{"id":8302,"date":"2022-10-28T07:54:22","date_gmt":"2022-10-28T07:54:22","guid":{"rendered":"https:\/\/skyplanner.ai\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/"},"modified":"2026-10-19T14:41:33","modified_gmt":"2026-10-19T14:41:33","slug":"uretimde-teslim-suresi-nasil-optimize-edilir","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/","title":{"rendered":"\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn"},"content":{"rendered":"<div class=\"gb-container gb-container-leadtime01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn<\/h1>\n\n\n<p>\u00dcretim rotas\u0131nda on iki saat yaz\u0131yor. M\u00fc\u015fteriye ise sekiz g\u00fcn denmi\u015f. \u0130lk operasyondan sipari\u015fin tamamlanmas\u0131na kadar ge\u00e7en s\u00fcrede i\u015f, \u00fczerinde \u00e7al\u0131\u015f\u0131ld\u0131\u011f\u0131ndan \u00e7ok daha uzun s\u00fcre bekliyor.<\/p>\n\n\n<p>Bir \u00fcretim planlama uzman\u0131 i\u00e7in \u00fcretimde lead time&#8217;\u0131 iyile\u015ftirmenin ilk ad\u0131m\u0131 bu fark\u0131 anlamakt\u0131r. Daha h\u0131zl\u0131 i\u015fleme fayda sa\u011flayabilir, ancak \u00e7izelgede kendisine yer a\u00e7\u0131lmas\u0131 i\u00e7in iki g\u00fcn bekleyen bir i\u015fin sorununu \u00e7\u00f6zmez.<\/p>\n\n\n<p>As\u0131l sorulmas\u0131 gereken \u015fudur: <strong>Bu sipari\u015fin haz\u0131r olmas\u0131 i\u00e7in hangi i\u015flemler, hangi s\u0131rayla yap\u0131lmal\u0131?<\/strong> SkyPlanner, bu operasyonlar\u0131, zamanlamalar\u0131n\u0131 belirleyen kapasite ve \u00f6nceliklerle birlikte ele al\u0131r. B\u00f6ylece \u00f6nlenebilir beklemeleri k\u0131saltman\u0131za ve m\u00fc\u015fterilere yap\u0131lacak i\u015fleri esas alan tarihler vermenize yard\u0131mc\u0131 olan bir \u00e7izelge elde edersiniz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dcretimde lead time nedir?<\/h2>\n\n\n<p>\u00dcretimde lead time, bir \u00fcr\u00fcn\u00fcn veya sipari\u015fin tan\u0131mlanm\u0131\u015f bir \u00fcretim s\u00fcrecinden ge\u00e7mesi i\u00e7in gereken toplam s\u00fcredir. Haz\u0131rl\u0131k ve i\u015flemenin yan\u0131 s\u0131ra bu s\u00fcre\u00e7teki kuyrukta beklemeleri, ta\u015f\u0131malar\u0131, kontrolleri ve di\u011fer beklemeleri de kapsar.<\/p>\n\n\n<p>Bu yaz\u0131da lead time&#8217;\u0131, <strong>sipari\u015fin \u00fcretime a\u00e7\u0131lmas\u0131ndan tamamlan\u0131p sevkiyata haz\u0131r h\u00e2le gelmesine kadar ge\u00e7en s\u00fcre<\/strong> olarak \u00f6l\u00e7\u00fcyoruz. \u00dcretime a\u00e7\u0131ld\u0131ktan sonra ilk operasyondan \u00f6nceki bekleme de buna dahildir. Ancak \u00fcretime a\u00e7\u0131lmadan \u00f6nce malzeme sat\u0131n al\u0131nmas\u0131 veya bitmi\u015f \u00fcr\u00fcnlerin m\u00fc\u015fteriye ta\u015f\u0131nmas\u0131 kendili\u011finden bu kapsama girmez.