{"id":99677,"date":"2026-10-16T05:16:05","date_gmt":"2026-10-16T05:16:05","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99677"},"modified":"2026-10-16T05:17:29","modified_gmt":"2026-10-16T05:17:29","slug":"siparise-gore-yapilandirma","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/","title":{"rendered":"Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Sipari\u015fe g\u00f6re yap\u0131land\u0131rma (CTO), bir \u00fcr\u00fcn\u00fcn \u00f6nceden tan\u0131mlanm\u0131\u015f, birbiriyle uyumlu se\u00e7enekler aras\u0131ndan m\u00fc\u015fterinin yapt\u0131\u011f\u0131 se\u00e7ime g\u00f6re \u00fcretilmesidir. M\u00fc\u015fteri ihtiya\u00e7lar\u0131na uygun bir kombinasyon elde eder. \u00dcretici ise her sipari\u015f i\u00e7in m\u00fchendislik \u00e7al\u0131\u015fmalar\u0131na s\u0131f\u0131rdan ba\u015flamak yerine mevcut tasar\u0131mlar\u0131 ve \u00fcr\u00fcn kurallar\u0131n\u0131 yeniden kullan\u0131r.<\/p>\n\n\n<p>Bu yakla\u015f\u0131m\u0131n cazibesi, ayn\u0131 tasar\u0131m kararlar\u0131 i\u00e7in tekrar tekrar maliyete katlanmadan se\u00e7enek sunabilmektir. Ancak onaylanm\u0131\u015f bir kombinasyon i\u00e7in de do\u011fru malzemelere ve \u00fcretim operasyonlar\u0131na ihtiya\u00e7 vard\u0131r; \u00fcretim i\u00e7in zaman da ay\u0131rmak gerekir. Bir \u00fcr\u00fcn\u00fcn sat\u0131\u015fa uygun olmas\u0131, gelecek cuma teslim edilebilece\u011fi anlam\u0131na gelmez.<\/p>\n\n\n<p>SkyPlanner APS, bu ikinci zorlu\u011fu y\u00f6netmenize yard\u0131mc\u0131 olur. \u00c7izelgeleme i\u00e7in geli\u015ftirilmi\u015f yapay zek\u00e2s\u0131 Arcturus, gerekli i\u015flerin di\u011fer sipari\u015flerinizle birlikte ne zaman y\u00fcr\u00fct\u00fclebilece\u011fini hesaplar. \u00dcr\u00fcn karmas\u0131 her de\u011fi\u015fti\u011finde t\u00fcm i\u015f merkezlerinin kuyruklar\u0131n\u0131 yeniden d\u00fczenlemek yerine, sonucu Gantt \u00e7izelgesinde g\u00f6r\u00fcr ve \u00f6ncelikleri siz belirlersiniz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bir \u00fcr\u00fcn\u00fc sipari\u015fe g\u00f6re yap\u0131land\u0131rmaya uygun k\u0131lan nedir?<\/h2>\n\n\n<p>CTO, m\u00fc\u015fteri sipari\u015f vermeden \u00f6nce ba\u015flar. M\u00fchendislik ekibi \u00fcr\u00fcn\u00fcn yap\u0131 ta\u015flar\u0131n\u0131, izin verilen se\u00e7enekleri ve bunlar\u0131n birlikte \u00e7al\u0131\u015fmas\u0131n\u0131 sa\u011flayan kurallar\u0131 tan\u0131mlar. Sat\u0131\u015f ekibi de bu onayl\u0131 se\u00e7enekler aras\u0131ndan se\u00e7im yapar.<\/p>\n\n\n<p>Mod\u00fcler konvey\u00f6r \u00fcreten bir firma d\u00fc\u015f\u00fcn\u00fcn. M\u00fc\u015fteriler standart geni\u015flik ve uzunluk se\u00e7eneklerini, bant tipini, \u015fasi malzemesini, tahrik \u00fcnitesini ve sens\u00f6r paketini se\u00e7er. Kurallar, hangi tahrik \u00fcnitelerinin hangi y\u00fck ve h\u0131zlara uygun oldu\u011funu, hangi bantlar\u0131n hangi uygulamalarda kullan\u0131labilece\u011fini ve hangi sens\u00f6r d\u00fczenlerinin sunulabilece\u011fini belirler. Ge\u00e7erli bir se\u00e7im, yan\u0131t bekleyen bir m\u00fchendislik sorusu de\u011fil, \u00f6nceden tan\u0131mlanm\u0131\u015f bir \u00e7\u00f6z\u00fcm ortaya koyar.<\/p>\n\n\n<p>Bu se\u00e7imler yine de \u00f6nemli miktarda imalat i\u015fi do\u011furabilir. Paslanmaz \u00e7elik bir \u015fasinin, konvey\u00f6r\u00fcn montaj\u0131ndan \u00f6nce imalat ve polisaj i\u015flemlerinden ge\u00e7mesi gerekebilir. CTO, t\u00fcm par\u00e7alar\u0131n zaten rafta haz\u0131r oldu\u011fu veya sipari\u015f i\u00e7in yaln\u0131zca son montaj\u0131n gerekti\u011fi anlam\u0131na gelmez.