{"id":106402,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/cegid\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"cegid","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/cegid\/","title":{"rendered":"SkyPlanner APS \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/\">\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457<\/a> \/ <a href=\"\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/\">ERP<\/a> \/ Cegid<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS \u0434\u043b\u044f Cegid: <span class=\"hl\">\u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">SkyPlanner APS \u2014 \u0446\u0435 \u0434\u043e\u043f\u043e\u0432\u043d\u0435\u043d\u043d\u044f \u0434\u043b\u044f \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0432 ERP-\u0441\u0438\u0441\u0442\u0435\u043c\u0430\u0445 Cegid, \u044f\u043a\u0435 \u0432\u0440\u0430\u0445\u043e\u0432\u0443\u0454 \u0440\u0435\u0430\u043b\u044c\u043d\u0456 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0456 \u043e\u0431\u043b\u0430\u0434\u043d\u0430\u043d\u043d\u044f \u0442\u0430 \u043f\u0435\u0440\u0441\u043e\u043d\u0430\u043b\u0443. \u041d\u0430\u0441\u0430\u043c\u043f\u0435\u0440\u0435\u0434 \u0432\u043e\u043d\u043e \u043f\u0440\u0438\u0437\u043d\u0430\u0447\u0435\u043d\u0435 \u0434\u043b\u044f Cegid PMI, \u0430 \u0442\u0430\u043a\u043e\u0436 \u0434\u043b\u044f Cegid Primavera \u0439 Cegid Ekon. \u0421\u0438\u0441\u0442\u0435\u043c\u0430 \u043f\u043b\u0430\u043d\u0443\u0454 \u0440\u043e\u0431\u043e\u0442\u0443 \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0430, \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0430 \u0439 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0430 \u0442\u0430 \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u043d\u043d\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0443. \u0412\u0438 \u0431\u0430\u0447\u0438\u0442\u0435, \u0434\u0435 \u0439 \u043a\u043e\u043b\u0438 \u0432\u0438\u043a\u043e\u043d\u0443\u0454\u0442\u044c\u0441\u044f \u043a\u043e\u0436\u043d\u0430 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0430 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f, \u0430 Autopilot \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0447\u043d\u043e \u043f\u0435\u0440\u0435\u0431\u0443\u0434\u043e\u0432\u0443\u0454 \u0433\u0440\u0430\u0444\u0456\u043a \u0443 \u0440\u0430\u0437\u0456 \u0437\u043c\u0456\u043d \u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0456.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/uk\/%d0%b2%d0%b8%d0%bf%d1%80%d0%be%d0%b1%d1%83%d0%b2%d0%b0%d0%bd%d0%bd%d1%8f\/\">\u0420\u043e\u0437\u043f\u043e\u0447\u0430\u0442\u0438 \u0431\u0435\u0437\u043a\u043e\u0448\u0442\u043e\u0432\u043d\u0438\u0439 \u043f\u0440\u043e\u0431\u043d\u0438\u0439 \u043f\u0435\u0440\u0456\u043e\u0434<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/uk\/%d0%b7%d0%b2%d1%8f%d0%b6%d1%96%d1%82%d1%8c%d1%81%d1%8f-%d0%b7-%d0%b2%d1%96%d0%b4%d0%b4%d1%96%d0%bb%d0%be%d0%bc-%d0%bf%d1%80%d0%be%d0%b4%d0%b0%d0%b6%d1%96%d0%b2\/\">\u0417\u0430\u043c\u043e\u0432\u0438\u0442\u0438 \u0434\u0435\u043c\u043e\u043d\u0441\u0442\u0440\u0430\u0446\u0456\u044e<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u041a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u0435 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0414\u0456\u0430\u0433\u0440\u0430\u043c\u0430 \u0413\u0430\u043d\u0442\u0430 \u0432 SkyPlanner APS \u0456\u0437 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u043c\u0438 \u0437\u0430\u0432\u0434\u0430\u043d\u043d\u044f\u043c\u0438, \u0440\u043e\u0437\u043f\u043e\u0434\u0456\u043b\u0435\u043d\u0438\u043c\u0438 \u043c\u0456\u0436 \u0440\u043e\u0431\u043e\u0447\u0438\u043c\u0438 \u0446\u0435\u043d\u0442\u0440\u0430\u043c\u0438, \u0442\u0430 \u0441\u043f\u0438\u0441\u043a\u043e\u043c \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u044c \u0443\u043d\u0438\u0437\u0443.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>SkyPlanner \u043e\u0431\u043c\u0456\u043d\u044e\u0454\u0442\u044c\u0441\u044f \u0434\u0430\u043d\u0438\u043c\u0438 \u0437 Cegid \u0432 \u043e\u0431\u043e\u0445 \u043d\u0430\u043f\u0440\u044f\u043c\u043a\u0430\u0445. \u0406\u0437 Cegid PMI \u043d\u0430\u0434\u0445\u043e\u0434\u044f\u0442\u044c \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f ordres de fabrication (OF) \u0437 \u0457\u0445\u043d\u0456\u043c\u0438 gammes, nomenclatures, postes de charge \u0442\u0430 machines, \u0430 \u0442\u0430\u043a\u043e\u0436 articles, \u0441\u043a\u043b\u0430\u0434\u0441\u044c\u043a\u0456 \u0437\u0430\u043b\u0438\u0448\u043a\u0438 \u0439 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043b\u044c\u043d\u0438\u043a\u0430\u043c. \u041d\u0430\u0437\u0430\u0434 \u043f\u0435\u0440\u0435\u0434\u0430\u044e\u0442\u044c\u0441\u044f \u043f\u043b\u0430\u043d\u043e\u0432\u0456 \u0434\u0430\u0442\u0438 \u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u0439 \u0437\u0430\u0432\u0435\u0440\u0448\u0435\u043d\u043d\u044f \u043a\u043e\u0436\u043d\u043e\u0457 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u043e\u0457 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457 OF, \u0430 \u0442\u0430\u043a\u043e\u0436 \u0437\u0430\u0440\u0435\u0454\u0441\u0442\u0440\u043e\u0432\u0430\u043d\u0438\u0439 \u0447\u0430\u0441 \u0443 \u0432\u0438\u0433\u043b\u044f\u0434\u0456 pointages. \u041f\u0456\u0434 \u0447\u0430\u0441 \u0432\u043f\u0440\u043e\u0432\u0430\u0434\u0436\u0435\u043d\u043d\u044f \u043a\u043e\u043c\u0430\u043d\u0434\u0430 SkyPlanner \u043d\u0430\u043b\u0430\u0448\u0442\u043e\u0432\u0443\u0454 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u043d\u043e \u0434\u043e \u0432\u0430\u0448\u043e\u0457 \u043a\u043e\u043d\u0444\u0456\u0433\u0443\u0440\u0430\u0446\u0456\u0457 Cegid.<\/p>\n\n\n<p>\u0412\u0430\u0440\u0442\u0456\u0441\u0442\u044c \u2014 \u0432\u0456\u0434 199 \u20ac \u043d\u0430 \u043c\u0456\u0441\u044f\u0446\u044c \u0437\u0430 5 \u0440\u043e\u0431\u043e\u0447\u0438\u0445 \u0446\u0435\u043d\u0442\u0440\u0456\u0432, \u0430 \u043a\u043e\u0436\u0435\u043d \u0434\u043e\u0434\u0430\u0442\u043a\u043e\u0432\u0438\u0439 \u0440\u043e\u0431\u043e\u0447\u0438\u0439 \u0446\u0435\u043d\u0442\u0440 \u043a\u043e\u0448\u0442\u0443\u0454 20 \u20ac \u043d\u0430 \u043c\u0456\u0441\u044f\u0446\u044c. \u0411\u0435\u0437\u043a\u043e\u0448\u0442\u043e\u0432\u043d\u0438\u0439 \u043f\u0440\u043e\u0431\u043d\u0438\u0439 \u043f\u0435\u0440\u0456\u043e\u0434 \u0442\u0440\u0438\u0432\u0430\u0454 30 \u0434\u043d\u0456\u0432 \u0456 \u0434\u0430\u0454 \u0437\u043c\u043e\u0433\u0443 \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0432\u0430\u0442\u0438 \u0434\u043e 20 \u0440\u043e\u0431\u043e\u0447\u0438\u0445 \u0446\u0435\u043d\u0442\u0440\u0456\u0432 \u0431\u0435\u0437 \u043a\u0440\u0435\u0434\u0438\u0442\u043d\u043e\u0457 \u043a\u0430\u0440\u0442\u043a\u0438.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0429\u043e \u0437\u043c\u0456\u043d\u0438\u0442\u044c\u0441\u044f \u0443 \u0432\u0430\u0448\u043e\u043c\u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0456<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0427\u0456\u0442\u043a\u0430 \u0447\u0435\u0440\u0433\u043e\u0432\u0456\u0441\u0442\u044c \u0440\u043e\u0431\u0456\u0442 \u043d\u0430 \u043a\u043e\u0436\u043d\u043e\u043c\u0443 \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0456.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner \u043f\u0440\u0438\u0437\u043d\u0430\u0447\u0430\u0454 \u043a\u043e\u0436\u043d\u0443 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0443 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u044e OF \u043d\u0430 \u043a\u043e\u043d\u043a\u0440\u0435\u0442\u043d\u0438\u0439 \u0432\u0435\u0440\u0441\u0442\u0430\u0442 \u0456 \u043a\u043e\u043d\u043a\u0440\u0435\u0442\u043d\u0438\u0439 \u0447\u0430\u0441. \u0414\u043e\u0441\u0442\u0443\u043f\u043d\u0456 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0456 \u0432\u0438\u0437\u043d\u0430\u0447\u0430\u044e\u0442\u044c\u0441\u044f \u0444\u0430\u043a\u0442\u0438\u0447\u043d\u0438\u043c\u0438 \u0437\u043c\u0456\u043d\u0430\u043c\u0438, \u0432\u0456\u0434\u0441\u0443\u0442\u043d\u0456\u0441\u0442\u044e \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0456\u0432 \u0456 \u043f\u043e\u043d\u0430\u0434\u043d\u043e\u0440\u043c\u043e\u0432\u043e\u044e \u0440\u043e\u0431\u043e\u0442\u043e\u044e, \u0442\u043e\u043c\u0443 \u0446\u0435\u0445 \u043e\u0442\u0440\u0438\u043c\u0443\u0454 \u043f\u043b\u0430\u043d, \u044f\u043a\u0438\u0439 \u043c\u043e\u0436\u0435 \u0432\u0438\u043a\u043e\u043d\u0430\u0442\u0438.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u041c\u0435\u043d\u0448\u0456 \u0432\u0438\u0442\u0440\u0430\u0442\u0438 \u043d\u0430 \u043f\u0435\u0440\u0435\u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner \u0437\u0431\u0435\u0440\u0456\u0433\u0430\u0454 \u0447\u0430\u0441 \u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f \u0434\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0457 \u043f\u0430\u0440\u0438 \u0432\u0438\u0440\u043e\u0431\u0456\u0432 \u0432 \u043e\u0431\u043e\u0445 \u043d\u0430\u043f\u0440\u044f\u043c\u043a\u0430\u0445 \u043f\u0435\u0440\u0435\u0445\u043e\u0434\u0443. \u0414\u043b\u044f \u043f\u0435\u0440\u0435\u0445\u043e\u0434\u0443 \u0437 \u043c\u2019\u044f\u043a\u043e\u0433\u043e \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0443 \u043d\u0430 \u0442\u0432\u0435\u0440\u0434\u0438\u0439 \u043c\u043e\u0436\u0435 \u0432\u0438\u0441\u0442\u0430\u0447\u0438\u0442\u0438 \u0448\u0432\u0438\u0434\u043a\u043e\u0457 \u0437\u0430\u043c\u0456\u043d\u0438 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0430, \u0442\u043e\u0434\u0456 \u044f\u043a \u0437\u0432\u043e\u0440\u043e\u0442\u043d\u0438\u0439 \u043f\u0435\u0440\u0435\u0445\u0456\u0434 \u043f\u043e\u0442\u0440\u0435\u0431\u0443\u0454 \u043f\u043e\u0432\u043d\u043e\u0433\u043e \u043e\u0447\u0438\u0449\u0435\u043d\u043d\u044f. \u0420\u0443\u0448\u0456\u0439 \u0432\u0438\u0431\u0443\u0434\u043e\u0432\u0443\u0454 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0437\u0430\u0432\u0434\u0430\u043d\u043d\u044f \u0432 \u043f\u043e\u0441\u043b\u0456\u0434\u043e\u0432\u043d\u043e\u0441\u0442\u0456 \u0437 \u043d\u0430\u0439\u043c\u0435\u043d\u0448\u0438\u043c\u0438 \u0432\u0442\u0440\u0430\u0442\u0430\u043c\u0438 \u0447\u0430\u0441\u0443.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u041b\u044e\u0434\u0438 \u0442\u0430 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438 \u0442\u0435\u0436 \u043c\u0430\u044e\u0442\u044c \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u0443 \u0434\u043e\u0441\u0442\u0443\u043f\u043d\u0456\u0441\u0442\u044c.<\/p>\n\n\n<p class=\"fx-pain__b\">\u0414\u043b\u044f \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u043e\u0457 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457, \u0449\u043e \u043f\u043e\u0442\u0440\u0435\u0431\u0443\u0454 \u0442\u0440\u044c\u043e\u0445 \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0456\u0432, \u043f\u0440\u0438\u0437\u043d\u0430\u0447\u0430\u044e\u0442\u044c\u0441\u044f \u0442\u0440\u043e\u0454 \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0456\u0432 \u0456\u0437 \u0432\u0456\u043b\u044c\u043d\u0438\u043c \u0447\u0430\u0441\u043e\u043c \u0443 \u0437\u043c\u0456\u043d\u0430\u0445. \u041f\u0440\u0435\u0441\u0444\u043e\u0440\u043c\u0430 \u0447\u0438 \u043f\u0440\u0438\u0441\u0442\u043e\u0441\u0443\u0432\u0430\u043d\u043d\u044f, \u0449\u043e \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0454\u0442\u044c\u0441\u044f \u043d\u0430 \u043e\u0434\u043d\u043e\u043c\u0443 \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0456, \u043d\u0456\u043a\u043e\u043b\u0438 \u043d\u0435 \u043f\u0440\u0438\u0437\u043d\u0430\u0447\u0430\u0454\u0442\u044c\u0441\u044f \u043e\u0434\u043d\u043e\u0447\u0430\u0441\u043d\u043e \u043d\u0430 \u0456\u043d\u0448\u0438\u0439. \u042f\u043a\u0449\u043e \u0432\u0435\u0440\u0441\u0442\u0430\u0442 \u0437\u0430\u0439\u043d\u044f\u0442\u0438\u0439, \u0440\u043e\u0431\u043e\u0442\u0430 \u043f\u0435\u0440\u0435\u0434\u0430\u0454\u0442\u044c\u0441\u044f \u043d\u0430 \u0430\u043b\u044c\u0442\u0435\u0440\u043d\u0430\u0442\u0438\u0432\u043d\u0438\u0439 \u0432\u0435\u0440\u0441\u0442\u0430\u0442 \u0430\u0431\u043e \u0456\u043d\u0448\u043e\u043c\u0443 \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u043e\u0432\u0456.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u041f\u043e\u0447\u0430\u0442\u043e\u043a \u0437\u0430\u043b\u0435\u0436\u0438\u0442\u044c \u0432\u0456\u0434 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0443.