{"id":96600,"date":"2026-10-08T07:53:30","date_gmt":"2026-10-08T07:53:30","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96600"},"modified":"2026-10-19T14:43:24","modified_gmt":"2026-10-19T14:43:24","slug":"siparis-uzerine-uretim","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/","title":{"rendered":"Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri"},"content":{"rendered":"<div class=\"gb-container gb-container-mto01 article-main-content-container\">\n<div class=\"gb-container gb-container-mto01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri<\/h1>\n\n<div class=\"gb-container gb-container-mto02\">\n<div class=\"gb-container gb-container-mto02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<\/div>\n<div class=\"gb-container gb-container-mto03\">\n<div class=\"gb-container gb-container-mto03\">\n\n<p>Bir m\u00fc\u015fteri, nadiren satt\u0131\u011f\u0131n\u0131z bir \u00f6l\u00e7\u00fcde ekipman muhafazas\u0131 sipari\u015f ediyor. \u00dcretime ancak sipari\u015f geldikten sonra ba\u015flamak mant\u0131kl\u0131: b\u00f6ylece depoyu belki de hi\u00e7 al\u0131c\u0131 bulamayacak \u00fcr\u00fcn \u00e7e\u015fitleriyle doldurmuyorsunuz. Ancak m\u00fc\u015fteri yine de bir teslim tarihi istiyor ve son i\u015flem i\u00e7in kullanaca\u011f\u0131n\u0131z kayna\u011f\u0131n kapasitesi zaten dolu.<\/p>\n\n\n<p><strong>Sipari\u015f \u00fczerine \u00fcretimin<\/strong> temel dengesi budur. \u00d6nceden daha az mamul \u00fcretip stoklars\u0131n\u0131z, ancak m\u00fc\u015fteriler sipari\u015fleri \u00fcretimden ge\u00e7erken bekler. Ba\u015far\u0131, yaln\u0131zca neleri \u00fcretebildi\u011finizi de\u011fil, fabrikan\u0131n mevcut kapasitesine hangi i\u015fleri s\u0131\u011fd\u0131rabildi\u011finizi de bilmenize ba\u011fl\u0131d\u0131r.<\/p>\n\n\n<p>SkyPlanner bu dengeyi y\u00f6netmek i\u00e7in pratik bir yol sunar. \u00c7izelgeleme i\u00e7in geli\u015ftirilmi\u015f yapay zek\u00e2s\u0131 Arcturus, kapasitenizi, malzemelerinizi ve \u00f6nceliklerinizi dikkate alarak \u00fcretim s\u0131ras\u0131n\u0131 hesaplar. Ortaya \u00e7\u0131kan plan\u0131 Gantt zaman \u00e7izelgesinde g\u00f6rebilir, \u00f6n\u00fcn\u00fczdeki i\u015fleri daha net de\u011ferlendirerek teslim taahh\u00fcd\u00fcnde bulunabilirsiniz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sipari\u015f \u00fczerine \u00fcretim ne demektir?<\/h2>\n\n\n<p>Sipari\u015f \u00fczerine \u00fcretim (MTO), \u00fcretimin m\u00fc\u015fteri sipari\u015fiyle ba\u015flad\u0131\u011f\u0131 bir \u00fcretim stratejisidir. Tahmin edilen talep i\u00e7in mamul \u00fcretip stoktan satmak yerine, m\u00fc\u015fterinin sipari\u015f etti\u011fi miktarda ve \u00f6zelliklerde \u00fcretim yapars\u0131n\u0131z.<\/p>\n\n\n<p>\u00dcr\u00fcn\u00fcn tek seferlik, yeni bir tasar\u0131m olmas\u0131 gerekmez. \u00dcretici, mevcut bir tasar\u0131m\u0131, \u00fcr\u00fcn a\u011fac\u0131n\u0131 ve \u00fcretim rotas\u0131n\u0131 kullanarak sipari\u015fe g\u00f6re belirli bir \u00f6l\u00e7\u00fcde, belirli y\u00fczey \u00f6zellikleriyle veya belirli bir parti b\u00fcy\u00fckl\u00fc\u011f\u00fcnde \u00fcretim yapabilir. Belirleyici olan, \u00fcr\u00fcn\u00fcn ne kadar benzersiz oldu\u011fu de\u011fil, <strong>\u00fcretimi neyin ba\u015flatt\u0131\u011f\u0131d\u0131r<\/strong>.<\/p>\n\n\n<p>Farkl\u0131 \u00f6l\u00e7\u00fclerde ve y\u00fczey \u00f6zelliklerinde ekipman muhafazalar\u0131 sunan bir sac imalat\u00e7\u0131s\u0131 d\u00fc\u015f\u00fcn\u00fcn. S\u0131k kullan\u0131lan sac malzemeyi stokta tutuyor, ancak muhafazan\u0131n kesim, b\u00fck\u00fcm ve son i\u015flemlerine yaln\u0131zca m\u00fc\u015fteri sipari\u015fini ald\u0131ktan sonra ba\u015fl\u0131yor. MTO tam olarak budur: mamul muhafaza stokta tutulmasa da ham madde stoklanabilir.