{"id":99153,"date":"2026-10-15T15:53:51","date_gmt":"2026-10-15T15:53:51","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99153"},"modified":"2026-10-15T15:55:25","modified_gmt":"2026-10-15T15:55:25","slug":"kaba-kapasite-planlamasi","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/","title":{"rendered":"Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Ana \u00fcretim plan\u0131, ne \u00fcretmeyi hedefledi\u011finizi g\u00f6sterir. Kaba kapasite planlamas\u0131 ise kritik kaynaklar\u0131n\u0131z\u0131n bu plan\u0131 kar\u015f\u0131lay\u0131p kar\u015f\u0131layamayaca\u011f\u0131n\u0131 sorgular. Sat\u0131n alma, \u00fcretim ve sat\u0131\u015f ekipleri fabrikan\u0131n ger\u00e7ekle\u015ftiremeyece\u011fi bir plana g\u00f6re harekete ge\u00e7meden \u00f6nce bu kontrol\u00fcn yap\u0131lmas\u0131 \u00f6nemlidir.<\/p>\n\n\n<p>Kaba kapasite planlamas\u0131 (RCCP), planlanan \u00fcretim miktarlar\u0131n\u0131 temel kaynaklar \u00fczerindeki y\u00fcke d\u00f6n\u00fc\u015ft\u00fcr\u00fcr ve bu y\u00fck\u00fc mevcut kapasiteyle kar\u015f\u0131la\u015ft\u0131r\u0131r. B\u00f6ylece erken a\u015famada karar verebilirsiniz: ana \u00fcretim plan\u0131n\u0131 korumak, miktarlar\u0131 veya tarihleri de\u011fi\u015ftirmek ya da ek kapasite sa\u011flamak.<\/p>\n\n\n<p>Ancak haftal\u0131k y\u00fck\u00fcn dengeli olmas\u0131, i\u015flerin hen\u00fcz uygulanabilir bir s\u0131raya kondu\u011fu anlam\u0131na gelmez. Bir makinenin toplam \u00e7al\u0131\u015fma saati yeterli olsa bile acil bir sipari\u015f i\u00e7in ihtiya\u00e7 duyuldu\u011funda makine m\u00fcsait olmayabilir. \u00d6nce RCCP ile \u00fcretim taahh\u00fcd\u00fcn\u00fcz\u00fcn kar\u015f\u0131lanabilirli\u011fini sorgulay\u0131n, ard\u0131ndan bu taahh\u00fcd\u00fcn gerektirdi\u011fi i\u015fleri SkyPlanner APS ile koordineli bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcn. Arcturus, kaynaklar\u0131n\u0131za ve \u00f6nceliklerinize g\u00f6re zamanlamay\u0131 hesaplar; Gantt zaman \u00e7izelgesi de bunun \u00fcretim ve teslimat a\u00e7\u0131s\u0131ndan ne anlama geldi\u011fini g\u00f6sterir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaba kapasite planlamas\u0131 nedir?<\/h2>\n\n\n<p>RCCP, <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/\">ana \u00fcretim plan\u0131n\u0131n (MPS)<\/a> ger\u00e7ekle\u015fmesini engelleyebilecek kaynaklara odaklanan bir kapasite kontrol\u00fcd\u00fcr. Bu kaynaklar, darbo\u011faz olu\u015fturan bir makine grubu, uzman bir montaj ekibi, bir f\u0131r\u0131n veya kapasitesi k\u0131s\u0131tl\u0131 bir \u00fcretim hatt\u0131 olabilir.<\/p>\n\n\n<p>Temel soru nettir: Her planlama d\u00f6neminde MPS bu kaynaktan ne kadar kapasite gerektiriyor ve siz ger\u00e7ek\u00e7i olarak ne kadar\u0131n\u0131 sa\u011flayabilirsiniz?<\/p>\n\n\n<p>B\u00fcy\u00fck bir uyumsuzlu\u011fu tespit etmek i\u00e7in her operasyonu s\u0131ralaman\u0131z gerekmedi\u011finden bu y\u00f6ntem \u201ckaba\u201d kapasite planlamas\u0131 olarak adland\u0131r\u0131l\u0131r. Kritik kaynaklar\u0131 se\u00e7er, bu kaynaklara y\u00f6nelik ihtiya\u00e7lar\u0131 basitle\u015ftirilmi\u015f bir modelle hesaplars\u0131n\u0131z. Bu sayede RCCP, \u00fcretim taahh\u00fctlerini de\u011fi\u015ftirmek, ek vardiyalar d\u00fczenlemek veya fason \u00fcretimi de\u011ferlendirmek i\u00e7in h\u00e2l\u00e2 zaman varken fayda sa\u011flar.<\/p>\n\n\n<p>Haftal\u0131k d\u00f6nemler bir\u00e7ok \u00fcretici i\u00e7in kullan\u0131\u015fl\u0131d\u0131r; ancak RCCP i\u00e7in herkesin uymas\u0131 gereken sabit bir hafta veya ay say\u0131s\u0131 yoktur. Alman\u0131z gereken kararlar\u0131 kapsayan bir planlama ufku ve bu kararlarla giderilmesi gereken a\u015f\u0131r\u0131 y\u00fckleri ortaya \u00e7\u0131karan d\u00f6nemler se\u00e7in. Uygulanmas\u0131 uzun s\u00fcren kapasite de\u011fi\u015fiklikleri, fazla mesai vardiyas\u0131na g\u00f6re daha erken karar almay\u0131 gerektirir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">RCCP\u2019nin yeri: MPS, MRP, CRP ve \u00e7izelgeleme<\/h2>\n\n\n<p>Bu planlama faaliyetleri farkl\u0131 sorulara yan\u0131t verir:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Faaliyet<\/th><th>Temel soru<\/th><th>Tipik ayr\u0131nt\u0131 d\u00fczeyi<\/th><\/tr><\/thead><tbody><tr><td>Ana \u00fcretim planlama<\/td><td>Hangi \u00fcr\u00fcnleri, hangi miktarlarda ve hangi d\u00f6nemlerde \u00fcretmeliyiz?