{"id":101233,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101233"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/odoo\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/","title":{"rendered":"\u041f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 Odoo \u0437\u0456 SkyPlanner APS \u0434\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/\">\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457<\/a> \/ <a href=\"\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/\">ERP<\/a> \/ Odoo<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">\u041f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 Odoo <span class=\"hl\">\u0437\u0456 SkyPlanner APS \u0434\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">\u0426\u0435\u0439 \u043f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u043f\u043e\u044f\u0441\u043d\u044e\u0454 \u043f\u0430\u0440\u0442\u043d\u0435\u0440\u0430\u043c Odoo, \u0440\u043e\u0437\u0440\u043e\u0431\u043d\u0438\u043a\u0430\u043c \u0442\u0430 \u0406\u0422-\u043a\u0435\u0440\u0456\u0432\u043d\u0438\u043a\u0430\u043c, \u044f\u043a \u043f\u0456\u0434\u043a\u043b\u044e\u0447\u0438\u0442\u0438 Odoo Manufacturing \u0434\u043e SkyPlanner APS. \u0411\u0456\u0437\u043d\u0435\u0441-\u043e\u0431\u0491\u0440\u0443\u043d\u0442\u0443\u0432\u0430\u043d\u043d\u044f \u0442\u0430 \u043c\u043e\u0436\u043b\u0438\u0432\u043e\u0441\u0442\u0456 \u043a\u043d\u043e\u043f\u043a\u0438 Plan \u0432 Odoo \u043e\u043f\u0438\u0441\u0430\u043d\u043e \u043d\u0430 <a href=\"\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/odoo\/\">\u0441\u0442\u043e\u0440\u0456\u043d\u0446\u0456 \u043f\u0440\u043e \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u0435 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0432 Odoo<\/a> \u0442\u0430 \u0443 \u0441\u0442\u0430\u0442\u0442\u0456 <a href=\"\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/odoo\/%d0%bf%d0%bb%d0%b0%d0%bd%d1%83%d0%b2%d0%b0%d0%bd%d0%bd%d1%8f-%d0%b2%d0%b8%d1%80%d0%be%d0%b1%d0%bd%d0%b8%d1%86%d1%82%d0%b2%d0%b0\/\">\u00ab\u0427\u0438 \u0454 \u0432 Odoo \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430?\u00bb<\/a>, \u0434\u0435 \u0439\u0434\u0435\u0442\u044c\u0441\u044f \u043f\u0440\u043e \u0441\u043a\u043b\u0430\u0434\u0430\u043d\u043d\u044f \u0433\u0440\u0430\u0444\u0456\u043a\u0430 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0440\u0435\u0430\u043b\u044c\u043d\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439 \u043e\u0431\u043b\u0430\u0434\u043d\u0430\u043d\u043d\u044f \u0442\u0430 \u0434\u043e\u0441\u0442\u0443\u043f\u043d\u043e\u0441\u0442\u0456 \u043f\u0435\u0440\u0441\u043e\u043d\u0430\u043b\u0443.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/uk\/%d0%b2%d0%b8%d0%bf%d1%80%d0%be%d0%b1%d1%83%d0%b2%d0%b0%d0%bd%d0%bd%d1%8f\/\">\u0420\u043e\u0437\u043f\u043e\u0447\u0430\u0442\u0438 \u0431\u0435\u0437\u043a\u043e\u0448\u0442\u043e\u0432\u043d\u0438\u0439 \u043f\u0440\u043e\u0431\u043d\u0438\u0439 \u043f\u0435\u0440\u0456\u043e\u0434<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/uk\/%d0%b7%d0%b2%d1%8f%d0%b6%d1%96%d1%82%d1%8c%d1%81%d1%8f-%d0%b7-%d0%b2%d1%96%d0%b4%d0%b4%d1%96%d0%bb%d0%be%d0%bc-%d0%bf%d1%80%d0%be%d0%b4%d0%b0%d0%b6%d1%96%d0%b2\/\">\u0417\u0430\u043c\u043e\u0432\u0438\u0442\u0438 \u0434\u0435\u043c\u043e\u043d\u0441\u0442\u0440\u0430\u0446\u0456\u044e<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u041a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u0435 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0414\u0456\u0430\u0433\u0440\u0430\u043c\u0430 \u0413\u0430\u043d\u0442\u0430 \u0432 SkyPlanner APS \u0456\u0437 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u043c\u0438 \u0437\u0430\u0432\u0434\u0430\u043d\u043d\u044f\u043c\u0438, \u0440\u043e\u0437\u043f\u043e\u0434\u0456\u043b\u0435\u043d\u0438\u043c\u0438 \u043c\u0456\u0436 \u0440\u043e\u0431\u043e\u0447\u0438\u043c\u0438 \u0446\u0435\u043d\u0442\u0440\u0430\u043c\u0438, \u0442\u0430 \u0441\u043f\u0438\u0441\u043a\u043e\u043c \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u044c \u0443\u043d\u0438\u0437\u0443.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Odoo \u0437\u0430\u043b\u0438\u0448\u0430\u0454\u0442\u044c\u0441\u044f \u0441\u0438\u0441\u0442\u0435\u043c\u043e\u044e \u043e\u0431\u043b\u0456\u043a\u0443 \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u0457, \u0441\u043f\u0435\u0446\u0438\u0444\u0456\u043a\u0430\u0446\u0456\u0439, \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0439, \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u044c \u043d\u0430 \u0432\u0438\u0433\u043e\u0442\u043e\u0432\u043b\u0435\u043d\u043d\u044f, \u0437\u0430\u043f\u0430\u0441\u0456\u0432 \u0456 \u0441\u043e\u0431\u0456\u0432\u0430\u0440\u0442\u043e\u0441\u0442\u0456. \u041d\u0430 \u043e\u0441\u043d\u043e\u0432\u0456 \u0446\u0438\u0445 \u0434\u0430\u043d\u0438\u0445 SkyPlanner \u0444\u043e\u0440\u043c\u0443\u0454 \u0433\u0440\u0430\u0444\u0456\u043a \u0437\u0430 \u0434\u043e\u043f\u043e\u043c\u043e\u0433\u043e\u044e \u0441\u0432\u043e\u0433\u043e \u0440\u0443\u0448\u0456\u044f Arcturus. \u041e\u0431\u043c\u0456\u043d \u0434\u0430\u043d\u0438\u043c\u0438 \u0437 Odoo \u0432\u0456\u0434\u0431\u0443\u0432\u0430\u0454\u0442\u044c\u0441\u044f \u0432 \u043e\u0431\u043e\u0445 \u043d\u0430\u043f\u0440\u044f\u043c\u043a\u0430\u0445:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>\u0414\u043e SkyPlanner \u043d\u0430\u0434\u0445\u043e\u0434\u044f\u0442\u044c \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u043d\u0430 \u0432\u0438\u0433\u043e\u0442\u043e\u0432\u043b\u0435\u043d\u043d\u044f, \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f, \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457 BoM, \u0440\u043e\u0431\u043e\u0447\u0456 \u0446\u0435\u043d\u0442\u0440\u0438 \u0442\u0430 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u043d\u0430 \u0437\u0430\u043a\u0443\u043f\u0456\u0432\u043b\u044e.<\/li>\n\n\n<li>\u0423 <code>mrp.workorder<\/code> \u0437\u0430\u043f\u0438\u0441\u0443\u044e\u0442\u044c\u0441\u044f \u043f\u043b\u0430\u043d\u043e\u0432\u0456 \u0447\u0430\u0441 \u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u0439 \u0437\u0430\u0432\u0435\u0440\u0448\u0435\u043d\u043d\u044f \u0442\u0430 \u0440\u043e\u0431\u043e\u0447\u0456 \u0446\u0435\u043d\u0442\u0440\u0438.<\/li>\n\n\n<li>\u0414\u0430\u043d\u0456 \u043f\u0440\u043e \u0445\u0456\u0434 \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0442\u0430 \u043e\u0431\u043b\u0456\u043a\u043e\u0432\u0430\u043d\u0438\u0439 \u0447\u0430\u0441 \u043f\u043e\u0432\u0435\u0440\u0442\u0430\u044e\u0442\u044c\u0441\u044f \u0434\u043e Odoo \u044f\u043a Time Logs.<\/li>\n\n\n<li>\u0412\u0435\u0431\u0445\u0443\u043a\u0438 SkyPlanner \u043f\u0435\u0440\u0435\u0434\u0430\u044e\u0442\u044c \u0437\u043c\u0456\u043d\u0438 \u0433\u0440\u0430\u0444\u0456\u043a\u0430 \u0432\u0456\u0434\u0440\u0430\u0437\u0443 \u043f\u0456\u0441\u043b\u044f \u0457\u0445 \u0432\u043d\u0435\u0441\u0435\u043d\u043d\u044f.<\/li>\n\n<\/ul>\n\n\n<p>\u041f\u0456\u0434 \u0447\u0430\u0441 \u043f\u043e\u0447\u0430\u0442\u043a\u043e\u0432\u043e\u0433\u043e \u043d\u0430\u043b\u0430\u0448\u0442\u0443\u0432\u0430\u043d\u043d\u044f \u043a\u043e\u043c\u0430\u043d\u0434\u0430 SkyPlanner \u0440\u0435\u0430\u043b\u0456\u0437\u0443\u0454 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u0447\u0435\u0440\u0435\u0437 \u0441\u0442\u0430\u043d\u0434\u0430\u0440\u0442\u043d\u0438\u0439 \u0437\u043e\u0432\u043d\u0456\u0448\u043d\u0456\u0439 API Odoo \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0432\u0430\u0448\u043e\u0457 \u0432\u0435\u0440\u0441\u0456\u0457, \u0445\u043e\u0441\u0442\u0438\u043d\u0433\u0443 \u0442\u0430 \u0434\u043e\u043e\u043f\u0440\u0430\u0446\u044e\u0432\u0430\u043d\u044c, \u0430 \u043f\u0456\u0441\u043b\u044f \u0437\u0430\u043f\u0443\u0441\u043a\u0443 \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0443\u0454 \u0457\u0457 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u043a\u0443. \u0426\u0435\u0439 \u043f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u043f\u0440\u0438\u0437\u043d\u0430\u0447\u0435\u043d\u043e \u0434\u043b\u044f \u043f\u0430\u0440\u0442\u043d\u0435\u0440\u0456\u0432 \u0456 \u0440\u043e\u0437\u0440\u043e\u0431\u043d\u0438\u043a\u0456\u0432, \u044f\u043a\u0456 \u0445\u043e\u0447\u0443\u0442\u044c \u0434\u043e\u043b\u0443\u0447\u0438\u0442\u0438\u0441\u044f \u0434\u043e \u0440\u043e\u0431\u043e\u0442\u0438 \u0430\u0431\u043e \u0441\u0430\u043c\u043e\u0441\u0442\u0456\u0439\u043d\u043e \u0441\u0442\u0432\u043e\u0440\u0438\u0442\u0438 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u043d\u0430 \u043e\u0441\u043d\u043e\u0432\u0456 \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u043e\u0432\u0430\u043d\u043e\u0433\u043e REST API SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">\u0434\u043e\u0432\u0456\u0434\u043d\u0438\u043a API<\/a>). \u0420\u043e\u0431\u043e\u0442\u0443 \u0437 \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u0454\u044e, \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0430\u043c\u0438 \u0442\u0430 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f\u043c\u0438 \u043d\u0430 \u0437\u0430\u043a\u0443\u043f\u0456\u0432\u043b\u044e \u043e\u043f\u0438\u0441\u0430\u043d\u043e \u0443 \u0432\u0456\u0434\u043a\u0440\u0438\u0442\u0456\u0439 <a href=\"\/uk\/docs\/%d0%bf%d1%96%d0%b4%d1%80%d1%83%d1%87%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/\">\u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u0430\u0446\u0456\u0457 SkyPlanner<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"step-zero-check-the-odoo-plan-and-hosting\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u041d\u0443\u043b\u044c\u043e\u0432\u0438\u0439 \u043a\u0440\u043e\u043a: \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u0442\u0435 \u0442\u0430\u0440\u0438\u0444\u043d\u0438\u0439 \u043f\u043b\u0430\u043d \u0456 \u0445\u043e\u0441\u0442\u0438\u043d\u0433 Odoo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0421\u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u0437\u2019\u044f\u0441\u0443\u0439\u0442\u0435, \u044f\u043a\u0438\u0439 \u0432\u0430\u0440\u0456\u0430\u043d\u0442 Odoo \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0454 \u0437\u0430\u043c\u043e\u0432\u043d\u0438\u043a. \u0412\u0456\u0434 \u0446\u044c\u043e\u0433\u043e \u0437\u0430\u043b\u0435\u0436\u0438\u0442\u044c \u0441\u043f\u043e\u0441\u0456\u0431 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457.<\/p>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>\u0412\u0430\u0440\u0456\u0430\u043d\u0442 \u0440\u043e\u0437\u0433\u043e\u0440\u0442\u0430\u043d\u043d\u044f<\/th><th>\u0417\u043e\u0432\u043d\u0456\u0448\u043d\u0456\u0439 API<\/th><th>\u0412\u043b\u0430\u0441\u043d\u0456 \u043c\u043e\u0434\u0443\u043b\u0456<\/th><th>\u041f\u0440\u0430\u043a\u0442\u0438\u0447\u043d\u0438\u0439 \u0441\u043f\u043e\u0441\u0456\u0431 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457<\/th><\/tr><\/thead><tbody><tr><td>Odoo Online, One App Free \u0430\u0431\u043e Standard<\/td><td>\u041d\u0456<\/td><td>\u041d\u0456<\/td><td>CSV\/XLSX \u0430\u0431\u043e \u043f\u0435\u0440\u0435\u0445\u0456\u0434 \u043d\u0430 \u0442\u0430\u0440\u0438\u0444\u043d\u0438\u0439 \u043f\u043b\u0430\u043d Custom<\/td><\/tr><tr><td>Odoo Online, \u0442\u0430\u0440\u0438\u0444\u043d\u0438\u0439 \u043f\u043b\u0430\u043d Custom<\/td><td>\u0422\u0430\u043a<\/td><td>\u041d\u0456<\/td><td>\u0417\u043e\u0432\u043d\u0456\u0448\u043d\u0456\u0439 API<\/td><\/tr><tr><td>Odoo.sh (\u0442\u0430\u0440\u0438\u0444\u043d\u0438\u0439 \u043f\u043b\u0430\u043d Custom)<\/td><td>\u0422\u0430\u043a<\/td><td>\u0422\u0430\u043a<\/td><td>\u0417\u043e\u0432\u043d\u0456\u0448\u043d\u0456\u0439 API, \u0437\u0430 \u043f\u043e\u0442\u0440\u0435\u0431\u0438 \u2014 \u043c\u043e\u0434\u0443\u043b\u044c<\/td><\/tr><tr><td>\u041d\u0430 \u0432\u043b\u0430\u0441\u043d\u0438\u0445 \u0441\u0435\u0440\u0432\u0435\u0440\u0430\u0445, Community \u0430\u0431\u043e Enterprise<\/td><td>\u0422\u0430\u043a<\/td><td>\u0422\u0430\u043a<\/td><td>\u0417\u043e\u0432\u043d\u0456\u0448\u043d\u0456\u0439 API, \u0437\u0430 \u043f\u043e\u0442\u0440\u0435\u0431\u0438 \u2014 \u043c\u043e\u0434\u0443\u043b\u044c<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u0423 <a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_api.html\">\u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u0430\u0446\u0456\u0457 API Odoo<\/a> \u0437\u0430\u0437\u043d\u0430\u0447\u0435\u043d\u043e, \u0449\u043e \u0434\u043e\u0441\u0442\u0443\u043f \u0434\u043e \u0437\u043e\u0432\u043d\u0456\u0448\u043d\u044c\u043e\u0433\u043e API \u00abonly available on Custom Odoo pricing plans\u00bb (\u0434\u043e\u0441\u0442\u0443\u043f\u043d\u0438\u0439 \u043b\u0438\u0448\u0435 \u043d\u0430 \u0442\u0430\u0440\u0438\u0444\u043d\u0438\u0445 \u043f\u043b\u0430\u043d\u0430\u0445 Odoo Custom), \u0430 \u043d\u0435 \u043d\u0430 One App Free \u0447\u0438 Standard. \u041d\u0430 <a href=\"https:\/\/www.odoo.com\/pricing-plan\">\u0441\u0442\u043e\u0440\u0456\u043d\u0446\u0456 \u0442\u0430\u0440\u0438\u0444\u0456\u0432<\/a> Standard \u043e\u043f\u0438\u0441\u0430\u043d\u043e \u044f\u043a \u0432\u0430\u0440\u0456\u0430\u043d\u0442 \u0440\u043e\u0437\u043c\u0456\u0449\u0435\u043d\u043d\u044f \u043d\u0430 Odoo Online \u00abwithout custom modules\u00bb (\u0431\u0435\u0437 \u0432\u043b\u0430\u0441\u043d\u0438\u0445 \u043c\u043e\u0434\u0443\u043b\u0456\u0432). \u0417\u2019\u044f\u0441\u0443\u0439\u0442\u0435 \u0446\u0435 \u043f\u0456\u0434 \u0447\u0430\u0441 \u043f\u043e\u0447\u0430\u0442\u043a\u043e\u0432\u043e\u0433\u043e \u043e\u0431\u0441\u0442\u0435\u0436\u0435\u043d\u043d\u044f, \u0430 \u043d\u0435 \u043f\u043e\u0441\u0435\u0440\u0435\u0434 \u0440\u043e\u0437\u0440\u043e\u0431\u043a\u0438.