{"id":97296,"date":"2026-10-10T08:49:19","date_gmt":"2026-10-10T08:49:19","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=97296"},"modified":"2026-10-10T08:50:40","modified_gmt":"2026-10-10T08:50:40","slug":"uretim-planina-uyum","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/","title":{"rendered":"\u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; \u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\u00dcretim plan\u0131na uyum, ger\u00e7ekle\u015fen i\u015flerin \u00fcretim sahas\u0131na verilen plana ne \u00f6l\u00e7\u00fcde uydu\u011funu g\u00f6sterir. Tamamlanmay\u0131 esas alan bir de\u011ferlendirmede, planlanan biti\u015f zaman\u0131na kadar eksiksiz tamamlanan operasyonlar\u0131n say\u0131s\u0131n\u0131 raporlama d\u00f6neminde bitmesi planlanan t\u00fcm operasyonlar\u0131n say\u0131s\u0131na b\u00f6l\u00fcn ve 100 ile \u00e7arp\u0131n. Kay\u0131tl\u0131 bir plan\u0131 esas alarak ayn\u0131 operasyon ID\u2019lerini kar\u015f\u0131la\u015ft\u0131r\u0131n: Hedeflenen toplam miktar\u0131 \u00fcretmek, do\u011fru i\u015flerin zaman\u0131nda tamamland\u0131\u011f\u0131n\u0131 kan\u0131tlamaz.<\/p>\n\n\n<p><strong>Tamamlanmaya dayal\u0131 uyum (%) = planlanan biti\u015f zaman\u0131na kadar eksiksiz tamamlanan operasyon say\u0131s\u0131 \u00f7 d\u00f6nem i\u00e7inde bitmesi planlanan operasyon say\u0131s\u0131 \u00d7 100<\/strong><\/p>\n\n\n<p>Bu rehberde bu \u00f6zel kural kullan\u0131l\u0131r. Erken tamamlanma kabul edilir, gecikmeye tolerans tan\u0131nmaz ve yaln\u0131zca kabul edilmi\u015f \u00fcretim miktar\u0131 hesaba kat\u0131l\u0131r. Planlanan ba\u015flang\u0131\u00e7lara veya i\u015flerin y\u00fcr\u00fct\u00fclme s\u0131ras\u0131na uyulup uyulmad\u0131\u011f\u0131 kontrol edilmez. Bunlar \u00fcretim s\u00fcreciniz i\u00e7in \u00f6nemliyse ayr\u0131ca de\u011ferlendirilmelidir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dcretim plan\u0131na uyum i\u00e7in hangi form\u00fcl\u00fc kullanmal\u0131s\u0131n\u0131z?<\/h2>\n\n\n<p>\u00dcretimde yan\u0131t arad\u0131\u011f\u0131n\u0131z soruya uygun form\u00fcl\u00fc se\u00e7in ve sonu\u00e7lar\u0131 \u00f6l\u00e7meden \u00f6nce kurallar\u0131n\u0131 yaz\u0131l\u0131 olarak belirleyin. Vardiya baz\u0131nda \u00fcretim miktar\u0131n\u0131 kontrol etmek de operasyon baz\u0131nda biti\u015f zaman\u0131n\u0131 kontrol etmek de yararl\u0131 olabilir. Ancak ayn\u0131 \u015feyi \u00f6l\u00e7\u00fcyorlarm\u0131\u015f gibi kar\u015f\u0131la\u015ft\u0131r\u0131lamazlar.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>G\u00f6sterge<\/th><th>Yan\u0131tlad\u0131\u011f\u0131 soru<\/th><th>Bu rehberde kullan\u0131lan hesaplama<\/th><\/tr><\/thead><tbody><tr><td>Tamamlanmaya dayal\u0131 \u00fcretim plan\u0131na uyum<\/td><td>Planlanan operasyonlar, kendi biti\u015f zamanlar\u0131na kadar eksiksiz tamamland\u0131 m\u0131?<\/td><td>Ko\u015fullar\u0131 sa\u011flayan operasyon say\u0131s\u0131 \u00f7 bitmesi planlanan operasyon say\u0131s\u0131 \u00d7 100<\/td><\/tr><tr><td>Toplam \u00fcretim miktar\u0131 hedefini kar\u015f\u0131lama<\/td><td>D\u00f6nem i\u00e7inde planlanan toplam miktar\u0131 \u00fcrettik mi?<\/td><td>\u00dcretilen ve kabul edilen miktar \u00f7 planlanan miktar \u00d7 100<\/td><\/tr><tr><td>Zaman\u0131nda teslimat<\/td><td>Sipari\u015fler m\u00fc\u015fteriye kararla\u015ft\u0131r\u0131lan zaman aral\u0131\u011f\u0131nda ula\u015ft\u0131 m\u0131?<\/td><td>Ko\u015fullar\u0131 sa\u011flayan teslim edilmi\u015f sipari\u015f say\u0131s\u0131 \u00f7 tan\u0131mlanan teslimat kapsam\u0131ndaki sipari\u015f say\u0131s\u0131 \u00d7 100<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Miktar hesab\u0131nda birimlerin kar\u015f\u0131la\u015ft\u0131r\u0131labilir olmas\u0131 gerekir. Ton, adet ve i\u015f\u00e7ilik saatini toplamak, hedefi kar\u015f\u0131lama oran\u0131 a\u00e7\u0131s\u0131ndan anlaml\u0131 bir sonu\u00e7 vermez. Ge\u00e7erli bir toplam bile \u00fcr\u00fcn da\u011f\u0131l\u0131m\u0131n\u0131n plana uymad\u0131\u011f\u0131n\u0131 gizleyebilir.