<\/p>\n\n\n<p>\u00dcretim stratejilerini birbirinden ay\u0131rmak i\u00e7in \u015fu soruyu sormak yararl\u0131d\u0131r: Sipari\u015f geldi\u011finde yap\u0131lacak hangi i\u015fler kalm\u0131\u015ft\u0131r?<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Strateji<\/th><th>M\u00fc\u015fteri sipari\u015fiyle ba\u015flayan i\u015fler<\/th><th>Planlamada temel soru<\/th><\/tr><\/thead><tbody><tr><td>Sto\u011fa \u00fcretim (MTS)<\/td><td>Beklenen talep i\u00e7in \u00fcretilmi\u015f mamul\u00fc stoktan al\u0131p sevk etmek<\/td><td>Hangi mamulleri, ne miktarda stoklamal\u0131y\u0131z?<\/td><\/tr><tr><td><a href=\"\/tr\/kaynaklar\/siparise-gore-montaj\/\">Sipari\u015fe g\u00f6re montaj (ATO)<\/a><\/td><td>Haz\u0131r bile\u015fenleri veya alt montajlar\u0131 kullanarak mamul\u00fcn montaj\u0131n\u0131 yapmak<\/td><td>Gerekli bile\u015fenler ve montaj kapasitesi mevcut mu?<\/td><\/tr><tr><td>Sipari\u015f \u00fczerine \u00fcretim (MTO)<\/td><td>Mevcut tasar\u0131m ve rotay\u0131 kullanarak sipari\u015f edilen \u00fcr\u00fcn\u00fc \u00fcretmek<\/td><td>Gerekli operasyonlara \u00fcretim \u00e7izelgesinde ne zaman yer a\u00e7\u0131labilir?<\/td><\/tr><tr><td><a href=\"\/tr\/kaynaklar\/siparise-ozel-tasarim-ve-uretim\/\">Sipari\u015fe \u00f6zel tasar\u0131m ve \u00fcretim (ETO)<\/a><\/td><td>\u00dcr\u00fcn\u00fcn tasar\u0131m\u0131n\u0131 veya m\u00fchendislik \u00e7al\u0131\u015fmalar\u0131n\u0131 tamamlay\u0131p ard\u0131ndan \u00fcretmek<\/td><td>Tasar\u0131m ne zaman haz\u0131r olacak ve hangi i\u015fleri gerektirecek?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>MTO, at\u00f6lye tipi \u00fcretimden de farkl\u0131d\u0131r. MTO, sipari\u015fin \u00fcretimi ba\u015flatmadaki rol\u00fcn\u00fc tan\u0131mlar; at\u00f6lye tipi \u00fcretim ise i\u015flerin ortak kaynaklardan farkl\u0131 rotalar izleyerek ge\u00e7ebildi\u011fi bir \u00fcretim ortam\u0131n\u0131 anlat\u0131r. Bir fabrika her iki modele de uyabilir. <a href=\"\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/\">At\u00f6lye tipi \u00e7izelgeleme rehberimiz<\/a>, farkl\u0131 rotalar\u0131 planlaman\u0131n getirdi\u011fi bu zorlu\u011fu ele al\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sipari\u015f \u00fczerine \u00fcretim ne zaman do\u011fru se\u00e7imdir?<\/h2>\n\n\n<p>Her \u00fcr\u00fcn \u00e7e\u015fidini mamul olarak stoklamak maliyetliyse, \u00e7e\u015fitlere y\u00f6nelik talep d\u00fczensizse ve m\u00fc\u015fteriler \u00fcretimi beklemeye raz\u0131ysa MTO cazip bir se\u00e7enektir. Olas\u0131 her \u00fcr\u00fcn\u00fc \u00f6nceden \u00fcretmeden daha geni\u015f bir \u00fcr\u00fcn yelpazesi sunman\u0131z\u0131 sa\u011flar.<\/p>\n\n\n<p>Fayda en belirgin bi\u00e7imde mamul stokunda g\u00f6r\u00fcl\u00fcr: \u00fcr\u00fcn karmas\u0131n\u0131 yanl\u0131\u015f tahmin etti\u011finiz i\u00e7in sat\u0131lmadan bekleyen \u00fcr\u00fcnler azal\u0131r. Yap\u0131lan i\u015f ger\u00e7ek bir m\u00fc\u015fteri sipari\u015fine dayan\u0131r; gerekli \u00f6l\u00e7\u00fcler, malzeme veya y\u00fczey \u00f6zellikleri sipari\u015fte belirtilebilir.