{"id":96106,"date":"2026-10-04T04:30:32","date_gmt":"2026-10-04T04:30:32","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96106"},"modified":"2026-10-19T14:42:42","modified_gmt":"2026-10-19T14:42:42","slug":"uretim-plani-ornegi","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/","title":{"rendered":"\u0130malat i\u00e7in \u00fcretim plan\u0131 \u015fablonu: \u0130\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u0130malat i\u00e7in \u00fcretim plan\u0131 \u015fablonu: \u0130\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n<\/h1>\n\n\n<p>\u00dcretim plan\u0131 \u015fablonu, sipari\u015flerinize sayfada bir yer ay\u0131r\u0131r. As\u0131l zor soru, fabrikada da onlara yer olup olmad\u0131\u011f\u0131d\u0131r: Uygun bir makinede, do\u011fru operat\u00f6rle, bir sonraki operasyona ve m\u00fc\u015fteriye teslimata yeti\u015fecek kadar erken i\u015flenebilecekler mi?<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template.csv\">\u00dcretim plan\u0131 \u015fablonunu indirin (Excel i\u00e7in CSV)<\/a>. Her operasyonun ayr\u0131 bir sat\u0131rda yer ald\u0131\u011f\u0131 bu basit imalat \u00f6rne\u011fini ihtiya\u00e7lar\u0131n\u0131za g\u00f6re uyarlayabilirsiniz. A\u015fa\u011f\u0131daki tabloda iki \u00f6rnek i\u015f g\u00f6sterilmi\u015ftir; dosyada saatlerin yan\u0131 s\u0131ra tam tarihler de bulunur.<\/p>\n\n\n<figure class=\"wp-block-table\"><table>\n<thead>\n<tr>\n<th>Sipari\u015f \/ operasyon<\/th>\n<th>Makine \/ operat\u00f6r<\/th>\n<th style=\"text-align: right;\">Haz\u0131rl\u0131k (dk)<\/th>\n<th style=\"text-align: right;\">\u0130\u015flem (dk)<\/th>\n<th>Ba\u015flang\u0131\u00e7<\/th>\n<th>Biti\u015f<\/th>\n<th>Termin<\/th>\n<th>Durum<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>A \/ A-10<\/td>\n<td>M1 \/ O1<\/td>\n<td style=\"text-align: right;\">30<\/td>\n<td style=\"text-align: right;\">120<\/td>\n<td>08:00<\/td>\n<td>10:30<\/td>\n<td>12:00<\/td>\n<td>Planland\u0131<\/td>\n<\/tr>\n<tr>\n<td>B \/ B-10<\/td>\n<td>M1 \/ O1<\/td>\n<td style=\"text-align: right;\">15<\/td>\n<td style=\"text-align: right;\">180<\/td>\n<td>10:30<\/td>\n<td>13:45<\/td>\n<td>16:00<\/td>\n<td>Planland\u0131<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/figure>\n\n\n<p>Gerekli verileri anlamak ve basit bir i\u015f s\u0131ralamas\u0131n\u0131 denemek i\u00e7in bu \u015fablonu kullan\u0131n. Yeni sipari\u015flere, gecikmelere ve kapasite de\u011fi\u015fikliklerine ra\u011fmen kullan\u0131labilirli\u011fini korumas\u0131 gereken bir \u00fcretim plan\u0131 i\u00e7in \u00e7izelgeyi SkyPlanner APS ile hesaplay\u0131n. Bir hesap tablosu se\u00e7ti\u011finiz ba\u015flang\u0131\u00e7 saatlerini g\u00f6sterebilir; operasyonlar\u0131 mevcut kapasiteye s\u0131\u011fd\u0131rma i\u015fini ise SkyPlanner yapar.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dcretim plan\u0131 \u015fablonu size ne s\u00f6ylemeli?<\/h2>\n\n\n<p>\u0130malatta \u00fcretim \u00e7izelgesi, hangi i\u015fin hangi kaynakta ne zaman yap\u0131laca\u011f\u0131n\u0131 belirler. Operasyon d\u00fczeyinde \u015fu d\u00f6rt soruyu yan\u0131tlamal\u0131d\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Hangi i\u015f yap\u0131lacak?<\/strong> Yaln\u0131zca \u00fcr\u00fcn ad\u0131n\u0131 de\u011fil, sipari\u015fi ve yap\u0131lacak operasyonu da belirtin.<\/li>\n<li><strong>Nerede yap\u0131labilir?<\/strong> Makineyi veya i\u015f merkezini ve i\u015fi yapacak ki\u015fileri belirtin.<\/li>\n<li><strong>Ne zaman yap\u0131labilir?