<\/p>\n\n\n<p>G\u00f6stergenin ad\u0131 tek ba\u015f\u0131na form\u00fcl\u00fc belirlemez. <a href=\"https:\/\/docs.machinemetrics.com\/docs\/product-guides\/schedule-attainment-guide\/\">MachineMetrics\u2019in Plan\u0131 Ger\u00e7ekle\u015ftirme Rehberi<\/a>, planlanan ve ger\u00e7ekle\u015fen zamanlar\u0131 kar\u015f\u0131la\u015ft\u0131r\u0131r; zaman\u0131nda ba\u015flama ve tamamlanmay\u0131 ayr\u0131 ayr\u0131 raporlar. Dolay\u0131s\u0131yla plan\u0131 ger\u00e7ekle\u015ftirme, her zaman yaln\u0131zca miktar\u0131 \u00f6l\u00e7mek anlam\u0131na gelmez. <a href=\"https:\/\/www.supplychain-masters.fr\/indicateur\/taux-de-respect-du-pdp\">Supply Chain Masters\u2019\u0131n PDP uyum tan\u0131m\u0131<\/a>, bir d\u00f6nem i\u00e7inde bitmesi planlanan ve ayn\u0131 d\u00f6nemde tamamlanan \u00fcretim emirlerini sayar. Bu, burada kullan\u0131lan her operasyona \u00f6zg\u00fc biti\u015f zaman\u0131ndan daha geni\u015f bir zaman aral\u0131\u011f\u0131d\u0131r.<\/p>\n\n\n<p><a href=\"https:\/\/www.symestic.com\/en-us\/what-is\/schedule-adherence\">SYMESTIC\u2019in \u00fcretime y\u00f6nelik tan\u0131m\u0131<\/a> miktar, zamanlama ve s\u0131ralamay\u0131 birbirinden ay\u0131r\u0131r. Tamamlanmaya dayal\u0131 form\u00fcl\u00fcm\u00fcz, miktar\u0131n tamam\u0131n\u0131 ve planlanan biti\u015f zaman\u0131n\u0131 kontrol eder; \u00fc\u00e7 boyutu birden kapsayan birle\u015fik bir puan de\u011fildir. Ba\u015fka bir dilde veya sistemde, \u201cplan\u0131 ger\u00e7ekle\u015ftirme\u201d olarak \u00e7evrilen bir etiket, miktar hedefini kar\u015f\u0131lamay\u0131 ifade edebilir. Kullan\u0131lan say\u0131m kural\u0131n\u0131 etiketin yan\u0131nda belirtin.<\/p>\n\n\n<p>Zaman\u0131nda teslimatta referans noktas\u0131 farkl\u0131d\u0131r: M\u00fc\u015fteriyle yap\u0131lan anla\u015fma esas al\u0131n\u0131r. <a href=\"https:\/\/www.apqc.org\/what-we-do\/benchmarking\/open-standards-benchmarking\/measures\/percentage-sales-orders-delivered-time\">APQC, sat\u0131\u015f sipari\u015flerinin teslimat\u0131na ili\u015fkin g\u00f6stergesini<\/a> kararla\u015ft\u0131r\u0131lan zaman aral\u0131\u011f\u0131nda teslimat yap\u0131lmas\u0131na g\u00f6re tan\u0131mlar. \u00dcretimin i\u015fletme i\u00e7inde tamamland\u0131\u011f\u0131n\u0131 g\u00f6steren zaman damgas\u0131, sipari\u015fin m\u00fc\u015fteriye zaman\u0131nda ula\u015ft\u0131\u011f\u0131n\u0131 kan\u0131tlamaz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kay\u0131tl\u0131 bir \u00fcretim plan\u0131na g\u00f6re uyum nas\u0131l hesaplan\u0131r?<\/h2>\n\n\n<p>Kullan\u0131labilir bir hesaplama i\u00e7in tek bir referans plan, a\u00e7\u0131k\u00e7a tan\u0131mlanm\u0131\u015f bir de\u011ferlendirme kapsam\u0131 ve plan\u0131n sat\u0131rlar\u0131yla e\u015fle\u015ftirilmi\u015f ger\u00e7ekle\u015fen sonu\u00e7lar gerekir.<\/p>\n\n\n<p>1. <strong>\u00dcretim sahas\u0131na verilen plan\u0131 kaydedin.<\/strong> De\u011ferlendirilecek i\u015f ba\u015flamadan \u00f6nce plan\u0131n s\u00fcr\u00fcm\u00fcn\u00fc ve yay\u0131mlanma zaman\u0131n\u0131 kayda al\u0131n. Orijinal operasyon ID\u2019lerini, planlanan miktarlar\u0131 ve biti\u015f zamanlar\u0131n\u0131 koruyun. Gerektik\u00e7e y\u00fcr\u00fcrl\u00fckteki \u00fcretim plan\u0131n\u0131 g\u00fcncellemeye devam edin, ancak kar\u015f\u0131la\u015ft\u0131rma i\u00e7in bu referans plan\u0131 saklay\u0131n.<\/p>\n\n\n<p>2. <strong>Say\u0131m birimini ve d\u00f6nemi se\u00e7in.<\/strong> Operasyon, i\u015f emri veya parti birimlerinden hangisini se\u00e7erseniz se\u00e7in, tutarl\u0131 bi\u00e7imde kullan\u0131n. Bu y\u00f6ntemde payda, tamamlanmam\u0131\u015f ve ilerlemesi engellenmi\u015f operasyonlar dahil, raporlama d\u00f6neminde bitmesi planlanan t\u00fcm operasyonlar\u0131n say\u0131s\u0131d\u0131r.<\/p>\n\n\n<p>3. <strong>Hangi ko\u015fullarda eksiksiz ve zaman\u0131nda tamamlanm\u0131\u015f say\u0131laca\u011f\u0131n\u0131 tan\u0131mlay\u0131n.<\/strong> Burada bir operasyon, planlanan miktar\u0131n\u0131n tamam\u0131 kendisi i\u00e7in belirlenen biti\u015f zaman\u0131na kadar kabul edildi\u011finde ko\u015fulu sa\u011flar. Erken tamamlanabilir; ge\u00e7 tamamlanamaz. S\u00fcreciniz hem erken hem ge\u00e7 tamamlanmay\u0131 s\u0131n\u0131rlayan bir zaman aral\u0131\u011f\u0131, ba\u015flang\u0131\u00e7 zaman\u0131 kontrol\u00fc veya s\u0131ralama kural\u0131 gerektiriyorsa bunun yerine o kural\u0131 yaz\u0131l\u0131 olarak belirleyin. Saat dilimini ve varsa tolerans\u0131 \u00f6nceden belirtin.