{"id":96280,"date":"2026-10-04T08:52:42","date_gmt":"2026-10-04T08:52:42","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96280"},"modified":"2026-10-19T14:42:56","modified_gmt":"2026-10-19T14:42:56","slug":"atolye-tipi-cizelgeleme","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/","title":{"rendered":"At\u00f6lye Tipi \u00c7izelgeleme: Farkl\u0131 Rotalarda Zaman\u0131nda Teslimat"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n\n<h1 class=\"wp-block-heading\">At\u00f6lye Tipi \u00c7izelgeleme: Farkl\u0131 Rotalarda Zaman\u0131nda Teslimat<\/h1>\n\n\n<p>Freze tezg\u00e2h\u0131 bo\u015f, bir g\u00f6vde i\u015flenmeye haz\u0131r ve \u00fcretim sorumlusu \u00fcretimin devam etmesini istiyor. G\u00f6vdeyi i\u015fleme almak en do\u011fal karar gibi g\u00f6r\u00fcn\u00fcyor. Ancak bir saat sonra tornadan acil bir pim gelecek ve ayn\u0131 freze tezg\u00e2h\u0131na ihtiya\u00e7 duyacak. G\u00f6vdenin i\u015flenmesine ba\u015fland\u0131\u011f\u0131 anda, pimin teslim tarihi tehlikeye giriyor.<\/p>\n\n\n<p>At\u00f6lye tipi \u00fcretimde her g\u00fcn kar\u015f\u0131la\u015f\u0131lan zorluk budur: Her makinede s\u0131radaki i\u015f i\u00e7in verilen karar, di\u011fer makinelerden ge\u00e7en sipari\u015fleri de etkiler. Bir i\u015f merkezinin s\u00fcrekli \u00e7al\u0131\u015f\u0131yor olmas\u0131, at\u00f6lyenin teslim edilmesi gereken i\u015fleri \u00fcretti\u011fi anlam\u0131na gelmez.<\/p>\n\n\n<p>At\u00f6lye tipi \u00e7izelgeleme bu kararlar\u0131 birbiriyle ili\u015fkilendirir. Her sipari\u015fin rotas\u0131n\u0131 ve teslimat \u00f6nceli\u011fini koruyarak operasyonlar\u0131n\u0131 kaynaklar\u0131n kullan\u0131labilir zaman aral\u0131klar\u0131na yerle\u015ftirir. <a href=\"\/tr\/\">SkyPlanner APS<\/a> \u00e7izelgeleme hesaplamalar\u0131n\u0131 sizin yerinize yapar. B\u00f6ylece \u00fcretim sorumlusunun s\u0131radaki i\u015fler listesi, i\u015fleri yeti\u015ftirmek i\u00e7in yap\u0131lan yeni m\u00fcdahalelerle de\u011fil, koordineli bir planla belirlenir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">At\u00f6lye tipi \u00e7izelgeleme nedir?<\/h2>\n\n\n<p><strong>At\u00f6lye tipi \u00e7izelgeleme, i\u015flerin farkl\u0131 rotalar izleyebildi\u011fi \u00fcretim ortamlar\u0131nda operasyonlar\u0131n ortak kaynaklara atanmas\u0131 ve s\u0131ralanmas\u0131d\u0131r.<\/strong> Her operasyonun nerede yap\u0131laca\u011f\u0131n\u0131, ne zaman ba\u015flay\u0131p bitece\u011fini ve i\u015fin di\u011fer operasyonlar\u0131yla nas\u0131l ba\u011flant\u0131 kuraca\u011f\u0131n\u0131 belirler.<\/p>\n\n\n<p>Bir g\u00f6vde kesme, frezeleme ve kontrolden ge\u00e7ebilir. Bir pim ise tornalama, frezeleme ve kontrol gerektirebilir. \u0130kisi de ayn\u0131 freze tezg\u00e2h\u0131n\u0131 kullan\u0131r, ancak bu sipari\u015flerin hi\u00e7biri tek bir \u00fcretim hatt\u0131n\u0131 izlemez. Ba\u015fka bir par\u00e7a da ayn\u0131 ekipmanlardan farkl\u0131 bir s\u0131rayla ge\u00e7ebilir.<\/p>\n\n\n<p>Burada esas al\u0131nan birim yaln\u0131zca sipari\u015f de\u011fil, operasyondur. Bir sipari\u015fin be\u015f saatlik i\u015f gerektirdi\u011fini bilmek, bu s\u00fcrenin hangi makinede kullan\u0131laca\u011f\u0131n\u0131 veya bir sonraki operasyonun ne zaman ba\u015flamaya haz\u0131r olaca\u011f\u0131n\u0131 s\u00f6ylemez. Bu s\u0131ray\u0131 <a href=\"\/tr\/kaynaklar\/uretim-rotasi\/\">\u00fcretim rotas\u0131<\/a> belirler; \u00e7izelge ise i\u015fi kaynaklara ve zaman aral\u0131klar\u0131na atar.<\/p>\n\n\n<p>\u00c7izelgenin uygulanabilir olmas\u0131 i\u00e7in iki temel ko\u015ful sa\u011flanmal\u0131d\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li>Bir operasyon, ba\u011fl\u0131 oldu\u011fu \u00f6nceki i\u015fler tamamlanmadan ba\u015flayamaz.<\/li>\n<li>Bir kayna\u011fa ayn\u0131 anda yapabilece\u011finden fazla i\u015f atanmamal\u0131d\u0131r.<\/li>\n<\/ul>\n\n\n<p>Klasik at\u00f6lye tipi \u00e7izelgeleme probleminde operasyonlar\u0131n yap\u0131laca\u011f\u0131 makineler bellidir ve operasyonlar kesintisiz y\u00fcr\u00fct\u00fcl\u00fcr. Ger\u00e7ek bir fabrikada bunlara vardiyalar, haz\u0131rl\u0131k s\u00fcresi, \u00e7al\u0131\u015fanlar, tak\u0131mlar, malzeme mevcudiyeti ve bildirilen i\u015f ilerlemesi de eklenir. Bunlar sonradan d\u00fczeltilecek ayr\u0131nt\u0131lar de\u011fildir; s\u0131radaki i\u015fin ger\u00e7ekten ba\u015flay\u0131p ba\u015flayamayaca\u011f\u0131n\u0131 belirler.<\/p>\n\n\n<h3 class=\"wp-block-heading\">At\u00f6lye tipi \u00fcretim, ak\u0131\u015f tipi \u00fcretim ve sipari\u015fe g\u00f6re \u00fcretim farkl\u0131 kavramlard\u0131r<\/h3>\n\n\n<p><strong>Ak\u0131\u015f tipi \u00fcretimde<\/strong> i\u015fler ayn\u0131 makine s\u0131ras\u0131n\u0131 izler. <strong>At\u00f6lye tipi \u00fcretimde<\/strong> ise rotalar farkl\u0131 olabilir. <strong>Esnek at\u00f6lye tipi \u00fcretimde<\/strong> baz\u0131 operasyonlar, bunlar\u0131 yapabilecek birden fazla makineden birine atanabilir. B\u00f6ylece operasyonun hangi makinede yap\u0131laca\u011f\u0131na da karar vermek gerekir.