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"odoo-s-integration-options\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0412\u0430\u0440\u0456\u0430\u043d\u0442\u0438 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \u0437 Odoo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>\u0412\u0430\u0440\u0456\u0430\u043d\u0442<\/th><th>\u0412\u0435\u0440\u0441\u0456\u0457<\/th><th>\u0410\u0432\u0442\u0435\u043d\u0442\u0438\u0444\u0456\u043a\u0430\u0446\u0456\u044f<\/th><th>\u0420\u043e\u043b\u044c \u0432 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \u0456\u0437 \u0441\u0438\u0441\u0442\u0435\u043c\u043e\u044e \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f<\/th><\/tr><\/thead><tbody><tr><td>\u0417\u043e\u0432\u043d\u0456\u0448\u043d\u0456\u0439 JSON-2 API: <code>POST \/json\/2\/&lt;model&gt;\/&lt;method&gt;<\/code><\/td><td>\u0417\u2019\u044f\u0432\u0438\u0432\u0441\u044f \u0443 \u0432\u0435\u0440\u0441\u0456\u0457 19.0<\/td><td>\u041a\u043b\u044e\u0447 API \u0443 <code>Authorization: bearer &lt;key&gt;<\/code>, \u043d\u0435\u043e\u0431\u043e\u0432\u2019\u044f\u0437\u043a\u043e\u0432\u0438\u0439 \u0437\u0430\u0433\u043e\u043b\u043e\u0432\u043e\u043a <code>X-Odoo-Database<\/code><\/td><td>\u041e\u0441\u043d\u043e\u0432\u043d\u0438\u0439 \u0432\u0430\u0440\u0456\u0430\u043d\u0442 \u0434\u043b\u044f \u043d\u043e\u0432\u0438\u0445 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0439: <code>search_read<\/code> \u0434\u043b\u044f \u0447\u0438\u0442\u0430\u043d\u043d\u044f, <code>write<\/code> \u0434\u043b\u044f \u0437\u0432\u043e\u0440\u043e\u0442\u043d\u043e\u0433\u043e \u0437\u0430\u043f\u0438\u0441\u0443 \u0434\u0430\u0442<\/td><\/tr><tr><td>\u0417\u043e\u0432\u043d\u0456\u0448\u043d\u0456 XML-RPC \/ JSON-RPC: <code>\/xmlrpc\/2<\/code>, <code>\/jsonrpc<\/code>, \u0441\u043b\u0443\u0436\u0431\u0438 <code>common<\/code>, <code>object<\/code><\/td><td>\u0414\u043e 19.0 \u0432\u043a\u043b\u044e\u0447\u043d\u043e; \u0437\u0430\u043f\u043b\u0430\u043d\u043e\u0432\u0430\u043d\u043e \u0432\u0438\u0434\u0430\u043b\u0435\u043d\u043d\u044f<\/td><td><code>common.authenticate<\/code> \u0437 \u043b\u043e\u0433\u0456\u043d\u043e\u043c \u0456 \u043f\u0430\u0440\u043e\u043b\u0435\u043c \u0430\u0431\u043e \u043a\u043b\u044e\u0447\u0435\u043c API, \u043f\u043e\u0442\u0456\u043c <code>execute_kw<\/code><\/td><td>\u041f\u043e\u0442\u0440\u0456\u0431\u043d\u0456 \u0434\u043b\u044f \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432 \u0456\u0437 \u0432\u0435\u0440\u0441\u0456\u044f\u043c\u0438 \u0432\u0456\u0434 16.0 \u0434\u043e 18.0<\/td><\/tr><tr><td>\u0412\u043b\u0430\u0441\u043d\u0456 \u043a\u043e\u043d\u0442\u0440\u043e\u043b\u0435\u0440\u0438 \u0432 \u043c\u043e\u0434\u0443\u043b\u0456<\/td><td>\u0423\u0441\u0456<\/td><td>\u0414\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u043c\u0430\u0440\u0448\u0440\u0443\u0442\u0443 \u043e\u043a\u0440\u0435\u043c\u043e, \u043d\u0430\u043f\u0440\u0438\u043a\u043b\u0430\u0434 <code>auth='bearer'<\/code><\/td><td>\u041e\u0431\u2019\u0454\u0434\u043d\u0430\u043d\u0456 \u0434\u0430\u043d\u0456: \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u043d\u0430 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e (MO) \u0440\u0430\u0437\u043e\u043c \u0456\u0437 \u0439\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u043c\u0438 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f\u043c\u0438 \u0437\u0430 \u043e\u0434\u0438\u043d \u0432\u0438\u043a\u043b\u0438\u043a<\/td><\/tr><tr><td>\u041f\u0440\u0430\u0432\u0438\u043b\u0430 \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0437\u0430\u0446\u0456\u0457: \u00abSend Webhook Notification\u00bb (\u043d\u0430\u0434\u0456\u0441\u043b\u0430\u0442\u0438 \u0441\u043f\u043e\u0432\u0456\u0449\u0435\u043d\u043d\u044f \u0447\u0435\u0440\u0435\u0437 \u0432\u0435\u0431\u0445\u0443\u043a)<\/td><td>\u0423 \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u0430\u0446\u0456\u0457 \u043f\u043e\u0447\u0438\u043d\u0430\u044e\u0447\u0438 \u0437 17.0<\/td><td>\u0412\u0438\u0445\u0456\u0434\u043d\u0438\u0439 POST-\u0437\u0430\u043f\u0438\u0442 \u043d\u0430 URL<\/td><td>\u041d\u0430\u0434\u0441\u0438\u043b\u0430\u043d\u043d\u044f \u0434\u0430\u043d\u0438\u0445 \u043f\u0456\u0434 \u0447\u0430\u0441 \u0441\u0442\u0432\u043e\u0440\u0435\u043d\u043d\u044f \u0430\u0431\u043e \u0440\u0435\u0434\u0430\u0433\u0443\u0432\u0430\u043d\u043d\u044f MO \u0442\u0430 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u044c<\/td><\/tr><tr><td>\u0406\u043c\u043f\u043e\u0440\u0442 \u0437\u0430\u043f\u0438\u0441\u0456\u0432 (CSV, XLSX) \u0442\u0430 \u0435\u043a\u0441\u043f\u043e\u0440\u0442<\/td><td>\u0423\u0441\u0456<\/td><td>\u0421\u0435\u0430\u043d\u0441 \u043a\u043e\u0440\u0438\u0441\u0442\u0443\u0432\u0430\u0447\u0430<\/td><td>\u0414\u0430\u043d\u0456 \u0434\u043b\u044f \u043f\u0440\u043e\u0431\u043d\u043e\u0433\u043e \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u043d\u043d\u044f \u0442\u0430 \u0440\u0430\u0437\u043e\u0432\u0435 \u0437\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0435\u043d\u043d\u044f \u043e\u0441\u043d\u043e\u0432\u043d\u0438\u0445 \u0434\u0430\u043d\u0438\u0445<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u041f\u0456\u0434\u0433\u043e\u0442\u0443\u0439\u0442\u0435\u0441\u044f \u0434\u043e \u0432\u0438\u0434\u0430\u043b\u0435\u043d\u043d\u044f \u0432\u0436\u0435 \u0437\u0430\u0440\u0430\u0437. Odoo <a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/developer\/reference\/external_rpc_api.html\">\u0437\u0430\u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043b\u0430 \u0432\u0438\u0434\u0430\u043b\u0435\u043d\u043d\u044f XML-RPC \u0456 JSON-RPC<\/a> \u0432 Odoo 22 (\u043e\u0441\u0456\u043d\u044c 2028) \u0442\u0430 Odoo Online 21.1 (\u0437\u0438\u043c\u0430 2027). \u0414\u043b\u044f 19.0 \u0431\u0443\u0434\u0443\u0439\u0442\u0435 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u043d\u0430 JSON-2, \u0430 \u0434\u043b\u044f \u0441\u0442\u0430\u0440\u0456\u0448\u0438\u0445 \u0431\u0430\u0437 \u0434\u0430\u043d\u0438\u0445 \u0456\u0437\u043e\u043b\u044e\u0439\u0442\u0435 \u0440\u043e\u0431\u043e\u0442\u0443 \u0437 RPC \u0432 \u043e\u0434\u043d\u043e\u043c\u0443 \u0430\u0434\u0430\u043f\u0442\u0435\u0440\u0456, \u0449\u043e\u0431 \u0434\u043b\u044f \u043e\u043d\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u0432\u0438\u0441\u0442\u0430\u0447\u0438\u043b\u043e \u043e\u0434\u043d\u0456\u0454\u0457 \u0437\u043c\u0456\u043d\u0438. \u0412\u0438\u0434\u0430\u043b\u0435\u043d\u043d\u044f \u043d\u0435 \u0441\u0442\u043e\u0441\u0443\u0454\u0442\u044c\u0441\u044f \u0432\u043b\u0430\u0441\u043d\u0438\u0445 \u043a\u043e\u043d\u0442\u0440\u043e\u043b\u0435\u0440\u0456\u0432 \u0456\u0437 <code>@route(type='jsonrpc')<\/code>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u0410\u0432\u0442\u0435\u043d\u0442\u0438\u0444\u0456\u043a\u0430\u0446\u0456\u044f<\/h3>\n\n\n<p>\u0421\u0442\u0432\u043e\u0440\u0456\u0442\u044c \u043e\u043a\u0440\u0435\u043c\u043e\u0433\u043e \u043a\u043e\u0440\u0438\u0441\u0442\u0443\u0432\u0430\u0447\u0430 \u0434\u043b\u044f \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \u0437 \u043f\u0440\u0430\u0432\u0430\u043c\u0438 \u0447\u0438\u0442\u0430\u043d\u043d\u044f \u0432 \u043c\u043e\u0434\u0443\u043b\u044f\u0445 \u00ab\u0412\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e\u00bb \u0442\u0430 \u00ab\u0421\u043a\u043b\u0430\u0434\u00bb \u0456 \u043f\u0440\u0430\u0432\u0430\u043c\u0438 \u0437\u0430\u043f\u0438\u0441\u0443 \u0434\u043b\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u044c. \u0417\u0433\u0435\u043d\u0435\u0440\u0443\u0439\u0442\u0435 \u0434\u043b\u044f \u043d\u044c\u043e\u0433\u043e \u043a\u043b\u044e\u0447 \u0443 \u0440\u043e\u0437\u0434\u0456\u043b\u0456 \u041d\u0430\u043b\u0430\u0448\u0442\u0443\u0432\u0430\u043d\u043d\u044f &gt; \u0411\u0435\u0437\u043f\u0435\u043a\u0430 \u043e\u0431\u043b\u0456\u043a\u043e\u0432\u043e\u0433\u043e \u0437\u0430\u043f\u0438\u0441\u0443 &gt; \u041d\u043e\u0432\u0438\u0439 \u043a\u043b\u044e\u0447 API. \u0423 \u0432\u0435\u0440\u0441\u0456\u0457 19.0 \u043a\u043b\u044e\u0447\u0456 \u0434\u0456\u044e\u0442\u044c \u0449\u043e\u043d\u0430\u0439\u0431\u0456\u043b\u044c\u0448\u0435 \u0442\u0440\u0438 \u043c\u0456\u0441\u044f\u0446\u0456, \u0442\u043e\u043c\u0443 \u043f\u0440\u043e\u043c\u0456\u0436\u043d\u0435 \u043f\u0440\u043e\u0433\u0440\u0430\u043c\u043d\u0435 \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0435\u043d\u043d\u044f \u043c\u0430\u0454 \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0443\u0432\u0430\u0442\u0438 \u0440\u043e\u0442\u0430\u0446\u0456\u044e \u043a\u043b\u044e\u0447\u0456\u0432 \u0456 \u0441\u043f\u043e\u0432\u0456\u0449\u0435\u043d\u043d\u044f \u043f\u0440\u043e \u043f\u043e\u043c\u0438\u043b\u043a\u0438 \u0430\u0432\u0442\u0435\u043d\u0442\u0438\u0444\u0456\u043a\u0430\u0446\u0456\u0457. \u0406\u043d\u0430\u043a\u0448\u0435 \u043f\u0456\u0441\u043b\u044f \u0437\u0430\u043a\u0456\u043d\u0447\u0435\u043d\u043d\u044f \u0441\u0442\u0440\u043e\u043a\u0443 \u0434\u0456\u0457 \u043a\u043b\u044e\u0447\u0430 \u0441\u0438\u043d\u0445\u0440\u043e\u043d\u0456\u0437\u0430\u0446\u0456\u044f \u0437\u0443\u043f\u0438\u043d\u0438\u0442\u044c\u0441\u044f \u043d\u0435\u043f\u043e\u043c\u0456\u0442\u043d\u043e. \u041d\u0430 \u0431\u043e\u0446\u0456 SkyPlanner \u0434\u043b\u044f \u0430\u0432\u0442\u0435\u043d\u0442\u0438\u0444\u0456\u043a\u0430\u0446\u0456\u0457 \u0432 REST API \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0454\u0442\u044c\u0441\u044f \u0442\u043e\u043a\u0435\u043d API, \u044f\u043a\u0438\u0439 \u043f\u0435\u0440\u0435\u0434\u0430\u0454\u0442\u044c\u0441\u044f \u0432 \u0437\u0430\u0433\u043e\u043b\u043e\u0432\u043a\u0443 Authorization-Token, \u0442\u043e\u043c\u0443 \u043f\u0440\u043e\u043c\u0456\u0436\u043d\u0435 \u043f\u0440\u043e\u0433\u0440\u0430\u043c\u043d\u0435 \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0435\u043d\u043d\u044f \u0437\u0431\u0435\u0440\u0456\u0433\u0430\u0454 \u043e\u0431\u043b\u0456\u043a\u043e\u0432\u0456 \u0434\u0430\u043d\u0456 \u0434\u043b\u044f \u043e\u0431\u043e\u0445 \u0441\u0438\u0441\u0442\u0435\u043c.<\/p>\n\n\n<p>\u041a\u043e\u0436\u0435\u043d \u0432\u0438\u043a\u043b\u0438\u043a JSON-2 \u0432\u0438\u043a\u043e\u043d\u0443\u0454\u0442\u044c\u0441\u044f \u0432 \u043e\u043a\u0440\u0435\u043c\u0456\u0439 SQL-\u0442\u0440\u0430\u043d\u0437\u0430\u043a\u0446\u0456\u0457, \u0442\u043e\u043c\u0443 \u0437\u0430\u043f\u0438\u0441 \u0434\u0430\u043d\u0438\u0445 \u0447\u0435\u0440\u0435\u0437 \u043a\u0456\u043b\u044c\u043a\u0430 \u0432\u0438\u043a\u043b\u0438\u043a\u0456\u0432 \u043d\u0435 \u0454 \u0430\u0442\u043e\u043c\u0430\u0440\u043d\u0438\u043c. \u0417\u0430\u043f\u0438\u0441\u0443\u0439\u0442\u0435 \u0434\u0430\u043d\u0456 \u043e\u043a\u0440\u0435\u043c\u043e \u0434\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u0442\u0430 \u0444\u0456\u043a\u0441\u0443\u0439\u0442\u0435 \u043a\u043e\u0436\u0435\u043d \u0440\u0435\u0437\u0443\u043b\u044c\u0442\u0430\u0442 \u0443 \u0436\u0443\u0440\u043d\u0430\u043b\u0456.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u041f\u043e\u0434\u0456\u0457<\/h3>\n\n\n<p>Odoo \u043d\u0430\u0434\u0441\u0438\u043b\u0430\u0454 \u0437\u043c\u0456\u043d\u0438 \u0447\u0435\u0440\u0435\u0437 <a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/studio\/automated_actions.html\">\u043f\u0440\u0430\u0432\u0438\u043b\u0430 \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0437\u0430\u0446\u0456\u0457<\/a>. \u041f\u0440\u0430\u0432\u0438\u043b\u043e \u0434\u043b\u044f <code>mrp.production<\/code> \u0430\u0431\u043e <code>mrp.workorder<\/code> \u0437 \u0442\u0440\u0438\u0433\u0435\u0440\u043e\u043c On create and edit \u0456 \u0434\u0456\u0454\u044e \u00abSend Webhook Notification\u00bb (\u043d\u0430\u0434\u0456\u0441\u043b\u0430\u0442\u0438 \u0441\u043f\u043e\u0432\u0456\u0449\u0435\u043d\u043d\u044f \u0447\u0435\u0440\u0435\u0437 \u0432\u0435\u0431\u0445\u0443\u043a) \u043d\u0430\u0434\u0441\u0438\u043b\u0430\u0454 POST-\u0437\u0430\u043f\u0438\u0442 \u0456\u0437 \u0432\u0438\u0431\u0440\u0430\u043d\u0438\u043c\u0438 \u043f\u043e\u043b\u044f\u043c\u0438 \u043d\u0430 \u0432\u043a\u0430\u0437\u0430\u043d\u0438\u0439 URL. \u0421\u0442\u0432\u043e\u0440\u0456\u0442\u044c \u043f\u0440\u0430\u0432\u0438\u043b\u043e \u0432 Studio \u0430\u0431\u043e \u0432 \u0440\u0435\u0436\u0438\u043c\u0456 \u0440\u043e\u0437\u0440\u043e\u0431\u043d\u0438\u043a\u0430 \u0447\u0435\u0440\u0435\u0437 \u0444\u043e\u0440\u043c\u0443 Automation Rules. \u0414\u043e\u043f\u043e\u0432\u043d\u0456\u0442\u044c \u0439\u043e\u0433\u043e \u043f\u0435\u0440\u0456\u043e\u0434\u0438\u0447\u043d\u0438\u043c \u043e\u043f\u0438\u0442\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0447\u0435\u0440\u0435\u0437 <code>search_read<\/code> \u0437\u0430 \u043f\u043e\u043b\u0435\u043c <code>write_date<\/code>, \u0449\u043e\u0431 \u043e\u0442\u0440\u0438\u043c\u0443\u0432\u0430\u0442\u0438 \u0456\u043c\u043f\u043e\u0440\u0442\u043e\u0432\u0430\u043d\u0456 \u0434\u0430\u043d\u0456 \u0442\u0430 \u0432\u0441\u0435, \u0449\u043e \u043f\u0440\u043e\u043f\u0443\u0441\u0442\u0438\u043b\u043e \u043f\u0440\u0430\u0432\u0438\u043b\u043e. \u0423 \u0437\u0432\u043e\u0440\u043e\u0442\u043d\u043e\u043c\u0443 \u043d\u0430\u043f\u0440\u044f\u043c\u043a\u0443 \u0432\u0435\u0431\u0445\u0443\u043a\u0438 SkyPlanner \u043d\u0430\u0434\u0441\u0438\u043b\u0430\u044e\u0442\u044c \u0437\u043c\u0456\u043d\u0438 \u0433\u0440\u0430\u0444\u0456\u043a\u0430 \u0442\u0430 \u0441\u0442\u0430\u043d\u0456\u0432 \u043e\u0434\u0440\u0430\u0437\u0443 \u043f\u0456\u0441\u043b\u044f \u0457\u0445 \u0432\u0438\u043d\u0438\u043a\u043d\u0435\u043d\u043d\u044f.<\/p>\n\n\n<p>\u041d\u0430\u0437\u0432\u0438 \u043f\u043e\u043b\u0456\u0432 \u0432\u0456\u0434\u0440\u0456\u0437\u043d\u044f\u044e\u0442\u044c\u0441\u044f \u0437\u0430\u043b\u0435\u0436\u043d\u043e \u0432\u0456\u0434 \u0432\u0435\u0440\u0441\u0456\u0457. \u0423 19.0 \u043a\u043e\u0436\u043d\u0430 \u0431\u0430\u0437\u0430 \u0434\u0430\u043d\u0438\u0445 \u043d\u0430\u0434\u0430\u0454 \u043f\u0435\u0440\u0435\u043b\u0456\u043a \u0441\u0432\u043e\u0457\u0445 \u043c\u043e\u0434\u0435\u043b\u0435\u0439, \u043f\u043e\u043b\u0456\u0432 \u0456 \u043c\u0435\u0442\u043e\u0434\u0456\u0432 \u0437\u0430 \u0430\u0434\u0440\u0435\u0441\u043e\u044e <code>\/doc<\/code>; \u0443 \u0441\u0442\u0430\u0440\u0456\u0448\u0438\u0445 \u0432\u0435\u0440\u0441\u0456\u044f\u0445 \u0432\u0438\u043a\u043b\u0438\u043a\u0430\u0439\u0442\u0435 <code>fields_get<\/code>. \u041d\u0430\u043b\u0430\u0448\u0442\u043e\u0432\u0443\u0439\u0442\u0435 \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u043d\u0456\u0441\u0442\u044c \u043f\u043e\u043b\u0456\u0432 \u0437\u0430 \u0446\u0438\u043c\u0438 \u0434\u0430\u043d\u0438\u043c\u0438, \u0430 \u043d\u0435 \u0437 \u043f\u0430\u043c\u2019\u044f\u0442\u0456.