<\/p>\n\n\n<p>4. <strong>Ger\u00e7ekle\u015fen sonucu plandaki her sat\u0131rla e\u015fle\u015ftirin.<\/strong> Kabul edilen miktar\u0131, planlanan miktar\u0131n tamamland\u0131\u011f\u0131 an\u0131n zaman damgas\u0131n\u0131 ve eksik ya da do\u011frulu\u011fu tart\u0131\u015fmal\u0131 kay\u0131tlar\u0131 kayda al\u0131n. Birinin daha sonra veriyi girdi\u011fi zaman\u0131 de\u011fil, \u00fcretimde olay\u0131n ger\u00e7ekle\u015fti\u011fi zaman\u0131 kullan\u0131n. Kalite onay\u0131 tamamlanma ko\u015fulunun bir par\u00e7as\u0131ysa kural\u0131n\u0131z\u0131n gerektirdi\u011fi onay olay\u0131n\u0131 esas al\u0131n.<\/p>\n\n\n<p>5. <strong>Ko\u015fullar\u0131 sa\u011flayan sat\u0131rlar\u0131 say\u0131n ve istisnalar\u0131 raporlay\u0131n.<\/strong> Ko\u015fullar\u0131 sa\u011flayan sat\u0131r say\u0131s\u0131n\u0131, d\u00f6nem i\u00e7inde bitmesi planlanan t\u00fcm sat\u0131rlar\u0131n say\u0131s\u0131na b\u00f6l\u00fcn. Geciken, k\u0131smen tamamlanan, ilerlemesi engellenen ve do\u011frulanmam\u0131\u015f sat\u0131rlar\u0131 nedenleriyle birlikte g\u00f6r\u00fcn\u00fcr tutun. Bitmesi planlanan hi\u00e7bir operasyon yoksa %100 yerine \u201cuygulanamaz\u201d olarak raporlay\u0131n.<\/p>\n\n\n<p>Paydaya yaln\u0131zca tamamlanm\u0131\u015f i\u015fleri dahil etmeyin. Aksi halde, plana g\u00f6re zaman\u0131nda tamamlanmayan i\u015fleri hesaplamadan \u00e7\u0131karm\u0131\u015f olursunuz. Ayn\u0131 \u015fekilde, plan d\u0131\u015f\u0131 bir i\u015f de yararl\u0131 bir \u00fcretim \u00e7\u0131kt\u0131s\u0131 sa\u011fl\u0131yor diye zaman\u0131nda tamamlanmayan planl\u0131 bir operasyonun yerine ge\u00e7emez.<\/p>\n\n\n<p>Pratik bir hesaplama tablosunda plan s\u00fcr\u00fcm\u00fc, operasyon ID, planlanan miktar, planlanan biti\u015f, fiilen kabul edilen miktar, ger\u00e7ekle\u015fen tamamlanma zaman\u0131, ko\u015fulun sa\u011flan\u0131p sa\u011flanmad\u0131\u011f\u0131 ve istisna nedeni i\u00e7in s\u00fctunlar bulunur. Planlanan ve ger\u00e7ekle\u015fen ba\u015flang\u0131\u00e7 zamanlar\u0131n\u0131 yaln\u0131zca ba\u015flang\u0131\u00e7lara uyumu da \u00f6l\u00e7mek istiyorsan\u0131z ekleyin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hesaplama \u00f6rne\u011fi: \u00dcretim miktar\u0131 hedefinde %100, \u00fcretim plan\u0131na uyumda %50<\/h2>\n\n\n<p>Bu, kurgusal bir \u00f6rnektir; m\u00fc\u015fteri verisi veya bir yaz\u0131l\u0131m\u0131n g\u00f6sterge paneli de\u011fildir. \u00dcretim planlama uzman\u0131 Aisha, Paketleme H\u00fccresi 1 i\u00e7in 07:00 plan\u0131n\u0131 yay\u0131mlar. Ben, 07:00\u201315:00 vardiyas\u0131nda d\u00f6rt paketleme operasyonunu belirtilen biti\u015f zamanlar\u0131na kadar tamamlamal\u0131d\u0131r. Her operasyon i\u00e7in ayn\u0131 standart boyutta, ancak farkl\u0131 \u00fcr\u00fcn etiketine sahip 25 paket gerekir; bir sat\u0131rdaki paketler ba\u015fka bir sat\u0131r\u0131n ihtiyac\u0131n\u0131 kar\u015f\u0131layamaz.<\/p>\n\n\n<p>Kar\u015f\u0131la\u015ft\u0131rmada kay\u0131tl\u0131 07:00 plan\u0131 esas al\u0131n\u0131r. Kalite kabul\u00fc zorunludur, erken tamamlanmaya izin verilir ve gecikmeye tolerans tan\u0131nmaz. Son kay\u0131t kontrol\u00fc 15:00\u2019te yap\u0131l\u0131r.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Operasyon<\/th><th>Planlanan paket say\u0131s\u0131<\/th><th>Planlanan biti\u015f<\/th><th>Kendi biti\u015f zaman\u0131na kadar kabul edilen<\/th><th>15:00\u2019e kadar kabul edilen<\/th><th>Miktar\u0131n tamam\u0131 zaman\u0131nda m\u0131?