<\/td><td>Ana \u00fcretim plan\u0131ndaki kalemler ve tamamlanmas\u0131 planlanan miktarlar<\/td><\/tr><tr><td>Kaba kapasite planlamas\u0131<\/td><td>Temel kaynaklar bu ana \u00fcretim plan\u0131n\u0131 kar\u015f\u0131layabilir mi?<\/td><td>D\u00f6nem baz\u0131nda kritik kaynak y\u00fckleri<\/td><\/tr><tr><td>Malzeme ihtiya\u00e7 planlamas\u0131 (MRP)<\/td><td>Hangi malzeme ve bile\u015fenlere, ne zaman ihtiya\u00e7 var?<\/td><td>\u00dcr\u00fcn yap\u0131lar\u0131 ve tedarik verilerinden hesaplanan ihtiya\u00e7lar<\/td><\/tr><tr><td>Kapasite ihtiya\u00e7 planlamas\u0131 (CRP)<\/td><td>Ayr\u0131nt\u0131l\u0131 malzeme plan\u0131 ne kadar kapasite gerektiriyor?<\/td><td>Operasyon ve i\u015f merkezi baz\u0131nda daha ayr\u0131nt\u0131l\u0131 ihtiya\u00e7lar<\/td><\/tr><tr><td>Ayr\u0131nt\u0131l\u0131 \u00fcretim \u00e7izelgeleme<\/td><td>Hangi i\u015f, nerede ve ne zaman yap\u0131lacak?<\/td><td>\u0130\u015f istasyonlar\u0131, operasyonlar, vardiyalar, ba\u011f\u0131ml\u0131l\u0131klar ve i\u015f \u00f6ncelikleri<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>MPS ile RCCP aras\u0131nda bir geri bildirim d\u00f6ng\u00fcs\u00fc olmal\u0131d\u0131r. Kapasite kontrol\u00fc plan\u0131n kar\u015f\u0131lanamayaca\u011f\u0131n\u0131 g\u00f6steriyorsa \u00f6nerilen plan\u0131 veya mevcut kapasiteyi de\u011fi\u015ftirip kontrol\u00fc tekrarlay\u0131n. Kapasiteyi a\u015fan bir ana \u00fcretim plan\u0131n\u0131 sonraki a\u015famalara aktar\u0131p ayr\u0131nt\u0131l\u0131 \u00e7izelgelemenin eksik saatleri yarataca\u011f\u0131n\u0131 varsaymay\u0131n.<\/p>\n\n\n<p>Ters y\u00f6ndeki geri bildirim de \u00f6nemlidir: Ayr\u0131nt\u0131l\u0131 \u00e7izelgeleme tekrarlayan bir darbo\u011faz\u0131 ortaya \u00e7\u0131kard\u0131\u011f\u0131nda, bu bilgiyi kapasite varsay\u0131mlar\u0131n\u0131z\u0131 g\u00fcncellemek i\u00e7in kullan\u0131n. Ge\u00e7en \u00e7eyre\u011fin \u00fcr\u00fcn karmas\u0131nda kritik g\u00f6r\u00fcnmeyen bir kayna\u011f\u0131, bir sonraki RCCP incelemesine dahil etmeniz gerekebilir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kaba kapasite ihtiyac\u0131 nas\u0131l hesaplan\u0131r?<\/h2>\n\n\n<p>Hesaplamaya MPS\u2019deki \u00fcretim miktarlar\u0131yla ba\u015flay\u0131n; bu miktarlar\u0131n \u00fczerine sat\u0131\u015f talebini eklemeyin. Ana \u00fcretim plan\u0131, \u00fcretim karar\u0131n\u0131 zaten yans\u0131tmal\u0131d\u0131r. Ayn\u0131 talebi yeniden hesaba katmak y\u00fck\u00fc oldu\u011fundan fazla g\u00f6sterir.<\/p>\n\n\n<p>Saat bazl\u0131 bir model i\u00e7in:<\/p>\n\n\n<p><strong>Gerekli kaynak saati = (MPS miktar\u0131 \u00d7 birim ba\u015f\u0131na kaynak saati) toplam\u0131 + varsa ayr\u0131ca modellenen haz\u0131rl\u0131k saatleri.<\/strong><\/p>\n\n\n<p>Bu hesab\u0131 se\u00e7ti\u011finiz her kaynak ve d\u00f6nem i\u00e7in yap\u0131n. Ard\u0131ndan sonucu ayn\u0131 birimle ifade edilen kapasiteyle kar\u015f\u0131la\u015ft\u0131r\u0131n:<\/p>\n\n\n<p><strong>Kapasite y\u00fck oran\u0131 = gerekli saat \u00f7 kullan\u0131labilir saat \u00d7 %100.<\/strong><\/p>\n\n\n<p>Oran\u0131n %100\u2019\u00fcn \u00fczerinde olmas\u0131, kullan\u0131lan varsay\u0131mlara g\u00f6re a\u015f\u0131r\u0131 y\u00fck oldu\u011funu g\u00f6sterir. %100\u2019\u00fcn alt\u0131nda olmas\u0131 ise toplam y\u00fck\u00fcn kapasiteye s\u0131\u011fd\u0131\u011f\u0131 anlam\u0131na gelir; t\u00fcm i\u015flerin kendi termin tarihlerine yeti\u015fece\u011fini kan\u0131tlamaz.<\/p>\n\n\n<p>Hesaplamay\u0131 be\u015f ad\u0131mda olu\u015fturun:<\/p>\n\n\n<p>1. <strong>Kritik kaynaklar\u0131 se\u00e7in.<\/strong> Taahh\u00fcd\u00fcn kar\u015f\u0131lanmas\u0131n\u0131 k\u0131s\u0131tlayabilecek makineleri, i\u015f g\u00fcc\u00fc yetkinliklerini veya hatlar\u0131 dahil edin. Bir kayna\u011f\u0131n a\u015f\u0131r\u0131 y\u00fck\u00fcn\u00fc ba\u015fka bir kayna\u011f\u0131n bo\u015f kapasitesiyle gizleyen fabrika geneli toplamlardan ka\u00e7\u0131n\u0131n.