{"id":96571,"date":"2026-10-08T07:20:14","date_gmt":"2026-10-08T07:20:14","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96571"},"modified":"2026-10-19T14:43:17","modified_gmt":"2026-10-19T14:43:17","slug":"smed","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/","title":{"rendered":"SMED: Daha K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Daha Fazla Zaman"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">SMED: Daha K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Daha Fazla Zaman<\/h1>\n\n\n<p>S\u0131radaki sipari\u015f haz\u0131r, ama makine hen\u00fcz haz\u0131r de\u011fil. Operat\u00f6r\u00fcn uygun tak\u0131mlar\u0131 getirmesi, ayarlar\u0131n kontrol edilmesi ve ilk par\u00e7alar\u0131n onaylanmas\u0131 gerekiyor. Bunlar yap\u0131l\u0131rken s\u0131radaki i\u015fler beklemeye devam ediyor.<\/p>\n\n\n<p>Uzun tip de\u011fi\u015fimi s\u00fcreleri, her \u00e7izelgeleme karar\u0131n\u0131n maliyetini art\u0131r\u0131r. Teslim tarihini kar\u015f\u0131lamak i\u00e7in ba\u015fka bir \u00fcr\u00fcne ge\u00e7ti\u011finizde \u00fcretim s\u00fcresinden kaybedersiniz. Mevcut ayarlarla \u00fcretime daha uzun s\u00fcre devam etti\u011finizde ise daha acil bir sipari\u015f beklerken hen\u00fcz ihtiya\u00e7 duyulmayan par\u00e7alar \u00fcretebilirsiniz. <a href=\"\/tr\/kaynaklar\/parti-tipi-uretim\/\">Parti tipi \u00fcretimde<\/a> bu ikilem, hem parti miktar\u0131n\u0131 hem de \u00fcretim s\u0131ras\u0131n\u0131 belirler.<\/p>\n\n\n<p>SMED, tip de\u011fi\u015fimi s\u00fcresini k\u0131saltarak bu ikilemden \u00e7\u0131kman\u0131za yard\u0131mc\u0131 olur. SkyPlanner ise kazand\u0131\u011f\u0131n\u0131z zaman\u0131 de\u011ferlendirmenizi sa\u011flar: Haz\u0131rl\u0131k s\u00fcrelerini dikkate alan \u00e7izelgeleme \u00f6zelli\u011fi, teslimat \u00f6nceliklerini de hesaba katarak birbiriyle uyumlu i\u015fleri grupland\u0131rabilir. \u0130kisi birlikte, hangi sipari\u015fleri \u00f6nce \u00fcretece\u011finizi m\u00fc\u015fterilerinizin ger\u00e7ek ihtiya\u00e7lar\u0131na g\u00f6re belirleme konusunda size daha fazla esneklik sunar. Daha k\u0131sa haz\u0131rl\u0131k s\u00fcreleri, <a href=\"\/tr\/kaynaklar\/heijunka\/\">\u00fcretim dengeleme<\/a> kapsam\u0131nda k\u00fc\u00e7\u00fck partilerle tekrarl\u0131 \u00fcretim yapmay\u0131 da kolayla\u015ft\u0131r\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dcretimde SMED nedir?<\/h2>\n\n\n<p>SMED, \u0130ngilizce Single-Minute Exchange of Die ifadesinin k\u0131saltmas\u0131d\u0131r. \u00dcretim ekipman\u0131n\u0131 bir i\u015ften veya \u00fcr\u00fcnden di\u011ferine ge\u00e7irmek i\u00e7in gereken s\u00fcreyi azaltmaya y\u00f6nelik bir y\u00f6ntemdir. Ad\u0131, bir dakikada tip de\u011fi\u015fimi vaadini de\u011fil, on dakikan\u0131n alt\u0131nda, tek haneli bir s\u00fcre hedefini ifade eder.<\/p>\n\n\n<p>Y\u00f6ntemin temelinde, makinenin durmas\u0131n\u0131 gerektiren <strong>i\u00e7 haz\u0131rl\u0131k<\/strong> ile makine \u00e7al\u0131\u015f\u0131rken yap\u0131labilen <strong>d\u0131\u015f haz\u0131rl\u0131k<\/strong> aras\u0131ndaki ayr\u0131m vard\u0131r. Ekip, uygun haz\u0131rl\u0131k i\u015flerini duru\u015f s\u00fcresinin d\u0131\u015f\u0131na ta\u015f\u0131r ve duru\u015f s\u0131ras\u0131nda yap\u0131lmas\u0131 zorunlu olan i\u015fleri basitle\u015ftirir.<\/p>\n\n\n<p>Bu ilke yaln\u0131zca kal\u0131p de\u011fi\u015fimlerinde i\u015fe yaramaz. \u00dcreticiler, tak\u0131m veya format de\u011fi\u015fimi gibi \u00fcr\u00fcnler aras\u0131nda tekrarlanan di\u011fer ge\u00e7i\u015flerde de bu y\u00f6ntemi uygulayabilir.