<\/p>\n\n\n<p><strong>Sipari\u015fe g\u00f6re \u00fcretim<\/strong>, \u00fcr\u00fcn\u00fcn fabrikada izledi\u011fi rotay\u0131 de\u011fil, \u00fcretimi neyin ba\u015flatt\u0131\u011f\u0131n\u0131, yani m\u00fc\u015fteri sipari\u015fini tan\u0131mlar. Sipari\u015fe g\u00f6re \u00fcretim yapan bir i\u015fletmede at\u00f6lye tipi \u00fcretimdeki gibi farkl\u0131 rotalar da, ak\u0131\u015f tipi \u00fcretimdeki gibi ortak bir rota da kullan\u0131labilir. K\u00fc\u00e7\u00fck partiler ve m\u00fc\u015fteriye \u00f6zel \u00fcr\u00fcnler at\u00f6lye tipi \u00fcretimde yayg\u0131nd\u0131r; ancak bunlar\u0131n hi\u00e7biri tek ba\u015f\u0131na at\u00f6lye tipi \u00e7izelgelemeyi tan\u0131mlamaz. <a href=\"\/tr\/kaynaklar\/yuksek-cesitlilik-dusuk-hacimli-uretim\/\">Y\u00fcksek \u00e7e\u015fitlilik, d\u00fc\u015f\u00fck hacimli \u00fcretim<\/a> ise farkl\u0131 bir soruyu g\u00fcndeme getirir: haz\u0131rl\u0131klar\u0131n ve de\u011fi\u015fen i\u015f y\u00fcklerinin k\u00e2r marj\u0131n\u0131 eritmesine izin vermeden geni\u015f bir \u00fcr\u00fcn yelpazesi nas\u0131l sunulur?<\/p>\n\n\n<p>Bu k\u0131lavuz, <a href=\"\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">\u00fcretim \u00e7izelgelemesinin<\/a> at\u00f6lye tipi \u00fcretimle ilgili y\u00f6n\u00fcne odaklan\u0131r: ortak kaynaklar\u0131 kullanan farkl\u0131 \u00fcretim rotalar\u0131n\u0131 koordine etmek.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Uygulamal\u0131 \u00f6rnek: Bo\u015f freze tezg\u00e2h\u0131 s\u0131radaki i\u015fe ba\u015flamal\u0131 m\u0131?<\/h2>\n\n\n<p>Saat 08:00&#8217;de \u00fcretime girmeye haz\u0131r iki sipari\u015f oldu\u011funu d\u00fc\u015f\u00fcn\u00fcn. Her i\u015f merkezinin kendi operat\u00f6r\u00fc var, t\u00fcm kaynaklar \u00f6rnek boyunca kullan\u0131labilir durumda ve a\u015fa\u011f\u0131daki s\u00fcreler ilgili ad\u0131mda yap\u0131lmas\u0131 gereken t\u00fcm i\u015fleri kaps\u0131yor. Ek haz\u0131rl\u0131k, mola veya ta\u015f\u0131ma s\u00fcresi yok. Her operasyon, bir sonraki ba\u015flamadan \u00f6nce tamamlanmal\u0131 ve ba\u015flad\u0131ktan sonra kesintisiz y\u00fcr\u00fct\u00fclmeli.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Sipari\u015f<\/th>\n<th>Rota ve operasyon s\u00fcreleri<\/th>\n<th>Tamamlanmas\u0131 gereken saat<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>G\u00f6vde<\/td>\n<td>Testere: 1 saat \u2192 Freze: 3 saat \u2192 Kontrol: 1 saat<\/td>\n<td>15:00<\/td>\n<\/tr>\n<tr>\n<td>Pim<\/td>\n<td>Torna: 2 saat \u2192 Freze: 1 saat \u2192 Kontrol: 1 saat<\/td>\n<td>12:00<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Testere g\u00f6vdeyi 08:00 ile 09:00 aras\u0131nda keser. Ayn\u0131 anda torna, pimi 08:00 ile 10:00 aras\u0131nda i\u015fler. Saat 09:00&#8217;da g\u00f6vde frezelemeye haz\u0131rd\u0131r, ancak pim hen\u00fcz haz\u0131r de\u011fildir.<\/p>\n\n\n<p><strong>Freze tezg\u00e2h\u0131 ilk haz\u0131r olan i\u015fi al\u0131rsa<\/strong>, g\u00f6vde 09:00 ile 12:00 aras\u0131nda i\u015flenir. Pim bekler, ard\u0131ndan 12:00 ile 13:00 aras\u0131nda i\u015flenir. Kontrol i\u015flemi g\u00f6vde i\u00e7in 13:00&#8217;te, pim i\u00e7in 14:00&#8217;te tamamlan\u0131r. Makinelerde ge\u00e7erli rotalar izlenmi\u015ftir, ancak pim iki saat gecikmi\u015ftir.<\/p>\n\n\n<p><strong>\u00c7izelge pimin teslim tarihini koruyacak \u015fekilde haz\u0131rlan\u0131rsa<\/strong>, freze tezg\u00e2h\u0131 10:00&#8217;a kadar bekler, pimi 11:00&#8217;e kadar, ard\u0131ndan g\u00f6vdeyi 14:00&#8217;e kadar i\u015fler. Kontrol i\u015flemi pim i\u00e7in 12:00&#8217;de, g\u00f6vde i\u00e7in 15:00&#8217;te tamamlan\u0131r. Her iki sipari\u015f de zaman\u0131nda tamamlan\u0131r.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Sonu\u00e7<\/th>\n<th>\u0130lk haz\u0131r olan i\u015fe \u00f6ncelik veren s\u0131ra<\/th>\n<th>Teslim tarihini koruyan s\u0131ra<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Frezeleme s\u0131ras\u0131<\/td>\n<td>\u00d6nce g\u00f6vde, sonra pim<\/td>\n<td>\u00d6nce pim, sonra g\u00f6vde<\/td>\n<\/tr>\n<tr>\n<td>Pimin tamamlanma saati<\/td>\n<td>14:00<\/td>\n<td>12:00<\/td>\n<\/tr>\n<tr>\n<td>G\u00f6vdenin tamamlanma saati<\/td>\n<td>13:00<\/td>\n<td>15:00<\/td>\n<\/tr>\n<tr>\n<td>\u0130ki sipari\u015fin de tamamland\u0131\u011f\u0131 saat<\/td>\n<td>14:00<\/td>\n<td>15:00<\/td>\n<\/tr>\n<tr>\n<td>Teslimat taahh\u00fctleri<\/td>\n<td>Pim gecikti<\/td>\n<td>\u0130kisi de kar\u015f\u0131land\u0131<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Freze tezg\u00e2h\u0131n\u0131n bir saat bo\u015f kalmas\u0131 bilin\u00e7li bir tercihtir. Bu aral\u0131\u011f\u0131 kesintisiz \u00fc\u00e7 saat s\u00fcren bir operasyonla doldurmak, acil sipari\u015fin \u00f6n\u00fcn\u00fc kapat\u0131rd\u0131. T\u00fcm i\u015fleri daha erken bitirmek de her zaman daha iyi de\u011fildir: \u0130lk s\u0131ralamada her \u015fey 14:00&#8217;te tamamlan\u0131r, ancak pim i\u00e7in verilen teslimat s\u00f6z\u00fc tutulamaz.