<\/p>\n\n\n<p>S\u0131n\u0131r\u0131, onaylanm\u0131\u015f tasar\u0131m aral\u0131\u011f\u0131 belirler. M\u00fc\u015fteri bu aral\u0131\u011f\u0131n d\u0131\u015f\u0131nda bir y\u00fck veya e\u011fim talep ederse m\u00fchendislik ekibi talebi de\u011ferlendirmelidir. Talebi herhangi bir de\u011ferlendirme yapmadan yap\u0131land\u0131rma s\u00fcrecine zorla dahil etmek yerine standart bir alternatif sunabilir veya bu istisnay\u0131 m\u00fchendislik \u00e7al\u0131\u015fmas\u0131 olarak ele alabilirsiniz.<\/p>\n\n\n<h3 class=\"wp-block-heading\">CTO, ETO, MTO ve ATO farkl\u0131 \u015feyleri tan\u0131mlar<\/h3>\n\n\n<p>Bu terimler bir sipari\u015fi tan\u0131mlamaya yard\u0131mc\u0131 olur, ancak her zaman birbirini d\u0131\u015flamaz:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Sipari\u015fe g\u00f6re yap\u0131land\u0131rma:<\/strong> M\u00fc\u015fteri neleri se\u00e7ebilir? \u00dcr\u00fcn, \u00f6nceden tan\u0131mlanm\u0131\u015f ve birbiriyle uyumlu se\u00e7enekler aras\u0131ndan belirlenir.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-ozel-tasarim-ve-uretim\/\">Sipari\u015fe \u00f6zel tasar\u0131m ve \u00fcretim (ETO)<\/a>:<\/strong> Talep yeni bir m\u00fchendislik \u00e7al\u0131\u015fmas\u0131 gerektiriyor mu? Gerekti\u011finde standart par\u00e7alardan da yararlan\u0131larak m\u00fc\u015fteriye \u00f6zel bir \u00e7\u00f6z\u00fcm geli\u015ftirilmelidir.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/\">Sipari\u015fe g\u00f6re \u00fcretim (MTO)<\/a>:<\/strong> \u00dcretimi ne ba\u015flat\u0131r? \u00dcretim, m\u00fc\u015fteri sipari\u015finden sonra ba\u015flar ve mevcut bir tasar\u0131ma dayanabilir.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-montaj\/\">Sipari\u015fe g\u00f6re montaj (ATO)<\/a>:<\/strong> \u00d6nceden neler haz\u0131rlan\u0131r? Bile\u015fenler veya alt montajlar sipari\u015ften \u00f6nce haz\u0131rd\u0131r; se\u00e7ilen nihai \u00fcr\u00fcn\u00fcn montaj\u0131 sipari\u015ften sonra yap\u0131l\u0131r.<\/li><\/ul>\n\n\n<p>Konvey\u00f6r, sipari\u015fe g\u00f6re yap\u0131land\u0131r\u0131l\u0131p ard\u0131ndan sipari\u015fe g\u00f6re \u00fcretilebilir. Ba\u015fka bir \u00fcr\u00fcn ailesinde ayn\u0131 yap\u0131land\u0131rma ilkesi kullan\u0131l\u0131rken stoktaki mod\u00fcller sipari\u015fe g\u00f6re monte edilebilir. Yap\u0131land\u0131rma, yap\u0131lan se\u00e7imi tan\u0131mlar; \u00fcretim stratejisi ise bu se\u00e7imden sonra hangi i\u015flerin yap\u0131laca\u011f\u0131n\u0131 belirler.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sipari\u015fe g\u00f6re yap\u0131land\u0131rma ne zaman fayda sa\u011flar?<\/h2>\n\n\n<p>M\u00fc\u015fterilerin ihtiya\u00e7lar\u0131na kar\u015f\u0131l\u0131k veren bir \u00e7e\u015fitlilik arad\u0131\u011f\u0131, ancak bunun arkas\u0131ndaki m\u00fchendislik \u00e7al\u0131\u015fmalar\u0131n\u0131n b\u00fcy\u00fck \u00f6l\u00e7\u00fcde tekrarland\u0131\u011f\u0131 durumlarda CTO \u00e7ok uygundur. En uygun adaylar, y\u00f6netilebilir say\u0131da mod\u00fcl ve kuralla talebin kayda de\u011fer bir b\u00f6l\u00fcm\u00fcn\u00fcn kar\u015f\u0131lanabildi\u011fi \u00fcr\u00fcn aileleridir.