<\/p>\n\n\n<p>SMED bir iyile\u015ftirme y\u00f6ntemidir; haz\u0131rl\u0131k s\u00fcresi ise azaltmaya \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131z s\u00fcredir. \u00c7izelgeleme ayr\u0131 bir ara\u00e7t\u0131r: birbiriyle uyumsuz i\u015fler aras\u0131ndaki ge\u00e7i\u015f say\u0131s\u0131n\u0131 azaltabilir. \u0130yi bir plan, i\u015fleri grupland\u0131rman\u0131n gereksiz yere uzun s\u00fcren tip de\u011fi\u015fimini \u00e7\u00f6zmesini beklemek yerine her ikisinden de yararlan\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tip de\u011fi\u015fimini k\u0131saltman\u0131n sipari\u015fe fayda sa\u011flayaca\u011f\u0131 yerden ba\u015flay\u0131n<\/h2>\n\n\n<p>Yaln\u0131zca kay\u0131tlardaki en uzun tip de\u011fi\u015fimine sahip makineyi de\u011fil, haz\u0131rl\u0131k kay\u0131plar\u0131n\u0131n teslimat\u0131 aksatt\u0131\u011f\u0131 bir i\u015f merkezini se\u00e7in. Hangi i\u015f kuyru\u011funun sizi s\u0131k s\u0131k tak\u0131m de\u011fi\u015ftirmek ile acil i\u015fleri tamamlamak aras\u0131nda se\u00e7im yapmaya zorlad\u0131\u011f\u0131n\u0131 de\u011ferlendirin.<\/p>\n\n\n<p>Yo\u011fun \u00e7al\u0131\u015fan bir b\u00fck\u00fcm makinesi iyi bir \u00f6rnektir. Sevkiyattan \u00f6nce birden fazla sipari\u015fin bu makineden ge\u00e7mesi gerekiyorsa, burada zaman kazanmak i\u015flerin ilerlemesini kolayla\u015ft\u0131rabilir. \u0130\u015f y\u00fck\u00fc d\u00fc\u015f\u00fck bir makinede ayn\u0131 s\u00fcreyi kazanmak bu hafta daha az fayda sa\u011flayabilir. <a href=\"\/tr\/kaynaklar\/uretim-rotasi\/\">\u00dcretim rotan\u0131z<\/a>, hangi sipari\u015flerin bu i\u015f merkezine ba\u011fl\u0131 oldu\u011funu ve sonras\u0131nda nereye gitti\u011fini g\u00f6sterir.<\/p>\n\n\n<p>Operat\u00f6rlerin iyi bildi\u011fi, tekrarlanan bir tip de\u011fi\u015fimini se\u00e7in. S\u00fcreci i\u015fi yapanlarla birlikte inceleyin; bak\u0131m veya kalite ekiplerinin g\u00f6revleri makinenin haz\u0131r olmas\u0131n\u0131 etkiliyorsa onlar\u0131 da dahil edin. Sorulmas\u0131 gereken soru \u201cNeden bu kadar uzun s\u00fcr\u00fcyor?\u201d de\u011fil, \u201cBu makinenin bir sonraki kabul edilebilir par\u00e7ay\u0131 \u00fcretebilmesi i\u00e7in neler yap\u0131lmal\u0131?\u201d sorusudur.<\/p>\n\n\n<p>Bu soru, g\u00f6r\u00fc\u015fmenin oda\u011f\u0131n\u0131 h\u0131zdan haz\u0131rl\u0131\u011fa, i\u015f s\u0131ras\u0131na ve tekrarlanabilirli\u011fe ta\u015f\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ekibin tekrarlayabilece\u011fi bir SMED y\u00f6ntemi olu\u015fturun<\/h2>\n\n\n<h3 class=\"wp-block-heading\">1. Tip de\u011fi\u015fimini ba\u015ftan sona g\u00f6zlemleyin<\/h3>\n\n\n<p>\u00d6l\u00e7\u00fcm\u00fc her seferinde ayn\u0131 \u015fekilde yap\u0131n: \u00f6nceki \u00fcretimde normal \u00fcretim h\u0131z\u0131nda \u00e7\u0131kan son sa\u011flam par\u00e7adan, sonraki \u00fcretimde normal \u00fcretim h\u0131z\u0131nda \u00e7\u0131kan ilk sa\u011flam par\u00e7aya kadar ge\u00e7en s\u00fcreyi \u00f6l\u00e7\u00fcn. Yeniden \u00e7al\u0131\u015fmaya ba\u015flam\u0131\u015f olsa bile h\u00e2l\u00e2 deneme par\u00e7alar\u0131 veya reddedilen par\u00e7alar \u00fcreten bir makine, hen\u00fcz sa\u011flam par\u00e7a \u00fcretimine d\u00f6nm\u00fc\u015f say\u0131lmaz.<\/p>\n\n\n<p>Bu iki nokta aras\u0131ndaki i\u015fleri ve beklemeleri kaydedin. Her i\u015fi kimin yapt\u0131\u011f\u0131n\u0131, neye ihtiya\u00e7 duydu\u011funu ve ger\u00e7ekten ekipman\u0131n durmas\u0131n\u0131 gerektirip gerektirmedi\u011fini not edin. M\u00fcmk\u00fcnse birden fazla tip de\u011fi\u015fimini g\u00f6zlemleyin: ola\u011fan\u00fcst\u00fc sorunsuz ge\u00e7en tek bir de\u011fi\u015fim, bir sonraki \u00fcretim taahh\u00fcd\u00fc i\u00e7in sa\u011flam bir dayanak de\u011fildir.<\/p>\n\n\n<p>\u0130ki \u00f6l\u00e7\u00fcy\u00fc de g\u00f6r\u00fcn\u00fcr tutun: makinenin duru\u015f s\u00fcresi ve bir sonraki \u00fcretime haz\u0131rl\u0131k i\u00e7in gereken i\u015f\u00e7ilik. Haz\u0131rl\u0131\u011f\u0131 daha erken yapmak ekipmana zaman kazand\u0131r\u0131r; ancak haz\u0131rl\u0131k i\u015fini mutlaka ortadan kald\u0131rmaz.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Duru\u015f gerektiren i\u015fleri gerektirmeyenlerden ay\u0131r\u0131n<\/h3>\n\n\n<p>Bug\u00fcn duru\u015f s\u0131ras\u0131nda yap\u0131lan bir i\u015f, s\u0131rf bu nedenle i\u00e7 haz\u0131rl\u0131k say\u0131lmaz. Ekip, bir sonraki i\u015fin belgelerini yaln\u0131zca s\u0131rada hangi i\u015fin oldu\u011funu kimse bilmedi\u011fi i\u00e7in makine durduktan sonra topluyor olabilir.