<\/p>\n\n\n<p>2. <strong>Kaynak ihtiya\u00e7lar\u0131n\u0131 tan\u0131mlay\u0131n.<\/strong> Ana \u00fcretim plan\u0131ndaki her kalem i\u00e7in tutarl\u0131 bir kapasite ihtiya\u00e7 listesi veya kaynak profili kullan\u0131n. Makine-saat ile i\u015f\u00e7ilik-saat de\u011ferlerini ayr\u0131 tutun. \u0130lgili bile\u015fenlerin \u00fcretim i\u015flerini de dahil edin, ancak bunlar\u0131 ba\u015fka bir yerde tekrar saymay\u0131n.<\/p>\n\n\n<p>3. <strong>Y\u00fck\u00fc do\u011fru d\u00f6neme yerle\u015ftirin.<\/strong> Kritik bir operasyonun, bitmi\u015f \u00fcr\u00fcn\u00fcn termininden \u00f6nce yap\u0131lmas\u0131 gerekiyorsa kapasite ihtiyac\u0131n\u0131 buna g\u00f6re \u00f6nceki d\u00f6neme kayd\u0131r\u0131n. Aksi takdirde, hesab\u0131 kolayla\u015ft\u0131rmak i\u00e7in t\u00fcm y\u00fck\u00fc tamamlanma haftas\u0131na yazmak daha \u00f6nceki bir kapasite a\u00e7\u0131\u011f\u0131n\u0131 gizleyebilir.<\/p>\n\n\n<p>4. <strong>Kullan\u0131labilir kapasiteyi ger\u00e7ek\u00e7i bi\u00e7imde hesaplay\u0131n.<\/strong> \u00c7al\u0131\u015fma takvimini, personel durumunu ve planl\u0131 duru\u015flar\u0131 esas al\u0131n. Performans kay\u0131plar\u0131 i\u00e7in ay\u0131rd\u0131\u011f\u0131n\u0131z paylar\u0131 tutarl\u0131 bi\u00e7imde uygulay\u0131n; ayn\u0131 kayb\u0131 iki kez d\u00fc\u015fmeyin.<\/p>\n\n\n<p>5. <strong>A\u00e7\u0131klar\u0131 de\u011ferlendirin ve plan\u0131 yeniden hesaplay\u0131n.<\/strong> \u00d6nerilen aksiyonu, hangi kaynak ve d\u00f6nemi de\u011fi\u015ftirdi\u011fini ve g\u00fcncellenen y\u00fck\u00fc kaydedin. Nas\u0131l giderilece\u011fi kararla\u015ft\u0131r\u0131lmam\u0131\u015f bir a\u015f\u0131r\u0131 y\u00fck, h\u00e2l\u00e2 a\u015f\u0131r\u0131 y\u00fckt\u00fcr.<\/p>\n\n\n<p>Hatt\u0131 \u00fcretim adedi \u00fczerinden planlamak daha uygunsa, saat hesab\u0131 yerine \u00fcretim h\u0131z\u0131na dayal\u0131 bir kar\u015f\u0131la\u015ft\u0131rma yap\u0131n: Her d\u00f6nemde planlanan adedi, \u00fcretilebilecek adetle kar\u015f\u0131la\u015ft\u0131r\u0131n. \u00dcretim h\u0131z\u0131n\u0131n \u00fcr\u00fcn karmas\u0131n\u0131 yans\u0131tt\u0131\u011f\u0131ndan emin olun; farkl\u0131 \u00fcr\u00fcnleri her zaman birbirine e\u015fde\u011fer birimler olarak ele alamazs\u0131n\u0131z.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hangi RCCP y\u00f6ntemini kullanmal\u0131s\u0131n\u0131z?<\/h3>\n\n\n<p>Yayg\u0131n kullan\u0131lan \u00fc\u00e7 yakla\u015f\u0131mda, basitlik ile y\u00fck\u00fc daha ayr\u0131nt\u0131l\u0131 g\u00f6sterme aras\u0131nda bir tercih s\u00f6z konusudur:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Genel fakt\u00f6rlerle kapasite planlamas\u0131 (CPOF)<\/strong>, MPS\u2019yi toplam i\u015f y\u00fck\u00fcne d\u00f6n\u00fc\u015ft\u00fcr\u00fcr ve bu y\u00fck\u00fc ge\u00e7mi\u015fteki kaynak kullan\u0131m oranlar\u0131na g\u00f6re da\u011f\u0131t\u0131r. H\u0131zl\u0131 bir yakla\u015f\u0131k sonu\u00e7 verir; ancak \u00fcr\u00fcn karmas\u0131 de\u011fi\u015fti\u011finde ge\u00e7mi\u015f oranlar yan\u0131lt\u0131c\u0131 olabilir.<\/li><li><strong>Kapasite ihtiya\u00e7 listeleri<\/strong>, \u00fcr\u00fcn ba\u015f\u0131na gereken kritik kaynak saatlerini belirtir. Toplam \u00fcretim miktar\u0131 ayn\u0131 olan iki ana \u00fcretim plan\u0131n\u0131n neden \u00e7ok farkl\u0131 darbo\u011fazlar yaratabildi\u011fini g\u00f6sterir.<\/li><li><strong>Kaynak profilleri<\/strong>, bu ihtiya\u00e7lar\u0131 ayr\u0131ca \u00fcretim s\u00fcresine ba\u011fl\u0131 zaman kayd\u0131rmalar\u0131yla d\u00f6nemlere da\u011f\u0131t\u0131r. B\u00f6ylece bitmi\u015f \u00fcr\u00fcn\u00fcn tamamlanaca\u011f\u0131 d\u00f6nemden daha \u00f6nce yap\u0131lmas\u0131 gereken kritik operasyonlar\u0131 ortaya \u00e7\u0131karmaya yard\u0131mc\u0131 olur.