<\/p>\n\n\n<p>Lead time tan\u0131mlar\u0131 \u015firketlere ve planlama sistemlerine g\u00f6re de\u011fi\u015fir. Rakamlar\u0131 kar\u015f\u0131la\u015ft\u0131rmadan \u00f6nce s\u00fcreyi ba\u015flatan ve bitiren olaylar\u0131 netle\u015ftirin:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u00d6l\u00e7\u00fct<\/th><th>Ba\u015flang\u0131\u00e7 ve biti\u015f<\/th><th>Yan\u0131tlamaya yard\u0131mc\u0131 oldu\u011fu soru<\/th><\/tr><\/thead><tbody><tr><td>Bu yaz\u0131daki tan\u0131m\u0131yla \u00fcretimde lead time<\/td><td>\u00dcretime a\u00e7\u0131lma an\u0131ndan sevkiyata haz\u0131r olma an\u0131na kadar<\/td><td>Bir sipari\u015f \u00fcretim s\u00fcrecimizde ne kadar zaman ge\u00e7iriyor?<\/td><\/tr><tr><td>M\u00fc\u015fteri sipari\u015finde lead time<\/td><td>Sipari\u015fin kabul\u00fcnden m\u00fc\u015fterinin teslim almas\u0131na kadar<\/td><td>M\u00fc\u015fteri ne kadar bekleyecek?<\/td><\/tr><tr><td>Tedarik\u00e7i lead time&#8217;\u0131<\/td><td>Sat\u0131n alma sipari\u015finin verilmesinden malzemenin teslim al\u0131nmas\u0131na kadar<\/td><td>Sat\u0131n al\u0131nan malzemenin ne zaman gelmesini bekleyebiliriz?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Bu s\u00fcreler birbiriyle \u00f6rt\u00fc\u015febilir. M\u00fchendislik ekibi sipari\u015fin haz\u0131rl\u0131klar\u0131yla u\u011fra\u015f\u0131rken malzeme sipari\u015fi verilirse her iki s\u00fcreyi de tam olarak toplamak, beklemenin bir b\u00f6l\u00fcm\u00fcn\u00fc iki kez saymak olur. Her b\u00f6l\u00fcm\u00fcn lead time tahminini toplamak yerine ger\u00e7ekte hangi i\u015flemin ne zaman ger\u00e7ekle\u015fti\u011fini izleyin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Lead time, \u00e7evrim s\u00fcresi veya \u00fcretim h\u0131z\u0131 de\u011fildir<\/h3>\n\n\n<p><a href=\"\/tr\/kaynaklar\/uretim-cevrim-suresi\/\">\u00dcretim \u00e7evrim s\u00fcresi<\/a>, bir birimi \u00fcretmek veya belirli bir operasyonu tamamlamak i\u00e7in gereken s\u00fcreyi \u00f6l\u00e7er. \u00dcretimde lead time ise operasyonlar aras\u0131ndaki beklemeler de dahil olmak \u00fczere \u00fcr\u00fcn\u00fcn daha geni\u015f bir s\u00fcre\u00e7te ge\u00e7irdi\u011fi s\u00fcreyi izler.<\/p>\n\n\n<p><a href=\"\/tr\/kaynaklar\/uretim-hizi\/\">\u00dcretim h\u0131z\u0131<\/a>, vardiya ba\u015f\u0131na kabul edilen montajl\u0131 \u00fcr\u00fcn say\u0131s\u0131 gibi, birim zamanda elde edilen \u00e7\u0131kt\u0131y\u0131 \u00f6l\u00e7er. Bir s\u00fcreyi de\u011fil, h\u0131z\u0131 ifade eder. Bir makinenin \u00e7evrim s\u00fcresi k\u0131sa olsa da o makinede \u00fcretilen par\u00e7alar\u0131 i\u00e7eren sipari\u015fin lead time&#8217;\u0131 uzun olabilir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dcretimde lead time nas\u0131l hesaplan\u0131r?