<\/p>\n\n\n<p>Bir planlama uzman\u0131 iki sipari\u015f aras\u0131ndaki bu dengeyi g\u00f6rebilir. Y\u00fczlerce operasyon oldu\u011funda ise ayn\u0131 soru bir\u00e7ok i\u015f kuyru\u011funda e\u015f zamanl\u0131 olarak ortaya \u00e7\u0131kar. SkyPlanner&#8217;\u0131n sa\u011flad\u0131\u011f\u0131 de\u011fer, hangi taahh\u00fctlere \u00f6ncelik verece\u011finize siz karar verirken birbiriyle ba\u011flant\u0131l\u0131 bu \u00e7izelgeleme i\u015fini \u00fcstlenmesidir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00d6ncelikleri tek tek kuyruklara g\u00f6re de\u011fil, sipari\u015fin b\u00fct\u00fcn\u00fcne g\u00f6re belirleyin<\/h2>\n\n\n<p>Bir s\u0131ralama kural\u0131, i\u015f merkezinde haz\u0131r olan operasyonlardan hangisinin s\u0131radaki i\u015f olaca\u011f\u0131n\u0131 belirler. \u00c7izelge ise t\u00fcm planlama d\u00f6nemini ve rotan\u0131n tamam\u0131n\u0131 dikkate al\u0131r. Bu t\u00fcr kurallar yararl\u0131d\u0131r, ancak tek bir i\u015f merkezinde uygulanan kural, genel teslimat plan\u0131na hizmet etmelidir.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Y\u00f6ntem<\/th>\n<th>Neye \u00f6ncelik verir?<\/th>\n<th>Nelere dikkat edilmeli?<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u0130lk gelen ilk i\u015flenir<\/td>\n<td>\u0130lk gelen i\u015fe<\/td>\n<td>Sonradan gelen acil bir i\u015f, zaman bask\u0131s\u0131 daha az olan i\u015flerin arkas\u0131nda bekleyebilir<\/td>\n<\/tr>\n<tr>\n<td>En erken teslim tarihi<\/td>\n<td>Teslim tarihi en yak\u0131n olan sipari\u015fe<\/td>\n<td>Teslim tarihi daha ileride olan bir sipari\u015fin kalan i\u015fi \u00e7ok daha fazla olabilir<\/td>\n<\/tr>\n<tr>\n<td>En k\u0131sa i\u015flem s\u00fcresi<\/td>\n<td>Haz\u0131r olan k\u0131sa s\u00fcreli operasyonlara<\/td>\n<td>Uzun operasyonlar s\u00fcrekli geri plana at\u0131labilir<\/td>\n<\/tr>\n<tr>\n<td>En az zaman pay\u0131<\/td>\n<td>Teslime kadar kalan s\u00fcre ile kalan i\u015f s\u00fcresi aras\u0131ndaki fark\u0131n en k\u00fc\u00e7\u00fck oldu\u011fu i\u015fe<\/td>\n<td>Kalan i\u015f s\u00fcresine ili\u015fkin ger\u00e7ek\u00e7i olmayan tahminler, aciliyet konusunda yan\u0131lt\u0131c\u0131 sonu\u00e7lar verir.<\/td>\n<\/tr>\n<tr>\n<td>Haz\u0131rl\u0131\u011fa g\u00f6re gruplama<\/td>\n<td>Benzer i\u015flerin birlikte y\u00fcr\u00fct\u00fclmesine<\/td>\n<td>Haz\u0131rl\u0131ktan sa\u011flanan tasarruf, bir teslimat taahh\u00fcd\u00fcn\u00fcn aksamas\u0131na yol a\u00e7abilir<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Tek bir kural, at\u00f6lye tipi \u00fcretimdeki t\u00fcm \u00e7izelgeleme \u00e7ak\u0131\u015fmalar\u0131n\u0131 \u00e7\u00f6zemez. \u00d6rnekte g\u00f6vde freze tezg\u00e2h\u0131na geldi\u011finde pim hen\u00fcz frezelemeye haz\u0131r bile de\u011fildir. Yaln\u0131zca haz\u0131r i\u015fler kuyru\u011funu s\u0131ralayan bir kural, genel plan pimin ihtiya\u00e7 duyaca\u011f\u0131 kapasiteyi ay\u0131rmad\u0131k\u00e7a pimi hesaba katamaz.<\/p>\n\n\n<p>Matematiksel optimizasyon ve sezgisel arama y\u00f6ntemleri, k\u0131s\u0131tlar alt\u0131nda farkl\u0131 atamalar\u0131 ve s\u0131ralamalar\u0131 kar\u015f\u0131la\u015ft\u0131rarak bu daha kapsaml\u0131 problemi ele al\u0131r. Ama\u00e7 \u00f6nemlidir: \u0130lk i\u015fin ba\u015flang\u0131c\u0131ndan t\u00fcm i\u015flerin tamamlanmas\u0131na kadar ge\u00e7en toplam s\u00fcreyi, yani <strong>makespan<\/strong> de\u011ferini en aza indirmek; gecikmeyi en aza indirmekten veya belirli bir m\u00fc\u015fteri sipari\u015fini korumaktan farkl\u0131d\u0131r. At\u00f6lyenizi y\u00f6netmek i\u00e7in bir algoritma se\u00e7meniz gerekmez, ancak \u00e7izelgeleme sistemine iyi bir sonucun sizin i\u00e7in ne anlama geldi\u011fini belirtmeniz gerekir.<\/p>\n\n\n<p>Teslimat odakl\u0131 \u00fcretimde \u00f6nce sipari\u015flerin tamamlanma tarihlerini ve \u00f6nceliklerini belirleyin. Ard\u0131ndan darbo\u011fazlar\u0131n y\u00fck\u00fcn\u00fc, haz\u0131rl\u0131k i\u00e7in gereken i\u015fi ve devam eden \u00fcretimi inceleyin. Verimli g\u00f6r\u00fcnen ama acil sipari\u015fleri geciktiren bir \u00e7izelge, i\u015fletmenin as\u0131l sorununu \u00e7\u00f6zm\u00fcyor demektir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">At\u00f6lye tipi \u00fcretim plan\u0131n\u0131z\u0131 SkyPlanner&#8217;da olu\u015fturun<\/h2>\n\n\n<p>SkyPlanner operasyonlar\u0131, i\u015f merkezlerini, vardiyalar\u0131, operat\u00f6rleri, \u00f6ncelikleri ve malzemeleri sonlu kapasiteli bir \u00fcretim \u00e7izelgesinde bir araya getirir. \u00c7izelgeleme i\u00e7in kullan\u0131lan yapay zek\u00e2 motoru <strong>Arcturus<\/strong>, tan\u0131mlanm\u0131\u015f kaynaklara ve ba\u011f\u0131ml\u0131l\u0131klara g\u00f6re operasyonlar\u0131n \u00e7izelgedeki yerini hesaplar. Gantt g\u00f6r\u00fcn\u00fcm\u00fc, sonucu i\u015f merkezlerindeki i\u015f kuyruklar\u0131 ve birbirine ba\u011fl\u0131 s\u00fcre\u00e7 ad\u0131mlar\u0131 olarak g\u00f6sterir.