<\/strong> Haz\u0131rl\u0131\u011f\u0131, i\u015flem s\u00fcresini, \u00e7al\u0131\u015fma d\u00f6nemlerini ve \u00f6nceden haz\u0131r olmas\u0131 gereken her \u015feyi hesaba kat\u0131n.<\/li>\n<li><strong>Zaman\u0131nda bitecek mi?<\/strong> Hesaplanan biti\u015fi, operasyonun tamamlanmas\u0131 gereken zamanla kar\u015f\u0131la\u015ft\u0131r\u0131n ve sevkiyata kadar kalan i\u015fleri de\u011ferlendirin.<\/li>\n<\/ul>\n\n\n<p>Bu son ayr\u0131m \u00f6nemlidir. Ard\u0131ndan montaj, kontrol veya paketleme yap\u0131lacaksa tala\u015fl\u0131 imalat operasyonunun bitmesi, sipari\u015fin sevkiyata haz\u0131r oldu\u011fu anlam\u0131na gelmez. Her operasyon i\u00e7in, sonraki i\u015flere zaman b\u0131rakacak bir tamamlanma hedefi belirleyin.<\/p>\n\n\n<p>Haftal\u0131k miktar plan\u0131 yararl\u0131d\u0131r, ancak farkl\u0131 bir soruyu yan\u0131tlar. <a href=\"\/tr\/kaynaklar\/ana-uretim-programi\/\">Ana \u00fcretim \u00e7izelgesi<\/a>, hangi bitmi\u015f \u00fcr\u00fcnlere ne zaman ihtiya\u00e7 duyuldu\u011funu ortaya koyar. Bu \u015fablon ise bir alt d\u00fczey i\u00e7indir: Makine ve operat\u00f6r zaman\u0131n\u0131 payla\u015fmak zorunda olan operasyonlar\u0131 ele al\u0131r. <a href=\"\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">\u00dcretim \u00e7izelgeleme rehberi<\/a>, bu verilerden uygulanabilir bir i\u015f s\u0131ralamas\u0131n\u0131n nas\u0131l olu\u015fturuldu\u011funu a\u00e7\u0131klar.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00d6rne\u011fi kapasite ay\u0131rma a\u00e7\u0131s\u0131ndan de\u011ferlendirin<\/h2>\n\n\n<p>Ayn\u0131 makineyi, M1&#8217;i, ve ayn\u0131 operat\u00f6r\u00fc, O1&#8217;i, bekleyen iki i\u015fin bulundu\u011fu bir at\u00f6lye d\u00fc\u015f\u00fcn\u00fcn. Her iki i\u015fin malzemeleri de haz\u0131rd\u0131r. Makine ve operat\u00f6r 08:00 ile 16:00 aras\u0131nda kesintisiz kullan\u0131labilir durumdad\u0131r ve iki operasyonun da tamamlanmam\u0131\u015f bir \u00f6nceki operasyonu yoktur.<\/p>\n\n\n<p>A i\u015fi i\u00e7in 30 dakika haz\u0131rl\u0131k ve 120 dakika i\u015flem s\u00fcresi ayr\u0131l\u0131r. \u0130\u015f, kayna\u011f\u0131 10:30&#8217;a kadar me\u015fgul eder. Ard\u0131ndan B i\u015fi i\u00e7in 15 dakika haz\u0131rl\u0131k ve 180 dakika i\u015flem s\u00fcresi ayr\u0131l\u0131r; i\u015f 13:45&#8217;te biter. \u0130\u015fler birbiriyle \u00e7ak\u0131\u015fmaz ve her ikisi de belirtilen termin saatlerinden \u00f6nce tamamlan\u0131r.<\/p>\n\n\n<p>Bu s\u0131ralama, dayand\u0131\u011f\u0131 varsay\u0131mlar ge\u00e7erli oldu\u011fu i\u00e7in uygulanabilir. O1&#8217;e 11:00&#8217;de ba\u015fka bir makinede ihtiya\u00e7 duyulursa M1 bo\u015f olsa bile B sat\u0131r\u0131ndaki atama art\u0131k uygulanamaz. \u00d6\u011fle molas\u0131 varsa \u00e7al\u0131\u015fma d\u00f6nemi kesintisiz olmaktan \u00e7\u0131kar. Bunlar ara operasyonlarsa sonraki ad\u0131mlar i\u00e7in de kapasite ayr\u0131lmas\u0131 gerekir.<\/p>\n\n\n<p>Tablonun as\u0131l faydas\u0131 renklerinde de\u011fildir. Her sat\u0131r\u0131n, bir kayna\u011f\u0131n kullan\u0131labilir zaman\u0131ndan belirli bir s\u00fcreyi ay\u0131rmas\u0131ndad\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u015eablonu k\u0131s\u0131tlar\u0131 gizlemeden uyarlay\u0131n<\/h2>\n\n\n<p>CSV dosyas\u0131n\u0131 Excel&#8217;de a\u00e7\u0131n ve \u00e7al\u0131\u015fma kopyas\u0131n\u0131 Excel \u00e7al\u0131\u015fma kitab\u0131 olarak kaydedin. T\u00fcm veriler tek s\u00fctunda g\u00f6r\u00fcn\u00fcyorsa dosyay\u0131 virg\u00fcl ay\u0131r\u0131c\u0131 kullanarak i\u00e7e aktar\u0131n. \u0130ndirdi\u011finiz CSV, otomatik bir \u00e7izelgeleme modeli de\u011fil, \u00f6rnek de\u011ferler i\u00e7erir.