<\/p>\n\n\n<p>Son sipari\u015flerinizi inceleyin. Hangi farkl\u0131l\u0131klar m\u00fc\u015fteri i\u00e7in ger\u00e7ekten de\u011fer yarat\u0131yor? Hangileri ayn\u0131 sorular\u0131n s\u00fcrekli m\u00fchendislik ekibine d\u00f6nmesine neden oluyor? Boyut, malzeme, performans veya aksesuarlarla ilgili tekrarlanan se\u00e7imler, kombinasyonlar\u0131 \u00f6nceden do\u011frulanabiliyorsa standartla\u015ft\u0131r\u0131labilir.<\/p>\n\n\n<p>Kazan\u0131mlar, tekrarlanan i\u015fleri ortadan kald\u0131rmaktan gelir. Sat\u0131\u015f ekibi, daha az yaz\u0131\u015fma ve g\u00f6r\u00fc\u015fmeyle onayl\u0131 kombinasyonlar sunabilir. M\u00fchendislik ekibi yeni \u00e7\u00f6z\u00fcmlere ve ger\u00e7ekten istisna olan taleplere daha fazla zaman ay\u0131rabilir. Sat\u0131n alma ve \u00fcretim ekipleri daha s\u0131k ayn\u0131 gereksinimlerle \u00e7al\u0131\u015f\u0131r. Her sat\u0131\u015f\u0131 yeni bir geli\u015ftirme projesi olarak ele almadan daha geni\u015f bir \u00fcr\u00fcn yelpazesi sunabilirsiniz.<\/p>\n\n\n<p>Bu kazan\u0131mlar\u0131n arkas\u0131nda bir yat\u0131r\u0131m vard\u0131r. Mod\u00fcllerin tasarlanmas\u0131, uyumluluk kurallar\u0131n\u0131n g\u00fcncel tutulmas\u0131 ve par\u00e7alar ya da tasar\u0131mlar de\u011fi\u015fti\u011finde \u00fcretim bilgilerinin bunlarla uyumlu kalmas\u0131 gerekir. Nadiren sat\u0131lan, ancak \u00f6zel bir tedarik zinciri ve kendine \u00f6zg\u00fc bir \u00fcretim rotas\u0131 gerektiren se\u00e7ene\u011fin maliyeti, kazand\u0131rd\u0131\u011f\u0131ndan fazla olabilir. Daha fazla se\u00e7enek sunmak, her zaman daha iyi bir teklif sunmak demek de\u011fildir.<\/p>\n\n\n<p>Tekrarlar\u0131n a\u00e7\u0131k\u00e7a g\u00f6r\u00fcld\u00fc\u011f\u00fc tek bir \u00fcr\u00fcn ailesiyle ba\u015flay\u0131n. Sunulacak se\u00e7enekleri ve istisnai taleplerin nas\u0131l ele al\u0131naca\u011f\u0131n\u0131 tan\u0131mlay\u0131n. Ard\u0131ndan sat\u0131\u015f, m\u00fchendislik ve \u00fcretim ekiplerinin ayn\u0131 se\u00e7imi ayn\u0131 \u015fekilde yorumlad\u0131\u011f\u0131n\u0131 kontrol edin. \u015eimdiye kadar ald\u0131\u011f\u0131n\u0131z her \u00f6zel talebi de\u011fil, m\u00fc\u015fterilerin tekrar tekrar sat\u0131n ald\u0131\u011f\u0131 se\u00e7enekleri standartla\u015ft\u0131r\u0131n.<\/p>\n\n\n<p>Sipari\u015flerin \u00e7o\u011fu ger\u00e7ekten yeni tasar\u0131m \u00e7al\u0131\u015fmalar\u0131 gerektiriyorsa veya m\u00fc\u015fteriler kalan imalat i\u015flerinin tamamlanmas\u0131n\u0131 beklemeyi kabul etmiyorsa CTO&#8217;nun cazibesi azal\u0131r. Hemen ihtiya\u00e7 duyulan, \u00e7ok talep g\u00f6ren \u00fcr\u00fcnleri mamul stoklar\u0131ndan kar\u015f\u0131lamak daha uygun olabilir. Farkl\u0131 \u00fcr\u00fcn ailelerinde farkl\u0131 yakla\u015f\u0131mlar kullan\u0131lmas\u0131, fabrikan\u0131n genel stratejisini tutars\u0131z hale getirmez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Se\u00e7ilen se\u00e7enekleri \u00fcretime haz\u0131r bir sipari\u015fe d\u00f6n\u00fc\u015ft\u00fcr\u00fcn<\/h2>\n\n\n<p>Yap\u0131land\u0131rma, \u00fcretime neyin \u00fcretilece\u011fini a\u00e7\u0131k\u00e7a bildirmelidir; planlamac\u0131y\u0131 bunu tekliften \u00e7\u0131karmak zorunda b\u0131rakmamal\u0131d\u0131r. \u00dcretime aktar\u0131l\u0131rken se\u00e7ilen teknik \u00f6zelliklerle birlikte bunlara kar\u015f\u0131l\u0131k gelen malzeme ihtiya\u00e7lar\u0131, operasyon s\u0131ras\u0131, s\u00fcreler ve uygun kaynaklar da iletilmelidir.