<\/li><\/ul>\n\n\n<p>Alman\u0131z gereken karar\u0131 netle\u015ftirebilen en basit modeli kullan\u0131n. \u00dcr\u00fcnler ortak kaynaklarda farkl\u0131 kapasite ihtiya\u00e7lar\u0131 olu\u015fturuyorsa, kapasite ihtiya\u00e7 listesine dayal\u0131 bir hesaplama iyi bir ba\u015flang\u0131\u00e7 noktas\u0131d\u0131r. \u00dcretim rotas\u0131 birden fazla planlama d\u00f6nemine yay\u0131l\u0131yorsa zaman kayd\u0131rmalar\u0131n\u0131 da ekleyin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">RCCP \u00f6rne\u011fi: 19 makine-saat a\u00e7\u0131\u011f\u0131 olan bir hafta<\/h2>\n\n\n<p>A ve B olmak \u00fczere iki pompa grubu \u00fcreten bir i\u015fletme d\u00fc\u015f\u00fcn\u00fcn. Her ikisi de ayn\u0131 tala\u015fl\u0131 imalat makine grubunu ve montaj ekibini kullan\u0131yor. Bu basitle\u015ftirilmi\u015f \u00f6rnekte kritik i\u015fler, \u00fcr\u00fcn\u00fcn tamamland\u0131\u011f\u0131 haftayla ayn\u0131 planlama d\u00f6neminde yap\u0131l\u0131yor. Birim ba\u015f\u0131na s\u00fcreler ise varsay\u0131lan haz\u0131rl\u0131k s\u00fcresi pay\u0131n\u0131 zaten i\u00e7eriyor.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u00dcr\u00fcn<\/th><th>Birim ba\u015f\u0131na tala\u015fl\u0131 imalat saati<\/th><th>Birim ba\u015f\u0131na montaj i\u015f\u00e7ilik-saati<\/th><th>1. hafta MPS<\/th><th>2. hafta MPS<\/th><th>3. hafta MPS<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>0,40<\/td><td>0,25<\/td><td>120<\/td><td>180<\/td><td>100<\/td><\/tr><tr><td>B<\/td><td>0,75<\/td><td>0,50<\/td><td>80<\/td><td>100<\/td><td>80<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Tala\u015fl\u0131 imalat grubunda iki makine bulunur. Her makine, be\u015f g\u00fcn boyunca g\u00fcnde sekizer saatlik iki vardiyada \u00e7al\u0131\u015f\u0131r. Planlanan kapasite 2 makine \u00d7 g\u00fcnde 2 vardiya \u00d7 vardiya ba\u015f\u0131na 8 saat \u00d7 5 g\u00fcn = 160 makine-saattir. %80 planlama katsay\u0131s\u0131 uyguland\u0131\u011f\u0131nda haftal\u0131k kullan\u0131labilir kapasite 128 makine-saat olur. Bu katsay\u0131, beklenen kapasite kay\u0131plar\u0131 i\u00e7in ayr\u0131lan pay\u0131 da i\u00e7erir; ayn\u0131 kay\u0131plar ikinci kez d\u00fc\u015f\u00fclmez.<\/p>\n\n\n<p>Montaj ekibinin kullan\u0131labilir kapasitesi ise ekibin personel durumu ve \u00e7al\u0131\u015fma takvimine g\u00f6re ayr\u0131 olarak hesaplan\u0131r ve haftada 96 i\u015f\u00e7ilik-saattir.<\/p>\n\n\n<p>2. haftan\u0131n tala\u015fl\u0131 imalat ihtiyac\u0131:<\/p>\n\n\n<p><strong>(180 \u00d7 0,40) + (100 \u00d7 0,75) = 147 makine-saat.<\/strong><\/p>\n\n\n<p>Bu de\u011fer, kullan\u0131labilir 128 saatin 19 saat \u00fczerindedir. Kapasite y\u00fck oran\u0131, virg\u00fclden sonra tek haneye yuvarland\u0131\u011f\u0131nda %114,8 olur.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kritik kaynak<\/th><th>Haftal\u0131k kullan\u0131labilir saat<\/th><th>1. hafta gerekli saat<\/th><th>2. hafta gereken saat<\/th><th>3. hafta gereken saat<\/th><\/tr><\/thead><tbody><tr><td>Tala\u015fl\u0131 imalat grubu<\/td><td>128<\/td><td>108<\/td><td>147<\/td><td>100<\/td><\/tr><tr><td>Montaj ekibi<\/td><td>96<\/td><td>70<\/td><td>95<\/td><td>65<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Montaj y\u00fck\u00fc her hafta kapasiteye s\u0131\u011far; ancak montajdaki bo\u015f i\u015f\u00e7ilik saatleri, tala\u015fl\u0131 imalat saatlerinin yerine ge\u00e7emez. Teslim tarihi de\u011fi\u015fmedik\u00e7e 3. haftadaki bo\u015f makine kapasitesi de 2. hafta i\u00e7in verilen teslimat taahh\u00fcd\u00fcn\u00fc kar\u015f\u0131lamaz.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kapasite a\u015f\u0131m\u0131n\u0131 somut bir karara d\u00f6n\u00fc\u015ft\u00fcr\u00fcn<\/h3>\n\n\n<p>Bir se\u00e7enek, 2. haftada kullan\u0131labilir tala\u015fl\u0131 imalat kapasitesini 19 saat art\u0131rmakt\u0131r. Maliyet ve personel ihtiyac\u0131 kontrol edilmelidir; ancak kapasite a\u00e7\u0131s\u0131ndan ne yap\u0131lmas\u0131 gerekti\u011fi a\u00e7\u0131kt\u0131r.