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u044f\u0454 \u0441\u043a\u043b\u0430\u0434\u0441\u044c\u043a\u0456 \u0437\u0430\u043b\u0438\u0448\u043a\u0438 \u0442\u0430 \u0432\u0456\u0434\u043a\u0440\u0438\u0442\u0456 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043b\u044c\u043d\u0438\u043a\u0430\u043c \u0434\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u043a\u043e\u043c\u043f\u043e\u043d\u0435\u043d\u0442\u0430. \u0412\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0435 \u0437\u0430\u0432\u0434\u0430\u043d\u043d\u044f, \u044f\u043a\u0435 \u043e\u0447\u0456\u043a\u0443\u0454 \u043d\u0430 \u043f\u043e\u0441\u0442\u0430\u0432\u043a\u0443, \u043f\u043b\u0430\u043d\u0443\u0454\u0442\u044c\u0441\u044f \u043f\u0456\u0441\u043b\u044f \u0434\u0430\u0442\u0438 \u0457\u0457 \u043d\u0430\u0434\u0445\u043e\u0434\u0436\u0435\u043d\u043d\u044f, \u0430 \u043d\u0435 \u0437\u0430\u043f\u0443\u0441\u043a\u0430\u0454\u0442\u044c\u0441\u044f, \u0449\u043e\u0431 \u043f\u043e\u0442\u0456\u043c \u0437\u0443\u043f\u0438\u043d\u0438\u0442\u0438\u0441\u044f \u0432 \u0446\u0435\u0445\u0443.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0410\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0447\u043d\u0435 \u043f\u0435\u0440\u0435\u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0447\u0435\u0440\u0435\u0437 \u0442\u0435\u0440\u043c\u0456\u043d\u043e\u0432\u0456 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u0439 \u043f\u043e\u043b\u043e\u043c\u043a\u0438.<\/p>\n\n\n<p class=\"fx-pain__b\">\u041a\u043e\u043b\u0438 \u0432\u0435\u0440\u0441\u0442\u0430\u0442 \u0437\u0443\u043f\u0438\u043d\u044f\u0454\u0442\u044c\u0441\u044f \u0430\u0431\u043e \u043d\u0430\u0434\u0445\u043e\u0434\u0438\u0442\u044c \u0442\u0435\u0440\u043c\u0456\u043d\u043e\u0432\u0435 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f, Autopilot \u043f\u0435\u0440\u0435\u0431\u0443\u0434\u043e\u0432\u0443\u0454 \u0433\u0440\u0430\u0444\u0456\u043a. \u0417\u0430\u0434\u0430\u043d\u0456 \u0432\u0430\u043c\u0438 \u0431\u043b\u043e\u043a\u0443\u0432\u0430\u043d\u043d\u044f \u0442\u0430 \u043f\u0440\u0456\u043e\u0440\u0438\u0442\u0435\u0442\u0438 \u0437\u0430\u043b\u0438\u0448\u0430\u044e\u0442\u044c\u0441\u044f \u0447\u0438\u043d\u043d\u0438\u043c\u0438, \u0430 \u043d\u043e\u0432\u0456 \u0434\u0430\u0442\u0438 \u043f\u0435\u0440\u0435\u0434\u0430\u044e\u0442\u044c\u0441\u044f \u043d\u0430\u0437\u0430\u0434 \u0434\u043e Cegid.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u041e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0438 \u0431\u0430\u0447\u0430\u0442\u044c \u0441\u0432\u043e\u044e \u0447\u0435\u0440\u0433\u0443 \u0437\u0430\u0432\u0434\u0430\u043d\u044c.<\/p>\n\n\n<p class=\"fx-pain__b\">\u041a\u043e\u0436\u0435\u043d \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440 \u0431\u0430\u0447\u0438\u0442\u044c \u043d\u0430\u0441\u0442\u0443\u043f\u043d\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0437\u0430\u0432\u0434\u0430\u043d\u043d\u044f \u043d\u0430 \u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0456 \u0447\u0438 \u043f\u043b\u0430\u043d\u0448\u0435\u0442\u0456 \u0439 \u0440\u0435\u0454\u0441\u0442\u0440\u0443\u0454 \u0440\u043e\u0431\u043e\u0442\u0443 \u0432 \u043c\u0456\u0440\u0443 \u0457\u0457 \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f. \u041e\u0444\u0456\u0441 \u0431\u0430\u0447\u0438\u0442\u044c \u043f\u0435\u0440\u0435\u0431\u0456\u0433 \u0440\u043e\u0431\u0456\u0442 \u0443 \u0440\u0435\u0430\u043b\u044c\u043d\u043e\u043c\u0443 \u0447\u0430\u0441\u0456, \u0430 \u0432\u0438 \u0432\u0438\u0440\u0456\u0448\u0443\u0454\u0442\u0435, \u0447\u0438 \u043f\u0435\u0440\u0435\u0434\u0430\u0432\u0430\u0442\u0438 \u043e\u0431\u043b\u0456\u043a \u0447\u0430\u0441\u0443 \u043d\u0430\u0437\u0430\u0434 \u0434\u043e Cegid.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0412\u0456\u0434\u0433\u0443\u043a\u0438 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u043a\u0456\u0432 \u043f\u0440\u043e SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, \u0444\u0430\u0445\u0456\u0432\u0435\u0446\u044c \u0437 \u0443\u043f\u0440\u0430\u0432\u043b\u0456\u043d\u043d\u044f \u043b\u0430\u043d\u0446\u044e\u0433\u0430\u043c\u0438 \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043d\u043d\u044f \u0432 UTU, \u0443 \u0446\u0435\u0445\u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0435\u043b\u0435\u043a\u0442\u0440\u043e\u0449\u0438\u0442\u0456\u0432 \u0432 \u0423\u043b\u0432\u0456\u043b\u0456\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u0433\u043e\u0434<\/b><span>\u0435\u043a\u043e\u043d\u043e\u043c\u0456\u0457 \u0449\u043e\u0442\u0438\u0436\u043d\u044f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab\u0417\u0430\u0432\u0434\u044f\u043a\u0438 SkyPlanner \u043c\u0438 \u043f\u0435\u0440\u0435\u0439\u0448\u043b\u0438 \u0432\u0456\u0434 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0432 \u0442\u0430\u0431\u043b\u0438\u0446\u044f\u0445 Excel \u0434\u043e \u0439\u043e\u0433\u043e \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0430\u0446\u0456\u0457 \u0432 \u0440\u0435\u0430\u043b\u044c\u043d\u043e\u043c\u0443 \u0447\u0430\u0441\u0456\u00bb.<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, \u0444\u0430\u0445\u0456\u0432\u0435\u0446\u044c \u0437 \u0443\u043f\u0440\u0430\u0432\u043b\u0456\u043d\u043d\u044f \u043b\u0430\u043d\u0446\u044e\u0433\u0430\u043c\u0438 \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043d\u043d\u044f<\/b><br>UTU \u00b7 \u0415\u043b\u0435\u043a\u0442\u0440\u043e\u0449\u0438\u0442\u0438 \u0442\u0430 \u0440\u043e\u0437\u043f\u043e\u0434\u0456\u043b\u044c\u043d\u0456 \u043f\u0440\u0438\u0441\u0442\u0440\u043e\u0457<\/p>\n\n\n<p class=\"ind-cust__result\">\u041f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437\u0430\u043e\u0449\u0430\u0434\u0436\u0443\u0454 2 \u0433\u043e\u0434\u0438\u043d\u0438 \u0440\u043e\u0431\u043e\u0447\u043e\u0433\u043e \u0447\u0430\u0441\u0443 \u0449\u043e\u0442\u0438\u0436\u043d\u044f, \u0430 \u043d\u043e\u0432\u0430 \u0447\u0435\u0440\u0433\u0430 \u0437\u0430\u0432\u0434\u0430\u043d\u044c \u043d\u0430\u0434\u0445\u043e\u0434\u0438\u0442\u044c \u043d\u0430 \u043b\u0456\u043d\u0456\u044e \u0437\u0430 \u043b\u0456\u0447\u0435\u043d\u0456 \u0441\u0435\u043a\u0443\u043d\u0434\u0438.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/uk\/%d1%96%d1%81%d1%82%d0%be%d1%80%d1%96%d1%97-%d0%ba%d0%bb%d1%96%d1%94%d0%bd%d1%82%d1%96%d0%b2\/utu\/\">\u0427\u0438\u0442\u0430\u0442\u0438 \u0432\u0456\u0434\u0433\u0443\u043a UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u041e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0438 \u0432 \u043e\u0434\u044f\u0437\u0456 \u0434\u043b\u044f \u0447\u0438\u0441\u0442\u0438\u0445 \u043f\u0440\u0438\u043c\u0456\u0449\u0435\u043d\u044c \u0431\u0456\u043b\u044f \u043b\u0456\u043d\u0456\u0457 \u0440\u043e\u0437\u043b\u0438\u0432\u0443 \u0443 \u0444\u043b\u0430\u043a\u043e\u043d\u0438 \u043d\u0430 \u0444\u0430\u0440\u043c\u0430\u0446\u0435\u0432\u0442\u0438\u0447\u043d\u043e\u043c\u0443 \u0437\u0430\u0432\u043e\u0434\u0456 Laboratory &amp; Allied \u0443 \u041d\u0430\u0439\u0440\u043e\u0431\u0456\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u0437\u0440\u043e\u0441\u0442\u0430\u043d\u043d\u044f \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u043e\u0441\u0442\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab\u0415\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437\u0440\u043e\u0441\u043b\u0430 \u043d\u0430 90%\u00bb.<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, \u043a\u0435\u0440\u0456\u0432\u043d\u0438\u043a \u0406\u0422-\u0432\u0456\u0434\u0434\u0456\u043b\u0443<\/b><br>Laboratory &amp; Allied \u00b7 \u0424\u0430\u0440\u043c\u0430\u0446\u0435\u0432\u0442\u0438\u0447\u043d\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e<\/p>\n\n\n<p class=\"ind-cust__result\">\u0415\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437\u0440\u043e\u0441\u043b\u0430 \u043d\u0430 90%, \u0430 \u0441\u043a\u043b\u0430\u0434\u0430\u043d\u043d\u044f \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u043e\u0432\u0430\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443 \u043d\u0430 \u0442\u0440\u0438 \u043c\u0456\u0441\u044f\u0446\u0456 \u0434\u043b\u044f \u0432\u0441\u0456\u0445 \u0440\u043e\u0431\u043e\u0447\u0438\u0445 \u0446\u0435\u043d\u0442\u0440\u0456\u0432 \u0437\u0430\u0439\u043c\u0430\u0454 \u043c\u0435\u043d\u0448 \u043d\u0456\u0436 30 \u0445\u0432\u0438\u043b\u0438\u043d.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/uk\/%d1%96%d1%81%d1%82%d0%be%d1%80%d1%96%d1%97-%d0%ba%d0%bb%d1%96%d1%94%d0%bd%d1%82%d1%96%d0%b2\/laboratory-allied\/\">\u0427\u0438\u0442\u0430\u0442\u0438 \u0432\u0456\u0434\u0433\u0443\u043a Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"\u0417\u0432\u0430\u0440\u044e\u0432\u0430\u043b\u044c\u043d\u0438\u043a KJH-Comp \u0448\u043b\u0456\u0444\u0443\u0454 \u0437\u0432\u0430\u0440\u043d\u0443 \u0441\u0442\u0430\u043b\u0435\u0432\u0443 \u043a\u043e\u043d\u0441\u0442\u0440\u0443\u043a\u0446\u0456\u044e \u043d\u0430 \u0437\u0430\u0432\u043e\u0434\u0456 \u0432 \u0410\u043b\u044f\u0445\u044f\u0440\u043c\u044f\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>\u043d\u0430\u0434\u0456\u0439\u043d\u043e\u0441\u0442\u0456 \u043f\u043e\u0441\u0442\u0430\u0432\u043e\u043a \u0437\u0430\u043c\u0456\u0441\u0442\u044c \u043f\u0440\u0438\u0431\u043b\u0438\u0437\u043d\u043e 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00abSkyPlanner \u0432\u0456\u0434\u0456\u0433\u0440\u0430\u0454 \u0432\u0438\u0440\u0456\u0448\u0430\u043b\u044c\u043d\u0443 \u0440\u043e\u043b\u044c \u0443 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0430\u043d\u043d\u0456 \u043d\u0430\u0434\u0456\u0439\u043d\u043e\u0441\u0442\u0456 \u043d\u0430\u0448\u0438\u0445 \u043f\u043e\u0441\u0442\u0430\u0432\u043e\u043a\u00bb.<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, \u043a\u0435\u0440\u0456\u0432\u043d\u0438\u0439 \u0434\u0438\u0440\u0435\u043a\u0442\u043e\u0440<\/b><br>KJH-Comp \u00b7 \u0412\u0438\u0433\u043e\u0442\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u0456\u0432 \u0456\u0437 \u043b\u0438\u0441\u0442\u043e\u0432\u043e\u0433\u043e \u043c\u0435\u0442\u0430\u043b\u0443 \u0442\u0430 \u043a\u043e\u043d\u0442\u0440\u0430\u043a\u0442\u043d\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e<\/p>\n\n\n<p class=\"ind-cust__result\">\u041d\u0430\u0434\u0456\u0439\u043d\u0456\u0441\u0442\u044c \u043f\u043e\u0441\u0442\u0430\u0432\u043e\u043a \u0437\u0440\u043e\u0441\u043b\u0430 \u0437 \u043f\u0440\u0438\u0431\u043b\u0438\u0437\u043d\u043e 50% \u0456 \u0441\u044f\u0433\u043d\u0443\u043b\u0430 98%, \u0430 \u0434\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0442\u0435\u043f\u0435\u0440 \u043f\u043e\u0442\u0440\u0456\u0431\u0435\u043d \u043e\u0434\u0438\u043d \u043a\u0435\u0440\u0456\u0432\u043d\u0438\u043a \u0437\u0430\u043c\u0456\u0441\u0442\u044c \u0434\u0432\u043e\u0445.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/uk\/%d1%96%d1%81%d1%82%d0%be%d1%80%d1%96%d1%97-%d0%ba%d0%bb%d1%96%d1%94%d0%bd%d1%82%d1%96%d0%b2\/kjh-comp\/\">\u0427\u0438\u0442\u0430\u0442\u0438 \u0432\u0456\u0434\u0433\u0443\u043a KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"\u0413\u0430\u043d\u043d\u0443 \u0420\u044e\u044e\u043d\u044f\u043d\u0435\u043d, \u0433\u0435\u043d\u0435\u0440\u0430\u043b\u044c\u043d\u0438\u0439 \u0434\u0438\u0440\u0435\u043a\u0442\u043e\u0440 Mamec, \u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u043c\u0443 \u0446\u0435\u0445\u0443 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u0457 \u0432 \u041b\u043e\u0433\u2019\u0457\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1 000 \u0456 \u0431\u0456\u043b\u044c\u0448\u0435<\/b><span> \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u044c \u043f\u043b\u0430\u043d\u0443\u044e\u0442\u044c\u0441\u044f \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0447\u043d\u043e<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab\u0422\u0435\u043f\u0435\u0440 \u043c\u0438 \u0437\u043e\u0432\u0441\u0456\u043c \u0456\u043d\u0430\u043a\u0448\u0435 \u043a\u043e\u043d\u0442\u0440\u043e\u043b\u044e\u0454\u043c\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e, \u0430 \u043d\u0430\u0448\u0435 \u0440\u043e\u0437\u0443\u043c\u0456\u043d\u043d\u044f \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439 \u0432\u0438\u0439\u0448\u043b\u043e \u043d\u0430 \u0446\u0456\u043b\u043a\u043e\u043c \u0456\u043d\u0448\u0438\u0439 \u0440\u0456\u0432\u0435\u043d\u044c\u00bb.