\u0442\u0440\u043e\u043a\u043e\u0432\u0438\u0439 \u0443\u0441\u043f\u0456\u0445 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u0457. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6636b964 gb-headline-text\">\u0411\u0456\u043b\u044c\u0448\u0430 \u0433\u043d\u0443\u0447\u043a\u0456\u0441\u0442\u044c<\/h4>\n\n\n\n<p>\u0423 \u0434\u0438\u043d\u0430\u043c\u0456\u0447\u043d\u043e\u043c\u0443 \u0440\u0438\u043d\u043a\u043e\u0432\u043e\u043c\u0443 \u0441\u0435\u0440\u0435\u0434\u043e\u0432\u0438\u0449\u0456 \u0433\u043d\u0443\u0447\u043a\u0456\u0441\u0442\u044c \u043c\u0430\u0454 \u0432\u0438\u0440\u0456\u0448\u0430\u043b\u044c\u043d\u0435 \u0437\u043d\u0430\u0447\u0435\u043d\u043d\u044f \u0434\u043b\u044f \u0432\u0438\u0436\u0438\u0432\u0430\u043d\u043d\u044f \u0442\u0430 \u0437\u0440\u043e\u0441\u0442\u0430\u043d\u043d\u044f.\n\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e, \u043d\u0430\u0433\u043e\u043b\u043e\u0448\u0443\u044e\u0447\u0438 \u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0442\u0430 \u0437\u043c\u0435\u043d\u0448\u0435\u043d\u043d\u0456 \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432, \u0437\u0430 \u0441\u0432\u043e\u0454\u044e \u0441\u0443\u0442\u0442\u044e \u0441\u043f\u0440\u0438\u044f\u0454 \u0433\u043d\u0443\u0447\u043a\u043e\u0441\u0442\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u043f\u0440\u043e\u0446\u0435\u0441\u0443.\n\u0417\u0430\u0432\u0434\u044f\u043a\u0438 \u0442\u0430\u043a\u0438\u043c \u043f\u0440\u0430\u043a\u0442\u0438\u043a\u0430\u043c, \u044f\u043a \u041a\u0430\u043d\u0431\u0430\u043d \u0456 \u043a\u043e\u043c\u0456\u0440\u043a\u043e\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e, \u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0434\u043e\u0437\u0432\u043e\u043b\u044f\u0454 \u0448\u0432\u0438\u0434\u043a\u043e \u043f\u0435\u0440\u0435\u043d\u0430\u043b\u0430\u0448\u0442\u043e\u0432\u0443\u0432\u0430\u0442\u0438\u0441\u044f \u0442\u0430 \u0430\u0434\u0430\u043f\u0442\u0443\u0432\u0430\u0442\u0438\u0441\u044f \u0434\u043e \u0440\u0456\u0437\u043d\u0438\u0445 \u043e\u0431\u0441\u044f\u0433\u0456\u0432 \u0456 \u0430\u0441\u043e\u0440\u0442\u0438\u043c\u0435\u043d\u0442\u0443 \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u0457.    <br\/><br\/>\u0426\u044f \u0433\u043d\u0443\u0447\u043a\u0456\u0441\u0442\u044c \u043d\u0435 \u043e\u0431\u043c\u0435\u0436\u0443\u0454\u0442\u044c\u0441\u044f \u043b\u0438\u0448\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u043c \u0446\u0435\u0445\u043e\u043c.\n\u041a\u043e\u043b\u0438 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u043c\u0438\u0441\u043b\u0435\u043d\u043d\u044f \u043f\u0440\u043e\u043d\u0438\u0437\u0443\u0454 \u0432\u0441\u044e \u043e\u0440\u0433\u0430\u043d\u0456\u0437\u0430\u0446\u0456\u044e, \u0432\u043e\u043d\u043e \u043c\u043e\u0436\u0435 \u043f\u0440\u0438\u0437\u0432\u0435\u0441\u0442\u0438 \u0434\u043e \u0433\u043d\u0443\u0447\u043a\u043e\u0457 \u0440\u043e\u0437\u0440\u043e\u0431\u043a\u0438 \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0456\u0432, \u0443\u043f\u0440\u0430\u0432\u043b\u0456\u043d\u043d\u044f \u043b\u0430\u043d\u0446\u044e\u0436\u043a\u0430\u043c\u0438 \u043f\u043e\u0441\u0442\u0430\u0432\u043e\u043a \u0456 \u043f\u0440\u043e\u0446\u0435\u0441\u0430\u043c\u0438 \u043e\u0431\u0441\u043b\u0443\u0433\u043e\u0432\u0443\u0432\u0430\u043d\u043d\u044f \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432.\n\u0412 \u0435\u043f\u043e\u0445\u0443, \u043a\u043e\u043b\u0438 \u0456\u043d\u0434\u0438\u0432\u0456\u0434\u0443\u0430\u043b\u0456\u0437\u0430\u0446\u0456\u044f \u0442\u0430 \u0448\u0432\u0438\u0434\u043a\u0438\u0439 \u0447\u0430\u0441 \u0440\u0435\u0430\u0433\u0443\u0432\u0430\u043d\u043d\u044f \u0447\u0430\u0441\u0442\u043e \u0454 \u043a\u043e\u043d\u043a\u0443\u0440\u0435\u043d\u0442\u043d\u043e\u044e \u043f\u0435\u0440\u0435\u0432\u0430\u0433\u043e\u044e, \u0433\u043d\u0443\u0447\u043a\u0456\u0441\u0442\u044c, \u044f\u043a\u0443 \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0443\u0454 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e, \u0454 \u0431\u0435\u0437\u0446\u0456\u043d\u043d\u043e\u044e.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-52484489 gb-headline-text\">\u0415\u043a\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0435 \u0443\u043f\u0440\u0430\u0432\u043b\u0456\u043d\u043d\u044f  <\/h4>\n\n\n\n<p>\u0412 \u0435\u043f\u043e\u0445\u0443, \u043a\u043e\u043b\u0438 \u0435\u043a\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0430 \u0441\u0432\u0456\u0434\u043e\u043c\u0456\u0441\u0442\u044c \u0454 \u043d\u0435 \u043f\u0440\u043e\u0441\u0442\u043e \u0442\u0440\u0435\u043d\u0434\u043e\u043c, \u0430 \u043d\u0435\u043e\u0431\u0445\u0456\u0434\u043d\u0456\u0441\u0442\u044e, \u043c\u0435\u0442\u043e\u0434 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u043f\u0440\u043e\u043f\u043e\u043d\u0443\u0454 \u0448\u043b\u044f\u0445 \u0434\u043e \u0441\u0442\u0430\u043b\u043e\u0433\u043e \u0440\u043e\u0437\u0432\u0438\u0442\u043a\u0443.\n\u041c\u0456\u043d\u0456\u043c\u0456\u0437\u0443\u044e\u0447\u0438 \u0432\u0456\u0434\u0445\u043e\u0434\u0438 \u0443 \u0432\u0438\u0433\u043b\u044f\u0434\u0456 \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0456\u0432, \u0432\u0438\u043a\u0438\u0434\u0456\u0432 \u0430\u0431\u043e \u0435\u043d\u0435\u0440\u0433\u0456\u0457, Lean \u0441\u043f\u0440\u0438\u044f\u0454 \u0437\u043c\u0435\u043d\u0448\u0435\u043d\u043d\u044e \u0432\u043f\u043b\u0438\u0432\u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u043f\u0440\u043e\u0446\u0435\u0441\u0443 \u043d\u0430 \u043d\u0430\u0432\u043a\u043e\u043b\u0438\u0448\u043d\u0454 \u0441\u0435\u0440\u0435\u0434\u043e\u0432\u0438\u0449\u0435.\n\u041a\u0440\u0456\u043c \u0442\u043e\u0433\u043e, \u0431\u0430\u0433\u0430\u0442\u043e \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0456\u0432 \u0456 \u043c\u0435\u0442\u043e\u0434\u0456\u0432 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u044e\u0442\u044c \u043f\u0440\u0438\u043d\u0446\u0438\u043f\u0430\u043c &#8220;\u0437\u0435\u043b\u0435\u043d\u043e\u0433\u043e&#8221; \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430.    <br\/><br\/>\u041d\u0430\u043f\u0440\u0438\u043a\u043b\u0430\u0434, \u043a\u0430\u0440\u0442\u0443\u0432\u0430\u043d\u043d\u044f \u043b\u0430\u043d\u0446\u044e\u0436\u043a\u0430 \u0441\u0442\u0432\u043e\u0440\u0435\u043d\u043d\u044f \u0432\u0430\u0440\u0442\u043e\u0441\u0442\u0456 \u043c\u043e\u0436\u043d\u0430 \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0432\u0430\u0442\u0438 \u0434\u043b\u044f \u0432\u0438\u044f\u0432\u043b\u0435\u043d\u043d\u044f \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432 \u0456 \u0442\u043e\u0447\u043d\u043e\u0433\u043e \u0432\u0438\u0437\u043d\u0430\u0447\u0435\u043d\u043d\u044f \u0441\u0444\u0435\u0440, \u0434\u0435 \u043c\u043e\u0436\u043d\u0430 \u0441\u043a\u043e\u0440\u043e\u0442\u0438\u0442\u0438 \u0441\u043f\u043e\u0436\u0438\u0432\u0430\u043d\u043d\u044f \u0435\u043d\u0435\u0440\u0433\u0456\u0457 \u0430\u0431\u043e \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0443\u0432\u0430\u0442\u0438 \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u043d\u043d\u044f \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0456\u0432 \u0434\u043b\u044f \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0435\u043d\u043d\u044f \u0441\u0442\u0430\u043b\u043e\u0433\u043e \u0440\u043e\u0437\u0432\u0438\u0442\u043a\u0443.