<\/p>\n\n\n<p>Tekrarlanan bir tip de\u011fi\u015fimi i\u00e7in a\u015fa\u011f\u0131daki basitle\u015ftirilmi\u015f i\u015f kayd\u0131n\u0131 d\u00fc\u015f\u00fcn\u00fcn. Mevcut durumda d\u00f6rt i\u015f de \u00fcretim durduktan sonra, s\u0131rayla yap\u0131l\u0131yor:<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>\u0130\u015f<\/th>\n<th>Mevcut duru\u015f s\u00fcresi<\/th>\n<th>\u0130yile\u015ftirme sonras\u0131 duru\u015f s\u00fcresi<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Sonraki i\u015fin tak\u0131mlar\u0131n\u0131 getirme ve kontrol etme<\/td>\n<td>8 dakika<\/td>\n<td>0 dakika: \u00f6nceden haz\u0131rlan\u0131r<\/td>\n<\/tr>\n<tr>\n<td>\u0130\u015f talimatlar\u0131n\u0131 temin etme ve do\u011frulama<\/td>\n<td>7 dakika<\/td>\n<td>0 dakika: \u00f6nceden haz\u0131rlan\u0131r<\/td>\n<\/tr>\n<tr>\n<td>Tak\u0131mlar\u0131 s\u00f6kme ve takma<\/td>\n<td>18 dakika<\/td>\n<td>15 dakika<\/td>\n<\/tr>\n<tr>\n<td>Ayar yapma ve ilk kabul edilebilir \u00fcretimi onaylama<\/td>\n<td>12 dakika<\/td>\n<td>10 dakika<\/td>\n<\/tr>\n<tr>\n<td><strong>Toplam makine duru\u015f s\u00fcresi<\/strong><\/td>\n<td><strong>45 dakika<\/strong><\/td>\n<td><strong>25 dakika<\/strong><\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Bu rakamlar bir m\u00fc\u015fteri sonucunu de\u011fil, \u00f6rnek bir durumu g\u00f6sterir. \u0130lk iki de\u011fi\u015fiklik, on be\u015f dakikal\u0131k haz\u0131rl\u0131\u011f\u0131 duru\u015f s\u00fcresinin d\u0131\u015f\u0131na ta\u015f\u0131r. Kalan be\u015f dakikal\u0131k kazan\u00e7 ise i\u00e7 haz\u0131rl\u0131k y\u00f6nteminin iyile\u015ftirilmesinden gelir.<\/p>\n\n\n<p>D\u0131\u015f haz\u0131rl\u0131k i\u015flerini yine birinin yapmas\u0131 gerekir. Sonraki i\u015fin tak\u0131mlar\u0131n\u0131 ve talimatlar\u0131n\u0131 kimin, ne zaman haz\u0131rlayaca\u011f\u0131n\u0131 kararla\u015ft\u0131r\u0131n. \u00dczerinde \u201chaz\u0131r\u201d yazan bir tak\u0131m arabas\u0131, ancak bir sonraki i\u015f i\u00e7in gereken ekipman ger\u00e7ekten eksiksiz ve kontrol edilmi\u015fse i\u015fe yarar.<\/p>\n\n\n<p>Farkl\u0131 bir d\u00fczenlemeyle d\u0131\u015f haz\u0131rl\u0131\u011fa d\u00f6n\u00fc\u015ft\u00fcr\u00fclebilecek i\u00e7 haz\u0131rl\u0131k i\u015flerini de inceleyin. \u00d6rne\u011fin yedek bir fikst\u00fcr, ekibin sonraki i\u015fi \u00e7al\u0131\u015fan makineden uzakta haz\u0131rlamas\u0131na ve hizalamas\u0131na olanak tan\u0131yabilir; b\u00f6ylece duru\u015f s\u0131ras\u0131nda yaln\u0131zca fikst\u00fcr\u00fcn de\u011fi\u015ftirilmesi gerekir. Bu de\u011fi\u015fikli\u011fi yapmadan \u00f6nce maliyeti, ekipman\u0131n uygunlu\u011funu ve g\u00fcvenli \u00e7al\u0131\u015fma y\u00f6ntemini de\u011ferlendirin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. \u0130\u00e7 haz\u0131rl\u0131\u011f\u0131 aceleye getirmeden iyile\u015ftirin<\/h3>\n\n\n<p>\u0130\u00e7 haz\u0131rl\u0131k olarak kalmas\u0131 gereken i\u015flerde aramay\u0131, yinelenen kontrolleri ve \u00f6nlenebilir ayarlar\u0131 ortadan kald\u0131racak, tekrarlanabilir y\u00f6ntemler aray\u0131n. Fikst\u00fcrlerde, ba\u011flama y\u00f6ntemlerinde veya i\u015f s\u0131ralamas\u0131nda yap\u0131lacak de\u011fi\u015fiklikleri ekipmandan sorumlu ki\u015filer de\u011ferlendirmelidir. S\u00fcre hedefini, g\u00fcvenli durdurma prosed\u00fcrlerini veya kalite onay\u0131n\u0131 atlama iznine d\u00f6n\u00fc\u015ft\u00fcrmeyin.<\/p>\n\n\n<p>\u00d6rnekte, iyile\u015ftirilen montaj ve ayar y\u00f6ntemi yirmi be\u015f dakika s\u00fcr\u00fcyor. S\u00fcre hen\u00fcz tek haneli dakikalara inmese de bu de\u011ferli bir kazan\u0131md\u0131r. \u0130lk hedef, istisnai tek bir uygulamada elde edilen etkileyici bir rakam de\u011fil, tekrar sa\u011flayabilece\u011finiz g\u00fcvenilir bir iyile\u015ftirmedir.