<\/th><\/tr><\/thead><tbody><tr><td>A: A etiketi<\/td><td>25<\/td><td>09:00<\/td><td>25<\/td><td>25<\/td><td>Evet<\/td><\/tr><tr><td>B: B etiketi<\/td><td>25<\/td><td>11:00<\/td><td>30<\/td><td>30<\/td><td>Evet<\/td><\/tr><tr><td>C: C etiketi<\/td><td>25<\/td><td>13:00<\/td><td>20<\/td><td>25<\/td><td>Hay\u0131r: Gecikti<\/td><\/tr><tr><td>D: D etiketi<\/td><td>25<\/td><td>15:00<\/td><td>20<\/td><td>20<\/td><td>Hay\u0131r: K\u0131smen tamamland\u0131<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A\u2019da kabul edilen paket say\u0131s\u0131 08:55\u2019te 25\u2019e ula\u015f\u0131r. B\u2019de planlanan 25 pakete 11:00\u2019den \u00f6nce ula\u015f\u0131l\u0131r, ard\u0131ndan kabul edilen be\u015f paket daha \u00fcretilir. C\u2019de 13:00\u2019e kadar yaln\u0131zca 20 paket kabul edilir; kalan be\u015f paket 14:10\u2019da kabul edilir. D i\u00e7in Ben 25 paket \u00fcretir, ancak kalite kontrol g\u00f6revlisi Tess be\u015f paketi inceleme i\u00e7in bekletir. Son kontrol an\u0131nda yaln\u0131zca 20 paket kabul edilmi\u015f oldu\u011fundan D ko\u015fulu sa\u011flamaz.<\/p>\n\n\n<p><strong>Toplam \u00fcretim miktar\u0131 hedefini kar\u015f\u0131lama: Kabul edilen 100 paket \u00f7 planlanan 100 paket \u00d7 100 = %100.<\/strong><\/p>\n\n\n<p><strong>Tamamlanmaya dayal\u0131 \u00fcretim plan\u0131na uyum: Ko\u015fullar\u0131 sa\u011flayan 2 operasyon \u00f7 planlanan 4 operasyon \u00d7 100 = %50.<\/strong><\/p>\n\n\n<p>Her iki hesaplama da belirtilen kurallara g\u00f6re do\u011frudur. Toplam miktarda B\u2019nin fazladan be\u015f paketi, D\u2019nin kabul edilen miktar\u0131ndaki be\u015f paketlik eksi\u011fi dengeler. C\u2019nin ge\u00e7 tamamlanmas\u0131 da vardiya toplam\u0131nda g\u00f6r\u00fcnmez hale gelir. Operasyon baz\u0131ndaki kontrol, her iki sapmay\u0131 da ortaya \u00e7\u0131kar\u0131r.<\/p>\n\n\n<p>15:00\u2019te \u00fcr\u00fcn baz\u0131nda e\u015fle\u015ftirilerek yap\u0131lan bir miktar kontrol\u00fcnde, her sat\u0131r i\u00e7in en fazla planlanan 25 paket hesaba kat\u0131l\u0131rd\u0131. Planlanan 100 paketin 95\u2019inin kar\u015f\u0131land\u0131\u011f\u0131, yani oran\u0131n %95 oldu\u011fu g\u00f6r\u00fcl\u00fcrd\u00fc. Bu kontrol, B\u2019nin D\u2019deki eksi\u011fi gideremedi\u011fini ortaya \u00e7\u0131kar\u0131r; ancak C\u2019nin 13:00 hedefini ka\u00e7\u0131rd\u0131\u011f\u0131n\u0131 yine g\u00f6stermez. Miktar\u0131n ve biti\u015f zaman\u0131n\u0131n planla e\u015fle\u015ftirilmesi farkl\u0131 sorulara yan\u0131t verir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0131smi \u00fcretim, eksik kay\u0131tlar ve plan de\u011fi\u015fiklikleri nas\u0131l ele al\u0131n\u0131r?<\/h2>\n\n\n<p><strong>K\u0131smi tamamlanma.<\/strong> Operasyonlar\u0131n ya tamamen ba\u015far\u0131l\u0131 ya da ba\u015far\u0131s\u0131z say\u0131ld\u0131\u011f\u0131 bu y\u00f6ntemde, 25 paketin 20\u2019sinin kabul edilmi\u015f olmas\u0131 operasyona k\u0131smi ba\u015far\u0131 pay\u0131 kazand\u0131rmaz. Ko\u015fulu sa\u011flamayan sat\u0131r\u0131n yan\u0131nda bu 20 paketi de sa\u011flanan ilerleme olarak g\u00f6sterin. Bunun yerine miktar a\u011f\u0131rl\u0131kl\u0131 bir g\u00f6sterge se\u00e7erseniz ayr\u0131 bir ad verin ve her \u00fcr\u00fcn i\u00e7in fazla \u00fcretimin hesaplamada nas\u0131l s\u0131n\u0131rland\u0131r\u0131laca\u011f\u0131n\u0131 belirtin.<\/p>\n\n\n<p><strong>Hurda, yeniden i\u015fleme ve kalite kontrol\u00fcnde bekleyen \u00fcr\u00fcnler.<\/strong> \u00dczerinde anla\u015f\u0131lm\u0131\u015f tamamlanma kural\u0131n\u0131 kar\u015f\u0131layan \u00fcretimi say\u0131n. Reddedilen par\u00e7alar\u0131 kabul edilmi\u015f \u00fcretim olarak saymay\u0131n; yeniden i\u015flemeden ge\u00e7en ayn\u0131 par\u00e7ay\u0131 da iki kez hesaba katmay\u0131n. Kontrol i\u00e7in bekletilen \u00fcr\u00fcnlerin operasyonun tamamlanmam\u0131\u015f say\u0131lmas\u0131na yol a\u00e7\u0131p a\u00e7mad\u0131\u011f\u0131n\u0131 belirtin; bu \u00f6rnekte a\u00e7ar.<\/p>\n\n\n<p><strong>Eksik ger\u00e7ekle\u015fen \u00fcretim kay\u0131tlar\u0131.<\/strong> Do\u011frulanmam\u0131\u015f bir sat\u0131r paydada kal\u0131r ve ge\u00e7ici sonu\u00e7ta ko\u015fulu sa\u011flam\u0131\u015f say\u0131lmaz. Bunu kan\u0131tlanm\u0131\u015f bir \u00fcretim ba\u015far\u0131s\u0131zl\u0131\u011f\u0131 olarak de\u011fil, do\u011frulanmam\u0131\u015f kay\u0131t olarak i\u015faretleyin. Kayd\u0131 netle\u015ftirin ve izlenebilir bir d\u00fczeltme yay\u0131mlay\u0131n. B\u00f6ylece eksik geri bildirimlerin puan\u0131 fark edilmeden y\u00fckseltmesi \u00f6nlenir.