<\/p>\n\n\n<p class=\"ind-cust__who\"><b>\u0413\u0430\u043d\u043d\u0443 \u0420\u044e\u044e\u043d\u044f\u043d\u0435\u043d, \u0433\u0435\u043d\u0435\u0440\u0430\u043b\u044c\u043d\u0438\u0439 \u0434\u0438\u0440\u0435\u043a\u0442\u043e\u0440<\/b><br>Mamec \u00b7 \u041f\u0440\u043e\u043c\u0438\u0441\u043b\u043e\u0432\u0456 \u0437\u043c\u0456\u0448\u0443\u0432\u0430\u0447\u0456, \u043d\u0430\u0441\u043e\u0441\u0438 \u0442\u0430 \u0432\u0438\u0441\u043e\u043a\u043e\u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0435 \u043a\u043e\u043d\u0442\u0440\u0430\u043a\u0442\u043d\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e<\/p>\n\n\n<p class=\"ind-cust__result\">\u0422\u0438\u0441\u044f\u0447\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u044c \u043f\u043b\u0430\u043d\u0443\u044e\u0442\u044c\u0441\u044f \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0447\u043d\u043e, \u0430 \u0432\u0441\u044f \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f \u0431\u0430\u0447\u0438\u0442\u044c \u0441\u0442\u0430\u043d \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0432 \u0440\u0435\u0430\u043b\u044c\u043d\u043e\u043c\u0443 \u0447\u0430\u0441\u0456.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/uk\/%d1%96%d1%81%d1%82%d0%be%d1%80%d1%96%d1%97-%d0%ba%d0%bb%d1%96%d1%94%d0%bd%d1%82%d1%96%d0%b2\/mamec\/\">\u0427\u0438\u0442\u0430\u0442\u0438 \u0432\u0456\u0434\u0433\u0443\u043a Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-the-cegid-integration-works\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u042f\u043a \u043f\u0440\u0430\u0446\u044e\u0454 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f \u0437 Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Cegid \u043f\u0435\u0440\u0435\u0434\u0430\u0454 \u0434\u0430\u043d\u0456 \u0434\u043b\u044f \u0440\u043e\u0431\u043e\u0442\u0438.<\/strong> \u0414\u043e SkyPlanner \u043d\u0430\u0434\u0445\u043e\u0434\u044f\u0442\u044c OF \u0437 \u0457\u0445\u043d\u0456\u043c\u0438 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0438\u043c\u0438 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u044f\u043c\u0438, gammes, nomenclatures, postes de charge, machines, articles, \u0441\u043a\u043b\u0430\u0434\u0441\u044c\u043a\u0438\u043c\u0438 \u0437\u0430\u043b\u0438\u0448\u043a\u0430\u043c\u0438 \u0442\u0430 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f\u043c\u0438 \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043b\u044c\u043d\u0438\u043a\u0430\u043c.<\/li>\n\n\n<li><strong>SkyPlanner \u0431\u0443\u0434\u0443\u0454 \u0433\u0440\u0430\u0444\u0456\u043a \u0456 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u0454 \u0439\u043e\u0433\u043e \u0430\u043a\u0442\u0443\u0430\u043b\u044c\u043d\u0456\u0441\u0442\u044c.<\/strong> \u0420\u0443\u0448\u0456\u0439 Arcturus \u0437\u0430 \u043b\u0456\u0447\u0435\u043d\u0456 \u0441\u0435\u043a\u0443\u043d\u0434\u0438 \u043f\u043b\u0430\u043d\u0443\u0454 \u043a\u043e\u0436\u043d\u0443 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0443 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u044e \u0442\u0430 \u043f\u0435\u0440\u0435\u0431\u0443\u0434\u043e\u0432\u0443\u0454 \u043f\u043b\u0430\u043d \u0443 \u0440\u0430\u0437\u0456 \u0437\u043c\u0456\u043d \u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0456.<\/li>\n\n\n<li><strong>\u0414\u0430\u0442\u0438 \u0439 \u0434\u0430\u043d\u0456 \u043f\u0440\u043e \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u0443 \u0440\u043e\u0431\u043e\u0442\u0443 \u043f\u0435\u0440\u0435\u0434\u0430\u044e\u0442\u044c\u0441\u044f \u043d\u0430\u0437\u0430\u0434.<\/strong> \u041f\u043b\u0430\u043d\u043e\u0432\u0456 \u0434\u0430\u0442\u0438 \u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u0439 \u0437\u0430\u0432\u0435\u0440\u0448\u0435\u043d\u043d\u044f \u043f\u043e\u0432\u0435\u0440\u0442\u0430\u044e\u0442\u044c\u0441\u044f \u0434\u043e \u043a\u043e\u0436\u043d\u043e\u0457 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u043e\u0457 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457 OF, \u0430 \u0437\u0430\u0440\u0435\u0454\u0441\u0442\u0440\u043e\u0432\u0430\u043d\u0438\u0439 \u0447\u0430\u0441 \u043c\u043e\u0436\u0435 \u043f\u0435\u0440\u0435\u0434\u0430\u0432\u0430\u0442\u0438\u0441\u044f \u0443 \u0432\u0438\u0433\u043b\u044f\u0434\u0456 pointages.<\/li>\n\n<\/ol>\n\n\n<p>Cegid \u0437\u0430\u043b\u0438\u0448\u0430\u0454\u0442\u044c\u0441\u044f \u0432\u0430\u0448\u043e\u044e \u043e\u0441\u043d\u043e\u0432\u043d\u043e\u044e \u043e\u0431\u043b\u0456\u043a\u043e\u0432\u043e\u044e \u0441\u0438\u0441\u0442\u0435\u043c\u043e\u044e. Articles, nomenclatures, gammes, CBN (\u0447\u0438\u0441\u0442\u0456 \u043f\u043e\u0442\u0440\u0435\u0431\u0438), \u0437\u0430\u043a\u0443\u043f\u0456\u0432\u043b\u0456, \u0441\u043a\u043b\u0430\u0434\u0441\u044c\u043a\u0438\u0439 \u043e\u0431\u043b\u0456\u043a, \u0440\u043e\u0437\u0440\u0430\u0445\u0443\u043d\u043e\u043a \u0441\u043e\u0431\u0456\u0432\u0430\u0440\u0442\u043e\u0441\u0442\u0456 \u0442\u0430 \u0444\u0456\u043d\u0430\u043d\u0441\u0438 \u0437\u0430\u043b\u0438\u0448\u0430\u044e\u0442\u044c\u0441\u044f \u0442\u0430\u043c, \u0434\u0435 \u0439 \u0431\u0443\u043b\u0438. SkyPlanner \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u0454 \u0437\u0430 \u043e\u0434\u043d\u0435: \u043f\u043e\u0441\u043b\u0456\u0434\u043e\u0432\u043d\u0456\u0441\u0442\u044c \u0456 \u0447\u0430\u0441 \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u043a\u043e\u0436\u043d\u043e\u0457 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u043e\u0457 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457 \u043d\u0430 \u043a\u043e\u0436\u043d\u043e\u043c\u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u043c\u0443 \u0440\u0435\u0441\u0443\u0440\u0441\u0456.<\/p>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cegid PMI.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner \u0447\u0438\u0442\u0430\u0454 \u0439 \u0437\u0430\u043f\u0438\u0441\u0443\u0454 \u0434\u0430\u043d\u0456 \u0447\u0435\u0440\u0435\u0437 Web API, \u044f\u043a\u0438\u0439 Cegid \u043d\u0430\u0434\u0430\u0454 \u0434\u043b\u044f PMI. Cegid \u043e\u043f\u0438\u0441\u0443\u0454 \u0439\u043e\u0433\u043e \u044f\u043a \u0437\u0430\u0441\u0456\u0431 \u0431\u0435\u0437\u043f\u0435\u0447\u043d\u043e\u0433\u043e \u043e\u0431\u043c\u0456\u043d\u0443 \u0434\u0430\u043d\u0438\u043c\u0438 \u0456\u0437 \u0437\u043e\u0432\u043d\u0456\u0448\u043d\u0456\u043c\u0438 \u0437\u0430\u0441\u0442\u043e\u0441\u0443\u043d\u043a\u0430\u043c\u0438 \u0437\u0456 \u0437\u0431\u0435\u0440\u0435\u0436\u0435\u043d\u043d\u044f\u043c \u0431\u0456\u0437\u043d\u0435\u0441-\u043f\u0440\u0430\u0432\u0438\u043b Manufacturing PMI (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>).<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cegid Primavera.<\/p>\n\n\n<p class=\"fx-pain__b\">SkyPlanner \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0454 PRIMAVERA ERP V10 API, \u044f\u043a\u0438\u0439 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u0454 \u0447\u0438\u0442\u0430\u043d\u043d\u044f \u0439 \u0437\u0430\u043f\u0438\u0441 \u0434\u0430\u043d\u0438\u0445 \u0443 \u0432\u0441\u0456\u0445 \u043c\u043e\u0434\u0443\u043b\u044f\u0445. \u041d\u0430\u0434\u0445\u043e\u0434\u044f\u0442\u044c Ordens de fabrico, \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0456 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457, centros de trabalho, roteiros \u0442\u0430 fichas t\u00e9cnicas. \u041f\u043b\u0430\u043d\u043e\u0432\u0456 \u0434\u0430\u0442\u0438 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0438\u0445 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0439 \u043f\u0435\u0440\u0435\u0434\u0430\u044e\u0442\u044c\u0441\u044f \u043d\u0430\u0437\u0430\u0434 \u0447\u0435\u0440\u0435\u0437 \u0441\u0435\u0440\u0432\u0456\u0441 Planeamento (ActualizaPlaneamentoOperacao), \u0430 \u0437\u0430\u0440\u0435\u0454\u0441\u0442\u0440\u043e\u0432\u0430\u043d\u0438\u0439 \u0447\u0430\u0441 \u2014 \u0447\u0435\u0440\u0435\u0437 Di\u00e1rios de Trabalho (<a href=\"https:\/\/developers.ila.cegid.com\/en\/v10\/api-documentation\/\">V10 API<\/a>).<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">Cegid Ekon.<\/p>\n\n\n<p class=\"fx-pain__b\">\u0414\u043e SkyPlanner \u043d\u0430\u0434\u0445\u043e\u0434\u044f\u0442\u044c \u00d3rdenes de fabricaci\u00f3n, hojas de ruta \u0442\u0430 listas de materiales, \u0430 \u043d\u0430\u0437\u0430\u0434 \u043f\u0435\u0440\u0435\u0434\u0430\u044e\u0442\u044c\u0441\u044f \u043f\u043b\u0430\u043d\u043e\u0432\u0456 \u0434\u0430\u0442\u0438 \u0439 imputaciones. \u041d\u0430 \u0435\u0442\u0430\u043f\u0456 \u0432\u0438\u0437\u043d\u0430\u0447\u0435\u043d\u043d\u044f \u043e\u0431\u0441\u044f\u0433\u0443 \u043a\u043e\u043c\u0430\u043d\u0434\u0430 SkyPlanner \u043e\u0431\u0438\u0440\u0430\u0454 \u0441\u043f\u043e\u0441\u0456\u0431 \u043e\u0431\u043c\u0456\u043d\u0443 \u0434\u0430\u043d\u0438\u043c\u0438 \u0434\u043b\u044f \u0432\u0430\u0448\u043e\u0457 \u0456\u043d\u0441\u0442\u0430\u043b\u044f\u0446\u0456\u0457 Ekon.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0412\u0435\u0431\u0445\u0443\u043a\u0438 SkyPlanner \u043f\u0435\u0440\u0435\u0434\u0430\u044e\u0442\u044c \u043a\u043e\u0436\u043d\u0443 \u0437\u043c\u0456\u043d\u0443 \u0433\u0440\u0430\u0444\u0456\u043a\u0430 \u043e\u0434\u0440\u0430\u0437\u0443, \u0430 \u0447\u0430\u0441\u0442\u043e\u0442\u0430 \u0441\u0438\u043d\u0445\u0440\u043e\u043d\u0456\u0437\u0430\u0446\u0456\u0457 \u0437 Cegid \u0437\u0430\u0434\u0430\u0454\u0442\u044c\u0441\u044f \u043e\u043a\u0440\u0435\u043c\u043e \u0434\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u043f\u0456\u0434\u043f\u0440\u0438\u0454\u043c\u0441\u0442\u0432\u0430. \u041a\u043e\u0436\u043d\u0435 \u043f\u0456\u0434\u043f\u0440\u0438\u0454\u043c\u0441\u0442\u0432\u043e \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0454 Cegid \u043f\u043e-\u0441\u0432\u043e\u0454\u043c\u0443, \u0442\u043e\u043c\u0443 \u043f\u0456\u0434 \u0447\u0430\u0441 \u0432\u043f\u0440\u043e\u0432\u0430\u0434\u0436\u0435\u043d\u043d\u044f \u043a\u043e\u043c\u0430\u043d\u0434\u0430 SkyPlanner \u043d\u0430\u043b\u0430\u0448\u0442\u043e\u0432\u0443\u0454 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u043f\u0456\u0434 \u0432\u0430\u0448\u0443 \u043a\u043e\u043d\u0444\u0456\u0433\u0443\u0440\u0430\u0446\u0456\u044e \u0442\u0430 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u0454 \u0457\u0457 \u043f\u0456\u0441\u043b\u044f \u0437\u0430\u043f\u0443\u0441\u043a\u0443. \u0412\u0430\u0440\u0442\u0456\u0441\u0442\u044c \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \u0440\u043e\u0437\u0440\u0430\u0445\u043e\u0432\u0443\u0454\u0442\u044c\u0441\u044f \u0437\u0430\u0437\u0434\u0430\u043b\u0435\u0433\u0456\u0434\u044c \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0432\u0430\u0448\u0438\u0445 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432 \u0456 \u043f\u043e\u0442\u0440\u0435\u0431. \u0412\u0430\u0448 \u043f\u0430\u0440\u0442\u043d\u0435\u0440 Cegid \u0430\u0431\u043e \u0432\u043b\u0430\u0441\u043d\u0456 \u0440\u043e\u0437\u0440\u043e\u0431\u043d\u0438\u043a\u0438 \u0442\u0430\u043a\u043e\u0436 \u043c\u043e\u0436\u0443\u0442\u044c \u0441\u0442\u0432\u043e\u0440\u0438\u0442\u0438 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u043d\u0430 \u043e\u0441\u043d\u043e\u0432\u0456 \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u043e\u0432\u0430\u043d\u043e\u0433\u043e API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">\u0434\u043e\u0432\u0456\u0434\u043d\u0438\u043a API<\/a>).<\/p>\n\n\n<p>\u0406\u043d\u0442\u0435\u0440\u0444\u0435\u0439\u0441\u0438, \u0437\u0456\u0441\u0442\u0430\u0432\u043b\u0435\u043d\u043d\u044f \u0434\u0430\u043d\u0438\u0445 \u0456 \u043f\u0440\u0430\u0432\u0438\u043b\u0430 \u0437\u0432\u043e\u0440\u043e\u0442\u043d\u043e\u0433\u043e \u0437\u0430\u043f\u0438\u0441\u0443 \u043e\u043f\u0438\u0441\u0430\u043d\u0456 \u0432 <a href=\"\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/cegid\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/\">\u043f\u043e\u0441\u0456\u0431\u043d\u0438\u043a\u0443 \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 Cegid \u0434\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430<\/a>. \u041f\u0440\u0430\u0446\u044e\u0454\u0442\u0435 \u0432 Cegid XRP Flex? \u0426\u044e \u0441\u0438\u0441\u0442\u0435\u043c\u0443 \u0441\u0442\u0432\u043e\u0440\u0435\u043d\u043e \u043d\u0430 \u043e\u0441\u043d\u043e\u0432\u0456 Acumatica, \u0442\u043e\u0436 \u043f\u0435\u0440\u0435\u0433\u043b\u044f\u043d\u044c\u0442\u0435 <a href=\"\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/acumatica\/\">SkyPlanner \u0434\u043b\u044f Acumatica<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-cegid-schedules-and-what-skyplanner-adds\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0429\u043e \u043f\u043b\u0430\u043d\u0443\u0454 Cegid \u0456 \u0449\u043e \u0434\u043e\u0434\u0430\u0454 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Cegid PMI \u043e\u0445\u043e\u043f\u043b\u044e\u0454 \u0432\u0435\u0441\u044c \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0439 \u0446\u0438\u043a\u043b: \u0441\u0442\u0432\u043e\u0440\u0435\u043d\u043d\u044f OF \u0456\u0437 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u043a\u043b\u0456\u0454\u043d\u0442\u0430 \u0430\u0431\u043e CBN, \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f, \u0432\u0456\u0434\u0441\u0442\u0435\u0436\u0435\u043d\u043d\u044f \u0440\u043e\u0431\u0456\u0442 \u0443 \u0446\u0435\u0445\u0443 \u0437\u0430 \u043a\u043e\u0436\u043d\u0438\u043c poste \u0442\u0430 \u043e\u0431\u043b\u0456\u043a \u0447\u0430\u0441\u0443 \u0437\u0430 \u0448\u0442\u0440\u0438\u0445\u043a\u043e\u0434\u0430\u043c\u0438. \u041d\u0430 <a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">\u0441\u0442\u043e\u0440\u0456\u043d\u0446\u0456 Cegid PMI<\/a> \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u043e\u043f\u0438\u0441\u0430\u043d\u043e \u0443 \u0434\u0432\u0430 \u0435\u0442\u0430\u043f\u0438, \u0430 \u0442\u0430\u043a\u043e\u0436 \u0437\u0430\u043f\u0440\u043e\u043f\u043e\u043d\u043e\u0432\u0430\u043d\u043e \u043f\u043e\u0434\u0430\u043b\u044c\u0448\u0435 \u0440\u043e\u0437\u0448\u0438\u0440\u0435\u043d\u043d\u044f:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0421\u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u2014 \u0431\u0435\u0437 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439.