{"id":99764,"date":"2026-10-16T07:53:34","date_gmt":"2026-10-16T07:53:34","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99764"},"modified":"2026-10-16T10:12:25","modified_gmt":"2026-10-16T10:12:25","slug":"capable-to-promise","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/","title":{"rendered":"Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">7<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Capable to promise (CTP), hem malzeme kullan\u0131labilirli\u011fini hem de i\u015fin gerektirdi\u011fi \u00fcretim kapasitesini dikkate alarak istenen miktar\u0131 \u00fcretip \u00fcretemeyece\u011finizi ve ne zaman \u00fcretebilece\u011finizi kontrol eden bir y\u00f6ntemdir. \u00dcr\u00fcnler do\u011frudan stoktan sevk edilemiyorsa sat\u0131\u015f ekibine teslimat taahh\u00fcd\u00fc i\u00e7in bir dayanak sunar.<\/p>\n\n\n<p>As\u0131l \u00f6nemli olan, sipari\u015fe evet demeden \u00f6nceki a\u015famad\u0131r. M\u00fc\u015fterinin istedi\u011fi tarih, sipari\u015fi kazanmak i\u00e7in ne gerekti\u011fini g\u00f6sterir. Standart lead time ise genellikle ne kadar s\u00fcreye ihtiya\u00e7 duyuldu\u011funu belirtir. Ancak ikisi de bu i\u015fin, daha \u00f6nce taahh\u00fct etti\u011finiz i\u015flerle birlikte plana s\u0131\u011f\u0131p s\u0131\u011fmayaca\u011f\u0131n\u0131 s\u00f6ylemez.<\/p>\n\n\n<p>SkyPlanner APS, hen\u00fcz kesinle\u015fmemi\u015f i\u015fleri planlaman\u0131z\u0131 sa\u011flayan Job Prospects \u00f6zelli\u011fiyle bu kontrol\u00fc yapman\u0131za yard\u0131mc\u0131 olur: \u00fcretim taahh\u00fcd\u00fcnde bulunmadan \u00f6nce olas\u0131 sipari\u015fler i\u00e7in ger\u00e7ek\u00e7i teslim tarihlerini sim\u00fcle edebilirsiniz. Olas\u0131 i\u015fleri mevcut i\u015f y\u00fck\u00fcn\u00fc dikkate alarak \u00e7izelgeleyin, planlanan tamamlanma zamanlar\u0131n\u0131 inceleyin ve Gantt \u00e7izelgesindeki di\u011fer i\u015flerle birlikte g\u00f6r\u00fcn. Sat\u0131\u015f ekibine yan\u0131t vermek i\u00e7in makinelerdeki i\u015f s\u0131ralar\u0131n\u0131 yeniden \u00e7\u0131karmak yerine, fabrikan\u0131z\u0131n kar\u015f\u0131layabilece\u011fi teklife odaklanabilirsiniz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Capable to promise ile available to promise aras\u0131ndaki fark<\/h2>\n\n\n<p>Available to promise (ATP), mevcut talep hesaba kat\u0131ld\u0131ktan sonra yeni bir taahh\u00fct i\u00e7in ne kadar kullan\u0131labilir arz kald\u0131\u011f\u0131n\u0131 sorgular. Bu arz, yaln\u0131zca bug\u00fcn rafta bulunan \u00fcr\u00fcnleri de\u011fil, herhangi bir sipari\u015fe ayr\u0131lmam\u0131\u015f stoklar\u0131 ve planlanan giri\u015fleri de kapsayabilir.<\/p>\n\n\n<p>CTP buna \u00fcretim boyutunu ekler: Bitmi\u015f \u00fcr\u00fcnler mevcut de\u011filse, kullan\u0131labilir malzeme ve kapasiteyle bunlar\u0131 gereken s\u00fcrede \u00fcretebilir misiniz?<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Soru<\/th><th>Available to promise (ATP)<\/th><th>Capable to promise (CTP)<\/th><\/tr><\/thead><tbody><tr><td>Yan\u0131t neye dayan\u0131r?