<\/p>\n\n\n<p>Bunun kar\u015f\u0131l\u0131\u011f\u0131nda lead time uzar. MTS modelinde \u00fcr\u00fcn sevke haz\u0131r olabilir. MTO modelinde ise m\u00fc\u015fterinin bekleme s\u00fcresine hem imalat hem de operasyonlar aras\u0131ndaki kuyruklar d\u00e2hildir. Sipari\u015flerin geli\u015f zaman\u0131 i\u015f y\u00fck\u00fcn\u00fc de dengesizle\u015ftirebilir: sakin bir haftan\u0131n ard\u0131ndan ayn\u0131 kayna\u011f\u0131 kullanmak isteyen birka\u00e7 sipari\u015f gelebilir.<\/p>\n\n\n<p><strong>Sipari\u015f \u00fczerine \u00fcretim (MTO), s\u0131f\u0131r stok veya kendili\u011finden daha d\u00fc\u015f\u00fck toplam maliyet anlam\u0131na gelmez.<\/strong> Yine de ham maddeye, sat\u0131n al\u0131nan par\u00e7alara ve yar\u0131 mamul stoklar\u0131na ihtiya\u00e7 duyabilirsiniz. K\u00fc\u00e7\u00fck partiler, s\u0131k makine haz\u0131rl\u0131\u011f\u0131 gerektirebilir. M\u00fc\u015fteriler \u00fcr\u00fcn\u00fcn hemen sevk edilmesini istiyor ve d\u00fczenli olarak ayn\u0131 standart \u00fcr\u00fcn\u00fc sat\u0131n al\u0131yorsa, <a href=\"\/tr\/kaynaklar\/stoga-uretim\/\">bu \u00fcr\u00fcn i\u00e7in sto\u011fa \u00fcretim yapmak<\/a> daha uygun olabilir.<\/p>\n\n\n<p>T\u00fcm fabrikay\u0131 tek bir modele uymaya zorlaman\u0131z gerekmez. Standart \u00fcr\u00fcnler stoklan\u0131rken talebi daha az \u00f6ng\u00f6r\u00fclebilen \u00e7e\u015fitler sipari\u015f \u00fczerine \u00fcretilebilir. <a href=\"\/tr\/kaynaklar\/ana-uretim-programi\/\">Ana \u00fcretim \u00e7izelgesi<\/a>, bu daha geni\u015f \u00fcr\u00fcn karmas\u0131 ile \u00fcretimde tamamlanmas\u0131 gereken i\u015fler aras\u0131nda ba\u011flant\u0131 kurman\u0131za yard\u0131mc\u0131 olur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sipari\u015fe yaln\u0131zca termin vermek yetmez, \u00e7izelgede de yer a\u00e7mak gerekir<\/h2>\n\n\n<p>\u00d6rne\u011fimizdeki muhafaza \u00fcreticisine d\u00f6nelim. Yeni sipari\u015f i\u00e7in kesim, b\u00fck\u00fcm ve son i\u015flemler gerekiyor. Malzeme haz\u0131r ve kesimde bo\u015f kapasite var; bu y\u00fczden sat\u0131\u015f ekibi k\u0131sa s\u00fcrede teslim s\u00f6z\u00fc vermeye e\u011filimli. Ancak son i\u015flem kapasitesi zaten di\u011fer m\u00fc\u015fterilerin i\u015flerine ayr\u0131lm\u0131\u015f durumda.<\/p>\n\n\n<p>Kesime hemen ba\u015flamak bu \u00e7ak\u0131\u015fmay\u0131 ortadan kald\u0131rmaz. Yaln\u0131zca son i\u015flem bekleyen par\u00e7alara bir yenisini ekleyebilir. As\u0131l sorulmas\u0131 gereken, daha \u00f6nce teslim s\u00f6z\u00fc verdi\u011finiz sipari\u015flerle birlikte <strong>rotadaki t\u00fcm operasyonlar\u0131n<\/strong> zaman\u0131nda tamamlan\u0131p tamamlanamayaca\u011f\u0131d\u0131r.<\/p>\n\n\n<p>Her yeni sipari\u015f i\u00e7in \u015fu bilgileri bir araya getirin:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Yap\u0131lacak i\u015fler:<\/strong> do\u011fru \u00fcr\u00fcn \u00f6zellikleri, miktar, operasyon s\u0131ras\u0131, i\u015flem s\u00fcreleri ve haz\u0131rl\u0131k s\u00fcreleri.<\/li><li><strong>\u0130\u015fi yapabilecek kaynaklar:<\/strong> uygun i\u015f merkezleri, \u00e7al\u0131\u015fma vardiyalar\u0131, operat\u00f6rler ve gerekli tak\u0131mlar.<\/li><li><strong>Malzemenin haz\u0131r olma durumu:<\/strong> mevcut stok ve sat\u0131n al\u0131nan malzeme veya bile\u015fenlerin beklenen kullan\u0131labilirlik tarihleri.<\/li><li><strong>Mevcut taahh\u00fctler:<\/strong> ayn\u0131 kaynaklar\u0131 kullanmay\u0131 bekleyen operasyonlar ve bunlar\u0131n \u00f6ncelikleri.<\/li><li><strong>Teslimat i\u00e7in gereken s\u00fcre:<\/strong> kalan \u00fcretim ad\u0131mlar\u0131, kontrol, paketleme ve gerekti\u011finde nakliye i\u00e7in ayr\u0131lacak zaman.