{"id":95903,"date":"2026-10-04T00:45:24","date_gmt":"2026-10-04T00:45:24","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=95903"},"modified":"2026-10-04T00:46:46","modified_gmt":"2026-10-04T00:46:46","slug":"ana-uretim-programi","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/","title":{"rendered":"Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">13<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Ana \u00fcretim program\u0131 (MPS), bir \u00fcreticinin hangi \u00fcr\u00fcnleri veya se\u00e7ilmi\u015f planlama kalemlerini, hangi miktarlarda ve hangi d\u00f6nemlerde \u00fcretmeyi ama\u00e7lad\u0131\u011f\u0131n\u0131 belirtir. Talebi \u00fcretim taahh\u00fctleriyle ba\u011flar. Ard\u0131ndan ayr\u0131nt\u0131l\u0131 \u00fcretim \u00e7izelgeleme, bu taahh\u00fctlerin arkas\u0131ndaki operasyonlar\u0131 kaynaklara ve zamanlara atar.<\/p>\n\n<div class=\"gb-container gb-container-article04\"><div class=\"gb-inside-container\">\n\n<p>\u00d6nemli \u00c7\u0131kar\u0131mlar<\/p>\n\n\n<p>MPS; neyin \u00fcretilece\u011fini, ne kadar \u00fcretilece\u011fini ve ne zaman haz\u0131r olmas\u0131 gerekti\u011fini yan\u0131tlar.<\/p>\n\n\n<p>\u00dcretim miktarlar\u0131 kabul edilmeden \u00f6nce tahmin t\u00fcketimi ile stok bakiyeleri tutarl\u0131 olmal\u0131d\u0131r.<\/p>\n\n\n<p>MRP, MPS&#8217;nin arkas\u0131ndaki bile\u015fen ihtiya\u00e7lar\u0131n\u0131 hesaplar; ayr\u0131nt\u0131l\u0131 \u00e7izelgeleme ise kaynak s\u0131ralamas\u0131n\u0131 s\u0131nar.<\/p>\n\n\n<p>Dengeli bir \u00fcr\u00fcn plan\u0131 yine de kapasite ve malzeme zamanlamas\u0131 kontrol\u00fcnden ge\u00e7melidir.<\/p>\n\n\n<p>Planlama ekibi taahh\u00fctleri ve \u00f6ncelikleri belirler; SkyPlanner bunlar\u0131n arkas\u0131ndaki \u00fcretim i\u015flerini otomatik olarak \u00e7izelgeler.<\/p>\n\n<\/div><\/div>\n\n<p>A ve B \u00fcr\u00fcnlerini d\u00fc\u015f\u00fcn\u00fcn. \u00d6ng\u00f6r\u00fclen stoklar\u0131 bir sonraki planlama d\u00f6nemi i\u00e7in yeterli g\u00f6r\u00fcn\u00fcrken, \u00fcretim i\u015fleri ayn\u0131 i\u015f merkezi i\u00e7in yar\u0131\u015fabilir. \u00dcr\u00fcn plan\u0131 dengelenir, ancak y\u00fcr\u00fctme s\u0131ras\u0131 uymayabilir. \u0130yi bir MPS s\u00fcreci, fabrika bir teslim tarihi vaat etmeden \u00f6nce bu \u00e7at\u0131\u015fmay\u0131 ortaya \u00e7\u0131kar\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ana \u00fcretim program\u0131nda neler yer almal\u0131d\u0131r?<\/h2>\n\n\n<p>MPS, i\u015fletmenin toplam \u00fcretim y\u00f6n\u00fc ile tek tek kalemlerin teslimi i\u00e7in gereken ayr\u0131nt\u0131l\u0131 i\u015f aras\u0131nda yer al\u0131r. Se\u00e7ilmi\u015f kalem d\u00fczeyindeki taahh\u00fctleri sat\u0131\u015f, sat\u0131n alma ve \u00fcretim ekipleri i\u00e7in g\u00f6r\u00fcn\u00fcr k\u0131lar; b\u00f6ylece herkes ayn\u0131 plan \u00fczerinden \u00e7al\u0131\u015fabilir.<\/p>\n\n\n<p>Planlama d\u00fczeyini \u00fcretim ortam\u0131na g\u00f6re se\u00e7in. Sto\u011fa \u00fcretim yapan bir i\u015fletme genellikle nihai \u00fcr\u00fcnleri talep ve stok hedeflerine g\u00f6re planlar. Sipari\u015fe g\u00f6re \u00fcretim yapan bir i\u015fletme, se\u00e7ilen kalemleri kesinle\u015fmi\u015f m\u00fc\u015fteri taahh\u00fctlerine dayand\u0131rabilir. Sipari\u015fe g\u00f6re montaj yapan bir i\u015fletme, nihai konfig\u00fcrasyon belli olmadan \u00f6nemli alt montajlar\u0131 veya opsiyonlar\u0131 planlayabilir. Pratik \u00f6l\u00e7\u00fct, se\u00e7ilen kalem d\u00fczeyinin anlaml\u0131 bir \u00fcretim karar\u0131n\u0131 destekleyip desteklemedi\u011fidir.<\/p>\n\n\n<p>Her MPS kayd\u0131 i\u00e7in bir kalem, bir d\u00f6nem ve o d\u00f6nemde haz\u0131r olacak planl\u0131 bir miktar gerekir. Destekleyici bilgiler genellikle ba\u015flang\u0131\u00e7 stokunu, talebi, \u00f6nceden \u00e7izelgelenmi\u015f giri\u015fleri ve \u00f6ng\u00f6r\u00fclen kullan\u0131labilir bakiyeyi i\u00e7erir. Tamamlanma veya kullan\u0131labilirlik tarihlerini operasyon ba\u015flang\u0131\u00e7 tarihlerinden ayr\u0131 tutun: bir giri\u015f, \u00fcretimi daha erken ba\u015flam\u0131\u015f olsa bile \u00fcr\u00fcn\u00fcn kullan\u0131labilir oldu\u011fu d\u00f6neme aittir.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Planlama katman\u0131<\/th><th>Ana karar<\/th><th>A ve B i\u00e7in anlam\u0131<\/th><\/tr><\/thead><tbody><tr><td>S&#038;OP ve toplula\u015ft\u0131r\u0131lm\u0131\u015f \u00fcretim planlama<\/td><td>\u00dcr\u00fcn ailesi d\u00fczeyinde talep ve tedarik y\u00f6n\u00fc<\/td><td>Aileleri i\u00e7in genel hacim ve kaynak y\u00f6n\u00fc \u00fczerinde anla\u015fmak<\/td><\/tr><tr><td>MPS<\/td><td>Se\u00e7ilmi\u015f kalem miktarlar\u0131 ve kullan\u0131labilirlik d\u00f6nemleri<\/td><td>A ve B&#8217;nin \u00fcretimini taahh\u00fct etmek<\/td><\/tr><tr><td>MRP, malzeme ihtiya\u00e7 planlamas\u0131<\/td><td>Zamana yay\u0131lm\u0131\u015f bile\u015fen ihtiya\u00e7lar\u0131<\/td><td>Bu \u00fcretimlerin arkas\u0131nda gereken bile\u015fenleri hesaplamak<\/td><\/tr><tr><td>Ayr\u0131nt\u0131l\u0131 \u00fcretim \u00e7izelgeleme ve APS<\/td><td>Kaynak atamas\u0131, zamanlama ve s\u0131ralama<\/td><td>A ve B&#8217;nin operasyonlar\u0131n\u0131 k\u0131s\u0131tlar\u0131yla birlikte i\u015f merkezlerine yerle\u015ftirmek<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Planlama hiyerar\u015fisi kaynaklar\u0131: <a href=\"https:\/\/www.optiproerp.com\/blog\/inventory-management-101-master-production-schedule-mps-explained\/\">OptiProERP&#8217;nin MPS a\u00e7\u0131klamas\u0131<\/a> ve <a href=\"https:\/\/www.mrpeasy.com\/blog\/what-is-master-production-schedule\/\">MRPeasy&#8217;nin MPS rehberi<\/a>, 4 Ekim 2026 tarihinde incelenmi\u015ftir. Tablo \u00f6\u011fretici bir \u00f6zettir; iki sa\u011flay\u0131c\u0131dan hi\u00e7birinin aray\u00fcz\u00fc de\u011fildir.