<\/td><td>Herhangi bir sipari\u015fe ayr\u0131lmam\u0131\u015f stoklar ve planlanan tedarik<\/td><td>Malzeme kullan\u0131labilirli\u011fi ve \u00fcretim i\u00e7in gereken kapasite<\/td><\/tr><tr><td>Sat\u0131\u015f ekibinin ne sunmas\u0131na yard\u0131mc\u0131 olur?<\/td><td>Mevcut arzdan kar\u015f\u0131lanabilecek miktar ve tarih<\/td><td>Ek \u00fcretimle kar\u015f\u0131lanabilecek miktar ve tarih<\/td><\/tr><tr><td>Bu ayr\u0131m hangi durumda yararl\u0131d\u0131r?<\/td><td>\u00dcr\u00fcnler stoktan veya beklenen giri\u015flerden kar\u015f\u0131lanabiliyorsa<\/td><td>Sipari\u015f i\u00e7in ortak kullan\u0131lan kaynaklarda h\u00e2l\u00e2 \u00fcretim veya montaj yap\u0131lmas\u0131 gerekiyorsa<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>ATP, sipari\u015fi kullan\u0131labilir arzdan kar\u015f\u0131layabildi\u011finizde i\u015fe yarar. CTP ise \u00f6zellikle <a href=\"\/tr\/kaynaklar\/siparis-uzerine-uretim\/\">sipari\u015fe g\u00f6re \u00fcretim<\/a> ve <a href=\"\/tr\/kaynaklar\/siparise-gore-montaj\/\">sipari\u015fe g\u00f6re montaj<\/a> s\u00fcre\u00e7lerinde de\u011fer kazan\u0131r. Bu s\u00fcre\u00e7lerde sat\u0131\u015f\u0131 kabul etmek, fabrikan\u0131n mevcut plan\u0131na s\u0131\u011fd\u0131r\u0131lmas\u0131 gereken yeni i\u015fler yarat\u0131r.<\/p>\n\n\n<p>T\u00fcm bile\u015fenlerin elinizde olmas\u0131, montaj i\u00e7in kapasiteniz oldu\u011fu anlam\u0131na gelmez. Ayn\u0131 \u015fekilde, bitmi\u015f \u00fcr\u00fcn sto\u011funuzun olmamas\u0131 da m\u00fc\u015fteriyi geri \u00e7evirmeniz gerekti\u011fi anlam\u0131na gelmez. CTP, bu iki varsay\u0131m aras\u0131ndaki f\u0131rsat\u0131 bulman\u0131za yard\u0131mc\u0131 olur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Yeni bir taahh\u00fct, mevcut bir taahh\u00fcd\u00fc riske atabilir<\/h2>\n\n\n<p>Bir tak\u0131m mil ve montaj plakas\u0131 i\u00e7in teklif haz\u0131rlayan fason tala\u015fl\u0131 imalat at\u00f6lyesini d\u00fc\u015f\u00fcn\u00fcn. Malzeme haz\u0131r ve sat\u0131\u015f ekibi cuma g\u00fcn\u00fc sevkiyat teklif etmek istiyor.<\/p>\n\n\n<p>Millerin tornalanmas\u0131 ve kontrol\u00fc per\u015fembeye kadar tamamlanabiliyor. Ancak plakalar\u0131n, teslimat taahh\u00fcd\u00fc verilmi\u015f sipari\u015flerle zaten dolu olan bir i\u015fleme merkezinde frezelenmesi gerekiyor. Mevcut i\u015f s\u0131ras\u0131na g\u00f6re plakalar bir sonraki haftadan \u00f6nce tamamlanamayacak.<\/p>\n\n\n<p>En kolay kalemi tamamland\u0131\u011f\u0131nda sipari\u015f haz\u0131r say\u0131lmaz. M\u00fc\u015fterinin tak\u0131m\u0131n tamam\u0131na ihtiyac\u0131 varsa, sevkiyat zaman\u0131n\u0131 plakalar belirler. Stok kontrol\u00fc frezeleme kuyru\u011funu, standart lead time ise o kuyruktaki mevcut i\u015f y\u00fck\u00fcn\u00fc hesaba katmaz.<\/p>\n\n\n<p>Plakalar\u0131 \u00f6ne almak, cuma g\u00fcn\u00fc sevkiyat\u0131 m\u00fcmk\u00fcn k\u0131labilir; ancak mevcut bir m\u00fc\u015fterinin i\u015fini de geciktirebilir. Bu, bo\u015f kapasite kullanmak de\u011fildir. Hangi taahh\u00fcd\u00fcn \u00f6ncelikli olaca\u011f\u0131na karar vermektir.