<\/p>\n\n\n<p>Di\u011fer se\u00e7enek, A \u00fcr\u00fcn\u00fcnden 50 adedi 2. hafta yerine 1. haftada \u00fcretmektir. B\u00f6ylece 20 saatlik tala\u015fl\u0131 imalat ve 12,5 saatlik montaj i\u015f\u00e7ili\u011fi bir hafta \u00f6ne \u00e7ekilir:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kritik kaynak<\/th><th>G\u00fcncellenmi\u015f 1. hafta y\u00fck\u00fc<\/th><th>G\u00fcncellenmi\u015f 2. hafta y\u00fck\u00fc<\/th><th>Haftal\u0131k kapasite<\/th><\/tr><\/thead><tbody><tr><td>Tala\u015fl\u0131 imalat grubu<\/td><td>128<\/td><td>127<\/td><td>128<\/td><\/tr><tr><td>Montaj ekibi<\/td><td>82,5<\/td><td>82,5<\/td><td>96<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>G\u00fcncellenmi\u015f MPS&#8217;de A miktarlar\u0131 s\u0131ras\u0131yla 170, 130, 100 olur; B ise 80, 100, 80 olarak kal\u0131r. \u00dc\u00e7 haftal\u0131k toplam \u00fcretim de\u011fi\u015fmez. Bu modelde kapasite a\u015f\u0131m\u0131 ortadan kalkar. Ancak 1. haftada tala\u015fl\u0131 imalat i\u00e7in, kapasite hesab\u0131nda zaten dikkate al\u0131nan kay\u0131plar d\u0131\u015f\u0131nda ek bir esneklik pay\u0131 kalmaz.<\/p>\n\n\n<p>Dolay\u0131s\u0131yla \u00fcretimi \u00f6ne \u00e7ekmek, maliyetsiz bir \u00e7\u00f6z\u00fcm de\u011fil, i\u015fletmenin vermesi gereken bir karard\u0131r. Malzemeye daha erken ihtiya\u00e7 duyars\u0131n\u0131z; montaj\u0131 tamamlanan \u00fcr\u00fcnleri depolayacak yeriniz olmal\u0131, \u00fcr\u00fcn\u00fcn talebi ve teknik \u00f6zellikleri de erken \u00fcretimi hakl\u0131 \u00e7\u0131karmal\u0131d\u0131r. Bu maliyetleri fazla mesai, fason \u00fcretim veya m\u00fc\u015fteriyle anla\u015farak teslim tarihini de\u011fi\u015ftirme se\u00e7enekleriyle kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/p>\n\n\n<p>RCCP, se\u00e7enekleri somutla\u015ft\u0131r\u0131r. Hangi taahh\u00fcd\u00fcn i\u015fletmeniz i\u00e7in daha de\u011ferli oldu\u011funa ise karar vermez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">RCCP kontrol\u00fcnden ge\u00e7mek neden zaman\u0131nda teslimat\u0131 garanti etmez?<\/h2>\n\n\n<p>G\u00fcncellenmi\u015f \u00f6rnekte y\u00fck, her iki kayna\u011f\u0131n da haftal\u0131k toplam kapasitesine s\u0131\u011far. \u015eimdi 1. haftadaki sipari\u015flerden birinin malzemesinin ancak per\u015fembe g\u00fcn\u00fc gelece\u011fini d\u00fc\u015f\u00fcn\u00fcn. Di\u011fer birka\u00e7 sipari\u015fin de cuma g\u00fcnk\u00fc montajdan \u00f6nce ayn\u0131 tala\u015fl\u0131 imalat grubunda i\u015flenmesi gerekiyor olsun.<\/p>\n\n\n<p>Haftan\u0131n toplam 128 saati ile malzeme geldikten sonra kalan kullan\u0131labilir saatler ayn\u0131 \u015fey de\u011fildir. Art\u0131k i\u015f s\u0131ras\u0131, vardiya ba\u015flang\u0131\u00e7 ve biti\u015fleri ve par\u00e7alar\u0131n montaja ne zaman aktar\u0131laca\u011f\u0131 \u00f6nem kazan\u0131r. Kaba kapasite kontrol\u00fc, yaln\u0131zca toplamlara bakarak bu zamanlamay\u0131 do\u011frulayamaz.<\/p>\n\n\n<p>Dengeli bir kapasite plan\u0131n\u0131n uygulamada yine de aksamas\u0131na yol a\u00e7abilecek \u015fu d\u00f6rt nedene dikkat edin:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>D\u00f6nem i\u00e7indeki zamanlama:<\/strong> Birden fazla i\u015f, ayn\u0131 g\u00fcn ayn\u0131 kayna\u011fa ihtiya\u00e7 duyar.<\/li><li><strong>Operasyonlar aras\u0131ndaki ba\u011f\u0131ml\u0131l\u0131klar:<\/strong> Gerekli par\u00e7alar\u0131n tala\u015fl\u0131 imalat\u0131 tamamlanmadan montajdaki bo\u015f kapasite kullan\u0131lamaz.<\/li><li><strong>Kayna\u011f\u0131n i\u015fe uygunlu\u011fu:<\/strong> Alternatif bir makinenin bo\u015f saatleri vard\u0131r, ancak gerekli operasyonu ger\u00e7ekle\u015ftiremez.<\/li><li><strong>De\u011fi\u015fen ko\u015fullar:<\/strong> Malzeme gecikmesi, ar\u0131za veya acil sipari\u015f, de\u011ferlendirmeden sonra plan\u0131 de\u011fi\u015ftirir.<\/li><\/ul>\n\n\n<p>Bu noktada <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">toplam kapasite kontrol\u00fcnden sonlu kapasite \u00e7izelgelemeye<\/a> ge\u00e7mek gerekir. Taahh\u00fct vermeden \u00f6nceki karar a\u015famas\u0131nda RCCP&#8217;yi kullanmaya devam edin; i\u015flerin ger\u00e7ekte bir arada nas\u0131l y\u00fcr\u00fct\u00fclece\u011fini ise ayr\u0131nt\u0131l\u0131 bir \u00e7izelgeyle kontrol edin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kapasite karar\u0131ndan SkyPlanner ile \u00e7izelgelemeye<\/h2>\n\n\n<p>Planlamac\u0131lar\u0131n\u0131z zamanlar\u0131n\u0131 bu kararlar\u0131 makine baz\u0131nda i\u015f s\u0131ralar\u0131na d\u00f6n\u00fc\u015ft\u00fcrmekle, \u00fcretimde her de\u011fi\u015fiklik oldu\u011funda da bu s\u0131ralar\u0131 yeniden olu\u015fturmakla ge\u00e7iriyorsa, sonraki ad\u0131m olarak SkyPlanner APS&#8217;yi \u00f6neriyoruz. Ana \u00fcretim planlama s\u00fcrecinizde RCCP&#8217;yi koruyun; ard\u0131ndan gelen ayr\u0131nt\u0131l\u0131 \u00e7izelgeleme i\u00e7in SkyPlanner&#8217;\u0131 kullan\u0131n.