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-sopun-gucunu-ortaya-cikarmak\/\">\u00dcretimde S&#038;OP s\u00fcreci<\/a>, \u00fcr\u00fcn ailesi d\u00fczeyindeki ba\u011flam\u0131 sa\u011flar. Burada MRP, bazen MRP I olarak da adland\u0131r\u0131lan malzeme ihtiya\u00e7 planlamas\u0131 anlam\u0131na gelir. \u0130malat kaynaklar\u0131 planlamas\u0131, yani MRP II ise daha geni\u015f bir planlama kavram\u0131d\u0131r; yaln\u0131zca bu bile\u015fen hesaplamas\u0131n\u0131n farkl\u0131 bir ad\u0131 de\u011fildir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kendi A ve B rakamlar\u0131n\u0131zla bir MPS \u00f6rne\u011fi olu\u015fturun<\/h2>\n\n\n<p>A ve B&#8217;nin ger\u00e7ek talep, stok ve a\u00e7\u0131k \u00fcretim kay\u0131tlar\u0131yla ba\u015flay\u0131n. A\u015fa\u011f\u0131daki tablo, okuyucunun kendi verilerini girece\u011fi bir hesaplama d\u00fczenidir: sembolleri kay\u0131tlar\u0131n\u0131zdaki miktarlar\u0131 temsil eder, bir fabrika k\u0131yas de\u011feri de\u011fildir. Karar s\u00fcrecinize uyan ard\u0131\u015f\u0131k planlama d\u00f6nemleri kullan\u0131n.<\/p>\n\n\n<p>Her kalem ve d\u00f6nem i\u00e7in \u015fu miktarlar\u0131 kullan\u0131n:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>I: plan i\u00e7in kullan\u0131labilir ba\u015flang\u0131\u00e7 stoku.<\/li><li>O: d\u00f6nem i\u00e7inde vadesi gelen kesinle\u015fmi\u015f m\u00fc\u015fteri sipari\u015fleri.<\/li><li>F: ilgili tahmin t\u00fcketimi s\u00fcrecinin ard\u0131ndan kalan tahmin talebi.<\/li><li>R: plana zaten dahil edilmi\u015f \u00fcretimden gelen \u00e7izelgelenmi\u015f giri\u015fler.<\/li><li>Q: d\u00f6nem i\u00e7in \u00f6nerilen yeni MPS giri\u015fleri.<\/li><li>D: kararla\u015ft\u0131r\u0131lan talep politikas\u0131na g\u00f6re say\u0131lan talep.<\/li><li>P: d\u00f6nem sonundaki \u00f6ng\u00f6r\u00fclen kullan\u0131labilir bakiye.<\/li><\/ul>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kalem ve d\u00f6nem<\/th><th>Ba\u015flang\u0131\u00e7 stoku<\/th><th>Kesinle\u015fmi\u015f sipari\u015fler<\/th><th>Art\u0131k tahmin<\/th><th>\u00c7izelgelenmi\u015f giri\u015fler<\/th><th>Yeni MPS miktar\u0131<\/th><th>\u00d6ng\u00f6r\u00fclen bakiye<\/th><\/tr><\/thead><tbody><tr><td>A, mevcut d\u00f6nem<\/td><td>I(A)<\/td><td>O(A)<\/td><td>F(A)<\/td><td>R(A)<\/td><td>Q(A)<\/td><td>I(A) + R(A) + Q(A) \u2212 D(A)<\/td><\/tr><tr><td>A, sonraki d\u00f6nem<\/td><td>\u00d6nceki P(A)<\/td><td>Sonraki O(A)<\/td><td>Sonraki F(A)<\/td><td>Sonraki R(A)<\/td><td>Sonraki Q(A)<\/td><td>I(A) + R(A) + Q(A) \u2212 D(A)<\/td><\/tr><tr><td>B, mevcut d\u00f6nem<\/td><td>I(B)<\/td><td>O(B)<\/td><td>F(B)<\/td><td>R(B)<\/td><td>Q(B)<\/td><td>I(B) + R(B) + Q(B) \u2212 D(B)<\/td><\/tr><tr><td>B, sonraki d\u00f6nem<\/td><td>\u00d6nceki P(B)<\/td><td>Sonraki O(B)<\/td><td>Sonraki F(B)<\/td><td>Sonraki R(B)<\/td><td>Sonraki Q(B)<\/td><td>I(B) + R(B) + Q(B) \u2212 D(B)<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Hesaplama kavramlar\u0131: yukar\u0131da ba\u011flant\u0131s\u0131 verilen MRPeasy rehberindeki MPS girdileri, stok, talep ve parti b\u00fcy\u00fckl\u00fc\u011f\u00fc b\u00f6l\u00fcmleri; 4 Ekim 2026 tarihinde incelenmi\u015ftir. Bu \u00f6zg\u00fcn A\/B d\u00fczeni okuyucunun kay\u0131tlar\u0131n\u0131 kullan\u0131r ve mevcut giri\u015fleri yeni \u00f6nerilerden ay\u0131r\u0131r.<\/p>\n\n\n<p>\u00d6nce tahmin t\u00fcketimini netle\u015ftirin. M\u00fc\u015fteri sipari\u015fleri tahminin bir k\u0131sm\u0131n\u0131 zaten t\u00fcketmi\u015fse, bu sipari\u015fleri \u00f6zg\u00fcn toplam tahmine eklemek talebin bir k\u0131sm\u0131n\u0131 iki kez saymak anlam\u0131na gelir. Politikan\u0131z talebi kesinle\u015fmi\u015f sipari\u015fler art\u0131 kalan, t\u00fcketilmemi\u015f tahmin olarak tan\u0131ml\u0131yorsa D, O + F&#8217;dir. Sipari\u015flerin ve tahminin b\u00fcy\u00fck olan\u0131n\u0131 kullanan bir politika, d\u00f6nemler ve t\u00fcketim konusunda kendi uyumlu varsay\u0131mlar\u0131n\u0131 gerektirir. Bu k\u0131sayol, tahmin t\u00fcketiminin her durumda ge\u00e7erli bir alternatifi de\u011fildir.<\/p>\n\n\n<p>Ard\u0131ndan bakiyeyi hesaplay\u0131n: ba\u015flang\u0131\u00e7 stoku art\u0131 \u00e7izelgelenmi\u015f giri\u015fler art\u0131 yeni MPS giri\u015fleri, eksi talep. Sonucu bir sonraki d\u00f6nemin ba\u015flang\u0131\u00e7 stoku olarak aktar\u0131n. Bir \u00fcretim miktar\u0131 yaln\u0131zca bir kez yer almal\u0131d\u0131r. \u00d6nerilen bir Q, mevcut bir \u00e7izelgelenmi\u015f giri\u015f R&#8217;ye d\u00f6n\u00fc\u015ft\u00fc\u011f\u00fcnde onu \u00f6neri s\u00fctunundan \u00e7\u0131kar\u0131n; aksi halde plan ayn\u0131 tedariki iki kez sayar.