<\/li><\/ul>\n\n\n<p><a href=\"\/tr\/kaynaklar\/uretim-emri\/\">\u00dcretim emri<\/a>, i\u015fin y\u00fcr\u00fct\u00fclmesi i\u00e7in gereken ayr\u0131nt\u0131lar\u0131 i\u00e7erir. <a href=\"\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">\u00dcretim \u00e7izelgeleme<\/a> ise bu i\u015fin mevcut zaman dilimlerinde ne zaman yap\u0131laca\u011f\u0131n\u0131 belirler. Talep edilen teslim tarihi tek ba\u015f\u0131na bunlar\u0131n hi\u00e7birini sa\u011flamaz.<\/p>\n\n\n<p>Talep edilen tarih \u00e7izelgeye uymuyorsa bir karar vermeniz gerekir. \u0130\u015fe uygun alternatif bir i\u015f merkezi, vardiya de\u011fi\u015fikli\u011fi veya farkl\u0131 bir \u00f6ncelik s\u0131ras\u0131 \u00e7\u00f6z\u00fcm olabilir. Bunlar yeterli de\u011filse, m\u00fc\u015fteri yerine getirilemeyecek bir s\u00f6ze g\u00fcvenmeden \u00f6nce daha ileri bir tarih \u00fczerinde anla\u015f\u0131n. Ortak kullan\u0131lan bir operasyon teslimatlar\u0131 tekrar tekrar geciktiriyorsa, kuyru\u011funa daha fazla i\u015f eklemek yerine <a href=\"\/tr\/kaynaklar\/darbogaz-analizi\/\">\u00fcretimdeki darbo\u011faz\u0131<\/a> inceleyin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00d6ncelikleri siz belirleyin, plan\u0131 SkyPlanner hesaplas\u0131n<\/h2>\n\n\n<p>Zor olan, bu bilgileri bir kez kontrol etmek de\u011fildir. Yeni sipari\u015fler gelirken, malzeme tarihleri de\u011fi\u015firken ve \u00fcretim planlanandan uzun s\u00fcrerken bilgilerin birbiriyle ba\u011flant\u0131s\u0131n\u0131 korumakt\u0131r. Her i\u015fi makine kuyruklar\u0131 aras\u0131nda elle ta\u015f\u0131mak, planlama uzman\u0131n\u0131 karar vermenin yan\u0131 s\u0131ra hesaplamalar\u0131 g\u00fcncel tutmaktan da sorumlu k\u0131lar.<\/p>\n\n\n<p><a href=\"\/tr\/\">SkyPlanner APS<\/a> bu \u00e7izelgeleme hesaplamas\u0131n\u0131 \u00fcstlenir. \u0130\u015f merkezlerini, vardiyalar\u0131, operat\u00f6rleri, malzemeleri ve \u00f6ncelikleri siz tan\u0131mlar; her \u00fcr\u00fcn\u00fcn i\u015flem ad\u0131mlar\u0131n\u0131 ve s\u00fcrelerini belirtirsiniz. Arcturus, tan\u0131mlanan kapasite ve ba\u011f\u0131ml\u0131l\u0131klara g\u00f6re i\u015fleri \u00e7izelgeler. Gantt g\u00f6r\u00fcn\u00fcm\u00fc i\u015f merkezlerindeki s\u0131ralamay\u0131 bir arada g\u00f6sterir. B\u00f6ylece ayr\u0131 ayr\u0131 kuyruklar\u0131 kontrol etmek yerine muhafazay\u0131 kesimden son i\u015fleme kadar takip edebilirsiniz.<\/p>\n\n\n<p>Muhafaza \u00f6rne\u011finde bu, son i\u015flem y\u00fck\u00fcn\u00fcn en ba\u015f\u0131ndan plana d\u00e2hil edilmesi demektir. Acil bir sipari\u015f \u00f6ne al\u0131nacaksa \u00f6nceli\u011fi de\u011fi\u015ftirir ve \u00e7izelgeyi yeniden hesaplat\u0131rs\u0131n\u0131z. Ard\u0131ndan, yeni teslim taahh\u00fcd\u00fcn\u00fc onaylamadan \u00f6nce di\u011fer sipari\u015flerin art\u0131k ne zaman tamamlanaca\u011f\u0131n\u0131 incelersiniz. Fayda, yaln\u0131zca bir m\u00fc\u015fteriye daha h\u0131zl\u0131 yan\u0131t vermekle s\u0131n\u0131rl\u0131 de\u011fildir: bu yan\u0131t\u0131n h\u00e2lihaz\u0131rda bekleyen m\u00fc\u015fteriler i\u00e7in ne anlama geldi\u011fini de g\u00f6rebilirsiniz.<\/p>\n\n\n<p>Malzeme kullan\u0131labilirli\u011fini dikkate alan \u00e7izelgeleme, MTO&#8217;da s\u0131k ya\u015fanan bir ba\u015fka sorunu da ayn\u0131 hesaplamaya d\u00e2hil eder. Bu kural etkinle\u015ftirildi\u011finde Arcturus, her kalem haz\u0131rm\u0131\u015f gibi plan yapmak yerine malzemenin kullan\u0131labilirli\u011fini dikkate al\u0131r. Sat\u0131n alma sipari\u015flerindeki teslim tarihleri beklenen kullan\u0131labilirli\u011fi g\u00f6sterir; malzemenin teslim al\u0131nd\u0131\u011f\u0131n\u0131 onaylamak ise stoku g\u00fcnceller. Tedarik\u00e7i gecikmesi s\u0131rada hangi i\u015fin yap\u0131labilece\u011fini de\u011fi\u015ftirdi\u011finde, bu tarihlerin g\u00fcncel tutulmas\u0131 \u00f6nem ta\u015f\u0131r.