<\/p>\n\n\n<p>Pratikte bunun faydas\u0131 \u015fudur: Bir sipari\u015fin ne zaman bitece\u011fini anlamak i\u00e7in art\u0131k her makinenin i\u015f kuyru\u011funu ayr\u0131 ayr\u0131 yeniden olu\u015fturman\u0131z gerekmez. Sipari\u015fin \u00e7izelgelenmi\u015f rotas\u0131n\u0131 takip edebilir, nerede bekledi\u011fini g\u00f6rebilir ve bir de\u011fi\u015fikli\u011fin di\u011fer i\u015flere etkisini inceleyebilirsiniz.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Her operasyon i\u00e7in ger\u00e7ek\u00e7i bir rota ve s\u00fcre belirleyin<\/h3>\n\n\n<p>S\u00fcre\u00e7 ad\u0131mlar\u0131n\u0131, bunlar\u0131n s\u0131ras\u0131n\u0131 ve bu ad\u0131mlar\u0131 ger\u00e7ekle\u015ftirebilecek i\u015f merkezlerini tan\u0131mlay\u0131n. \u0130\u015flem ve haz\u0131rl\u0131k s\u00fcrelerinin yan\u0131 s\u0131ra ad\u0131mlar aras\u0131nda gerekli bekleme s\u00fcrelerini de ekleyin. Alternatif bir makine, ancak ilgili operasyonu ger\u00e7ekle\u015ftirmeye uygunsa i\u015fe yarar.<\/p>\n\n\n<p>SkyPlanner, sizin sa\u011flad\u0131\u011f\u0131n\u0131z rotalar\u0131 \u00e7izelgeler; Arcturus \u00fcretim s\u0131ras\u0131n\u0131 tasarlamaz. \u00dcretiminizi temsil eden bir \u00fcr\u00fcn ailesiyle ba\u015flay\u0131n ve operasyon verilerini i\u015fi yapan ki\u015filerle birlikte kontrol edin. Eksik bir kontrol ad\u0131m\u0131 veya iyimser bir haz\u0131rl\u0131k s\u00fcresi tahmini, iyi g\u00f6r\u00fcnen bir \u00e7izelgeyi uygulanamaz h\u00e2le getirebilir.<\/p>\n\n\n<p><strong>SkyPlanner, a\u00e7\u0131k REST API arac\u0131l\u0131\u011f\u0131yla her t\u00fcrl\u00fc ERP veya MES ile entegre olur.<\/strong> Sipari\u015f ve \u00fcretim kay\u0131tlar\u0131n\u0131 zaten iyi y\u00f6neten bir sistemi de\u011fi\u015ftirmek yerine, mevcut verileri \u00e7izelgelemede kullanabilirsiniz. \u00c7izelgenin \u00fcretimle uyumlu kalmas\u0131 i\u00e7in rotalar\u0131n, teslim tarihlerinin ve ilerleme bilgilerinin hangi sistemde y\u00f6netilece\u011fini netle\u015ftirin. <a href=\"\/tr\/entegrasyonlar\/\">SkyPlanner entegrasyonlar\u0131n\u0131 ke\u015ffedin<\/a>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. \u0130\u015fi ger\u00e7ekten yapabilecek kapasiteyi modelleyin<\/h3>\n\n\n<p>\u0130\u015f merkezlerinin kullan\u0131labilirlik bilgilerini ve \u00e7al\u0131\u015fma vardiyalar\u0131n\u0131 ekleyin; ard\u0131ndan operat\u00f6rleri ve ilgili di\u011fer kaynak k\u0131s\u0131tlar\u0131n\u0131 hesaba kat\u0131n. \u0130ki bo\u015f makinenin de s\u00fcrekli ayn\u0131 operat\u00f6re ihtiyac\u0131 varsa, bu makinelerde iki operasyon ayn\u0131 anda y\u00fcr\u00fct\u00fclemez.<\/p>\n\n\n<p><a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">Sonlu kapasite \u00e7izelgeleme<\/a>, plan\u0131n ba\u015fka i\u015flere tahsis edilmi\u015f kapasiteye dayanmas\u0131n\u0131 \u00f6nler. Malzemeyi dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde, malzeme kullan\u0131labilirli\u011fi de hesaplamaya dahil edilir. \u0130\u015fler \u00fcretime verildikten sonra eksiklerin sahada fark edilmesini beklemek yerine, malzeme kullan\u0131labilirlik bilgilerini g\u00fcncel tutun.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. \u00d6ncelikleri belirleyin ve yeri de\u011fi\u015fmemesi gereken i\u015fleri koruyun<\/h3>\n\n\n<p>\u00c7izelgeleme hesab\u0131n\u0131 i\u015fletmeniz i\u00e7in \u00f6nemli teslimat ve \u00fcretim \u00f6l\u00e7\u00fctlerine g\u00f6re y\u00f6nlendirmek i\u00e7in SkyPlanner&#8217;\u0131n dinamik \u00f6nceliklerini kullan\u0131n. \u00d6ncelikleri siz belirlersiniz; Arcturus hesaplamay\u0131 bu \u00f6nceliklere g\u00f6re yapar.<\/p>\n\n\n<p>Atamalar\u0131n korunmas\u0131 gereken durumlarda kilitleri kullan\u0131n; \u00f6rne\u011fin, operat\u00f6rlerin haz\u0131rl\u0131\u011f\u0131n\u0131 tamamlad\u0131\u011f\u0131 ve yak\u0131nda ba\u015flayacak i\u015fleri kilitleyin. B\u00f6ylece yararl\u0131 bir denge sa\u011flan\u0131r: Haz\u0131rlanm\u0131\u015f i\u015flerin t\u00fcm\u00fcn\u00fc ta\u015f\u0131nabilir kabul etmeden genel \u00e7izelge de\u011fi\u015fikliklere uyarlanabilir. Kilitleme bir planlama karar\u0131d\u0131r, her \u015feyi sabitlemek i\u00e7in bir gerek\u00e7e de\u011fildir. \u00c7ok fazla i\u015fi kilitlemek, de\u011fi\u015fikliklere yan\u0131t verme alan\u0131n\u0131 daralt\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Sonucu son operasyona kadar inceleyin<\/h3>\n\n\n<p>Yaln\u0131zca ilk bo\u015f zaman aral\u0131\u011f\u0131n\u0131 veya s\u0131radaki makineyi de\u011fil, sipari\u015fin ne zaman tamamlanaca\u011f\u0131n\u0131 kontrol edin. G\u00f6vde ve pim \u00f6rne\u011finde yaln\u0131zca frezeleme s\u0131ras\u0131na bakmak yeterli de\u011fildir: Pimin, taahh\u00fct edilen 12:00 teslim saatinden \u00f6nce kontrolden de ge\u00e7mesi gerekir.