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"data-mapping-odoo-to-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0417\u0456\u0441\u0442\u0430\u0432\u043b\u0435\u043d\u043d\u044f \u0434\u0430\u043d\u0438\u0445: \u0437 Odoo \u0434\u043e SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>\u041c\u043e\u0434\u0435\u043b\u044c Odoo<\/th><th>\u041e\u0431\u2019\u0454\u043a\u0442 SkyPlanner<\/th><th>\u041d\u0430\u043f\u0440\u044f\u043c\u043e\u043a<\/th><th>\u041f\u0435\u0440\u0456\u043e\u0434\u0438\u0447\u043d\u0456\u0441\u0442\u044c<\/th><\/tr><\/thead><tbody><tr><td><code>product.product<\/code> \/ <code>product.template<\/code> (<code>default_code<\/code>, <code>uom_id<\/code>, <code>qty_available<\/code>)<\/td><td>\u0412\u0438\u0440\u0456\u0431 \u0430\u0431\u043e \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b<\/td><td>Odoo \u2192 SkyPlanner<\/td><td>\u041f\u043e\u0447\u0430\u0442\u043a\u043e\u0432\u0435 \u0437\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0435\u043d\u043d\u044f, \u0434\u0430\u043b\u0456 \u0449\u043e\u0434\u043d\u044f \u0430\u0431\u043e \u0432 \u0440\u0430\u0437\u0456 \u0437\u043c\u0456\u043d<\/td><\/tr><tr><td><code>mrp.bom<\/code> (<code>product_tmpl_id<\/code>, <code>product_qty<\/code>, <code>produce_delay<\/code>), <code>mrp.bom.line<\/code> (<code>product_id<\/code>, <code>product_qty<\/code>, <code>operation_id<\/code>), <code>mrp.bom.byproduct<\/code><\/td><td>\u0412\u0438\u0440\u0456\u0431 \u0456\u0437 \u0431\u0430\u0433\u0430\u0442\u043e\u0440\u0456\u0432\u043d\u0435\u0432\u043e\u044e \u0441\u0442\u0440\u0443\u043a\u0442\u0443\u0440\u043e\u044e, \u043f\u043e\u0442\u0440\u0435\u0431\u0438 \u0432 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0430\u0445 \u0434\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u0435\u0442\u0430\u043f\u0443<\/td><td>Odoo \u2192 SkyPlanner<\/td><td>\u0423 \u0440\u0430\u0437\u0456 \u0437\u043c\u0456\u043d<\/td><\/tr><tr><td><code>mrp.routing.workcenter<\/code> (\u0432\u043a\u043b\u0430\u0434\u043a\u0430 Operations: <code>workcenter_id<\/code>, <code>sequence<\/code>, <code>time_mode<\/code>, <code>time_cycle_manual<\/code>, <code>blocked_by_operation_ids<\/code>)<\/td><td>\u0415\u0442\u0430\u043f\u0438 \u043f\u0440\u043e\u0446\u0435\u0441\u0443 \u0437 \u043f\u043e\u0441\u043b\u0456\u0434\u043e\u0432\u043d\u0456\u0441\u0442\u044e \u0442\u0430 \u0442\u0440\u0438\u0432\u0430\u043b\u0456\u0441\u0442\u044e \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f<\/td><td>Odoo \u2192 SkyPlanner<\/td><td>\u0423 \u0440\u0430\u0437\u0456 \u0437\u043c\u0456\u043d<\/td><\/tr><tr><td><code>mrp.workcenter<\/code> (<code>resource_calendar_id<\/code>, <code>time_efficiency<\/code>, <code>time_start<\/code>, <code>time_stop<\/code>, <code>alternative_workcenter_ids<\/code>)<\/td><td>\u0420\u043e\u0431\u043e\u0447\u0438\u0439 \u0446\u0435\u043d\u0442\u0440, \u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c, \u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f \u0442\u0430 \u0437\u0430\u0432\u0435\u0440\u0448\u0430\u043b\u044c\u043d\u0456 \u0440\u043e\u0431\u043e\u0442\u0438, \u0430\u043b\u044c\u0442\u0435\u0440\u043d\u0430\u0442\u0438\u0432\u043d\u0456 \u0440\u043e\u0431\u043e\u0447\u0456 \u0446\u0435\u043d\u0442\u0440\u0438<\/td><td>Odoo \u2192 SkyPlanner, \u043f\u043e\u0434\u0430\u043b\u044c\u0448\u0435 \u0432\u0435\u0434\u0435\u043d\u043d\u044f \u0434\u0430\u043d\u0438\u0445 \u0443 SkyPlanner<\/td><td>\u041f\u043e\u0447\u0430\u0442\u043a\u043e\u0432\u0435 \u0437\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0435\u043d\u043d\u044f<\/td><\/tr><tr><td><code>mrp.workcenter.capacity<\/code> (<code>capacity<\/code>)<\/td><td>\u041a\u0456\u043b\u044c\u043a\u0456\u0441\u0442\u044c \u043e\u0434\u0438\u043d\u0438\u0446\u044c \u0437\u0430 \u0446\u0438\u043a\u043b, \u0447\u0430\u0441 \u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f \u0442\u0430 \u0437\u0430\u0432\u0435\u0440\u0448\u0430\u043b\u044c\u043d\u0438\u0445 \u0440\u043e\u0431\u0456\u0442 \u0434\u043b\u044f \u043a\u043e\u043d\u043a\u0440\u0435\u0442\u043d\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u0443<\/td><td>Odoo \u2192 SkyPlanner<\/td><td>\u041f\u043e\u0447\u0430\u0442\u043a\u043e\u0432\u0435 \u0437\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0435\u043d\u043d\u044f<\/td><\/tr><tr><td><code>resource.calendar<\/code>, <code>resource.calendar.attendance<\/code>, <code>resource.calendar.leaves<\/code><\/td><td>\u0417\u043c\u0456\u043d\u0438 \u0442\u0430 \u0432\u0456\u0434\u0441\u0443\u0442\u043d\u043e\u0441\u0442\u0456<\/td><td>Odoo \u2192 SkyPlanner<\/td><td>\u041f\u043e\u0447\u0430\u0442\u043a\u043e\u0432\u0435 \u0437\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0435\u043d\u043d\u044f, \u0432\u0456\u0434\u0441\u0443\u0442\u043d\u043e\u0441\u0442\u0456 \u2014 \u0443 \u0440\u0430\u0437\u0456 \u0437\u043c\u0456\u043d<\/td><\/tr><tr><td><code>mrp.production<\/code> (<code>product_id<\/code>, <code>product_qty<\/code>, <code>date_deadline<\/code>, <code>priority<\/code>, <code>state<\/code>, <code>workorder_ids<\/code>)<\/td><td>\u0417\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u0437 \u0442\u0435\u0440\u043c\u0456\u043d\u043e\u043c \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0442\u0430 \u043f\u0440\u0456\u043e\u0440\u0438\u0442\u0435\u0442\u043e\u043c<\/td><td>Odoo \u2192 SkyPlanner<\/td><td>\u0412\u0435\u0431\u0445\u0443\u043a \u043f\u0456\u0434 \u0447\u0430\u0441 \u043f\u0456\u0434\u0442\u0432\u0435\u0440\u0434\u0436\u0435\u043d\u043d\u044f \u0442\u0430 \u043e\u043f\u0438\u0442\u0443\u0432\u0430\u043d\u043d\u044f<\/td><\/tr><tr><td><code>mrp.workorder<\/code> (<code>operation_id<\/code>, <code>workcenter_id<\/code>, <code>duration_expected<\/code>, <code>state<\/code>)<\/td><td>\u0412\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0435 \u0437\u0430\u0432\u0434\u0430\u043d\u043d\u044f \u043d\u0430 \u0440\u043e\u0431\u043e\u0447\u043e\u043c\u0443 \u0446\u0435\u043d\u0442\u0440\u0456<\/td><td>Odoo \u2192 SkyPlanner<\/td><td>\u0412\u0435\u0431\u0445\u0443\u043a \u0442\u0430 \u043e\u043f\u0438\u0442\u0443\u0432\u0430\u043d\u043d\u044f<\/td><\/tr><tr><td><code>stock.quant<\/code>, <code>stock.move<\/code> (\u0440\u0443\u0445 \u043a\u043e\u043c\u043f\u043e\u043d\u0435\u043d\u0442\u0456\u0432)<\/td><td>\u041d\u0430\u044f\u0432\u043d\u0456 \u0437\u0430\u043f\u0430\u0441\u0438 \u0442\u0430 \u043f\u043e\u0442\u0440\u0435\u0431\u0438 \u0432 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0430\u0445 \u0434\u043b\u044f \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0434\u043e\u0441\u0442\u0443\u043f\u043d\u043e\u0441\u0442\u0456 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0456\u0432<\/td><td>Odoo \u2192 SkyPlanner<\/td><td>\u0417\u0430 \u0440\u043e\u0437\u043a\u043b\u0430\u0434\u043e\u043c, \u043d\u0430\u043f\u0440\u0438\u043a\u043b\u0430\u0434 \u043a\u043e\u0436\u043d\u0456 15\u201360 \u0445\u0432\u0438\u043b\u0438\u043d<\/td><\/tr><tr><td><code>purchase.order<\/code> (<code>partner_id<\/code>, <code>state<\/code>), <code>purchase.order.line<\/code> (<code>product_id<\/code>, <code>product_qty<\/code>, <code>date_planned<\/code>, <code>qty_received<\/code>)<\/td><td>\u0417\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u043d\u0430 \u0437\u0430\u043a\u0443\u043f\u0456\u0432\u043b\u044e \u0442\u0430 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0438, \u0449\u043e \u043c\u0430\u044e\u0442\u044c \u043d\u0430\u0434\u0456\u0439\u0442\u0438 \u0439 \u0431\u0443\u0434\u0443\u0442\u044c \u0434\u043e\u0441\u0442\u0443\u043f\u043d\u0456 \u0432 \u043e\u0447\u0456\u043a\u0443\u0432\u0430\u043d\u0443 \u0434\u0430\u0442\u0443 \u043f\u043e\u0441\u0442\u0430\u0432\u043a\u0438<\/td><td>Odoo \u2192 SkyPlanner<\/td><td>\u0412\u0435\u0431\u0445\u0443\u043a \u043f\u0456\u0434 \u0447\u0430\u0441 \u043f\u0456\u0434\u0442\u0432\u0435\u0440\u0434\u0436\u0435\u043d\u043d\u044f \u0430\u0431\u043e \u0440\u0435\u0434\u0430\u0433\u0443\u0432\u0430\u043d\u043d\u044f \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u043d\u0430 \u0437\u0430\u043a\u0443\u043f\u0456\u0432\u043b\u044e \u0442\u0430 \u0442\u0435 \u0441\u0430\u043c\u0435 \u043f\u0435\u0440\u0456\u043e\u0434\u0438\u0447\u043d\u0435 \u043e\u043f\u0438\u0442\u0443\u0432\u0430\u043d\u043d\u044f<\/td><\/tr><tr><td>\u041f\u043b\u0430\u043d\u043e\u0432\u0456 \u043f\u043e\u0447\u0430\u0442\u043e\u043a \u0456 \u0437\u0430\u0432\u0435\u0440\u0448\u0435\u043d\u043d\u044f, \u0440\u043e\u0431\u043e\u0447\u0438\u0439 \u0446\u0435\u043d\u0442\u0440<\/td><td><code>mrp.workorder.date_start<\/code>, <code>date_finished<\/code>, <code>workcenter_id<\/code><\/td><td>SkyPlanner \u2192 Odoo<\/td><td>\u0423 \u0440\u0430\u0437\u0456 \u0437\u043c\u0456\u043d\u0438 \u0433\u0440\u0430\u0444\u0456\u043a\u0430, \u0447\u0435\u0440\u0435\u0437 \u0432\u0435\u0431\u0445\u0443\u043a SkyPlanner<\/td><\/tr><tr><td>Mobile Confirmations, \u0437\u0430\u043f\u0438\u0441\u0438 \u043e\u0431\u043b\u0456\u043a\u0443 \u0447\u0430\u0441\u0443<\/td><td><code>mrp.workcenter.productivity<\/code> (Time Logs: <code>workcenter_id<\/code>, <code>workorder_id<\/code>, <code>date_start<\/code>, <code>date_end<\/code>, <code>loss_id<\/code>)<\/td><td>SkyPlanner \u2192 Odoo<\/td><td>\u0414\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u043f\u0456\u0434\u0442\u0432\u0435\u0440\u0434\u0436\u0435\u043d\u043d\u044f<\/td><\/tr><tr><td>\u0412\u0438\u0433\u043e\u0442\u043e\u0432\u043b\u0435\u043d\u0430 \u043a\u0456\u043b\u044c\u043a\u0456\u0441\u0442\u044c, \u0437\u0430\u0432\u0435\u0440\u0448\u0435\u043d\u043d\u044f \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u043e\u0457 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457<\/td><td><code>qty_producing<\/code> \u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u043c\u0443 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u0456, \u043f\u043e\u0442\u0456\u043c <code>button_finish<\/code>; <code>button_mark_done<\/code> \u0443 MO<\/td><td>SkyPlanner \u2192 Odoo \u0430\u0431\u043e \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0432 Odoo Shop Floor<\/td><td>\u0414\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u043f\u0456\u0434\u0442\u0432\u0435\u0440\u0434\u0436\u0435\u043d\u043d\u044f<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0421\u0445\u0435\u043c\u0438 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0421\u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u2014 \u043e\u0441\u043d\u043e\u0432\u043d\u0456 \u0434\u0430\u043d\u0456.<\/p>\n\n\n<p class=\"fx-pain__b\">\u0417\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0442\u0435 \u0440\u043e\u0431\u043e\u0447\u0456 \u0446\u0435\u043d\u0442\u0440\u0438 \u0442\u0430 \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u0456, \u0430 \u043f\u043e\u0442\u0456\u043c \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u044e, BoM \u0456 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457, \u044f\u043a\u0456 \u043f\u043e\u0441\u0438\u043b\u0430\u044e\u0442\u044c\u0441\u044f \u043d\u0430 \u0440\u043e\u0431\u043e\u0447\u0456 \u0446\u0435\u043d\u0442\u0440\u0438. \u041f\u0456\u0434 \u0447\u0430\u0441 30-\u0434\u0435\u043d\u043d\u043e\u0433\u043e \u043f\u0440\u043e\u0431\u043d\u043e\u0433\u043e \u043f\u0435\u0440\u0456\u043e\u0434\u0443 \u0446\u0456 \u0441\u0430\u043c\u0456 \u0441\u043f\u0438\u0441\u043a\u0438 \u0437\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0443\u044e\u0442\u044c\u0441\u044f \u044f\u043a \u0435\u043a\u0441\u043f\u043e\u0440\u0442\u043e\u0432\u0430\u043d\u0456 CSV-\u0444\u0430\u0439\u043b\u0438. <a href=\"https:\/\/www.odoo.com\/documentation\/19.0\/applications\/essentials\/export_import_data.html\">\u0406\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442 \u0456\u043c\u043f\u043e\u0440\u0442\u0443 \u0439 \u0435\u043a\u0441\u043f\u043e\u0440\u0442\u0443<\/a> Odoo \u043f\u0440\u0430\u0446\u044e\u0454 \u0432 \u0431\u0443\u0434\u044c-\u044f\u043a\u043e\u043c\u0443 \u043f\u043e\u0434\u0430\u043d\u043d\u0456 \u0441\u043f\u0438\u0441\u043a\u0443.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0421\u0438\u043d\u0445\u0440\u043e\u043d\u0456\u0437\u0430\u0446\u0456\u044f \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u044c.<\/p>\n\n\n<p class=\"fx-pain__b\">\u0417\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0443\u0439\u0442\u0435 MO \u0443 \u0441\u0442\u0430\u043d\u0430\u0445 <code>confirmed<\/code> \u0456 <code>progress<\/code> \u0440\u0430\u0437\u043e\u043c \u0456\u0437 \u0457\u0445\u043d\u0456\u043c\u0438 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u043c\u0438 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f\u043c\u0438. \u0427\u0435\u0440\u043d\u0435\u0442\u043a\u0438 MO \u043d\u0435 \u0437\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0443\u0439\u0442\u0435 \u0430\u0431\u043e \u0432\u0440\u0430\u0445\u043e\u0432\u0443\u0439\u0442\u0435 \u044f\u043a \u043f\u043e\u043f\u0435\u0440\u0435\u0434\u043d\u0456\u0439 \u043f\u043e\u043f\u0438\u0442. \u0421\u043a\u043b\u0430\u0434\u0430\u043b\u044c\u043d\u0456 \u043e\u0434\u0438\u043d\u0438\u0446\u0456 \u0437 \u0432\u043b\u0430\u0441\u043d\u043e\u044e \u0441\u043f\u0435\u0446\u0438\u0444\u0456\u043a\u0430\u0446\u0456\u0454\u044e BoM \u043c\u043e\u0436\u0443\u0442\u044c \u043d\u0430\u0434\u0445\u043e\u0434\u0438\u0442\u0438 \u044f\u043a \u043e\u043a\u0440\u0435\u043c\u0456 \u0434\u043e\u0447\u0456\u0440\u043d\u0456 MO, \u043f\u0440\u0438\u0447\u043e\u043c\u0443 Odoo \u043f\u043b\u0430\u043d\u0443\u0454 \u043a\u043e\u0436\u043d\u0435 MO \u043d\u0435\u0437\u0430\u043b\u0435\u0436\u043d\u043e. \u0417\u0456\u0441\u0442\u0430\u0432\u0442\u0435 \u0457\u0445 \u0456\u0437 \u043f\u0456\u0434\u0432\u0438\u0440\u043e\u0431\u0430\u043c\u0438 SkyPlanner, \u0449\u043e\u0431 \u0432\u0438\u0433\u043e\u0442\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u0441\u043a\u043b\u0430\u0434\u0430\u043b\u044c\u043d\u0438\u0445 \u043e\u0434\u0438\u043d\u0438\u0446\u044c \u0437\u0430\u0432\u0435\u0440\u0448\u0443\u0432\u0430\u043b\u043e\u0441\u044f \u0434\u043e \u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u0432\u0438\u0433\u043e\u0442\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u0431\u0430\u0442\u044c\u043a\u0456\u0432\u0441\u044c\u043a\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u0443.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-pain__t\">\u0417\u0432\u043e\u0440\u043e\u0442\u043d\u0438\u0439 \u0437\u0430\u043f\u0438\u0441 \u0433\u0440\u0430\u0444\u0456\u043a\u0430.