\n\u0422\u0430\u043a\u0435 \u0443\u0437\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f \u0437 \u0435\u043a\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0438\u043c \u043c\u0435\u043d\u0435\u0434\u0436\u043c\u0435\u043d\u0442\u043e\u043c \u0434\u043e\u043f\u043e\u043c\u0430\u0433\u0430\u0454 \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u0442\u0438 \u043d\u043e\u0440\u043c\u0430\u0442\u0438\u0432\u043d\u0438\u043c \u0432\u0438\u043c\u043e\u0433\u0430\u043c \u0456 \u043f\u0440\u0438\u0432\u0430\u0431\u043b\u044e\u0454 \u0437\u0440\u043e\u0441\u0442\u0430\u044e\u0447\u0438\u0439 \u0441\u0435\u0433\u043c\u0435\u043d\u0442 \u0435\u043a\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u043e \u0441\u0432\u0456\u0434\u043e\u043c\u0438\u0445 \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-2a35ba75 gb-headline-text\">\u041a\u043e\u043d\u043a\u0443\u0440\u0435\u043d\u0442\u043d\u0430 \u043f\u0435\u0440\u0435\u0432\u0430\u0433\u0430<\/h4>\n\n\n\n<p>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0441\u043f\u0440\u0438\u044f\u0454 \u0441\u0442\u0432\u043e\u0440\u0435\u043d\u043d\u044e \u0432\u0435\u043b\u0438\u0447\u0435\u0437\u043d\u043e\u0457 \u043a\u043e\u043d\u043a\u0443\u0440\u0435\u043d\u0442\u043d\u043e\u0457 \u043f\u0435\u0440\u0435\u0432\u0430\u0433\u0438 \u0437\u0430\u0432\u0434\u044f\u043a\u0438 \u0441\u0432\u043e\u0457\u043c \u0440\u0456\u0437\u043d\u043e\u043c\u0430\u043d\u0456\u0442\u043d\u0438\u043c \u043f\u0435\u0440\u0435\u0432\u0430\u0433\u0430\u043c, \u0442\u0430\u043a\u0438\u043c \u044f\u043a \u0437\u043d\u0438\u0436\u0435\u043d\u043d\u044f \u0432\u0438\u0442\u0440\u0430\u0442, \u043f\u043e\u043a\u0440\u0430\u0449\u0435\u043d\u043d\u044f \u044f\u043a\u043e\u0441\u0442\u0456, \u0437\u0430\u0434\u043e\u0432\u043e\u043b\u0435\u043d\u043d\u044f \u043f\u043e\u0442\u0440\u0435\u0431 \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432 \u0442\u0430 \u0433\u043d\u0443\u0447\u043a\u0456\u0441\u0442\u044c.\n\u0426\u0435 \u043c\u043e\u0436\u0435 \u0431\u0443\u0442\u0438 \u0440\u0456\u0437\u043d\u0438\u0446\u0435\u044e \u043c\u0456\u0436 \u043f\u0440\u043e\u0446\u0432\u0456\u0442\u0430\u043d\u043d\u044f\u043c \u0456 \u0432\u0438\u0436\u0438\u0432\u0430\u043d\u043d\u044f\u043c \u043d\u0430 \u0433\u043b\u043e\u0431\u0430\u043b\u0456\u0437\u043e\u0432\u0430\u043d\u043e\u043c\u0443 \u0440\u0438\u043d\u043a\u0443.   <br\/><br\/>\u0411\u0456\u043b\u044c\u0448\u0435 \u0442\u043e\u0433\u043e, \u043a\u043e\u043b\u0438 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u043c\u0438\u0441\u043b\u0435\u043d\u043d\u044f \u043f\u043e\u0447\u0438\u043d\u0430\u0454 \u0444\u043e\u0440\u043c\u0443\u0432\u0430\u0442\u0438 \u043e\u0440\u0433\u0430\u043d\u0456\u0437\u0430\u0446\u0456\u0439\u043d\u0443 \u043a\u0443\u043b\u044c\u0442\u0443\u0440\u0443, \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u0457 \u0447\u0430\u0441\u0442\u043e \u0432\u0438\u044f\u0432\u043b\u044f\u044e\u0442\u044c, \u0449\u043e \u0432\u043e\u043d\u0438 \u043c\u0430\u044e\u0442\u044c \u043a\u0440\u0430\u0449\u0456 \u043f\u043e\u0437\u0438\u0446\u0456\u0457 \u0434\u043b\u044f \u0456\u043d\u043d\u043e\u0432\u0430\u0446\u0456\u0439.\n\u041f\u043e\u0441\u0442\u0456\u0439\u043d\u0435 \u043f\u0440\u0430\u0433\u043d\u0435\u043d\u043d\u044f \u0434\u043e \u0432\u0434\u043e\u0441\u043a\u043e\u043d\u0430\u043b\u0435\u043d\u043d\u044f \u0442\u0430 \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456, \u0430 \u0442\u0430\u043a\u043e\u0436 \u0437\u0430\u043b\u0443\u0447\u0435\u043d\u0456\u0441\u0442\u044c \u0456 \u0440\u043e\u0437\u0448\u0438\u0440\u0435\u043d\u043d\u044f \u043f\u0440\u0430\u0432 \u0456 \u043c\u043e\u0436\u043b\u0438\u0432\u043e\u0441\u0442\u0435\u0439 \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0456\u0432 \u0441\u0442\u0432\u043e\u0440\u044e\u044e\u0442\u044c \u0441\u0435\u0440\u0435\u0434\u043e\u0432\u0438\u0449\u0435, \u0434\u0435 \u043f\u0440\u043e\u0446\u0432\u0456\u0442\u0430\u044e\u0442\u044c \u043d\u043e\u0432\u0456 \u0456\u0434\u0435\u0457.\n\u0426\u044f \u0437\u0434\u0430\u0442\u043d\u0456\u0441\u0442\u044c \u0434\u043e \u0456\u043d\u043d\u043e\u0432\u0430\u0446\u0456\u0439 \u0449\u0435 \u0431\u0456\u043b\u044c\u0448\u0435 \u0437\u043c\u0456\u0446\u043d\u044e\u0454 \u043a\u043e\u043d\u043a\u0443\u0440\u0435\u043d\u0442\u043d\u0443 \u043f\u0435\u0440\u0435\u0432\u0430\u0433\u0443, \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0443\u044e\u0447\u0438 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u0457 \u043b\u0456\u0434\u0435\u0440\u0441\u0442\u0432\u043e \u0443 \u0441\u0432\u043e\u0457\u0439 \u0433\u0430\u043b\u0443\u0437\u0456.  <\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">\u0417\u0430\u0441\u0442\u0435\u0440\u0435\u0436\u0435\u043d\u043d\u044f \u0449\u043e\u0434\u043e \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430<\/h2>\n\n\n\n<p>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e &#8211; \u0446\u0435 \u043f\u043e\u0442\u0443\u0436\u043d\u0438\u0439 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442, \u0430\u043b\u0435 \u0446\u0435 \u043d\u0435 \u0443\u043d\u0456\u0432\u0435\u0440\u0441\u0430\u043b\u044c\u043d\u0435 \u0440\u0456\u0448\u0435\u043d\u043d\u044f.\n\u0412\u043e\u043d\u043e \u0432\u0438\u043c\u0430\u0433\u0430\u0454 \u0433\u043b\u0438\u0431\u043e\u043a\u043e\u0433\u043e \u0440\u043e\u0437\u0443\u043c\u0456\u043d\u043d\u044f \u0442\u0430 \u0440\u0435\u0442\u0435\u043b\u044c\u043d\u043e\u0433\u043e \u0432\u043f\u0440\u043e\u0432\u0430\u0434\u0436\u0435\u043d\u043d\u044f. <br\/><br\/>\u041c\u0435\u0442\u043e\u0434\u043e\u043b\u043e\u0433\u0456\u044f \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u043c\u043e\u0436\u0435 \u0431\u0443\u0442\u0438 \u043c\u0435\u043d\u0448 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u044e \u0432 \u0433\u0430\u043b\u0443\u0437\u044f\u0445 \u0437 \u0432\u0438\u0441\u043e\u043a\u0438\u043c \u0440\u0456\u0432\u043d\u0435\u043c \u043a\u0430\u0441\u0442\u043e\u043c\u0456\u0437\u0430\u0446\u0456\u0457 \u0442\u0430 \u043c\u0456\u043d\u043b\u0438\u0432\u043e\u0441\u0442\u0456.\n\u041a\u0440\u0456\u043c \u0442\u043e\u0433\u043e, \u0432\u043e\u043d\u0430 \u043c\u043e\u0436\u0435 \u0431\u0443\u0442\u0438 \u043d\u0435\u043f\u0440\u0438\u0434\u0430\u0442\u043d\u043e\u044e \u0434\u043b\u044f \u0434\u0440\u0456\u0431\u043d\u043e\u0441\u0435\u0440\u0456\u0439\u043d\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u0406\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438, \u044f\u043a\u0456 \u0434\u043e\u043f\u043e\u0432\u043d\u044e\u044e\u0442\u044c \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Value Stream Mapping (VSM)<\/strong>: \u0406\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442 \u0434\u043b\u044f \u0432\u0456\u0437\u0443\u0430\u043b\u0456\u0437\u0430\u0446\u0456\u0457 \u043f\u043e\u0442\u043e\u043a\u0443 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0456\u0432 \u0442\u0430 \u0456\u043d\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u0457.