{"id":96019,"date":"2026-10-04T02:31:16","date_gmt":"2026-10-04T02:31:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96019"},"modified":"2026-10-04T02:32:38","modified_gmt":"2026-10-04T02:32:38","slug":"uretim-cizelgeleme-nedir","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/","title":{"rendered":"\u00dcretim Planlama Nedir? \u0130malat Rehberi"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u00dcretim Planlama Nedir? \u0130malat Rehberi<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; \u00dcretim Planlama Nedir? \u0130malat Rehberi<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\u00dcretim \u00e7izelgeleme, imalat operasyonlar\u0131n\u0131 kaynaklara atar ve bunlar\u0131n s\u0131ras\u0131n\u0131, ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131n\u0131 belirler. Kapasiteyi, proses ba\u011f\u0131ml\u0131l\u0131klar\u0131n\u0131, malzeme eri\u015filebilirli\u011fini ve teslim tarihlerini hesaba katarak \u00fcretim plan\u0131n\u0131 uygulanabilir i\u015fe d\u00f6n\u00fc\u015ft\u00fcr\u00fcr. Yararl\u0131 bir \u00e7izelge, s\u0131rada neyin \u00e7al\u0131\u015fabilece\u011fini ve neyin beklemesi gerekti\u011fini birlikte g\u00f6sterir.<\/p>\n\n<div class=\"gb-container gb-container-article04\"><div class=\"gb-inside-container\">\n\n<p><strong>\u00d6nemli \u00c7\u0131kar\u0131mlar<\/strong><\/p>\n\n\n<p>\u00dcretim planlama \u00fcretim hedeflerini belirler; \u00e7izelgeleme ise operasyon d\u00fczeyindeki s\u0131ra ve zamanlamay\u0131 belirler.<\/p>\n\n\n<p>Teslim tarihi veya y\u00fcksek \u00f6ncelik, eksik makine kapasitesini, i\u015f g\u00fcc\u00fcn\u00fc ya da malzemeyi yaratmaz.<\/p>\n\n\n<p>Kullan\u0131labilir \u00e7izelgeler i\u00e7in proses ad\u0131mlar\u0131, s\u00fcreler, i\u015f merkezi rotas\u0131 ve ger\u00e7ek\u00e7i uygunluk bilgisi gerekir.<\/p>\n\n\n<p>SkyPlanner&#8217;da planlama uzmanlar\u0131 \u00f6ncelikleri belirler, Arcturus \u00e7izelgeyi yeniden hesaplar ve Gantt sonucu g\u00f6sterir.<\/p>\n\n<\/div><\/div>\n\n<h2 class=\"wp-block-heading\">Detayl\u0131 \u00fcretim planlama neye karar verir<\/h2>\n\n\n<p>Bir \u00fcretim planlama uzman\u0131 i\u00e7in pratik soru \u015fudur: s\u0131rada hangi operasyon hangi i\u015f merkezinde \u00e7al\u0131\u015fmal\u0131? Yan\u0131t, sipari\u015fi \u00fcretim ak\u0131\u015f\u0131na ba\u011flamal\u0131d\u0131r. \u0130\u015fleme, ona ba\u011fl\u0131 montaj operasyonu ba\u015flamadan \u00f6nce tamamlanmal\u0131d\u0131r. Se\u00e7ilen makine uygun olmal\u0131, i\u015f de ilgili vardiyaya ve kaynak uygunlu\u011funa s\u0131\u011fmal\u0131d\u0131r.<\/p>\n\n\n<p>Bir sipari\u015f listesi, miktarlar\u0131 ve s\u00f6z verilen tarihleri g\u00f6sterebilir, ancak bu sorular\u0131n hi\u00e7birini yan\u0131tlamaz. \u00dcretim \u00e7izelgesi, bu listeyi shop floor&#8217;daki i\u015fe d\u00f6n\u00fc\u015ft\u00fcrmek i\u00e7in gereken kaynak atamalar\u0131n\u0131 ve zamanlamay\u0131 ekler. Kalitesi, tarihlerin ne kadar d\u00fczg\u00fcn g\u00f6sterildi\u011fine de\u011fil, atamalar\u0131n ger\u00e7ekten uygulan\u0131p uygulanamayaca\u011f\u0131na ba\u011fl\u0131d\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00dcretim planlama ile detayl\u0131 operasyon planlamas\u0131 aras\u0131ndaki fark<\/h3>\n\n\n<p>\u00dcretim planlama ve \u00e7izelgeleme, ayn\u0131 \u00fcretim sorununun farkl\u0131 d\u00fczeylerini ele al\u0131r. Planlama, nelerin \u00fcretilmesi gerekti\u011fini ve bunu desteklemek i\u00e7in gereken kapasite ya da malzemeleri belirler. \u00c7izelgeleme ise tekil operasyonlar\u0131n mevcut kaynaklara nas\u0131l oturaca\u011f\u0131n\u0131 \u00e7\u00f6zer.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Karar<\/th><th>\u00dcretim planlama<\/th><th>\u00dcretim \u00e7izelgeleme<\/th><\/tr><\/thead><tbody><tr><td>\u00dcretilecek i\u015f<\/td><td>\u00dcr\u00fcnler ve gereken miktarlar<\/td><td>Belirli i\u015flere ait operasyonlar<\/td><\/tr><tr><td>Kapasite<\/td><td>\u00dcretim hedefini kar\u015f\u0131lamak i\u00e7in gereken kapasite<\/td><td>Her operasyon i\u00e7in uygun i\u015f merkezi ve vardiya kapasitesi<\/td><\/tr><tr><td>Zamanlama<\/td><td>\u00dcretim d\u00f6nemleri ve teslimat taahh\u00fctleri<\/td><td>Operasyon s\u0131ras\u0131, ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131<\/td><\/tr><tr><td>Aksakl\u0131\u011fa yan\u0131t<\/td><td>\u00dcretim hedefini veya mevcut kaynaklar\u0131 yeniden g\u00f6zden ge\u00e7irme<\/td><td>Etkilenen hangi operasyonlar\u0131n ne zaman \u00e7al\u0131\u015fabilece\u011fini yeniden hesaplama<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Bu, bir \u00fcr\u00fcn \u00f6zelli\u011fi de\u011fil, kavramsal bir kar\u015f\u0131la\u015ft\u0131rmad\u0131r. Bir