<\/strong> PMI \u043d\u0430\u0434\u0430\u0454 &#8220;des OF planifi\u00e9s \u00e0 capacit\u00e9 infinie pour vous permettre de g\u00e9rer rapidement les charges et surcharges, la file d&#8217;attente&#8221; (OF, \u0441\u043f\u043b\u0430\u043d\u043e\u0432\u0430\u043d\u0456 \u0431\u0435\u0437 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439, \u0449\u043e\u0431 \u0448\u0432\u0438\u0434\u043a\u043e \u043a\u0435\u0440\u0443\u0432\u0430\u0442\u0438 \u0437\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0435\u043d\u043d\u044f\u043c, \u043f\u0435\u0440\u0435\u0432\u0430\u043d\u0442\u0430\u0436\u0435\u043d\u043d\u044f\u043c \u0456 \u0447\u0435\u0440\u0433\u043e\u044e).<\/li>\n\n\n<li><strong>\u0414\u0430\u043b\u0456 \u2014 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432 \u0456 \u0437\u0430\u043f\u0430\u0441\u0456\u0432.<\/strong> \u041d\u0430\u0441\u0442\u0443\u043f\u043d\u0438\u0439 \u0435\u0442\u0430\u043f \u2014 &#8220;la planification \u00e0 capacit\u00e9 finie tenant compte des contraintes de vos ressources et des stocks.&#8221; (\u041f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c \u0432\u0430\u0448\u0438\u0445 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432 \u0456 \u0441\u043a\u043b\u0430\u0434\u0441\u044c\u043a\u0438\u0445 \u0437\u0430\u043f\u0430\u0441\u0456\u0432.)<\/li>\n\n\n<li><strong>\u0414\u043b\u044f \u0448\u0438\u0440\u0448\u0438\u0445 \u043c\u043e\u0436\u043b\u0438\u0432\u043e\u0441\u0442\u0435\u0439 Cegid \u0440\u0430\u0434\u0438\u0442\u044c \u043f\u0456\u0434\u043a\u043b\u044e\u0447\u0438\u0442\u0438 APS.<\/strong> &#8220;Connectez des outils de planification avanc\u00e9e pour aller plus loin dans la gestion des contraintes de planification.&#8221; (\u041f\u0456\u0434\u043a\u043b\u044e\u0447\u0430\u0439\u0442\u0435 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438 \u0440\u043e\u0437\u0448\u0438\u0440\u0435\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f, \u0449\u043e\u0431 \u0432\u0440\u0430\u0445\u043e\u0432\u0443\u0432\u0430\u0442\u0438 \u0431\u0456\u043b\u044c\u0448\u0435 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c.)<\/li>\n\n<\/ul>\n\n\n<p><strong>Cegid Primavera<\/strong> \u043f\u0440\u043e\u043f\u043e\u043d\u0443\u0454 \u0433\u0440\u0430\u0444\u0456\u0447\u043d\u0435 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f: \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043b\u044c\u043d\u0438\u043a \u0440\u043e\u0437\u043f\u043e\u0434\u0456\u043b\u044f\u0454 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0456 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457 \u043c\u0456\u0436 centros de trabalho, \u0430 &#8220;o algoritmo de planeamento que sugere a melhor alternativa de escalonamento&#8221; (\u0430\u043b\u0433\u043e\u0440\u0438\u0442\u043c \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f, \u0449\u043e \u043f\u0440\u043e\u043f\u043e\u043d\u0443\u0454 \u043d\u0430\u0439\u043a\u0440\u0430\u0449\u0438\u0439 \u0432\u0430\u0440\u0456\u0430\u043d\u0442 \u0440\u043e\u0437\u043a\u043b\u0430\u0434\u0443) \u0440\u0435\u043a\u043e\u043c\u0435\u043d\u0434\u0443\u0454 \u043f\u043e\u0441\u043b\u0456\u0434\u043e\u0432\u043d\u0456\u0441\u0442\u044c. \u041f\u043b\u0430\u043d\u0443\u0432\u0430\u043b\u044c\u043d\u0438\u043a \u043c\u043e\u0434\u0435\u043b\u044e\u0454 \u0430\u043b\u044c\u0442\u0435\u0440\u043d\u0430\u0442\u0438\u0432\u043d\u0456 \u043f\u043b\u0430\u043d\u0438 \u0442\u0430 \u0443\u0445\u0432\u0430\u043b\u044e\u0454 \u0440\u0456\u0448\u0435\u043d\u043d\u044f (<a href=\"https:\/\/pt.primaverabss.com\/pt\/software\/solucoes-setoriais\/industria\/manufacturing\/\">Cegid Primavera Manufacturing<\/a>).<\/p>\n\n\n<p><strong>Cegid Ekon XRP Industria<\/strong> \u0444\u043e\u0440\u043c\u0443\u0454 hojas de ruta, listas de materiales \u0442\u0430 \u00f3rdenes de trabajo \u043d\u0430 \u043e\u0441\u043d\u043e\u0432\u0456 \u00f3rdenes de fabricaci\u00f3n \u0456 \u0440\u0435\u0454\u0441\u0442\u0440\u0443\u0454 imputaciones \u0443 \u0446\u0435\u0445\u0443 \u0430\u0431\u043e \u0432 \u043e\u0444\u0456\u0441\u0456 (<a href=\"https:\/\/www.cegid.com\/ib\/es\/productos\/software-gestion-produccion-industrial\/\">Cegid Ekon<\/a>).<\/p>\n\n\n<p>SkyPlanner \u2014 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442 \u0440\u043e\u0437\u0448\u0438\u0440\u0435\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0441\u0430\u043c\u0435 \u0442\u043e\u0433\u043e \u0442\u0438\u043f\u0443, \u044f\u043a\u0438\u0439 Cegid \u0440\u0435\u043a\u043e\u043c\u0435\u043d\u0434\u0443\u0454 \u043f\u0456\u0434\u043a\u043b\u044e\u0447\u0430\u0442\u0438. \u041a\u043e\u0436\u0435\u043d \u0435\u0442\u0430\u043f \u043f\u043e\u044f\u0441\u043d\u0435\u043d\u043e \u0432 \u0441\u0442\u0430\u0442\u0442\u0456 <a href=\"\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/cegid\/%d0%bf%d0%bb%d0%b0%d0%bd%d1%83%d0%b2%d0%b0%d0%bd%d0%bd%d1%8f-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%b0\/\">\u00ab\u0427\u0438 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u0454 Cegid \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439?\u00bb<\/a>. \u041e\u0441\u043d\u043e\u0432\u043d\u0456 \u043f\u043e\u043d\u044f\u0442\u0442\u044f \u0440\u043e\u0437\u0433\u043b\u044f\u043d\u0443\u0442\u043e \u0432 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0456 \u043f\u0440\u043e <a href=\"\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/finite-capacity-scheduling\/\">\u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"cegid-today-and-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cegid \u0441\u044c\u043e\u0433\u043e\u0434\u043d\u0456 \u0442\u0430 \u0440\u0430\u0437\u043e\u043c \u0437\u0456 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>\u041f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432 Cegid PMI<\/th><th>Cegid \u0437\u0456 SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>\u0412\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0456<\/td><td>OF \u0431\u0435\u0437 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439, \u0434\u0430\u043b\u0456 \u2014 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432 \u0456 \u0437\u0430\u043f\u0430\u0441\u0456\u0432<\/td><td>\u0423\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f \u0434\u043e\u0441\u0442\u0443\u043f\u043d\u043e\u0441\u0442\u0456 \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0430, \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0430 \u0439 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0430 \u0442\u0430 \u0444\u0430\u043a\u0442\u0438\u0447\u043d\u0438\u0445 \u0437\u043c\u0456\u043d<\/td><\/tr><tr><td>\u0413\u0440\u0430\u0444\u0456\u043a<\/td><td>\u041d\u0430\u0441\u0442\u0443\u043f\u043d\u0456 OF \u0434\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e poste \u043d\u0430 \u043d\u0430\u0439\u0431\u043b\u0438\u0436\u0447\u0456 \u0433\u043e\u0434\u0438\u043d\u0438 \u0447\u0438 \u0434\u043d\u0456<\/td><td>\u0414\u0435\u0442\u0430\u043b\u044c\u043d\u0430 \u043f\u043e\u0441\u043b\u0456\u0434\u043e\u0432\u043d\u0456\u0441\u0442\u044c \u0443\u0441\u0456\u0445 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0438\u0445 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0439 OF \u0437\u0430 \u043b\u0456\u0447\u0435\u043d\u0456 \u0441\u0435\u043a\u0443\u043d\u0434\u0438<\/td><\/tr><tr><td>\u041f\u0435\u0440\u0435\u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f<\/td><td>\u041f\u043b\u0430\u043d\u0443\u044e\u0442\u044c\u0441\u044f \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432 \u0456 \u0437\u0430\u043f\u0430\u0441\u0456\u0432<\/td><td>\u041c\u0430\u0442\u0440\u0438\u0446\u044f \u0447\u0430\u0441\u0443 \u043f\u0435\u0440\u0435\u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f: \u043d\u0430\u0439\u043c\u0435\u043d\u0448\u0438\u0439 \u0441\u0443\u043c\u0430\u0440\u043d\u0438\u0439 \u0447\u0430\u0441 \u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f<\/td><\/tr><tr><td>\u041f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0438 \u0442\u0430 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438<\/td><td>Salari\u00e9s \u0442\u0430 \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0438 \u0432 \u043e\u0441\u043d\u043e\u0432\u043d\u0438\u0445 \u0434\u0430\u043d\u0438\u0445<\/td><td>\u041a\u043e\u043d\u043a\u0440\u0435\u0442\u043d\u0456 \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0438 \u0437 \u0433\u0440\u0430\u0444\u0456\u043a\u0430\u043c\u0438 \u0437\u043c\u0456\u043d; \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438 \u044f\u043a \u0441\u043f\u0456\u043b\u044c\u043d\u0456 \u0440\u0435\u0441\u0443\u0440\u0441\u0438 \u0437 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u043e\u044e \u0434\u043e\u0441\u0442\u0443\u043f\u043d\u0456\u0441\u0442\u044e; \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0437\u0430\u0432\u0434\u0430\u043d\u043d\u044f \u0434\u043b\u044f \u043a\u0456\u043b\u044c\u043a\u043e\u0445 \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0456\u0432<\/td><\/tr><tr><td>\u041c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0438<\/td><td>CBN \u043f\u0440\u043e\u043f\u043e\u043d\u0443\u0454 OF \u0442\u0430 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043b\u044c\u043d\u0438\u043a\u0430\u043c<\/td><td>\u0412\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0437\u0430\u0432\u0434\u0430\u043d\u043d\u044f \u043f\u043e\u0447\u0438\u043d\u0430\u044e\u0442\u044c\u0441\u044f, \u043a\u043e\u043b\u0438 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0438 \u0434\u043e\u0441\u0442\u0443\u043f\u043d\u0456 \u043d\u0430 \u0441\u043a\u043b\u0430\u0434\u0456 \u0430\u0431\u043e \u043d\u0430\u0434\u0445\u043e\u0434\u044f\u0442\u044c \u0432\u0456\u0434 \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043b\u044c\u043d\u0438\u043a\u0456\u0432<\/td><\/tr><tr><td>\u0417\u043c\u0456\u043d\u0438<\/td><td>\u041f\u043b\u0430\u043d\u0443\u0432\u0430\u043b\u044c\u043d\u0438\u043a \u043a\u0435\u0440\u0443\u0454 \u0437\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0435\u043d\u043d\u044f\u043c, \u043f\u0435\u0440\u0435\u0432\u0430\u043d\u0442\u0430\u0436\u0435\u043d\u043d\u044f\u043c \u0456 \u0447\u0435\u0440\u0433\u043e\u044e<\/td><td>Autopilot \u043f\u0435\u0440\u0435\u0431\u0443\u0434\u043e\u0432\u0443\u0454 \u043f\u043b\u0430\u043d \u0443\u0441\u044c\u043e\u0433\u043e \u043f\u0456\u0434\u043f\u0440\u0438\u0454\u043c\u0441\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0432\u0430\u0448\u0438\u0445 \u043f\u0440\u0456\u043e\u0440\u0438\u0442\u0435\u0442\u0456\u0432<\/td><\/tr><tr><td>\u0420\u043e\u0437\u043f\u043e\u0447\u0430\u0442\u0456 \u0440\u043e\u0431\u043e\u0442\u0438<\/td><td>Pointages \u0437\u0430 \u0448\u0442\u0440\u0438\u0445\u043a\u043e\u0434\u043e\u043c OF<\/td><td>\u041f\u043b\u0430\u043d \u043e\u043d\u043e\u0432\u043b\u044e\u0454\u0442\u044c\u0441\u044f \u0437\u0430 \u0437\u0430\u0440\u0435\u0454\u0441\u0442\u0440\u043e\u0432\u0430\u043d\u0438\u043c \u043f\u0435\u0440\u0435\u0431\u0456\u0433\u043e\u043c \u0440\u043e\u0431\u0456\u0442; Running Time Lock \u0444\u0456\u043a\u0441\u0443\u0454 \u0433\u0440\u0430\u0444\u0456\u043a \u043d\u0430 \u043d\u0430\u0439\u0431\u043b\u0438\u0436\u0447\u0456 \u0433\u043e\u0434\u0438\u043d\u0438<\/td><\/tr><tr><td>\u0420\u043e\u0431\u043e\u0447\u0435 \u043f\u043e\u0434\u0430\u043d\u043d\u044f \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043b\u044c\u043d\u0438\u043a\u0430<\/td><td>\u0417\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0435\u043d\u043d\u044f, \u043f\u0435\u0440\u0435\u0432\u0430\u043d\u0442\u0430\u0436\u0435\u043d\u043d\u044f \u0439 \u0447\u0435\u0440\u0433\u0430 \u0434\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e poste<\/td><td>\u0406\u043d\u0442\u0435\u0440\u0430\u043a\u0442\u0438\u0432\u043d\u0430 \u0434\u0456\u0430\u0433\u0440\u0430\u043c\u0430 \u0413\u0430\u043d\u0442\u0430: \u043f\u0435\u0440\u0435\u043c\u0456\u0449\u0443\u0439\u0442\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0437\u0430\u0432\u0434\u0430\u043d\u043d\u044f \u2014 \u043f\u043b\u0430\u043d \u0437\u0430\u043b\u0438\u0448\u0430\u0454\u0442\u044c\u0441\u044f \u0443\u0437\u0433\u043e\u0434\u0436\u0435\u043d\u0438\u043c<\/td><\/tr><tr><td>\u0412\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0439 \u0446\u0435\u0445<\/td><td>\u0422\u0435\u0440\u043c\u0456\u043d\u0430\u043b\u0438 \u0437\u0456 \u0441\u043a\u0430\u043d\u0435\u0440\u0430\u043c\u0438 \u0448\u0442\u0440\u0438\u0445\u043a\u043e\u0434\u0456\u0432 \u0442\u0430 \u0456\u043d\u0442\u0435\u0440\u0444\u0435\u0439\u0441 MES<\/td><td>\u041e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0438 \u0431\u0430\u0447\u0430\u0442\u044c \u0441\u0432\u043e\u044e \u0447\u0435\u0440\u0433\u0443 \u0439 \u0440\u0435\u0454\u0441\u0442\u0440\u0443\u044e\u0442\u044c \u0440\u043e\u0431\u043e\u0442\u0443 \u043d\u0430 \u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0456 \u0447\u0438 \u043f\u043b\u0430\u043d\u0448\u0435\u0442\u0456<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-cegid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u042f\u043a \u0432\u0438\u0431\u0440\u0430\u0442\u0438 \u0441\u0438\u0441\u0442\u0435\u043c\u0443 \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0434\u043b\u044f Cegid<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u041f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432 Cegid PMI \u043f\u0456\u0434\u0445\u043e\u0434\u0438\u0442\u044c \u043f\u0456\u0434\u043f\u0440\u0438\u0454\u043c\u0441\u0442\u0432\u0430\u043c \u0437\u0456 \u0441\u0442\u0430\u043b\u0438\u043c\u0438 gammes, \u043a\u0456\u043b\u044c\u043a\u043e\u043c\u0430 \u043a\u043b\u044e\u0447\u043e\u0432\u0438\u043c\u0438 postes de charge \u0456 \u0442\u0438\u0436\u043d\u0435\u0432\u0438\u043c \u043f\u043b\u0430\u043d\u043e\u043c, \u044f\u043a\u0438\u0439 \u043f\u0435\u0440\u0435\u0433\u043b\u044f\u0434\u0430\u0454 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043b\u044c\u043d\u0438\u043a. \u0413\u0440\u0430\u0444\u0456\u0447\u043d\u0435 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f Cegid Primavera \u043f\u0456\u0434\u0445\u043e\u0434\u0438\u0442\u044c \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043b\u044c\u043d\u0438\u043a\u0443, \u044f\u043a\u0438\u0439 \u0432\u0438\u0431\u0443\u0434\u043e\u0432\u0443\u0454 \u043f\u043e\u0441\u043b\u0456\u0434\u043e\u0432\u043d\u0456\u0441\u0442\u044c \u043d\u0430 \u0434\u043e\u0448\u0446\u0456, \u0441\u043f\u0438\u0440\u0430\u044e\u0447\u0438\u0441\u044c \u043d\u0430 \u0440\u0435\u043a\u043e\u043c\u0435\u043d\u0434\u0430\u0446\u0456\u0457 \u0430\u043b\u0433\u043e\u0440\u0438\u0442\u043c\u0443. \u041a\u043e\u043b\u0438 \u0432\u0438\u043f\u0443\u0441\u043a \u043e\u0431\u043c\u0435\u0436\u0443\u044e\u0442\u044c \u043e\u0434\u043d\u043e\u0447\u0430\u0441\u043d\u043e \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0438, \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0438, \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438 \u0439 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0438, \u0430 \u043f\u043b\u0430\u043d \u0437\u043c\u0456\u043d\u044e\u0454\u0442\u044c\u0441\u044f \u0449\u043e\u0434\u043d\u044f, \u0432\u0430\u0440\u0442\u043e \u043f\u0456\u0434\u043a\u043b\u044e\u0447\u0438\u0442\u0438 APS \u2014 \u044f\u043a \u0456 \u0440\u0430\u0434\u0438\u0442\u044c \u0441\u0430\u043c\u0430 Cegid.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>\u0412\u0430\u0440\u0456\u0430\u043d\u0442<\/th><th>\u0429\u043e \u0446\u0435<\/th><th>\u041a\u043e\u043b\u0438 \u043f\u0456\u0434\u0445\u043e\u0434\u0438\u0442\u044c<\/th><\/tr><\/thead><tbody><tr><td>\u0412\u0431\u0443\u0434\u043e\u0432\u0430\u043d\u0435 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f Cegid<\/td><td>PMI: \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0441\u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u0431\u0435\u0437 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439, \u043f\u043e\u0442\u0456\u043c \u0437 \u0457\u0445 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c; Primavera: \u0433\u0440\u0430\u0444\u0456\u0447\u043d\u0435 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0437 \u0440\u0435\u043a\u043e\u043c\u0435\u043d\u0434\u0430\u0446\u0456\u044f\u043c\u0438 \u0430\u043b\u0433\u043e\u0440\u0438\u0442\u043c\u0443<\/td><td>\u041f\u043b\u0430\u043d\u0443\u0432\u0430\u043b\u044c\u043d\u0438\u043a \u0432\u0440\u0443\u0447\u043d\u0443 \u0432\u0438\u0437\u043d\u0430\u0447\u0430\u0454 \u043f\u043e\u0441\u043b\u0456\u0434\u043e\u0432\u043d\u0456\u0441\u0442\u044c \u0440\u043e\u0431\u0456\u0442 \u0434\u043b\u044f \u043a\u0456\u043b\u044c\u043a\u043e\u0445 \u0432\u0443\u0437\u044c\u043a\u0438\u0445 \u043c\u0456\u0441\u0446\u044c<\/td><\/tr><tr><td>APS \u0442\u0430 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0434\u043b\u044f Cegid<\/td><td>\u041f\u0456\u0434\u043a\u043b\u044e\u0447\u0435\u043d\u0456 \u0434\u043e Cegid \u0441\u0438\u0441\u0442\u0435\u043c\u0438 \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c, \u0443\u043d\u0456\u0432\u0435\u0440\u0441\u0430\u043b\u044c\u043d\u0456 \u0441\u0438\u0441\u0442\u0435\u043c\u0438 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432 \u0456 MES \u0456\u0437 \u0444\u0443\u043d\u043a\u0446\u0456\u044f\u043c\u0438 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f<\/td><td>\u041e\u043a\u0440\u0435\u043c\u0430 \u043a\u043e\u043c\u0430\u043d\u0434\u0430 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u043f\u0440\u0430\u0446\u044e\u0454 \u0432 \u043e\u043a\u0440\u0435\u043c\u0456\u0439 \u0441\u0438\u0441\u0442\u0435\u043c\u0456 \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f<\/td><\/tr><tr><td>\u0425\u043c\u0430\u0440\u043d\u0430 APS \u0437 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u043a\u043e\u044e \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0440\u043e\u0431\u0456\u0442 \u0443 \u0446\u0435\u0445\u0443<\/td><td>SkyPlanner APS: \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u0440\u0435\u0441\u0443\u0440\u0441\u0443, \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0447\u043d\u0435 \u043f\u0435\u0440\u0435\u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f, \u0437\u0430\u0441\u0442\u043e\u0441\u0443\u043d\u043e\u043a \u0434\u043b\u044f \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0456\u0432, \u0434\u0432\u043e\u0431\u0456\u0447\u043d\u0438\u0439 \u043e\u0431\u043c\u0456\u043d \u0456\u0437 Cegid<\/td><td>\u0412\u0438 \u0445\u043e\u0447\u0435\u0442\u0435 \u0437\u0430 \u043a\u0456\u043b\u044c\u043a\u0430 \u0442\u0438\u0436\u043d\u0456\u0432 \u043e\u0442\u0440\u0438\u043c\u0430\u0442\u0438 \u0440\u043e\u0431\u043e\u0447\u0438\u0439 \u043f\u043b\u0430\u043d \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439, \u044f\u043a\u0438\u0439 \u043e\u043d\u043e\u0432\u043b\u044e\u0454\u0442\u044c\u0441\u044f \u0441\u0430\u043c\u043e\u0441\u0442\u0456\u0439\u043d\u043e<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>\u041e\u0431\u0438\u0440\u0430\u0439\u0442\u0435 SkyPlanner \u0437\u0430\u043c\u0456\u0441\u0442\u044c \u0432\u0431\u0443\u0434\u043e\u0432\u0430\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f Cegid, \u044f\u043a\u0449\u043e:<\/strong><\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u041e\u0431\u043c\u0435\u0436\u0435\u043d\u043d\u044f \u043d\u0435 \u0437\u0432\u043e\u0434\u044f\u0442\u044c\u0441\u044f \u0434\u043e \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432 \u0456 \u0437\u0430\u043f\u0430\u0441\u0456\u0432.<\/strong> Cegid \u043e\u043f\u0438\u0441\u0443\u0454 \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u043d\u0438\u0439 \u0435\u0442\u0430\u043f \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432 PMI \u044f\u043a \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432 \u0456 \u0437\u0430\u043f\u0430\u0441\u0456\u0432, \u0430 \u0434\u043b\u044f \u0434\u043e\u0434\u0430\u0442\u043a\u043e\u0432\u0438\u0445 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c \u0440\u0435\u043a\u043e\u043c\u0435\u043d\u0434\u0443\u0454 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438 \u0440\u043e\u0437\u0448\u0438\u0440\u0435\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f (<a href=\"https:\/\/www.cegid.com\/fr\/produits\/pmi\/\">Cegid PMI<\/a>). SkyPlanner \u0437\u0430 \u043e\u0434\u0438\u043d \u0440\u043e\u0437\u0440\u0430\u0445\u0443\u043d\u043e\u043a \u043f\u043b\u0430\u043d\u0443\u0454 \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0438, \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0456\u0432, \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438, \u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f \u0442\u0430 \u043d\u0430\u0434\u0445\u043e\u0434\u0436\u0435\u043d\u043d\u044f \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0456\u0432.<\/li>\n\n\n<li><strong>\u041f\u043b\u0430\u043d \u043c\u0430\u0454 \u043e\u043d\u043e\u0432\u043b\u044e\u0432\u0430\u0442\u0438\u0441\u044f \u0441\u0430\u043c.<\/strong> \u0410\u043b\u0433\u043e\u0440\u0438\u0442\u043c Primavera \u043f\u0440\u043e\u043f\u043e\u043d\u0443\u0454 \u043f\u043b\u0430\u043d, \u0430 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043b\u044c\u043d\u0438\u043a \u043c\u043e\u0434\u0435\u043b\u044e\u0454 \u0432\u0430\u0440\u0456\u0430\u043d\u0442\u0438 \u0439 \u0443\u0445\u0432\u0430\u043b\u044e\u0454 \u0440\u0456\u0448\u0435\u043d\u043d\u044f (<a href=\"https:\/\/pt.primaverabss.com\/pt\/software\/solucoes-setoriais\/industria\/manufacturing\/\">Cegid Primavera<\/a>). Autopilot \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0447\u043d\u043e \u043f\u0435\u0440\u0435\u043f\u043b\u0430\u043d\u043e\u0432\u0443\u0454 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0437\u0430 \u043a\u043e\u0436\u043d\u043e\u0457 \u0441\u0443\u0442\u0442\u0454\u0432\u043e\u0457 \u0437\u043c\u0456\u043d\u0438, \u0430 \u0434\u0430\u0442\u0438 \u043f\u0435\u0440\u0435\u0434\u0430\u044e\u0442\u044c\u0441\u044f \u043d\u0430\u0437\u0430\u0434 \u0443 Cegid.<\/li>\n\n\n<li><strong>\u041f\u0435\u0440\u0435\u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f \u0432\u0438\u0437\u043d\u0430\u0447\u0430\u044e\u0442\u044c \u043e\u0431\u0441\u044f\u0433 \u0432\u0438\u043f\u0443\u0441\u043a\u0443.<\/strong> \u041c\u0430\u0442\u0440\u0438\u0446\u044f \u0447\u0430\u0441\u0443 \u043f\u0435\u0440\u0435\u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f \u0437\u0431\u0435\u0440\u0456\u0433\u0430\u0454 \u0447\u0430\u0441 \u043f\u0435\u0440\u0435\u0445\u043e\u0434\u0443 \u0432\u0456\u0434 \u043e\u0434\u043d\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u0443 \u0434\u043e \u0456\u043d\u0448\u043e\u0433\u043e \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u043d\u0430\u043f\u0440\u044f\u043c\u043a\u0443 \u043f\u0435\u0440\u0435\u0445\u043e\u0434\u0443, \u0430 \u043f\u0430\u0440\u0430\u043c\u0435\u0442\u0440 &#8220;Allow similarity&#8221; \u0433\u0440\u0443\u043f\u0443\u0454 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0437\u0430\u0432\u0434\u0430\u043d\u043d\u044f \u0437\u0430 \u043f\u0435\u0432\u043d\u043e\u044e \u043e\u0437\u043d\u0430\u043a\u043e\u044e, \u043d\u0430\u043f\u0440\u0438\u043a\u043b\u0430\u0434 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u043e\u043c.<\/li>\n\n\n<li><strong>\u0411\u0440\u0438\u0433\u0430\u0434\u0438 \u0442\u0430 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438 \u0437\u0430\u0434\u0430\u044e\u0442\u044c \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u043d\u044f \u043f\u043b\u0430\u043d\u0443.