<\/p>\n\n\n<p>\u00d6ncelikler sizin kontrol\u00fcn\u00fczde kal\u0131r; \u00e7izelgeleme kararlar\u0131n\u0131z\u0131 korumak i\u00e7in kilitleri kullan\u0131rs\u0131n\u0131z. Arcturus hesaplamay\u0131 bu talimatlar \u00e7er\u00e7evesinde yapar. Eksik fiziksel kapasiteyi yaratamaz, ancak plan\u0131 m\u0131 yoksa teslim taahh\u00fcd\u00fcn\u00fc m\u00fc de\u011fi\u015ftirece\u011finize karar vermeniz i\u00e7in daha net bir dayanak sunabilir.<\/p>\n\n\n<p>SkyPlanner, a\u00e7\u0131k REST API \u00fczerinden her t\u00fcrl\u00fc ERP veya MES ile entegre olur. Daha iyi MTO planlamas\u0131na ba\u015flamak i\u00e7in ERP&#8217;yi de\u011fi\u015ftirmek zorunda kalmadan mevcut sipari\u015f ve \u00fcretim verilerinizi \u00e7izelgeye ba\u011flayabilirsiniz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kapasitenin g\u00f6r\u00fcn\u00fcr olmas\u0131 Fredman Operations&#8217;ta neleri de\u011fi\u015ftirdi?<\/h2>\n\n\n<p>G\u0131da temas\u0131na uygun mutfak ve ambalaj \u00e7\u00f6z\u00fcmleri \u00fcreten Fredman Operations, sipari\u015f hacmi b\u00fcy\u00fcd\u00fck\u00e7e kapasitesini daha net g\u00f6rmeye ihtiya\u00e7 duydu. \u0130\u015f kartlar\u0131 L7 ERP sisteminden LTR \u00fcretim y\u00f6netimi sistemine elle aktar\u0131l\u0131yor, planlama uzman\u0131 makinelerin ne zaman bo\u015falaca\u011f\u0131n\u0131 veya vardiya kapasitesini tam olarak g\u00f6remeden i\u015fleri \u00f6nceliklendiriyordu. Acil durumlarda \u00e7izelgeyi yeniden d\u00fczenlemek bir saat veya daha uzun s\u00fcrebiliyordu.<\/p>\n\n\n<p>\u015eirket, ortak Gantt g\u00f6r\u00fcn\u00fcm\u00fcn\u00fcn sa\u011flad\u0131\u011f\u0131 netlik nedeniyle SkyPlanner&#8217;\u0131 se\u00e7ti ve L7 ile LTR sistemlerini birbirine ba\u011flad\u0131. Makineler, bo\u015f ve ayr\u0131lm\u0131\u015f kapasite ile i\u015flerin ilerleme durumu ayn\u0131 g\u00f6r\u00fcn\u00fcmde izlenebilir h\u00e2le geldi. \u00dcretim \u00e7al\u0131\u015fanlar\u0131 planlanan ba\u015flang\u0131\u00e7 ve biti\u015f saatlerini g\u00f6rebilirken sat\u0131\u015f ekibi de teslim taahh\u00fctleri i\u00e7in daha sa\u011flam bir dayanak elde etti.<\/p>\n\n\n<p>Fredman&#8217;\u0131n m\u00fc\u015fteri hik\u00e2yesinde fazla mesainin azald\u0131\u011f\u0131 ve \u00e7izelge de\u011fi\u015fikliklerine daha h\u0131zl\u0131 yan\u0131t verildi\u011fi belirtiliyor. MTO ile \u00e7al\u0131\u015fan bir \u00fcretici i\u00e7in buradaki ders, \u00fcretim ile sat\u0131\u015f aras\u0131ndaki ba\u011flant\u0131d\u0131r: herkes teslim s\u00f6z\u00fcn\u00fcn arkas\u0131ndaki kapasiteyi g\u00f6rebildi\u011finde, o s\u00f6z\u00fc gerek\u00e7elendirmek daha kolayd\u0131r. <a href=\"\/tr\/musteri-hikayeleri\/fredman-operations\/\">Fredman Operations m\u00fc\u015fteri hik\u00e2yesini okuyun<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bir sonraki sipari\u015finizin \u00e7izelgeye nas\u0131l s\u0131\u011faca\u011f\u0131n\u0131 g\u00f6r\u00fcn<\/h2>\n\n\n<p>Sipari\u015f \u00fczerine \u00fcretim, yanl\u0131\u015f mamulleri stoklamaktan ka\u00e7\u0131nman\u0131za yard\u0131mc\u0131 olur. Uygulanabilir bir \u00e7izelge ise stok sorununu \u00e7\u00f6zerken gecikmi\u015f m\u00fc\u015fteri sipari\u015flerinin birikmesi gibi yeni bir sorun yaratmaman\u0131za yard\u0131mc\u0131 olur.