<\/p>\n\n\n<p>\u015eimdi \u00f6ng\u00f6r\u00fclen her bakiyeyi kalemin stok hedefiyle kar\u015f\u0131la\u015ft\u0131r\u0131n. A emniyet sto\u011fu hedefinin alt\u0131na d\u00fc\u015ferse, \u00f6nerilen \u00fcretim miktar\u0131n\u0131n art\u0131r\u0131lmas\u0131 veya daha erken tamamlanmas\u0131 gerekebilir. A&#8217;n\u0131n ger\u00e7ek parti b\u00fcy\u00fckl\u00fc\u011f\u00fc k\u0131s\u0131t\u0131n\u0131 bu \u00f6neriye uygulay\u0131n, ard\u0131ndan sonraki bakiyeleri yeniden hesaplay\u0131n. Bir partiyi yukar\u0131 yuvarlamak stoku ve kaynak y\u00fck\u00fcn\u00fc de\u011fi\u015ftirir; bedelsiz bir d\u00fczeltme de\u011fildir. Ayn\u0131 i\u015flemi B i\u00e7in de B&#8217;nin kendi parti b\u00fcy\u00fckl\u00fc\u011f\u00fc ve stok ayarlar\u0131yla tekrarlay\u0131n.<\/p>\n\n\n<p>Taahh\u00fct edilebilir miktar (Available-to-Promise, ATP), ilgili aral\u0131kta kesin sipari\u015flere kar\u015f\u0131 hen\u00fcz taahh\u00fct edilmemi\u015f ve h\u00e2l\u00e2 s\u00f6z verilebilecek arzd\u0131r. \u00d6ng\u00f6r\u00fclen d\u00f6nem sonu stoku ise planlama politikas\u0131n\u0131n sayd\u0131\u011f\u0131 t\u00fcm talep d\u00fc\u015f\u00fcld\u00fckten sonra kalan d\u00f6nem bakiyesidir; uygulanabildi\u011fi durumlarda art\u0131k \u00f6ng\u00f6r\u00fc de bu talebe dahildir. Ek bir m\u00fc\u015fteri taahh\u00fcd\u00fc verirken planlama sisteminizde tan\u0131ml\u0131 ATP y\u00f6ntemini kullan\u0131n.<\/p>\n\n\n<p>Tablo bir stok testi sunar. S\u0131radaki test, A ve B&#8217;nin ger\u00e7ekten zaman\u0131nda \u00fcretilip \u00fcretilemeyece\u011fidir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A ve B&#8217;nin \u00fcretim tarihlerini kabul etmeden \u00f6nce kapasiteyi kontrol edin<\/h2>\n\n\n<p>Kaba kapasite planlamas\u0131 kontrol\u00fc, MPS&#8217;in ima etti\u011fi kritik kaynak y\u00fck\u00fcn\u00fc mevcut kapasiteyle kar\u015f\u0131la\u015ft\u0131r\u0131r. A ve B i\u00e7in ortak i\u015f merkezinden ba\u015flay\u0131n. Birle\u015fik y\u00fcklerinin hedeflenen d\u00f6neme s\u0131\u011f\u0131p s\u0131\u011fmad\u0131\u011f\u0131n\u0131 g\u00f6rmek i\u00e7in planlanan miktarlar\u0131, ilgili i\u015flem gereksinimlerini ve mevcut vardiya kapasitesini kullan\u0131n.<\/p>\n\n\n<p>A\u015f\u0131r\u0131 y\u00fck bir i\u015f karar\u0131 gerektirir. \u00dcretim miktar\u0131n\u0131 de\u011fi\u015ftirebilir, bir taahh\u00fcd\u00fc \u00f6teleyebilir, farkl\u0131 bir vardiya d\u00fczenini onaylayabilir veya farkl\u0131 bir \u00f6ncelik se\u00e7ebilirsiniz. M\u00fc\u015fteri taahh\u00fcd\u00fcn\u00fc revize etmeden \u00f6nce se\u00e7ilen se\u00e7ene\u011fin ger\u00e7ekten uygulanabilir oldu\u011funu do\u011frulay\u0131n.<\/p>\n\n\n<p>D\u00f6nem d\u00fczeyindeki kontrol ge\u00e7ilse bile bir s\u0131ralama sorusu geride kal\u0131r. A ve B toplam i\u015f merkezi saatlerine s\u0131\u011fabilir; yine de belirli bir anda \u00e7ak\u0131\u015fabilir, \u00e7\u00fcnk\u00fc biri daha \u00f6nceki bir proses ad\u0131m\u0131na, bir haz\u0131rl\u0131\u011fa, bir operat\u00f6re veya hen\u00fcz haz\u0131r olmayan bir malzemeye ihtiya\u00e7 duyar. D\u00f6nem toplamlar\u0131 bu ili\u015fkileri s\u0131k\u0131\u015ft\u0131r\u0131r.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/sonlu-kapasite-planlama\/\">Sonlu kapasite \u00e7izelgeleme<\/a> tam bu noktada i\u015fe yarar. Ayr\u0131nt\u0131l\u0131 model; rotalar\u0131, operasyon s\u00fcrelerini, haz\u0131rl\u0131k s\u00fcrelerini, kaynak kullan\u0131labilirli\u011fini ve ba\u011f\u0131ml\u0131l\u0131klar\u0131 gerektirir. Stok bakiyesi, A ve B&#8217;nin planlanan arz\u0131n\u0131n yeterli oldu\u011funu s\u00f6yler. Kaynak s\u0131ralamas\u0131 ise operasyonlar\u0131n bu arz\u0131 planlanan tarihlere kadar kar\u015f\u0131lay\u0131p kar\u015f\u0131layamayaca\u011f\u0131n\u0131 g\u00f6sterir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MPS&#8217;in SkyPlanner&#8217;da uygulanabilir bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fc\u011f\u00fc yer<\/h2>\n\n\n<p>SkyPlanner&#8217;da A ve B&#8217;nin arkas\u0131ndaki i\u015f merkezlerini, vardiyalar\u0131, operat\u00f6rleri, \u00f6ncelikleri ve malzemeleri tan\u0131mlay\u0131n ve ko\u015fullar de\u011fi\u015ftik\u00e7e bu girdileri g\u00fcncel tutun. Sipari\u015f kalemleri; s\u00fcre hesaplama ve haz\u0131rl\u0131k ayarlar\u0131 dahil olmak \u00fczere \u00fcr\u00fcnleri ve proses ad\u0131mlar\u0131n\u0131 i\u00e7erir. King button, Arcturus&#8217;un \u00fcretim \u00e7izelgesini \u00f6ncelikleri, i\u015f merkezi kapasitelerini ve tak\u0131m kullan\u0131labilirli\u011fini esas alarak yeniden hesaplamas\u0131n\u0131 tetikler. Consider the materials etkinle\u015ftirildi\u011finde, mevcut malzemeler, gelen sevkiyatlar ve stok da ba\u015flang\u0131\u00e7 zamanlamas\u0131n\u0131 etkiler. A ve B&#8217;yi Gantt&#8217;taki i\u015f merkezi \u015feritlerinde inceleyin, ba\u011flant\u0131l\u0131 proses ad\u0131mlar\u0131n\u0131 izleyin ve her taahh\u00fcd\u00fcn arkas\u0131ndaki i\u015fi kontrol etmek i\u00e7in Job Details&#8217;i a\u00e7\u0131n. Bu, \u0130leri Planlama ve \u00c7izelgeleme (APS) yaz\u0131l\u0131m\u0131n\u0131n ayr\u0131nt\u0131l\u0131 y\u00fcr\u00fctme katman\u0131d\u0131r; \u00fcr\u00fcn d\u00fczeyindeki MPS ise planlama ba\u011flam\u0131 olarak kal\u0131r.