<\/p>\n\n\n<p>\u00dcr\u00fcn yap\u0131land\u0131rma yaz\u0131l\u0131m\u0131, se\u00e7imlerin ge\u00e7erlili\u011fini do\u011frular. Yap\u0131land\u0131rma, fiyatland\u0131rma ve teklif haz\u0131rlama (CPQ) yaz\u0131l\u0131m\u0131, fiyatland\u0131rmay\u0131 ve teklif haz\u0131rlamay\u0131 da destekleyebilir. ERP, kabul edilen sipari\u015fi ve \u00fcretim verilerini bar\u0131nd\u0131rabilir. Detay \u00e7izelgeleme ise gerekli i\u015fleri uygun zaman aral\u0131klar\u0131na yerle\u015ftirir. Bunlar birbiriyle ba\u011flant\u0131l\u0131 i\u015flerdir: bir kombinasyonun do\u011frulanmas\u0131, tek ba\u015f\u0131na \u00fcretim kapasitesi ay\u0131rmaz.<\/p>\n\n\n<p>\u00d6rne\u011fimizdeki konvey\u00f6r \u00fcreticisi i\u00e7in planlamaya etkiler \u015f\u00f6yle olabilir:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>M\u00fc\u015fterinin se\u00e7imi<\/th><th>\u0130\u015flere veya tedarike etkisi<\/th><th>\u00c7izelgeleme i\u00e7in gereken bilgiler<\/th><\/tr><\/thead><tbody><tr><td>Paslanmaz \u00e7elik \u015fasi<\/td><td>Farkl\u0131 malzeme, imalat ve polisaj i\u015flemleri<\/td><td>\u0130lgili malzemenin kullan\u0131labilirli\u011fi ve gerekli operasyonlar<\/td><\/tr><tr><td>Kaplamal\u0131 \u00e7elik \u015fasi<\/td><td>\u0130malat\u0131n ard\u0131ndan onayl\u0131 kaplama rotas\u0131n\u0131n uygulanmas\u0131<\/td><td>\u0130\u015flem, haz\u0131rl\u0131k ve gerekli bekleme s\u00fcreleri<\/td><\/tr><tr><td>Onayl\u0131 se\u00e7enekler aras\u0131ndan daha b\u00fcy\u00fck bir tahrik \u00fcnitesi<\/td><td>Sat\u0131n al\u0131nacak farkl\u0131 bir bile\u015fen ve farkl\u0131 montaj gereksinimleri<\/td><td>Bile\u015fenin haz\u0131r olma durumu ve uygun operasyon s\u00fcreleri<\/td><\/tr><tr><td>\u0130ste\u011fe ba\u011fl\u0131 sens\u00f6r paketi<\/td><td>Ek montaj ve kontrol i\u015flemleri<\/td><td>Tamamlanmadan \u00f6nce gereken ek i\u015fler ve kaynaklar<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Her se\u00e7ene\u011fin etkisini sipari\u015fe yans\u0131t\u0131n. A\u00e7\u0131klamay\u0131 de\u011fi\u015ftirip varsay\u0131lan rotay\u0131 oldu\u011fu gibi b\u0131rakmak, az \u00f6nce satt\u0131\u011f\u0131n\u0131z i\u015fi g\u00f6r\u00fcnmez k\u0131lar.<\/p>\n\n\n<p>Se\u00e7ilen yap\u0131land\u0131rman\u0131n, \u00fcretime a\u00e7\u0131l\u0131rken ve sonraki de\u011fi\u015fiklikler boyunca a\u00e7\u0131k\u00e7a tan\u0131mlanabilir kalmas\u0131n\u0131 sa\u011flay\u0131n. M\u00fc\u015fteri bir se\u00e7ene\u011fi de\u011fi\u015ftirdi\u011finde malzeme ve i\u015f gereksinimlerini kimin g\u00fcncelleyece\u011fini kararla\u015ft\u0131r\u0131n. Bant veya \u015fasi se\u00e7imindeki bir de\u011fi\u015fiklik, sat\u0131n al\u0131nan par\u00e7alar\u0131, ba\u015flam\u0131\u015f i\u015fleri ve tamamlanma tarihini etkileyebilir. Bunu yaln\u0131zca teklife eklenen yeni bir sat\u0131r olarak de\u011fil, de\u011ferlendirilmesi gereken bir sipari\u015f de\u011fi\u015fikli\u011fi olarak ele al\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ortalama \u00fcr\u00fcn\u00fc de\u011fil, se\u00e7ilen varyant\u0131 \u00e7izelgeleyin<\/h2>\n\n\n<p>Konvey\u00f6r \u00fcreticisi \u00f6rne\u011fine d\u00f6nelim. Sat\u0131\u015f ekibi, paslanmaz \u00e7elik model i\u00e7in birka\u00e7 sipari\u015f al\u0131yor. Konvey\u00f6r say\u0131s\u0131 al\u0131\u015f\u0131lm\u0131\u015f d\u00fczeyde, ancak art\u0131k daha fazlas\u0131 polisaj gerektiriyor. Fabrikan\u0131n standart lead time de\u011feri de\u011fi\u015fmedi; de\u011fi\u015fen, polisaj kayna\u011f\u0131n\u0131n i\u015f y\u00fck\u00fc.