<\/p>\n\n\n<p>Bu nedenle yararl\u0131 bir CTP kontrol\u00fc iki soruyu birlikte yan\u0131tlar: <strong>Bu sipari\u015f ne zaman tamamlanabilir ve ona yer a\u00e7mak, daha \u00f6nce taahh\u00fct edilen i\u015fleri nas\u0131l etkiler?<\/strong> \u0130kisini birden g\u00f6rmek, yeni i\u015fi alman\u0131n maliyetini ancak onaydan sonra fark etmek yerine, bu maliyeti \u00f6nceden de\u011ferlendirerek sipari\u015fi kazanma f\u0131rsat\u0131 verir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Olas\u0131 sipari\u015fi SkyPlanner ile kontrol edin<\/h2>\n\n\n<p>SkyPlanner bu soruyu, i\u015fi \u00e7izelgeleyerek yan\u0131tlar. \u00c7izelgeleme yapay zek\u00e2s\u0131 Arcturus, tan\u0131mlad\u0131\u011f\u0131n\u0131z <a href=\"\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">\u00fcretim kaynaklar\u0131n\u0131, ba\u011f\u0131ml\u0131l\u0131klar\u0131 ve \u00f6ncelikleri<\/a> kullanarak operasyonlar\u0131n \u00e7izelgedeki yerini hesaplar. Her operasyonu elle atamak yerine, olu\u015fan \u00e7izelgeyi g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n\n\n<p>Sipari\u015f i\u00e7in teslimat taahh\u00fcd\u00fc verirken izleyece\u011finiz ad\u0131mlar basittir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sat\u0131\u015f\u0131n teklif etti\u011fi i\u015fi oldu\u011fu gibi \u00e7izelgeleyin<\/h3>\n\n\n<p>Sipari\u015fi olu\u015fturun ve teklif a\u015famas\u0131ndaki sipari\u015f kalemlerini Prospect (hen\u00fcz kesinle\u015fmemi\u015f i\u015f) olarak i\u015faretleyin. Ortalama s\u00fcreli genel bir i\u015fi denemek yerine, talep edilen kalemleri, miktarlar\u0131 ve gerekli i\u015flem ad\u0131mlar\u0131n\u0131 tan\u0131mlay\u0131n. \u0130\u015fi \u00e7izelgeleyin ve plan\u0131 kabul etmeden \u00f6nce zaman \u00e7izelgesinde \u00f6nerilen yerle\u015fimini inceleyin. Sat\u0131\u015f\u0131 kesinle\u015ftirmeden, i\u015f hen\u00fcz teklif a\u015famas\u0131ndayken ger\u00e7ek\u00e7i bir tamamlanma tarihi de\u011ferlendirebilirsiniz.<\/p>\n\n\n<p>\u00d6nemli girdiler, yan\u0131t\u0131n\u0131z\u0131 de\u011fi\u015ftirebilecek olanlard\u0131r: \u0130\u015fi hangi kaynaklar\u0131n yapabilece\u011fi, operasyon ve haz\u0131rl\u0131k s\u00fcreleri, \u00e7al\u0131\u015fma vardiyalar\u0131, malzemenin haz\u0131r olma durumu ve kapasiteyi zaten kullanan sipari\u015fler. Malzemeyi dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde Arcturus, hesaplamaya malzeme kullan\u0131labilirli\u011fini de katar.<\/p>\n\n\n<p>At\u00f6lye \u00f6rne\u011finde bu, hem milleri hem de plakalar\u0131 \u00e7izelgelemek demektir. Daha uzun s\u00fcren \u00fcretim rotas\u0131n\u0131 hesaba katmazsan\u0131z \u00f6nerilen tarih cazip g\u00f6r\u00fcnebilir, ancak bu, sipari\u015fin tamam\u0131n\u0131n o tarihte teslim edilebilece\u011fi anlam\u0131na gelmez.