<\/p>\n\n\n<p><strong>\u0130lerlemesi engellenen veya iptal edilen i\u015fler.<\/strong> Malzeme eksikli\u011fi, planl\u0131 bir operasyonu kay\u0131tl\u0131 referans plandan \u00e7\u0131karmaz. Sapmay\u0131 ve nedenini kaydedin. Yetkili bir iptal karar\u0131 taahh\u00fcd\u00fc de\u011fi\u015ftiriyorsa bu de\u011fi\u015fikli\u011fin kayd\u0131n\u0131 saklay\u0131n. Orijinal sat\u0131r\u0131 sonradan silmek yerine, orijinal planla ve varsa revize planla yap\u0131lan kar\u015f\u0131la\u015ft\u0131rmalar\u0131 ayr\u0131 ayr\u0131 raporlay\u0131n.<\/p>\n\n\n<p><strong>Vardiya s\u0131ras\u0131nda eklenen acil i\u015fler.<\/strong> Bunlar\u0131 plana eklenen i\u015fler olarak kaydedin. Planlanm\u0131\u015f bir operasyonun yerini alsa bile bu, m\u00fc\u015fteri a\u00e7\u0131s\u0131ndan do\u011fru bir karar olabilir. \u0130lk plana g\u00f6re \u00f6l\u00e7\u00fcm yapmak, karar\u0131n mutlaka yanl\u0131\u015f oldu\u011funu varsaymadan de\u011fi\u015fikli\u011fin maliyetini ortaya koyar.<\/p>\n\n\n<p><strong>Yeniden \u00e7izelgeleme.<\/strong> G\u00fcncellenmi\u015f bir \u00e7al\u0131\u015fma plan\u0131, \u00fcretim sahas\u0131n\u0131n de\u011fi\u015fikliklere yan\u0131t vermesini kolayla\u015ft\u0131r\u0131r. Ancak \u00f6nceki taahh\u00fcd\u00fc de\u011ferlendirmek i\u00e7in kullan\u0131lan plan\u0131n \u00fczerine yaz\u0131lmamal\u0131d\u0131r. Aksi takdirde, ka\u00e7\u0131r\u0131lan biti\u015f tarihini fiil\u00ee tamamlanma zaman\u0131ndan sonraya ta\u015f\u0131mak, geciken bir operasyonu zaman\u0131nda tamamlanm\u0131\u015f gibi g\u00f6sterebilir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dcretim plan\u0131na uyum y\u00fczdesini nas\u0131l yorumlamal\u0131s\u0131n\u0131z?<\/h2>\n\n\n<p>D\u00fczeltici bir faaliyet se\u00e7meden \u00f6nce plana uyulmayan sat\u0131rlar\u0131 inceleyin. Malzeme eksikli\u011fi, malzemenin zaman\u0131nda haz\u0131r olup olmad\u0131\u011f\u0131n\u0131 kontrol etmeyi gerektirir. S\u00fcrelerin tekrar tekrar a\u015f\u0131lmas\u0131, operasyon s\u00fcrelerinin veya <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-kapasitesi-planlamasi\/\">kullan\u0131labilir kapasitenin<\/a> g\u00f6zden ge\u00e7irilmesi gerekti\u011fine i\u015faret eder. Kalite nedeniyle bekletilen i\u015fler i\u00e7in kaliteye ili\u015fkin bir karar gerekir. Tamamlanma kay\u0131tlar\u0131 eksikse, sorunu \u00fcretimin y\u00fcr\u00fct\u00fclmesine ba\u011flamadan \u00f6nce verileri kontrol edin.<\/p>\n\n\n<p>Y\u00fczde de\u011feri tek ba\u015f\u0131na bu nedenleri birbirinden ay\u0131ramaz. Bu de\u011ferin yan\u0131nda paydadaki operasyon say\u0131s\u0131n\u0131, plan s\u00fcr\u00fcm\u00fcn\u00fc, \u00f6l\u00e7\u00fcm kural\u0131n\u0131 ve istisnalar\u0131n d\u00f6k\u00fcm\u00fcn\u00fc de g\u00f6sterin. De\u011ferlendirilen operasyon say\u0131s\u0131 az oldu\u011funda, tek bir operasyonun hedefi ka\u00e7\u0131rmas\u0131 bile y\u00fczdeyi \u00f6nemli \u00f6l\u00e7\u00fcde de\u011fi\u015ftirebilir.<\/p>\n\n\n<p>Operasyon say\u0131s\u0131na dayal\u0131 bir \u00f6l\u00e7\u00fcm, k\u0131sa ve uzun operasyonlara e\u015fit a\u011f\u0131rl\u0131k verir. \u0130\u015f y\u00fck\u00fc \u00f6nemliyse, plandaki standart s\u00fcreleri dakika cinsinden a\u011f\u0131rl\u0131k olarak kullanan, ayr\u0131 tan\u0131mlanm\u0131\u015f bir \u00f6l\u00e7\u00fct ekleyin. Tan\u0131mdaki de\u011fi\u015fikli\u011fi kaydetmeden ilk \u00f6l\u00e7\u00fcmdeki operasyon say\u0131s\u0131n\u0131n yerine ba\u015fka bir \u00f6l\u00e7\u00fct koymay\u0131n. Sonu\u00e7 belli olduktan sonra de\u011fi\u015fen fiil\u00ee s\u00fcre a\u015f\u0131mlar\u0131n\u0131 da a\u011f\u0131rl\u0131k olarak kullanmay\u0131n.<\/p>\n\n\n<p>De\u011ferlendirilen operasyon k\u00fcmesi, say\u0131m birimi, son biti\u015f zaman\u0131 kural\u0131 ve kabul politikas\u0131 ayn\u0131 de\u011filse, uygulanabilecek anlaml\u0131 bir evrensel hedef yoktur. De\u011fi\u015fmeyen bir tan\u0131mla kendi ba\u015flang\u0131\u00e7 seviyenizi belirleyin, ard\u0131ndan tekrarlayan sapmalar\u0131n azal\u0131p azalmad\u0131\u011f\u0131n\u0131 kontrol edin. Tolerans\u0131 geni\u015fleterek veya planlanan i\u015f y\u00fck\u00fcn\u00fc azaltarak elde edilen daha y\u00fcksek bir oran, \u00fcretimin daha iyi y\u00fcr\u00fct\u00fcld\u00fc\u011f\u00fcn\u00fc g\u00f6stermez.