<\/p>\n\n\n<p>\u0130\u015fletme ve \u00fcretim verilerinizin kayna\u011f\u0131 olarak ERP sisteminizi kullanmaya devam edin. SkyPlanner, <a href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/\">a\u00e7\u0131k REST API \u00fczerinden her ERP veya MES ile entegre olur<\/a>. B\u00f6ylece planlamac\u0131n\u0131n plan\u0131 tekrar tekrar elle kurmas\u0131 yerine bu veriler do\u011frudan \u00fcretim \u00e7izelgelemede kullan\u0131l\u0131r.<\/p>\n\n\n<p>\u0130\u015f istasyonlar\u0131n\u0131, s\u00fcre\u00e7 ad\u0131mlar\u0131n\u0131, vardiyalar\u0131, operat\u00f6rleri ve \u00f6ncelikleri tan\u0131mlay\u0131n. Arcturus, tan\u0131mlanan kapasiteyi, ba\u011f\u0131ml\u0131l\u0131klar\u0131 ve kurallar\u0131 kullanarak \u00e7izelgeyi hesaplar. Malzeme durumunu dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde, malzeme mevcudiyeti ve beklenen tedarikler de zamanlamay\u0131 etkiler. Ortaya \u00e7\u0131kan i\u015fleri ve aralar\u0131ndaki ili\u015fkileri Gantt zaman \u00e7izelgesinde g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n\n\n<p>Pompa \u00f6rne\u011finde bir sonraki somut ad\u0131m, g\u00fcncellenmi\u015f \u00fcretim miktarlar\u0131n\u0131 \u00e7izelgelemek ve tala\u015fl\u0131 imalat ile montaj\u0131n ne zaman tamamland\u0131\u011f\u0131n\u0131 incelemektir. Bir malzemenin geli\u015f tarihi de\u011fi\u015firse tedarik bilgilerini g\u00fcncelleyip \u00e7izelgeyi yeniden hesaplay\u0131n. Gantt g\u00f6r\u00fcn\u00fcm\u00fc; taahh\u00fcd\u00fc koruma, \u00f6ncelikleri de\u011fi\u015ftirme veya ek kapasite sa\u011flama karar\u0131n\u0131z i\u00e7in somut bir dayanak sunar.<\/p>\n\n\n<p>Bu yakla\u015f\u0131m, kaba kapasite hesab\u0131n\u0131n kapsamad\u0131\u011f\u0131 i\u015fleri kolayla\u015ft\u0131rarak planlama y\u00fck\u00fcn\u00fc azalt\u0131r: farkl\u0131 kaynaklardaki i\u015fleri koordine etmeyi ve ko\u015fullar de\u011fi\u015ftik\u00e7e bu koordinasyonu s\u00fcrd\u00fcrmeyi sa\u011flar. \u00d6ncelikleri planlamac\u0131 belirler; \u00e7izelgeleme hesab\u0131n\u0131 Arcturus yapar. Gerekli i\u015fler h\u00e2l\u00e2 terminlerine yeti\u015fmiyorsa al\u0131nmas\u0131 gereken i\u015fletme karar\u0131, dengeli bir haftal\u0131k toplam\u0131n arkas\u0131nda gizlenmez; g\u00f6r\u00fcn\u00fcr kal\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">KJH-Comp: kaba haftal\u0131k y\u00fcklemenin \u00f6tesine ge\u00e7mek<\/h3>\n\n\n<p>Finlandiyal\u0131 fason sac metal \u00fcreticisi KJH-Comp, C9000 ERP sisteminde ve elektronik tablolarda zaten kaba haftal\u0131k y\u00fckleme yap\u0131yordu. Sorun bir sonraki ad\u0131md\u0131: m\u00fc\u015fteri sipari\u015flerinin belirli g\u00fcnlerde teslim edilmesi gerekirken, \u00fcretim sorumlular\u0131 i\u015fleri makinelere h\u00e2l\u00e2 elle at\u0131yordu. \u0130ki \u00fcretim sorumlusunun her biri, zaman\u0131n\u0131n en az yar\u0131s\u0131n\u0131 kapasite \u00e7izelgelemeye ay\u0131r\u0131yordu.<\/p>\n\n\n<p>\u015eirket, ERP sistemini koruyarak sonlu kapasite \u00e7izelgeleme i\u00e7in SkyPlanner&#8217;\u0131 kullanmaya ba\u015flad\u0131. KJH-Comp, yay\u0131mlanan m\u00fc\u015fteri hik\u00e2yesinde i\u015flerin makinelere otomatik atanmas\u0131n\u0131, darbo\u011fazlar\u0131n daha erken g\u00f6r\u00fclmesini ve elle yap\u0131lan \u00e7izelgeleme i\u015finin azalmas\u0131n\u0131 anlat\u0131yor. \u00c7izelgeleme sorumlulu\u011fu iki \u00fcretim sorumlusundan birine ge\u00e7ti; di\u011feri ise farkl\u0131 g\u00f6revler \u00fcstlendi.