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Yaln\u0131zca istenen teslim tarihine de\u011fil, tamamlanma zamanlar\u0131na bak\u0131n<\/h3>\n\n\n<p>Prospect olarak i\u015faretlenen i\u015f \u00e7izelgelendikten sonra her sipari\u015f kaleminin Planlanan Biti\u015f Zaman\u0131n\u0131 inceleyin. En son tamamlanan kalemin biti\u015f zaman\u0131, mevcut i\u015f y\u00fck\u00fc alt\u0131nda sipari\u015fin tamam\u0131 i\u00e7in teslim taahh\u00fcd\u00fc verirken esas alaca\u011f\u0131n\u0131z \u00fcretim biti\u015f tarihini belirler.<\/p>\n\n\n<p>Bu sonucu, \u00fcr\u00fcn\u00fcn m\u00fc\u015fteriye ula\u015faca\u011f\u0131 tarihle kar\u0131\u015ft\u0131rmay\u0131n. Planda hen\u00fcz yer almayan kontrol, paketleme, sevkiyat veya ta\u015f\u0131ma s\u00fcrelerini hesaba kat\u0131n. Sat\u0131\u015f ve \u00fcretim ekipleri, teklif edilen tarihin teslim al\u0131nmaya haz\u0131r olmay\u0131 m\u0131, sevk edilmi\u015f olmay\u0131 m\u0131, yoksa m\u00fc\u015fteriye teslim edilmi\u015f olmay\u0131 m\u0131 ifade etti\u011fini netle\u015ftirmelidir.<\/p>\n\n\n<p>\u0130stenen bir tarihi girmekle, \u00fcretimin bu tarihi kar\u015f\u0131lay\u0131p kar\u015f\u0131layamayaca\u011f\u0131n\u0131 kontrol etmek aras\u0131ndaki fark budur. M\u00fc\u015fteriye verilen taahh\u00fcd\u00fcn sorumlulu\u011fu sizdedir; SkyPlanner, bu taahh\u00fcd\u00fc sa\u011flam bir temele oturtman\u0131za yard\u0131mc\u0131 olacak planlanm\u0131\u015f tamamlanma zamanlar\u0131n\u0131 sunar.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Di\u011fer taahh\u00fctleri de g\u00f6zden ge\u00e7irin<\/h3>\n\n\n<p>\u00d6nerilen i\u015fi mevcut sipari\u015flerle birlikte incelemek i\u00e7in <a href=\"\/tr\/kaynaklar\/uretim-cizelgeleme-icin-gantt-semasi\/\">Gantt \u00e7izelgesini<\/a> kullan\u0131n. Daha erken tamamlanmas\u0131 i\u00e7in i\u015fin \u00f6nceli\u011fini de\u011fi\u015ftirirseniz, bu teklifte anla\u015fmadan \u00f6nce yeniden hesaplay\u0131n ve ba\u015fka hangi i\u015flerin yer de\u011fi\u015ftirdi\u011fini kontrol edin.<\/p>\n\n\n<p>\u00d6ncelikleri siz belirlersiniz; \u00e7izelgeleme kararlar\u0131n\u0131 korumak i\u00e7in kilitleri kullanabilirsiniz. Arcturus, bu talimatlar \u00e7er\u00e7evesinde hesaplamay\u0131 yapar. B\u00f6ylece g\u00f6r\u00fc\u015fme s\u0131ras\u0131nda, acil sipari\u015fin hangi i\u015fleri \u00f6teleyece\u011fini anlamak i\u00e7in kuyruklar\u0131 elle yeniden olu\u015fturmak yerine, bu sipari\u015fi kabul etmeye de\u011fip de\u011fmeyece\u011fini de\u011ferlendirebilirsiniz.<\/p>\n\n\n<p>SkyPlanner, <a href=\"\/tr\/entegrasyonlar\/\">a\u00e7\u0131k REST API<\/a> \u00fczerinden her t\u00fcrl\u00fc ERP veya MES ile entegre olur. Mevcut sipari\u015f y\u00f6netim sisteminizi kullanmaya devam edebilir ve bu teslimat kararlar\u0131 i\u00e7in ihtiya\u00e7 duydu\u011funuz \u00e7izelgeleme g\u00f6r\u00fcn\u00fcm\u00fcne ba\u011flayabilirsiniz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sonucu yaln\u0131zca evet veya hay\u0131r yan\u0131t\u0131na de\u011fil, bir teklife d\u00f6n\u00fc\u015ft\u00fcr\u00fcn<\/h2>\n\n\n<p>\u0130stenen miktar, mevcut i\u015fleri kabul edilemez bi\u00e7imde etkilemeden istenen tarihe yeti\u015fiyorsa, onay vermek i\u00e7in daha sa\u011flam bir dayana\u011f\u0131n\u0131z vard\u0131r. Yeti\u015fmiyorsa, yararl\u0131 yan\u0131t m\u00fc\u015fterinin sat\u0131n alabilece\u011fi bir alternatif sunmakt\u0131r.