<\/li>\n\n\n\n<li><strong>\u041a\u0430\u0439\u0434\u0437\u0435\u043d<\/strong>: \u0421\u0442\u0440\u0430\u0442\u0435\u0433\u0456\u044f \u0437\u0430\u043b\u0443\u0447\u0435\u043d\u043d\u044f \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0456\u0432 \u0443\u0441\u0456\u0445 \u0440\u0456\u0432\u043d\u0456\u0432 \u0434\u043e \u043f\u043e\u0441\u0442\u0456\u0439\u043d\u043e\u0433\u043e \u0432\u0434\u043e\u0441\u043a\u043e\u043d\u0430\u043b\u0435\u043d\u043d\u044f.<\/li>\n\n\n\n<li><strong>\u0421\u0438\u0441\u0442\u0435\u043c\u0430 5S<\/strong>: \u041c\u0435\u0442\u043e\u0434 \u043e\u0440\u0433\u0430\u043d\u0456\u0437\u0430\u0446\u0456\u0457 \u0440\u043e\u0431\u043e\u0447\u043e\u0433\u043e \u043c\u0456\u0441\u0446\u044f, \u044f\u043a\u0438\u0439 \u043f\u0456\u0434\u0432\u0438\u0449\u0443\u0454 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c.<\/li>\n\n\n\n<li><strong>\u041a\u0430\u043d\u0431\u0430\u043d<\/strong>: \u0406\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0434\u043b\u044f \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0442\u0430 \u0432\u0447\u0430\u0441\u043d\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430.<\/li>\n\n\n\n<li><strong>Total Productive Maintenance (TPM)<\/strong>: \u041f\u0440\u043e\u0433\u0440\u0430\u043c\u0430 \u043f\u0440\u043e\u0430\u043a\u0442\u0438\u0432\u043d\u043e\u0433\u043e \u0442\u0435\u0445\u043d\u0456\u0447\u043d\u043e\u0433\u043e \u043e\u0431\u0441\u043b\u0443\u0433\u043e\u0432\u0443\u0432\u0430\u043d\u043d\u044f, \u044f\u043a\u0430 \u0440\u043e\u0431\u0438\u0442\u044c \u0430\u043a\u0446\u0435\u043d\u0442 \u043d\u0430 \u043d\u0430\u0434\u0456\u0439\u043d\u043e\u0441\u0442\u0456 \u043e\u0431\u043b\u0430\u0434\u043d\u0430\u043d\u043d\u044f.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">\u0412\u0438\u0433\u0440\u0430\u0448\u043d\u0430 \u043a\u043e\u043c\u0431\u0456\u043d\u0430\u0446\u0456\u044f<\/h2>\n\n\n\n<p>\u0420\u043e\u0437\u0448\u0438\u0440\u044e\u0439\u0442\u0435 \u043c\u043e\u0436\u043b\u0438\u0432\u043e\u0441\u0442\u0456 \u0441\u0432\u043e\u0457\u0445 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432, \u0440\u043e\u0431\u043b\u044f\u0447\u0438 \u0440\u043e\u0437\u0443\u043c\u043d\u0456 \u0456\u043d\u0432\u0435\u0441\u0442\u0438\u0446\u0456\u0457 \u0432 \u0441\u0438\u0441\u0442\u0435\u043c\u0443 APS \u0432\u0456\u0434 Skyplanner, \u0434\u043e\u043f\u043e\u0432\u043d\u0435\u043d\u0443 \u043f\u0440\u0438\u043d\u0446\u0438\u043f\u0430\u043c\u0438 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430.\n\u0421\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u0439\u0442\u0435\u0441\u044f \u043f\u0435\u0440\u0435\u0432\u0430\u0433\u0430\u043c\u0438 \u0437\u043d\u0438\u0436\u0435\u043d\u043d\u044f \u0432\u0438\u0442\u0440\u0430\u0442, \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0442\u0430 \u0433\u043d\u0443\u0447\u043a\u043e\u0457, \u043e\u043f\u0435\u0440\u0430\u0442\u0438\u0432\u043d\u043e\u0457 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0457 \u043b\u0456\u043d\u0456\u0457, \u044f\u043a\u0430 \u0443\u043d\u0438\u043a\u0430\u0454 \u0432\u0443\u0437\u044c\u043a\u0438\u0445 \u043c\u0456\u0441\u0446\u044c \u0456 \u043f\u0440\u043e\u0446\u0432\u0456\u0442\u0430\u0454 \u0432 \u0441\u0443\u0447\u0430\u0441\u043d\u043e\u043c\u0443 \u043a\u043e\u043d\u043a\u0443\u0440\u0435\u043d\u0442\u043d\u043e\u043c\u0443 \u0441\u0435\u0440\u0435\u0434\u043e\u0432\u0438\u0449\u0456.\n\u041d\u0430\u0441\u0442\u0430\u0432 \u0447\u0430\u0441 \u0437\u0440\u043e\u0431\u0438\u0442\u0438 \u043a\u0440\u043e\u043a \u043d\u0430\u0437\u0443\u0441\u0442\u0440\u0456\u0447 \u0456 \u0440\u0435\u0432\u043e\u043b\u044e\u0446\u0456\u043e\u043d\u0456\u0437\u0443\u0432\u0430\u0442\u0438 \u0441\u0432\u043e\u0454 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0435 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f.\n\u041e\u043f\u0438\u0440\u0430\u0439\u0442\u0435\u0441\u044f \u043d\u0430 \u0443\u0441\u043f\u0456\u0445 \u0437 APS \u0442\u0430 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0438\u043c \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e\u043c \u043d\u0430 \u0432\u0430\u0448\u043e\u043c\u0443 \u0431\u043e\u0446\u0456!   <br\/><br\/>\u041d\u0430\u0448\u0430 <a href=\"\/uk\/%d0%b7%d0%b2%d1%8f%d0%b6%d1%96%d1%82%d1%8c%d1%81%d1%8f-%d0%b7-%d0%b2%d1%96%d0%b4%d0%b4%d1%96%d0%bb%d0%be%d0%bc-%d0%bf%d1%80%d0%be%d0%b4%d0%b0%d0%b6%d1%96%d0%b2\/\">\u043a\u043e\u043c\u0430\u043d\u0434\u0430 \u0435\u043a\u0441\u043f\u0435\u0440\u0442\u0456\u0432 <\/a>\u0433\u043e\u0442\u043e\u0432\u0430 \u0434\u043e\u043f\u043e\u043c\u043e\u0433\u0442\u0438 \u0432\u0430\u043c \u043d\u0430 \u0448\u043b\u044f\u0445\u0443 \u0434\u043e \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430.\n\u0417\u0432 <a href=\"\/uk\/\">&#8216; <\/a>\u044f\u0436\u0456\u0442\u044c\u0441\u044f \u0437 \u043d\u0430\u043c\u0438 \u0442\u0430 <a href=\"\/uk\/\">\u0434\u0456\u0437\u043d\u0430\u0439\u0442\u0435\u0441\u044f \u043f\u0440\u043e \u043f\u0435\u0440\u0435\u0432\u0430\u0433\u0438 APS \u0432\u0456\u0434 Skyplanner. <\/a>  <\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-609c09fb wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner \u0420\u043e\u0437\u0448\u0438\u0440\u0435\u043d\u0435 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0442\u0430 \u0434\u0438\u0441\u043f\u0435\u0442\u0447\u0435\u0440\u0438\u0437\u0430\u0446\u0456\u044f \u0420\u0456\u0448\u0435\u043d\u043d\u044f \u0434\u043b\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u043f\u0440\u043e\u0431\u043b\u0435\u043c\" class=\"uag-image-4232\" width=\"1024\" height=\"302\" title=\"\" loading=\"lazy\" role=\"img\"><\/figure><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">\u041f\u041e\u0428\u0418\u0420\u0415\u041d\u0406 \u0417\u0410\u041f\u0418\u0422\u0410\u041d\u041d\u042f<\/h2>\n\n\n\n<p>\u0423 \u0446\u044c\u043e\u043c\u0443 \u0440\u043e\u0437\u0434\u0456\u043b\u0456 \u0432\u0438 \u0437\u043d\u0430\u0439\u0434\u0435\u0442\u0435 \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0456 \u043d\u0430 \u043d\u0430\u0439\u043f\u043e\u0448\u0438\u0440\u0435\u043d\u0456\u0448\u0456 \u0437\u0430\u043f\u0438\u0442\u0430\u043d\u043d\u044f \u0449\u043e\u0434\u043e \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0442\u0430 \u0434\u0456\u0437\u043d\u0430\u0454\u0442\u0435\u0441\u044c, \u044f\u043a \u0441\u0438\u0441\u0442\u0435\u043c\u0430 \u0440\u043e\u0437\u0448\u0438\u0440\u0435\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f Skyplanner \u043c\u043e\u0436\u0435 \u043f\u043e\u043a\u0440\u0430\u0449\u0438\u0442\u0438 \u0432\u0430\u0448 \u0431\u0456\u0437\u043d\u0435\u0441.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-2e079e79 gb-headline-text\">\u0429\u043e \u0442\u0430\u043a\u0435 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e?&nbsp;<\/h4>\n\n\n\n<p>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e &#8211; \u0446\u0435 \u0441\u0438\u0441\u0442\u0435\u043c\u043d\u0438\u0439 \u043f\u0456\u0434\u0445\u0456\u0434, \u0441\u043f\u0440\u044f\u043c\u043e\u0432\u0430\u043d\u0438\u0439 \u043d\u0430 \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456, \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0442\u0430 \u0446\u0456\u043d\u043d\u043e\u0441\u0442\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432.