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp&#8217;un bildirdi\u011fine g\u00f6re<\/a> teslimat performans\u0131 yakla\u015f\u0131k %50&#8217;den 2026&#8217;da %98&#8217;e kadar y\u00fckseldi. Bu, \u015firketin kendi uygulamas\u0131ndan edindi\u011fi deneyimdir. RCCP de\u011ferlendirmesi a\u00e7\u0131s\u0131ndan \u00e7\u0131kar\u0131lacak ders, uygulamada giderilen eksikliktir: haftal\u0131k y\u00fckleri g\u00f6rmekle yetinilmeyip g\u00fcnl\u00fck i\u015fler koordineli bi\u00e7imde y\u00fcr\u00fct\u00fclmeye ba\u015fland\u0131. B\u00f6ylece haftal\u0131k y\u00fckler, \u00fcretim sorumlular\u0131n\u0131n elle i\u015f s\u0131ralar\u0131na d\u00f6n\u00fc\u015ft\u00fcrmesi gereken veriler olarak kalmad\u0131.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bir sonraki kapasite de\u011ferlendirmenizi uygulamaya ta\u015f\u0131y\u0131n<\/h2>\n\n\n<p>Bir sonraki MPS de\u011ferlendirmenizde, kapasite a\u00e7\u0131\u011f\u0131 en b\u00fcy\u00fck olan kritik kayna\u011f\u0131 belirleyin. \u00dcretimin zaman\u0131n\u0131 de\u011fi\u015ftirme, kullan\u0131labilir kapasiteyi art\u0131rma veya taahh\u00fcd\u00fc de\u011fi\u015ftirme se\u00e7eneklerinden hangisini uygulayaca\u011f\u0131n\u0131z\u0131 kararla\u015ft\u0131r\u0131n; ard\u0131ndan kaba kapasite y\u00fck\u00fcn\u00fc yeniden hesaplay\u0131n. G\u00fcncellenen i\u015fleri \u00fcretime vermeden \u00f6nce ayr\u0131nt\u0131l\u0131 zamanlamalar\u0131n\u0131 di\u011fer i\u015fler ve malzeme mevcudiyetiyle kar\u015f\u0131la\u015ft\u0131rarak kontrol edin.<\/p>\n\n\n<p>Bu son ad\u0131m\u0131 daha h\u0131zl\u0131 ve faydal\u0131 h\u00e2le getirmek i\u00e7in SkyPlanner&#8217;\u0131 kullan\u0131n. \u00c7izelgeleme i\u015f ak\u0131\u015f\u0131n\u0131 ke\u015ffetmek i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">demo verileriyle denemeye ba\u015flay\u0131n<\/a> veya kendi darbo\u011faz\u0131n\u0131z, vardiyalar\u0131n\u0131z ve teslimat taahh\u00fctleriniz \u00fczerinden bir sunum i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">demo randevusu al\u0131n<\/a>. Ger\u00e7ekle\u015ftirmek istedi\u011finiz \u00fcretim plan\u0131n\u0131 getirin; Arcturus ve Gantt zaman \u00e7izelgesinin bu plan\u0131 ekibinizin kullanabilece\u011fi bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcrmenize nas\u0131l yard\u0131mc\u0131 oldu\u011funu g\u00f6r\u00fcn.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin Ana Sayfa &raquo; Kaynaklar &raquo; Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin Ana \u00fcretim plan\u0131, ne \u00fcretmeyi hedefledi\u011finizi g\u00f6sterir. Kaba kapasite planlamas\u0131 ise kritik kaynaklar\u0131n\u0131z\u0131n bu plan\u0131 kar\u015f\u0131lay\u0131p kar\u015f\u0131layamayaca\u011f\u0131n\u0131 sorgular. Sat\u0131n alma, \u00fcretim ve sat\u0131\u015f ekipleri fabrikan\u0131n ger\u00e7ekle\u015ftiremeyece\u011fi bir plana g\u00f6re harekete ge\u00e7meden \u00f6nce bu kontrol\u00fcn &#8230; <a title=\"Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/\" aria-label=\"Read more about Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":99190,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-99153","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ve-cizelgeleme","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin<\/title>\n<meta name=\"description\" content=\"Kritik kaynaklar\u0131n\u0131z MPS\u2019yi kar\u015f\u0131layabilir mi? Bu RCCP \u00f6rne\u011fiyle a\u015f\u0131r\u0131 y\u00fckleri belirleyin, ard\u0131ndan plan\u0131 uygulanabilir bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin\" \/>\n<meta property=\"og:description\" content=\"Kritik kaynaklar\u0131n\u0131z MPS\u2019yi kar\u015f\u0131layabilir mi? Bu RCCP \u00f6rne\u011fiyle a\u015f\u0131r\u0131 y\u00fckleri belirleyin, ard\u0131ndan plan\u0131 uygulanabilir bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T15:53:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T15:55:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/kaba-kapasite-planlamasi\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/kaba-kapasite-planlamasi\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin\",\"datePublished\":\"2026-10-15T15:53:51+00:00\",\"dateModified\":\"2026-10-15T15:55:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/kaba-kapasite-planlamasi\\\/\"},\"wordCount\":2858,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/kaba-kapasite-planlamasi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"articleSection\":[\"APS