<\/p>\n\n\n<p class=\"fx-pain__b\">\u041a\u043e\u043b\u0438 \u0433\u0440\u0430\u0444\u0456\u043a \u0437\u043c\u0456\u043d\u044e\u0454\u0442\u044c\u0441\u044f, \u0432\u0435\u0431\u0445\u0443\u043a SkyPlanner \u0437\u0430\u043f\u0443\u0441\u043a\u0430\u0454 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e, \u044f\u043a\u0430 \u0432\u0438\u043a\u043b\u0438\u043a\u0430\u0454 \u043c\u0435\u0442\u043e\u0434 ORM <code>write<\/code> \u0434\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u043d\u043e\u0433\u043e \u0437\u0430\u043f\u0438\u0441\u0443 <code>mrp.workorder<\/code>. \u0412 Odoo 19.0 \u0446\u0435 \u043e\u0434\u0438\u043d \u0437\u0430\u043f\u0438\u0442 JSON-2 \u043d\u0430 \u043a\u043e\u0436\u043d\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0435 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f:<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>&#8220;<code> POST \/json\/2\/mrp.workorder\/write Authorization: bearer &lt;api-key&gt; {\"ids\": [4711], \"vals\": {\"date_start\": \"2026-11-03 06:00:00\", \"date_finished\": \"2026-11-03 09:30:00\", \"workcenter_id\": 7}} <\/code>&#8220;<\/p>\n\n\n<p>JSON-2 \u043f\u0440\u0438\u0439\u043c\u0430\u0454 \u0432\u0441\u0456 \u0430\u0440\u0433\u0443\u043c\u0435\u043d\u0442\u0438 \u043c\u0435\u0442\u043e\u0434\u0443 \u0437\u0430 \u0456\u043c\u0435\u043d\u0430\u043c\u0438, \u0430 \u0442\u0430\u043a\u043e\u0436 <code>ids<\/code> \u0456 <code>context<\/code>, \u0442\u043e\u043c\u0443 \u0430\u0440\u0433\u0443\u043c\u0435\u043d\u0442 \u0456\u0437 <code>write(vals)<\/code> \u043f\u0435\u0440\u0435\u0434\u0430\u0454\u0442\u044c\u0441\u044f \u044f\u043a \u043a\u043b\u044e\u0447 <code>vals<\/code>. \u0423 \u0432\u0435\u0440\u0441\u0456\u044f\u0445 \u0432\u0456\u0434 16.0 \u0434\u043e 18.0 \u0442\u043e\u0439 \u0441\u0430\u043c\u0438\u0439 \u0432\u0438\u043a\u043b\u0438\u043a \u0432\u0438\u043a\u043e\u043d\u0443\u0454\u0442\u044c\u0441\u044f \u044f\u043a <code>execute_kw(db, uid, key, 'mrp.workorder', 'write', [[4711], vals])<\/code> \u0447\u0435\u0440\u0435\u0437 XML-RPC \u0430\u0431\u043e JSON-RPC, \u0430 \u0443 16.0 \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u044e\u0442\u044c\u0441\u044f \u043a\u043b\u044e\u0447\u0456 <code>date_planned_start<\/code> \u0456 <code>date_planned_finished<\/code>. \u0414\u0430\u0442\u0438 \u0439 \u0447\u0430\u0441 \u043f\u0435\u0440\u0435\u0434\u0430\u0432\u0430\u0439\u0442\u0435 \u0432 UTC. \u0429\u043e\u0431 \u0437\u0430\u043f\u0438\u0441 \u043f\u0440\u0430\u0446\u044e\u0432\u0430\u0432 \u043a\u043e\u0440\u0435\u043a\u0442\u043d\u043e, \u0434\u043e\u0442\u0440\u0438\u043c\u0443\u0439\u0442\u0435\u0441\u044f \u043a\u0456\u043b\u044c\u043a\u043e\u0445 \u043f\u0440\u0430\u0432\u0438\u043b:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li>\u041f\u0435\u0440\u0435\u0434\u0430\u0432\u0430\u0439\u0442\u0435 \u043e\u0431\u0438\u0434\u0432\u0456 \u0434\u0430\u0442\u0438 \u0432 \u043e\u0434\u043d\u043e\u043c\u0443 \u0432\u0438\u043a\u043b\u0438\u043a\u0443.<\/li>\n\n\n<li>\u0414\u043e\u0434\u0430\u0432\u0430\u0439\u0442\u0435 <code>workcenter_id<\/code> \u043b\u0438\u0448\u0435 \u0442\u043e\u0434\u0456, \u043a\u043e\u043b\u0438 \u0440\u0443\u0448\u0456\u0439 \u0432\u0438\u0431\u0440\u0430\u0432 \u0430\u043b\u044c\u0442\u0435\u0440\u043d\u0430\u0442\u0438\u0432\u043d\u0438\u0439 \u0432\u0435\u0440\u0441\u0442\u0430\u0442.<\/li>\n\n\n<li>\u0417\u0430\u043f\u0438\u0441\u0443\u0439\u0442\u0435 \u043b\u0438\u0448\u0435 \u043f\u043e\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u2014 \u043d\u0456\u043a\u043e\u043b\u0438 \u043d\u0435 \u0437\u043c\u0456\u043d\u044e\u0439\u0442\u0435 \u043a\u0456\u043b\u044c\u043a\u043e\u0441\u0442\u0456 \u0447\u0438 BoM.<\/li>\n\n<\/ul>\n\n\n<p>\u0417\u0430\u043f\u0438\u0441 \u0434\u0430\u0442 \u0437\u043c\u0456\u043d\u044e\u0454 \u0447\u0430\u0441, \u0437\u0430\u0440\u0435\u0437\u0435\u0440\u0432\u043e\u0432\u0430\u043d\u0438\u0439 \u0434\u043b\u044f \u0440\u043e\u0431\u043e\u0447\u043e\u0433\u043e \u0446\u0435\u043d\u0442\u0440\u0443 \u0432 \u0441\u0430\u043c\u0456\u0439 Odoo, \u0442\u043e\u0436 \u0443 \u043f\u043e\u0434\u0430\u043d\u043d\u044f\u0445 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f Odoo \u0432\u0456\u0434\u043e\u0431\u0440\u0430\u0436\u0430\u0454\u0442\u044c\u0441\u044f \u043f\u043b\u0430\u043d SkyPlanner.<\/p>\n\n\n<p><strong>\u0414\u0430\u043d\u0456 \u0437 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u0446\u0435\u0445\u0443 \u043d\u0430\u0437\u0430\u0434 \u0434\u043e Odoo.<\/strong> \u041e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0438 \u0440\u0435\u0454\u0441\u0442\u0440\u0443\u044e\u0442\u044c \u0440\u043e\u0431\u043e\u0442\u0443 \u0432 SkyPlanner Mobile Confirmations. \u0414\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u043f\u0456\u0434\u0442\u0432\u0435\u0440\u0434\u0436\u0435\u043d\u043d\u044f \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f \u0432\u0438\u043a\u043b\u0438\u043a\u0430\u0454 <code>create<\/code> \u0434\u043b\u044f <code>mrp.workcenter.productivity<\/code> (JSON-2: <code>POST \/json\/2\/mrp.workcenter.productivity\/create<\/code> \u0437 <code>vals_list<\/code>). \u0412\u043e\u043d\u0430 \u0437\u0430\u043f\u043e\u0432\u043d\u044e\u0454 <code>workorder_id<\/code>, <code>workcenter_id<\/code>, <code>date_start<\/code>, <code>date_end<\/code> \u0442\u0430 <code>loss_id<\/code> \u0442\u0438\u043f\u0443 Productive, \u043f\u0456\u0441\u043b\u044f \u0447\u043e\u0433\u043e \u0432 Odoo \u0432\u0456\u0434\u043e\u0431\u0440\u0430\u0436\u0430\u044e\u0442\u044c\u0441\u044f \u0442\u0440\u0443\u0434\u043e\u0432\u0438\u0442\u0440\u0430\u0442\u0438 \u0442\u0430 \u0457\u0445\u043d\u044f \u0432\u0430\u0440\u0442\u0456\u0441\u0442\u044c.<\/p>\n\n\n<p>\u041f\u0456\u0441\u043b\u044f \u0437\u0430\u0432\u0435\u0440\u0448\u0435\u043d\u043d\u044f \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u043e\u0457 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f \u0437\u0430\u0434\u0430\u0454 \u0432\u0438\u0433\u043e\u0442\u043e\u0432\u043b\u0435\u043d\u0443 \u043a\u0456\u043b\u044c\u043a\u0456\u0441\u0442\u044c \u0456 \u0432\u0438\u043a\u043b\u0438\u043a\u0430\u0454 <code>button_finish<\/code> \u0434\u043b\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f. \u041f\u0456\u0441\u043b\u044f \u0437\u0430\u0432\u0435\u0440\u0448\u0435\u043d\u043d\u044f \u043e\u0441\u0442\u0430\u043d\u043d\u044c\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f MO \u0433\u043e\u0442\u043e\u0432\u0435 \u0434\u043e \u0432\u0438\u043a\u043b\u0438\u043a\u0443 <code>button_mark_done<\/code>. \u041a\u043e\u0436\u043d\u0435 \u043f\u0456\u0434\u0442\u0432\u0435\u0440\u0434\u0436\u0435\u043d\u043d\u044f \u0437\u0430\u043f\u0438\u0441\u0443\u0454\u0442\u044c\u0441\u044f \u043b\u0438\u0448\u0435 \u043e\u0434\u0438\u043d \u0440\u0430\u0437, \u0430 \u0456\u0434\u0435\u043d\u0442\u0438\u0444\u0456\u043a\u0430\u0442\u043e\u0440 \u0439\u043e\u0433\u043e \u0437\u0430\u043f\u0438\u0441\u0443 \u0432 Odoo \u0437\u0431\u0435\u0440\u0456\u0433\u0430\u0454\u0442\u044c\u0441\u044f \u0440\u0430\u0437\u043e\u043c \u0456\u0437 \u0437\u0430\u043f\u0438\u0441\u043e\u043c \u043e\u0431\u043b\u0456\u043a\u0443 \u0447\u0430\u0441\u0443 \u0432 SkyPlanner, \u0442\u043e\u043c\u0443 \u043f\u043e\u0432\u0442\u043e\u0440\u043d\u0438\u0439 \u0432\u0438\u043a\u043b\u0438\u043a \u0432\u0435\u0431\u0445\u0443\u043a\u0430 \u043d\u0456\u043a\u043e\u043b\u0438 \u043d\u0435 \u0441\u0442\u0432\u043e\u0440\u044e\u0454 \u0434\u0440\u0443\u0433\u043e\u0433\u043e \u0437\u0430\u043f\u0438\u0441\u0443 Time Log.<\/p>\n\n\n<p>\u041d\u0430 \u043f\u0456\u0434\u043f\u0440\u0438\u0454\u043c\u0441\u0442\u0432\u0430\u0445, \u044f\u043a\u0456 \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u044e\u0442\u044c \u0437\u0430\u0441\u0442\u043e\u0441\u0443\u043d\u043e\u043a Enterprise Shop Floor, \u043d\u0430\u043f\u0440\u044f\u043c\u043e\u043a \u0437\u0432\u043e\u0440\u043e\u0442\u043d\u0438\u0439: SkyPlanner \u0437\u0447\u0438\u0442\u0443\u0454 \u0441\u0442\u0430\u043d \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u0442\u0430 <code>qty_produced<\/code>, \u0430 Autopilot \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0447\u043d\u043e \u043f\u0435\u0440\u0435\u043f\u043b\u0430\u043d\u043e\u0432\u0443\u0454 \u0433\u0440\u0430\u0444\u0456\u043a \u0443 \u0440\u0430\u0437\u0456 \u0437\u043c\u0456\u043d \u043d\u0430 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0456.<\/p>\n\n\n<p><strong>\u0412\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u043b\u044c\u043d\u0456\u0441\u0442\u044c \u0437\u0430 \u0434\u0430\u043d\u0456.<\/strong> \u0417\u0430\u0444\u0456\u043a\u0441\u0443\u0439\u0442\u0435 \u043f\u0440\u0430\u0432\u0438\u043b\u0430 \u0434\u043e \u0437\u0430\u043f\u0443\u0441\u043a\u0443 \u0432 \u0435\u043a\u0441\u043f\u043b\u0443\u0430\u0442\u0430\u0446\u0456\u044e:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>\u0414\u0430\u043d\u0456<\/th><th>\u0412\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u0430\u043b\u044c\u043d\u0430 \u0441\u0438\u0441\u0442\u0435\u043c\u0430<\/th><\/tr><\/thead><tbody><tr><td>\u041f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u044f, BoM, \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457, \u043a\u0456\u043b\u044c\u043a\u043e\u0441\u0442\u0456, \u0441\u0442\u0430\u043d MO<\/td><td>Odoo<\/td><\/tr><tr><td>\u041f\u043e\u0441\u043b\u0456\u0434\u043e\u0432\u043d\u0456\u0441\u0442\u044c \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u044c, \u0447\u0430\u0441 \u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u0439 \u0437\u0430\u0432\u0435\u0440\u0448\u0435\u043d\u043d\u044f, \u0432\u0438\u0431\u0456\u0440 \u0440\u043e\u0431\u043e\u0447\u043e\u0433\u043e \u0446\u0435\u043d\u0442\u0440\u0443<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u041c\u0430\u0442\u0440\u0438\u0446\u044f \u0447\u0430\u0441\u0443 \u043f\u0435\u0440\u0435\u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f, \u0432\u0438\u043c\u043e\u0433\u0438 \u0434\u043e \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0456\u0432 \u0456 \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0456\u0432, \u0430\u043b\u044c\u0442\u0435\u0440\u043d\u0430\u0442\u0438\u0432\u043d\u0456 \u0440\u0435\u0441\u0443\u0440\u0441\u0438<\/td><td>SkyPlanner<\/td><\/tr><tr><td>\u041a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u0456 \u0440\u043e\u0431\u043e\u0447\u0438\u0445 \u0446\u0435\u043d\u0442\u0440\u0456\u0432 \u0456 Time Off<\/td><td>\u041e\u0434\u043d\u0430 \u0441\u0438\u0441\u0442\u0435\u043c\u0430, \u043e\u0431\u0440\u0430\u043d\u0430 \u043f\u0456\u0434 \u0447\u0430\u0441 \u0432\u0438\u0437\u043d\u0430\u0447\u0435\u043d\u043d\u044f \u043e\u0431\u0441\u044f\u0433\u0443<\/td><\/tr><tr><td>Time Logs, \u0437\u0430\u043f\u0430\u0441\u0438 \u0442\u0430 \u0441\u043e\u0431\u0456\u0432\u0430\u0440\u0442\u0456\u0441\u0442\u044c<\/td><td>Odoo, \u043d\u0430 \u043e\u0441\u043d\u043e\u0432\u0456 \u043f\u0456\u0434\u0442\u0432\u0435\u0440\u0434\u0436\u0435\u043d\u044c \u0437\u0456 SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u041f\u043b\u0430\u043d\u0443\u0432\u0430\u043b\u044c\u043d\u0438\u043a\u0438 \u0431\u0456\u043b\u044c\u0448\u0435 \u043d\u0435 \u043d\u0430\u0442\u0438\u0441\u043a\u0430\u044e\u0442\u044c Plan \u0456 Unplan \u0432 Odoo \u0434\u043b\u044f MO, \u044f\u043a\u0456 \u043f\u043b\u0430\u043d\u0443\u0454 SkyPlanner. \u0406\u043d\u0430\u043a\u0448\u0435 Odoo \u0440\u0435\u0437\u0435\u0440\u0432\u0443\u0454 \u0432\u043b\u0430\u0441\u043d\u0456 \u0447\u0430\u0441\u043e\u0432\u0456 \u0456\u043d\u0442\u0435\u0440\u0432\u0430\u043b\u0438 \u0437\u0430\u043c\u0456\u0441\u0442\u044c \u0434\u0430\u0442, \u0432\u0438\u0437\u043d\u0430\u0447\u0435\u043d\u0438\u0445 SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0422\u0438\u043f\u043e\u0432\u0456 \u0435\u0442\u0430\u043f\u0438 \u043f\u0440\u043e\u0454\u043a\u0442\u0443<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0412\u043f\u0440\u043e\u0432\u0430\u0434\u0436\u0435\u043d\u043d\u044f \u0437\u0430\u0437\u0432\u0438\u0447\u0430\u0439 \u0437\u0430\u0432\u0435\u0440\u0448\u0443\u0454\u0442\u044c\u0441\u044f \u043f\u0440\u043e\u0442\u044f\u0433\u043e\u043c \u043a\u0456\u043b\u044c\u043a\u043e\u0445 \u0442\u0438\u0436\u043d\u0456\u0432 \u0432\u0456\u0434 \u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u043d\u0430\u043b\u0430\u0448\u0442\u0443\u0432\u0430\u043d\u043d\u044f. \u041f\u0435\u0440\u0435\u0434 \u0446\u0438\u043c \u043f\u0440\u043e\u0442\u044f\u0433\u043e\u043c 30-\u0434\u0435\u043d\u043d\u043e\u0433\u043e \u0431\u0435\u0437\u043f\u043b\u0430\u0442\u043d\u043e\u0433\u043e \u043f\u0440\u043e\u0431\u043d\u043e\u0433\u043e \u043f\u0435\u0440\u0456\u043e\u0434\u0443 \u0432\u0438 \u043f\u0440\u0430\u0446\u044e\u0454\u0442\u0435 \u0437 CSV-\u0444\u0430\u0439\u043b\u0430\u043c\u0438, \u0435\u043a\u0441\u043f\u043e\u0440\u0442\u043e\u0432\u0430\u043d\u0438\u043c\u0438 \u0437 \u0432\u0430\u0448\u043e\u0457 Odoo. \u0421\u0430\u043c \u043f\u0440\u043e\u0454\u043a\u0442 \u043e\u0445\u043e\u043f\u043b\u044e\u0454:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u0417\u0456\u0441\u0442\u0430\u0432\u043b\u0435\u043d\u043d\u044f \u043e\u0441\u043d\u043e\u0432\u043d\u0438\u0445 \u0434\u0430\u043d\u0438\u0445:<\/strong> \u043c\u043e\u0434\u0435\u043b\u0456 \u0442\u0430 \u043f\u043e\u043b\u044f Odoo \u0434\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0457 \u0432\u0435\u0440\u0441\u0456\u0457 (\u043f\u0435\u0440\u0435\u0432\u0456\u0440\u044f\u0439\u0442\u0435 \u0447\u0435\u0440\u0435\u0437 <code>\/doc<\/code> \u0430\u0431\u043e <code>fields_get<\/code>), \u043e\u0434\u0438\u043d\u0438\u0446\u0456 \u0432\u0438\u043c\u0456\u0440\u044e\u0432\u0430\u043d\u043d\u044f \u0442\u0430 \u0432\u0438\u0437\u043d\u0430\u0447\u0435\u043d\u043d\u044f \u0441\u0438\u0441\u0442\u0435\u043c\u0438, \u0443 \u044f\u043a\u0456\u0439 \u0432\u0435\u0434\u0443\u0442\u044c\u0441\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u0456 \u0439 \u0434\u0430\u043d\u0456 Time Off.<\/li>\n\n\n<li><strong>\u0423\u043f\u043e\u0440\u044f\u0434\u043a\u0443\u0432\u0430\u043d\u043d\u044f \u0434\u0430\u043d\u0438\u0445:<\/strong> \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u0442\u0435 \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u0456 \u0440\u043e\u0431\u043e\u0447\u0438\u0445 \u0446\u0435\u043d\u0442\u0440\u0456\u0432, \u043f\u043e\u043b\u044f Setup Time \u0456 Cleanup Time \u0442\u0430 \u0432\u0441\u0442\u0430\u043d\u043e\u0432\u0456\u0442\u044c Fixed \u0437\u0430\u043c\u0456\u0441\u0442\u044c Computed \u0434\u043b\u044f \u0442\u0440\u0438\u0432\u0430\u043b\u043e\u0441\u0442\u0456 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0439 BoM.<\/li>\n\n\n<li><strong>\u041f\u043e\u0447\u0430\u0442\u043a\u043e\u0432\u0435 \u0437\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0435\u043d\u043d\u044f:<\/strong> \u043f\u0440\u043e\u0434\u0443\u043a\u0446\u0456\u0457, \u0440\u043e\u0431\u043e\u0447\u0438\u0445 \u0446\u0435\u043d\u0442\u0440\u0456\u0432 \u0456\u0437 \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u044f\u043c\u0438, BoM \u0442\u0430 \u0457\u0445\u043d\u0456\u0445 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0439.<\/li>\n\n\n<li><strong>\u0421\u0438\u043d\u0445\u0440\u043e\u043d\u0456\u0437\u0430\u0446\u0456\u044f \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u044c \u0456 \u0437\u0430\u043a\u0443\u043f\u0456\u0432\u0435\u043b\u044c:<\/strong> \u043f\u0456\u0434\u0442\u0432\u0435\u0440\u0434\u0436\u0435\u043d\u0456 MO \u0442\u0430 MO \u0443 \u043f\u0440\u043e\u0446\u0435\u0441\u0456 \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0440\u0430\u0437\u043e\u043c \u0456\u0437 \u0457\u0445\u043d\u0456\u043c\u0438 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u043c\u0438 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f\u043c\u0438, \u0430 \u0442\u0430\u043a\u043e\u0436 \u0440\u044f\u0434\u043a\u0438 <code>purchase.order<\/code> \u0437 \u043e\u0447\u0456\u043a\u0443\u0432\u0430\u043d\u0438\u043c\u0438 \u0434\u0430\u0442\u0430\u043c\u0438 \u043d\u0430\u0434\u0445\u043e\u0434\u0436\u0435\u043d\u043d\u044f.<\/li>\n\n\n<li><strong>\u0417\u0432\u043e\u0440\u043e\u0442\u043d\u0438\u0439 \u0437\u0430\u043f\u0438\u0441 \u0433\u0440\u0430\u0444\u0456\u043a\u0430:<\/strong> \u0434\u0430\u0442\u0438 \u0442\u0430 \u0440\u043e\u0431\u043e\u0447\u0456 \u0446\u0435\u043d\u0442\u0440\u0438 \u0432 <code>mrp.workorder<\/code>, \u0456\u0437 \u0440\u043e\u0442\u0430\u0446\u0456\u0454\u044e \u043a\u043b\u044e\u0447\u0456\u0432 API \u043d\u0430 \u0431\u043e\u0446\u0456 Odoo.