<\/p>\n\n\n<p>\u00d6rnekteki tarih <strong>5 Ekim 2026<\/strong>&#8216;d\u0131r. Bunu ger\u00e7ek \u00e7al\u0131\u015fma tarihlerinizle de\u011fi\u015ftirin; Ba\u015flang\u0131\u00e7, Biti\u015f ve Termin h\u00fccrelerinin i\u00e7e aktar\u0131lm\u0131\u015f metin de\u011fil, hesap tablosunun tan\u0131d\u0131\u011f\u0131 tarih\/saat de\u011ferleri oldu\u011fundan emin olun. Saatin yan\u0131nda tarihi de g\u00f6sterin; aksi halde yar\u0131n\u0131n 08:00&#8217;i bug\u00fcne aitmi\u015f gibi g\u00f6r\u00fcnebilir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Her operasyonu ayr\u0131 tan\u0131mlay\u0131n ve s\u00fcresinin hangi temelde hesapland\u0131\u011f\u0131n\u0131 belirtin<\/h3>\n\n\n<p>A ve B&#8217;yi kendi sipari\u015f ve operasyon kimliklerinizle de\u011fi\u015ftirin. Bir sipari\u015f i\u00e7in kesme, b\u00fckme ve kaynak gerekiyorsa bu operasyonlar\u0131 ayr\u0131 sat\u0131rlara yaz\u0131n. Operasyonlar\u0131n s\u0131ras\u0131n\u0131 hesap tablosundaki sat\u0131r s\u0131ras\u0131 de\u011fil, <a href=\"\/tr\/kaynaklar\/uretim-rotasi\/\">\u00fcretim rotas\u0131<\/a> belirler.<\/p>\n\n\n<p>\u0130\u015flem (dk), <strong>partinin toplam i\u015flem s\u00fcresini<\/strong> ifade eder. Tahmininiz par\u00e7a ba\u015f\u0131na s\u00fcre ise girmeden \u00f6nce miktarla \u00e7arp\u0131n. Haz\u0131rl\u0131k (dk), makinenin me\u015fgul oldu\u011fu ek s\u00fcredir; bu s\u00fcreyi a\u00e7\u0131klanmam\u0131\u015f bir toplam\u0131n i\u00e7ine gizlemeyin veya iki kez hesaba katmay\u0131n.<\/p>\n\n\n<p>Kesintisiz y\u00fcr\u00fct\u00fclen bir operasyon i\u00e7in F2 h\u00fccresindeki sabit Biti\u015f de\u011ferini bu form\u00fclle de\u011fi\u015ftirin ve form\u00fcl\u00fc a\u015fa\u011f\u0131daki sat\u0131rlara kopyalay\u0131n:<\/p>\n\n\n<p><code>=E2+(C2+D2)\/1440<\/code><\/p>\n\n\n<p>Form\u00fcl, ba\u015flang\u0131\u00e7 zaman\u0131na haz\u0131rl\u0131k ve i\u015flem dakikalar\u0131n\u0131 ekler. Ba\u015flang\u0131c\u0131 se\u00e7mez, ba\u015fka bir i\u015fle \u00e7ak\u0131\u015fmay\u0131 \u00f6nlemez veya i\u015fi \u00e7al\u0131\u015fma yap\u0131lmayan vardiya saatlerinin d\u0131\u015f\u0131na ta\u015f\u0131maz. Bu tabloda s\u00f6z konusu \u00e7izelgeleme kararlar\u0131 h\u00e2l\u00e2 size aittir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u0130\u015f ba\u015flamadan \u00f6nce haz\u0131r olmas\u0131 gerekenleri kaydedin<\/h3>\n\n\n<p>Operasyon listesinin yan\u0131nda her makine ve operat\u00f6r i\u00e7in tarihli \u00e7al\u0131\u015fma d\u00f6nemlerini tutun. Molalar\u0131, bak\u0131mlar\u0131 ve kullan\u0131lamayan di\u011fer d\u00f6nemleri kaydedin. Atamalar\u0131n\u0131 birbirinden ba\u011f\u0131ms\u0131z kontrol etmeniz gerekti\u011finde Makine ve Operat\u00f6r bilgilerini ayr\u0131 s\u00fctunlara ay\u0131r\u0131n.<\/p>\n\n\n<p>\u00c7ok ad\u0131ml\u0131 sipari\u015flerde, \u00f6nceki operasyonun kimli\u011fini i\u00e7eren bir \u00d6nceki operasyon s\u00fctunu ekleyin. Ba\u015flang\u0131\u00e7 zaman\u0131 bir malzeme teslimat\u0131na ba\u011fl\u0131ysa malzemenin haz\u0131r olaca\u011f\u0131 zaman\u0131 da ekleyin. Bir sat\u0131r ancak gerekli girdileri ve \u00f6nceki i\u015fleri de haz\u0131r oldu\u011funda \u00e7izelgelenebilir.<\/p>\n\n\n<p>Bir operasyona ara verilemiyorsa haz\u0131rl\u0131k ve i\u015flem i\u00e7in yeterince uzun, kesintisiz bir \u00e7al\u0131\u015fma d\u00f6nemi gerekir. Ara verilebiliyorsa basit biti\u015f saati form\u00fcl\u00fc, birden fazla \u00e7al\u0131\u015fma d\u00f6nemine yay\u0131lan i\u015fin biti\u015fini hesaplamaz. Bunun i\u00e7in \u00e7al\u0131\u015fma takvimini dikkate alan ayr\u0131 bir hesaplama gerekir.