i\u015fletme her iki faaliyete de \u201cplanlama\u201d diyorsa bu ayr\u0131m yine i\u015fe yarar: \u00e7\u0131kt\u0131n\u0131n, bir operat\u00f6re belirli bir kaynakta hangi i\u015fin s\u0131rada \u00e7al\u0131\u015fabilece\u011fini s\u00f6yleyip s\u00f6ylemedi\u011fine bak\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00d6rnek: A ve B sipari\u015fleri bir i\u015f merkezini payla\u015f\u0131yor<\/h2>\n\n\n<p>A ve B sipari\u015flerinin bulundu\u011fu \u00f6rnek bir \u00fcretim ortam\u0131 d\u00fc\u015f\u00fcn\u00fcn. \u0130kisi de sonraki montaj ad\u0131mlar\u0131ndan \u00f6nce ayn\u0131 i\u015fleme i\u015f merkezine ihtiya\u00e7 duyuyor. Her sipari\u015fin bir teslim tarihi var ve planlama uzman\u0131 \u00f6nceliklerini atam\u0131\u015f durumda. \u00c7at\u0131\u015fma basit: A ve B ortak i\u015fleme i\u015f merkezini ayn\u0131 anda kullanamaz.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u0130\u015f<\/th><th>\u00dcretim ak\u0131\u015f\u0131<\/th><th>\u00c7\u00f6z\u00fclmesi gereken k\u0131s\u0131t<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>\u0130\u015fleme, ard\u0131ndan montaj<\/td><td>Ortak i\u015fleme i\u015f merkezi i\u00e7in B ile rekabet eder<\/td><\/tr><tr><td>B<\/td><td>\u0130\u015fleme, ard\u0131ndan montaj<\/td><td>Montaj ad\u0131m\u0131, kendi i\u015fleme ad\u0131m\u0131n\u0131n bitmesini bekler<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u00c7izelgeleme karar\u0131, ortak i\u015f merkezine uygulanabilir bir s\u0131ra vermek ve ba\u011f\u0131ml\u0131 her montaj ad\u0131m\u0131n\u0131 ilgili i\u015fleme ad\u0131m\u0131ndan sonraya yerle\u015ftirmektir. Sonu\u00e7, kuyruktaki \u00e7ak\u0131\u015fmay\u0131 giderir; ancak her teslimat taahh\u00fcd\u00fcn\u00fcn kar\u015f\u0131lanabilece\u011fini g\u00f6stermez. Bu da ger\u00e7ek s\u00fcrelere ve mevcut kapasiteye ba\u011fl\u0131d\u0131r.<\/p>\n\n\n<p>\u015eimdi B&#8217;nin malzemesinin haz\u0131r olmad\u0131\u011f\u0131n\u0131 varsayal\u0131m. Planlama uzman\u0131 B&#8217;nin ne zaman \u00e7al\u0131\u015fmaya uygun hale gelebilece\u011fini kontrol etmeli, ard\u0131ndan her iki sipari\u015f \u00fczerindeki etkiyi de\u011ferlendirmelidir. B&#8217;nin \u00f6nceli\u011fini y\u00fckseltmek i\u015f a\u00e7\u0131s\u0131ndan \u00f6nemini ifade eder, ancak eksik malzemeyi sa\u011flayamaz. Bunun yerine bir i\u015fleme vardiyas\u0131 devre d\u0131\u015f\u0131 kal\u0131rsa, sipari\u015f miktarlar\u0131 de\u011fi\u015fmese bile hem A hem de B i\u00e7in kapasite tablosu de\u011fi\u015fir.<\/p>\n\n\n<p>Bu k\u00fc\u00e7\u00fck \u00f6rnek, \u00e7izelgelemenin amac\u0131n\u0131 g\u00f6r\u00fcn\u00fcr k\u0131lar: kaynak s\u0131ras\u0131n\u0131, ba\u011f\u0131ml\u0131l\u0131klar\u0131 ve \u00fcretim ko\u015fullar\u0131n\u0131 tutarl\u0131 tutmak. Burada varsay\u0131lm\u0131\u015f bir parti b\u00fcy\u00fckl\u00fc\u011f\u00fc ya da hesaplanm\u0131\u015f bir tamamlanma s\u00fcresi yoktur. Bunlar, i\u015fletmenin kendi operasyon verilerine aittir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner&#8217;da detayl\u0131 \u00fcretim planlama<\/h2>\n\n\n<p><a href=\"\/tr\/\">SkyPlanner \u00fcretim \u00e7izelgeleme yaz\u0131l\u0131m\u0131nda<\/a>, yap\u0131land\u0131r\u0131lm\u0131\u015f i\u015f merkezleri, vardiyalar, operat\u00f6rler, \u00f6ncelikler ve malzemeler \u00e7izelgeleme girdilerini olu\u015fturur. A ve B i\u00e7in ortak i\u015f merkezi ve \u00fcretim ak\u0131\u015flar\u0131, kapasite \u00e7at\u0131\u015fmas\u0131n\u0131 ve ba\u011f\u0131ml\u0131l\u0131klar\u0131 tan\u0131mlar. \u00dcretim \u00e7izelgeleme Gantt g\u00f6r\u00fcn\u00fcm\u00fcn\u00fcn alt \u00e7ubu\u011fundaki <strong>Reschedule all<\/strong>, Arcturus&#8217;un \u00f6ncelikleri ve mevcut kapasiteyi (i\u015f merkezi uygunlu\u011fu, ba\u011f\u0131ml\u0131l\u0131klar ve teslim tarihleri dahil) kullanarak yeniden hesaplama yapmas\u0131n\u0131 tetikler. Planlama uzman\u0131 neyin \u00f6nemli oldu\u011funa \u00f6nceden belirlenmi\u015f \u00f6nceliklerle karar verir; yapay zek\u00e2 bu \u00f6nceliklere uyar.<\/p>\n\n\n<p>Gantt, \u00e7izelgelenmi\u015f i\u015fleri i\u015f merkezi \u015feritlerinde g\u00f6sterir; faz \u00e7izgileri ili\u015fkili proses ad\u0131mlar\u0131n\u0131 birbirine ba\u011flar. A veya B&#8217;yi etkileyen bir de\u011fi\u015fiklikten sonra planlama uzman\u0131, yeniden hesaplanan kuyru\u011fu ve sonraki operasyonlar\u0131 birlikte inceleyebilir. Malzemeyi dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde depo ve stok durumu g\u00f6z \u00f6n\u00fcne al\u0131n\u0131r, b\u00f6ylece malzeme eksiklikleri \u00e7izelgeyi etkiler. Yararl\u0131 \u00e7\u0131kt\u0131, g\u00fcncellenmi\u015f \u00fcretim ko\u015fullar\u0131na g\u00f6re incelenecek yeni bir \u00e7izelgedir; girdiler ne olursa olsun A&#8217;n\u0131n B&#8217;den \u00f6nce gelece\u011fine dair verilmi\u015f bir s\u00f6z de\u011fildir.