<\/strong> \u0414\u043b\u044f \u0437\u0430\u0432\u0434\u0430\u043d\u044c, \u0449\u043e \u043f\u043e\u0442\u0440\u0435\u0431\u0443\u044e\u0442\u044c \u043a\u0456\u043b\u044c\u043a\u043e\u0445 \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0456\u0432, \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0456\u0432 \u043f\u0440\u0438\u0437\u043d\u0430\u0447\u0430\u044e\u0442\u044c \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u043d\u043e \u0434\u043e \u0444\u0430\u043a\u0442\u0438\u0447\u043d\u0438\u0445 \u0437\u043c\u0456\u043d. \u0406\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442 \u0440\u0435\u0437\u0435\u0440\u0432\u0443\u0454\u0442\u044c\u0441\u044f \u043b\u0438\u0448\u0435 \u0437\u0430 \u043e\u0434\u043d\u0438\u043c \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u043e\u043c \u043e\u0434\u043d\u043e\u0447\u0430\u0441\u043d\u043e, \u0430 \u0440\u043e\u0431\u043e\u0442\u0443 \u043c\u043e\u0436\u043d\u0430 \u043f\u0435\u0440\u0435\u043d\u043e\u0441\u0438\u0442\u0438 \u043d\u0430 \u0456\u043d\u0448\u0456 \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0438 \u0430\u0431\u043e \u043f\u0435\u0440\u0435\u0434\u0430\u0432\u0430\u0442\u0438 \u0456\u043d\u0448\u0438\u043c \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0430\u043c.<\/li>\n\n\n<li><strong>\u041a\u043e\u0436\u0435\u043d \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440 \u043c\u0430\u0454 \u043f\u0440\u0430\u0446\u044e\u0432\u0430\u0442\u0438 \u0437\u0430 \u043f\u043b\u0430\u043d\u043e\u043c.<\/strong> Mobile Confirmations \u043d\u0430\u0434\u0430\u0454 \u0434\u043e\u0441\u0442\u0443\u043f \u0434\u043e \u0430\u043a\u0442\u0443\u0430\u043b\u044c\u043d\u043e\u0457 \u0447\u0435\u0440\u0433\u0438 \u0437\u0430\u0432\u0434\u0430\u043d\u044c \u0456\u0437 \u0431\u0443\u0434\u044c-\u044f\u043a\u043e\u0433\u043e \u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0430 \u0447\u0438 \u043f\u043b\u0430\u043d\u0448\u0435\u0442\u0430. \u041a\u0456\u043b\u044c\u043a\u0456\u0441\u0442\u044c \u043a\u043e\u0440\u0438\u0441\u0442\u0443\u0432\u0430\u0447\u0456\u0432 \u043d\u0435 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u0430: \u0446\u0456\u043d\u0430 \u0437\u0430\u043b\u0435\u0436\u0438\u0442\u044c \u0432\u0456\u0434 \u043a\u0456\u043b\u044c\u043a\u043e\u0441\u0442\u0456 \u0440\u043e\u0431\u043e\u0447\u0438\u0445 \u0446\u0435\u043d\u0442\u0440\u0456\u0432, \u0430 \u043d\u0435 \u043a\u043e\u0440\u0438\u0441\u0442\u0443\u0432\u0430\u0446\u044c\u043a\u0438\u0445 \u043c\u0456\u0441\u0446\u044c.<\/li>\n\n\n<li><strong>\u0412\u0430\u043c \u043f\u043e\u0442\u0440\u0456\u0431\u043d\u0430 \u0454\u0434\u0438\u043d\u0430 \u0449\u043e\u043c\u0456\u0441\u044f\u0447\u043d\u0430 \u043f\u043b\u0430\u0442\u0430.<\/strong> \u0412\u0456\u0434 199 \u20ac \u043d\u0430 \u043c\u0456\u0441\u044f\u0446\u044c \u2014 \u0456\u0437 \u0434\u0432\u043e\u0441\u0442\u043e\u0440\u043e\u043d\u043d\u044c\u043e\u044e \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0454\u044e, \u044f\u043a\u0443 \u043d\u0430\u043b\u0430\u0448\u0442\u043e\u0432\u0443\u0454 \u0442\u0430 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u0454 \u043a\u043e\u043c\u0430\u043d\u0434\u0430 SkyPlanner.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u042f\u043a \u0440\u043e\u0437\u043f\u043e\u0447\u0430\u0442\u0438<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u041f\u043e\u0447\u043d\u0456\u0442\u044c \u0431\u0435\u0437\u043a\u043e\u0448\u0442\u043e\u0432\u043d\u0438\u0439 \u043f\u0440\u043e\u0431\u043d\u0438\u0439 \u043f\u0435\u0440\u0456\u043e\u0434.<\/strong> 30 \u0434\u043d\u0456\u0432, \u0434\u043e 20 \u0440\u043e\u0431\u043e\u0447\u0438\u0445 \u0446\u0435\u043d\u0442\u0440\u0456\u0432, \u0443\u0441\u0456 \u0444\u0443\u043d\u043a\u0446\u0456\u0457 Basic, \u0431\u0435\u0437 \u0431\u0430\u043d\u043a\u0456\u0432\u0441\u044c\u043a\u043e\u0457 \u043a\u0430\u0440\u0442\u043a\u0438.<\/li>\n\n\n<li><strong>\u0421\u0442\u0432\u043e\u0440\u0456\u0442\u044c \u043c\u043e\u0434\u0435\u043b\u044c \u0441\u0432\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430.<\/strong> \u0414\u043e\u0434\u0430\u0439\u0442\u0435 \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0438, \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0456\u0432 \u0456 \u0437\u043c\u0456\u043d\u0438 \u0443 SkyPlanner \u0430\u0431\u043e \u0456\u043c\u043f\u043e\u0440\u0442\u0443\u0439\u0442\u0435 postes de charge \u0442\u0430 \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0438 \u0437 Cegid. \u0417\u0430 \u043f\u043e\u0442\u0440\u0435\u0431\u0438 \u043c\u043e\u0436\u043d\u0430 \u043e\u0442\u0440\u0438\u043c\u0430\u0442\u0438 \u0434\u043e\u043f\u043e\u043c\u043e\u0433\u0443 \u0437 \u043f\u043e\u0447\u0430\u0442\u043a\u043e\u0432\u0438\u043c \u043d\u0430\u043b\u0430\u0448\u0442\u0443\u0432\u0430\u043d\u043d\u044f\u043c.<\/li>\n\n\n<li><strong>\u0417\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0442\u0435 \u0441\u0432\u043e\u0457 OF.<\/strong> \u0415\u043a\u0441\u043f\u043e\u0440\u0442\u0443\u0439\u0442\u0435 \u0432\u0456\u0434\u043a\u0440\u0438\u0442\u0456 OF \u0442\u0430 \u0457\u0445\u043d\u0456 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0456 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457 \u0437 Cegid \u0432 Excel, \u043d\u0430\u043f\u0440\u0438\u043a\u043b\u0430\u0434 \u0437\u0430 \u0434\u043e\u043f\u043e\u043c\u043e\u0433\u043e\u044e \u0433\u0435\u043d\u0435\u0440\u0430\u0442\u043e\u0440\u0430 \u0437\u0432\u0456\u0442\u0456\u0432 PMI. \u0406\u043c\u043f\u043e\u0440\u0442\u0443\u0439\u0442\u0435 \u0457\u0445 \u0443 SkyPlanner \u0456 \u043f\u043e\u0440\u0456\u0432\u043d\u044f\u0439\u0442\u0435 \u043e\u0442\u0440\u0438\u043c\u0430\u043d\u0438\u0439 \u0433\u0440\u0430\u0444\u0456\u043a \u0456\u0437 \u043f\u043e\u0442\u043e\u0447\u043d\u0438\u043c \u043f\u043b\u0430\u043d\u043e\u043c.<\/li>\n\n\n<li><strong>\u041f\u0456\u0434\u043a\u043b\u044e\u0447\u0456\u0442\u044c Cegid.<\/strong> \u041a\u043e\u043c\u0430\u043d\u0434\u0430 SkyPlanner \u043d\u0430\u043b\u0430\u0448\u0442\u0443\u0454 \u0434\u0432\u043e\u0441\u0442\u043e\u0440\u043e\u043d\u043d\u044e \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u0442\u0430 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u0432\u0430\u0442\u0438\u043c\u0435 \u0457\u0457 \u043f\u0456\u0441\u043b\u044f \u0437\u0430\u043f\u0443\u0441\u043a\u0443 \u0432 \u0440\u043e\u0431\u043e\u0442\u0443.<\/li>\n\n<\/ol>\n\n\n<p><strong>\u0412\u0430\u0440\u0442\u0456\u0441\u0442\u044c.<\/strong> \u041f\u043b\u0430\u0442\u0430 \u0437\u0430 \u0442\u0430\u0440\u0438\u0444\u043e\u043c \u043d\u0430\u0440\u0430\u0445\u043e\u0432\u0443\u0454\u0442\u044c\u0441\u044f \u0449\u043e\u043c\u0456\u0441\u044f\u0446\u044f \u0437\u0430 \u043a\u043e\u0436\u0435\u043d \u0440\u043e\u0431\u043e\u0447\u0438\u0439 \u0446\u0435\u043d\u0442\u0440. \u0412\u0438 \u043c\u043e\u0436\u0435\u0442\u0435 \u0431\u0443\u0434\u044c-\u043a\u043e\u043b\u0438 \u0434\u043e\u0434\u0430\u0432\u0430\u0442\u0438 \u0447\u0438 \u0432\u0438\u0434\u0430\u043b\u044f\u0442\u0438 \u0440\u043e\u0431\u043e\u0447\u0456 \u0446\u0435\u043d\u0442\u0440\u0438 \u0430\u0431\u043e \u0441\u043a\u0430\u0441\u0443\u0432\u0430\u0442\u0438 \u043f\u0456\u0434\u043f\u0438\u0441\u043a\u0443. \u0414\u043e\u043a\u043b\u0430\u0434\u043d\u0456\u0448\u0435 \u2014 \u043d\u0430 \u0441\u0442\u043e\u0440\u0456\u043d\u0446\u0456 <a href=\"\/uk\/%d1%86%d1%96%d0%bd%d0%be%d1%83%d1%82%d0%b2%d0%be%d1%80%d0%b5%d0%bd%d0%bd%d1%8f\/\">\u0442\u0430\u0440\u0438\u0444\u0456\u0432<\/a>. \u0422\u0430\u043a\u043e\u0436 \u043f\u0435\u0440\u0435\u0433\u043b\u044f\u043d\u044c\u0442\u0435 <a href=\"\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/\">\u0443\u0441\u0456 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \u0437 ERP<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/uk\/%d0%b2%d0%b8%d0%bf%d1%80%d0%be%d0%b1%d1%83%d0%b2%d0%b0%d0%bd%d0%bd%d1%8f\/\">\u0421\u043f\u0440\u043e\u0431\u0443\u0432\u0430\u0442\u0438 \u0431\u0435\u0437\u043a\u043e\u0448\u0442\u043e\u0432\u043d\u043e<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/uk\/%d0%b7%d0%b2%d1%8f%d0%b6%d1%96%d1%82%d1%8c%d1%81%d1%8f-%d0%b7-%d0%b2%d1%96%d0%b4%d0%b4%d1%96%d0%bb%d0%be%d0%bc-%d0%bf%d1%80%d0%be%d0%b4%d0%b0%d0%b6%d1%96%d0%b2\/\">\u0417\u0432\u2019\u044f\u0437\u0430\u0442\u0438\u0441\u044f \u0437 \u0432\u0456\u0434\u0434\u0456\u043b\u043e\u043c \u043f\u0440\u043e\u0434\u0430\u0436\u0456\u0432<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u041f\u043e\u0448\u0438\u0440\u0435\u043d\u0456 \u0437\u0430\u043f\u0438\u0442\u0430\u043d\u043d\u044f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u042f\u043a\u0435 \u0434\u043e\u043f\u043e\u0432\u043d\u0435\u043d\u043d\u044f \u0434\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u043d\u0430\u0439\u043a\u0440\u0430\u0449\u0435 \u043f\u0456\u0434\u0445\u043e\u0434\u0438\u0442\u044c \u0434\u043b\u044f Cegid?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS \u2014 \u0446\u0435 \u0434\u043e\u043f\u043e\u0432\u043d\u0435\u043d\u043d\u044f \u0434\u043b\u044f \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439 \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0456\u0432 \u0456 \u0434\u043e\u0441\u0442\u0443\u043f\u043d\u043e\u0441\u0442\u0456 \u043f\u0435\u0440\u0441\u043e\u043d\u0430\u043b\u0443. \u0412\u043e\u043d\u043e \u043c\u0430\u0454 \u0434\u0432\u043e\u0441\u0442\u043e\u0440\u043e\u043d\u043d\u044e \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u0437 Cegid PMI, Cegid Primavera \u0442\u0430 Cegid Ekon. \u0414\u043e SkyPlanner \u043d\u0430\u0434\u0445\u043e\u0434\u044f\u0442\u044c OF \u0440\u0430\u0437\u043e\u043c \u0456\u0437 gammes, nomenclatures, postes de charge, \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0430\u043c\u0438, articles, \u0437\u0430\u043f\u0430\u0441\u0430\u043c\u0438 \u0442\u0430 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f\u043c\u0438 \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043b\u044c\u043d\u0438\u043a\u0430\u043c, \u0430 \u043d\u0430\u0437\u0430\u0434 \u043f\u0435\u0440\u0435\u0434\u0430\u044e\u0442\u044c\u0441\u044f \u0437\u0430\u043f\u043b\u0430\u043d\u043e\u0432\u0430\u043d\u0456 \u0434\u0430\u0442\u0438 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0438\u0445 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0439 \u0456 \u043e\u0431\u043b\u0456\u043a\u043e\u0432\u0430\u043d\u0438\u0439 \u0447\u0430\u0441. \u041f\u043b\u0430\u043d \u0432\u0440\u0430\u0445\u043e\u0432\u0443\u0454 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u0443 \u0434\u043e\u0441\u0442\u0443\u043f\u043d\u0456\u0441\u0442\u044c \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0430, \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0430, \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0430 \u0439 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0443. \u041c\u0430\u0442\u0440\u0438\u0446\u044f \u0447\u0430\u0441\u0443 \u043f\u0435\u0440\u0435\u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u043d\u0430\u043f\u0440\u044f\u043c\u043a\u0443 \u043f\u0435\u0440\u0435\u0445\u043e\u0434\u0443 \u0432\u0438\u0437\u043d\u0430\u0447\u0430\u0454 \u043f\u043e\u0441\u043b\u0456\u0434\u043e\u0432\u043d\u0456\u0441\u0442\u044c \u0437\u0430\u0432\u0434\u0430\u043d\u044c \u0442\u0430\u043a, \u0449\u043e\u0431 \u043c\u0456\u043d\u0456\u043c\u0456\u0437\u0443\u0432\u0430\u0442\u0438 \u043f\u0435\u0440\u0435\u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f. Autopilot \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0447\u043d\u043e \u043e\u043d\u043e\u0432\u043b\u044e\u0454 \u0433\u0440\u0430\u0444\u0456\u043a, \u043a\u043e\u043b\u0438 \u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0456 \u0432\u0456\u0434\u0431\u0443\u0432\u0430\u044e\u0442\u044c\u0441\u044f \u0437\u043c\u0456\u043d\u0438. \u0412\u0430\u0440\u0442\u0456\u0441\u0442\u044c \u2014 \u0432\u0456\u0434 199 \u20ac \u043d\u0430 \u043c\u0456\u0441\u044f\u0446\u044c, \u0430 \u0431\u0435\u0437\u043a\u043e\u0448\u0442\u043e\u0432\u043d\u0438\u0439 \u043f\u0440\u043e\u0431\u043d\u0438\u0439 \u043f\u0435\u0440\u0456\u043e\u0434 \u0442\u0440\u0438\u0432\u0430\u0454 30 \u0434\u043d\u0456\u0432.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0427\u0438 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u0454 Cegid \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439?