<\/p>\n\n\n<p>Gantt \u00e7izelgesi, atamalar\u0131, beklemeleri ve sonraki operasyonlar\u0131 g\u00f6r\u00fcn\u00fcr k\u0131lar. Risk alt\u0131ndaki teslim tarihlerini ve bu riske yol a\u00e7an kaynaklar\u0131 incelemek i\u00e7in \u00e7izelgeyi kullan\u0131n. Gerekli i\u015fler h\u00e2l\u00e2 mevcut zamana s\u0131\u011fm\u0131yorsa, s\u0131ralamay\u0131 de\u011fi\u015ftirmek tek ba\u015f\u0131na yeterli olmayabilir. Operat\u00f6r deste\u011fiyle sa\u011flanan ek \u00e7al\u0131\u015fma s\u00fcresi, i\u015fi yapabilecek ba\u015fka bir kaynak veya teslim taahh\u00fcd\u00fcn\u00fcn g\u00fcncellenmesi gerekebilir; <a href=\"\/tr\/kaynaklar\/uretim-kapasitesi-planlamasi\/\">kapasite planlama<\/a> bu se\u00e7enekleri de\u011ferlendirmenize yard\u0131mc\u0131 olur.<\/p>\n\n\n<p><a href=\"\/tr\/ozellikler\/\">SkyPlanner&#8217;\u0131n \u00e7izelgeleme \u00f6zelliklerini inceleyin<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dcretim de\u011fi\u015fti\u011finde, birbirine ba\u011fl\u0131 i\u015fleri kapsayan plan\u0131 yeniden hesaplay\u0131n<\/h2>\n\n\n<p>Acil bir sipari\u015f, <a href=\"\/tr\/kaynaklar\/makine-arizasi-sonrasi-uretimde-yeniden-cizelgeleme\/\">makinenin durmas\u0131<\/a> veya beklenenden uzun s\u00fcren bir operasyon, birden fazla i\u015f kuyru\u011funu etkiler. Acil bir i\u015fi \u00f6ne almak, ba\u015fka bir sipari\u015fin rotas\u0131n\u0131n ilerleyen a\u015famalar\u0131nda ihtiya\u00e7 duyaca\u011f\u0131 kapasiteyi t\u00fcketebilir.<\/p>\n\n\n<p>De\u011fi\u015fen \u00f6ncelik, kapasite veya ilerleme bilgisini SkyPlanner&#8217;a kaydedin; ard\u0131ndan Arcturus&#8217;un yeni duruma g\u00f6re yeniden hesaplama yapmas\u0131n\u0131 sa\u011flay\u0131n. Bir sonraki teslim taahh\u00fcd\u00fcn\u00fc vermeden \u00f6nce ortaya \u00e7\u0131kan tamamlanma tarihlerini inceleyin. Sorulmas\u0131 gereken yaln\u0131zca \u201cbu i\u015fi frezeye s\u0131k\u0131\u015ft\u0131rabilir miyiz?\u201d de\u011fil, \u201cteslim s\u00f6z\u00fc verdi\u011fimiz di\u011fer sipari\u015fler bundan nas\u0131l etkilenir?\u201d sorusudur.<\/p>\n\n\n<p><strong>Autopilot etkinle\u015ftirildi\u011finde<\/strong> SkyPlanner, belirledi\u011finiz kurallar\u0131 ve kilitleri koruyarak yap\u0131land\u0131r\u0131lm\u0131\u015f olaylar veya bir zamanlay\u0131c\u0131 \u00fczerinden yeniden \u00e7izelgelemeyi tetikleyebilir. B\u00f6ylece planlama uzman\u0131n\u0131n plan\u0131 s\u00fcrekli elle yeniden olu\u015fturmas\u0131na gerek kalmadan plan g\u00fcncel tutulabilir. Yine de bilgilerin do\u011fru g\u00fcncellenmesi \u00f6nemlidir: Yaz\u0131l\u0131m, kimsenin kaydetmedi\u011fi bir makine duru\u015funu hesaba katamaz.<\/p>\n\n\n<p>\u00dcretim sahas\u0131 i\u00e7in fayda, s\u0131radaki i\u015flerin daha net olmas\u0131d\u0131r. Planlama uzman\u0131 ise etkilenen her operasyonu elle ta\u015f\u0131mak yerine \u00f6nemli bir teslimat, kapasite karar\u0131 veya m\u00fc\u015fteri g\u00f6r\u00fc\u015fmesi gibi \u00f6zel durumlarla ilgilenmeye zaman ay\u0131rabilir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mamec i\u00e7in neler de\u011fi\u015fti?<\/h2>\n\n\n<p>Finlandiya&#8217;da end\u00fcstriyel kar\u0131\u015ft\u0131rma ekipmanlar\u0131 ve y\u00fcksek teknolojili \u00fcr\u00fcnler i\u00e7in fason \u00fcretim yapan Mamec&#8217;in birbirine ba\u011fl\u0131 binlerce i\u015f emri vard\u0131. SkyPlanner&#8217;dan \u00f6nce \u00fcretim sorumlular\u0131, k\u00e2\u011f\u0131t i\u015f emirlerindeki teslim tarihlerine g\u00f6re i\u015fleri \u00f6nceliklendiriyordu. ERP&#8217;nin planlama i\u015flevleri \u015firketin \u00fcretimi bir b\u00fct\u00fcn olarak g\u00f6rmesini sa\u011flam\u0131yordu; ba\u011f\u0131ml\u0131l\u0131klar\u0131n elle y\u00f6netilmesi de \u00fcretim kontrol\u00fcn\u00fcn i\u015f y\u00fck\u00fcn\u00fc art\u0131r\u0131yordu.<\/p>\n\n\n<p>Mamec, s\u00fcreleri birka\u00e7 dakikadan sekiz saate kadar de\u011fi\u015fen dinamik i\u015f emri yap\u0131s\u0131na uyum sa\u011flayabildi\u011fi i\u00e7in SkyPlanner&#8217;\u0131 se\u00e7ti. SkyPlanner&#8217;\u0131 mevcut Oscar ERP ile entegre etti ve ana \u00fcretim planlama platformu olarak kullanmaya ba\u015flad\u0131.