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>A ve B i\u00e7in kontrol edilecek girdi<\/th><th>\u00c7izelgeleme sonucu<\/th><th>SkyPlanner&#8217;daki belgelenmi\u015f kar\u015f\u0131l\u0131\u011f\u0131<\/th><\/tr><\/thead><tbody><tr><td>Ortak i\u015f merkezi ve uygun vardiyalar<\/td><td>\u0130\u015fleme operasyonlar\u0131 mevcut kapasiteye s\u0131\u011fmal\u0131d\u0131r<\/td><td>\u0130\u015f merkezleri ve vardiyalar \u00e7izelgeleme girdilerini olu\u015fturur; Arcturus mevcut kapasiteyi dikkate al\u0131r<\/td><\/tr><tr><td>S\u0131ral\u0131 proses ad\u0131mlar\u0131 ve s\u00fcreler<\/td><td>Montaj, ba\u011fl\u0131 oldu\u011fu i\u015flemeden sonra gelmelidir<\/td><td>Proses ad\u0131m\u0131 yap\u0131land\u0131rmas\u0131 ve ba\u011f\u0131ml\u0131l\u0131klar\u0131 dikkate alan yeniden hesaplama<\/td><\/tr><tr><td>Teslim tarihleri ve se\u00e7ilen \u00f6ncelikler<\/td><td>\u00c7al\u0131\u015fmaya uygun i\u015fler, planlama uzman\u0131n\u0131n hedeflerine g\u00f6re yar\u0131\u015f\u0131r<\/td><td>Reschedule all teslim tarihlerini ve \u00f6ncelikleri kullan\u0131r<\/td><\/tr><tr><td>B&#8217;nin malzeme uygunlu\u011fu<\/td><td>Bir eksiklik, B&#8217;nin uygunlu\u011funu ve zamanlamas\u0131n\u0131 de\u011fi\u015ftirir<\/td><td>Malzemeyi dikkate alan \u00e7izelgeleme, etkinle\u015ftirildi\u011finde stok durumunu g\u00f6z \u00f6n\u00fcne al\u0131r<\/td><\/tr><tr><td>Yeniden hesaplanan operasyon s\u0131ras\u0131<\/td><td>\u0130\u015flemeyi ve sonraki montaj\u0131 birlikte kontrol edin<\/td><td>Gantt&#8217;taki i\u015f merkezi \u015feritleri ve faz \u00e7izgileri<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u00dcr\u00fcn temeli: SkyPlanner dok\u00fcmantasyonu, \u201cWhere is the King Button?\u201d (KB 892) ve \u201cSkyPlanner: The Basics\u201d (KB 775) ile belgelenmi\u015f Arcturus yetenekleri; 4 Ekim 2026&#8217;da kontrol edildi. Tablo, belgelenmi\u015f i\u015flevleri \u00f6rnek bir senaryoyla e\u015fle\u015ftirir; \u00f6l\u00e7\u00fclm\u00fc\u015f bir yaz\u0131l\u0131m \u00e7al\u0131\u015ft\u0131rmas\u0131 de\u011fildir.<\/p>\n\n\n<p>Bu s\u0131ray\u0131 ke\u015ffetmek i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>. Kendi i\u015f merkezi, vardiya ve \u00fcretim ak\u0131\u015f\u0131 bilgilerinizi g\u00f6r\u00fc\u015fmek i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">demo randevusu al\u0131n<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bir \u00fcretim \u00e7izelgesini kullan\u0131labilir k\u0131lan girdiler<\/h2>\n\n\n<p>A ve B \u00e7izelgesini de\u011ferlendirmeden \u00f6nce arkas\u0131ndaki modeli kontrol edin. \u00dcr\u00fcn kayd\u0131 neyi \u00fcretti\u011finizi tan\u0131mlar; tek ba\u015f\u0131na uygulanabilir i\u015fi tan\u0131mlamaz. SkyPlanner&#8217;\u0131n Ba\u015flang\u0131\u00e7 belgeleri, i\u015f merkezlerinden, \u00fcr\u00fcnlerden ve \u00fcretim ak\u0131\u015flar\u0131ndan asgari bir model kurar. Ak\u0131\u015fa haz\u0131r bir \u00fcretim \u00fcr\u00fcn\u00fc i\u00e7in s\u0131ral\u0131 proses ad\u0131mlar\u0131, pozitif s\u00fcreler ve i\u015f merkezi rotas\u0131 gerekir.<\/p>\n\n\n<p>\u0130lk modeli haz\u0131rlarken veya beklenmeyen bir s\u0131ray\u0131 incelerken \u015fu kontrol listesini kullan\u0131n:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\u00dcretim ak\u0131\u015f\u0131:<\/strong> Her i\u015fte gereken operasyonlar do\u011fru s\u0131rada mevcut mu? B i\u00e7in montaj, A&#8217;n\u0131n de\u011fil B&#8217;nin i\u015flemesine ba\u011fl\u0131 olmal\u0131d\u0131r.<\/li><li><strong>S\u00fcre temeli:<\/strong> Operasyon s\u00fcreleri i\u015fi ve miktar\u0131n\u0131 yans\u0131t\u0131yor mu? SkyPlanner, Time\/Piece, Pieces\/Time ve Fixed Time proses ad\u0131m\u0131 hesaplamalar\u0131n\u0131 destekler; haz\u0131rl\u0131k i\u00e7in haz\u0131rl\u0131k s\u00fcresi (setting time) kullan\u0131l\u0131r.<\/li><li><strong>\u0130\u015f merkezi rotas\u0131:<\/strong> Her operasyon uygun bir i\u015f merkezine atanm\u0131\u015f m\u0131? Shop floor&#8217;daki ikinci bir makine, ancak ilgili operasyon onu kullanabiliyorsa i\u015fe yarar.<\/li><li><strong>Vardiyalar ve operat\u00f6rler:<\/strong> Kay\u0131tl\u0131 uygunluk, i\u015fi ger\u00e7ekten yapabilecek kapasiteyle \u00f6rt\u00fc\u015f\u00fcyor mu? Gereken operat\u00f6r yoksa bo\u015f bir makine aral\u0131\u011f\u0131 yeterli de\u011fildir.<\/li><li><strong>Malzemeler:<\/strong> Malzeme durumu g\u00fcncel mi, \u00f6zellikle B&#8217;nin geciken girdisi i\u00e7in? Bu yetene\u011fi kullan\u0131yorsan\u0131z bunu malzemeyi dikkate alan \u00e7izelgeleme ayar\u0131yla birlikte kontrol edin.