<\/p>\n\n\n<p>SkyPlanner, a\u00e7\u0131k REST API&#8217;si arac\u0131l\u0131\u011f\u0131yla her t\u00fcrl\u00fc ERP veya MES sistemiyle entegre olur. Otomatik i\u015f \u00e7izelgeleme ile ERP&#8217;nizi tamamlar; b\u00f6ylece \u00fcr\u00fcn taahh\u00fctleri ve ilgili sipari\u015fler, bir <a href=\"https:\/\/skyplanner.ai\/tr\/entegrasyonlar\/\">ERP ve MES entegrasyonu<\/a> \u00fczerinden y\u00fcr\u00fctmeyle ba\u011flanabilir. \u00d6ncelikleri planlama uzmanlar\u0131 belirler; ortaya \u00e7\u0131kan \u00e7izelgeyi Arcturus hesaplar. Bu devir noktas\u0131n\u0131 ke\u015ffetmek i\u00e7in A ve B&#8217;nin rotas\u0131n\u0131 ve kaynak k\u0131s\u0131tlar\u0131n\u0131 tart\u0131\u015fma \u00f6rne\u011fi olarak kullanarak <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a> veya <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">demo talep edin<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Talep veya malzemeler de\u011fi\u015fti\u011finde A ve B&#8217;yi istikrarl\u0131 tutun<\/h2>\n\n\n<p>B&#8217;nin gelen malzemesinin plana g\u00f6re daha ge\u00e7 geldi\u011fini varsayal\u0131m. Yaln\u0131zca B&#8217;nin \u00fcr\u00fcn d\u00fczeyindeki teslim alma tarihini g\u00fcncellemek, ayr\u0131nt\u0131l\u0131 \u00fcretim girdisini senkron d\u0131\u015f\u0131 b\u0131rak\u0131r. \u00c7izelgelemede kullan\u0131lan malzeme bilgisini g\u00fcncelleyin, Consider the materials se\u00e7ene\u011finin etkin oldu\u011funu do\u011frulay\u0131n, yeniden hesaplay\u0131n ve B&#8217;nin art\u0131k A&#8217;ya g\u00f6re nerede durdu\u011funu inceleyin.<\/p>\n\n\n<p>\u0130\u015f karar\u0131n\u0131 \u00e7izelgeleme eylemine ba\u011flamak i\u00e7in bir istisna kart\u0131 kullan\u0131n:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>A\/B istisnas\u0131<\/th><th>Planlama uzman\u0131n\u0131n karar\u0131<\/th><th>\u00c7izelgeleme girdisi veya kontrol\u00fc<\/th><th>Yeniden hesaplamadan sonra incelenecekler<\/th><\/tr><\/thead><tbody><tr><td>A ve B, ortak i\u015f merkezi i\u00e7in rekabet ediyor<\/td><td>Hangi taahh\u00fcd\u00fcn \u00f6ncelikli oldu\u011funu do\u011frulay\u0131n veya kapasiteyi ya da tarihleri revize edin<\/td><td>G\u00fcncel i\u015f merkezi ve vardiya verileri; se\u00e7ilen Dynamic Priorities; King button<\/td><td>A\/B&#8217;nin i\u015f merkezi \u015feridindeki yerle\u015fimi ve ba\u011flant\u0131l\u0131 proses ad\u0131mlar\u0131<\/td><\/tr><tr><td>B&#8217;nin gelen malzemesi gecikiyor<\/td><td>B&#8217;nin taahh\u00fcd\u00fcn\u00fcn \u00f6telenmesi gerekip gerekmedi\u011fine karar verin<\/td><td>G\u00fcncellenmi\u015f malzeme var\u0131\u015f bilgisi; Consider the materials etkin; King button<\/td><td>B&#8217;nin yeni zamanlamas\u0131 ve A&#8217;ya g\u00f6re konumu<\/td><\/tr><tr><td>A&#8217;n\u0131n yak\u0131n vadeli i\u015fleri istikrarl\u0131 kalmal\u0131<\/td><td>Sonraki i\u015fler de\u011fi\u015firken korunacak i\u015fleri se\u00e7in<\/td><td>Yak\u0131n vadeli i\u015fler i\u00e7in Running Time Lock<\/td><td>Korunan A i\u015fleri ve kalan B s\u0131ras\u0131<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Kontrol e\u015fle\u015ftirmesi kaynaklar\u0131: SkyPlanner bilgi bankas\u0131 makaleleri 775, SkyPlanner: The Basics; 835, Consider the Materials; ve 632, master schedule and project detail; 4 Ekim 2026&#8217;da g\u00f6zden ge\u00e7irilmi\u015ftir. Bu, \u00f6\u011fretici bir e\u015fle\u015ftirmedir; \u00f6l\u00e7\u00fclm\u00fc\u015f bir \u00fcretim sonucu de\u011fildir.<\/p>\n\n\n<p>Bir planlama zaman \u00e7iti, i\u015fletme d\u00fczeyindeki hangi MPS de\u011fi\u015fikliklerinin kontrol veya onay gerektirdi\u011fini belirler. SkyPlanner&#8217;\u0131n Running Time Lock \u00f6zelli\u011fi ise yak\u0131n vadeli i\u015fleri Arcturus&#8217;un yeniden \u00e7izelgelemesinden korur. \u0130ki sorumlulu\u011fu birbirinden ayr\u0131 tutun: i\u015f kilidi \u00e7izelgeleme yerle\u015fimini korur, bir MPS taahh\u00fcd\u00fcn\u00fcn de\u011fi\u015fip de\u011fi\u015fmeyece\u011fine ise yine planlama uzman\u0131 karar verir.<\/p>\n\n\n<p>Belgelenmi\u015f kurulum rehberi, A ve B rekabet etti\u011finde de \u00f6nem ta\u015f\u0131r. Her Dynamic Priorities \u00e7ubu\u011funu maksimuma ayarlamak her \u015feyi e\u015fit derecede \u00f6nemli h\u00e2le getirir. \u0130lgili \u00f6ncelikleri se\u00e7ici bi\u00e7imde ayarlay\u0131n ve yeni yerle\u015fimi de\u011ferlendirmeden \u00f6nce proses s\u00fcrelerini, haz\u0131rl\u0131\u011f\u0131, vardiyalar\u0131 ve ba\u011f\u0131ml\u0131l\u0131klar\u0131 kontrol edin. Daha y\u00fcksek bir \u00f6ncelik yeni bir i\u015f merkezi yaratmaz ve B&#8217;nin eksik malzemesinin gelmesini sa\u011flamaz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MPS ve MRP: Hangi plana neler girer?<\/h2>\n\n\n<p>MPS, \u00fcr\u00fcn d\u00fczeyindeki arz karar\u0131n\u0131 belirler. MRP ise bu karar\u0131n arkas\u0131ndaki malzeme ihtiya\u00e7lar\u0131n\u0131 hesaplar. A ve B i\u00e7in planlanan \u00fcretim miktarlar\u0131 bile\u015fen talebini olu\u015fturur; hangi malzemelerin ne zaman gerekti\u011fini ise \u00fcr\u00fcn a\u011fa\u00e7lar\u0131, stok ve lead time belirler.