<\/p>\n\n\n<p>Bir sonraki karar\u0131n\u0131z a\u00e7\u0131s\u0131ndan <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">\u00fcretim \u00e7izelgeleme<\/a>, plan\u0131n uygulanabilir olup olmad\u0131\u011f\u0131n\u0131 ele al\u0131r; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/shop-floor\/\">\u00fcretim sahas\u0131 kontrol\u00fc<\/a> ise i\u015flerin ve istisnalar\u0131n \u00fcretim sahas\u0131 ile \u00fcretim planlama uzman\u0131 aras\u0131nda nas\u0131l aktar\u0131ld\u0131\u011f\u0131na odaklan\u0131r. Bu hesaplama, iki faaliyet aras\u0131nda ba\u011flant\u0131 kuran veriyi sa\u011flar; hi\u00e7birinin yerine ge\u00e7mez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dcretim plan\u0131na uyumu \u00f6l\u00e7mekten plan\u0131 g\u00fcncel tutmaya<\/h2>\n\n\n<p>SkyPlanner, i\u015f istasyonlar\u0131n\u0131, vardiyalar\u0131, operat\u00f6rleri, malzemeleri ve \u00fcretim planlama uzman\u0131n\u0131n belirledi\u011fi \u00f6ncelikleri esas alarak \u00fcretim planlar\u0131n\u0131 hesaplar. Plan\u0131n g\u00fcncellenmesi gerekti\u011finde Arcturus yeniden hesaplama yapar ve sonu\u00e7 Gantt g\u00f6r\u00fcn\u00fcm\u00fcnde g\u00f6sterilir. SkyPlanner, a\u00e7\u0131k REST API \u00fczerinden herhangi bir ERP veya MES ile entegre olur. <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">Demo verileriyle \u00fccretsiz deneme<\/a>, bu \u00fcretim \u00e7izelgeleme i\u015f ak\u0131\u015f\u0131n\u0131 ke\u015ffetmenin bir yoludur.<\/p>\n\n\n<p>Bu rehberdeki \u00e7al\u0131\u015fma sayfas\u0131 ve form\u00fcller, \u00f6l\u00e7\u00fcm \u00f6rnekleridir; \u00fcr\u00fcn\u00fcn burada g\u00f6sterilen uyum panelini i\u00e7erdi\u011fi anlam\u0131na gelmez. \u00d6l\u00e7\u00fcm i\u00e7in kaydetti\u011finiz referans plan\u0131, de\u011fi\u015fikliklere yan\u0131t vermek i\u00e7in kulland\u0131\u011f\u0131n\u0131z g\u00fcncel \u00e7al\u0131\u015fma plan\u0131ndan ayr\u0131 tutun.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dcretim plan\u0131na uyum hakk\u0131nda s\u0131k sorulan sorular<\/h2>\n\n\n<h3 class=\"wp-block-heading\">\u00dcretim plan\u0131na uyum ile \u00fcretim plan\u0131n\u0131 ger\u00e7ekle\u015ftirme oran\u0131 ayn\u0131 \u015fey midir?<\/h3>\n\n\n<p>Her zaman de\u011fil. Baz\u0131 ekipler ger\u00e7ekle\u015ftirme oran\u0131n\u0131, toplam \u00fcretimi hedef miktarla kar\u015f\u0131la\u015ft\u0131rmak i\u00e7in kullan\u0131r; baz\u0131lar\u0131 ise planlanan ve ger\u00e7ekle\u015fen zamanlar\u0131 kar\u015f\u0131la\u015ft\u0131rmak i\u00e7in kullan\u0131r. Oranlar\u0131 kar\u015f\u0131la\u015ft\u0131rmadan \u00f6nce belgelenmi\u015f pay\u0131, payday\u0131, say\u0131m birimini ve zaman kural\u0131n\u0131 kontrol edin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00dcretim plan\u0131na uyum %100&#8217;\u00fc a\u015fabilir mi?<\/h3>\n\n\n<p>Bu rehberdeki operasyon bazl\u0131 form\u00fcl %100&#8217;\u00fc a\u015famaz; \u00e7\u00fcnk\u00fc planlanm\u0131\u015f her operasyon yaln\u0131zca bir kez uyumlu say\u0131labilir. Ger\u00e7ekle\u015fen miktar\u0131n planlanan miktara b\u00f6l\u00fcnd\u00fc\u011f\u00fc ve \u00fcst s\u0131n\u0131r uygulanmayan bir \u00f6l\u00e7\u00fcm ise fazla \u00fcretim nedeniyle %100&#8217;\u00fc a\u015fabilir. Bunlar farkl\u0131 hesaplamalard\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00dcretimin erken tamamlanmas\u0131 plana uyum say\u0131l\u0131r m\u0131?<\/h3>\n\n\n<p>Bu rehberde kullan\u0131lan, son biti\u015f zaman\u0131na kadar tamamlanma kural\u0131na g\u00f6re evet. Belirli bir zaman aral\u0131\u011f\u0131nda veya belirli bir s\u0131rayla tamamlanmay\u0131 gerektiren s\u00fcre\u00e7lerde, erken bitirilen i\u015fler farkl\u0131 de\u011ferlendirilebilir. Oran\u0131 hesaplamadan \u00f6nce bu kural \u00fczerinde anla\u015f\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00dcretim miktar\u0131 hedefinin %100 kar\u015f\u0131lanmas\u0131, planlanan her i\u015fin tamamland\u0131\u011f\u0131 anlam\u0131na gelir mi?