<\/p>\n\n\n<p>Planlamac\u0131 her konvey\u00f6r\u00fc ortalama bir \u00fcr\u00fcn gibi \u00e7izelgelerse bu ek operasyonlar, \u00fcretimde s\u0131ra onlara gelene kadar g\u00f6r\u00fcnmez kalabilir. \u015easilerin imalat\u0131 h\u0131zla tamamlanabilir, ancak ard\u0131ndan polisaj i\u00e7in bekleyebilirler. Daha fazla \u015fasinin imalat\u0131na ba\u015flamak, polisaj kapasitesini art\u0131rmaz.<\/p>\n\n\n<p>Dolay\u0131s\u0131yla teslimat i\u00e7in sorulmas\u0131 gereken as\u0131l soru \u015fudur: Malzemeler ve <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">di\u011fer m\u00fc\u015fterilere zaten ayr\u0131lm\u0131\u015f kapasite<\/a> dikkate al\u0131nd\u0131\u011f\u0131nda, bu sipari\u015fin gerektirdi\u011fi i\u015fler ne zaman tamamlanabilir?<\/p>\n\n\n<p>SkyPlanner, bu i\u015fleri birbiriyle ba\u011flant\u0131l\u0131 bir \u00fcretim \u00e7izelgesine yerle\u015ftirir. S\u00fcre\u00e7 ad\u0131mlar\u0131n\u0131, s\u00fcreleri, i\u015f merkezlerini, vardiyalar\u0131 ve kaynak gereksinimlerini siz tan\u0131mlars\u0131n\u0131z. Tekrar kullan\u0131lan \u00fcr\u00fcnler \u00f6nceden tan\u0131mlanm\u0131\u015f rotalar i\u00e7erebilir; sipari\u015f kalemleri de \u00e7izelgelenecek i\u015fleri temsil eder. Yap\u0131land\u0131r\u0131lm\u0131\u015f sipari\u015f, se\u00e7ilen varyanta uygun operasyon ve malzeme bilgileriyle planlamaya ula\u015fmal\u0131d\u0131r.<\/p>\n\n\n<p>Arcturus, tan\u0131mlad\u0131\u011f\u0131n\u0131z kapasiteyi, ba\u011f\u0131ml\u0131l\u0131klar\u0131 ve \u00e7izelgeleme kurallar\u0131n\u0131 kullanarak sipari\u015fler aras\u0131ndaki i\u015f s\u0131ras\u0131n\u0131 hesaplar. Gantt g\u00f6r\u00fcn\u00fcm\u00fcnde i\u015flerin kaynaklar aras\u0131ndaki ilerleyi\u015fini takip edebilir ve ayn\u0131 kapasiteyi kullanmak isteyen di\u011fer sipari\u015flerin etkisini g\u00f6rebilirsiniz. B\u00f6ylece polisaj kuyru\u011fu, shop floor&#8217;da bir s\u00fcrprize d\u00f6n\u00fc\u015fmeden \u00f6nce teslimat de\u011ferlendirmesine dahil edilir.<\/p>\n\n\n<p>Malzeme durumunu dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde, malzeme kullan\u0131labilirli\u011fi de hesaplamaya dahil edilir. \u0130leride teslim edilmesi beklenen, sat\u0131n al\u0131nm\u0131\u015f bir tahrik \u00fcnitesi, zaten haz\u0131r olan bir \u00fcnite gibi ele al\u0131namaz. Tedarik bilgilerini g\u00fcncel tutun ve de\u011fi\u015ftiklerinde \u00e7izelgeyi yeniden hesaplay\u0131n.<\/p>\n\n\n<p>\u00d6ncelikleri siz belirlersiniz ve \u00e7izelgeleme kararlar\u0131n\u0131 korumak i\u00e7in kilitleri kullan\u0131rs\u0131n\u0131z. Acil bir konvey\u00f6r sipari\u015fi \u00f6ne al\u0131nd\u0131\u011f\u0131nda Arcturus, bu talimatlar \u00e7er\u00e7evesinde yeniden hesaplama yapar; siz de di\u011fer sipari\u015fler i\u00e7in olu\u015fan tarihleri g\u00f6zden ge\u00e7irirsiniz. B\u00f6ylece i\u015f kuyruklar\u0131n\u0131 elle d\u00fczenleme ihtiyac\u0131 azal\u0131r ve hangi teslimat taahh\u00fctlerini koruyaca\u011f\u0131n\u0131za daha net bir temelde karar verebilirsiniz.<\/p>\n\n\n<p>SkyPlanner, <a href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/\">a\u00e7\u0131k REST API<\/a> arac\u0131l\u0131\u011f\u0131yla her t\u00fcrl\u00fc ERP veya MES ile entegre olur. ERP&#8217;nizi de\u011fi\u015ftirmekle ba\u015flamak yerine mevcut sipari\u015f, \u00fcr\u00fcn ve \u00fcretim verilerinizi detay \u00e7izelgelemeye ba\u011flay\u0131n. CTO uygulamas\u0131nda, se\u00e7ilen varyant\u0131n bu ak\u0131\u015f i\u00e7inde do\u011fru malzeme ve operasyon verilerine nas\u0131l d\u00f6n\u00fc\u015ft\u00fc\u011f\u00fcn\u00fc tan\u0131mlay\u0131n. Satt\u0131\u011f\u0131n\u0131z \u00fcr\u00fcnle Arcturus&#8217;un \u00e7izelgeledi\u011fi i\u015fler aras\u0131ndaki somut ba\u011flant\u0131 budur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">B\u00fct\u00fcnle\u015fik \u00e7izelgeleme UTU&#8217;da neleri de\u011fi\u015ftirdi?