<\/p>\n\n\n<p>\u00d6rnekteki at\u00f6lye sipari\u015fi i\u00e7in \u015fu se\u00e7enekler d\u00fc\u015f\u00fcn\u00fclebilir:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Sipari\u015fin tamam\u0131 i\u00e7in daha ge\u00e7 bir teslim tarihi \u00f6nerin.<\/strong> Mevcut taahh\u00fctleri koruyun ve daha uzun s\u00fcren plaka rotas\u0131n\u0131n kar\u015f\u0131layabildi\u011fi tarihi teklif edin.<\/li><li><strong>Par\u00e7al\u0131 teslimat\u0131 g\u00f6r\u00fc\u015f\u00fcn.<\/strong> M\u00fc\u015fteri milleri ba\u011f\u0131ms\u0131z olarak kullanabiliyorsa, \u00f6nce milleri, ard\u0131ndan plakalar\u0131 teslim etmeyi \u00f6nerin. Ek elle\u00e7leme ve nakliye ihtiyac\u0131 yaratmadan \u00f6nce, k\u0131smi sevkiyat\u0131n m\u00fc\u015fteriye fayda sa\u011flayaca\u011f\u0131n\u0131 do\u011frulay\u0131n.<\/li><li><strong>Plan\u0131 de\u011fi\u015ftirerek daha erken bir tarihi de\u011ferlendirin.<\/strong> Onaylanm\u0131\u015f ek bir vardiya veya i\u015fe uygun ba\u015fka bir kaynak yard\u0131mc\u0131 olabilir. Daha erken tarihi m\u00fc\u015fteriye sunmadan \u00f6nce kapasite varsay\u0131mlar\u0131n\u0131 g\u00fcncelleyin ve yeniden hesaplay\u0131n.<\/li><li><strong>\u00d6ncelik de\u011fi\u015fikli\u011finin bedeli konusunda a\u00e7\u0131k\u00e7a anla\u015f\u0131n.<\/strong> Y\u00f6netim bu sipari\u015fi \u00f6ne almaya karar verirse, hangi taahh\u00fctlerin etkilenece\u011fini belirleyin ve sonu\u00e7lar\u0131n\u0131 bilin\u00e7li bi\u00e7imde y\u00f6netin.<\/li><\/ul>\n\n\n<p>Bunlar yaln\u0131zca \u00e7izelgeleme d\u00fczenlemeleri de\u011fil, ticari kararlard\u0131r. Fiyata yans\u0131t\u0131lmam\u0131\u015f fazla mesaiye, y\u00fcksek nakliye maliyetine veya aksamalara yol a\u00e7an acil bir sipari\u015f, g\u00f6r\u00fcnd\u00fc\u011f\u00fcnden daha az k\u00e2rl\u0131 olabilir. Kabulden \u00f6nce kontrol yapmak, ek \u00e7abay\u0131 fiyatland\u0131rman\u0131za veya daha uygun bir tarih \u00fczerinde pazarl\u0131k etmenize olanak tan\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Taahh\u00fcd\u00fcn\u00fcz\u00fc g\u00fcncel i\u015f y\u00fck\u00fcne dayand\u0131r\u0131n<\/h2>\n\n\n<p>D\u00fcn\u00fcn \u00e7izelgesine dayanan bir teklif, ba\u015fka bir sipari\u015f kabul edildi\u011finde veya malzeme teslimat\u0131 gecikti\u011finde art\u0131k plana uymayabilir. M\u00fc\u015fteri onay vermeden \u00f6nce teklif tarihinin dayand\u0131\u011f\u0131 varsay\u0131mlar de\u011fi\u015firse olas\u0131 sipari\u015fi yeniden kontrol edin.