<\/p>\n\n\n<p>SkyPlanner ile \u00fcretiminizin nas\u0131l planlanabilece\u011fini g\u00f6rmek i\u00e7in <a href=\"\/tr\/iletisim-satis\/\">demo randevusu al\u0131n<\/a>. G\u00f6r\u00fc\u015fmeye tipik bir sipari\u015fin \u00fcretim rotas\u0131n\u0131, sipari\u015flerin \u00e7o\u011funun ayn\u0131 anda ihtiya\u00e7 duydu\u011fu kayna\u011f\u0131 ve yak\u0131n zamanda teslimat tarihlerini aksatan bir de\u011fi\u015fiklik \u00f6rne\u011fini getirin. Bu bilgiler, Arcturus ve Gantt \u00e7izelgesinin g\u00fcnl\u00fck planlama i\u015flerinizi nas\u0131l kolayla\u015ft\u0131rabilece\u011fini g\u00f6stermek i\u00e7in iyi bir ba\u015flang\u0131\u00e7 noktas\u0131 sa\u011flar.<\/p>\n\n\n<p>\u00d6nce kendiniz incelemek mi istersiniz? <a href=\"\/tr\/deneme\/\">SkyPlanner\u2019\u0131 demo verileriyle deneyin<\/a>; sipari\u015flerin ve kapasitenin \u00e7izelgede nas\u0131l bir araya geldi\u011fini g\u00f6r\u00fcn.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u0131k\u00e7a sorulan sorular<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Sipari\u015f \u00fczerine \u00fcretimde her \u00fcr\u00fcn\u00fcn \u00f6zel olarak tasarlanmas\u0131 m\u0131 gerekir?<\/h3>\n\n\n<p>Hay\u0131r. MTO kapsam\u0131nda bir \u00fcr\u00fcn, mevcut bir tasar\u0131m ve \u00fcretim rotas\u0131 kullan\u0131larak \u00fcretilebilir; \u00fcretim ancak m\u00fc\u015fteri sipari\u015f verdikten sonra ba\u015flar. Sipari\u015f ayn\u0131 zamanda yeni bir \u00fcr\u00fcn i\u00e7in m\u00fchendislik \u00e7al\u0131\u015fmalar\u0131n\u0131 da ba\u015flat\u0131yorsa, bu modeli sipari\u015fe g\u00f6re m\u00fchendislik olarak tan\u0131mlamak daha uygundur.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sipari\u015f \u00fczerine \u00fcretim yapan bir i\u015fletme malzeme stoku tutabilir mi?<\/h3>\n\n\n<p>Evet. MTO, \u00fcretimin ne zaman ba\u015flad\u0131\u011f\u0131n\u0131 tan\u0131mlar; stok tutmay\u0131 yasaklamaz. \u00dcretime daha erken ba\u015flayabilmek i\u00e7in ortak kullan\u0131lan ham maddeler ve sat\u0131n al\u0131nan par\u00e7alar stokta tutulabilir. Bitmi\u015f \u00fcr\u00fcn, tahmin edilen bitmi\u015f \u00fcr\u00fcn talebini kar\u015f\u0131lamak i\u00e7in de\u011fil, bir m\u00fc\u015fteri sipari\u015fi i\u00e7in \u00fcretilir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sipari\u015f \u00fczerine \u00fcretimde teslimat tarihleri neden de\u011fi\u015febilir?<\/h3>\n\n\n<p>Sipari\u015fler ayn\u0131 kaynaklar\u0131 kullan\u0131r. Malzeme gecikmesi, kapasite kayb\u0131 veya \u00f6ncelik de\u011fi\u015fikli\u011fi bir operasyonun zaman\u0131n\u0131 kayd\u0131rarak sonraki i\u015fleri etkileyebilir. \u00c7izelgenin yeniden hesaplanmas\u0131 bu etkileri g\u00f6r\u00fcn\u00fcr k\u0131lar; b\u00f6ylece planlamac\u0131 gerekli ad\u0131mlar\u0131 atabilir ve gerekti\u011finde taahh\u00fct edilen teslimat tarihlerini g\u00fcncelleyebilir.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Does make to order mean every product is custom-designed?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. An MTO product can use an established design and production route, with manufacturing starting only after the customer places an order. If that order also triggers new product engineering, engineer to order is the more appropriate description.\"}},{\"@type\":\"Question\",\"name\":\"Can a make-to-order manufacturer keep materials in stock?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. MTO describes when manufacturing is triggered, not a ban on inventory. Common raw materials and purchased parts can be stocked so production can start sooner. The finished product is made for a customer order rather than for forecast finished-goods demand.