\n\u0417\u043e\u0441\u0435\u0440\u0435\u0434\u0436\u0443\u044e\u0447\u0438\u0441\u044c \u043d\u0430 \u043c\u0456\u043d\u0456\u043c\u0456\u0437\u0430\u0446\u0456\u0457 \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432 \u043f\u0440\u0438 \u0437\u0431\u0435\u0440\u0435\u0436\u0435\u043d\u043d\u0456 \u0432\u0438\u0441\u043e\u043a\u043e\u0457 \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456, \u0446\u0435\u0439 \u043c\u0435\u0442\u043e\u0434 \u0432\u043f\u043e\u0440\u044f\u0434\u043a\u043e\u0432\u0443\u0454 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457 \u0456 \u043c\u043e\u0436\u0435 \u043f\u0440\u0438\u0437\u0432\u0435\u0441\u0442\u0438 \u0434\u043e \u0437\u0431\u0456\u043b\u044c\u0448\u0435\u043d\u043d\u044f \u043f\u0440\u0438\u0431\u0443\u0442\u043a\u0443. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-80c52ee6 gb-headline-text\">\u0427\u0438\u043c \u0446\u0435\u0439 \u043c\u0435\u0442\u043e\u0434 \u0432\u0456\u0434\u0440\u0456\u0437\u043d\u044f\u0454\u0442\u044c\u0441\u044f \u0432\u0456\u0434 Just-In-Time?<\/h4>\n\n\n\n<p>\u0425\u043e\u0447\u0430 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0442\u0430 &#8220;\u0442\u043e\u0447\u043d\u043e \u0432 \u0441\u0442\u0440\u043e\u043a&#8221; (JIT) \u043c\u0430\u044e\u0442\u044c \u043d\u0430 \u043c\u0435\u0442\u0456 \u0437\u043c\u0435\u043d\u0448\u0438\u0442\u0438 \u0432\u0456\u0434\u0445\u043e\u0434\u0438, \u0432\u043e\u043d\u0438 \u0432\u0456\u0434\u0440\u0456\u0437\u043d\u044f\u044e\u0442\u044c\u0441\u044f.\nJIT \u0432 \u043e\u0441\u043d\u043e\u0432\u043d\u043e\u043c\u0443 \u0444\u043e\u043a\u0443\u0441\u0443\u0454\u0442\u044c\u0441\u044f \u043d\u0430 \u0441\u043a\u043e\u0440\u043e\u0447\u0435\u043d\u043d\u0456 \u0437\u0430\u043f\u0430\u0441\u0456\u0432 \u0456 \u043f\u043e\u043b\u0456\u043f\u0448\u0435\u043d\u043d\u0456 \u043f\u043e\u0442\u043e\u043a\u0443 \u0442\u043e\u0432\u0430\u0440\u0456\u0432.\n\u0417 \u0456\u043d\u0448\u043e\u0433\u043e \u0431\u043e\u043a\u0443, \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0454 \u0448\u0438\u0440\u0448\u0438\u0439 \u043f\u0456\u0434\u0445\u0456\u0434, \u0449\u043e \u043e\u0445\u043e\u043f\u043b\u044e\u0454 \u0432\u0441\u0456 \u0430\u0441\u043f\u0435\u043a\u0442\u0438 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u043f\u0440\u043e\u0446\u0435\u0441\u0443, \u0432\u043a\u043b\u044e\u0447\u0430\u044e\u0447\u0438 \u0443\u043f\u0440\u0430\u0432\u043b\u0456\u043d\u043d\u044f \u043f\u0435\u0440\u0441\u043e\u043d\u0430\u043b\u043e\u043c \u0456 \u0432\u0456\u0434\u043d\u043e\u0441\u0438\u043d\u0438 \u0437 \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043b\u044c\u043d\u0438\u043a\u0430\u043c\u0438.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-9c325e9d gb-headline-text\">\u0427\u0438 \u043c\u043e\u0436\u0435 Lean-\u043c\u0435\u0442\u043e\u0434 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u0432\u0430\u0442\u0438 \u0441\u0442\u0430\u043b\u0438\u0439 \u0440\u043e\u0437\u0432\u0438\u0442\u043e\u043a \u0442\u0430 \u0435\u043a\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0456 \u0456\u043d\u0456\u0446\u0456\u0430\u0442\u0438\u0432\u0438?<\/h4>\n\n\n\n<p>\u0422\u0430\u043a, \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u043c\u043e\u0436\u0435 \u0441\u043f\u0440\u0438\u044f\u0442\u0438 \u0441\u0442\u0430\u043b\u043e\u043c\u0443 \u0440\u043e\u0437\u0432\u0438\u0442\u043a\u0443, \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0443\u044e\u0447\u0438 \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u043d\u043d\u044f \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432 \u0442\u0430 \u0437\u043c\u0435\u043d\u0448\u0443\u044e\u0447\u0438 \u0432\u0456\u0434\u0445\u043e\u0434\u0438.\n\u0426\u0435 \u043c\u0430\u0454 \u0435\u043a\u043e\u043d\u043e\u043c\u0456\u0447\u043d\u0443 \u0432\u0438\u0433\u043e\u0434\u0443 \u0456 \u0434\u043e\u043f\u043e\u043c\u0430\u0433\u0430\u0454 \u0437\u043c\u0435\u043d\u0448\u0438\u0442\u0438 \u0432\u043f\u043b\u0438\u0432 \u043d\u0430 \u0434\u043e\u0432\u043a\u0456\u043b\u043b\u044f, \u0442\u0430\u043a\u0438\u043c \u0447\u0438\u043d\u043e\u043c \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u044e\u0447\u0438 \u0435\u043a\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0456 \u0456\u043d\u0456\u0446\u0456\u0430\u0442\u0438\u0432\u0438. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-b34cc3f5 gb-headline-text\">\u042f\u043a\u0443 \u0440\u043e\u043b\u044c \u0432\u0456\u0434\u0456\u0433\u0440\u0430\u0454 \u0441\u0438\u0441\u0442\u0435\u043c\u0430 \u0432\u0434\u043e\u0441\u043a\u043e\u043d\u0430\u043b\u0435\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0442\u0430 \u0434\u0438\u0441\u043f\u0435\u0442\u0447\u0435\u0440\u0438\u0437\u0430\u0446\u0456\u0457 (APS) \u0432 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u043c\u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0456?&nbsp;<\/h4>\n\n\n\n<p>\u0421\u0438\u0441\u0442\u0435\u043c\u0438 APS \u043c\u0430\u044e\u0442\u044c \u0432\u0430\u0436\u043b\u0438\u0432\u0435 \u0437\u043d\u0430\u0447\u0435\u043d\u043d\u044f \u0434\u043b\u044f \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430, \u043e\u0441\u043a\u0456\u043b\u044c\u043a\u0438 \u0432\u043e\u043d\u0438 \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0443\u044e\u0442\u044c \u0431\u0435\u0437\u043f\u0435\u0440\u0435\u0431\u0456\u0439\u043d\u0438\u0439 \u043f\u043e\u0442\u0456\u043a \u0456\u043d\u0444\u043e\u0440\u043c\u0430\u0446\u0456\u0457, \u0449\u043e \u0454 \u043a\u0440\u0438\u0442\u0438\u0447\u043d\u043e \u0432\u0430\u0436\u043b\u0438\u0432\u0438\u043c \u0434\u043b\u044f \u043f\u0440\u0438\u0439\u043d\u044f\u0442\u0442\u044f \u0448\u0432\u0438\u0434\u043a\u0438\u0445 \u0456 \u043e\u0431\u0491\u0440\u0443\u043d\u0442\u043e\u0432\u0430\u043d\u0438\u0445 \u0440\u0456\u0448\u0435\u043d\u044c.\n\u0426\u0435 \u0432\u0430\u0436\u043b\u0438\u0432\u043e \u0432 \u0441\u0435\u0440\u0435\u0434\u043e\u0432\u0438\u0449\u0456 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430, \u0434\u0435 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0456 \u043c\u0456\u043d\u0456\u043c\u0456\u0437\u0430\u0446\u0456\u044f \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432 \u0454 \u043a\u043b\u044e\u0447\u043e\u0432\u0438\u043c\u0438 \u0444\u0430\u043a\u0442\u043e\u0440\u0430\u043c\u0438. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-123a7395 gb-headline-text\">\u042f\u043a\u0456 \u0432\u0456\u0441\u0456\u043c \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432 \u0456\u0441\u043d\u0443\u044e\u0442\u044c \u0432 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u043c\u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0456?<\/h4>\n\n\n\n<p>\u0412\u0456\u0441\u0456\u043c \u0432\u0442\u0440\u0430\u0442 &#8211; \u0446\u0435 \u0434\u0435\u0444\u0435\u043a\u0442\u0438, \u043f\u0435\u0440\u0435\u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e, \u043e\u0447\u0456\u043a\u0443\u0432\u0430\u043d\u043d\u044f, \u043d\u0435\u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u043d\u043d\u044f \u0442\u0430\u043b\u0430\u043d\u0442\u0456\u0432, \u0442\u0440\u0430\u043d\u0441\u043f\u043e\u0440\u0442\u0443\u0432\u0430\u043d\u043d\u044f, \u0456\u043d\u0432\u0435\u043d\u0442\u0430\u0440\u0438\u0437\u0430\u0446\u0456\u044f, \u0440\u0443\u0445 \u0456 \u043d\u0430\u0434\u043b\u0438\u0448\u043a\u043e\u0432\u0430 \u043e\u0431\u0440\u043e\u0431\u043a\u0430.