<\/summary>\n<p class=\"sp-faq__a\">\u0427\u0430\u0441\u0442\u043a\u043e\u0432\u043e. Cegid PMI \u0441\u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u043f\u043b\u0430\u043d\u0443\u0454 OF \u0431\u0435\u0437 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0456, \u0430 \u043f\u043e\u0442\u0456\u043c \u0432\u0440\u0430\u0445\u043e\u0432\u0443\u0454 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u0440\u0435\u0441\u0443\u0440\u0441\u0456\u0432 \u0456 \u0437\u0430\u043f\u0430\u0441\u0456\u0432. \u0414\u043b\u044f \u0432\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f \u0434\u043e\u0434\u0430\u0442\u043a\u043e\u0432\u0438\u0445 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u044c Cegid \u0440\u0435\u043a\u043e\u043c\u0435\u043d\u0434\u0443\u0454 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438 \u0440\u043e\u0437\u0448\u0438\u0440\u0435\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f. Cegid Primavera \u043f\u0440\u043e\u043f\u043e\u043d\u0443\u0454 \u0433\u0440\u0430\u0444\u0456\u0447\u043d\u0435 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0437 \u0430\u043b\u0433\u043e\u0440\u0438\u0442\u043c\u043e\u043c, \u044f\u043a\u0438\u0439 \u043f\u0456\u0434\u043a\u0430\u0437\u0443\u0454 \u043f\u043e\u0441\u043b\u0456\u0434\u043e\u0432\u043d\u0456\u0441\u0442\u044c \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f. SkyPlanner APS \u043f\u0440\u0430\u0446\u044e\u0454 \u0440\u0430\u0437\u043e\u043c \u0456\u0437 Cegid: \u0441\u043a\u043b\u0430\u0434\u0430\u0454 \u0433\u0440\u0430\u0444\u0456\u043a \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u043e\u0457 \u0434\u043e\u0441\u0442\u0443\u043f\u043d\u043e\u0441\u0442\u0456 \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0430, \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a\u0430, \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0430 \u0439 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0443 \u0442\u0430 \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0447\u043d\u043e \u043f\u0435\u0440\u0435\u043f\u043b\u0430\u043d\u043e\u0432\u0443\u0454 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u042f\u043a\u0435 \u043f\u0440\u043e\u0433\u0440\u0430\u043c\u043d\u0435 \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0435\u043d\u043d\u044f \u0434\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0456\u043d\u0442\u0435\u0433\u0440\u0443\u0454\u0442\u044c\u0441\u044f \u0437 Cegid?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS \u043c\u0430\u0454 \u0434\u0432\u043e\u0441\u0442\u043e\u0440\u043e\u043d\u043d\u044e \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u0437 Cegid. \u0414\u043b\u044f \u0447\u0438\u0442\u0430\u043d\u043d\u044f \u0442\u0430 \u0437\u0430\u043f\u0438\u0441\u0443 \u0434\u0430\u043d\u0438\u0445 \u0443 Cegid PMI \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0454\u0442\u044c\u0441\u044f PMI Web API: \u0434\u043e SkyPlanner \u043d\u0430\u0434\u0445\u043e\u0434\u044f\u0442\u044c OF \u0456 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0456 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457, \u0430 \u043d\u0430\u0437\u0430\u0434 \u043f\u0435\u0440\u0435\u0434\u0430\u044e\u0442\u044c\u0441\u044f \u0437\u0430\u043f\u043b\u0430\u043d\u043e\u0432\u0430\u043d\u0456 \u0434\u0430\u0442\u0438 \u0442\u0430 pointages. \u0414\u043b\u044f Cegid Primavera \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0454\u0442\u044c\u0441\u044f PRIMAVERA V10 API: \u0434\u043e SkyPlanner \u043d\u0430\u0434\u0445\u043e\u0434\u044f\u0442\u044c ordens de fabrico, \u0437\u0430\u043f\u043b\u0430\u043d\u043e\u0432\u0430\u043d\u0456 \u0434\u0430\u0442\u0438 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0438\u0445 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0439 \u043f\u043e\u0432\u0435\u0440\u0442\u0430\u044e\u0442\u044c\u0441\u044f \u0447\u0435\u0440\u0435\u0437 \u0441\u0435\u0440\u0432\u0456\u0441 Planeamento, \u0430 \u0434\u0430\u043d\u0456 \u043f\u0440\u043e \u0447\u0430\u0441 \u2014 \u0447\u0435\u0440\u0435\u0437 Di\u00e1rios de Trabalho.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0429\u043e \u043e\u0431\u0440\u0430\u0442\u0438 \u0434\u043b\u044f \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f: Cegid PMI \u0447\u0438 SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner \u2014 \u044f\u043a\u0449\u043e \u0432\u0430\u0448\u0456 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u043d\u044f \u043d\u0435 \u0437\u0432\u043e\u0434\u044f\u0442\u044c\u0441\u044f \u0434\u043e \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0456\u0432 \u0456 \u0437\u0430\u043f\u0430\u0441\u0456\u0432, \u0430 \u043f\u043b\u0430\u043d \u0447\u0430\u0441\u0442\u043e \u0437\u043c\u0456\u043d\u044e\u0454\u0442\u044c\u0441\u044f. \u0417\u0430 \u043e\u043f\u0438\u0441\u043e\u043c Cegid, \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0437 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u0438\u043c\u0438 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u044f\u043c\u0438 \u0432 PMI \u0432\u0440\u0430\u0445\u043e\u0432\u0443\u0454 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0440\u0435\u0441\u0443\u0440\u0441\u0438 \u0442\u0430 \u0437\u0430\u043f\u0430\u0441\u0438; \u0434\u043b\u044f \u0448\u0438\u0440\u0448\u0438\u0445 \u043c\u043e\u0436\u043b\u0438\u0432\u043e\u0441\u0442\u0435\u0439 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u044f \u0440\u0435\u043a\u043e\u043c\u0435\u043d\u0434\u0443\u0454 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438 \u0440\u043e\u0437\u0448\u0438\u0440\u0435\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f. SkyPlanner \u0456 \u0454 \u0442\u0430\u043a\u0438\u043c \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u043e\u043c: \u0432\u0456\u043d \u0441\u043f\u0456\u043b\u044c\u043d\u043e \u043f\u043b\u0430\u043d\u0443\u0454 \u0440\u043e\u0431\u043e\u0442\u0443 \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0456\u0432, \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u043d\u043d\u044f \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0456\u0432, \u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f \u0442\u0430 \u043d\u0430\u0434\u0445\u043e\u0434\u0436\u0435\u043d\u043d\u044f \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0456\u0432, \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0447\u043d\u043e \u043f\u0435\u0440\u0435\u043f\u043b\u0430\u043d\u043e\u0432\u0443\u0454 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e \u0439 \u043d\u0430\u0434\u0430\u0454 \u043a\u043e\u0436\u043d\u043e\u043c\u0443 \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0443 \u0432\u043b\u0430\u0441\u043d\u0443 \u0447\u0435\u0440\u0433\u0443 \u0437\u0430\u0432\u0434\u0430\u043d\u044c \u0431\u0435\u0437 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u043d\u044f \u043a\u0456\u043b\u044c\u043a\u043e\u0441\u0442\u0456 \u043a\u043e\u0440\u0438\u0441\u0442\u0443\u0432\u0430\u0447\u0456\u0432. \u0412\u0438 \u043c\u043e\u0436\u0435\u0442\u0435 \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u0438\u0442\u0438 \u0446\u0435 \u043d\u0430 \u0432\u043b\u0430\u0441\u043d\u0438\u0445 OF \u043f\u0440\u043e\u0442\u044f\u0433\u043e\u043c \u0431\u0435\u0437\u043a\u043e\u0448\u0442\u043e\u0432\u043d\u043e\u0433\u043e \u043f\u0440\u043e\u0431\u043d\u043e\u0433\u043e \u043f\u0435\u0440\u0456\u043e\u0434\u0443.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0427\u0438 \u0437\u0430\u043c\u0456\u043d\u044e\u0454 SkyPlanner \u0443\u043f\u0440\u0430\u0432\u043b\u0456\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e\u043c \u0443 Cegid?<\/summary>\n<p class=\"sp-faq__a\">\u041d\u0456, \u0432\u0456\u043d \u0434\u043e\u043f\u043e\u0432\u043d\u044e\u0454 \u0439\u043e\u0433\u043e. \u0423 Cegid \u0437\u0430\u043b\u0438\u0448\u0430\u044e\u0442\u044c\u0441\u044f articles, nomenclatures, gammes, CBN, \u0441\u0442\u0432\u043e\u0440\u0435\u043d\u043d\u044f OF, \u0437\u0430\u043a\u0443\u043f\u0456\u0432\u043b\u0456, \u0437\u0430\u043f\u0430\u0441\u0438, \u0440\u043e\u0437\u0440\u0430\u0445\u0443\u043d\u043e\u043a \u0441\u043e\u0431\u0456\u0432\u0430\u0440\u0442\u043e\u0441\u0442\u0456 \u0442\u0430 \u0444\u0456\u043d\u0430\u043d\u0441\u0438. SkyPlanner \u0441\u043a\u043b\u0430\u0434\u0430\u0454 \u0433\u0440\u0430\u0444\u0456\u043a \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0432\u0430\u0448\u0438\u0445 OF \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439 \u0456 \u043f\u0435\u0440\u0435\u0434\u0430\u0454 \u0434\u0430\u0442\u0438 \u043d\u0430\u0437\u0430\u0434.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0417 \u044f\u043a\u0438\u043c\u0438 ERP-\u0441\u0438\u0441\u0442\u0435\u043c\u0430\u043c\u0438 Cegid \u043f\u0440\u0430\u0446\u044e\u0454 SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">\u0406\u0437 Cegid PMI \u0443 \u0424\u0440\u0430\u043d\u0446\u0456\u0457, Cegid Primavera Manufacturing \u0443 \u041f\u043e\u0440\u0442\u0443\u0433\u0430\u043b\u0456\u0457 \u0442\u0430 Cegid Ekon XRP Industria \u0432 \u0406\u0441\u043f\u0430\u043d\u0456\u0457. Cegid XRP Flex \u043f\u043e\u0431\u0443\u0434\u043e\u0432\u0430\u043d\u043e \u043d\u0430 Acumatica, \u0442\u043e\u043c\u0443 \u0434\u043b\u044f \u043d\u044c\u043e\u0433\u043e \u043f\u0456\u0434\u0445\u043e\u0434\u0438\u0442\u044c <a href=\"\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/acumatica\/\">\u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f \u0437 Acumatica<\/a>.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0421\u043a\u0456\u043b\u044c\u043a\u0438 \u043a\u043e\u0448\u0442\u0443\u0454 SkyPlanner \u0434\u043b\u044f \u043f\u0456\u0434\u043f\u0440\u0438\u0454\u043c\u0441\u0442\u0432\u0430, \u0449\u043e \u043f\u0440\u0430\u0446\u044e\u0454 \u0437 Cegid?<\/summary>\n<p class=\"sp-faq__a\">\u0412\u0456\u0434 199 \u20ac \u043d\u0430 \u043c\u0456\u0441\u044f\u0446\u044c \u0437\u0430 5 \u0440\u043e\u0431\u043e\u0447\u0438\u0445 \u0446\u0435\u043d\u0442\u0440\u0456\u0432 \u0456 \u0449\u0435 20 \u20ac \u043d\u0430 \u043c\u0456\u0441\u044f\u0446\u044c \u0437\u0430 \u043a\u043e\u0436\u0435\u043d \u0434\u043e\u0434\u0430\u0442\u043a\u043e\u0432\u0438\u0439 \u0440\u043e\u0431\u043e\u0447\u0438\u0439 \u0446\u0435\u043d\u0442\u0440. \u0420\u043e\u0431\u043e\u0447\u0438\u0439 \u0446\u0435\u043d\u0442\u0440 \u2014 \u0446\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0439 \u0440\u0435\u0441\u0443\u0440\u0441 \u0456\u0437 \u0432\u043b\u0430\u0441\u043d\u043e\u044e \u0437\u0430\u043f\u043b\u0430\u043d\u043e\u0432\u0430\u043d\u043e\u044e \u0447\u0435\u0440\u0433\u043e\u044e \u0437\u0430\u0432\u0434\u0430\u043d\u044c. \u0412\u0430\u0440\u0442\u0456\u0441\u0442\u044c \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \u0440\u043e\u0437\u0440\u0430\u0445\u043e\u0432\u0443\u0454\u0442\u044c\u0441\u044f \u0437\u0430\u0437\u0434\u0430\u043b\u0435\u0433\u0456\u0434\u044c \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0432\u0430\u0448\u0438\u0445 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432 \u0456 \u043f\u043e\u0442\u0440\u0435\u0431 \u0442\u0430 \u043d\u0430\u0434\u0430\u0454\u0442\u044c\u0441\u044f \u0440\u0430\u0437\u043e\u043c \u0456\u0437 \u0432\u0430\u0440\u0442\u0456\u0441\u0442\u044e \u0442\u0430\u0440\u0438\u0444\u0443, \u0442\u043e\u0436 \u0432\u0438 \u0431\u0430\u0447\u0438\u0442\u0435 \u043f\u043e\u0432\u043d\u0443 \u0441\u0443\u043c\u0443 \u0449\u0435 \u0434\u043e \u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u0440\u043e\u0431\u043e\u0442\u0438.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0421\u043a\u0456\u043b\u044c\u043a\u0438 \u0447\u0430\u0441\u0443 \u0437\u0430\u0439\u043c\u0430\u0454 \u0432\u043f\u0440\u043e\u0432\u0430\u0434\u0436\u0435\u043d\u043d\u044f?<\/summary>\n<p class=\"sp-faq__a\">\u0417\u0430\u0437\u0432\u0438\u0447\u0430\u0439 \u0432\u043f\u0440\u043e\u0432\u0430\u0434\u0436\u0435\u043d\u043d\u044f \u0437\u0430\u0432\u0435\u0440\u0448\u0443\u0454\u0442\u044c\u0441\u044f \u043f\u0440\u043e\u0442\u044f\u0433\u043e\u043c \u043a\u0456\u043b\u044c\u043a\u043e\u0445 \u0442\u0438\u0436\u043d\u0456\u0432 \u043f\u0456\u0441\u043b\u044f \u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u043d\u0430\u043b\u0430\u0448\u0442\u0443\u0432\u0430\u043d\u043d\u044f. \u041a\u043e\u043c\u0430\u043d\u0434\u0430 \u043d\u0430\u043b\u0430\u0448\u0442\u043e\u0432\u0443\u0454 \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u043d\u0456\u0441\u0442\u044c \u0432\u0430\u0448\u0438\u0445 postes de charge, \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0456\u0432 \u0456 gammes, \u043f\u0456\u0434\u043a\u043b\u044e\u0447\u0430\u0454 \u043e\u0431\u043c\u0456\u043d OF \u0442\u0430 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f\u043c\u0438 \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043b\u044c\u043d\u0438\u043a\u0430\u043c \u0456 \u0437\u0432\u043e\u0440\u043e\u0442\u043d\u0435 \u043f\u0435\u0440\u0435\u0434\u0430\u0432\u0430\u043d\u043d\u044f \u0437\u0430\u043f\u043b\u0430\u043d\u043e\u0432\u0430\u043d\u0438\u0445 \u0434\u0430\u0442. \u041f\u0435\u0440\u0435\u0434 \u0437\u0430\u043f\u0443\u0441\u043a\u043e\u043c \u0443 \u0440\u043e\u0431\u043e\u0442\u0443 \u0432\u0441\u0435 \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u044f\u044e\u0442\u044c, \u0437\u0456\u0441\u0442\u0430\u0432\u043b\u044f\u044e\u0447\u0438 \u0437 \u0432\u0430\u0448\u0438\u043c \u043f\u043e\u0442\u043e\u0447\u043d\u0438\u043c \u043f\u043b\u0430\u043d\u043e\u043c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0427\u0438 \u043c\u043e\u0436\u043d\u0430 \u0432\u0438\u043f\u0440\u043e\u0431\u0443\u0432\u0430\u0442\u0438 SkyPlanner \u0434\u043e \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \u0437 Cegid?