<\/p>\n\n\n<p>\u00c7izelgelenmi\u015f Prospect i\u015fleri planlama y\u00fck\u00fcne dahil edilir ve kapasite ay\u0131r\u0131r. B\u00f6ylece sat\u0131\u015f ekibi, her f\u0131rsata ayn\u0131 bo\u015f kapasiteye dayanarak teklif vermek yerine olas\u0131 sipari\u015fleri de hesaba katabilir. Hangi f\u0131rsatlar\u0131n \u00e7izelgelenece\u011fini, bunlar\u0131 kimin g\u00fcncel tutaca\u011f\u0131n\u0131 ve kabul edilmemi\u015f bir teklifin ne zaman plan\u0131 etkilemekten \u00e7\u0131kar\u0131laca\u011f\u0131n\u0131 birlikte belirleyin. M\u00fc\u015fteri onay verdi\u011finde Prospect i\u015faretini kald\u0131r\u0131n ve i\u015fi kesinle\u015fmi\u015f sipari\u015f olarak \u00e7izelgeleyin. B\u00f6ylece teklif ile \u00fcretim taahh\u00fcd\u00fc aras\u0131ndaki ba\u011f korunur; g\u00fcncelli\u011fini yitirmi\u015f teklifler de kullan\u0131labilir kapasiteyi g\u00f6rmenizi engellemez.<\/p>\n\n\n<p>\u0130\u015f i\u00e7in taahh\u00fct verildikten sonra \u00f6ncelikleri, kaynak kullan\u0131labilirli\u011fini ve malzeme bilgilerini g\u00fcncel tutun. Hesaplamaya dayal\u0131 bir taahh\u00fcd\u00fcn faydas\u0131, her vardiya ve teslimat\u0131n ba\u015flang\u0131\u00e7ta beklendi\u011fi gibi ger\u00e7ekle\u015fece\u011fini varsayan bir plandan de\u011fil, fabrikan\u0131n fiilen \u00e7al\u0131\u015faca\u011f\u0131 ko\u015fullar\u0131 kontrol etmekten gelir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">G\u00fcnl\u00fck i\u015fleyi\u015fte daha do\u011fru teslim tarihleri belirleyin<\/h2>\n\n\n<p>Finlandiyal\u0131 fason tala\u015fl\u0131 imalat \u015firketi Eskomatic, daha \u00f6nce i\u015f kuyruklar\u0131n\u0131 eski bir ERP ve \u00fcretim kontrol sisteminde b\u00fcy\u00fck \u00f6l\u00e7\u00fcde elle y\u00f6netiyordu. Genel durumu g\u00f6rmek zaman al\u0131yordu. Malzeme bilgilerinin yeterince g\u00f6r\u00fcn\u00fcr olmamas\u0131 nedeniyle eksikler, bazen ancak i\u015fin ba\u015flamas\u0131na yak\u0131n fark edilebiliyordu.<\/p>\n\n\n<p>SkyPlanner ile ekip, mevcut ERP verilerine ba\u011fl\u0131 g\u00f6rsel bir Gantt i\u015f kuyru\u011funa ve i\u015f y\u00fck\u00fcn\u00fc otomatik \u00e7izelgeleme olana\u011f\u0131na kavu\u015ftu. <a href=\"\/tr\/musteri-hikayeleri\/eskomatic\/\">Eskomatic,<\/a> \u00fcretim y\u00fck\u00fcn\u00fcn daha net g\u00f6r\u00fcnmesinin ger\u00e7ek\u00e7i teslim zamanlar\u0131n\u0131 belirlemeyi kolayla\u015ft\u0131rd\u0131\u011f\u0131n\u0131 ve m\u00fc\u015fterilere daha do\u011fru tarihler vermeye yard\u0131mc\u0131 oldu\u011funu belirtiyor. \u00dcretim Planlama M\u00fcd\u00fcr\u00fc Tommi M\u00e4nnist\u00f6, SkyPlanner&#8217;\u0131n g\u00fcnl\u00fck kullan\u0131mda \u00f6zellikle teslim tarihi belirleme konusunda g\u00fc\u00e7l\u00fc oldu\u011funu vurguluyor.<\/p>\n\n\n<p>Bu sorun i\u00e7in SkyPlanner se\u00e7menin pratik gerek\u00e7esi budur: Sat\u0131\u015f ekibine \u00e7izelgelenmi\u015f i\u015flere dayanan bir yan\u0131t verirken, planlama uzman\u0131n\u0131 bu yan\u0131t\u0131 elle olu\u015fturma y\u00fck\u00fcnden kurtarmak.