<\/p>\n\n\n<p>\u015eablon bu noktada as\u0131l planlama i\u015fini ortaya koymaya ba\u015flar: Daha fazla sat\u0131r girmek de\u011fil, bu sat\u0131rlar\u0131n birbirini nas\u0131l etkiledi\u011fini kontrol etmek.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bir varsay\u0131m\u0131 de\u011fi\u015ftirerek plan\u0131 s\u0131nay\u0131n<\/h2>\n\n\n<p>Hesap tablosundaki \u00e7izelgeye g\u00fcvenmeden \u00f6nce \u00fcretim de\u011fi\u015fti\u011finde ne oldu\u011funu g\u00f6r\u00fcn.<\/p>\n\n\n<p>A&#8217;n\u0131n 10:30&#8217;da bitti\u011fini, ancak M1&#8217;in 10:30 ile 13:00 aras\u0131nda kullan\u0131lamad\u0131\u011f\u0131n\u0131 varsayal\u0131m. B hen\u00fcz ba\u015flamam\u0131\u015ft\u0131r. \u0130\u015f kesintisiz y\u00fcr\u00fct\u00fcl\u00fcrse 195 dakikal\u0131k haz\u0131rl\u0131k ve i\u015flem s\u00fcresiyle art\u0131k 16:15&#8217;te bitecektir.<\/p>\n\n\n<p>Bu biti\u015f hem 16:00&#8217;da sona eren \u00e7al\u0131\u015fma d\u00f6nemini hem de B&#8217;nin 16:00 olan terminini a\u015far. Bu, onaylanm\u0131\u015f yeni bir \u00e7izelge de\u011fil, bir uyar\u0131d\u0131r. B&#8217;nin ba\u015flang\u0131\u00e7 h\u00fccresini de\u011fi\u015ftirmek sorunu ortaya \u00e7\u0131karm\u0131\u015ft\u0131r; \u00e7\u00f6zmemi\u015ftir.<\/p>\n\n\n<p>Uygun bir operat\u00f6r\u00fcn de haz\u0131r oldu\u011fu ba\u015fka bir elveri\u015fli makineyi, \u00e7al\u0131\u015fma saatlerinin onayl\u0131 olarak uzat\u0131lmas\u0131n\u0131 veya farkl\u0131 bir teslimat taahh\u00fcd\u00fcn\u00fc de\u011ferlendirebilirsiniz. Ancak B&#8217;yi ba\u015fka bir yere ta\u015f\u0131mak, oraya atanm\u0131\u015f i\u015fleri de kontrol etmenizi gerektirir. B&#8217;yi izleyen bir operasyon varsa onun ba\u015flang\u0131c\u0131n\u0131n da de\u011fi\u015fmesi gerekebilir.<\/p>\n\n\n<p>Aritmetik ile <a href=\"\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">sonlu kapasite \u00e7izelgeleme<\/a> aras\u0131ndaki fark budur. Aritmetik, se\u00e7ti\u011finiz ataman\u0131n ne zaman bitece\u011fini hesaplar. \u00c7izelgeleme ise mevcut kapasiteyi a\u015fmadan i\u015fe bir yer bulur.<\/p>\n\n\n<p>Hesap tablosundaki plan\u0131 yay\u0131mlamadan \u00f6nce makine ve operat\u00f6r \u00e7ak\u0131\u015fmalar\u0131n\u0131, malzemeleri, \u00f6nceki operasyonlar\u0131, \u00e7al\u0131\u015fma d\u00f6nemlerini ve tamamlanma hedeflerini kontrol edin. Tamamlanan i\u015flerin ger\u00e7ekle\u015fen zamanlar\u0131n\u0131 saklay\u0131n ve \u00fcretim sahas\u0131nda eski bir kopyan\u0131n kullan\u0131lmamas\u0131 i\u00e7in onayl\u0131 s\u00fcr\u00fcm\u00fc a\u00e7\u0131k\u00e7a belirtin.<\/p>\n\n\n<p>Bu \u00f6rnekte s\u00f6z konusu kontrolleri yapmak kolayd\u0131r. \u00dcretimin s\u00fcrekli de\u011fi\u015fti\u011fi bir fabrikada ise etkilenen her sipari\u015f i\u00e7in bunlar\u0131 tekrarlamak, bir \u00e7izelgeleme yaz\u0131l\u0131m\u0131na devretmek isteyece\u011finiz i\u015ftir. Daha kapsaml\u0131 <a href=\"\/tr\/kaynaklar\/excel-uretim-planlama-zorluklari-ve-skyplanner-aps\/\">Excel ile \u00fcretim planlaman\u0131n zorluklar\u0131 rehberi<\/a>, plan\u0131 g\u00fcncel tutma y\u00fck\u00fcn\u00fcn neden b\u00fcy\u00fcd\u00fc\u011f\u00fcn\u00fc ele al\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Plan\u0131 siz y\u00f6nlendirin, i\u015fleri kapasiteye SkyPlanner yerle\u015ftirsin<\/h2>\n\n\n<p>SkyPlanner, i\u015f