<\/li><li><strong>Teslim tarihleri ve \u00f6ncelikler:<\/strong> Tarihler ve tercihler, planlama uzman\u0131n\u0131n vermeyi ama\u00e7lad\u0131\u011f\u0131 kararlar\u0131 yans\u0131t\u0131yor mu?<\/li><\/ul>\n\n\n<p>Yararl\u0131 bir kurulum kontrol\u00fc, \u00e7\u0131kt\u0131y\u0131 \u00f6nceliklerle d\u00fczeltmeye \u00e7al\u0131\u015fmadan \u00f6nce ak\u0131\u015f\u0131 incelemektir. Eksik rota veya kullan\u0131lamaz s\u00fcreler girdi sorunlar\u0131d\u0131r. SkyPlanner&#8217;\u0131n Dynamic Priorities rehberi ayr\u0131ca her \u00f6ncelik \u00e7ubu\u011funu en \u00fcst d\u00fczeye \u00e7\u0131karmak yerine se\u00e7ici \u00f6ncelikler kullan\u0131lmas\u0131n\u0131 \u00f6nerir: tercihler, birbiriyle rekabet eden hedefler aras\u0131nda anlaml\u0131 bir se\u00e7imi ifade etmelidir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Detayl\u0131 planlama y\u00f6ntemleri ve s\u0131n\u0131rlar\u0131<\/h2>\n\n\n<p>Bir kuyru\u011fun nas\u0131l olu\u015fturuldu\u011funu a\u00e7\u0131klamaya yard\u0131mc\u0131 olan birka\u00e7 genel \u00e7izelgeleme kavram\u0131 vard\u0131r. Bunlar \u00e7izelgeleme yakla\u015f\u0131mlar\u0131n\u0131 anlat\u0131r; SkyPlanner&#8217;da se\u00e7ilebilen modlar\u0131n bir listesi de\u011fildir.<\/p>\n\n\n<p><strong>\u0130leri y\u00f6nl\u00fc \u00e7izelgeleme<\/strong>, i\u015fin ba\u015flayabilece\u011fi noktadan yola \u00e7\u0131kar ve sonraki operasyonlar\u0131 bunun arkas\u0131na yerle\u015ftirir. A i\u00e7in bu, tala\u015fl\u0131 i\u015fleme ve montaj s\u0131ras\u0131n\u0131 uygun bir ba\u015flang\u0131\u00e7tan itibaren izlemek demektir. Kabul edilen uygunluk varsay\u0131m\u0131n\u0131n destekledi\u011fi tamamlanma tarihinin g\u00f6r\u00fcn\u00fcr hale gelmesine yard\u0131mc\u0131 olur.<\/p>\n\n\n<p><strong>Geri y\u00f6nl\u00fc \u00e7izelgeleme<\/strong>, gereken tamamlanma tarihinden ba\u015flay\u0131p operasyonlar boyunca geriye do\u011fru giderek bunlar\u0131n ne zaman ba\u015flamas\u0131 gerekti\u011fini belirler. B i\u00e7in, gecikmeli malzemesinin kar\u015f\u0131layamayaca\u011f\u0131 bir ba\u015flang\u0131\u00e7 gereksinimini ortaya \u00e7\u0131karabilir. Gereken ba\u015flang\u0131\u00e7, incelenmesi gereken bir k\u0131s\u0131tt\u0131r; i\u015fin uygulanabilir oldu\u011funun kan\u0131t\u0131 de\u011fildir.<\/p>\n\n\n<p><strong>Sonlu kapasiteli \u00e7izelgeleme<\/strong>, i\u015fleri yerle\u015ftirirken mevcut kaynak kapasitesini dikkate al\u0131r. Ortak i\u015f merkezi \u00f6rne\u011finde A ile B aras\u0131ndaki rekabeti \u00e7\u00f6zmesi gerekir. S\u0131n\u0131rs\u0131z kapasite varsay\u0131m\u0131, her iki i\u015fi de ayn\u0131 uygun zaman aral\u0131\u011f\u0131na yerle\u015ftirebilir ve \u00e7at\u0131\u015fmay\u0131 daha sonra d\u00fczeltmesi i\u00e7in birilerine b\u0131rakabilir.<\/p>\n\n\n<p>Bir e-tablo, planlama uzman\u0131n\u0131n k\u00fc\u00e7\u00fck bir kuyru\u011fu anlamas\u0131na ve \u00f6nerilen s\u0131ray\u0131 belgelemesine yard\u0131mc\u0131 olabilir. Ortak kaynaklar ve birbirine ba\u011fl\u0131 operasyonlar \u00e7o\u011fald\u0131k\u00e7a her de\u011fi\u015fiklik daha fazla uzla\u015ft\u0131rma gerektirir: B&#8217;nin tala\u015fl\u0131 i\u015flemesini kayd\u0131r\u0131rsan\u0131z onun montaj\u0131n\u0131, A&#8217;n\u0131n \u00e7evresindeki kuyru\u011fu ve etkilenen di\u011fer i\u015fleri yeniden g\u00f6zden ge\u00e7irmeniz gerekir. <a href=\"\/tr\/kaynaklar\/excel-uretim-planlama-zorluklari-ve-skyplanner-aps\/\">Excel \u00fcretim planlama kayna\u011f\u0131<\/a> bu bak\u0131m sorununu daha ayr\u0131nt\u0131l\u0131 a\u00e7\u0131klar.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kapasite yetersiz kald\u0131\u011f\u0131nda ne yap\u0131lmal\u0131?<\/h2>\n\n\n<p>Uygulanabilir bir s\u0131ra ile tatmin edici bir teslimat sonucu ayr\u0131 s\u0131namalard\u0131r. A ve B mevcut kapasite i\u00e7inde birlikte tamamlanam\u0131yorsa, onlar\u0131 ge\u00e7erli bir s\u0131raya koymak a\u00e7\u0131\u011f\u0131 ortadan kald\u0131rmaz. Planlama uzman\u0131n\u0131n; s\u00f6z verilen zamanlamay\u0131 de\u011fi\u015ftirmeye, ek kapasite sa\u011flamaya ya da hangi i\u015fin \u00f6ncelik alaca\u011f\u0131n\u0131 se\u00e7meye karar vermesi gerekir.<\/p>\n\n\n<p>Ba\u011flay\u0131c\u0131 k\u0131s\u0131ttan ba\u015flay\u0131n. B malzeme bekliyorsa, yaln\u0131zca ek i\u015fleme kapasitesi onu haz\u0131r hale getirmez. Ortak i\u015f merkezi a\u015f\u0131r\u0131 y\u00fckl\u00fcyse, montaj tarihlerinin do\u011frulu\u011funu art\u0131rmak bir i\u015fleme aral\u0131\u011f\u0131n\u0131 bo\u015faltmaz. K\u0131s\u0131t bir operat\u00f6rse, makine takviminin operat\u00f6r uygunlu\u011fuyla birlikte de\u011ferlendirilmesi gerekir.