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Soru<\/th><th>MPS<\/th><th>MRP<\/th><\/tr><\/thead><tbody><tr><td>Ne planlan\u0131r?<\/td><td>Se\u00e7ilmi\u015f \u00fcr\u00fcnler veya planlama kalemleri<\/td><td>Planlanan \u00fcretimin arkas\u0131ndaki bile\u015fenler ve malzemeler<\/td><\/tr><tr><td>Hesaplamay\u0131 ne y\u00f6nlendirir?<\/td><td>Talep politikas\u0131, stok, teslim al\u0131nacak sipari\u015fler ve \u00fcretim taahh\u00fctleri<\/td><td>\u00dcr\u00fcn gereksinimleri, \u00fcr\u00fcn a\u011fa\u00e7lar\u0131 (BOM), stok ve lead time<\/td><\/tr><tr><td>Planlama uzman\u0131 neyi inceler?<\/td><td>\u00dcretim miktarlar\u0131, d\u00f6nemler ve \u00f6ng\u00f6r\u00fclen bakiyeler<\/td><td>Zamana yay\u0131lm\u0131\u015f malzeme ihtiya\u00e7lar\u0131 ve bunlardan do\u011fan tedarik \u00f6nerileri<\/td><\/tr><tr><td>B \u00f6telendi\u011finde ne de\u011fi\u015fir?<\/td><td>B&#8217;nin planlanan kullan\u0131labilirlik d\u00f6nemi<\/td><td>B ile ili\u015fkili bile\u015fen ihtiya\u00e7lar\u0131n\u0131n zamanlamas\u0131<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u0130li\u015fki kaynaklar\u0131: yukar\u0131da ba\u011flant\u0131s\u0131 verilen OptiProERP ve MRPeasy k\u0131lavuzlar\u0131, 4 Ekim 2026&#8217;da g\u00f6zden ge\u00e7irilmi\u015ftir.<\/p>\n\n\n<p><a href=\"\/tr\/kaynaklar\/mrp-kisa-bir-rehber\/\">MRP k\u0131lavuzu<\/a> malzeme planlama katman\u0131n\u0131 a\u00e7\u0131klar; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/erp-bom-malzeme-listesi\/\">ERP \u00fcr\u00fcn a\u011fac\u0131 k\u0131lavuzu<\/a> ise bu katman\u0131n dayand\u0131\u011f\u0131 \u00fcr\u00fcn yap\u0131lar\u0131n\u0131 anlat\u0131r. A veya B&#8217;yi revize ederken kay\u0131tlar\u0131 birbiriyle uyumlu tutun. B&#8217;nin \u00fcretim d\u00f6nemini bile\u015fen zamanlamas\u0131n\u0131 g\u00f6zden ge\u00e7irmeden kayd\u0131rmak, sat\u0131n alma ile \u00fcretimin farkl\u0131 tarihlere g\u00f6re \u00e7al\u0131\u015fmas\u0131na yol a\u00e7abilir.<\/p>\n\n\n<p>Ayr\u0131nt\u0131l\u0131 \u00e7izelgeleme, operasyon d\u00fczeyinde bir kontrol ekler. Bir bile\u015fen plan\u0131 malzeme talebini belirleyebilir; i\u015f s\u0131ralamas\u0131 ise yine de ger\u00e7ek i\u015f merkezi zamanlamas\u0131n\u0131 ve ba\u011f\u0131ml\u0131l\u0131klar\u0131 hesaba katmak zorundad\u0131r. Kalem bakiyesini, malzeme plan\u0131n\u0131 ve kaynak \u00e7izelgesini, farkl\u0131 \u00e7\u0131kt\u0131lar \u00fcreten birbirine ba\u011fl\u0131 kararlar olarak ele al\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Buldu\u011funuz soruna g\u00f6re bir sonraki ad\u0131ma karar verin<\/h2>\n\n\n<p>D\u00fczeltici eylemi, A ve B&#8217;nin plan\u0131n\u0131n hangi d\u00fczeyde ba\u015far\u0131s\u0131z oldu\u011funa g\u00f6re se\u00e7in:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>A&#8217;n\u0131n \u00f6ng\u00f6r\u00fclen stoku hedefin alt\u0131ndaysa, \u00f6nce talebi, teslim al\u0131nacak sipari\u015fleri ve \u00f6nerilen \u00fcretim miktar\u0131n\u0131 mutab\u0131k h\u00e2le getirin.<\/li><li>A ve B kritik kayna\u011f\u0131 a\u015f\u0131r\u0131 y\u00fckl\u00fcyorsa, d\u00f6nemi kabul etmeden \u00f6nce kapasiteyi veya taahh\u00fctleri yeniden g\u00f6zden ge\u00e7irin.<\/li><li>Toplamlar uyuyor ancak B malzeme zamanlamas\u0131 veya ba\u011f\u0131ml\u0131l\u0131klar y\u00fcz\u00fcnden ba\u015flayam\u0131yorsa, ayr\u0131nt\u0131l\u0131 \u00e7izelgeleme girdilerini do\u011frulay\u0131n ve operasyon s\u0131ras\u0131n\u0131 inceleyin.<\/li><li>\u00c7izelge korunan yak\u0131n vadeli i\u015fleri tekrar tekrar kayd\u0131r\u0131yorsa, istikrar karar\u0131n\u0131n i\u015f kilitleme yoluyla nas\u0131l temsil edildi\u011fini kontrol edin.<\/li><\/ul>\n\n\n<p>Y\u00fcr\u00fctme odakl\u0131 bir de\u011ferlendirme i\u00e7in se\u00e7ti\u011finiz A\/B kalemlerini ve \u00fcretim d\u00f6nemlerini, rotalar\u0131n\u0131, i\u015flem ve haz\u0131rl\u0131k bilgilerini, i\u015f merkezlerini ve vardiyalar\u0131, se\u00e7ti\u011finiz \u00f6ncelikleri ve g\u00fcncel malzeme var\u0131\u015f bilgilerini getirin. Bunlar planlama devrini somut h\u00e2le getirir. Do\u011fru girdiler, taahh\u00fctlerinizin arkas\u0131ndaki \u00e7izelgeyi de\u011ferlendirmenizi sa\u011flar; yaz\u0131l\u0131m hatal\u0131 bir stok kayd\u0131n\u0131 do\u011fru h\u00e2le getiremez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u0131k sorulan sorular<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Ana \u00fcretim program\u0131 (MPS) nedir?<\/h3>\n\n\n<p>Ana \u00fcretim program\u0131 (MPS), miktarlar\u0131 ve kullan\u0131labilirlik d\u00f6nemlerini belirten, kalem baz\u0131nda haz\u0131rlanan bir \u00fcretim plan\u0131d\u0131r. Planlama kalemleri \u00fcretim ortam\u0131na g\u00f6re de\u011fi\u015fir: bitmi\u015f \u00fcr\u00fcnler, se\u00e7ilmi\u015f alt montajlar veya uygun di\u011fer kalemler olabilir. A ve B i\u00e7in faydal\u0131 \u00e7\u0131kt\u0131; tutarl\u0131 bir stok dengesi ve kapasite kontrol\u00fcyle desteklenen net bir \u00fcretim taahh\u00fcd\u00fcd\u00fcr.<\/p>\n\n\n<h3 class=\"wp-block-heading\">MPS ile MRP aras\u0131ndaki fark nedir?