merkezlerinizi, vardiyalar\u0131n\u0131z\u0131, operat\u00f6rlerinizi, \u00f6nceliklerinizi ve malzemelerinizi \u00e7izelgeleme s\u00fcrecine dahil eder. \u00dcretim kaynaklar\u0131n\u0131 ve operasyon verilerini siz tan\u0131mlars\u0131n\u0131z; \u00e7izelgeleme yapay zek\u00e2s\u0131 Arcturus, tan\u0131mlanan kapasite ve ba\u011f\u0131ml\u0131l\u0131klara g\u00f6re i\u015f s\u0131ras\u0131n\u0131 hesaplar. Sonu\u00e7, her i\u015f merkezinin i\u015f kuyru\u011fu ve ilgili i\u015flem ad\u0131mlar\u0131 aras\u0131ndaki ba\u011flant\u0131larla birlikte Gantt zaman \u00e7izelgesinde g\u00f6r\u00fcn\u00fcr.<\/p>\n\n\n<p>M1&#8217;deki kesinti i\u00e7in makinenin kullan\u0131lamad\u0131\u011f\u0131 d\u00f6nemi kaydedip \u00e7izelgeyi yeniden hesaplat\u0131rs\u0131n\u0131z. Arcturus, tan\u0131mlad\u0131\u011f\u0131n\u0131z kaynak se\u00e7eneklerini ve k\u0131s\u0131tlar\u0131 kullanarak i\u015fleri bu d\u00f6nemin d\u0131\u015f\u0131na \u00e7izelgeler. Ard\u0131ndan, zincirleme de\u011fi\u015fikliklerin her birini hesap tablosu sat\u0131rlar\u0131nda kendiniz takip etmek yerine sonucu inceleyebilir ve hangi sipari\u015fin tamamlanma zaman\u0131na m\u00fcdahale gerekti\u011fini g\u00f6rebilirsiniz.<\/p>\n\n\n<p>Malzeme durumunu dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde, malzemelerin haz\u0131r olup olmad\u0131\u011f\u0131 da bu hesaplamaya dahil edilebilir. Kilitler, yerinin de\u011fi\u015ftirilmesini istemedi\u011finiz i\u015fleri korur; \u00f6nceden belirledi\u011finiz \u00f6ncelikler ise hangi taahh\u00fctlerin daha \u00f6nemli oldu\u011funu ifade eder. <strong>\u00d6nceliklere siz karar verirsiniz; yapay zek\u00e2 bunlara uyar.<\/strong> Bu kararlar\u0131 uygulamak i\u00e7in her i\u015fi tek tek yerle\u015ftirmeniz gerekmez.<\/p>\n\n\n<p>Kazanc\u0131n\u0131z yaln\u0131zca daha d\u00fczenli bir sipari\u015f listesi de\u011fil, fabrikada ko\u015fullar de\u011fi\u015fti\u011finde de kullanabilece\u011finiz bir pland\u0131r. Eme\u011finizi \u00fcretim kararlar\u0131na ay\u0131r\u0131rs\u0131n\u0131z: Kapasite art\u0131r\u0131lmal\u0131 m\u0131, bir \u00f6ncelik de\u011fi\u015ftirilmeli mi, yoksa m\u00fc\u015fteriyle teslim tarihi hakk\u0131nda m\u0131 g\u00f6r\u00fc\u015f\u00fclmeli? Bu kararlar\u0131n arkas\u0131ndaki \u00e7izelgeleme hesaplamas\u0131n\u0131 SkyPlanner yapar.<\/p>\n\n\n<p>Gantt&#8217;\u0131n, kaynak uygunlu\u011funun ve otomatik \u00e7izelgelemenin bu i\u015fi nas\u0131l destekledi\u011fini g\u00f6rmek i\u00e7in <a href=\"\/tr\/ozellikler\/\">SkyPlanner&#8217;\u0131n \u00e7izelgeleme \u00f6zelliklerini ke\u015ffedin<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Excel&#8217;den ge\u00e7i\u015f UTU i\u00e7in neyi de\u011fi\u015ftirdi?<\/h2>\n\n\n<p>UTU&#8217;nun Ulvila fabrikas\u0131 elektrik panolar\u0131 ve \u015falt donan\u0131mlar\u0131 \u00fcretiyor. SkyPlanner&#8217;dan \u00f6nce b\u00f6l\u00fcmler, elle g\u00fcncelledikleri kendi Excel tablolar\u0131yla planlama yap\u0131yordu. ERP&#8217;deki i\u015f s\u0131ras\u0131 de\u011fi\u015fiklikleri her zaman \u00fcretim sahas\u0131na ula\u015fm\u0131yor, ger\u00e7ek\u00e7i kapasiteyi g\u00f6rmek zor oluyordu.<\/p>\n\n\n<p>Sorun yaln\u0131zca eksik bir s\u00fctun de\u011fildi. Sipari\u015f bilgilerinin, \u00fcretim s\u0131ras\u0131n\u0131n ve i\u015fi yapan ki\u015filerin birbiriyle uyumlu kalmas\u0131n\u0131 sa\u011flamakt\u0131.