<\/p>\n\n\n<p>Yeni bir \u00e7izelgeyi de\u011ferlendirmeden \u00f6nce se\u00e7ilen de\u011fi\u015fikli\u011fi girdilere kaydedin. Ard\u0131ndan yaln\u0131zca ta\u015f\u0131nan operasyonu de\u011fil, etkilenen sonraki a\u015famalardaki i\u015fleri de inceleyin. A ve B i\u00e7in bu, ortak tala\u015fl\u0131 i\u015fleme kuyru\u011funun yan\u0131 s\u0131ra montaj ad\u0131mlar\u0131n\u0131 da kontrol etmek demektir. B\u00f6ylece ger\u00e7ek bir iyile\u015ftirme, yaln\u0131zca ba\u015fka bir yere kayd\u0131r\u0131lm\u0131\u015f bir \u00e7at\u0131\u015fmadan ayr\u0131l\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00c7izelgeyi \u00fcretim verileriyle uyumlu tutmak<\/h2>\n\n\n<p>Bir \u00e7izelge, i\u00e7inde temsil edilen ko\u015fullar kadar g\u00fcnceldir. B&#8217;nin malzemesi haz\u0131r olduktan sonra ya da bir vardiya de\u011fi\u015fikli\u011fi A&#8217;y\u0131 etkiledi\u011finde, yeniden hesaplamay\u0131 incelemeden \u00f6nce ilgili verilerin de\u011fi\u015fikli\u011fi yans\u0131tt\u0131\u011f\u0131ndan emin olun. Aksi halde planlama uzman\u0131, shop floor&#8217;daki g\u00fcncel durumu eski bir modelle kar\u015f\u0131la\u015ft\u0131r\u0131yor olabilir.<\/p>\n\n\n<p>SkyPlanner, a\u00e7\u0131k REST API&#8217;si arac\u0131l\u0131\u011f\u0131yla her ERP veya MES sistemiyle entegre olur. Bu, \u00e7izelgeleme modelini sipari\u015f ve \u00fcretim verilerini tutan sistemlere ba\u011flaman\u0131n bir yolunu sunar. <a href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/\">ERP ve MES entegrasyon bilgileri<\/a>, mevcut verilerinizin \u00e7izelgelemeyi nas\u0131l destekleyebilece\u011fini belirlemek i\u00e7in bir sonraki ad\u0131md\u0131r.<\/p>\n\n\n<p>Entegrasyon g\u00f6r\u00fc\u015fmesi i\u00e7in A ve B&#8217;yi bir veri izi olarak kullan\u0131n: sipari\u015fleri, \u00fcretim ad\u0131mlar\u0131 ve uygunluk bilgileri nereden geliyor ve de\u011fi\u015fiklikler modele nas\u0131l ula\u015facak? Bu girdilerde uzla\u015fmak, \u00e7izelgeleme sonucunu de\u011ferlendirmeyi kolayla\u015ft\u0131r\u0131r. Entegrasyon y\u00f6ntemi ve veri e\u015flemesi, s\u00f6z konusu ger\u00e7ek sistemler i\u00e7in ayr\u0131ca ele al\u0131nmal\u0131d\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n\n<h3 class=\"wp-block-heading\">\u0130malatta detayl\u0131 \u00fcretim planlama nedir?<\/h3>\n\n\n<p>\u0130malat operasyonlar\u0131n\u0131n \u00fcretim kaynaklar\u0131na atanmas\u0131, s\u0131ralanmas\u0131 ve zamanlanmas\u0131d\u0131r. \u00c7\u0131kt\u0131s\u0131, shop floor&#8217;a hangi i\u015fin s\u0131rada \u00e7al\u0131\u015fabilece\u011fini ve hangisinin beklemesi gerekti\u011fini g\u00f6stermelidir. A\/B \u00f6rne\u011finde ortak tala\u015fl\u0131 i\u015fleme kuyru\u011fu ve birbirine ba\u011fl\u0131 montaj ad\u0131mlar\u0131 ayn\u0131 \u00e7izelgeleme karar\u0131n\u0131n par\u00e7as\u0131d\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00dcretim planlama ile detayl\u0131 operasyon planlamas\u0131 aras\u0131ndaki fark nedir?<\/h3>\n\n\n<p>A ve B i\u00e7in bu ayr\u0131m, ortak i\u015f merkezi her iki taahh\u00fcd\u00fc birlikte destekleyemedi\u011finde pratik bir anlam kazan\u0131r. Tala\u015fl\u0131 i\u015fleme s\u0131ras\u0131n\u0131 de\u011fi\u015ftirmek bir \u00e7izelgeleme karar\u0131d\u0131r; \u00fcretim hedefini veya mevcut kaynaklar\u0131 yeniden ele almak ise planlamaya aittir. Operasyon tarihlerini de\u011fi\u015ftirmeden \u00f6nce hangi karara dikkat etmeniz gerekti\u011fini belirlemek i\u00e7in yukar\u0131daki kar\u015f\u0131la\u015ft\u0131rma tablosunu kullan\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00dcretim \u00e7izelgesi olu\u015fturmak i\u00e7in hangi bilgilere ihtiya\u00e7 vard\u0131r?<\/h3>\n\n\n<p>\u0130\u015flerle, s\u0131ral\u0131 proses ad\u0131mlar\u0131yla, s\u00fcrelerle, uygun i\u015f merkezleriyle, mevcut vardiya ve operat\u00f6rlerle, malzemelerle, teslim tarihleri ve \u00f6nceliklerle ba\u015flay\u0131n. SkyPlanner&#8217;daki ilk modelinizde, s\u0131ray\u0131 de\u011ferlendirmeden \u00f6nce \u00fcretilen \u00fcr\u00fcn\u00fcn ak\u0131\u015f\u0131n\u0131 do\u011frulay\u0131n. \u00dcr\u00fcn sat\u0131rlar\u0131 tek ba\u015f\u0131na bir operasyonun nerede \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131 veya bir kayna\u011f\u0131 ne kadar s\u00fcre me\u015fgul etti\u011fini belirlemez.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sonlu kapasite teslimat a\u00e7\u0131\u011f\u0131na yol a\u00e7t\u0131\u011f\u0131nda planlay\u0131c\u0131 ne yapmal\u0131?