<\/p>\n\n\n<p>\u0130yile\u015ftirilen y\u00f6ntemi belgeleyin, gerekli malzemeleri haz\u0131r bulundurun ve sonraki tip de\u011fi\u015fimlerini kontrol edin. \u0130\u015f s\u0131ralamas\u0131n\u0131n uygulanabilmesi, bir sonraki sipari\u015fin \u00f6nceden bilinmesine ba\u011fl\u0131ysa \u00fcretim \u00e7izelgesi de art\u0131k y\u00f6ntemin i\u015flemesini sa\u011flayan unsurlardan biridir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Daha k\u0131sa tip de\u011fi\u015fimleri, i\u015f s\u0131ralamas\u0131nda size daha fazla se\u00e7enek sunar<\/h2>\n\n\n<p>\u0130yile\u015ftirmeden sonra ayn\u0131 makineyi ele alal\u0131m. A1, B1, A2 ve B2 olmak \u00fczere d\u00f6rt haz\u0131r i\u015f oldu\u011funu d\u00fc\u015f\u00fcn\u00fcn. Her biri yirmi dakikal\u0131k i\u015flem s\u00fcresi gerektiriyor. A i\u015fleri bir tak\u0131m ailesini, B i\u015fleri ise ba\u015fka bir tak\u0131m ailesini kullan\u0131yor. Aileler aras\u0131nda ge\u00e7i\u015f her iki y\u00f6nde de yirmi be\u015f dakika s\u00fcr\u00fcyor; ayn\u0131 ailedeki ard\u0131\u015f\u0131k i\u015fler ise ek bir aile de\u011fi\u015fimi gerektirmiyor.<\/p>\n\n\n<p>Bu \u00f6rnekte makine, A ailesinin tak\u0131mlar\u0131 zaten tak\u0131l\u0131 olarak 08:00&#8217;da \u00e7al\u0131\u015fmaya ba\u015fl\u0131yor. T\u00fcm malzemeler ve operat\u00f6r haz\u0131r; mola veya ek haz\u0131rl\u0131k i\u015fi yok. B1&#8217;in bu makinede en ge\u00e7 09:10&#8217;da tamamlanmas\u0131 gerekiyor. Di\u011fer i\u015flerin taahh\u00fct edilen tamamlanma zamanlar\u0131 daha ge\u00e7 oldu\u011fu i\u00e7in a\u015fa\u011f\u0131daki s\u0131ralamalar uygulanabiliyor.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>S\u0131ralama<\/th>\n<th>Tak\u0131m ailesi de\u011fi\u015fim say\u0131s\u0131<\/th>\n<th>Toplam tak\u0131m ailesi de\u011fi\u015fim s\u00fcresi<\/th>\n<th>B1&#8217;in biti\u015fi<\/th>\n<th>Son i\u015fin biti\u015fi<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>A1 \u2192 B1 \u2192 A2 \u2192 B2<\/td>\n<td>3<\/td>\n<td>75 dakika<\/td>\n<td>09:05<\/td>\n<td>10:35<\/td>\n<\/tr>\n<tr>\n<td>A1 \u2192 A2 \u2192 B1 \u2192 B2<\/td>\n<td>1<\/td>\n<td>25 dakika<\/td>\n<td>09:25<\/td>\n<td>09:45<\/td>\n<\/tr>\n<tr>\n<td>A1 \u2192 B1 \u2192 B2 \u2192 A2<\/td>\n<td>2<\/td>\n<td>50 dakika<\/td>\n<td>09:05<\/td>\n<td>10:10<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>\u00d6nce t\u00fcm A i\u015flerini, ard\u0131ndan t\u00fcm B i\u015flerini grupland\u0131rmak, bu s\u0131ralamalar aras\u0131nda i\u015flerin tamam\u0131n\u0131n en erken bitmesini sa\u011flar; ancak B1 gereken zamanda tamamlanamaz. B1&#8217;i erkene al\u0131p ard\u0131ndan B2&#8217;yi \u00e7al\u0131\u015ft\u0131rmak, aileleri d\u00f6n\u00fc\u015f\u00fcml\u00fc \u00e7al\u0131\u015ft\u0131rmaya g\u00f6re bir tip de\u011fi\u015fimini ortadan kald\u0131r\u0131r ve B1&#8217;in son tamamlanma zaman\u0131n\u0131 da kar\u015f\u0131lar.<\/p>\n\n\n<p>Planlaman\u0131n sundu\u011fu f\u0131rsat budur. Her \u015feyi grupland\u0131rmak ile haz\u0131rl\u0131klar\u0131 yok saymak aras\u0131nda se\u00e7im yapmak zorunda de\u011filsiniz. Elinizdeki sipari\u015fler i\u00e7in uygun \u00f6l\u00e7\u00fcde grupland\u0131rma yapman\u0131z gerekir.<\/p>\n\n\n<p>Sahadaki iyile\u015ftirme de \u00f6nemlidir. SMED \u00f6ncesinde d\u00f6n\u00fc\u015f\u00fcml\u00fc s\u0131ralama, her biri k\u0131rk be\u015f dakika s\u00fcren \u00fc\u00e7 de\u011fi\u015fim, yani 135 dakikal\u0131k duru\u015f gerektiriyordu. SMED sonras\u0131nda ayn\u0131 s\u0131ralamada bu s\u00fcre 75 dakikaya iner. Son tamamlanma zaman\u0131na uygun \u00fc\u00e7\u00fcnc\u00fc s\u0131ralama ise s\u00fcreyi 50 dakikaya d\u00fc\u015f\u00fcr\u00fcr. Y\u00f6ntem altm\u0131\u015f dakika kazand\u0131r\u0131r; yeni s\u0131ralama da buna yirmi be\u015f dakika daha ekler.<\/p>\n\n\n<p>Ger\u00e7ek sipari\u015flerde i\u015flerin birbirine ba\u011f\u0131ml\u0131l\u0131\u011f\u0131, <a href=\"\/tr\/kaynaklar\/uretim-cevrim-suresi\/\">farkl\u0131 i\u015flem s\u00fcreleri<\/a> ve ba\u015fka kaynaklar da devreye girer. Bu makinedeki i\u015flemi tamamlanan bir i\u015f, sevkiyattan \u00f6nce h\u00e2l\u00e2 kaynak veya muayene gerektirebilir. <a href=\"\/tr\/kaynaklar\/siparis-uzerine-uretim\/\">Sipari\u015fe g\u00f6re \u00fcretimde<\/a> as\u0131l fayda, yaln\u0131zca makinedeki i\u015f s\u0131ras\u0131n\u0131 d\u00fczenlemek de\u011fil, m\u00fc\u015fterinin sipari\u015fi i\u00e7in zaman\u0131nda bo\u015f kapasite yaratmakt\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner ile haz\u0131rl\u0131klar\u0131 ve teslimat \u00f6nceliklerini dengeleyin<\/h2>\n\n\n<p>Bunu d\u00f6rt i\u015f i\u00e7in bir kez yapmak kolayd\u0131r. As\u0131l g\u00fc\u00e7l\u00fck, s\u00fcrekli de\u011fi\u015fen sipari\u015fler aras\u0131nda do\u011fru dengeyi korumakt\u0131r. Yeni bir acil sipari\u015f, geciken malzeme veya kullan\u0131lamayan bir makine, az \u00f6nce olu\u015fturdu\u011funuz s\u0131ralamay\u0131 ge\u00e7ersiz k\u0131labilir.