<\/h2>\n\n\n<p>UTU, elektrik panolar\u0131 ve \u015falt donan\u0131mlar\u0131 \u00fcretiyor. SkyPlanner&#8217;dan \u00f6nce departmanlar ayr\u0131 Excel planlar\u0131 tutuyordu ve ERP&#8217;deki s\u0131ralama de\u011fi\u015fiklikleri her zaman shop floor&#8217;a ula\u015fm\u0131yordu. Ger\u00e7ek\u00e7i kapasiteyi g\u00f6rmek zordu; bu y\u00fczden teslimat s\u00f6zlerini tutmak i\u00e7in planlar\u0131 tekrar tekrar d\u00fczenlemek gerekiyordu.<\/p>\n\n\n<p>SkyPlanner&#8217;\u0131n Oracle NetSuite ve bordro sistemiyle entegrasyonu sayesinde UTU, fabrikas\u0131ndaki hatlar\u0131 ve b\u00f6l\u00fcmleri tek bir planlama sisteminde bir araya getirdi. Ekip, otomatik \u00e7izelgeleme ile Gantt g\u00f6r\u00fcn\u00fcm\u00fcn\u00fcn birlikte kullan\u0131lmas\u0131n\u0131 \u00f6zellikle vurguluyor: kapasite, y\u00fck ve i\u015f s\u0131ras\u0131 ayn\u0131 anda g\u00f6r\u00fclebiliyor.<\/p>\n\n\n<p>\u015eirket, <a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun SkyPlanner de\u011ferlendirmesinde<\/a>, daha \u00f6nce elektronik tablolar\u0131 g\u00fcncellemek i\u00e7in harcad\u0131\u011f\u0131 zamandan haftada yakla\u015f\u0131k iki saat tasarruf etti\u011fini belirtiyor. Ayr\u0131ca proje teslimatlar\u0131n\u0131n daha hassas bi\u00e7imde \u00e7izelgelendi\u011fini ve g\u00fcncellenen i\u015f kuyruklar\u0131n\u0131n saniyeler i\u00e7inde \u00fcretim hatt\u0131na ula\u015ft\u0131\u011f\u0131n\u0131 aktar\u0131yor. Sipari\u015fi, \u00e7al\u0131\u015fanlar\u0131n fiilen yapt\u0131\u011f\u0131 i\u015fle ili\u015fkilendirmenin de\u011feri de burada: ayr\u0131 planlar\u0131 g\u00fcncel tutmak i\u00e7in daha az \u00e7aba harcan\u0131yor ve i\u015f s\u0131ras\u0131 de\u011fi\u015fti\u011finde koordinasyon daha net sa\u011flan\u0131yor.<\/p>\n\n\n<h2 class=\"wp-block-heading\">M\u00fc\u015fterinin se\u00e7ti\u011fi \u00fcr\u00fcn\u00fc teslim etmeyi kolayla\u015ft\u0131r\u0131n<\/h2>\n\n\n<p>CTO, tekrar eden m\u00fc\u015fteri ihtiya\u00e7lar\u0131n\u0131 yeniden kullan\u0131labilen se\u00e7eneklere d\u00f6n\u00fc\u015ft\u00fcrerek de\u011fer yarat\u0131r. Bu avantaj\u0131 \u00fcretim boyunca koruyun: se\u00e7ilen varyant\u0131n gerektirdi\u011fi i\u015fleri do\u011fru tan\u0131mlay\u0131n ve teslimat\u0131, di\u011fer sipari\u015flerle ortak kullan\u0131lan kaynaklar\u0131 dikkate alarak de\u011ferlendirin.<\/p>\n\n\n<p>Bu koordinasyonu sa\u011flamak her g\u00fcn \u00e7izelgeyi yeniden d\u00fczenleme y\u00fck\u00fcne d\u00f6n\u00fc\u015ft\u00fc\u011f\u00fcnde SkyPlanner&#8217;\u0131 se\u00e7in. \u00c7izelgeleme hesaplamalar\u0131n\u0131 Arcturus yapar, sonu\u00e7lar\u0131 Gantt g\u00f6r\u00fcn\u00fcm\u00fcnde g\u00f6r\u00fcrs\u00fcn\u00fcz; \u00f6nceliklerin kontrol\u00fc ise sizde kal\u0131r. B\u00f6ylece ayr\u0131 i\u015f kuyruklar\u0131n\u0131 uyumlu tutmak i\u00e7in i\u015flerin yerini de\u011fi\u015ftirmeye daha az, as\u0131l k\u0131s\u0131t\u0131 \u00e7\u00f6zmeye daha fazla zaman ay\u0131rabilirsiniz.