<\/li>\n\n\n<li><strong>\u041f\u0456\u0434\u0442\u0432\u0435\u0440\u0434\u0436\u0435\u043d\u043d\u044f \u0437 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u0446\u0435\u0445\u0443:<\/strong> \u043f\u0435\u0440\u0435\u0434\u0430\u0432\u0430\u043d\u043d\u044f Time Logs \u0456 \u0434\u0430\u043d\u0438\u0445 \u043f\u0440\u043e \u0437\u0430\u0432\u0435\u0440\u0448\u0435\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u044c \u043d\u0430\u0437\u0430\u0434 \u0434\u043e Odoo.<\/li>\n\n\n<li><strong>\u0422\u0435\u0441\u0442\u0443\u0432\u0430\u043d\u043d\u044f \u043f\u0430\u0440\u0430\u043b\u0435\u043b\u044c\u043d\u043e \u0437 \u043f\u043e\u0442\u043e\u0447\u043d\u0438\u043c \u043f\u043b\u0430\u043d\u043e\u043c,<\/strong> \u0430 \u043f\u043e\u0442\u0456\u043c \u2014 \u0437\u0430\u043f\u0443\u0441\u043a \u0432 \u0435\u043a\u0441\u043f\u043b\u0443\u0430\u0442\u0430\u0446\u0456\u044e.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"odoo-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u041f\u0456\u0434\u0432\u043e\u0434\u043d\u0456 \u043a\u0430\u043c\u0435\u043d\u0456 Odoo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u041f\u0435\u0440\u0435\u0439\u043c\u0435\u043d\u043e\u0432\u0430\u043d\u0456 \u043f\u043e\u043b\u044f \u0434\u0430\u0442.<\/strong> \u0414\u043e 16.0 \u0432\u043a\u043b\u044e\u0447\u043d\u043e \u043f\u043e\u043b\u044f <code>date_planned_start<\/code> \u0456 <code>date_planned_finished<\/code> \u043c\u0456\u0441\u0442\u0438\u043b\u0438 \u043f\u043b\u0430\u043d\u043e\u0432\u0456 \u0434\u0430\u0442\u0438, \u0430 <code>date_start<\/code>\/<code>date_finished<\/code> \u2014 \u0444\u0430\u043a\u0442\u0438\u0447\u043d\u0456. \u041f\u043e\u0447\u0438\u043d\u0430\u044e\u0447\u0438 \u0437 17.0, \u043f\u043b\u0430\u043d\u043e\u0432\u0456 \u0434\u0430\u0442\u0438 \u0437\u0431\u0435\u0440\u0456\u0433\u0430\u044e\u0442\u044c\u0441\u044f \u0432 <code>date_start<\/code> \u0456 <code>date_finished<\/code>. \u0417\u0456\u0441\u0442\u0430\u0432\u043b\u0435\u043d\u043d\u044f, \u0441\u043a\u043e\u043f\u0456\u0439\u043e\u0432\u0430\u043d\u0435 \u0437 \u043f\u0440\u043e\u0454\u043a\u0442\u0443 \u043d\u0430 16.0, \u0443 \u0432\u0435\u0440\u0441\u0456\u044f\u0445 17+ \u043d\u0435\u043f\u043e\u043c\u0456\u0442\u043d\u043e \u0437\u0447\u0438\u0442\u0443\u0454 \u0444\u0430\u043a\u0442\u0438\u0447\u043d\u0456 \u0434\u0430\u0442\u0438 \u044f\u043a \u043f\u043b\u0430\u043d\u043e\u0432\u0456.<\/li>\n\n\n<li><strong>\u0414\u0430\u0442\u0438 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u2014 \u0446\u0435 \u0440\u0435\u0437\u0435\u0440\u0432\u0443\u0432\u0430\u043d\u043d\u044f \u0447\u0430\u0441\u0443.<\/strong> \u0423 19.0 \u043f\u043e\u043b\u044f <code>date_start<\/code> \u0456 <code>date_finished<\/code> \u0443 <code>mrp.workorder<\/code> \u043e\u0431\u0447\u0438\u0441\u043b\u044e\u044e\u0442\u044c\u0441\u044f \u043d\u0430 \u043e\u0441\u043d\u043e\u0432\u0456 \u0437\u0430\u043f\u0438\u0441\u0443 <code>resource.calendar.leaves<\/code> (<code>leave_id<\/code>) \u0443 \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u0456 \u0440\u043e\u0431\u043e\u0447\u043e\u0433\u043e \u0446\u0435\u043d\u0442\u0440\u0443. \u0417\u0430\u043f\u0438\u0441 \u0434\u0430\u0442 \u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0435 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u043e\u043d\u043e\u0432\u043b\u044e\u0454 \u0446\u0435 \u0440\u0435\u0437\u0435\u0440\u0432\u0443\u0432\u0430\u043d\u043d\u044f. \u041d\u0456\u043a\u043e\u043b\u0438 \u043d\u0435 \u0437\u0430\u043f\u0438\u0441\u0443\u0439\u0442\u0435 \u0434\u0430\u043d\u0456 \u0431\u0435\u0437\u043f\u043e\u0441\u0435\u0440\u0435\u0434\u043d\u044c\u043e \u0432 \u0442\u0430\u0431\u043b\u0438\u0446\u044e \u0432\u0456\u0434\u0441\u0443\u0442\u043d\u043e\u0441\u0442\u0435\u0439.<\/li>\n\n\n<li><strong>\u0420\u043e\u0437\u043f\u043e\u0447\u0430\u0442\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u0431\u043b\u043e\u043a\u0443\u044e\u0442\u044c Unplan.<\/strong> Odoo \u043d\u0435 \u0434\u043e\u0437\u0432\u043e\u043b\u044f\u0454 \u0441\u043a\u0430\u0441\u0443\u0432\u0430\u0442\u0438 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f MO, \u043a\u043e\u043b\u0438 \u00abSome work orders have already started\u00bb (\u0434\u0435\u044f\u043a\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u0432\u0436\u0435 \u0440\u043e\u0437\u043f\u043e\u0447\u0430\u0442\u043e). \u041f\u0456\u0434 \u0447\u0430\u0441 \u0437\u0432\u043e\u0440\u043e\u0442\u043d\u043e\u0433\u043e \u0437\u0430\u043f\u0438\u0441\u0443 \u043f\u0440\u043e\u043f\u0443\u0441\u043a\u0430\u0439\u0442\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u0443 \u0441\u0442\u0430\u043d\u0430\u0445 <code>progress<\/code> \u0430\u0431\u043e <code>done<\/code> \u0456 \u043f\u0435\u0440\u0435\u043d\u043e\u0441\u0456\u0442\u044c \u043b\u0438\u0448\u0435 \u0442\u0456, \u044f\u043a\u0456 \u0449\u0435 \u043d\u0435 \u0440\u043e\u0437\u043f\u043e\u0447\u0430\u0442\u043e.<\/li>\n\n\n<li><strong>\u0422\u0440\u0438\u0432\u0430\u043b\u0456\u0441\u0442\u044c \u0437\u043c\u0456\u043d\u044e\u0454\u0442\u044c\u0441\u044f.<\/strong> \u0414\u043b\u044f \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0439 \u0443 \u0440\u0435\u0436\u0438\u043c\u0456 Computed \u0442\u0440\u0438\u0432\u0430\u043b\u0456\u0441\u0442\u044c \u0432\u0438\u0437\u043d\u0430\u0447\u0430\u0454\u0442\u044c\u0441\u044f \u0437\u0430 \u043e\u0441\u0442\u0430\u043d\u043d\u0456\u043c\u0438 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u043c\u0438 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f\u043c\u0438 (\u0442\u0438\u043f\u043e\u0432\u043e \u2014 10) \u0437 \u043a\u043e\u0440\u0438\u0433\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0437\u0430 Time Efficiency. \u041d\u0430 \u043f\u0440\u043e\u0431\u043d\u0438\u0439 \u043f\u0435\u0440\u0456\u043e\u0434 \u0443\u0441\u0442\u0430\u043d\u043e\u0432\u0456\u0442\u044c Fixed \u0430\u0431\u043e \u0432\u0440\u0430\u0445\u043e\u0432\u0443\u0439\u0442\u0435, \u0449\u043e \u0432\u0445\u0456\u0434\u043d\u0456 \u0434\u0430\u043d\u0456 \u0437\u043c\u0456\u043d\u044e\u0432\u0430\u0442\u0438\u043c\u0443\u0442\u044c\u0441\u044f. \u041e\u043f\u0435\u0440\u0430\u0446\u0456\u0457 \u0437\u0431\u0435\u0440\u0456\u0433\u0430\u044e\u0442\u044c\u0441\u044f \u0432 \u043a\u043e\u0436\u043d\u0456\u0439 BoM \u043e\u043a\u0440\u0435\u043c\u043e, \u0431\u0435\u0437 \u0441\u043f\u0456\u043b\u044c\u043d\u043e\u0433\u043e \u0434\u043e\u0432\u0456\u0434\u043d\u0438\u043a\u0430 \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0438\u0445 \u043c\u0430\u0440\u0448\u0440\u0443\u0442\u0456\u0432, \u0442\u043e\u043c\u0443 \u043a\u043e\u0436\u043d\u0443 BoM \u043f\u043e\u0442\u0440\u0456\u0431\u043d\u043e \u0432\u043f\u043e\u0440\u044f\u0434\u043a\u0443\u0432\u0430\u0442\u0438 \u043e\u043a\u0440\u0435\u043c\u043e.<\/li>\n\n\n<li><strong>\u041d\u0435\u043a\u043e\u0440\u0435\u043a\u0442\u043d\u0456 \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u0456.<\/strong> \u041a\u043e\u0436\u043d\u043e\u043c\u0443 \u0440\u043e\u0431\u043e\u0447\u043e\u043c\u0443 \u0446\u0435\u043d\u0442\u0440\u0443 \u043f\u043e\u0442\u0440\u0456\u0431\u0435\u043d \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440 \u0440\u043e\u0431\u043e\u0447\u043e\u0433\u043e \u0447\u0430\u0441\u0443. \u0412\u043b\u0430\u0441\u043d\u0438\u0439 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043b\u044c\u043d\u0438\u043a Odoo \u0448\u0443\u043a\u0430\u0454 \u0432\u0456\u043b\u044c\u043d\u0438\u0439 \u0447\u0430\u0441 \u043d\u0430 \u043f\u0435\u0440\u0456\u043e\u0434 \u0434\u043e 700 \u0434\u043d\u0456\u0432 \u0443\u043f\u0435\u0440\u0435\u0434, \u0430 \u043f\u043e\u0442\u0456\u043c \u0437\u0443\u043f\u0438\u043d\u044f\u0454\u0442\u044c\u0441\u044f \u0437 \u043f\u043e\u0432\u0456\u0434\u043e\u043c\u043b\u0435\u043d\u043d\u044f\u043c \u00abImpossible to plan the workorder\u00bb (\u043d\u0435\u043c\u043e\u0436\u043b\u0438\u0432\u043e \u0437\u0430\u043f\u043b\u0430\u043d\u0443\u0432\u0430\u0442\u0438 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0435 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f). \u0412\u0438\u043f\u0440\u0430\u0432\u0442\u0435 \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u0456 \u0434\u043e \u043f\u0435\u0440\u0448\u043e\u0433\u043e \u0437\u0430\u0432\u0430\u043d\u0442\u0430\u0436\u0435\u043d\u043d\u044f.<\/li>\n\n\n<li><strong>\u041e\u0434\u0438\u043d\u0438\u0446\u0456 \u0432\u0438\u043c\u0456\u0440\u044e\u0432\u0430\u043d\u043d\u044f.<\/strong> <code>mrp.bom.line<\/code> \u043c\u0430\u0454 \u0432\u043b\u0430\u0441\u043d\u0435 \u043f\u043e\u043b\u0435 <code>product_uom_id<\/code>, \u0437\u043d\u0430\u0447\u0435\u043d\u043d\u044f \u044f\u043a\u043e\u0433\u043e \u043c\u043e\u0436\u0435 \u0432\u0456\u0434\u0440\u0456\u0437\u043d\u044f\u0442\u0438\u0441\u044f \u0432\u0456\u0434 \u0441\u043a\u043b\u0430\u0434\u0441\u044c\u043a\u043e\u0457 \u043e\u0434\u0438\u043d\u0438\u0446\u0456 \u0432\u0438\u043c\u0456\u0440\u044e\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u0443. \u041f\u0435\u0440\u0435\u0434 \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u043a\u043e\u044e \u0434\u043e\u0441\u0442\u0443\u043f\u043d\u043e\u0441\u0442\u0456 \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0456\u0432 \u0432\u0438\u043a\u043e\u043d\u0430\u0439\u0442\u0435 \u043f\u0435\u0440\u0435\u0440\u0430\u0445\u0443\u043d\u043e\u043a \u043e\u0434\u0438\u043d\u0438\u0446\u044c.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"who-configures-the-odoo-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0425\u0442\u043e \u043d\u0430\u043b\u0430\u0448\u0442\u043e\u0432\u0443\u0454 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u0437 Odoo<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u041a\u043e\u0436\u043d\u0435 \u043f\u0456\u0434\u043f\u0440\u0438\u0454\u043c\u0441\u0442\u0432\u043e \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0454 Odoo \u043f\u043e-\u0441\u0432\u043e\u0454\u043c\u0443: \u043c\u0430\u0454 \u0432\u043b\u0430\u0441\u043d\u0456 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457 BoM, \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u0456 \u0440\u043e\u0431\u043e\u0447\u0438\u0445 \u0446\u0435\u043d\u0442\u0440\u0456\u0432, \u0430\u043b\u044c\u0442\u0435\u0440\u043d\u0430\u0442\u0438\u0432\u043d\u0456 \u0440\u043e\u0431\u043e\u0447\u0456 \u0446\u0435\u043d\u0442\u0440\u0438 \u0442\u0430 \u0432\u043b\u0430\u0441\u043d\u0456 \u043c\u043e\u0434\u0443\u043b\u0456. \u041a\u043e\u043c\u0430\u043d\u0434\u0430 SkyPlanner \u043c\u0430\u0454 \u0434\u043e\u0441\u0432\u0456\u0434, \u043f\u043e\u0442\u0440\u0456\u0431\u043d\u0438\u0439 \u0434\u043b\u044f \u043f\u0440\u0430\u0432\u0438\u043b\u044c\u043d\u043e\u0433\u043e \u0437\u0456\u0441\u0442\u0430\u0432\u043b\u0435\u043d\u043d\u044f \u0434\u0430\u043d\u0438\u0445 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0441\u0430\u043c\u0435 \u0432\u0430\u0448\u043e\u0457 \u043a\u043e\u043d\u0444\u0456\u0433\u0443\u0440\u0430\u0446\u0456\u0457.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u041a\u043e\u043c\u0430\u043d\u0434\u0430 SkyPlanner \u043d\u0430\u043b\u0430\u0448\u0442\u043e\u0432\u0443\u0454 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e<\/strong> \u043f\u0456\u0434 \u0432\u0430\u0448\u0443 \u043a\u043e\u043d\u0444\u0456\u0433\u0443\u0440\u0430\u0446\u0456\u044e Odoo \u043d\u0430 \u043f\u043e\u0447\u0430\u0442\u043a\u043e\u0432\u043e\u043c\u0443 \u0435\u0442\u0430\u043f\u0456 \u0442\u0430 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u0454 \u0457\u0457 \u043f\u0456\u0441\u043b\u044f \u0437\u0430\u043f\u0443\u0441\u043a\u0443. \u0412\u043e\u043d\u0430 \u043f\u0440\u0430\u0446\u044e\u0454 \u0447\u0435\u0440\u0435\u0437 REST API \u0456 \u0432\u0435\u0431\u0445\u0443\u043a\u0438 SkyPlanner \u0442\u0430 JSON-2 \u0430\u0431\u043e RPC API Odoo. \u0426\u0435 \u0441\u0442\u0430\u043d\u0434\u0430\u0440\u0442\u043d\u0438\u0439 \u0432\u0430\u0440\u0456\u0430\u043d\u0442.<\/li>\n\n\n<li><strong>\u0412\u0430\u0448 \u043f\u0430\u0440\u0442\u043d\u0435\u0440 Odoo \u043c\u043e\u0436\u0435 \u0434\u043e\u043b\u0443\u0447\u0438\u0442\u0438\u0441\u044f.<\/strong> \u0412\u0456\u043d \u0437\u043d\u0430\u0454 \u0432\u0430\u0448\u0443 \u043a\u043e\u043d\u0444\u0456\u0433\u0443\u0440\u0430\u0446\u0456\u044e \u0442\u0430 \u0441\u043f\u0435\u0446\u0456\u0430\u043b\u044c\u043d\u043e \u0440\u043e\u0437\u0440\u043e\u0431\u043b\u0435\u043d\u0456 \u043c\u043e\u0434\u0443\u043b\u0456 \u0439 \u043c\u043e\u0436\u0435 \u0440\u0435\u0430\u043b\u0456\u0437\u0443\u0432\u0430\u0442\u0438 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u043d\u0430 \u043e\u0441\u043d\u043e\u0432\u0456 \u0442\u043e\u0433\u043e \u0441\u0430\u043c\u043e\u0433\u043e \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u043e\u0432\u0430\u043d\u043e\u0433\u043e REST API. \u0426\u0435\u0439 API \u0434\u0430\u0454 \u0437\u043c\u043e\u0433\u0443 \u0447\u0438\u0442\u0430\u0442\u0438 \u0439 \u0437\u0430\u043f\u0438\u0441\u0443\u0432\u0430\u0442\u0438 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f, \u043f\u0440\u043e\u0434\u0443\u043a\u0442\u0438, \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0438, \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0456 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457 \u0442\u0430 \u0437\u0430\u043f\u0438\u0441\u0438 \u043e\u0431\u043b\u0456\u043a\u0443 \u0447\u0430\u0441\u0443, \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0454 \u0442\u043e\u043a\u0435\u043d API \u0434\u043b\u044f \u0430\u0432\u0442\u0435\u043d\u0442\u0438\u0444\u0456\u043a\u0430\u0446\u0456\u0457 \u0442\u0430 \u043c\u0430\u0454 \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u0430\u0446\u0456\u044e Swagger\/OpenAPI.<\/li>\n\n\n<li><strong>\u0412\u0430\u0448\u0456 \u0432\u043b\u0430\u0441\u043d\u0456 \u0440\u043e\u0437\u0440\u043e\u0431\u043d\u0438\u043a\u0438<\/strong> \u043c\u043e\u0436\u0443\u0442\u044c \u0437\u0440\u043e\u0431\u0438\u0442\u0438 \u0442\u0435 \u0441\u0430\u043c\u0435 \u2014 \u0437\u0430\u0437\u0432\u0438\u0447\u0430\u0439 \u0443 \u0432\u0438\u0433\u043b\u044f\u0434\u0456 \u043d\u0435\u0432\u0435\u043b\u0438\u043a\u043e\u0433\u043e \u043f\u0440\u043e\u043c\u0456\u0436\u043d\u043e\u0433\u043e \u041f\u0417 \u043f\u043e\u0440\u0443\u0447 \u0437 Odoo \u0430\u0431\u043e \u043c\u043e\u0434\u0443\u043b\u044f \u043d\u0430 Odoo.sh \u0447\u0438 \u043d\u0430 \u0432\u043b\u0430\u0441\u043d\u0438\u0445 \u0441\u0435\u0440\u0432\u0435\u0440\u0430\u0445. \u0414\u043b\u044f \u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u0434\u043e\u0441\u0442\u0430\u0442\u043d\u044c\u043e \u043a\u043b\u044e\u0447\u0430 API (<a href=\"\/uk\/docs\/%d0%bf%d1%96%d0%b4%d1%80%d1%83%d1%87%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/\">\u043f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457<\/a>), \u0430 \u043a\u043e\u043c\u0430\u043d\u0434\u0430 SkyPlanner \u0434\u043e\u043f\u043e\u043c\u043e\u0436\u0435 \u0437\u0430 \u043f\u043e\u0442\u0440\u0435\u0431\u0438.