<\/p>\n\n\n<p>SkyPlanner APS, haz\u0131rl\u0131klar\u0131 dikkate alan i\u015f s\u0131ralamas\u0131n\u0131 <a href=\"\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">\u00fcretim \u00e7izelgelemenin<\/a> bir par\u00e7as\u0131 h\u00e2line getirir. \u00c7izelgeleme yapay zek\u00e2s\u0131 Arcturus, tan\u0131mlanm\u0131\u015f kapasiteyi, operasyon ba\u011f\u0131ml\u0131l\u0131klar\u0131n\u0131 ve \u00f6ncelikleri dikkate alarak i\u015fleri \u00e7izelgeler. Neyin \u00f6nemli oldu\u011funa siz karar verirsiniz; yapay zek\u00e2 da bu talimatlar \u00e7er\u00e7evesinde \u00e7izelgeyi olu\u015fturur.<\/p>\n\n\n<p>Tip de\u011fi\u015fimlerinin kullan\u0131lan tak\u0131mlara ba\u011fl\u0131 oldu\u011fu bir i\u015f merkezinde, \u00fcr\u00fcnler i\u00e7in ilgili tak\u0131m \u00f6zelli\u011fini tan\u0131mlay\u0131n. Ayn\u0131 haz\u0131rl\u0131kla \u00fcretilebilen i\u015flerde bu \u00f6zelli\u011fin de\u011feri ayn\u0131 olmal\u0131d\u0131r. \u0130\u015f merkezi i\u00e7in benzerli\u011fi etkinle\u015ftirin ve Dynamic Priorities i\u00e7inde benzer i\u015flere a\u011f\u0131rl\u0131k verin. SkyPlanner&#8217;\u0131n benzerlik kural\u0131yla \u00f6zelli\u011fi se\u00e7ebilir, farkl\u0131 i\u015fler aras\u0131ndaki ge\u00e7i\u015f i\u00e7in haz\u0131rl\u0131k s\u00fcresi girebilir ve benzer i\u015flerin art arda y\u00fcr\u00fct\u00fclmesine ne kadar \u00f6nem verilece\u011fini belirleyebilirsiniz.<\/p>\n\n\n<p>Bunun pratikteki faydas\u0131, her i\u015f kuyru\u011funu elle yeniden d\u00fczenlemenize gerek kalmadan, \u00e7izelgeleme sisteminin plan\u0131 hesaplarken gruplama tercihini dikkate alabilmesidir. S\u00fcrecinize uygunsa benzerlik i\u00e7in se\u00e7ilen \u00f6zellik, renk veya malzeme gibi tip de\u011fi\u015fimine yol a\u00e7an ba\u015fka bir unsuru da temsil edebilir. \u0130lgili i\u015f merkezinde <a href=\"\/tr\/kaynaklar\/hazirlik-suresi-matrisi\/\">tip de\u011fi\u015fimine ger\u00e7ekte neyin yol a\u00e7t\u0131\u011f\u0131n\u0131<\/a> yans\u0131tan \u00f6zelli\u011fi se\u00e7in.<\/p>\n\n\n<p>Ard\u0131ndan olu\u015fan Gantt \u00e7izelgesini teslimat \u00f6nceliklerinize g\u00f6re g\u00f6zden ge\u00e7irin. Gruplama acil i\u015flerin \u00f6n\u00fcne ge\u00e7iyorsa benzerli\u011fi kesin bir talimat olarak kabul etmek yerine \u00f6ncelikleri ayarlay\u0131n. Kurallar ve kilitler, korunmas\u0131 gereken planlama kararlar\u0131n\u0131 sabit tutman\u0131z\u0131 sa\u011flar.<\/p>\n\n\n<p>\u00dcretim sahas\u0131nda iyile\u015ftirmeler yap\u0131ld\u0131k\u00e7a planda esas al\u0131nan s\u00fcreleri g\u00fcncel tutun. Proses ad\u0131mlar\u0131n\u0131n kendi haz\u0131rl\u0131k s\u00fcreleri vard\u0131r; benzerlik kural\u0131nda da farkl\u0131 i\u015fler aras\u0131ndaki ge\u00e7i\u015f i\u00e7in bir s\u00fcre tan\u0131mlan\u0131r. Ayn\u0131 s\u00fcreyi iki kez hesaba katmamak i\u00e7in her birinin hangi i\u015fi kapsad\u0131\u011f\u0131n\u0131 kontrol edin. Haz\u0131rl\u0131k s\u00fcresi, Gantt g\u00f6r\u00fcn\u00fcm\u00fcnde i\u015fin toplam s\u00fcresine dahildir; ayr\u0131 bir renkli b\u00f6l\u00fcm olarak g\u00f6sterilmez.<\/p>\n\n\n<p>SkyPlanner, ekibin sahada y\u00fcr\u00fctt\u00fc\u011f\u00fc SMED \u00e7al\u0131\u015fmalar\u0131n\u0131n yerini almaz. Bu \u00e7al\u0131\u015fmalar\u0131n plana yans\u0131mas\u0131n\u0131 sa\u011flar: k\u0131salt\u0131lm\u0131\u015f haz\u0131rl\u0131k s\u00fcreleri ve s\u00fcreci do\u011fru yans\u0131tan benzerlik \u00f6zellikleri, \u00fcretimin geri kalan\u0131n\u0131 da hesaba katan \u00e7izelgenin girdileri olur. Kapasitenin, \u00f6nceliklerin ve Gantt plan\u0131n\u0131n birlikte nas\u0131l i\u015fledi\u011fini g\u00f6rmek i\u00e7in <a href=\"\/tr\/ozellikler\/\">SkyPlanner&#8217;\u0131n \u00e7izelgeleme \u00f6zelliklerini ke\u015ffedin<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">KJH-Comp&#8217;ta uygulama nas\u0131l i\u015fliyor?