<\/p>\n\n\n<p>UTU, Oracle NetSuite&#8217;e ge\u00e7erken SkyPlanner&#8217;\u0131 se\u00e7ti. UTU&#8217;daki uygulamada SkyPlanner, NetSuite ve bordro sistemiyle ba\u011flant\u0131 kurarak fabrikan\u0131n hatlar\u0131n\u0131 ve departmanlar\u0131n\u0131 tek bir sistemde bir araya getiriyor. Ekip, yapay zek\u00e2 destekli \u00e7izelgelemenin Gantt zaman \u00e7izelgesiyle birlikte kullan\u0131lmas\u0131n\u0131 \u00f6ne \u00e7\u0131kar\u0131yor: i\u015f s\u0131ras\u0131, kapasite ve ilerleme ayn\u0131 anda g\u00f6r\u00fclebiliyor.<\/p>\n\n\n<p>UTU, <strong>elektronik tablolar\u0131 elle g\u00fcncellemek i\u00e7in harcanan zamandan haftada yakla\u015f\u0131k iki saat tasarruf etti\u011fini<\/strong> ve g\u00fcncellenmi\u015f i\u015f kuyru\u011funun montaj \u00e7al\u0131\u015fanlar\u0131na saniyeler i\u00e7inde ula\u015ft\u0131\u011f\u0131n\u0131 belirtiyor. \u015eablonun \u00f6tesine ge\u00e7menin pratik kar\u015f\u0131l\u0131\u011f\u0131 bu: kopyalar\u0131 g\u00fcncel tutmak i\u00e7in daha az \u00e7aba harcamak ve i\u015fi yapan \u00e7al\u0131\u015fanlara daha net bir i\u015f s\u0131ras\u0131 sunmak.<\/p>\n\n\n<p><a href=\"\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun Excel&#8217;den SkyPlanner&#8217;a ge\u00e7i\u015f deneyimini okuyun<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u0130\u015fe yarayan verileri koruyun. \u00c7izelgeyi ba\u015ftan kurmay\u0131 b\u0131rak\u0131n.<\/h2>\n\n\n<p>\u015eablon, \u00e7izelgeleme i\u00e7in gerekenleri belirlemenize yard\u0131mc\u0131 olur: operasyonlar, s\u00fcreler, kaynaklar, kullan\u0131labilirlik ve hedef biti\u015f zamanlar\u0131. Bu verilerden yararlanmak i\u00e7in aralar\u0131ndaki etkile\u015fimleri s\u00fcrekli Excel&#8217;de hesaplamak zorunda de\u011filsiniz.<\/p>\n\n\n<p><strong>SkyPlanner, a\u00e7\u0131k REST API&#8217;si arac\u0131l\u0131\u011f\u0131yla her ERP veya MES ile entegre olur.<\/strong> Mevcut sistemlerinizden yararlanarak daha iyi \u00e7izelgeleme yapabilir, \u00f6ncelikleri belirlemeye ve \u00fcretim kararlar\u0131n\u0131 vermeye devam edebilirsiniz.<\/p>\n\n\n<p>Tipik bir sipari\u015fin \u00fcretim rotas\u0131n\u0131 ve yak\u0131n zamanda ya\u015fanan bir \u00e7izelge de\u011fi\u015fikli\u011fini d\u00fc\u015f\u00fcnerek <a href=\"\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>. Makineler, \u00e7al\u0131\u015fanlar ve teslim tarihleri aras\u0131nda \u00f6ncelik belirlemek gerekti\u011finde i\u015flerinizin nas\u0131l \u00e7izelgelenebilece\u011fini bu \u00f6rnekler \u00fczerinden inceleyin. Ya da <a href=\"\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a> ve kendi kurulumunuzu planlamadan \u00f6nce \u00e7izelgeyi Gantt \u00fczerinde g\u00f6r\u00fcn.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u0130malat i\u00e7in \u00fcretim plan\u0131 \u015fablonu: \u0130\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n \u00dcretim plan\u0131 \u015fablonu, sipari\u015flerinize sayfada bir yer ay\u0131r\u0131r. As\u0131l zor soru, fabrikada da onlara yer olup olmad\u0131\u011f\u0131d\u0131r: Uygun bir makinede, do\u011fru operat\u00f6rle, bir sonraki operasyona ve m\u00fc\u015fteriye teslimata yeti\u015fecek kadar erken i\u015flenebilecekler mi? \u00dcretim plan\u0131 \u015fablonunu indirin (Excel i\u00e7in CSV). Her operasyonun ayr\u0131 bir sat\u0131rda yer ald\u0131\u011f\u0131 &#8230; <a title=\"\u0130malat i\u00e7in \u00fcretim plan\u0131 \u015fablonu: \u0130\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/\" aria-label=\"Read more about \u0130malat i\u00e7in \u00fcretim plan\u0131 \u015fablonu: \u0130\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97779,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-96106","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ve-cizelgeleme","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00dcretim plan\u0131 \u015fablonu: \u0130malatta i\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n<\/title>\n<meta name=\"description\" content=\"Excel i\u00e7in \u00fcretim plan\u0131 \u015fablonunu indirin, i\u015flerin kapasiteye nas\u0131l s\u0131\u011fd\u0131\u011f\u0131n\u0131 ve \u00fcretim de\u011fi\u015fti\u011finde SkyPlanner&#039;\u0131n plan\u0131 nas\u0131l y\u00f6netti\u011fini \u00f6\u011frenin.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u0130malat i\u00e7in \u00fcretim plan\u0131 \u015fablonu: \u0130\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n\" \/>\n<meta property=\"og:description\" content=\"Excel i\u00e7in \u00fcretim plan\u0131 \u015fablonunu indirin, i\u015flerin kapasiteye nas\u0131l s\u0131\u011fd\u0131\u011f\u0131n\u0131 ve \u00fcretim de\u011fi\u015fti\u011finde SkyPlanner&#039;\u0131n plan\u0131 nas\u0131l y\u00f6netti\u011fini \u00f6\u011frenin.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-04T04:30:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:42:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-plani-ornegi\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-plani-ornegi\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u0130malat i\u00e7in \u00fcretim plan\u0131 \u015fablonu: \u0130\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n\",\"datePublished\":\"2026-10-04T04:30:32+00:00\",\"dateModified\":\"2026-10-19T14:42:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-plani-ornegi\\\/\"},\"wordCount\":2155,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-plani-ornegi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"articleSection\":[\"APS ve \u00e7izelgeleme\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-plani-ornegi\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-plani-ornegi\\\/\",\"name\":\"\u00dcretim plan\u0131 \u015fablonu: \u0130malatta i\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-plani-ornegi\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-plani-ornegi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"datePublished\":\"2026-10-04T04:30:32+00:00\",\"dateModified\":\"2026-10-19T14:42:42+00:00\",\"description\":\"Excel i\u00e7in \u00fcretim plan\u0131 \u015fablonunu indirin, i\u015flerin kapasiteye nas\u0131l s\u0131\u011fd\u0131\u011f\u0131n\u0131 ve \u00fcretim de\u011fi\u015fti\u011finde SkyPlanner'\u0131n plan\u0131 nas\u0131l y\u00f6netti\u011fini \u00f6\u011frenin.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-plani-ornegi\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-plani-ornegi\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-plani-ornegi\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-schedule-template-hero-2.png\",\"width\":1672,\"height\":941,\"caption\":\"Two groups of components waiting for one machining resource in a manufacturing production schedule\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-plani-ornegi\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u0130malat i\u00e7in \u00fcretim plan\u0131 \u015fablonu: \u0130\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00dcretim plan\u0131 \u015fablonu: \u0130malatta i\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n","description":"Excel i\u00e7in \u00fcretim plan\u0131 \u015fablonunu indirin, i\u015flerin kapasiteye nas\u0131l s\u0131\u011fd\u0131\u011f\u0131n\u0131 ve \u00fcretim de\u011fi\u015fti\u011finde SkyPlanner'\u0131n plan\u0131 nas\u0131l y\u00f6netti\u011fini \u00f6\u011frenin.