<\/h3>\n\n\n<p>MPS, se\u00e7ilen \u00fcr\u00fcnlerin \u00fcretim miktarlar\u0131n\u0131 belirler; MRP ise bunlar\u0131n arkas\u0131ndaki malzeme ihtiya\u00e7lar\u0131n\u0131 hesaplar. B&#8217;nin planlanan \u00fcretimi kayarsa bile\u015fenlerinin zamanlamas\u0131n\u0131n da kaymas\u0131 gerekebilir. \u00dcr\u00fcn taahh\u00fctlerini ve malzeme planlamas\u0131n\u0131 birbirine ba\u011fl\u0131 tutun; ancak de\u011fi\u015fen \u00fcretim tarihini uygulanabilir saymadan \u00f6nce detayl\u0131 kaynak s\u0131ras\u0131n\u0131 ayr\u0131ca kontrol edin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">MPS&#8217;te \u00f6ng\u00f6r\u00fclen kullan\u0131labilir bakiye nas\u0131l hesaplan\u0131r?<\/h3>\n\n\n<p>Ba\u015flang\u0131\u00e7 stokuna mevcut planl\u0131 giri\u015fleri ve yeni MPS giri\u015flerini ekleyin, ard\u0131ndan planlama politikan\u0131z\u0131n tan\u0131mlad\u0131\u011f\u0131 talebi \u00e7\u0131kar\u0131n. D\u00f6nem sonu bakiyesini bir sonraki d\u00f6neme aktar\u0131n. A\/B tablosunda, bir \u00fcretimi ya mevcut giri\u015flerde ya da yeni \u00f6nerilerde tutun; b\u00f6ylece tedari\u011fi yaln\u0131zca bir kez say\u0131l\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Tahmini talep ile m\u00fc\u015fteri sipari\u015flerini toplamal\u0131 m\u0131s\u0131n\u0131z?<\/h3>\n\n\n<p>Yaln\u0131zca tahmin k\u0131sm\u0131, \u015firketinizin politikas\u0131 uyar\u0131nca bu sipari\u015fler taraf\u0131ndan hen\u00fcz t\u00fcketilmemi\u015f talebi temsil ediyorsa. Kesin sipari\u015fleri orijinal toplam tahmine eklemek talebin iki kez say\u0131lmas\u0131na yol a\u00e7abilir. A ve B&#8217;nin talep toplamlar\u0131n\u0131 \u00f6nerilen \u00fcretimlerini hesaplamak i\u00e7in kullanmadan \u00f6nce, t\u00fcketim s\u00fcrecinin hangi d\u00f6nemleri ve kalemleri kapsad\u0131\u011f\u0131n\u0131 kontrol edin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">MPS ile detayl\u0131 \u00fcretim \u00e7izelgesi aras\u0131ndaki fark nedir?<\/h3>\n\n\n<p>B&#8217;nin MPS&#8217;inde yap\u0131lan bir revizyon \u00fcr\u00fcn taahh\u00fcd\u00fcn\u00fc de\u011fi\u015ftirir; B&#8217;nin detayl\u0131 \u00e7izelgesinde yap\u0131lan bir revizyon ise i\u015flerinin nas\u0131l y\u00fcr\u00fct\u00fclece\u011fini de\u011fi\u015ftirir. Bir de\u011fi\u015fikli\u011fi incelerken bunun s\u00f6z verilen tedari\u011fi mi, operasyonlar\u0131n yerle\u015fimini mi, yoksa her ikisini birden mi etkiledi\u011fini sorun. Bu ayr\u0131m, hangi planlama kay\u0131tlar\u0131n\u0131n ve y\u00fcr\u00fctme girdilerinin birlikte g\u00fcncellenmesi gerekti\u011fini g\u00f6sterir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Emniyet stoku, parti b\u00fcy\u00fckl\u00fckleri ve kapasite MPS&#8217;i nas\u0131l etkiler?<\/h3>\n\n\n<p>Emniyet stoku bir stok hedefi belirler, parti b\u00fcy\u00fckl\u00fckleri \u00fcretim miktarlar\u0131n\u0131 k\u0131s\u0131tlar, kapasite ise ortaya \u00e7\u0131kan i\u015f y\u00fck\u00fcn\u00fcn s\u0131\u011f\u0131p s\u0131\u011fmad\u0131\u011f\u0131n\u0131 s\u0131nar. A&#8217;n\u0131n partisini parti b\u00fcy\u00fckl\u00fc\u011f\u00fcn\u00fc kar\u015f\u0131lamak i\u00e7in art\u0131rmak stoku y\u00fckseltebilir ve B ile payla\u015ft\u0131\u011f\u0131 kaynak \u00e7at\u0131\u015fmas\u0131n\u0131 k\u00f6t\u00fcle\u015ftirebilir. Miktar\u0131 de\u011fi\u015ftirdikten sonra hem stok bakiyelerini hem de kaynak y\u00fck\u00fcn\u00fc yeniden kontrol edin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ana \u00fcretim program\u0131 i\u00e7in Excel kullanabilir misiniz?<\/h3>\n\n\n<p>Bir elektronik tablo, MPS \u0131zgaras\u0131n\u0131 ve stok hesaplamalar\u0131n\u0131 g\u00f6sterebilir. Uygulamadaki zorluk, ko\u015fullar de\u011fi\u015firken talep, giri\u015fler ve sto\u011fu tutarl\u0131 tutmakt\u0131r. A ve B i\u00e7in ayr\u0131ca payla\u015f\u0131lan kaynak s\u0131ras\u0131n\u0131 nas\u0131l kontrol edece\u011finizi ve \u00fcr\u00fcn plan\u0131n\u0131 \u00fcretimin kulland\u0131\u011f\u0131 detayl\u0131 \u00e7izelgeyle nas\u0131l uyumlu tutaca\u011f\u0131n\u0131z\u0131 da de\u011ferlendirin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">SkyPlanner, MPS&#8217;in veya ERP&#8217;nin yerini al\u0131r m\u0131?<\/h3>\n\n\n<p>SkyPlanner, otomatik detayl\u0131 \u00fcretim \u00e7izelgeleme ile ERP&#8217;yi tamamlar. Bu i\u015f ak\u0131\u015f\u0131nda, A ve B&#8217;nin \u00fcr\u00fcn d\u00fczeyindeki \u00fcretim taahh\u00fctlerini kendi planlama ba\u011flam\u0131nda tutun ve bunlar\u0131n arkas\u0131ndaki i\u015fleri \u00e7izelgelemek i\u00e7in SkyPlanner&#8217;\u0131 kullan\u0131n. A\u00e7\u0131k REST API&#8217;si ERP veya MES entegrasyonunu destekler; Gantt ise ortaya \u00e7\u0131kan i\u015f merkezi s\u0131ras\u0131n\u0131 incelemenizi sa\u011flar.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is a master production schedule?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"An MPS is an item-level production plan specifying quantities and availability periods. Its planning items depend on the manufacturing environment: finished products, selected assemblies or other appropriate items. For A and B, the useful output is a clear build commitment supported by a consistent inventory balance and a capacity check.