ve \u00e7izelgeleme\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/kaba-kapasite-planlamasi\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/kaba-kapasite-planlamasi\\\/\",\"name\":\"Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/kaba-kapasite-planlamasi\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/kaba-kapasite-planlamasi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"datePublished\":\"2026-10-15T15:53:51+00:00\",\"dateModified\":\"2026-10-15T15:55:25+00:00\",\"description\":\"Kritik kaynaklar\u0131n\u0131z MPS\u2019yi kar\u015f\u0131layabilir mi? Bu RCCP \u00f6rne\u011fiyle a\u015f\u0131r\u0131 y\u00fckleri belirleyin, ard\u0131ndan plan\u0131 uygulanabilir bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/kaba-kapasite-planlamasi\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/kaba-kapasite-planlamasi\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/kaba-kapasite-planlamasi\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/kaba-kapasite-planlamasi\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin","description":"Kritik kaynaklar\u0131n\u0131z MPS\u2019yi kar\u015f\u0131layabilir mi? Bu RCCP \u00f6rne\u011fiyle a\u015f\u0131r\u0131 y\u00fckleri belirleyin, ard\u0131ndan plan\u0131 uygulanabilir bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/","og_locale":"tr_TR","og_type":"article","og_title":"Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin","og_description":"Kritik kaynaklar\u0131n\u0131z MPS\u2019yi kar\u015f\u0131layabilir mi? Bu RCCP \u00f6rne\u011fiyle a\u015f\u0131r\u0131 y\u00fckleri belirleyin, ard\u0131ndan plan\u0131 uygulanabilir bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T15:53:51+00:00","article_modified_time":"2026-10-15T15:55:25+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"14 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin","datePublished":"2026-10-15T15:53:51+00:00","dateModified":"2026-10-15T15:55:25+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/"},"wordCount":2858,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","articleSection":["APS ve \u00e7izelgeleme","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/","name":"Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","datePublished":"2026-10-15T15:53:51+00:00","dateModified":"2026-10-15T15:55:25+00:00","description":"Kritik kaynaklar\u0131n\u0131z MPS\u2019yi kar\u015f\u0131layabilir mi? Bu RCCP \u00f6rne\u011fiyle a\u015f\u0131r\u0131 y\u00fckleri belirleyin, ard\u0131ndan plan\u0131 uygulanabilir bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/kaba-kapasite-planlamasi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin Ana Sayfa &raquo; Kaynaklar &raquo; Kaba Kapasite Planlamas\u0131: MPS\u2019nizi RCCP ile Test Edin Ana \u00fcretim plan\u0131, ne \u00fcretmeyi hedefledi\u011finizi g\u00f6sterir. Kaba kapasite planlamas\u0131 ise kritik kaynaklar\u0131n\u0131z\u0131n bu plan\u0131 kar\u015f\u0131lay\u0131p kar\u015f\u0131layamayaca\u011f\u0131n\u0131 sorgular. Sat\u0131n alma, \u00fcretim ve sat\u0131\u015f ekipleri fabrikan\u0131n ger\u00e7ekle\u015ftiremeyece\u011fi bir plana g\u00f6re harekete ge\u00e7meden \u00f6nce bu kontrol\u00fcn&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/99153","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=99153"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/99153\/revisions"}],"predecessor-version":[{"id":99212,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/99153\/revisions\/99212"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/99190"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=99153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=99153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=99153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}