<\/h2>\n\n\n<p>Tamamlanm\u0131\u015f bir sipari\u015f i\u00e7in kay\u0131tl\u0131 olaylar\u0131 esas al\u0131n:<\/p>\n\n\n<p><strong>\u00dcretimde lead time = Sevkiyata haz\u0131r olma zaman\u0131 \u2212 \u00dcretime a\u00e7\u0131lma zaman\u0131<\/strong><\/p>\n\n\n<p>Pazartesi 08:00&#8217;de \u00fcretime a\u00e7\u0131lan ve per\u015fembe 08:00&#8217;de sevkiyata haz\u0131r olan bir sipari\u015f d\u00fc\u015f\u00fcn\u00fcn. Haz\u0131rl\u0131k ve i\u015fleme yaln\u0131zca on iki saat gerektirse bile bu sipari\u015fin \u00fcretimdeki lead time&#8217;\u0131, takvim esas\u0131na g\u00f6re <strong>72 saattir<\/strong>.<\/p>\n\n\n<p>Geriye kalan <strong>60 saat<\/strong>, haz\u0131rl\u0131k ve i\u015fleme d\u0131\u015f\u0131nda ge\u00e7en s\u00fcredir. Buna kuyrukta bekleme, ta\u015f\u0131ma, kontrol, gece \u00e7al\u0131\u015f\u0131lmayan saatler ve zorunlu so\u011fuma s\u00fcresi dahil olabilir. Altm\u0131\u015f saatin tamam\u0131n\u0131 \u00f6nlenebilir israf olarak g\u00f6rmeyin; her aral\u0131\u011f\u0131n neye kar\u015f\u0131l\u0131k geldi\u011fini belirleyin.<\/p>\n\n\n<p>Toplam s\u00fcrenin nereden geldi\u011fini anlamak i\u00e7in zaman ak\u0131\u015f\u0131n\u0131 birbiriyle \u00f6rt\u00fc\u015fmeyen kategorilere ay\u0131r\u0131n:<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Haz\u0131rl\u0131k ve i\u015fleme:<\/strong> Ekipman\u0131n haz\u0131rlanmas\u0131 ve operasyonlar\u0131n ger\u00e7ekle\u015ftirilmesi.<\/li>\n\n<li><strong>Kuyrukta bekleme:<\/strong> Bir makinenin veya operat\u00f6r\u00fcn m\u00fcsait olmas\u0131n\u0131 ya da kontrol i\u00e7in s\u0131ra gelmesini bekleme.<\/li>\n\n<li><strong>Ta\u015f\u0131ma ve kontroller:<\/strong> \u00d6l\u00e7\u00fcm i\u00e7in belirlenen s\u0131n\u0131rlar i\u00e7indeki ta\u015f\u0131malar ve kalite faaliyetleri.<\/li>\n\n<li><strong>Di\u011fer s\u00fcreler:<\/strong> Zorunlu beklemeler, vardiya takviminde \u00e7al\u0131\u015fma olmayan saatler ve ba\u015fka bir kategoride say\u0131lmam\u0131\u015f kesintiler.<\/li>\n<\/ul>\n\n\n<p>Toplam\u0131 bulmak i\u00e7in zaman kay\u0131tlar\u0131n\u0131, nedenlerini anlamak i\u00e7in de bu kategorileri kullan\u0131n. \u0130ki operasyon paralel y\u00fcr\u00fcyorsa ge\u00e7en toplam lead time&#8217;\u0131 bulmak i\u00e7in s\u00fcrelerini do\u011frudan toplayamazs\u0131n\u0131z.<\/p>\n\n\n<p>S\u00fcre hesab\u0131nda kulland\u0131\u011f\u0131n\u0131z temeli de tutarl\u0131 tutun. Takvim saati, ge\u00e7en toplam s\u00fcreyi; \u00e7al\u0131\u015fma saati ise belirli bir vardiya takvimi i\u00e7indeki s\u00fcreyi ifade eder. Her ikisi de yararl\u0131 olabilir, ancak on iki \u00e7al\u0131\u015fma saati ile yetmi\u015f iki takvim saati birbirinin yerine kullan\u0131lamaz. M\u00fc\u015fteriye verilen tarihin hangi esasa g\u00f6re hesapland\u0131\u011f\u0131n\u0131 sat\u0131\u015f ekibine bildirin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u0131sa s\u00fcreli bir rota neden uzun bir lead time&#8217;a d\u00f6n\u00fc\u015f\u00fcr?