<\/h2>\n\n\n<p>Finlandiya&#8217;da fason sac metal \u00fcretimi yapan KJH-Comp, haftal\u0131k y\u00fckleme plan\u0131 i\u00e7in C9000 ERP sistemini ve elektronik tablolar\u0131 kullan\u0131yordu. \u00dcretim sorumlular\u0131 ise i\u015fleri g\u00fcnl\u00fck olarak makinelere elle at\u0131yordu. \u00dcr\u00fcn yelpazesi geni\u015fledik\u00e7e bu elle \u00e7izelgeleme yakla\u015f\u0131m\u0131n\u0131 s\u00fcrd\u00fcrmek zorla\u015ft\u0131.<\/p>\n\n\n<p>SkyPlanner ile sipari\u015fler yine mevcut ERP sistemine giriliyor, ancak sonlu kapasite \u00e7izelgeleme ve makine atamalar\u0131 otomatik yap\u0131l\u0131yor. \u015eirketin deneyimi, b\u00fck\u00fcm operasyonlar\u0131nda elde edilen yararl\u0131 bir sonucu ortaya koyuyor: ayn\u0131 tak\u0131mlar\u0131 ve ayn\u0131 kal\u0131nl\u0131ktaki malzemeyi kullanan i\u015fler art arda y\u00fcr\u00fct\u00fcl\u00fcyor, b\u00f6ylece haz\u0131rl\u0131k s\u00fcreleri k\u0131sal\u0131yor ve bo\u015fta kalma s\u00fcresi azal\u0131yor.<\/p>\n\n\n<p>Ayn\u0131 deneyim, gruplaman\u0131n neden tek ba\u015f\u0131na yeterli olmad\u0131\u011f\u0131n\u0131 da g\u00f6steriyor. \u0130ki hafta sonra tamamlanmas\u0131 gereken bir i\u015f art\u0131k yar\u0131n sevk edilecek bir sipari\u015fin \u00f6n\u00fcne ge\u00e7miyor; \u00fcretim sorumlusu da d\u00f6rt metrelik b\u00fck\u00fcm makinesinin y\u00fck\u00fcn\u00fc g\u00f6rebiliyor. Haz\u0131rl\u0131k verimlili\u011fi ve teslimat zamanlamas\u0131, ayn\u0131 \u00fcretim karar\u0131n\u0131n par\u00e7alar\u0131d\u0131r.<\/p>\n\n\n<p>KJH-Comp&#8217;un deneyimi burada \u00f6nemli, \u00e7\u00fcnk\u00fc yaln\u0131zca \u00e7izelgeleme kavram\u0131n\u0131 de\u011fil, g\u00fcnl\u00fck i\u015fleyi\u015fteki de\u011fi\u015fimi de g\u00f6steriyor: elle yap\u0131lan y\u00fck planlamas\u0131 azal\u0131yor, darbo\u011fazlar daha net g\u00f6r\u00fcl\u00fcyor ve i\u015f s\u0131ras\u0131, makinede tak\u0131l\u0131 olan tak\u0131mlardan daha iyi yararlan\u0131lmas\u0131n\u0131 sa\u011fl\u0131yor. <a href=\"\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp&#8217;un SkyPlanner deneyimini okuyun<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kazand\u0131\u011f\u0131n\u0131z zaman\u0131 de\u011ferlendirin<\/h2>\n\n\n<p>Tip de\u011fi\u015fimini iyile\u015ftirdikten sonra, \u00f6l\u00e7\u00fcm\u00fcn ba\u015flang\u0131\u00e7 ve biti\u015f noktalar\u0131n\u0131 ayn\u0131 tutarak e\u015fde\u011fer i\u015fleri kar\u015f\u0131la\u015ft\u0131r\u0131n. Gerekli tip de\u011fi\u015fimlerinin s\u00fcresini, i\u015f s\u0131ras\u0131n\u0131n ka\u00e7 tak\u0131m ailesi de\u011fi\u015fimi gerektirdi\u011fini ve acil sipari\u015flerin h\u00e2l\u00e2 gereken zamanda tamamlan\u0131p tamamlanmad\u0131\u011f\u0131n\u0131 kontrol edin. \u00dcretime ba\u015flang\u0131\u00e7taki kaliteyi ve makine \u00e7al\u0131\u015f\u0131rken yap\u0131lan d\u0131\u015f haz\u0131rl\u0131\u011f\u0131n i\u015f y\u00fck\u00fcn\u00fc de de\u011ferlendirmeye dahil edin.<\/p>\n\n\n<p>Ortalama haz\u0131rl\u0131k s\u00fcresinin k\u0131salmas\u0131 bir ilerlemedir. Bu k\u0131salma, s\u0131radaki \u00f6nemli sipari\u015fi tamamlamak i\u00e7in zaman kazand\u0131rd\u0131\u011f\u0131nda \u00fcretimde somut faydaya d\u00f6n\u00fc\u015f\u00fcr.<\/p>\n\n\n<p>SkyPlanner, a\u00e7\u0131k REST API \u00fczerinden her ERP veya MES ile entegre olur. B\u00f6ylece sipari\u015flerinizin bulundu\u011fu sistemleri kullanmaya devam edebilir ve bu sistemlerdeki \u00fcretim verilerini, haz\u0131rl\u0131k s\u00fcrelerini dikkate alan \u00e7izelgelemeye aktarabilirsiniz. \u0130\u015fletmenizde zaten i\u015flevini yerine getiren bir ERP sistemini de\u011fi\u015ftirerek ba\u015flaman\u0131z gerekmez.