<\/h3>\n\n\n<p>Planlama uzman\u0131 i\u00e7in \u00e7\u0131kar\u0131m, gereken tarihe kar\u015f\u0131 somut bir a\u00e7\u0131kt\u0131r. B, mevcut i\u015fleme kapasitesiyle zaman\u0131nda bitemiyorsa k\u0131s\u0131t\u0131 inceleyin ve kapasiteyi, \u00f6nceli\u011fi ya da taahh\u00fcd\u00fc de\u011fi\u015ftirip de\u011fi\u015ftirmeyece\u011finize karar verin. A&#8217;n\u0131n sonraki a\u015famalardaki i\u015flerini de yeniden kontrol edin; b\u00f6ylece B&#8217;nin sorununu \u00e7\u00f6zmek a\u00e7\u0131\u011f\u0131 yaln\u0131zca ba\u015fka bir yere ta\u015f\u0131maz.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Malzeme eksikleri veya makinenin kullan\u0131lamamas\u0131 \u00e7izelgeyi nas\u0131l etkiler?<\/h3>\n\n\n<p>Malzeme eksikli\u011fi bir operasyonun ne zaman ba\u015flamaya uygun hale gelece\u011fini geciktirebilir; makinenin kullan\u0131lamamas\u0131 ise i\u015fin \u00e7al\u0131\u015fmas\u0131 beklenen yerde kapasiteyi ortadan kald\u0131r\u0131r. Her ikisi de sonraki ad\u0131mlar\u0131 ve rakip i\u015fleri etkileyebilir. B&#8217;nin malzeme eksikli\u011fi i\u00e7in, yeniden hesaplanan kuyru\u011fu incelemeden \u00f6nce stok durumunu ve SkyPlanner&#8217;da etkinle\u015ftirilmi\u015f malzeme duyarl\u0131 \u00e7izelgeleme \u00f6zelli\u011fini do\u011frulay\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00dcretim planlama yaz\u0131l\u0131m\u0131 mevcut bir ERP veya MES ile \u00e7al\u0131\u015fabilir mi?<\/h3>\n\n\n<p>Evet. SkyPlanner, a\u00e7\u0131k REST API&#8217;si arac\u0131l\u0131\u011f\u0131yla her ERP veya MES ile entegre olur. As\u0131l pratik soru, ilgili sipari\u015f ve \u00fcretim verilerinin nas\u0131l e\u015flenece\u011fi ve g\u00fcncel tutulaca\u011f\u0131d\u0131r. A ve B i\u00e7in, entegrasyonun uygulanmas\u0131n\u0131 konu\u015fmadan \u00f6nce operasyonlar\u0131n\u0131n ve uygunluk bilgilerinin kayna\u011f\u0131n\u0131 izleyin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">E-tablo ne zaman yeterlidir, otomatik yeniden planlama ne zaman i\u015fe yarar?<\/h3>\n\n\n<p>Planlama uzman\u0131 kuyru\u011fu s\u00fcrd\u00fcrebiliyor ve ba\u011f\u0131ml\u0131l\u0131klar\u0131n\u0131 g\u00fcvenilir bi\u00e7imde uzla\u015ft\u0131rabiliyorsa e-tablo i\u015fe yarayabilir. Otomatik yeniden \u00e7izelgeleme, de\u011fi\u015fiklikler birbirine ba\u011fl\u0131 \u00e7ok say\u0131da operasyonu veya ortak kayna\u011f\u0131 etkiledi\u011finde yararl\u0131 hale gelir. A ve B ile, tek bir tala\u015fl\u0131 i\u015fleme de\u011fi\u015fikli\u011finin ard\u0131ndan montaj ve kuyruktaki di\u011fer i\u015fler dahil ne kadar i\u015fin geldi\u011fini de\u011ferlendirin.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is production scheduling in manufacturing?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It is the assignment, sequencing and timing of manufacturing operations on production resources. Its output should tell the shop floor which work can run next and which work must wait. In the A\/B example, the shared machining queue and the dependent assembly steps belong to the same scheduling decision.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between production planning and production scheduling?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"For A and B, the distinction becomes practical when their shared workstation cannot support both commitments. Changing the machining sequence is a scheduling decision; reconsidering the production objective or available resources belongs to planning. Use the comparison table above to identify which decision needs attention before changing operation dates.\"}},{\"@type\":\"Question\",\"name\":\"What information do you need to create a production schedule?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Start with jobs, ordered process steps, durations, eligible workstations, available shifts and operators, materials, delivery dates and priorities. In SkyPlanner's first model, verify the manufactured product's flow before evaluating its sequence. Product rows alone do not establish where an operation runs or how long it occupies a resource.\"}},{\"@type\":\"Question\",\"name\":\"What should a planner do when finite capacity causes a delivery shortfall?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The planner takeaway is a concrete shortfall against a required date. If B cannot finish on time with the available machining capacity, inspect the constraint and decide whether to change capacity, priority or the commitment. Recheck A's downstream work as well, so solving B's problem does not simply move the shortfall.\"}},{\"@type\":\"Question\",\"name\":\"How do material shortages or machine unavailability affect a schedule?