<\/h3>\n\n\n<p>Hay\u0131r. Bir i\u015fteki fazla \u00fcretim, toplam miktarda ba\u015fka bir i\u015fteki eksi\u011fi telafi edebilir. Vardiyan\u0131n toplam \u00fcretim miktar\u0131 da daha \u00f6nce hangi i\u015flerin s\u00fcresinde tamamlanmad\u0131\u011f\u0131n\u0131 gizler. Ger\u00e7ekle\u015fen \u00fcretimi planlanan her operasyonla e\u015fle\u015ftirin, ard\u0131ndan o operasyon i\u00e7in belirlenen tamamlanma ve zamanlama kural\u0131n\u0131 uygulay\u0131n.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Is production schedule adherence the same as schedule attainment?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Not consistently. Some teams use attainment for total output versus a quantity target; others use it for planned-versus-actual timing. Check the documented numerator, denominator, counting unit and time rule before comparing figures.\"}},{\"@type\":\"Question\",\"name\":\"Can schedule adherence exceed 100%?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The operation-level formula in this guide cannot exceed 100% because each scheduled operation can pass only once. An uncapped actual-quantity-divided-by-planned-quantity measure can exceed 100% through overproduction. Those are different calculations.\"}},{\"@type\":\"Question\",\"name\":\"Does finishing early count as adherence?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It does under this guide's completion-by-deadline rule. A process requiring completion within a specific time window or in a particular sequence may treat early work differently. Agree on that rule before calculating the score.\"}},{\"@type\":\"Question\",\"name\":\"Does 100% output attainment mean every planned job is complete?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. Extra output on one job can offset a shortage on another in the total, and a shift total hides earlier missed deadlines. Match actual output to each planned operation, then apply its completion and timing rule.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>\u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi \u00dcretim plan\u0131na uyum, ger\u00e7ekle\u015fen i\u015flerin \u00fcretim sahas\u0131na verilen plana ne \u00f6l\u00e7\u00fcde uydu\u011funu g\u00f6sterir. Tamamlanmay\u0131 esas alan bir de\u011ferlendirmede, planlanan biti\u015f zaman\u0131na kadar eksiksiz tamamlanan operasyonlar\u0131n say\u0131s\u0131n\u0131 raporlama d\u00f6neminde bitmesi planlanan t\u00fcm operasyonlar\u0131n say\u0131s\u0131na b\u00f6l\u00fcn ve 100 &#8230; <a title=\"\u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/\" aria-label=\"Read more about \u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97335,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-97296","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00dcretim plan\u0131na uyum: Hesaplama form\u00fcl\u00fc<\/title>\n<meta name=\"description\" content=\"\u00dcretim hedefi tuttu ama planlanan i\u015fler tamamlanmad\u0131 m\u0131? \u00dcretim plan\u0131na uyumu kay\u0131tl\u0131 plana g\u00f6re \u00f6rnek ve a\u00e7\u0131k say\u0131m kurallar\u0131yla hesaplay\u0131n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi\" \/>\n<meta property=\"og:description\" content=\"\u00dcretim hedefi tuttu ama planlanan i\u015fler tamamlanmad\u0131 m\u0131? \u00dcretim plan\u0131na uyumu kay\u0131tl\u0131 plana g\u00f6re \u00f6rnek ve a\u00e7\u0131k say\u0131m kurallar\u0131yla hesaplay\u0131n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-10T08:49:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-10T08:50:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-planina-uyum\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-planina-uyum\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi\",\"datePublished\":\"2026-10-10T08:49:19+00:00\",\"dateModified\":\"2026-10-10T08:50:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-planina-uyum\\\/\"},\"wordCount\":2699,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-planina-uyum\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-adherence-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-planina-uyum\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-planina-uyum\\\/\",\"name\":\"\u00dcretim