<\/p>\n\n\n<p>Bu faydan\u0131n kendi \u00fcretiminizde nas\u0131l kar\u015f\u0131l\u0131k bulabilece\u011fini de\u011ferlendirmek i\u00e7in <a href=\"\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>. G\u00f6r\u00fc\u015fmeye yo\u011fun \u00e7al\u0131\u015fan bir i\u015f merkezi \u00f6rne\u011fi, tip de\u011fi\u015fimine yol a\u00e7an \u00f6zellik, \u00f6l\u00e7\u00fclm\u00fc\u015f bir haz\u0131rl\u0131k s\u00fcresi ve farkl\u0131 terminlere sahip birka\u00e7 sipari\u015fle gelin. Bu bilgiler, gruplaman\u0131n nerede yararl\u0131 oldu\u011fu ve nerede teslimat\u0131n \u00f6ncelik kazanmas\u0131 gerekti\u011fi \u00fczerine verimli bir g\u00f6r\u00fc\u015fmenin temelini olu\u015fturur.<\/p>\n\n\n<p>\u00d6nce planlama g\u00f6r\u00fcn\u00fcm\u00fcn\u00fc incelemeyi tercih ederseniz <a href=\"\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>SMED: Daha K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Daha Fazla Zaman S\u0131radaki sipari\u015f haz\u0131r, ama makine hen\u00fcz haz\u0131r de\u011fil. Operat\u00f6r\u00fcn uygun tak\u0131mlar\u0131 getirmesi, ayarlar\u0131n kontrol edilmesi ve ilk par\u00e7alar\u0131n onaylanmas\u0131 gerekiyor. Bunlar yap\u0131l\u0131rken s\u0131radaki i\u015fler beklemeye devam ediyor. Uzun tip de\u011fi\u015fimi s\u00fcreleri, her \u00e7izelgeleme karar\u0131n\u0131n maliyetini art\u0131r\u0131r. Teslim tarihini kar\u015f\u0131lamak i\u00e7in ba\u015fka bir \u00fcr\u00fcne ge\u00e7ti\u011finizde \u00fcretim s\u00fcresinden &#8230; <a title=\"SMED: Daha K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Daha Fazla Zaman\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/\" aria-label=\"Read more about SMED: Daha K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Daha Fazla Zaman\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97692,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-96571","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ve-cizelgeleme","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>SMED: K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Zaman &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Uzun tip de\u011fi\u015fimi sipari\u015flere az zaman b\u0131rak\u0131r. SMED ve SkyPlanner&#039;\u0131n haz\u0131rl\u0131\u011f\u0131 g\u00f6zeten \u00e7izelgelemesiyle teslimat \u00f6nceliklerini koruyup makine zaman\u0131 kazan\u0131n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SMED: Daha K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Daha Fazla Zaman\" \/>\n<meta property=\"og:description\" content=\"Uzun tip de\u011fi\u015fimi sipari\u015flere az zaman b\u0131rak\u0131r. SMED ve SkyPlanner&#039;\u0131n haz\u0131rl\u0131\u011f\u0131 g\u00f6zeten \u00e7izelgelemesiyle teslimat \u00f6nceliklerini koruyup makine zaman\u0131 kazan\u0131n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:20:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/smed\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/smed\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"SMED: Daha K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Daha Fazla Zaman\",\"datePublished\":\"2026-10-08T07:20:14+00:00\",\"dateModified\":\"2026-10-19T14:43:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/smed\\\/\"},\"wordCount\":2870,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/smed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"articleSection\":[\"APS ve \u00e7izelgeleme\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/smed\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/smed\\\/\",\"name\":\"SMED: K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Zaman &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/smed\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/smed\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"datePublished\":\"2026-10-08T07:20:14+00:00\",\"dateModified\":\"2026-10-19T14:43:17+00:00\",\"description\":\"Uzun tip de\u011fi\u015fimi sipari\u015flere az zaman b\u0131rak\u0131r. SMED ve SkyPlanner'\u0131n haz\u0131rl\u0131\u011f\u0131 g\u00f6zeten \u00e7izelgelemesiyle teslimat \u00f6nceliklerini koruyup makine zaman\u0131 