\n\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0441\u043f\u0440\u044f\u043c\u043e\u0432\u0430\u043d\u0435 \u043d\u0430 \u0432\u0438\u044f\u0432\u043b\u0435\u043d\u043d\u044f \u0442\u0430 \u0443\u0441\u0443\u043d\u0435\u043d\u043d\u044f \u0446\u0438\u0445 \u0432\u0442\u0440\u0430\u0442 \u0434\u043b\u044f \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-9b054b0c gb-headline-text\">\u042f\u043a Lean-\u043f\u0456\u0434\u0445\u0456\u0434 \u043f\u0456\u0434\u0432\u0438\u0449\u0443\u0454 \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c?<\/h4>\n\n\n\n<p>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u043f\u0456\u0434\u0432\u0438\u0449\u0443\u0454 \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0437\u0430 \u0440\u0430\u0445\u0443\u043d\u043e\u043a \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0430\u0446\u0456\u0457 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432 \u0442\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0433\u043e \u0440\u043e\u0437\u043f\u043e\u0434\u0456\u043b\u0443 \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432.\n\u0417\u0430\u0432\u0434\u044f\u043a\u0438 \u0441\u043a\u043e\u0440\u043e\u0447\u0435\u043d\u043d\u044e \u0447\u0430\u0441\u0443 \u043e\u0447\u0456\u043a\u0443\u0432\u0430\u043d\u043d\u044f \u0442\u0430 \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0435\u043d\u043d\u044e \u0431\u0435\u0437\u043f\u0435\u0440\u0435\u0431\u0456\u0439\u043d\u043e\u0433\u043e \u043f\u043e\u0442\u043e\u043a\u0443 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0456\u0432 \u043c\u043e\u0436\u043d\u0430 \u0432\u0438\u0440\u043e\u0431\u043b\u044f\u0442\u0438 \u0431\u0456\u043b\u044c\u0448\u0435 \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u0457 \u0437\u0430 \u0442\u043e\u0439 \u0441\u0430\u043c\u0438\u0439 \u043f\u0440\u043e\u043c\u0456\u0436\u043e\u043a \u0447\u0430\u0441\u0443, \u0449\u043e \u0432 \u043a\u0456\u043d\u0446\u0435\u0432\u043e\u043c\u0443 \u043f\u0456\u0434\u0441\u0443\u043c\u043a\u0443 \u0437\u0431\u0456\u043b\u044c\u0448\u0443\u0454 \u043f\u0440\u043e\u0434\u0430\u0436\u0456. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-58136507 gb-headline-text\">\u042f\u043a\u0438\u043c \u0447\u0438\u043d\u043e\u043c \u0446\u044f \u043c\u0435\u0442\u043e\u0434\u043e\u043b\u043e\u0433\u0456\u044f \u0441\u043f\u0440\u0438\u044f\u0454 \u0437\u043d\u0438\u0436\u0435\u043d\u043d\u044e \u0432\u0438\u0442\u0440\u0430\u0442?<\/h4>\n\n\n\n<p>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0437\u043c\u0435\u043d\u0448\u0443\u0454 \u0432\u0438\u0442\u0440\u0430\u0442\u0438 \u0437\u0430 \u0440\u0430\u0445\u0443\u043d\u043e\u043a \u0441\u043a\u043e\u0440\u043e\u0447\u0435\u043d\u043d\u044f \u0440\u0456\u0437\u043d\u0438\u0445 \u0444\u043e\u0440\u043c \u0432\u0456\u0434\u0445\u043e\u0434\u0456\u0432 \u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0456.\n\u0426\u0435 \u0432\u043a\u043b\u044e\u0447\u0430\u0454 \u0432 \u0441\u0435\u0431\u0435 \u0441\u043a\u043e\u0440\u043e\u0447\u0435\u043d\u043d\u044f \u043f\u0435\u0440\u0435\u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430, \u0434\u0435\u0444\u0435\u043a\u0442\u0456\u0432, \u043d\u0435\u043f\u043e\u0442\u0440\u0456\u0431\u043d\u0438\u0445 \u043f\u0435\u0440\u0435\u043c\u0456\u0449\u0435\u043d\u044c \u0456 \u0442\u0440\u0430\u043d\u0441\u043f\u043e\u0440\u0442\u0443\u0432\u0430\u043d\u043d\u044f.\n\u041e\u043f\u0442\u0438\u043c\u0456\u0437\u0430\u0446\u0456\u044f \u0440\u0456\u0432\u043d\u044f \u0437\u0430\u043f\u0430\u0441\u0456\u0432 \u0442\u0430 \u0441\u043f\u0440\u0438\u044f\u043d\u043d\u044f \u0435\u043d\u0435\u0440\u0433\u043e\u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0438\u043c \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u044f\u043c \u0442\u0430\u043a\u043e\u0436 \u0441\u043f\u0440\u0438\u044f\u044e\u0442\u044c \u0437\u043d\u0438\u0436\u0435\u043d\u043d\u044e \u0432\u0438\u0442\u0440\u0430\u0442.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-dfbeae82 gb-headline-text\">\u042f\u043a Lean-\u043c\u0435\u0442\u043e\u0434\u043e\u043b\u043e\u0433\u0456\u044f \u043f\u0456\u0434\u0432\u0438\u0449\u0443\u0454 \u0437\u0430\u0434\u043e\u0432\u043e\u043b\u0435\u043d\u0456\u0441\u0442\u044c \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432?<\/h4>\n\n\n\n<p>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0444\u043e\u043a\u0443\u0441\u0443\u0454\u0442\u044c\u0441\u044f \u043d\u0430 \u0441\u0442\u0432\u043e\u0440\u0435\u043d\u043d\u0456 \u0446\u0456\u043d\u043d\u043e\u0441\u0442\u0456 \u0434\u043b\u044f \u043a\u043b\u0456\u0454\u043d\u0442\u0430 \u0437\u0430\u0432\u0434\u044f\u043a\u0438 \u0432\u0438\u0441\u043e\u043a\u043e\u044f\u043a\u0456\u0441\u043d\u0456\u0439 \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u0457, \u0441\u0432\u043e\u0454\u0447\u0430\u0441\u043d\u0438\u043c \u043f\u043e\u0441\u0442\u0430\u0432\u043a\u0430\u043c \u0442\u0430 \u0435\u043a\u043e\u043d\u043e\u043c\u0456\u0457 \u0432\u0438\u0442\u0440\u0430\u0442, \u044f\u043a\u0443 \u043c\u043e\u0436\u043d\u0430 \u043f\u0435\u0440\u0435\u0434\u0430\u0442\u0438 \u0447\u0435\u0440\u0435\u0437 \u043a\u043e\u043d\u043a\u0443\u0440\u0435\u043d\u0442\u043d\u0456 \u0446\u0456\u043d\u0438.\n\u0426\u0435 \u0442\u0430\u043a\u043e\u0436 \u0434\u043e\u0437\u0432\u043e\u043b\u044f\u0454 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f\u043c \u0448\u0432\u0438\u0434\u043a\u043e \u0430\u0434\u0430\u043f\u0442\u0443\u0432\u0430\u0442\u0438\u0441\u044f \u0434\u043e \u043c\u0456\u043d\u043b\u0438\u0432\u0438\u0445 \u043f\u043e\u0442\u0440\u0435\u0431 \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4a3a3b72 gb-headline-text\">\u042f\u043a \u0446\u0435\u0439 \u043c\u0435\u0442\u043e\u0434 \u0432\u043f\u043b\u0438\u0432\u0430\u0454 \u043d\u0430 \u043c\u043e\u0440\u0430\u043b\u044c\u043d\u0438\u0439 \u0434\u0443\u0445 \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0456\u0432?<\/h4>\n\n\n\n<p>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0437\u0430\u043b\u0443\u0447\u0430\u0454 \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0456\u0432 \u043d\u0430 \u0432\u0441\u0456\u0445 \u0440\u0456\u0432\u043d\u044f\u0445 \u0456 \u0434\u0430\u0454 \u0457\u043c \u043c\u043e\u0436\u043b\u0438\u0432\u0456\u0441\u0442\u044c \u0431\u0440\u0430\u0442\u0438 \u0443\u0447\u0430\u0441\u0442\u044c \u0443 \u0432\u0438\u0440\u0456\u0448\u0435\u043d\u043d\u0456 \u043f\u0440\u043e\u0431\u043b\u0435\u043c \u0456 \u043f\u043e\u0441\u0442\u0456\u0439\u043d\u043e\u043c\u0443 \u0432\u0434\u043e\u0441\u043a\u043e\u043d\u0430\u043b\u0435\u043d\u043d\u0456.\n\u0422\u0430\u043a\u0435 \u0432\u0456\u0434\u0447\u0443\u0442\u0442\u044f \u043f\u0440\u0438\u0447\u0435\u0442\u043d\u043e\u0441\u0442\u0456 \u0442\u0430 \u0432\u043d\u0435\u0441\u043a\u0443 \u043f\u0440\u0438\u0437\u0432\u043e\u0434\u0438\u0442\u044c \u0434\u043e \u0431\u0456\u043b\u044c\u0448\u043e\u0457 \u0437\u0430\u0434\u043e\u0432\u043e\u043b\u0435\u043d\u043e\u0441\u0442\u0456 \u0440\u043e\u0431\u043e\u0442\u043e\u044e \u0442\u0430 \u0431\u0456\u043b\u044c\u0448 \u043c\u043e\u0442\u0438\u0432\u043e\u0432\u0430\u043d\u043e\u0457 \u0440\u043e\u0431\u043e\u0447\u043e\u0457 \u0441\u0438\u043b\u0438. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-af2e5b69 gb-headline-text\">\u0427\u0438 \u0456\u0441\u043d\u0443\u044e\u0442\u044c \u044f\u043a\u0456\u0441\u044c \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u043d\u044f \u0434\u043b\u044f \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430?&nbsp;<\/h4>\n\n\n\n<p>\u0422\u0430\u043a, \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u043c\u043e\u0436\u0435 \u043d\u0435 \u043f\u0456\u0434\u0445\u043e\u0434\u0438\u0442\u0438 \u0434\u043b\u044f \u0433\u0430\u043b\u0443\u0437\u0435\u0439 \u0437 \u0432\u0438\u0441\u043e\u043a\u043e\u044e \u0456\u043d\u0434\u0438\u0432\u0456\u0434\u0443\u0430\u043b\u0456\u0437\u0430\u0446\u0456\u0454\u044e \u0442\u0430 \u0432\u0430\u0440\u0456\u0430\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044e \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u0457 \u0430\u0431\u043e \u0432 \u0443\u043c\u043e\u0432\u0430\u0445 \u0434\u0440\u0456\u0431\u043d\u043e\u0441\u0435\u0440\u0456\u0439\u043d\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430.\n\u0429\u043e\u0431 \u0431\u0443\u0442\u0438 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0438\u043c, \u0432\u043e\u043d\u043e \u0432\u0438\u043c\u0430\u0433\u0430\u0454 \u0433\u043b\u0438\u0431\u043e\u043a\u043e\u0433\u043e \u0440\u043e\u0437\u0443\u043c\u0456\u043d\u043d\u044f \u0442\u0430 \u0440\u0435\u0442\u0435\u043b\u044c\u043d\u043e\u0433\u043e \u0432\u043f\u0440\u043e\u0432\u0430\u0434\u0436\u0435\u043d\u043d\u044f. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-83f424c3 gb-headline-text\">\u042f\u043a\u0456 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438 \u0434\u043e\u043f\u043e\u0432\u043d\u044e\u044e\u0442\u044c \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e?<\/h4>\n\n\n\n<p>\u0414\u0435\u044f\u043a\u0456 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438, \u044f\u043a\u0456 \u0434\u043e\u043f\u043e\u0432\u043d\u044e\u044e\u0442\u044c \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e, \u0432\u043a\u043b\u044e\u0447\u0430\u044e\u0442\u044c \u043a\u0430\u0440\u0442\u0443\u0432\u0430\u043d\u043d\u044f \u043f\u043e\u0442\u043e\u043a\u0456\u0432 \u0441\u0442\u0432\u043e\u0440\u0435\u043d\u043d\u044f \u0432\u0430\u0440\u0442\u043e\u0441\u0442\u0456, \u043a\u0430\u0439\u0434\u0437\u0435\u043d, \u0441\u0438\u0441\u0442\u0435\u043c\u0443 5S, \u043a\u0430\u043d\u0431\u0430\u043d \u0456 \u0442\u043e\u0442\u0430\u043b\u044c\u043d\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0435 \u043e\u0431\u0441\u043b\u0443\u0433\u043e\u0432\u0443\u0432\u0430\u043d\u043d\u044f (TPM).<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-bde88add gb-headline-text\">\u042f\u043a \u0442\u0430\u043a\u0438\u0439 \u043f\u0456\u0434\u0445\u0456\u0434 \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0443\u0454 \u043a\u043e\u043d\u043a\u0443\u0440\u0435\u043d\u0442\u043d\u0443 \u043f\u0435\u0440\u0435\u0432\u0430\u0433\u0443?&nbsp;<\/h4>\n\n\n\n<p>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0441\u0442\u0432\u043e\u0440\u044e\u0454 \u043a\u043e\u043d\u043a\u0443\u0440\u0435\u043d\u0442\u043d\u0443 \u043f\u0435\u0440\u0435\u0432\u0430\u0433\u0443 \u0437\u0430\u0432\u0434\u044f\u043a\u0438 \u0437\u043d\u0438\u0436\u0435\u043d\u043d\u044e \u0432\u0438\u0442\u0440\u0430\u0442, \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044e \u044f\u043a\u043e\u0441\u0442\u0456, \u0437\u0430\u0434\u043e\u0432\u043e\u043b\u0435\u043d\u043e\u0441\u0442\u0456 \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432 \u0442\u0430 \u0433\u043d\u0443\u0447\u043a\u043e\u0441\u0442\u0456.\n\u041a\u0440\u0456\u043c \u0442\u043e\u0433\u043e, \u0432\u043e\u043d\u043e \u0441\u043f\u0440\u0438\u044f\u0454 \u0441\u0442\u0432\u043e\u0440\u0435\u043d\u043d\u044e \u0441\u0435\u0440\u0435\u0434\u043e\u0432\u0438\u0449\u0430 \u0434\u043b\u044f \u0456\u043d\u043d\u043e\u0432\u0430\u0446\u0456\u0439 \u0442\u0430 \u0443\u0437\u0433\u043e\u0434\u0436\u0443\u0454\u0442\u044c\u0441\u044f \u0437 \u0435\u043a\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0438\u043c \u043c\u0435\u043d\u0435\u0434\u0436\u043c\u0435\u043d\u0442\u043e\u043c, \u043f\u043e\u0437\u0438\u0446\u0456\u043e\u043d\u0443\u044e\u0447\u0438 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044e \u0434\u043b\u044f \u0434\u043e\u0441\u044f\u0433\u043d\u0435\u043d\u043d\u044f \u0443\u0441\u043f\u0456\u0445\u0443 \u043d\u0430 \u0440\u0438\u043d\u043a\u0443. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-8a211508 gb-headline-text\">\u042f\u043a \u044f \u043c\u043e\u0436\u0443 \u0432\u0434\u043e\u0441\u043a\u043e\u043d\u0430\u043b\u0438\u0442\u0438 \u0441\u0432\u0456\u0439 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0439 \u043f\u0440\u043e\u0446\u0435\u0441, \u0449\u043e\u0431 \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u0442\u0438 \u0432\u0438\u043c\u043e\u0433\u0430\u043c \u0441\u0443\u0447\u0430\u0441\u043d\u043e\u0433\u043e \u043a\u043e\u043d\u043a\u0443\u0440\u0435\u043d\u0442\u043d\u043e\u0433\u043e \u0441\u0435\u0440\u0435\u0434\u043e\u0432\u0438\u0449\u0430?<\/h4>\n\n\n\n<p>\u0420\u043e\u0437\u0448\u0438\u0440\u0435\u043d\u043d\u044f \u043c\u043e\u0436\u043b\u0438\u0432\u043e\u0441\u0442\u0435\u0439 \u0432\u0430\u0448\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u043f\u0440\u043e\u0446\u0435\u0441\u0443 \u0437\u0430\u0432\u0434\u044f\u043a\u0438 \u0441\u0442\u0440\u0430\u0442\u0435\u0433\u0456\u0447\u043d\u0438\u043c \u0456\u043d\u0432\u0435\u0441\u0442\u0438\u0446\u0456\u044f\u043c \u0443 \u0441\u0438\u0441\u0442\u0435\u043c\u0443 \u0432\u0434\u043e\u0441\u043a\u043e\u043d\u0430\u043b\u0435\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0442\u0430 \u0441\u043a\u043b\u0430\u0434\u0430\u043d\u043d\u044f \u0440\u043e\u0437\u043a\u043b\u0430\u0434\u0456\u0432 Skyplanner (APS) \u0442\u0430 \u043f\u0440\u0438\u043d\u0446\u0438\u043f\u0438 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430.\n\u0426\u044f \u043a\u043e\u043c\u0431\u0456\u043d\u0430\u0446\u0456\u044f \u043f\u043e\u043a\u043b\u0438\u043a\u0430\u043d\u0430 \u043c\u043e\u0434\u0435\u0440\u043d\u0456\u0437\u0443\u0432\u0430\u0442\u0438 \u0432\u0430\u0448\u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0443 \u043b\u0456\u043d\u0456\u044e, \u0437\u0440\u043e\u0431\u0438\u0432\u0448\u0438 \u0457\u0457 \u0433\u043d\u0443\u0447\u043a\u043e\u044e \u0442\u0430 \u0448\u0432\u0438\u0434\u043a\u043e\u044e \u0443 \u0440\u0435\u0430\u0433\u0443\u0432\u0430\u043d\u043d\u0456, \u0449\u043e \u0434\u043e\u0437\u0432\u043e\u043b\u0438\u0442\u044c \u0443\u043d\u0438\u043a\u043d\u0443\u0442\u0438 \u0432\u0443\u0437\u044c\u043a\u0438\u0445 \u043c\u0456\u0441\u0446\u044c.