<\/p>\n\n\n<p>Art\u0131k yapay zek\u00e2 destekli sonlu kapasite \u00e7izelgeleme i\u015fleri s\u0131ral\u0131yor; birer haftal\u0131k d\u00f6nemler i\u00e7in kilitlenen i\u015f kuyruklar\u0131 da makine operat\u00f6rlerine s\u0131rada ne oldu\u011funu net bi\u00e7imde g\u00f6steriyor. Operat\u00f6rler, uzun s\u00fcren bir i\u015f devam ederken sonraki i\u015flerin haz\u0131rl\u0131\u011f\u0131n\u0131 yapabiliyor. \u00c7al\u0131\u015fanlar sipari\u015f numaras\u0131yla arama yaparak sipari\u015fin s\u0131ras\u0131n\u0131 ve \u00e7izelgesini g\u00f6rebiliyor; y\u00f6netim de \u00fcretim y\u00fck\u00fcn\u00fc ortak bir g\u00f6r\u00fcn\u00fcm \u00fczerinden takip edebiliyor.<\/p>\n\n\n<p>Mamec, optimize edilen i\u015f s\u0131ralamas\u0131 sayesinde planlama i\u015f y\u00fck\u00fcn\u00fcn belirgin bi\u00e7imde hafifledi\u011fini, teslimat performans\u0131n\u0131n iyile\u015fti\u011fini ve i\u015f merkezlerindeki duru\u015flar\u0131n azald\u0131\u011f\u0131n\u0131 bildiriyor. At\u00f6lye tipi \u00fcretim yapan di\u011fer i\u015fletmeler i\u00e7in \u00e7\u0131kar\u0131m somut: K\u00e2\u011f\u0131t \u00fczerindeki tarihlere ve ki\u015fisel de\u011ferlendirmelere dayanan \u00fcretim plan\u0131n\u0131n yerini, ortak \u00f6ncelikler ve birbirine ba\u011fl\u0131 i\u015f kuyruklar\u0131 al\u0131yor.<\/p>\n\n\n<p><a href=\"\/tr\/musteri-hikayeleri\/mamec\/\">Mamec&#8217;in m\u00fc\u015fteri hik\u00e2yesinin tamam\u0131n\u0131 okuyun<\/a>. Tala\u015fl\u0131 imalata ba\u015fka bir a\u00e7\u0131dan bakmak i\u00e7in <a href=\"\/tr\/musteri-hikayeleri\/eskomatic\/\">Eskomatic&#8217;in hik\u00e2yesini<\/a> de inceleyebilirsiniz; bu hik\u00e2ye, malzemelerin haz\u0131r olmas\u0131n\u0131n ve teslim tarihlerine g\u00f6re planlaman\u0131n \u00f6nemini g\u00f6steriyor.<\/p>\n\n\n<h2 class=\"wp-block-heading\">At\u00f6lye tipi \u00fcretiminiz i\u00e7in sahada uygulanabilir bir plan olu\u015fturun<\/h2>\n\n\n<p>Bir teslim tarihi de\u011fi\u015fti\u011finde, etkisini anlamak i\u00e7in t\u00fcm makinelerin i\u015f kuyruklar\u0131n\u0131 yeniden olu\u015fturman\u0131z gerekmemeli. SkyPlanner, otomatik \u00e7izelgelemeyi ve g\u00f6rsel Gantt plan\u0131n\u0131, \u00f6ncelikler ve kilitlenen i\u015fler \u00fczerindeki kontrol\u00fcn\u00fczle bir araya getirir. B\u00f6ylece s\u0131rada hangi i\u015fin yap\u0131laca\u011f\u0131na ve hangi teslim taahh\u00fctlerini verebilece\u011finize daha sa\u011flam bir temelde karar verebilirsiniz.<\/p>\n\n\n<p><a href=\"\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>; g\u00f6r\u00fc\u015fmeye tipik bir sipari\u015f rotas\u0131, i\u015flerin en \u00e7ok \u00e7ak\u0131\u015ft\u0131\u011f\u0131 kayna\u011f\u0131n\u0131z ve yak\u0131n zamanda \u00e7izelgelemekte zorland\u0131\u011f\u0131n\u0131z bir de\u011fi\u015fiklikle gelin. \u0130\u015flerin birbirine nas\u0131l ba\u011fland\u0131\u011f\u0131n\u0131 ve \u00f6ncelik de\u011fi\u015fikli\u011finin plan\u0131 nas\u0131l etkiledi\u011fini g\u00f6r\u00fcn. \u00d6nce \u00e7izelgeleme g\u00f6r\u00fcn\u00fcm\u00fcn\u00fc ke\u015ffetmek isterseniz <a href=\"\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u0131k\u00e7a sorulan sorular<\/h2>\n\n\n<h3 class=\"wp-block-heading\">\u00c7izelgeleme ile s\u0131radaki i\u015fi \u00fcretime verme aras\u0131ndaki fark nedir?<\/h3>\n\n\n<p>\u00c7izelgeleme, bir planlama d\u00f6nemi boyunca operasyonlar\u0131n hangi kaynaklarda ve ne zaman yap\u0131laca\u011f\u0131n\u0131 belirler. S\u0131radaki i\u015fi \u00fcretime verme ise bir i\u015f merkezinde haz\u0131r olan bir sonraki operasyonun se\u00e7ilmesi veya \u00fcretime verilmesidir. At\u00f6lye tipi \u00fcretimde bu yerel karar genel plana uygun olmal\u0131d\u0131r; \u00e7\u00fcnk\u00fc sonraki operasyonu ba\u015fka bir makinede yap\u0131lacak sipari\u015fleri de etkiler.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Excel&#8217;de at\u00f6lye tipi \u00fcretim \u00e7izelgesi olu\u015fturulabilir mi?<\/h3>\n\n\n<p>Az say\u0131da ve de\u011fi\u015fmeyen operasyon, bir hesap tablosunda g\u00f6sterilebilir. As\u0131l zorluk, \u00fcretim de\u011fi\u015fti\u011finde t\u00fcm ba\u011f\u0131ml\u0131l\u0131klar\u0131, kaynak \u00e7ak\u0131\u015fmalar\u0131n\u0131 ve tamamlanma tarihlerini g\u00fcncel tutmakt\u0131r. Planlama uzmanlar\u0131 g\u00fcnlerini i\u015f kuyruklar\u0131n\u0131 yeniden olu\u015fturmakla ge\u00e7iriyorsa, birbirine ba\u011fl\u0131 i\u015fleri kapsayan \u00e7izelgeyi hesaplamak ve g\u00fcncel tutmak i\u00e7in SkyPlanner APS daha pratik bir \u00e7\u00f6z\u00fcmd\u00fcr.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Daha k\u0131sa bir \u00e7izelge her zaman daha iyi teslimat performans\u0131 sa\u011flar m\u0131?