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>; s\u0131k kullan\u0131lan iki yap\u0131land\u0131rmay\u0131, aralar\u0131nda farkl\u0131l\u0131k g\u00f6steren operasyonlar\u0131 ve ortak kulland\u0131klar\u0131 bir kayna\u011f\u0131 g\u00f6r\u00fc\u015fmeye getirin. Bunlar, \u00fcr\u00fcn se\u00e7eneklerinizin ger\u00e7ek\u00e7i bir \u00fcretim \u00e7izelgesine nas\u0131l yerle\u015ftirilebilece\u011fini g\u00f6rmek i\u00e7in yararl\u0131 bir ba\u015flang\u0131\u00e7 noktas\u0131d\u0131r. \u00d6nce kendiniz ke\u015ffetmek isterseniz <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata Ana Sayfa &raquo; Kaynaklar &raquo; Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata Sipari\u015fe g\u00f6re yap\u0131land\u0131rma (CTO), bir \u00fcr\u00fcn\u00fcn \u00f6nceden tan\u0131mlanm\u0131\u015f, birbiriyle uyumlu se\u00e7enekler aras\u0131ndan m\u00fc\u015fterinin yapt\u0131\u011f\u0131 se\u00e7ime g\u00f6re \u00fcretilmesidir. M\u00fc\u015fteri ihtiya\u00e7lar\u0131na uygun bir kombinasyon elde eder. \u00dcretici ise her sipari\u015f i\u00e7in m\u00fchendislik \u00e7al\u0131\u015fmalar\u0131na s\u0131f\u0131rdan ba\u015flamak yerine mevcut tasar\u0131mlar\u0131 ve \u00fcr\u00fcn &#8230; <a title=\"Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/\" aria-label=\"Read more about Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99687,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-99677","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ve-cizelgeleme","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata<\/title>\n<meta name=\"description\" content=\"Her sipari\u015fi s\u0131f\u0131rdan tasarlamadan \u00fcr\u00fcn se\u00e7enekleri sunun. CTO&#039;nun ne zaman uygun oldu\u011funu ve SkyPlanner&#039;\u0131n her yap\u0131land\u0131rman\u0131n i\u015flerini nas\u0131l \u00e7izelgeledi\u011fini g\u00f6r\u00fcn.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata\" \/>\n<meta property=\"og:description\" content=\"Her sipari\u015fi s\u0131f\u0131rdan tasarlamadan \u00fcr\u00fcn se\u00e7enekleri sunun. CTO&#039;nun ne zaman uygun oldu\u011funu ve SkyPlanner&#039;\u0131n her yap\u0131land\u0131rman\u0131n i\u015flerini nas\u0131l \u00e7izelgeledi\u011fini g\u00f6r\u00fcn.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T05:16:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T05:17:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparise-gore-yapilandirma\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparise-gore-yapilandirma\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:17:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparise-gore-yapilandirma\\\/\"},\"wordCount\":2402,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparise-gore-yapilandirma\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"articleSection\":[\"APS ve \u00e7izelgeleme\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparise-gore-yapilandirma\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparise-gore-yapilandirma\\\/\",\"name\":\"Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparise-gore-yapilandirma\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparise-gore-yapilandirma\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:17:29+00:00\",\"description\":\"Her sipari\u015fi s\u0131f\u0131rdan tasarlamadan \u00fcr\u00fcn se\u00e7enekleri sunun. CTO'nun ne zaman uygun oldu\u011funu ve SkyPlanner'\u0131n her yap\u0131land\u0131rman\u0131n i\u015flerini nas\u0131l \u00e7izelgeledi\u011fini g\u00f6r\u00fcn.