<\/summary>\n<p class=\"sp-faq__a\">\u0422\u0430\u043a. \u041f\u0440\u043e\u0442\u044f\u0433\u043e\u043c 30-\u0434\u0435\u043d\u043d\u043e\u0433\u043e \u043f\u0440\u043e\u0431\u043d\u043e\u0433\u043e \u043f\u0435\u0440\u0456\u043e\u0434\u0443 \u043c\u043e\u0436\u043d\u0430 \u043f\u0440\u0430\u0446\u044e\u0432\u0430\u0442\u0438 \u0437 \u0432\u0456\u0434\u043a\u0440\u0438\u0442\u0438\u043c\u0438 OF, \u0435\u043a\u0441\u043f\u043e\u0440\u0442\u043e\u0432\u0430\u043d\u0438\u043c\u0438 \u0437 Cegid \u0432 Excel. \u0429\u0435 \u0434\u043e \u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u0431\u0443\u0434\u044c-\u044f\u043a\u0438\u0445 \u0440\u043e\u0431\u0456\u0442 \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \u0432\u0438 \u043f\u043e\u0431\u0430\u0447\u0438\u0442\u0435 <a href=\"\/uk\/%d1%80%d0%b5%d1%81%d1%83%d1%80%d1%81%d0%b8\/finite-capacity-scheduling\/\">\u043f\u043b\u0430\u043d \u0432\u043b\u0430\u0441\u043d\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \/ ERP \/ Cegid SkyPlanner APS \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439 SkyPlanner APS \u2014 \u0446\u0435 \u0434\u043e\u043f\u043e\u0432\u043d\u0435\u043d\u043d\u044f \u0434\u043b\u044f \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0432 ERP-\u0441\u0438\u0441\u0442\u0435\u043c\u0430\u0445 Cegid, \u044f\u043a\u0435 \u0432\u0440\u0430\u0445\u043e\u0432\u0443\u0454 \u0440\u0435\u0430\u043b\u044c\u043d\u0456 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0456 \u043e\u0431\u043b\u0430\u0434\u043d\u0430\u043d\u043d\u044f \u0442\u0430 \u043f\u0435\u0440\u0441\u043e\u043d\u0430\u043b\u0443. \u041d\u0430\u0441\u0430\u043c\u043f\u0435\u0440\u0435\u0434 \u0432\u043e\u043d\u043e \u043f\u0440\u0438\u0437\u043d\u0430\u0447\u0435\u043d\u0435 \u0434\u043b\u044f Cegid PMI, \u0430 \u0442\u0430\u043a\u043e\u0436 \u0434\u043b\u044f Cegid Primavera \u0439 Cegid Ekon. \u0421\u0438\u0441\u0442\u0435\u043c\u0430 \u043f\u043b\u0430\u043d\u0443\u0454 \u0440\u043e\u0431\u043e\u0442\u0443 \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0430, \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0430 \u0439 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0430 &#8230; <a title=\"SkyPlanner APS \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/cegid\/\" aria-label=\"Read more about SkyPlanner APS \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439\">\u0414\u043e\u043a\u043b\u0430\u0434\u043d\u0456\u0448\u0435<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100698,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106402","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Cegid: \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f APS, \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437\u0430 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u044f\u043c\u0438<\/title>\n<meta name=\"description\" content=\"SkyPlanner APS \u2014 \u043c\u043e\u0434\u0443\u043b\u044c \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0454 \u0437\u0430 \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u043c\u0438 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u044f\u043c\u0438, \u0434\u0432\u043e\u0431\u0456\u0447\u043d\u0430 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f, \u043a\u043e\u0436\u0435\u043d \u0432\u0435\u0440\u0441\u0442\u0430\u0442, \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440, \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442 \u0456 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b. \u0412\u0456\u0434 199 \u20ac \u043d\u0430 \u043c\u0456\u0441\u044f\u0446\u044c.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/cegid\/\" \/>\n<meta property=\"og:locale\" content=\"uk_UA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439\" \/>\n<meta property=\"og:description\" content=\"SkyPlanner APS \u2014 \u043c\u043e\u0434\u0443\u043b\u044c \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0454 \u0437\u0430 \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u043c\u0438 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u044f\u043c\u0438, \u0434\u0432\u043e\u0431\u0456\u0447\u043d\u0430 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f, \u043a\u043e\u0436\u0435\u043d \u0432\u0435\u0440\u0441\u0442\u0430\u0442, \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440, \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442 \u0456 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b. \u0412\u0456\u0434 199 \u20ac \u043d\u0430 \u043c\u0456\u0441\u044f\u0446\u044c.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/cegid\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u041f\u0440\u0438\u0431\u043b. \u0447\u0430\u0441 \u0447\u0438\u0442\u0430\u043d\u043d\u044f\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 \u0445\u0432\u0438\u043b\u0438\u043d\u0438\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/erp\\\/cegid\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/erp\\\/cegid\\\/\",\"name\":\"Cegid: \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f APS, \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437\u0430 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u044f\u043c\u0438\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"SkyPlanner APS \u2014 \u043c\u043e\u0434\u0443\u043b\u044c \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0454 \u0437\u0430 \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u043c\u0438 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u044f\u043c\u0438, \u0434\u0432\u043e\u0431\u0456\u0447\u043d\u0430 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f, \u043a\u043e\u0436\u0435\u043d \u0432\u0435\u0440\u0441\u0442\u0430\u0442, \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440, \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442 \u0456 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b. \u0412\u0456\u0434 199 \u20ac \u043d\u0430 \u043c\u0456\u0441\u044f\u0446\u044c.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/erp\\\/cegid\\\/#breadcrumb\"},\"inLanguage\":\"uk\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/erp\\\/cegid\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/erp\\\/cegid\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 ERP- \u0456 MES-\u043f\u0440\u043e\u0433\u0440\u0430\u043c\u043d\u043e\u0433\u043e \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0435\u043d\u043d\u044f \u0437\u0456 SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS \u0434\u043b\u044f \u0432\u0430\u0448\u043e\u0457 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"uk\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"uk\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cegid: \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f APS, \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437\u0430 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u044f\u043c\u0438","description":"SkyPlanner APS \u2014 \u043c\u043e\u0434\u0443\u043b\u044c \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0454 \u0437\u0430 \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u043c\u0438 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u044f\u043c\u0438, \u0434\u0432\u043e\u0431\u0456\u0447\u043d\u0430 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f, \u043a\u043e\u0436\u0435\u043d \u0432\u0435\u0440\u0441\u0442\u0430\u0442, \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440, \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442 \u0456 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b. \u0412\u0456\u0434 199 \u20ac \u043d\u0430 \u043c\u0456\u0441\u044f\u0446\u044c.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/cegid\/","og_locale":"uk_UA","og_type":"article","og_title":"SkyPlanner APS \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439","og_description":"SkyPlanner APS \u2014 \u043c\u043e\u0434\u0443\u043b\u044c \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0454 \u0437\u0430 \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u043c\u0438 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u044f\u043c\u0438, \u0434\u0432\u043e\u0431\u0456\u0447\u043d\u0430 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f, \u043a\u043e\u0436\u0435\u043d \u0432\u0435\u0440\u0441\u0442\u0430\u0442, \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440, \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442 \u0456 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b. \u0412\u0456\u0434 199 \u20ac \u043d\u0430 \u043c\u0456\u0441\u044f\u0446\u044c.","og_url":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/cegid\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u041f\u0440\u0438\u0431\u043b. \u0447\u0430\u0441 \u0447\u0438\u0442\u0430\u043d\u043d\u044f":"2 \u0445\u0432\u0438\u043b\u0438\u043d\u0438"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/cegid\/","url":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/cegid\/","name":"Cegid: \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f APS, \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437\u0430 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u044f\u043c\u0438","isPartOf":{"@id":"https:\/\/skyplanner.ai\/uk\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"SkyPlanner APS \u2014 \u043c\u043e\u0434\u0443\u043b\u044c \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0454 \u0437\u0430 \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u043c\u0438 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u044f\u043c\u0438, \u0434\u0432\u043e\u0431\u0456\u0447\u043d\u0430 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f, \u043a\u043e\u0436\u0435\u043d \u0432\u0435\u0440\u0441\u0442\u0430\u0442, \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440, \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442 \u0456 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b. \u0412\u0456\u0434 199 \u20ac \u043d\u0430 \u043c\u0456\u0441\u044f\u0446\u044c.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/cegid\/#breadcrumb"},"inLanguage":"uk","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/cegid\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/cegid\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/uk\/"},{"@type":"ListItem","position":2,"name":"\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 ERP- \u0456 MES-\u043f\u0440\u043e\u0433\u0440\u0430\u043c\u043d\u043e\u0433\u043e \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0435\u043d\u043d\u044f \u0437\u0456 SkyPlanner","item":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS \u0434\u043b\u044f \u0432\u0430\u0448\u043e\u0457 ERP","item":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/uk\/#website","url":"https:\/\/skyplanner.ai\/uk\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"uk"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/uk\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/uk\/","logo":{"@type":"ImageObject","inLanguage":"uk","@id":"https:\/\/skyplanner.ai\/uk\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/uk\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/uk\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \/ ERP \/ Cegid SkyPlanner APS \u0434\u043b\u044f Cegid: \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439 SkyPlanner APS \u2014 \u0446\u0435 \u0434\u043e\u043f\u043e\u0432\u043d\u0435\u043d\u043d\u044f \u0434\u043b\u044f \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0432 ERP-\u0441\u0438\u0441\u0442\u0435\u043c\u0430\u0445 Cegid, \u044f\u043a\u0435 \u0432\u0440\u0430\u0445\u043e\u0432\u0443\u0454 \u0440\u0435\u0430\u043b\u044c\u043d\u0456 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0456 \u043e\u0431\u043b\u0430\u0434\u043d\u0430\u043d\u043d\u044f \u0442\u0430 \u043f\u0435\u0440\u0441\u043e\u043d\u0430\u043b\u0443. \u041d\u0430\u0441\u0430\u043c\u043f\u0435\u0440\u0435\u0434 \u0432\u043e\u043d\u043e \u043f\u0440\u0438\u0437\u043d\u0430\u0447\u0435\u043d\u0435 \u0434\u043b\u044f Cegid PMI, \u0430 \u0442\u0430\u043a\u043e\u0436 \u0434\u043b\u044f Cegid Primavera \u0439 Cegid Ekon. \u0421\u0438\u0441\u0442\u0435\u043c\u0430 \u043f\u043b\u0430\u043d\u0443\u0454 \u0440\u043e\u0431\u043e\u0442\u0443 \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0430, \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0430 \u0439 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0430&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/pages\/106402","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/comments?post=106402"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/pages\/106402\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/pages\/100698"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/media?parent=106402"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}