<\/h3>\n\n\n<p>Hay\u0131r. \u0130lk i\u015fin ba\u015flang\u0131c\u0131ndan son i\u015fin biti\u015fine kadar ge\u00e7en toplam s\u00fcre k\u0131sald\u0131\u011f\u0131nda, i\u015flerin tamam\u0131 daha erken bitmi\u015f olur; ancak tek bir sipari\u015f yine de teslim tarihini ka\u00e7\u0131rabilir. Her sipari\u015fin t\u00fcm operasyonlar\u0131n\u0131n tamamland\u0131\u011f\u0131 tarihi teslim taahh\u00fctleriyle kar\u015f\u0131la\u015ft\u0131r\u0131n; ard\u0131ndan haz\u0131rl\u0131k i\u015f y\u00fck\u00fcn\u00fc, darbo\u011fazdaki y\u00fck\u00fc ve \u00fcretimdeki yar\u0131 mamulleri de\u011ferlendirin. En iyi \u00e7izelge, hangi \u00f6nceliklere hizmet etmesi gerekti\u011fine ba\u011fl\u0131d\u0131r.<\/p>\n\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is the difference between scheduling and dispatching?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Scheduling assigns operations to resources and times across a planning period. Dispatching selects or releases the next ready operation at a workstation. In a job shop, that local choice should follow the wider plan because it affects orders whose next operation is on another machine.\"}},{\"@type\":\"Question\",\"name\":\"Can a job shop schedule be built in Excel?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A small, stable set of operations can be represented in a spreadsheet. The difficulty is maintaining all the dependencies, resource conflicts and completion dates when production changes. If planners spend their day rebuilding queues, SkyPlanner APS is a more practical way to calculate and maintain the connected schedule.\"}},{\"@type\":\"Question\",\"name\":\"Does a shorter schedule always mean better delivery performance?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. A shorter makespan finishes the entire set of jobs earlier, but an individual order can still miss its deadline. Compare complete-order finish dates with delivery commitments, then consider setup effort, bottleneck loading and work in progress. The best schedule depends on the priorities you need it to serve.\"}}]}<\/script>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>At\u00f6lye Tipi \u00c7izelgeleme: Farkl\u0131 Rotalarda Zaman\u0131nda Teslimat Freze tezg\u00e2h\u0131 bo\u015f, bir g\u00f6vde i\u015flenmeye haz\u0131r ve \u00fcretim sorumlusu \u00fcretimin devam etmesini istiyor. G\u00f6vdeyi i\u015fleme almak en do\u011fal karar gibi g\u00f6r\u00fcn\u00fcyor. Ancak bir saat sonra tornadan acil bir pim gelecek ve ayn\u0131 freze tezg\u00e2h\u0131na ihtiya\u00e7 duyacak. G\u00f6vdenin i\u015flenmesine ba\u015fland\u0131\u011f\u0131 anda, pimin teslim tarihi tehlikeye giriyor. At\u00f6lye tipi &#8230; <a title=\"At\u00f6lye Tipi \u00c7izelgeleme: Farkl\u0131 Rotalarda Zaman\u0131nda Teslimat\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/\" aria-label=\"Read more about At\u00f6lye Tipi \u00c7izelgeleme: Farkl\u0131 Rotalarda Zaman\u0131nda Teslimat\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97663,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-96280","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ve-cizelgeleme","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>At\u00f6lye tipi \u00e7izelgeleme: Zaman\u0131nda teslimat &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Sipari\u015f rotalar\u0131 farkl\u0131, makineler ortak. At\u00f6lye tipi \u00e7izelgelemenin i\u015fleri nas\u0131l koordine etti\u011fini, SkyPlanner&#039;\u0131n plan\u0131 nas\u0131l uygulanabilir tuttu\u011funu g\u00f6r\u00fcn.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"At\u00f6lye Tipi \u00c7izelgeleme: Farkl\u0131 Rotalarda Zaman\u0131nda Teslimat\" \/>\n<meta property=\"og:description\" content=\"Sipari\u015f rotalar\u0131 farkl\u0131, makineler ortak. At\u00f6lye tipi \u00e7izelgelemenin i\u015fleri nas\u0131l koordine etti\u011fini, SkyPlanner&#039;\u0131n plan\u0131 nas\u0131l uygulanabilir tuttu\u011funu g\u00f6r\u00fcn.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-04T08:52:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:42:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/atolye-tipi-cizelgeleme\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/atolye-tipi-cizelgeleme\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"At\u00f6lye Tipi \u00c7izelgeleme: Farkl\u0131 Rotalarda Zaman\u0131nda Teslimat\",\"datePublished\":\"2026-10-04T08:52:42+00:00\",\"dateModified\":\"2026-10-19T14:42:56+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/atolye-tipi-cizelgeleme\\\/\"},\"wordCount\":3180,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/atolye-tipi-cizelgeleme\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/job-shop-scheduling-hero-1.png\",\"articleSection\":[\"APS ve \u00e7izelgeleme\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/atolye-tipi-cizelgeleme\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/atolye-tipi-cizelgeleme\\\/\",\"name\":\"At\u00f6lye tipi \u00e7izelgeleme: Zaman\u0131nda teslimat &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/atolye-tipi-cizelgeleme\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/atolye-tipi-cizelgeleme\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/job-shop-scheduling-hero-1.png\",\"datePublished\":\"2026-10-04T08:52:42+00:00\",\"dateModified\":\"2026-10-19T14:42:56+00:00\",\"description\":\"Sipari\u015f rotalar\u0131 farkl\u0131, makineler ortak. At\u00f6lye tipi \u00e7izelgelemenin i\u015fleri nas\u0131l koordine etti\u011fini, SkyPlanner'\u0131n plan\u0131 nas\u0131l uygulanabilir tuttu\u011funu g\u00f6r\u00fcn.