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparise-gore-yapilandirma\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparise-gore-yapilandirma\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparise-gore-yapilandirma\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparise-gore-yapilandirma\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata","description":"Her sipari\u015fi s\u0131f\u0131rdan tasarlamadan \u00fcr\u00fcn se\u00e7enekleri sunun. CTO'nun ne zaman uygun oldu\u011funu ve SkyPlanner'\u0131n her yap\u0131land\u0131rman\u0131n i\u015flerini nas\u0131l \u00e7izelgeledi\u011fini g\u00f6r\u00fcn.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/","og_locale":"tr_TR","og_type":"article","og_title":"Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata","og_description":"Her sipari\u015fi s\u0131f\u0131rdan tasarlamadan \u00fcr\u00fcn se\u00e7enekleri sunun. CTO'nun ne zaman uygun oldu\u011funu ve SkyPlanner'\u0131n her yap\u0131land\u0131rman\u0131n i\u015flerini nas\u0131l \u00e7izelgeledi\u011fini g\u00f6r\u00fcn.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T05:16:05+00:00","article_modified_time":"2026-10-16T05:17:29+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"12 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:17:29+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/"},"wordCount":2402,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","articleSection":["APS ve \u00e7izelgeleme","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/","name":"Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:17:29+00:00","description":"Her sipari\u015fi s\u0131f\u0131rdan tasarlamadan \u00fcr\u00fcn se\u00e7enekleri sunun. CTO'nun ne zaman uygun oldu\u011funu ve SkyPlanner'\u0131n her yap\u0131land\u0131rman\u0131n i\u015flerini nas\u0131l \u00e7izelgeledi\u011fini g\u00f6r\u00fcn.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","width":1672,"height":941,"caption":"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparise-gore-yapilandirma\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata Ana Sayfa &raquo; Kaynaklar &raquo; Sipari\u015fe G\u00f6re Yap\u0131land\u0131rma: M\u00fc\u015fteri Se\u00e7iminden Teslimata Sipari\u015fe g\u00f6re yap\u0131land\u0131rma (CTO), bir \u00fcr\u00fcn\u00fcn \u00f6nceden tan\u0131mlanm\u0131\u015f, birbiriyle uyumlu se\u00e7enekler aras\u0131ndan m\u00fc\u015fterinin yapt\u0131\u011f\u0131 se\u00e7ime g\u00f6re \u00fcretilmesidir. M\u00fc\u015fteri ihtiya\u00e7lar\u0131na uygun bir kombinasyon elde eder. \u00dcretici ise her sipari\u015f i\u00e7in m\u00fchendislik \u00e7al\u0131\u015fmalar\u0131na s\u0131f\u0131rdan ba\u015flamak yerine mevcut tasar\u0131mlar\u0131 ve \u00fcr\u00fcn&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/99677","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=99677"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/99677\/revisions"}],"predecessor-version":[{"id":99735,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/99677\/revisions\/99735"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/99687"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=99677"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=99677"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=99677"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}