kazan\u0131n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/smed\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/smed\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/smed\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-setup-time-hero-1.png\",\"width\":1672,\"height\":941,\"caption\":\"Bending machine beside tooling prepared on a cart for the next production changeover\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/smed\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"SMED: Daha K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Daha Fazla Zaman\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"SMED: K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Zaman &#8211; SkyPlanner","description":"Uzun tip de\u011fi\u015fimi sipari\u015flere az zaman b\u0131rak\u0131r. SMED ve SkyPlanner'\u0131n haz\u0131rl\u0131\u011f\u0131 g\u00f6zeten \u00e7izelgelemesiyle teslimat \u00f6nceliklerini koruyup makine zaman\u0131 kazan\u0131n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/","og_locale":"tr_TR","og_type":"article","og_title":"SMED: Daha K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Daha Fazla Zaman","og_description":"Uzun tip de\u011fi\u015fimi sipari\u015flere az zaman b\u0131rak\u0131r. SMED ve SkyPlanner'\u0131n haz\u0131rl\u0131\u011f\u0131 g\u00f6zeten \u00e7izelgelemesiyle teslimat \u00f6nceliklerini koruyup makine zaman\u0131 kazan\u0131n.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:20:14+00:00","article_modified_time":"2026-10-19T14:43:17+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"14 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"SMED: Daha K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Daha Fazla Zaman","datePublished":"2026-10-08T07:20:14+00:00","dateModified":"2026-10-19T14:43:17+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/"},"wordCount":2870,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","articleSection":["APS ve \u00e7izelgeleme","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/","name":"SMED: K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Zaman &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","datePublished":"2026-10-08T07:20:14+00:00","dateModified":"2026-10-19T14:43:17+00:00","description":"Uzun tip de\u011fi\u015fimi sipari\u015flere az zaman b\u0131rak\u0131r. SMED ve SkyPlanner'\u0131n haz\u0131rl\u0131\u011f\u0131 g\u00f6zeten \u00e7izelgelemesiyle teslimat \u00f6nceliklerini koruyup makine zaman\u0131 kazan\u0131n.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png","width":1672,"height":941,"caption":"Bending machine beside tooling prepared on a cart for the next production changeover"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/smed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"SMED: Daha K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Daha Fazla Zaman"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-setup-time-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"SMED: Daha K\u0131sa Tip De\u011fi\u015fimi, Sipari\u015flere Daha Fazla Zaman S\u0131radaki sipari\u015f haz\u0131r, ama makine hen\u00fcz haz\u0131r de\u011fil. Operat\u00f6r\u00fcn uygun tak\u0131mlar\u0131 getirmesi, ayarlar\u0131n kontrol edilmesi ve ilk par\u00e7alar\u0131n onaylanmas\u0131 gerekiyor. Bunlar yap\u0131l\u0131rken s\u0131radaki i\u015fler beklemeye devam ediyor. Uzun tip de\u011fi\u015fimi s\u00fcreleri, her \u00e7izelgeleme karar\u0131n\u0131n maliyetini art\u0131r\u0131r. Teslim tarihini kar\u015f\u0131lamak i\u00e7in ba\u015fka bir \u00fcr\u00fcne ge\u00e7ti\u011finizde \u00fcretim s\u00fcresinden&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96571","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=96571"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96571\/revisions"}],"predecessor-version":[{"id":96770,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96571\/revisions\/96770"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/97692"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=96571"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=96571"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=96571"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}