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A material shortage can delay when an operation becomes eligible; machine unavailability removes capacity where work was expected to run. Both can affect downstream steps and competing jobs. For B's material shortage, verify the inventory state and, in SkyPlanner, the enabled material-aware scheduling capability before inspecting the recalculated queue.\"}},{\"@type\":\"Question\",\"name\":\"Can production scheduling software work with an existing ERP or MES?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. SkyPlanner integrates with any ERP or MES through its open REST API. The practical question is how the relevant order and production data will be mapped and kept current. For A and B, trace the source of their operations and availability information before discussing the integration implementation.\"}},{\"@type\":\"Question\",\"name\":\"When is a spreadsheet enough, and when is automatic rescheduling useful?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A spreadsheet can be useful when a planner can maintain the queue and reconcile its dependencies reliably. Automatic rescheduling becomes useful when changes affect many linked operations or shared resources. With A and B, assess how much work follows a single machining change, including downstream assembly and other jobs in the queue.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>\u00dcretim Planlama Nedir? \u0130malat Rehberi Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretim Planlama Nedir? \u0130malat Rehberi \u00dcretim \u00e7izelgeleme, imalat operasyonlar\u0131n\u0131 kaynaklara atar ve bunlar\u0131n s\u0131ras\u0131n\u0131, ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131n\u0131 belirler. Kapasiteyi, proses ba\u011f\u0131ml\u0131l\u0131klar\u0131n\u0131, malzeme eri\u015filebilirli\u011fini ve teslim tarihlerini hesaba katarak \u00fcretim plan\u0131n\u0131 uygulanabilir i\u015fe d\u00f6n\u00fc\u015ft\u00fcr\u00fcr. Yararl\u0131 bir \u00e7izelge, s\u0131rada neyin \u00e7al\u0131\u015fabilece\u011fini ve neyin beklemesi gerekti\u011fini birlikte &#8230; <a title=\"\u00dcretim Planlama Nedir? \u0130malat Rehberi\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\" aria-label=\"Read more about \u00dcretim Planlama Nedir? \u0130malat Rehberi\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":96058,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-96019","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00dcretim Planlama Nedir? \u0130malat Rehberi<\/title>\n<meta name=\"description\" content=\"Uygulanabilir \u00fcretim \u00e7izelgesi kurun: i\u015f s\u0131ralamas\u0131, kapasite ve malzemeyi \u00f6\u011frenin, \u00f6ncelik de\u011fi\u015fince SkyPlanner&#039;\u0131n i\u015fi nas\u0131l yeniden hesaplad\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcn.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00dcretim Planlama Nedir? \u0130malat Rehberi\" \/>\n<meta property=\"og:description\" content=\"Uygulanabilir \u00fcretim \u00e7izelgesi kurun: i\u015f s\u0131ralamas\u0131, kapasite ve malzemeyi \u00f6\u011frenin, \u00f6ncelik de\u011fi\u015fince SkyPlanner&#039;\u0131n i\u015fi nas\u0131l yeniden hesaplad\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcn.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-04T02:31:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-04T02:32:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"2172\" \/>\n\t<meta property=\"og:image:height\" content=\"724\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-cizelgeleme-nedir\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-cizelgeleme-nedir\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u00dcretim Planlama Nedir? \u0130malat Rehberi\",\"datePublished\":\"2026-10-04T02:31:16+00:00\",\"dateModified\":\"2026-10-04T02:32:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-cizelgeleme-nedir\\\/\"},\"wordCount\":2780,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-cizelgeleme-nedir\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-cizelgeleme-nedir\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-cizelgeleme-nedir\\\/\",\"name\":\"\u00dcretim Planlama Nedir? \u0130malat Rehberi\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-cizelgeleme-nedir\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-cizelgeleme-nedir\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-hero.png\",\"datePublished\":\"2026-10-04T02:31:16+00:00\",\"dateModified\":\"2026-10-04T02:32:38+00:00\",\"description\":\"Uygulanabilir \u00fcretim \u00e7izelgesi kurun: i\u015f s\u0131ralamas\u0131, kapasite ve malzemeyi \u00f6\u011frenin, \u00f6ncelik de\u011fi\u015fince SkyPlanner'\u0131n i\u015fi nas\u0131l yeniden hesaplad\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcn.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-cizelgeleme-nedir\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-cizelgeleme-nedir\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-cizelgeleme-nedir\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-hero.png\",\"width\":2172,\"height\":724,\"caption\":\"Two component batches queue for a shared machining workstation before moving to assembly\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-cizelgeleme-nedir\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00dcretim Planlama Nedir? \u0130malat Rehberi\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00dcretim Planlama Nedir? \u0130malat Rehberi","description":"Uygulanabilir \u00fcretim \u00e7izelgesi kurun: i\u015f s\u0131ralamas\u0131, kapasite ve malzemeyi \u00f6\u011frenin, \u00f6ncelik de\u011fi\u015fince SkyPlanner'\u0131n i\u015fi nas\u0131l yeniden hesaplad\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcn.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/","og_locale":"tr_TR","og_type":"article","og_title":"\u00dcretim Planlama Nedir? \u0130malat Rehberi","og_description":"Uygulanabilir \u00fcretim \u00e7izelgesi kurun: i\u015f s\u0131ralamas\u0131, kapasite ve malzemeyi \u00f6\u011frenin, \u00f6ncelik de\u011fi\u015fince SkyPlanner'\u0131n i\u015fi nas\u0131l yeniden hesaplad\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcn.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-04T02:31:16+00:00","article_modified_time":"2026-10-04T02:32:38+00:00","og_image":[{"width":2172,"height":724,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"14 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u00dcretim Planlama Nedir? \u0130malat Rehberi","datePublished":"2026-10-04T02:31:16+00:00","dateModified":"2026-10-04T02:32:38+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/"},"wordCount":2780,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","articleSection":["APS &amp; Scheduling","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/","name":"\u00dcretim Planlama Nedir? \u0130malat Rehberi","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","datePublished":"2026-10-04T02:31:16+00:00","dateModified":"2026-10-04T02:32:38+00:00","description":"Uygulanabilir \u00fcretim \u00e7izelgesi kurun: i\u015f s\u0131ralamas\u0131, kapasite ve malzemeyi \u00f6\u011frenin, \u00f6ncelik de\u011fi\u015fince SkyPlanner'\u0131n i\u015fi nas\u0131l yeniden hesaplad\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcn.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","width":2172,"height":724,"caption":"Two component batches queue for a shared machining workstation before moving to assembly"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"\u00dcretim Planlama Nedir? \u0130malat Rehberi"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png",2172,724,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-300x100.png",300,100,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-768x256.png",768,256,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-1024x341.png",1024,341,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-1536x512.png",1536,512,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-2048x683.png",2048,683,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-360x120.png",360,120,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u00dcretim Planlama Nedir? \u0130malat Rehberi Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretim Planlama Nedir? \u0130malat Rehberi \u00dcretim \u00e7izelgeleme, imalat operasyonlar\u0131n\u0131 kaynaklara atar ve bunlar\u0131n s\u0131ras\u0131n\u0131, ba\u015flang\u0131\u00e7 ve biti\u015f zamanlar\u0131n\u0131 belirler. Kapasiteyi, proses ba\u011f\u0131ml\u0131l\u0131klar\u0131n\u0131, malzeme eri\u015filebilirli\u011fini ve teslim tarihlerini hesaba katarak \u00fcretim plan\u0131n\u0131 uygulanabilir i\u015fe d\u00f6n\u00fc\u015ft\u00fcr\u00fcr. Yararl\u0131 bir \u00e7izelge, s\u0131rada neyin \u00e7al\u0131\u015fabilece\u011fini ve neyin beklemesi gerekti\u011fini birlikte&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96019","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=96019"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96019\/revisions"}],"predecessor-version":[{"id":96048,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/96019\/revisions\/96048"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/96058"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=96019"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=96019"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=96019"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}