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between MPS and MRP?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"MPS establishes the selected product builds; MRP calculates the material requirements behind them. If B's planned production moves, its component timing may need to move too. Keep product commitments and material planning connected, while checking the detailed resource sequence separately before treating the changed build date as executable.\"}},{\"@type\":\"Question\",\"name\":\"How do you calculate projected available balance in an MPS?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Add beginning inventory, existing scheduled receipts and new MPS receipts, then subtract the demand defined by your planning policy. Carry the ending balance into the next period. In the A\/B table, keep a build in either existing receipts or new proposals so that its supply is counted only once.\"}},{\"@type\":\"Question\",\"name\":\"Should you add forecast demand and customer orders together?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Only when the forecast portion represents demand still unconsumed by those orders under your company's policy. Adding firm orders to the original total forecast can double-count demand. Check which periods and items the consumption process covers before using A and B's demand totals to calculate their proposed builds.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between an MPS and a detailed production schedule?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A revision to B's MPS changes the product commitment; a revision to B's detailed schedule changes how its work is carried out. When inspecting a change, ask whether it affects the promised supply, the operation placement, or both. That distinction identifies which planning records and execution inputs need updating together.\"}},{\"@type\":\"Question\",\"name\":\"How do safety stock, lot sizes and capacity affect an MPS?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Safety stock sets an inventory target, lot sizes constrain build quantities, and capacity tests whether the resulting workload fits. Increasing A's batch to satisfy its lot size may raise inventory while worsening its shared-resource conflict with B. Recheck both the inventory balances and the resource load after changing the quantity.\"}},{\"@type\":\"Question\",\"name\":\"Can you use Excel for master production scheduling?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A spreadsheet can represent the MPS grid and its inventory calculations. The practical challenge is maintaining consistent demand, receipts and inventory while conditions change. For A and B, also evaluate how you will check the shared-resource sequence and keep the product plan aligned with the detailed schedule used by production.\"}},{\"@type\":\"Question\",\"name\":\"Does SkyPlanner replace the MPS or ERP?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"SkyPlanner complements ERP with automatic detailed production scheduling. In this workflow, keep A and B's product-level build commitments in their planning context and use SkyPlanner to schedule the jobs behind them. Its open REST API supports ERP or MES integration; the Gantt lets you inspect the resulting workstation sequence.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi Ana Sayfa &raquo; Kaynaklar &raquo; Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi Ana \u00fcretim program\u0131 (MPS), bir \u00fcreticinin hangi \u00fcr\u00fcnleri veya se\u00e7ilmi\u015f planlama kalemlerini, hangi miktarlarda ve hangi d\u00f6nemlerde \u00fcretmeyi ama\u00e7lad\u0131\u011f\u0131n\u0131 belirtir. Talebi \u00fcretim taahh\u00fctleriyle ba\u011flar. Ard\u0131ndan ayr\u0131nt\u0131l\u0131 \u00fcretim \u00e7izelgeleme, bu taahh\u00fctlerin arkas\u0131ndaki operasyonlar\u0131 kaynaklara ve zamanlara atar. \u00d6nemli \u00c7\u0131kar\u0131mlar &#8230; <a title=\"Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/\" aria-label=\"Read more about Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":95942,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-95903","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ana \u00dcretim Program\u0131 (MPS): Uygulamal\u0131 Rehber<\/title>\n<meta name=\"description\" content=\"Ana \u00fcretim program\u0131n\u0131 netle\u015ftirin: \u00fcr\u00fcn miktarlar\u0131n\u0131, stoku ve talebi ba\u011flay\u0131n, kapasiteyi kontrol edin, taahh\u00fctleri \u00e7izelgelenmi\u015f i\u015flere d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi\" \/>\n<meta property=\"og:description\" content=\"Ana \u00fcretim program\u0131n\u0131 netle\u015ftirin: \u00fcr\u00fcn miktarlar\u0131n\u0131, stoku ve talebi ba\u011flay\u0131n, kapasiteyi kontrol edin, taahh\u00fctleri \u00e7izelgelenmi\u015f i\u015flere d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-04T00:45:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-04T00:46:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"17 