<\/li>\n\n<\/ol>\n\n\n<p>\u0422\u0430\u043a\u0430 \u0441\u0430\u043c\u0430 \u043c\u043e\u0434\u0435\u043b\u044c \u0443\u0436\u0435 \u043f\u0440\u0430\u0446\u044e\u0454 \u0432 \u043f\u0440\u043e\u043c\u0438\u0441\u043b\u043e\u0432\u0456\u0439 \u0435\u043a\u0441\u043f\u043b\u0443\u0430\u0442\u0430\u0446\u0456\u0457 \u0437 \u0456\u043d\u0448\u0438\u043c\u0438 ERP. \u0423 <a href=\"\/uk\/customers\/laboratory-allied\/\">Laboratory &amp; Allied<\/a> \u0432\u043d\u0443\u0442\u0440\u0456\u0448\u043d\u044f \u0406\u0422-\u043a\u043e\u043c\u0430\u043d\u0434\u0430 \u0440\u043e\u0437\u0440\u043e\u0431\u0438\u043b\u0430 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u0456\u0437 SAP Business One \u043f\u0435\u0440\u0435\u0432\u0430\u0436\u043d\u043e \u0441\u0430\u043c\u043e\u0441\u0442\u0456\u0439\u043d\u043e, \u0437\u0430 \u0434\u043e\u043f\u043e\u043c\u043e\u0433\u0438 SkyPlanner. \u041a\u043e\u043c\u043f\u0430\u043d\u0456\u044f <a href=\"\/uk\/customers\/utu\/\">UTU<\/a> \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0454 SkyPlanner \u0440\u0430\u0437\u043e\u043c \u0437\u0456 \u0441\u0432\u043e\u0454\u044e ERP NetSuite.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"why-the-integration-pays-off\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0427\u043e\u043c\u0443 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f \u043e\u043a\u0443\u043f\u0430\u0454\u0442\u044c\u0441\u044f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u0421\u0430\u043c\u0435 \u0437\u0432\u043e\u0440\u043e\u0442\u043d\u0438\u0439 \u0437\u0430\u043f\u0438\u0441 \u0434\u0430\u043d\u0438\u0445 \u0440\u043e\u0431\u0438\u0442\u044c \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u043a\u043e\u0440\u0438\u0441\u043d\u043e\u044e \u0432 \u0449\u043e\u0434\u0435\u043d\u043d\u0456\u0439 \u0440\u043e\u0431\u043e\u0442\u0456. \u041a\u043e\u043b\u0438 \u0432\u0456\u043d \u043f\u0440\u0430\u0446\u044e\u0454:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0412\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f Odoo \u043e\u0442\u0440\u0438\u043c\u0443\u044e\u0442\u044c \u0440\u0435\u0430\u043b\u0456\u0441\u0442\u0438\u0447\u043d\u0456 \u0434\u0430\u0442\u0438.<\/strong> \u0420\u0443\u0448\u0456\u0439 Arcturus AI \u0437\u0430 \u0441\u0435\u043a\u0443\u043d\u0434\u0438 \u0432\u0438\u0437\u043d\u0430\u0447\u0430\u0454 \u043f\u043e\u0441\u043b\u0456\u0434\u043e\u0432\u043d\u0456\u0441\u0442\u044c \u0443\u0441\u0456\u0445 \u0432\u0456\u0434\u043a\u0440\u0438\u0442\u0438\u0445 MO, \u0430 \u0440\u043e\u0437\u0440\u0430\u0445\u043e\u0432\u0430\u043d\u0456 \u0434\u0430\u0442\u0438 \u0442\u0430 \u0432\u0438\u0431\u0440\u0430\u043d\u0456 \u0440\u043e\u0431\u043e\u0447\u0456 \u0446\u0435\u043d\u0442\u0440\u0438 \u0437\u0430\u043f\u0438\u0441\u0443\u044e\u0442\u044c\u0441\u044f \u0432 <code>mrp.workorder<\/code> \u0456 \u0432\u0456\u0434\u043e\u0431\u0440\u0430\u0436\u0430\u044e\u0442\u044c\u0441\u044f \u0432 \u043f\u043e\u0434\u0430\u043d\u043d\u044f\u0445 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f Odoo.<\/li>\n\n\n<li><strong>\u0411\u0435\u0437 \u0440\u0443\u0447\u043d\u043e\u0433\u043e \u043f\u0435\u0440\u0435\u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f.<\/strong> Autopilot \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0447\u043d\u043e \u043f\u0435\u0440\u0435\u0431\u0443\u0434\u043e\u0432\u0443\u0454 \u0433\u0440\u0430\u0444\u0456\u043a \u0443 \u0440\u0430\u0437\u0456 \u0437\u043c\u0456\u043d \u043d\u0430 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0456, \u0430 \u0432\u0435\u0431\u0445\u0443\u043a \u043f\u0435\u0440\u0435\u0434\u0430\u0454 \u043d\u043e\u0432\u0456 \u0434\u0430\u0442\u0438 \u0434\u043e Odoo.<\/li>\n\n\n<li><strong>\u0417\u0432\u043e\u0440\u043e\u0442\u043d\u0438\u0439 \u0437\u0432\u2019\u044f\u0437\u043e\u043a \u0456\u0437 \u0446\u0435\u0445\u043e\u043c.<\/strong> \u041e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0438 \u0440\u0435\u0454\u0441\u0442\u0440\u0443\u044e\u0442\u044c \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u0443 \u0440\u043e\u0431\u043e\u0442\u0443 \u043d\u0430 \u0442\u0435\u043b\u0435\u0444\u043e\u043d\u0456 \u0447\u0438 \u043f\u043b\u0430\u043d\u0448\u0435\u0442\u0456 \u0437\u0430 \u0434\u043e\u043f\u043e\u043c\u043e\u0433\u043e\u044e Mobile Confirmations, Production Timer \u0456 Quick Log Mode, \u0430 Time Logs \u043d\u0430\u0434\u0445\u043e\u0434\u044f\u0442\u044c \u0434\u043e Odoo \u0434\u043b\u044f \u043e\u0431\u043b\u0456\u043a\u0443 \u0437\u0430\u043f\u0430\u0441\u0456\u0432 \u0456 \u0440\u043e\u0437\u0440\u0430\u0445\u0443\u043d\u043a\u0443 \u0441\u043e\u0431\u0456\u0432\u0430\u0440\u0442\u043e\u0441\u0442\u0456. \u041f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0442\u0430 \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0432\u0435\u0434\u0443\u0442\u044c\u0441\u044f \u0432 \u043e\u0434\u043d\u043e\u043c\u0443 \u0456\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0456 \u2014 \u044f\u043a \u0443 Community, \u0442\u0430\u043a \u0456 \u0432 Enterprise.<\/li>\n\n\n<li><strong>\u0413\u0440\u0430\u0444\u0456\u043a \u0432\u0440\u0430\u0445\u043e\u0432\u0443\u0454 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u043d\u044f, \u044f\u043a\u0438\u0445 \u043d\u0435 \u0432\u0440\u0430\u0445\u043e\u0432\u0443\u0454 Odoo.<\/strong> \u041c\u0430\u0442\u0440\u0438\u0446\u044f \u0447\u0430\u0441\u0443 \u043f\u0435\u0440\u0435\u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f \u0437\u0430\u0434\u0430\u0454 \u0447\u0430\u0441 \u043f\u0435\u0440\u0435\u043d\u0430\u043b\u0430\u0433\u043e\u0434\u0436\u0435\u043d\u043d\u044f \u0434\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0457 \u043f\u0430\u0440\u0438 \u0432\u0438\u0440\u043e\u0431\u0456\u0432 \u0437\u0430\u043b\u0435\u0436\u043d\u043e \u0432\u0456\u0434 \u043f\u043e\u0441\u043b\u0456\u0434\u043e\u0432\u043d\u043e\u0441\u0442\u0456 \u0457\u0445 \u0432\u0438\u0433\u043e\u0442\u043e\u0432\u043b\u0435\u043d\u043d\u044f. \u0406\u043d\u0441\u0442\u0440\u0443\u043c\u0435\u043d\u0442\u0438 \u2014 \u0446\u0435 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0440\u0435\u0441\u0443\u0440\u0441\u0438, \u0441\u043f\u0456\u043b\u044c\u043d\u0456 \u0434\u043b\u044f \u043a\u0456\u043b\u044c\u043a\u043e\u0445 \u0432\u0435\u0440\u0441\u0442\u0430\u0442\u0456\u0432, \u0430 \u043e\u0434\u043d\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0435 \u0437\u0430\u0432\u0434\u0430\u043d\u043d\u044f \u043c\u043e\u0436\u0435 \u043f\u043e\u0442\u0440\u0435\u0431\u0443\u0432\u0430\u0442\u0438 \u043a\u0456\u043b\u044c\u043a\u043e\u0445 \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0456\u0432 \u043e\u0434\u043d\u043e\u0447\u0430\u0441\u043d\u043e. \u042f\u043a\u0449\u043e \u043e\u0441\u043d\u043e\u0432\u043d\u0438\u0439 \u0432\u0435\u0440\u0441\u0442\u0430\u0442 \u0430\u0431\u043e \u043f\u0440\u0430\u0446\u0456\u0432\u043d\u0438\u043a \u043d\u0435\u0434\u043e\u0441\u0442\u0443\u043f\u043d\u0438\u0439, \u0440\u0443\u0448\u0456\u0439 \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0454 \u0430\u043b\u044c\u0442\u0435\u0440\u043d\u0430\u0442\u0438\u0432\u043d\u0456. \u0414\u0430\u0442\u0438, \u0437\u0430\u043f\u0438\u0441\u0430\u043d\u0456 \u0432 <code>mrp.workorder<\/code>, \u0432\u0440\u0430\u0445\u043e\u0432\u0443\u044e\u0442\u044c \u0443\u0441\u0456 \u0446\u0456 \u043e\u0431\u043c\u0435\u0436\u0435\u043d\u043d\u044f.<\/li>\n\n\n<li><strong>\u041f\u043b\u0430\u043d \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u043d\u0430\u0434\u0445\u043e\u0434\u0436\u0435\u043d\u043d\u044f \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0456\u0432.<\/strong> \u041d\u0430\u044f\u0432\u043d\u0456 \u0437\u0430\u043f\u0430\u0441\u0438 \u0442\u0430 \u0432\u0456\u0434\u043a\u0440\u0438\u0442\u0456 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u043d\u0430 \u0437\u0430\u043a\u0443\u043f\u0456\u0432\u043b\u044e \u0432 Odoo \u0441\u043b\u0443\u0433\u0443\u044e\u0442\u044c \u043e\u0441\u043d\u043e\u0432\u043e\u044e \u0434\u043b\u044f \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u043c\u0430\u0442\u0435\u0440\u0456\u0430\u043b\u0456\u0432. \u0417\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u0456 \u043a\u043e\u043c\u043f\u043e\u043d\u0435\u043d\u0442\u0438 \u0432\u0432\u0430\u0436\u0430\u044e\u0442\u044c\u0441\u044f \u0434\u043e\u0441\u0442\u0443\u043f\u043d\u0438\u043c\u0438 \u043d\u0430 \u0434\u0430\u0442\u0443 \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043d\u043d\u044f \u0432 PO, \u0430 \u0437\u0430\u043f\u0430\u0441\u0438 \u043e\u043d\u043e\u0432\u043b\u044e\u044e\u0442\u044c\u0441\u044f, \u043a\u043e\u043b\u0438 PO \u043e\u0442\u0440\u0438\u043c\u0443\u0454 \u0441\u0442\u0430\u0442\u0443\u0441 Delivered. \u0414\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u0437\u0430\u0432\u0434\u0430\u043d\u043d\u044f \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u044f\u0454\u0442\u044c\u0441\u044f, \u0449\u043e \u0454 \u043d\u0430 \u0441\u043a\u043b\u0430\u0434\u0456 \u0442\u0430 \u0449\u043e \u043f\u0435\u0440\u0435\u0431\u0443\u0432\u0430\u0454 \u0432 \u0434\u043e\u0440\u043e\u0437\u0456.<\/li>\n\n<\/ul>\n\n\n<p>\u0412\u0438 \u043c\u043e\u0436\u0435\u0442\u0435 \u043e\u0446\u0456\u043d\u0438\u0442\u0438 \u0433\u0440\u0430\u0444\u0456\u043a \u0449\u0435 \u0434\u043e \u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u0440\u043e\u0431\u0456\u0442 \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457. \u041f\u043e\u0447\u043d\u0456\u0442\u044c <a href=\"\/uk\/%d0%b2%d0%b8%d0%bf%d1%80%d0%be%d0%b1%d1%83%d0%b2%d0%b0%d0%bd%d0%bd%d1%8f\/\">30-\u0434\u0435\u043d\u043d\u0438\u0439 \u0431\u0435\u0437\u043f\u043b\u0430\u0442\u043d\u0438\u0439 \u043f\u0440\u043e\u0431\u043d\u0438\u0439 \u043f\u0435\u0440\u0456\u043e\u0434<\/a> \u0456\u0437 CSV-\u0444\u0430\u0439\u043b\u0430\u043c\u0438 \u0442\u0430 \u043f\u0435\u0440\u0435\u0433\u043b\u044f\u043d\u044c\u0442\u0435 \u0432\u043b\u0430\u0441\u043d\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0456 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u0437 Odoo \u043d\u0430 \u0434\u0456\u0430\u0433\u0440\u0430\u043c\u0456 \u0413\u0430\u043d\u0442\u0430 \u2014 \u0434\u043e 20 \u0440\u043e\u0431\u043e\u0447\u0438\u0445 \u0446\u0435\u043d\u0442\u0440\u0456\u0432, \u0431\u0435\u0437 \u0431\u0430\u043d\u043a\u0456\u0432\u0441\u044c\u043a\u043e\u0457 \u043a\u0430\u0440\u0442\u043a\u0438. \u0412\u0430\u0440\u0442\u0456\u0441\u0442\u044c \u2014 \u0432\u0456\u0434 199 \u20ac \u043d\u0430 \u043c\u0456\u0441\u044f\u0446\u044c \u0456\u0437 5 \u0440\u043e\u0431\u043e\u0447\u0438\u043c\u0438 \u0446\u0435\u043d\u0442\u0440\u0430\u043c\u0438 \u0432\u043a\u043b\u044e\u0447\u043d\u043e; \u043e\u043f\u043b\u0430\u0442\u0430 \u0449\u043e\u043c\u0456\u0441\u044f\u0447\u043d\u0430, \u0441\u043a\u0430\u0441\u0443\u0432\u0430\u0442\u0438 \u043c\u043e\u0436\u043d\u0430 \u0431\u0443\u0434\u044c-\u043a\u043e\u043b\u0438. \u0412\u0430\u0440\u0442\u0456\u0441\u0442\u044c \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \u0440\u043e\u0437\u0440\u0430\u0445\u043e\u0432\u0443\u0454\u0442\u044c\u0441\u044f \u0437\u0430\u0437\u0434\u0430\u043b\u0435\u0433\u0456\u0434\u044c \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0432\u0430\u0448\u0438\u0445 \u043f\u0440\u043e\u0446\u0435\u0441\u0456\u0432 \u0456 \u043f\u043e\u0442\u0440\u0435\u0431 \u0440\u0430\u0437\u043e\u043c \u0456\u0437 \u0442\u0430\u0440\u0438\u0444\u043d\u0438\u043c \u043f\u043b\u0430\u043d\u043e\u043c, \u0442\u043e\u0436 \u0432\u0438 \u0431\u0430\u0447\u0438\u0442\u0435 \u043f\u043e\u0432\u043d\u0443 \u0441\u0443\u043c\u0443 \u0449\u0435 \u0434\u043e \u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u0440\u043e\u0431\u043e\u0442\u0438. \u041f\u0435\u0440\u0435\u0433\u043b\u044f\u043d\u044c\u0442\u0435 <a href=\"\/uk\/%d1%84%d1%83%d0%bd%d0%ba%d1%86%d1%96%d1%97\/\">\u043c\u043e\u0436\u043b\u0438\u0432\u043e\u0441\u0442\u0456<\/a> \u0442\u0430 <a href=\"\/uk\/%d1%96%d1%81%d1%82%d0%be%d1%80%d1%96%d1%97-%d0%ba%d0%bb%d1%96%d1%94%d0%bd%d1%82%d1%96%d0%b2\/\">\u0456\u0441\u0442\u043e\u0440\u0456\u0457 \u043a\u043b\u0456\u0454\u043d\u0442\u0456\u0432<\/a> \u0430\u0431\u043e <a href=\"\/uk\/%d0%b7%d0%b2%d1%8f%d0%b6%d1%96%d1%82%d1%8c%d1%81%d1%8f-%d0%b7-%d0%b2%d1%96%d0%b4%d0%b4%d1%96%d0%bb%d0%be%d0%bc-%d0%bf%d1%80%d0%be%d0%b4%d0%b0%d0%b6%d1%96%d0%b2\/\">\u0437\u0430\u043c\u043e\u0432\u0442\u0435 \u0434\u0435\u043c\u043e\u043d\u0441\u0442\u0440\u0430\u0446\u0456\u044e<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0412\u0456\u0434\u0433\u0443\u043a\u0438 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u043a\u0456\u0432 \u043f\u0440\u043e SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, \u0444\u0430\u0445\u0456\u0432\u0435\u0446\u044c \u0456\u0437 \u043b\u0430\u043d\u0446\u044e\u0433\u0430 \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043d\u043d\u044f UTU, \u0443 \u0446\u0435\u0445\u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0435\u043b\u0435\u043a\u0442\u0440\u043e\u0449\u0438\u0442\u0456\u0432 \u0432 \u0423\u043b\u0432\u0456\u043b\u0430\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u0433\u043e\u0434<\/b><span>\u0435\u043a\u043e\u043d\u043e\u043c\u0456\u0457 \u0449\u043e\u0442\u0438\u0436\u043d\u044f<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab\u0417\u0430\u0432\u0434\u044f\u043a\u0438 SkyPlanner \u043c\u0438 \u043f\u0435\u0440\u0435\u0439\u0448\u043b\u0438 \u0432\u0456\u0434 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0432 \u0442\u0430\u0431\u043b\u0438\u0446\u044f\u0445 Excel \u0434\u043e \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u0430\u0446\u0456\u0457 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0432 \u0440\u0435\u0430\u043b\u044c\u043d\u043e\u043c\u0443 \u0447\u0430\u0441\u0456\u00bb.<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, \u0444\u0430\u0445\u0456\u0432\u0435\u0446\u044c \u0456\u0437 \u043b\u0430\u043d\u0446\u044e\u0433\u0430 \u043f\u043e\u0441\u0442\u0430\u0447\u0430\u043d\u043d\u044f<\/b><br>UTU \u00b7 \u0415\u043b\u0435\u043a\u0442\u0440\u043e\u0449\u0438\u0442\u0438 \u0442\u0430 \u0440\u043e\u0437\u043f\u043e\u0434\u0456\u043b\u044c\u043d\u0456 \u043f\u0440\u0438\u0441\u0442\u0440\u043e\u0457<\/p>\n\n\n<p class=\"ind-cust__result\">\u041f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437\u0430\u043e\u0449\u0430\u0434\u0436\u0443\u0454 2 \u0433\u043e\u0434\u0438\u043d\u0438 \u0440\u043e\u0431\u043e\u0447\u043e\u0433\u043e \u0447\u0430\u0441\u0443 \u0449\u043e\u0442\u0438\u0436\u043d\u044f, \u0430 \u043d\u043e\u0432\u0430 \u0447\u0435\u0440\u0433\u0430 \u0437\u0430\u0432\u0434\u0430\u043d\u044c \u043d\u0430\u0434\u0445\u043e\u0434\u0438\u0442\u044c \u043d\u0430 \u043b\u0456\u043d\u0456\u044e \u0437\u0430 \u043b\u0456\u0447\u0435\u043d\u0456 \u0441\u0435\u043a\u0443\u043d\u0434\u0438.