\"}},{\"@type\":\"Question\",\"name\":\"Why can make-to-order delivery dates change?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Orders share resources. A material delay, lost capacity or priority change can move an operation and affect later work. Recalculating the schedule makes those consequences visible so the planner can respond and update commitments when needed.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri Ana Sayfa &raquo; Kaynaklar &raquo; Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri Bir m\u00fc\u015fteri, nadiren satt\u0131\u011f\u0131n\u0131z bir \u00f6l\u00e7\u00fcde ekipman muhafazas\u0131 sipari\u015f ediyor. \u00dcretime ancak sipari\u015f geldikten sonra ba\u015flamak mant\u0131kl\u0131: b\u00f6ylece depoyu belki de hi\u00e7 al\u0131c\u0131 bulamayacak \u00fcr\u00fcn \u00e7e\u015fitleriyle doldurmuyorsunuz. Ancak &#8230; <a title=\"Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/\" aria-label=\"Read more about Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97068,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-96600","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ve-cizelgeleme","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sipari\u015f \u00fczerine \u00fcretim: az stok, g\u00fcvenilir termin &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Sipari\u015f \u00fczerine \u00fcretim mamul stokunu azalt\u0131r; her sipari\u015fe ger\u00e7ek\u00e7i termin gerekir. SkyPlanner&#039;\u0131n sipari\u015fleri nas\u0131l uygulanabilir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcrd\u00fc\u011f\u00fcn\u00fc g\u00f6r\u00fcn.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri\" \/>\n<meta property=\"og:description\" content=\"Sipari\u015f \u00fczerine \u00fcretim mamul stokunu azalt\u0131r; her sipari\u015fe ger\u00e7ek\u00e7i termin gerekir. SkyPlanner&#039;\u0131n sipari\u015fleri nas\u0131l uygulanabilir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcrd\u00fc\u011f\u00fcn\u00fc g\u00f6r\u00fcn.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:53:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparis-uzerine-uretim\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparis-uzerine-uretim\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-19T14:43:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparis-uzerine-uretim\\\/\"},\"wordCount\":2201,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparis-uzerine-uretim\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"articleSection\":[\"APS ve \u00e7izelgeleme\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparis-uzerine-uretim\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparis-uzerine-uretim\\\/\",\"name\":\"Sipari\u015f \u00fczerine \u00fcretim: az stok, g\u00fcvenilir termin &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparis-uzerine-uretim\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparis-uzerine-uretim\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-19T14:43:24+00:00\",\"description\":\"Sipari\u015f \u00fczerine \u00fcretim mamul stokunu azalt\u0131r; her sipari\u015fe ger\u00e7ek\u00e7i termin gerekir. SkyPlanner'\u0131n sipari\u015fleri nas\u0131l uygulanabilir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcrd\u00fc\u011f\u00fcn\u00fc g\u00f6r\u00fcn.