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ana-uretim-programi\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ana-uretim-programi\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi\",\"datePublished\":\"2026-10-04T00:45:24+00:00\",\"dateModified\":\"2026-10-04T00:46:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ana-uretim-programi\\\/\"},\"wordCount\":3431,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ana-uretim-programi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/master-production-schedule-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ana-uretim-programi\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ana-uretim-programi\\\/\",\"name\":\"Ana \u00dcretim Program\u0131 (MPS): Uygulamal\u0131 Rehber\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ana-uretim-programi\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ana-uretim-programi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/master-production-schedule-hero.png\",\"datePublished\":\"2026-10-04T00:45:24+00:00\",\"dateModified\":\"2026-10-04T00:46:46+00:00\",\"description\":\"Ana \u00fcretim program\u0131n\u0131 netle\u015ftirin: \u00fcr\u00fcn miktarlar\u0131n\u0131, stoku ve talebi ba\u011flay\u0131n, kapasiteyi kontrol edin, taahh\u00fctleri \u00e7izelgelenmi\u015f i\u015flere d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ana-uretim-programi\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ana-uretim-programi\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ana-uretim-programi\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/master-production-schedule-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/master-production-schedule-hero.png\",\"width\":1536,\"height\":864,\"caption\":\"Product groups across planning periods feeding a shared production workstation\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ana-uretim-programi\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ana \u00dcretim Program\u0131 (MPS): Uygulamal\u0131 Rehber","description":"Ana \u00fcretim program\u0131n\u0131 netle\u015ftirin: \u00fcr\u00fcn miktarlar\u0131n\u0131, stoku ve talebi ba\u011flay\u0131n, kapasiteyi kontrol edin, taahh\u00fctleri \u00e7izelgelenmi\u015f i\u015flere d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/","og_locale":"tr_TR","og_type":"article","og_title":"Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi","og_description":"Ana \u00fcretim program\u0131n\u0131 netle\u015ftirin: \u00fcr\u00fcn miktarlar\u0131n\u0131, stoku ve talebi ba\u011flay\u0131n, kapasiteyi kontrol edin, taahh\u00fctleri \u00e7izelgelenmi\u015f i\u015flere d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-04T00:45:24+00:00","article_modified_time":"2026-10-04T00:46:46+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"17 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi","datePublished":"2026-10-04T00:45:24+00:00","dateModified":"2026-10-04T00:46:46+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/"},"wordCount":3431,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero.png","articleSection":["APS &amp; Scheduling","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/","name":"Ana \u00dcretim Program\u0131 (MPS): Uygulamal\u0131 Rehber","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero.png","datePublished":"2026-10-04T00:45:24+00:00","dateModified":"2026-10-04T00:46:46+00:00","description":"Ana \u00fcretim program\u0131n\u0131 netle\u015ftirin: \u00fcr\u00fcn miktarlar\u0131n\u0131, stoku ve talebi ba\u011flay\u0131n, kapasiteyi kontrol edin, taahh\u00fctleri \u00e7izelgelenmi\u015f i\u015flere d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero.png","width":1536,"height":864,"caption":"Product groups across planning periods feeding a shared production workstation"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ana-uretim-programi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/master-production-schedule-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi Ana Sayfa &raquo; Kaynaklar &raquo; Ana \u00dcretim Program\u0131: Uygulamal\u0131 MPS Rehberi Ana \u00fcretim program\u0131 (MPS), bir \u00fcreticinin hangi \u00fcr\u00fcnleri veya se\u00e7ilmi\u015f planlama kalemlerini, hangi miktarlarda ve hangi d\u00f6nemlerde \u00fcretmeyi ama\u00e7lad\u0131\u011f\u0131n\u0131 belirtir. Talebi \u00fcretim taahh\u00fctleriyle ba\u011flar. Ard\u0131ndan ayr\u0131nt\u0131l\u0131 \u00fcretim \u00e7izelgeleme, bu taahh\u00fctlerin arkas\u0131ndaki operasyonlar\u0131 kaynaklara ve zamanlara atar. \u00d6nemli \u00c7\u0131kar\u0131mlar&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/95903","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=95903"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/95903\/revisions"}],"predecessor-version":[{"id":95932,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/95903\/revisions\/95932"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/95942"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=95903"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=95903"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=95903"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}