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/atolye-tipi-cizelgeleme\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/atolye-tipi-cizelgeleme\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/atolye-tipi-cizelgeleme\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/job-shop-scheduling-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/job-shop-scheduling-hero-1.png\",\"width\":1672,\"height\":941,\"caption\":\"Housing and pin production routes converging on a shared milling machine before finished parts\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/atolye-tipi-cizelgeleme\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"At\u00f6lye Tipi \u00c7izelgeleme: Farkl\u0131 Rotalarda Zaman\u0131nda Teslimat\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"At\u00f6lye tipi \u00e7izelgeleme: Zaman\u0131nda teslimat &#8211; SkyPlanner","description":"Sipari\u015f rotalar\u0131 farkl\u0131, makineler ortak. At\u00f6lye tipi \u00e7izelgelemenin i\u015fleri nas\u0131l koordine etti\u011fini, SkyPlanner'\u0131n plan\u0131 nas\u0131l uygulanabilir tuttu\u011funu g\u00f6r\u00fcn.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/","og_locale":"tr_TR","og_type":"article","og_title":"At\u00f6lye Tipi \u00c7izelgeleme: Farkl\u0131 Rotalarda Zaman\u0131nda Teslimat","og_description":"Sipari\u015f rotalar\u0131 farkl\u0131, makineler ortak. At\u00f6lye tipi \u00e7izelgelemenin i\u015fleri nas\u0131l koordine etti\u011fini, SkyPlanner'\u0131n plan\u0131 nas\u0131l uygulanabilir tuttu\u011funu g\u00f6r\u00fcn.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-04T08:52:42+00:00","article_modified_time":"2026-10-19T14:42:56+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"16 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"At\u00f6lye Tipi \u00c7izelgeleme: Farkl\u0131 Rotalarda Zaman\u0131nda Teslimat","datePublished":"2026-10-04T08:52:42+00:00","dateModified":"2026-10-19T14:42:56+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/"},"wordCount":3180,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png","articleSection":["APS ve \u00e7izelgeleme","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/","name":"At\u00f6lye tipi \u00e7izelgeleme: Zaman\u0131nda teslimat &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png","datePublished":"2026-10-04T08:52:42+00:00","dateModified":"2026-10-19T14:42:56+00:00","description":"Sipari\u015f rotalar\u0131 farkl\u0131, makineler ortak. At\u00f6lye tipi \u00e7izelgelemenin i\u015fleri nas\u0131l koordine etti\u011fini, SkyPlanner'\u0131n plan\u0131 nas\u0131l uygulanabilir tuttu\u011funu g\u00f6r\u00fcn.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png","width":1672,"height":941,"caption":"Housing and pin production routes converging on a shared milling machine before finished parts"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/atolye-tipi-cizelgeleme\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"At\u00f6lye Tipi \u00c7izelgeleme: Farkl\u0131 Rotalarda Zaman\u0131nda Teslimat"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/job-shop-scheduling-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"At\u00f6lye Tipi \u00c7izelgeleme: Farkl\u0131 Rotalarda Zaman\u0131nda Teslimat Freze tezg\u00e2h\u0131 bo\u015f, bir g\u00f6vde i\u015flenmeye haz\u0131r ve \u00fcretim sorumlusu \u00fcretimin devam etmesini istiyor. G\u00f6vdeyi i\u015fleme almak en do\u011fal karar gibi g\u00f6r\u00fcn\u00fcyor. Ancak bir saat sonra tornadan acil bir pim gelecek ve ayn\u0131 freze tezg\u00e2h\u0131na ihtiya\u00e7 duyacak. G\u00f6vdenin i\u015flenmesine ba\u015fland\u0131\u011f\u0131 anda, pimin teslim tarihi tehlikeye giriyor. At\u00f6lye tipi&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96280","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=96280"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96280\/revisions"}],"predecessor-version":[{"id":96309,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96280\/revisions\/96309"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/97663"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=96280"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=96280"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=96280"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}