<\/p>\n\n\n<p><a href=\"\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>; g\u00f6r\u00fc\u015fme i\u00e7in olas\u0131 bir sipari\u015fi, istenen teslim tarihini ve i\u015fi geciktirmesi en muhtemel kayna\u011f\u0131 belirleyin. G\u00f6r\u00fc\u015fmede, teklifi onaylamadan \u00f6nce mevcut taahh\u00fctlerinizi dikkate alarak nas\u0131l kontrol edebilece\u011finizi de\u011ferlendirin. \u00d6nce kendiniz ke\u015ffetmek isterseniz <a href=\"\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin Ana Sayfa &raquo; Kaynaklar &raquo; Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin Capable to promise (CTP), hem malzeme kullan\u0131labilirli\u011fini hem de i\u015fin gerektirdi\u011fi \u00fcretim kapasitesini dikkate alarak istenen miktar\u0131 \u00fcretip \u00fcretemeyece\u011finizi ve ne zaman \u00fcretebilece\u011finizi kontrol eden bir y\u00f6ntemdir. \u00dcr\u00fcnler do\u011frudan stoktan sevk edilemiyorsa sat\u0131\u015f ekibine &#8230; <a title=\"Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/\" aria-label=\"Read more about Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99840,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-99764","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ve-cizelgeleme","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin<\/title>\n<meta name=\"description\" content=\"Yeni sipari\u015f di\u011fer m\u00fc\u015fterileri geciktirir mi? Teslim tarihi vermeden \u00f6nce capable to promise ve SkyPlanner ile kapasiteyi kontrol edin.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin\" \/>\n<meta property=\"og:description\" content=\"Yeni sipari\u015f di\u011fer m\u00fc\u015fterileri geciktirir mi? Teslim tarihi vermeden \u00f6nce capable to promise ve SkyPlanner ile kapasiteyi kontrol edin.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T07:53:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T10:12:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/capable-to-promise\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/capable-to-promise\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin\",\"datePublished\":\"2026-10-16T07:53:34+00:00\",\"dateModified\":\"2026-10-16T10:12:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/capable-to-promise\\\/\"},\"wordCount\":2033,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/capable-to-promise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"articleSection\":[\"APS ve \u00e7izelgeleme\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/capable-to-promise\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/capable-to-promise\\\/\",\"name\":\"Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/capable-to-promise\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/capable-to-promise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"datePublished\":\"2026-10-16T07:53:34+00:00\",\"dateModified\":\"2026-10-16T10:12:25+00:00\",\"description\":\"Yeni sipari\u015f di\u011fer m\u00fc\u015fterileri geciktirir mi? Teslim tarihi vermeden \u00f6nce capable to promise ve SkyPlanner ile kapasiteyi kontrol edin.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/capable-to-promise\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/capable-to-promise\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/capable-to-promise\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"width\":1536,\"height\":864,\"caption\":\"Turned shafts await a mounting plate beside a milling machine before the complete order can ship.