\n\u0412\u0438 \u043e\u0442\u0440\u0438\u043c\u0430\u0454\u0442\u0435 \u0432\u0438\u0433\u043e\u0434\u0443 \u0432\u0456\u0434 \u0437\u043d\u0438\u0436\u0435\u043d\u043d\u044f \u0432\u0438\u0442\u0440\u0430\u0442 \u0456 \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456, \u0449\u043e \u0454 \u043a\u0440\u0438\u0442\u0438\u0447\u043d\u043e \u0432\u0430\u0436\u043b\u0438\u0432\u0438\u043c\u0438 \u0434\u043b\u044f \u043f\u0440\u043e\u0446\u0432\u0456\u0442\u0430\u043d\u043d\u044f \u0432 \u0441\u0443\u0447\u0430\u0441\u043d\u043e\u043c\u0443 \u043a\u043e\u043d\u043a\u0443\u0440\u0435\u043d\u0442\u043d\u043e\u043c\u0443 \u0441\u0435\u0440\u0435\u0434\u043e\u0432\u0438\u0449\u0456.\n\u0417\u0440\u043e\u0431\u0438\u0432\u0448\u0438 \u0446\u0435\u0439 \u043a\u0440\u043e\u043a, \u0432\u0438 \u0437\u0440\u043e\u0431\u0438\u0442\u0435 \u0440\u0435\u0432\u043e\u043b\u044e\u0446\u0456\u044e \u0443 \u0441\u0432\u043e\u0454\u043c\u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u043c\u0443 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u0456 \u0442\u0430 \u0441\u0442\u0430\u043d\u0435\u0442\u0435 \u043d\u0430 \u0448\u043b\u044f\u0445 \u0434\u043e \u0443\u0441\u043f\u0456\u0445\u0443.\n\u0429\u043e\u0431 \u043f\u043e\u0447\u0430\u0442\u0438 \u0456 \u0434\u0456\u0437\u043d\u0430\u0442\u0438\u0441\u044f \u0431\u0456\u043b\u044c\u0448\u0435 \u043f\u0440\u043e \u0442\u0435, \u044f\u043a \u0446\u0435 \u043c\u043e\u0436\u0435 \u0431\u0443\u0442\u0438 \u0430\u0434\u0430\u043f\u0442\u043e\u0432\u0430\u043d\u043e \u0434\u043e \u043a\u043e\u043d\u043a\u0440\u0435\u0442\u043d\u0438\u0445 \u043f\u043e\u0442\u0440\u0435\u0431 \u0432\u0430\u0448\u043e\u0457 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u0457, \u043d\u0435 \u0441\u043e\u0440\u043e\u043c\u0442\u0435\u0441\u044f \u0437\u0432\u0435\u0440\u0442\u0430\u0442\u0438\u0441\u044f \u0434\u043e \u043d\u0430\u0448\u043e\u0457 \u043a\u043e\u043c\u0430\u043d\u0434\u0438 \u0435\u043a\u0441\u043f\u0435\u0440\u0442\u0456\u0432 \u0437\u0430 \u043f\u043e\u0440\u0430\u0434\u0430\u043c\u0438 \u043d\u0430 \u0448\u043b\u044f\u0445\u0443 \u0434\u043e \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430!    <\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0413\u043e\u043b\u043e\u0432\u043d\u0430 &#8221; \u0420\u0435\u0441\u0443\u0440\u0441\u0438 &#8221; \u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0423\u044f\u0432\u0456\u0442\u044c \u0441\u043e\u0431\u0456: \u0412\u0430\u0448\u0430 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0430 \u043b\u0456\u043d\u0456\u044f \u0437\u0430\u0441\u0442\u0440\u044f\u0433\u043b\u0430. \u0417\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u043d\u0430\u043a\u043e\u043f\u0438\u0447\u0443\u044e\u0442\u044c\u0441\u044f. \u0412\u0456\u0434 \u0437\u0432\u0443\u043a\u0443 \u043c\u0430\u0448\u0438\u043d, \u0449\u043e \u0437\u0443\u043f\u0438\u043d\u044f\u044e\u0442\u044c\u0441\u044f, \u0443 \u0432\u0430\u0441 \u0431\u043e\u043b\u0438\u0442\u044c \u0433\u043e\u043b\u043e\u0432\u0430. \u0412\u0430\u0448\u0430 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f \u0441\u0442\u0438\u043a\u0430\u0454\u0442\u044c\u0441\u044f \u0437 \u0432\u0443\u0437\u044c\u043a\u0438\u043c\u0438 \u043c\u0456\u0441\u0446\u044f\u043c\u0438, \u044f\u043a\u0456 \u0437\u043d\u0438\u0436\u0443\u044e\u0442\u044c \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c. \u042f\u043a\u0449\u043e \u0446\u0435\u0439 \u0441\u0446\u0435\u043d\u0430\u0440\u0456\u0439 \u0437\u0432\u0443\u0447\u0438\u0442\u044c \u043d\u0430\u0434\u0442\u043e \u0437\u043d\u0430\u0439\u043e\u043c\u043e, \u0442\u043e \u0441\u0430\u043c\u0435 \u0447\u0430\u0441 \u043f\u043e\u0437\u043d\u0430\u0439\u043e\u043c\u0438\u0442\u0438\u0441\u044f \u0437 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0438\u043c \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e\u043c. TL;DR \u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e &#8211; &#8230; <a title=\"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/\" aria-label=\"Read more about \u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c\">\u0414\u043e\u043a\u043b\u0430\u0434\u043d\u0456\u0448\u0435<\/a><\/p>\n","protected":false},"author":6,"featured_media":39907,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2571,522],"tags":[],"class_list":["post-39906","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-2571","category-522","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e - \u0446\u0435 \u0441\u0438\u0441\u0442\u0435\u043c\u043d\u0438\u0439 \u043f\u0456\u0434\u0445\u0456\u0434, \u0441\u043f\u0440\u044f\u043c\u043e\u0432\u0430\u043d\u0438\u0439 \u043d\u0430 \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456, \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0442\u0430 \u0446\u0456\u043d\u043d\u043e\u0441\u0442\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/\" \/>\n<meta property=\"og:locale\" content=\"uk_UA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c\" \/>\n<meta property=\"og:description\" content=\"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e - \u0446\u0435 \u0441\u0438\u0441\u0442\u0435\u043c\u043d\u0438\u0439 \u043f\u0456\u0434\u0445\u0456\u0434, \u0441\u043f\u0440\u044f\u043c\u043e\u0432\u0430\u043d\u0438\u0439 \u043d\u0430 \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456, \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0442\u0430 \u0446\u0456\u043d\u043d\u043e\u0441\u0442\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-06-27T16:59:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T08:45:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u041d\u0430\u043f\u0438\u0441\u0430\u043d\u043e\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\\\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\\\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c\",\"datePublished\":\"2023-06-27T16:59:05+00:00\",\"dateModified\":\"2026-10-15T08:45:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\\\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\\\/\"},\"wordCount\":2301,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\\\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/LEAN-MANUFACTURING.png\",\"articleSection\":[\"\u0415\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430\",\"\u0420\u0435\u0441\u0443\u0440\u0441\u0438\"],\"inLanguage\":\"uk\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\\\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\\\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\\\/\",\"name\":\"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\\\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\\\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/LEAN-MANUFACTURING.png\",\"datePublished\":\"2023-06-27T16:59:05+00:00\",\"dateModified\":\"2026-10-15T08:45:47+00:00\",\"description\":\"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e - \u0446\u0435 \u0441\u0438\u0441\u0442\u0435\u043c\u043d\u0438\u0439 \u043f\u0456\u0434\u0445\u0456\u0434, \u0441\u043f\u0440\u044f\u043c\u043e\u0432\u0430\u043d\u0438\u0439 \u043d\u0430 \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456, \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0442\u0430 \u0446\u0456\u043d\u043d\u043e\u0441\u0442\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\\\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\\\/#breadcrumb\"},\"inLanguage\":\"uk\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\\\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"uk\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\\\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/LEAN-MANUFACTURING.