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/uk\/customers\/utu\/\">\u0427\u0438\u0442\u0430\u0442\u0438 \u0432\u0456\u0434\u0433\u0443\u043a UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u041e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0438 \u0432 \u043a\u043e\u0441\u0442\u044e\u043c\u0430\u0445 \u0434\u043b\u044f \u0447\u0438\u0441\u0442\u0438\u0445 \u043f\u0440\u0438\u043c\u0456\u0449\u0435\u043d\u044c \u0431\u0456\u043b\u044f \u043b\u0456\u043d\u0456\u0457 \u0440\u043e\u0437\u043b\u0438\u0432\u0443 \u0443 \u0444\u043b\u0430\u043a\u043e\u043d\u0438 \u043d\u0430 \u0444\u0430\u0440\u043c\u0430\u0446\u0435\u0432\u0442\u0438\u0447\u043d\u043e\u043c\u0443 \u0437\u0430\u0432\u043e\u0434\u0456 Laboratory &amp; Allied \u0443 \u041d\u0430\u0439\u0440\u043e\u0431\u0456\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u0435\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab\u0415\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437\u0440\u043e\u0441\u043b\u0430 \u043d\u0430 90%\u00bb.<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, \u043a\u0435\u0440\u0456\u0432\u043d\u0438\u043a \u0406\u0422-\u0432\u0456\u0434\u0434\u0456\u043b\u0443<\/b><br>Laboratory &amp; Allied \u00b7 \u0424\u0430\u0440\u043c\u0430\u0446\u0435\u0432\u0442\u0438\u0447\u043d\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e<\/p>\n\n\n<p class=\"ind-cust__result\">\u0415\u0444\u0435\u043a\u0442\u0438\u0432\u043d\u0456\u0441\u0442\u044c \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0437\u0440\u043e\u0441\u043b\u0430 \u043d\u0430 90%, \u0430 \u043f\u0456\u0434\u0433\u043e\u0442\u043e\u0432\u043a\u0430 \u043e\u043f\u0442\u0438\u043c\u0456\u0437\u043e\u0432\u0430\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443 \u043d\u0430 \u0442\u0440\u0438 \u043c\u0456\u0441\u044f\u0446\u0456 \u0434\u043b\u044f \u0432\u0441\u0456\u0445 \u0440\u043e\u0431\u043e\u0447\u0438\u0445 \u0446\u0435\u043d\u0442\u0440\u0456\u0432 \u0437\u0430\u0439\u043c\u0430\u0454 \u043c\u0435\u043d\u0448 \u043d\u0456\u0436 30 \u0445\u0432\u0438\u043b\u0438\u043d.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/uk\/customers\/laboratory-allied\/\">\u0427\u0438\u0442\u0430\u0442\u0438 \u0432\u0456\u0434\u0433\u0443\u043a Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, \u0433\u0435\u043d\u0435\u0440\u0430\u043b\u044c\u043d\u0438\u0439 \u0434\u0438\u0440\u0435\u043a\u0442\u043e\u0440 Mamec, \u0443 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u043c\u0443 \u0446\u0435\u0445\u0443 \u043a\u043e\u043c\u043f\u0430\u043d\u0456\u0457 \u0432 \u041b\u043e\u0433\u2019\u0457\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1,000s<\/b><span>\u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u044c \u0437\u0430\u043f\u043b\u0430\u043d\u043e\u0432\u0430\u043d\u043e \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0447\u043d\u043e<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab\u0422\u0435\u043f\u0435\u0440 \u043c\u0438 \u043f\u043e-\u0456\u043d\u0448\u043e\u043c\u0443 \u043a\u043e\u043d\u0442\u0440\u043e\u043b\u044e\u0454\u043c\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e, \u0430 \u043d\u0430\u0448\u0435 \u0440\u043e\u0437\u0443\u043c\u0456\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u043f\u043e\u0442\u0443\u0436\u043d\u043e\u0441\u0442\u0435\u0439 \u0432\u0438\u0439\u0448\u043b\u043e \u043d\u0430 \u0437\u043e\u0432\u0441\u0456\u043c \u0456\u043d\u0448\u0438\u0439 \u0440\u0456\u0432\u0435\u043d\u044c\u00bb.<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, \u0433\u0435\u043d\u0435\u0440\u0430\u043b\u044c\u043d\u0438\u0439 \u0434\u0438\u0440\u0435\u043a\u0442\u043e\u0440<\/b><br>Mamec \u00b7 \u041f\u0440\u043e\u043c\u0438\u0441\u043b\u043e\u0432\u0456 \u0437\u043c\u0456\u0448\u0443\u0432\u0430\u0447\u0456, \u043d\u0430\u0441\u043e\u0441\u0438 \u0442\u0430 \u0432\u0438\u0441\u043e\u043a\u043e\u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u0435 \u043a\u043e\u043d\u0442\u0440\u0430\u043a\u0442\u043d\u0435 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e<\/p>\n\n\n<p class=\"ind-cust__result\">\u0422\u0438\u0441\u044f\u0447\u0456 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u0445 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u044c \u043f\u043b\u0430\u043d\u0443\u044e\u0442\u044c\u0441\u044f \u0430\u0432\u0442\u043e\u043c\u0430\u0442\u0438\u0447\u043d\u043e, \u0430 \u0432\u0441\u044f \u043e\u0440\u0433\u0430\u043d\u0456\u0437\u0430\u0446\u0456\u044f \u0431\u0430\u0447\u0438\u0442\u044c \u0441\u0442\u0430\u043d \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0432 \u0440\u0435\u0430\u043b\u044c\u043d\u043e\u043c\u0443 \u0447\u0430\u0441\u0456.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/uk\/customers\/mamec\/\">\u0427\u0438\u0442\u0430\u0442\u0438 \u0432\u0456\u0434\u0433\u0443\u043a Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"\u0412\u0438\u0433\u043b\u044f\u0434 \u0437 \u043f\u043e\u0432\u0456\u0442\u0440\u044f \u043d\u0430 \u0437\u0430\u0432\u043e\u0434 Piristeel \u0437 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0441\u0438\u0441\u0442\u0435\u043c \u0431\u0435\u0437\u043f\u0435\u043a\u0438 \u043f\u043e\u043a\u0440\u0456\u0432\u043b\u0456 \u0432 \u041a\u0430\u0443\u0433\u0430\u0432\u0456\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>\u043d\u0430\u0434\u0456\u0439\u043d\u0456\u0441\u0442\u044c \u043f\u043e\u0441\u0442\u0430\u0432\u043e\u043a<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u00ab\u0417\u0430\u0432\u0434\u044f\u043a\u0438 SkyPlanner \u0441\u0442\u0430\u043b\u043e \u043b\u0435\u0433\u0448\u0435 \u0432\u0438\u044f\u0432\u043b\u044f\u0442\u0438 \u0432\u0443\u0437\u044c\u043a\u0456 \u043c\u0456\u0441\u0446\u044f, \u0430 \u0443\u043f\u0440\u0430\u0432\u043b\u0456\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u043e\u043c \u0441\u0442\u0430\u043b\u043e \u0437\u0440\u043e\u0437\u0443\u043c\u0456\u043b\u0456\u0448\u0438\u043c\u00bb.<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, \u043a\u0435\u0440\u0456\u0432\u043d\u0438\u043a \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430<\/b><br>Piristeel \u00b7 \u0421\u0438\u0441\u0442\u0435\u043c\u0438 \u0431\u0435\u0437\u043f\u0435\u043a\u0438 \u043f\u043e\u043a\u0440\u0456\u0432\u043b\u0456 \u0442\u0430 \u0432\u043e\u0434\u043e\u0441\u0442\u0456\u0447\u043d\u0456 \u0441\u0438\u0441\u0442\u0435\u043c\u0438<\/p>\n\n\n<p class=\"ind-cust__result\">\u0426\u044c\u043e\u0433\u043e \u0440\u043e\u043a\u0443 \u043d\u0430\u0434\u0456\u0439\u043d\u0456\u0441\u0442\u044c \u043f\u043e\u0441\u0442\u0430\u0432\u043e\u043a \u0434\u043e\u0441\u044f\u0433\u043b\u0430 99,2%, \u0430 \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u0435 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0434\u0430\u0454 \u0437\u043c\u043e\u0433\u0443 \u0437\u0430\u043e\u0449\u0430\u0434\u0436\u0443\u0432\u0430\u0442\u0438 \u0434\u043e \u0447\u043e\u0442\u0438\u0440\u044c\u043e\u0445 \u0433\u043e\u0434\u0438\u043d \u0440\u043e\u0431\u043e\u0447\u043e\u0433\u043e \u0447\u0430\u0441\u0443 \u0449\u043e\u0434\u043d\u044f.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/uk\/customers\/piristeel\/\">\u0427\u0438\u0442\u0430\u0442\u0438 \u0432\u0456\u0434\u0433\u0443\u043a Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u041f\u043e\u0448\u0438\u0440\u0435\u043d\u0456 \u0437\u0430\u043f\u0438\u0442\u0430\u043d\u043d\u044f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0427\u0438 \u043f\u0440\u0430\u0446\u044e\u0454 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f \u0432 Odoo Online?<\/summary>\n<p class=\"sp-faq__a\">\u041d\u0430 \u0442\u0430\u0440\u0438\u0444\u0456 Custom \u2014 \u0442\u0430\u043a, \u0447\u0435\u0440\u0435\u0437 \u0437\u043e\u0432\u043d\u0456\u0448\u043d\u0456\u0439 API. \u0422\u0430\u0440\u0438\u0444\u0438 One App Free \u0442\u0430 Standard \u043d\u0435 \u043c\u0430\u044e\u0442\u044c \u0434\u043e\u0441\u0442\u0443\u043f\u0443 \u0434\u043e \u0437\u043e\u0432\u043d\u0456\u0448\u043d\u044c\u043e\u0433\u043e API, \u0430 Standard \u043d\u0435 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u0454 \u0432\u043b\u0430\u0441\u043d\u0438\u0445 \u043c\u043e\u0434\u0443\u043b\u0456\u0432. \u0422\u043e\u043c\u0443 \u043d\u0430 \u0446\u0438\u0445 \u0442\u0430\u0440\u0438\u0444\u0430\u0445 \u0434\u043e\u0441\u0442\u0443\u043f\u043d\u0456 \u043b\u0438\u0448\u0435 \u0456\u043c\u043f\u043e\u0440\u0442 \u0442\u0430 \u0435\u043a\u0441\u043f\u043e\u0440\u0442 CSV\/XLSX.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0429\u043e \u0432\u0438\u043a\u043e\u0440\u0438\u0441\u0442\u043e\u0432\u0443\u0432\u0430\u0442\u0438: JSON-2 \u0447\u0438 XML-RPC?<\/summary>\n<p class=\"sp-faq__a\">\u0412 Odoo 19.0 \u0456 \u043d\u043e\u0432\u0456\u0448\u0438\u0445 \u0432\u0435\u0440\u0441\u0456\u044f\u0445 \u2014 JSON-2. \u0414\u043b\u044f \u0432\u0435\u0440\u0441\u0456\u0439 \u0432\u0456\u0434 16.0 \u0434\u043e 18.0 \u0434\u043e\u0441\u0456 \u043f\u043e\u0442\u0440\u0456\u0431\u043d\u0456 XML-RPC \u0442\u0430 JSON-RPC, \u0430\u043b\u0435 \u0432 Odoo 22 \u0457\u0445 \u0437\u0430\u043f\u043b\u0430\u043d\u043e\u0432\u0430\u043d\u043e \u0432\u0438\u043b\u0443\u0447\u0438\u0442\u0438.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u042f\u043a \u0433\u0440\u0430\u0444\u0456\u043a \u043f\u0435\u0440\u0435\u0434\u0430\u0454\u0442\u044c\u0441\u044f \u043d\u0430\u0437\u0430\u0434 \u0434\u043e Odoo?<\/summary>\n<p class=\"sp-faq__a\">\u0427\u0435\u0440\u0435\u0437 \u043c\u0435\u0442\u043e\u0434 ORM <code>write<\/code> \u0434\u043b\u044f \u043a\u043e\u0436\u043d\u043e\u0433\u043e \u0437\u0430\u043f\u0438\u0441\u0443 <code>mrp.workorder<\/code>: \u0443 19.0 \u2014 <code>POST \/json\/2\/mrp.workorder\/write<\/code> \u0437 <code>ids<\/code> \u0456 <code>vals<\/code>, \u0430 \u0443 \u0432\u0435\u0440\u0441\u0456\u044f\u0445 \u0432\u0456\u0434 16.0 \u0434\u043e 18.0 \u2014 <code>execute_kw<\/code> \u0456\u0437 <code>write<\/code> \u0447\u0435\u0440\u0435\u0437 XML-RPC \u0430\u0431\u043e JSON-RPC. \u041f\u0435\u0440\u0435\u0434\u0430\u044e\u0442\u044c\u0441\u044f \u0437\u043d\u0430\u0447\u0435\u043d\u043d\u044f <code>date_start<\/code>, <code>date_finished<\/code> (\u0443 16.0 \u2014 <code>date_planned_start<\/code> \u0456 <code>date_planned_finished<\/code>) \u0442\u0430, \u044f\u043a\u0449\u043e \u0440\u043e\u0431\u043e\u0447\u0438\u0439 \u0446\u0435\u043d\u0442\u0440 \u0437\u043c\u0456\u043d\u0438\u0432\u0441\u044f, <code>workcenter_id<\/code>. Odoo \u0432\u0456\u0434\u043f\u043e\u0432\u0456\u0434\u043d\u043e \u043f\u0435\u0440\u0435\u043d\u043e\u0441\u0438\u0442\u044c \u0440\u0435\u0437\u0435\u0440\u0432\u0443\u0432\u0430\u043d\u043d\u044f \u0447\u0430\u0441\u0443 \u0440\u043e\u0431\u043e\u0447\u043e\u0433\u043e \u0446\u0435\u043d\u0442\u0440\u0443, \u0442\u043e\u043c\u0443 \u0432 \u043f\u043e\u0434\u0430\u043d\u043d\u044f\u0445 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f Odoo \u0432\u0456\u0434\u043e\u0431\u0440\u0430\u0436\u0430\u044e\u0442\u044c\u0441\u044f \u0434\u0430\u0442\u0438 \u0437\u0456 SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u042f\u043a \u043f\u0456\u0434\u0442\u0432\u0435\u0440\u0434\u0436\u0435\u043d\u043d\u044f \u043e\u043f\u0435\u0440\u0430\u0442\u043e\u0440\u0456\u0432 \u043d\u0430\u0434\u0445\u043e\u0434\u044f\u0442\u044c \u0434\u043e Odoo?<\/summary>\n<p class=\"sp-faq__a\">\u042f\u043a \u0437\u0430\u043f\u0438\u0441\u0438 Time Logs: \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f \u0441\u0442\u0432\u043e\u0440\u044e\u0454 \u0434\u043b\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u043e\u0433\u043e \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u0437\u0430\u043f\u0438\u0441\u0438 <code>mrp.workcenter.productivity<\/code> \u0456\u0437 \u043f\u043e\u0447\u0430\u0442\u043a\u043e\u043c, \u0437\u0430\u0432\u0435\u0440\u0448\u0435\u043d\u043d\u044f\u043c \u0456 \u043f\u0440\u0438\u0447\u0438\u043d\u043e\u044e \u0432\u0442\u0440\u0430\u0442 \u0442\u0438\u043f\u0443 Productive, \u0430 \u043f\u0456\u0441\u043b\u044f \u0437\u0430\u0432\u0435\u0440\u0448\u0435\u043d\u043d\u044f \u0442\u0435\u0445\u043d\u043e\u043b\u043e\u0433\u0456\u0447\u043d\u043e\u0457 \u043e\u043f\u0435\u0440\u0430\u0446\u0456\u0457 \u0432\u0438\u043a\u043b\u0438\u043a\u0430\u0454 <code>button_finish<\/code>. \u041a\u043e\u0436\u043d\u0435 \u043f\u0456\u0434\u0442\u0432\u0435\u0440\u0434\u0436\u0435\u043d\u043d\u044f \u0437\u0430\u043f\u0438\u0441\u0443\u0454\u0442\u044c\u0441\u044f \u043b\u0438\u0448\u0435 \u043e\u0434\u0438\u043d \u0440\u0430\u0437, \u0442\u043e\u043c\u0443 \u043f\u043e\u0432\u0442\u043e\u0440\u043d\u0456 \u0441\u043f\u0440\u043e\u0431\u0438 \u043d\u0435 \u0434\u0443\u0431\u043b\u044e\u044e\u0442\u044c \u043e\u0431\u043b\u0456\u043a \u0447\u0430\u0441\u0443.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0425\u0442\u043e \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u0454 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u043f\u0456\u0441\u043b\u044f \u0437\u0430\u043f\u0443\u0441\u043a\u0443?<\/summary>\n<p class=\"sp-faq__a\">\u041a\u043e\u043c\u0430\u043d\u0434\u0430 SkyPlanner \u043d\u0430\u043b\u0430\u0448\u0442\u043e\u0432\u0443\u0454 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u043f\u0456\u0434 \u0447\u0430\u0441 \u043f\u043e\u0447\u0430\u0442\u043a\u043e\u0432\u043e\u0433\u043e \u0432\u043f\u0440\u043e\u0432\u0430\u0434\u0436\u0435\u043d\u043d\u044f \u0442\u0430 \u043f\u0456\u0434\u0442\u0440\u0438\u043c\u0443\u0454 \u0457\u0457 \u043f\u0456\u0441\u043b\u044f \u0437\u0430\u043f\u0443\u0441\u043a\u0443, \u0437\u043e\u043a\u0440\u0435\u043c\u0430 \u0430\u0434\u0430\u043f\u0442\u0443\u0454 \u0434\u043e \u0437\u043c\u0456\u043d \u0443 \u0432\u0430\u0448\u0456\u0439 \u043a\u043e\u043d\u0444\u0456\u0433\u0443\u0440\u0430\u0446\u0456\u0457 Odoo. \u042f\u043a\u0449\u043e \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u0441\u0442\u0432\u043e\u0440\u044e\u0454 \u0432\u0430\u0448 \u043f\u0430\u0440\u0442\u043d\u0435\u0440 \u0430\u0431\u043e \u0432\u0430\u0448\u0456 \u0440\u043e\u0437\u0440\u043e\u0431\u043d\u0438\u043a\u0438, \u0432\u043e\u043d\u0438 \u0441\u043f\u0438\u0440\u0430\u044e\u0442\u044c\u0441\u044f \u043d\u0430 \u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u043e\u0432\u0430\u043d\u0438\u0439 REST API \u0442\u0430 <a href=\"\/uk\/docs\/%d0%bf%d1%96%d0%b4%d1%80%d1%83%d1%87%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/\">\u0434\u043e\u043a\u0443\u043c\u0435\u043d\u0442\u0430\u0446\u0456\u044e SkyPlanner<\/a>, \u0430 \u043a\u043e\u043c\u0430\u043d\u0434\u0430 \u0434\u043e\u043f\u043e\u043c\u0430\u0433\u0430\u0454 \u0437\u0430 \u043f\u043e\u0442\u0440\u0435\u0431\u0438.