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/","og_locale":"tr_TR","og_type":"article","og_title":"\u0130malat i\u00e7in \u00fcretim plan\u0131 \u015fablonu: \u0130\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n","og_description":"Excel i\u00e7in \u00fcretim plan\u0131 \u015fablonunu indirin, i\u015flerin kapasiteye nas\u0131l s\u0131\u011fd\u0131\u011f\u0131n\u0131 ve \u00fcretim de\u011fi\u015fti\u011finde SkyPlanner'\u0131n plan\u0131 nas\u0131l y\u00f6netti\u011fini \u00f6\u011frenin.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-04T04:30:32+00:00","article_modified_time":"2026-10-19T14:42:42+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"11 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u0130malat i\u00e7in \u00fcretim plan\u0131 \u015fablonu: \u0130\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n","datePublished":"2026-10-04T04:30:32+00:00","dateModified":"2026-10-19T14:42:42+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/"},"wordCount":2155,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","articleSection":["APS ve \u00e7izelgeleme","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/","name":"\u00dcretim plan\u0131 \u015fablonu: \u0130malatta i\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","datePublished":"2026-10-04T04:30:32+00:00","dateModified":"2026-10-19T14:42:42+00:00","description":"Excel i\u00e7in \u00fcretim plan\u0131 \u015fablonunu indirin, i\u015flerin kapasiteye nas\u0131l s\u0131\u011fd\u0131\u011f\u0131n\u0131 ve \u00fcretim de\u011fi\u015fti\u011finde SkyPlanner'\u0131n plan\u0131 nas\u0131l y\u00f6netti\u011fini \u00f6\u011frenin.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png","width":1672,"height":941,"caption":"Two groups of components waiting for one machining resource in a manufacturing production schedule"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-plani-ornegi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"\u0130malat i\u00e7in \u00fcretim plan\u0131 \u015fablonu: \u0130\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-schedule-template-hero-2-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0130malat i\u00e7in \u00fcretim plan\u0131 \u015fablonu: \u0130\u015fleri kapasiteye s\u0131\u011fd\u0131r\u0131n \u00dcretim plan\u0131 \u015fablonu, sipari\u015flerinize sayfada bir yer ay\u0131r\u0131r. As\u0131l zor soru, fabrikada da onlara yer olup olmad\u0131\u011f\u0131d\u0131r: Uygun bir makinede, do\u011fru operat\u00f6rle, bir sonraki operasyona ve m\u00fc\u015fteriye teslimata yeti\u015fecek kadar erken i\u015flenebilecekler mi? \u00dcretim plan\u0131 \u015fablonunu indirin (Excel i\u00e7in CSV). Her operasyonun ayr\u0131 bir sat\u0131rda yer ald\u0131\u011f\u0131&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96106","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=96106"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96106\/revisions"}],"predecessor-version":[{"id":96135,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96106\/revisions\/96135"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/97779"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=96106"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=96106"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=96106"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}