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/06\\\/LEAN-MANUFACTURING.png\",\"width\":6000,\"height\":4000,\"caption\":\"Lean Manufacturing\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\\\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"uk\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"uk\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"uk\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c &#8211; SkyPlanner","description":"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e - \u0446\u0435 \u0441\u0438\u0441\u0442\u0435\u043c\u043d\u0438\u0439 \u043f\u0456\u0434\u0445\u0456\u0434, \u0441\u043f\u0440\u044f\u043c\u043e\u0432\u0430\u043d\u0438\u0439 \u043d\u0430 \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456, \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0442\u0430 \u0446\u0456\u043d\u043d\u043e\u0441\u0442\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/","og_locale":"uk_UA","og_type":"article","og_title":"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c","og_description":"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e - \u0446\u0435 \u0441\u0438\u0441\u0442\u0435\u043c\u043d\u0438\u0439 \u043f\u0456\u0434\u0445\u0456\u0434, \u0441\u043f\u0440\u044f\u043c\u043e\u0432\u0430\u043d\u0438\u0439 \u043d\u0430 \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456, \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0442\u0430 \u0446\u0456\u043d\u043d\u043e\u0441\u0442\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432.","og_url":"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/","og_site_name":"SkyPlanner","article_published_time":"2023-06-27T16:59:05+00:00","article_modified_time":"2026-10-15T08:45:47+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u041d\u0430\u043f\u0438\u0441\u0430\u043d\u043e":"SkyPlanner"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/uk\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c","datePublished":"2023-06-27T16:59:05+00:00","dateModified":"2026-10-15T08:45:47+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/"},"wordCount":2301,"publisher":{"@id":"https:\/\/skyplanner.ai\/uk\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING.png","articleSection":["\u0415\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430","\u0420\u0435\u0441\u0443\u0440\u0441\u0438"],"inLanguage":"uk"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/","url":"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/","name":"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING.png","datePublished":"2023-06-27T16:59:05+00:00","dateModified":"2026-10-15T08:45:47+00:00","description":"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e - \u0446\u0435 \u0441\u0438\u0441\u0442\u0435\u043c\u043d\u0438\u0439 \u043f\u0456\u0434\u0445\u0456\u0434, \u0441\u043f\u0440\u044f\u043c\u043e\u0432\u0430\u043d\u0438\u0439 \u043d\u0430 \u043f\u0456\u0434\u0432\u0438\u0449\u0435\u043d\u043d\u044f \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456, \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0442\u0430 \u0446\u0456\u043d\u043d\u043e\u0441\u0442\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/#breadcrumb"},"inLanguage":"uk","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/"]}]},{"@type":"ImageObject","inLanguage":"uk","@id":"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING.png","width":6000,"height":4000,"caption":"Lean Manufacturing"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/%d0%be%d1%89%d0%b0%d0%b4%d0%bb%d0%b8%d0%b2%d0%b5-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%be-%d1%80%d0%be%d0%b7%d0%b1%d0%bb%d0%be%d0%ba%d0%be%d0%b2%d0%b0%d0%bd%d0%b0-%d0%b5\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/uk\/"},{"@type":"ListItem","position":2,"name":"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/uk\/#website","url":"https:\/\/skyplanner.ai\/uk\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"uk"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/uk\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/uk\/","logo":{"@type":"ImageObject","inLanguage":"uk","@id":"https:\/\/skyplanner.ai\/uk\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/uk\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/uk\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"uk","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING.png",6000,4000,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/06\/LEAN-MANUFACTURING.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/uk\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"\u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0413\u043e\u043b\u043e\u0432\u043d\u0430 &#8221; \u0420\u0435\u0441\u0443\u0440\u0441\u0438 &#8221; \u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e: \u0420\u043e\u0437\u0431\u043b\u043e\u043a\u043e\u0432\u0430\u043d\u0430 \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0423\u044f\u0432\u0456\u0442\u044c \u0441\u043e\u0431\u0456: \u0412\u0430\u0448\u0430 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0430 \u043b\u0456\u043d\u0456\u044f \u0437\u0430\u0441\u0442\u0440\u044f\u0433\u043b\u0430. \u0417\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u043d\u0430\u043a\u043e\u043f\u0438\u0447\u0443\u044e\u0442\u044c\u0441\u044f. \u0412\u0456\u0434 \u0437\u0432\u0443\u043a\u0443 \u043c\u0430\u0448\u0438\u043d, \u0449\u043e \u0437\u0443\u043f\u0438\u043d\u044f\u044e\u0442\u044c\u0441\u044f, \u0443 \u0432\u0430\u0441 \u0431\u043e\u043b\u0438\u0442\u044c \u0433\u043e\u043b\u043e\u0432\u0430. \u0412\u0430\u0448\u0430 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f \u0441\u0442\u0438\u043a\u0430\u0454\u0442\u044c\u0441\u044f \u0437 \u0432\u0443\u0437\u044c\u043a\u0438\u043c\u0438 \u043c\u0456\u0441\u0446\u044f\u043c\u0438, \u044f\u043a\u0456 \u0437\u043d\u0438\u0436\u0443\u044e\u0442\u044c \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c. \u042f\u043a\u0449\u043e \u0446\u0435\u0439 \u0441\u0446\u0435\u043d\u0430\u0440\u0456\u0439 \u0437\u0432\u0443\u0447\u0438\u0442\u044c \u043d\u0430\u0434\u0442\u043e \u0437\u043d\u0430\u0439\u043e\u043c\u043e, \u0442\u043e \u0441\u0430\u043c\u0435 \u0447\u0430\u0441 \u043f\u043e\u0437\u043d\u0430\u0439\u043e\u043c\u0438\u0442\u0438\u0441\u044f \u0437 \u043e\u0449\u0430\u0434\u043b\u0438\u0432\u0438\u043c \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e\u043c. TL;DR \u041e\u0449\u0430\u0434\u043b\u0438\u0432\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e &#8211;&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/posts\/39906","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/comments?post=39906"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/posts\/39906\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/media\/39907"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/media?parent=39906"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/categories?post=39906"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/tags?post=39906"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}