plan\u0131na uyum: Hesaplama form\u00fcl\u00fc\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-planina-uyum\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-planina-uyum\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-adherence-hero.png\",\"datePublished\":\"2026-10-10T08:49:19+00:00\",\"dateModified\":\"2026-10-10T08:50:40+00:00\",\"description\":\"\u00dcretim hedefi tuttu ama planlanan i\u015fler tamamlanmad\u0131 m\u0131? \u00dcretim plan\u0131na uyumu kay\u0131tl\u0131 plana g\u00f6re \u00f6rnek ve a\u00e7\u0131k say\u0131m kurallar\u0131yla hesaplay\u0131n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-planina-uyum\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-planina-uyum\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-planina-uyum\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-adherence-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-adherence-hero.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-planina-uyum\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00dcretim plan\u0131na uyum: Hesaplama form\u00fcl\u00fc","description":"\u00dcretim hedefi tuttu ama planlanan i\u015fler tamamlanmad\u0131 m\u0131? \u00dcretim plan\u0131na uyumu kay\u0131tl\u0131 plana g\u00f6re \u00f6rnek ve a\u00e7\u0131k say\u0131m kurallar\u0131yla hesaplay\u0131n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/","og_locale":"tr_TR","og_type":"article","og_title":"\u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi","og_description":"\u00dcretim hedefi tuttu ama planlanan i\u015fler tamamlanmad\u0131 m\u0131? \u00dcretim plan\u0131na uyumu kay\u0131tl\u0131 plana g\u00f6re \u00f6rnek ve a\u00e7\u0131k say\u0131m kurallar\u0131yla hesaplay\u0131n.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-10T08:49:19+00:00","article_modified_time":"2026-10-10T08:50:40+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"13 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi","datePublished":"2026-10-10T08:49:19+00:00","dateModified":"2026-10-10T08:50:40+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/"},"wordCount":2699,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","articleSection":["APS &amp; Scheduling","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/","name":"\u00dcretim plan\u0131na uyum: Hesaplama form\u00fcl\u00fc","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","datePublished":"2026-10-10T08:49:19+00:00","dateModified":"2026-10-10T08:50:40+00:00","description":"\u00dcretim hedefi tuttu ama planlanan i\u015fler tamamlanmad\u0131 m\u0131? \u00dcretim plan\u0131na uyumu kay\u0131tl\u0131 plana g\u00f6re \u00f6rnek ve a\u00e7\u0131k say\u0131m kurallar\u0131yla hesaplay\u0131n.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-planina-uyum\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"\u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-adherence-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretim plan\u0131na uyum: Form\u00fcl ve hesaplama \u00f6rne\u011fi \u00dcretim plan\u0131na uyum, ger\u00e7ekle\u015fen i\u015flerin \u00fcretim sahas\u0131na verilen plana ne \u00f6l\u00e7\u00fcde uydu\u011funu g\u00f6sterir. Tamamlanmay\u0131 esas alan bir de\u011ferlendirmede, planlanan biti\u015f zaman\u0131na kadar eksiksiz tamamlanan operasyonlar\u0131n say\u0131s\u0131n\u0131 raporlama d\u00f6neminde bitmesi planlanan t\u00fcm operasyonlar\u0131n say\u0131s\u0131na b\u00f6l\u00fcn ve 100&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/97296","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=97296"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/97296\/revisions"}],"predecessor-version":[{"id":97357,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/97296\/revisions\/97357"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/97335"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=97296"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=97296"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=97296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}