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/capable-to-promise\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin","description":"Yeni sipari\u015f di\u011fer m\u00fc\u015fterileri geciktirir mi? Teslim tarihi vermeden \u00f6nce capable to promise ve SkyPlanner ile kapasiteyi kontrol edin.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/","og_locale":"tr_TR","og_type":"article","og_title":"Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin","og_description":"Yeni sipari\u015f di\u011fer m\u00fc\u015fterileri geciktirir mi? Teslim tarihi vermeden \u00f6nce capable to promise ve SkyPlanner ile kapasiteyi kontrol edin.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T07:53:34+00:00","article_modified_time":"2026-10-16T10:12:25+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"10 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin","datePublished":"2026-10-16T07:53:34+00:00","dateModified":"2026-10-16T10:12:25+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/"},"wordCount":2033,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","articleSection":["APS ve \u00e7izelgeleme","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/","name":"Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","datePublished":"2026-10-16T07:53:34+00:00","dateModified":"2026-10-16T10:12:25+00:00","description":"Yeni sipari\u015f di\u011fer m\u00fc\u015fterileri geciktirir mi? Teslim tarihi vermeden \u00f6nce capable to promise ve SkyPlanner ile kapasiteyi kontrol edin.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","width":1536,"height":864,"caption":"Turned shafts await a mounting plate beside a milling machine before the complete order can ship."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/capable-to-promise\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin Ana Sayfa &raquo; Kaynaklar &raquo; Capable to Promise: Taahh\u00fctten \u00d6nce Sipari\u015fi Kontrol Edin Capable to promise (CTP), hem malzeme kullan\u0131labilirli\u011fini hem de i\u015fin gerektirdi\u011fi \u00fcretim kapasitesini dikkate alarak istenen miktar\u0131 \u00fcretip \u00fcretemeyece\u011finizi ve ne zaman \u00fcretebilece\u011finizi kontrol eden bir y\u00f6ntemdir. \u00dcr\u00fcnler do\u011frudan stoktan sevk edilemiyorsa sat\u0131\u015f ekibine&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/99764","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=99764"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/99764\/revisions"}],"predecessor-version":[{"id":99887,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/99764\/revisions\/99887"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/99840"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=99764"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=99764"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=99764"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}