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0429\u043e \u0432\u0456\u0434\u0431\u0443\u0432\u0430\u0454\u0442\u044c\u0441\u044f \u0437 \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0438\u043c\u0438 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f\u043c\u0438, \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u044f\u043a\u0438\u0445 \u0443\u0436\u0435 \u0440\u043e\u0437\u043f\u043e\u0447\u0430\u043b\u043e\u0441\u044f?<\/summary>\n<p class=\"sp-faq__a\">\u041d\u0435 \u0437\u043c\u0456\u043d\u044e\u0439\u0442\u0435 \u0457\u0445 \u043f\u0456\u0434 \u0447\u0430\u0441 \u0437\u0432\u043e\u0440\u043e\u0442\u043d\u043e\u0433\u043e \u0437\u0430\u043f\u0438\u0441\u0443. Odoo \u043d\u0435 \u0434\u043e\u0437\u0432\u043e\u043b\u044f\u0454 \u0441\u043a\u0430\u0441\u0443\u0432\u0430\u0442\u0438 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f MO, \u044f\u043a\u0449\u043e \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0447\u0435 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u043d\u044f \u0432\u0436\u0435 \u0432\u0438\u043a\u043e\u043d\u0443\u0454\u0442\u044c\u0441\u044f \u0430\u0431\u043e \u0437\u0430\u0432\u0435\u0440\u0448\u0435\u043d\u0435. SkyPlanner \u0437\u0447\u0438\u0442\u0443\u0454 \u0457\u0445\u043d\u0456\u0439 \u0441\u0442\u0430\u043d \u0456 \u043f\u0435\u0440\u0435\u0431\u0456\u0433 \u0432\u0438\u043a\u043e\u043d\u0430\u043d\u043d\u044f \u0442\u0430 \u043f\u043b\u0430\u043d\u0443\u0454 \u0440\u0435\u0448\u0442\u0443 \u0440\u043e\u0431\u0456\u0442 \u0437 \u0443\u0440\u0430\u0445\u0443\u0432\u0430\u043d\u043d\u044f\u043c \u0446\u0438\u0445 \u0437\u0430\u043c\u043e\u0432\u043b\u0435\u043d\u044c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0421\u043a\u0456\u043b\u044c\u043a\u0438 \u0447\u0430\u0441\u0443 \u0437\u0430\u0439\u043c\u0430\u0454 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f \u0437 Odoo?<\/summary>\n<p class=\"sp-faq__a\">\u0417\u0430\u0437\u0432\u0438\u0447\u0430\u0439 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044e \u0437\u0430\u0432\u0435\u0440\u0448\u0443\u044e\u0442\u044c \u043f\u0440\u043e\u0442\u044f\u0433\u043e\u043c \u043a\u0456\u043b\u044c\u043a\u043e\u0445 \u0442\u0438\u0436\u043d\u0456\u0432 \u0432\u0456\u0434 \u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u0432\u043f\u0440\u043e\u0432\u0430\u0434\u0436\u0435\u043d\u043d\u044f. \u0421\u043f\u0435\u0440\u0448\u0443 \u0441\u043a\u043e\u0440\u0438\u0441\u0442\u0430\u0439\u0442\u0435\u0441\u044f 30-\u0434\u0435\u043d\u043d\u0438\u043c \u043f\u0440\u043e\u0431\u043d\u0438\u043c \u043f\u0435\u0440\u0456\u043e\u0434\u043e\u043c \u0456\u0437 \u0434\u0430\u043d\u0438\u043c\u0438, \u0435\u043a\u0441\u043f\u043e\u0440\u0442\u043e\u0432\u0430\u043d\u0438\u043c\u0438 \u0443 CSV. \u0422\u0430\u043a \u0432\u0438 \u043f\u0435\u0440\u0435\u0432\u0456\u0440\u0438\u0442\u0435 \u0433\u0440\u0430\u0444\u0456\u043a \u043d\u0430 \u0432\u043b\u0430\u0441\u043d\u0438\u0445 \u0434\u0430\u043d\u0438\u0445 Odoo \u0449\u0435 \u0434\u043e \u043f\u043e\u0447\u0430\u0442\u043a\u0443 \u0440\u043e\u0431\u0456\u0442 \u0437 API.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \/ ERP \/ Odoo \u041f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 Odoo \u0437\u0456 SkyPlanner APS \u0434\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0426\u0435\u0439 \u043f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u043f\u043e\u044f\u0441\u043d\u044e\u0454 \u043f\u0430\u0440\u0442\u043d\u0435\u0440\u0430\u043c Odoo, \u0440\u043e\u0437\u0440\u043e\u0431\u043d\u0438\u043a\u0430\u043c \u0442\u0430 \u0406\u0422-\u043a\u0435\u0440\u0456\u0432\u043d\u0438\u043a\u0430\u043c, \u044f\u043a \u043f\u0456\u0434\u043a\u043b\u044e\u0447\u0438\u0442\u0438 Odoo Manufacturing \u0434\u043e SkyPlanner APS. \u0411\u0456\u0437\u043d\u0435\u0441-\u043e\u0431\u0491\u0440\u0443\u043d\u0442\u0443\u0432\u0430\u043d\u043d\u044f \u0442\u0430 \u043c\u043e\u0436\u043b\u0438\u0432\u043e\u0441\u0442\u0456 \u043a\u043d\u043e\u043f\u043a\u0438 Plan \u0432 Odoo \u043e\u043f\u0438\u0441\u0430\u043d\u043e \u043d\u0430 \u0441\u0442\u043e\u0440\u0456\u043d\u0446\u0456 \u043f\u0440\u043e \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u0435 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0432 Odoo \u0442\u0430 \u0443 \u0441\u0442\u0430\u0442\u0442\u0456 \u00ab\u0427\u0438 \u0454 \u0432 Odoo \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f &#8230; <a title=\"\u041f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 Odoo \u0437\u0456 SkyPlanner APS \u0434\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/odoo\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/\" aria-label=\"Read more about \u041f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 Odoo \u0437\u0456 SkyPlanner APS \u0434\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430\">\u0414\u043e\u043a\u043b\u0430\u0434\u043d\u0456\u0448\u0435<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100846,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101233","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Odoo: \u043f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \u0434\u043b\u044f \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f APS | SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f SkyPlanner APS \u0437 Odoo Manufacturing: API JSON-2 \u0456 XML-RPC, \u0437\u0456\u0441\u0442\u0430\u0432\u043b\u0435\u043d\u043d\u044f mrp.workorder, \u0437\u0430\u043f\u0438\u0441 \u0434\u0430\u0442 \u0443 Odoo, \u0432\u0435\u0431\u0445\u0443\u043a\u0438 \u0442\u0430 \u043f\u0456\u0434\u0432\u043e\u0434\u043d\u0456 \u043a\u0430\u043c\u0435\u043d\u0456 Odoo.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/odoo\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/\" \/>\n<meta property=\"og:locale\" content=\"uk_UA\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u041f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 Odoo \u0437\u0456 SkyPlanner APS \u0434\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430\" \/>\n<meta property=\"og:description\" content=\"\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f SkyPlanner APS \u0437 Odoo Manufacturing: API JSON-2 \u0456 XML-RPC, \u0437\u0456\u0441\u0442\u0430\u0432\u043b\u0435\u043d\u043d\u044f mrp.workorder, \u0437\u0430\u043f\u0438\u0441 \u0434\u0430\u0442 \u0443 Odoo, \u0432\u0435\u0431\u0445\u0443\u043a\u0438 \u0442\u0430 \u043f\u0456\u0434\u0432\u043e\u0434\u043d\u0456 \u043a\u0430\u043c\u0435\u043d\u0456 Odoo.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/odoo\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u041f\u0440\u0438\u0431\u043b. \u0447\u0430\u0441 \u0447\u0438\u0442\u0430\u043d\u043d\u044f\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 \u0445\u0432\u0438\u043b\u0438\u043d\u0438\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/erp\\\/odoo\\\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/erp\\\/odoo\\\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/\",\"name\":\"Odoo: \u043f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \u0434\u043b\u044f \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f APS | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f SkyPlanner APS \u0437 Odoo Manufacturing: API JSON-2 \u0456 XML-RPC, \u0437\u0456\u0441\u0442\u0430\u0432\u043b\u0435\u043d\u043d\u044f mrp.workorder, \u0437\u0430\u043f\u0438\u0441 \u0434\u0430\u0442 \u0443 Odoo, \u0432\u0435\u0431\u0445\u0443\u043a\u0438 \u0442\u0430 \u043f\u0456\u0434\u0432\u043e\u0434\u043d\u0456 \u043a\u0430\u043c\u0435\u043d\u0456 Odoo.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/erp\\\/odoo\\\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/#breadcrumb\"},\"inLanguage\":\"uk\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/erp\\\/odoo\\\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/erp\\\/odoo\\\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 ERP- \u0456 MES-\u043f\u0440\u043e\u0433\u0440\u0430\u043c\u043d\u043e\u0433\u043e \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0435\u043d\u043d\u044f \u0437\u0456 SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS \u0434\u043b\u044f \u0432\u0430\u0448\u043e\u0457 ERP\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS \u0434\u043b\u044f Odoo: \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0442\u0430 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\\\/erp\\\/odoo\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"\u041f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 Odoo \u0437\u0456 SkyPlanner APS \u0434\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"uk\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"uk\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/uk\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Odoo: \u043f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \u0434\u043b\u044f \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f APS | SkyPlanner","description":"\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f SkyPlanner APS \u0437 Odoo Manufacturing: API JSON-2 \u0456 XML-RPC, \u0437\u0456\u0441\u0442\u0430\u0432\u043b\u0435\u043d\u043d\u044f mrp.workorder, \u0437\u0430\u043f\u0438\u0441 \u0434\u0430\u0442 \u0443 Odoo, \u0432\u0435\u0431\u0445\u0443\u043a\u0438 \u0442\u0430 \u043f\u0456\u0434\u0432\u043e\u0434\u043d\u0456 \u043a\u0430\u043c\u0435\u043d\u0456 Odoo.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/odoo\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/","og_locale":"uk_UA","og_type":"article","og_title":"\u041f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 Odoo \u0437\u0456 SkyPlanner APS \u0434\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430","og_description":"\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f SkyPlanner APS \u0437 Odoo Manufacturing: API JSON-2 \u0456 XML-RPC, \u0437\u0456\u0441\u0442\u0430\u0432\u043b\u0435\u043d\u043d\u044f mrp.workorder, \u0437\u0430\u043f\u0438\u0441 \u0434\u0430\u0442 \u0443 Odoo, \u0432\u0435\u0431\u0445\u0443\u043a\u0438 \u0442\u0430 \u043f\u0456\u0434\u0432\u043e\u0434\u043d\u0456 \u043a\u0430\u043c\u0435\u043d\u0456 Odoo.","og_url":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/odoo\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u041f\u0440\u0438\u0431\u043b. \u0447\u0430\u0441 \u0447\u0438\u0442\u0430\u043d\u043d\u044f":"4 \u0445\u0432\u0438\u043b\u0438\u043d\u0438"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/odoo\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/","url":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/odoo\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/","name":"Odoo: \u043f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \u0434\u043b\u044f \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f APS | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/uk\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f SkyPlanner APS \u0437 Odoo Manufacturing: API JSON-2 \u0456 XML-RPC, \u0437\u0456\u0441\u0442\u0430\u0432\u043b\u0435\u043d\u043d\u044f mrp.workorder, \u0437\u0430\u043f\u0438\u0441 \u0434\u0430\u0442 \u0443 Odoo, \u0432\u0435\u0431\u0445\u0443\u043a\u0438 \u0442\u0430 \u043f\u0456\u0434\u0432\u043e\u0434\u043d\u0456 \u043a\u0430\u043c\u0435\u043d\u0456 Odoo.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/odoo\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/#breadcrumb"},"inLanguage":"uk","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/odoo\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/odoo\/%d0%bf%d0%be%d1%81%d1%96%d0%b1%d0%bd%d0%b8%d0%ba-%d0%b7-%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/uk\/"},{"@type":"ListItem","position":2,"name":"\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 ERP- \u0456 MES-\u043f\u0440\u043e\u0433\u0440\u0430\u043c\u043d\u043e\u0433\u043e \u0437\u0430\u0431\u0435\u0437\u043f\u0435\u0447\u0435\u043d\u043d\u044f \u0437\u0456 SkyPlanner","item":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS \u0434\u043b\u044f \u0432\u0430\u0448\u043e\u0457 ERP","item":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS \u0434\u043b\u044f Odoo: \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0442\u0430 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u044f","item":"https:\/\/skyplanner.ai\/uk\/%d1%96%d0%bd%d1%82%d0%b5%d0%b3%d1%80%d0%b0%d1%86%d1%96%d1%97\/erp\/odoo\/"},{"@type":"ListItem","position":5,"name":"\u041f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 Odoo \u0437\u0456 SkyPlanner APS \u0434\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/uk\/#website","url":"https:\/\/skyplanner.ai\/uk\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"uk"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/uk\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/uk\/","logo":{"@type":"ImageObject","inLanguage":"uk","@id":"https:\/\/skyplanner.ai\/uk\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/uk\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/uk\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0406\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 \/ ERP \/ Odoo \u041f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u0437 \u0456\u043d\u0442\u0435\u0433\u0440\u0430\u0446\u0456\u0457 Odoo \u0437\u0456 SkyPlanner APS \u0434\u043b\u044f \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u043e\u0433\u043e \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0426\u0435\u0439 \u043f\u043e\u0441\u0456\u0431\u043d\u0438\u043a \u043f\u043e\u044f\u0441\u043d\u044e\u0454 \u043f\u0430\u0440\u0442\u043d\u0435\u0440\u0430\u043c Odoo, \u0440\u043e\u0437\u0440\u043e\u0431\u043d\u0438\u043a\u0430\u043c \u0442\u0430 \u0406\u0422-\u043a\u0435\u0440\u0456\u0432\u043d\u0438\u043a\u0430\u043c, \u044f\u043a \u043f\u0456\u0434\u043a\u043b\u044e\u0447\u0438\u0442\u0438 Odoo Manufacturing \u0434\u043e SkyPlanner APS. \u0411\u0456\u0437\u043d\u0435\u0441-\u043e\u0431\u0491\u0440\u0443\u043d\u0442\u0443\u0432\u0430\u043d\u043d\u044f \u0442\u0430 \u043c\u043e\u0436\u043b\u0438\u0432\u043e\u0441\u0442\u0456 \u043a\u043d\u043e\u043f\u043a\u0438 Plan \u0432 Odoo \u043e\u043f\u0438\u0441\u0430\u043d\u043e \u043d\u0430 \u0441\u0442\u043e\u0440\u0456\u043d\u0446\u0456 \u043f\u0440\u043e \u043a\u0430\u043b\u0435\u043d\u0434\u0430\u0440\u043d\u0435 \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f \u0432\u0438\u0440\u043e\u0431\u043d\u0438\u0446\u0442\u0432\u0430 \u0432 Odoo \u0442\u0430 \u0443 \u0441\u0442\u0430\u0442\u0442\u0456 \u00ab\u0427\u0438 \u0454 \u0432 Odoo \u043f\u043b\u0430\u043d\u0443\u0432\u0430\u043d\u043d\u044f&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/pages\/101233","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/comments?post=101233"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/pages\/101233\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/pages\/100846"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/uk\/wp-json\/wp\/v2\/media?parent=101233"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}