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparis-uzerine-uretim\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparis-uzerine-uretim\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparis-uzerine-uretim\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"One custom housing waits while another occupies the finishing resource needed to complete both orders.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/siparis-uzerine-uretim\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sipari\u015f \u00fczerine \u00fcretim: az stok, g\u00fcvenilir termin &#8211; SkyPlanner","description":"Sipari\u015f \u00fczerine \u00fcretim mamul stokunu azalt\u0131r; her sipari\u015fe ger\u00e7ek\u00e7i termin gerekir. SkyPlanner'\u0131n sipari\u015fleri nas\u0131l uygulanabilir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcrd\u00fc\u011f\u00fcn\u00fc g\u00f6r\u00fcn.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/","og_locale":"tr_TR","og_type":"article","og_title":"Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri","og_description":"Sipari\u015f \u00fczerine \u00fcretim mamul stokunu azalt\u0131r; her sipari\u015fe ger\u00e7ek\u00e7i termin gerekir. SkyPlanner'\u0131n sipari\u015fleri nas\u0131l uygulanabilir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcrd\u00fc\u011f\u00fcn\u00fc g\u00f6r\u00fcn.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:53:30+00:00","article_modified_time":"2026-10-19T14:43:24+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"11 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-19T14:43:24+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/"},"wordCount":2201,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","articleSection":["APS ve \u00e7izelgeleme","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/","name":"Sipari\u015f \u00fczerine \u00fcretim: az stok, g\u00fcvenilir termin &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-19T14:43:24+00:00","description":"Sipari\u015f \u00fczerine \u00fcretim mamul stokunu azalt\u0131r; her sipari\u015fe ger\u00e7ek\u00e7i termin gerekir. SkyPlanner'\u0131n sipari\u015fleri nas\u0131l uygulanabilir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcrd\u00fc\u011f\u00fcn\u00fc g\u00f6r\u00fcn.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","width":1672,"height":941,"caption":"One custom housing waits while another occupies the finishing resource needed to complete both orders."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/siparis-uzerine-uretim\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri Ana Sayfa &raquo; Kaynaklar &raquo; Sipari\u015f \u00fczerine \u00fcretim: daha az mamul stoku, daha ger\u00e7ek\u00e7i teslim taahh\u00fctleri Bir m\u00fc\u015fteri, nadiren satt\u0131\u011f\u0131n\u0131z bir \u00f6l\u00e7\u00fcde ekipman muhafazas\u0131 sipari\u015f ediyor. \u00dcretime ancak sipari\u015f geldikten sonra ba\u015flamak mant\u0131kl\u0131: b\u00f6ylece depoyu belki de hi\u00e7 al\u0131c\u0131 bulamayacak \u00fcr\u00fcn \u00e7e\u015fitleriyle doldurmuyorsunuz. Ancak&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96600","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=96600"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96600\/revisions"}],"predecessor-version":[{"id":96919,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96600\/revisions\/96919"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/97068"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=96600"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=96600"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=96600"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}