<\/h2>\n\n\n<p>Rota, sipari\u015f i\u00e7in nelerin gerekti\u011fini g\u00f6sterir. Bunlar\u0131n ne zaman yap\u0131labilece\u011fini ise kuyruk belirler.<\/p>\n\n\n<p>Tala\u015fl\u0131 i\u015flemenin sal\u0131 sabah\u0131 tamamland\u0131\u011f\u0131n\u0131, ancak son i\u015flem istasyonunda per\u015fembeye kadar i\u015fe uygun kapasite olmad\u0131\u011f\u0131n\u0131 d\u00fc\u015f\u00fcn\u00fcn. Son i\u015flem i\u00e7in ayr\u0131lan zaman de\u011fi\u015fmiyorsa tala\u015fl\u0131 i\u015flemeyi bir saat h\u0131zland\u0131rmak tamamlanma tarihini \u00f6ne \u00e7ekmez. Burada \u00e7izelgelemeyle sa\u011flanabilecek iyile\u015fme, yaln\u0131zca ilk operasyonu daha erken ba\u015flatmakta de\u011fil, iki operasyonu birbiriyle uyumlu planlamaktad\u0131r.<\/p>\n\n\n<p>G\u00fcnl\u00fck i\u015fleyi\u015fte al\u0131nan \u00e7e\u015fitli kararlar bu beklemelere yol a\u00e7ar:<\/p>\n\n\n<p><strong>Rotan\u0131n devam\u0131 haz\u0131r olmadan i\u015fe ba\u015flamak.<\/strong> \u0130lk i\u015f merkezi me\u015fgul kal\u0131r, ancak k\u0131smen tamamlanm\u0131\u015f i\u015fler sonraki a\u015famalarda birikir. \u0130\u015fleri \u00fcretime a\u00e7arken rotan\u0131n devam\u0131n\u0131 da g\u00f6z \u00f6n\u00fcnde bulundurun. Bu ilke <a href=\"\/tr\/kaynaklar\/tam-zamaninda-uretim\/\">tam zaman\u0131nda \u00fcretimi<\/a> de destekler: \u00c7al\u0131\u015f\u0131l\u0131yor olmas\u0131 tek ba\u015f\u0131na i\u015flerin verimli bi\u00e7imde akt\u0131\u011f\u0131n\u0131 g\u00f6stermez.<\/p>\n\n\n<p><strong>Ger\u00e7ekte kullan\u0131labilir olmayan kapasiteye g\u00f6re plan yapmak.<\/strong> K\u00e2\u011f\u0131t \u00fczerinde bo\u015f g\u00f6r\u00fcnen bir makine i\u00e7in ba\u015fka bir yerde \u00e7al\u0131\u015fan operat\u00f6re ihtiya\u00e7 duyulabilir. Gerekli bir tak\u0131m veya malzeme eksik olabilir. Planlanan ba\u015flang\u0131\u00e7 zaman\u0131, operasyonun ger\u00e7ekten ihtiya\u00e7 duydu\u011fu kaynaklar\u0131 dikkate almal\u0131d\u0131r.<\/p>\n\n\n<p><strong>\u00d6ncelikleri her kuyrukta birbirinden ba\u011f\u0131ms\u0131z de\u011fi\u015ftirmek.<\/strong> Acil bir i\u015f \u00f6ne al\u0131n\u0131r, ancak sonraki operasyonu yerinde kal\u0131r. Ba\u015fka bir sipari\u015f, tamamlanma tarihine etkisi incelenmeden \u00e7izelgedeki yerini kaybeder.<\/p>\n\n\n<p><strong>Zorunlu beklemeleri bo\u015f zaman olarak g\u00f6rmek.<\/strong> Kurutma, so\u011futma veya kalite onay\u0131 gerekebilir. Bunlar\u0131 rotaya kaydedin ki sonraki operasyonun ba\u015flang\u0131c\u0131 \u00fcr\u00fcn\u00fcn haz\u0131r olaca\u011f\u0131 zamandan \u00f6nceye planlanmas\u0131n.<\/p>\n\n\n<p><a href=\"\/tr\/kaynaklar\/yalin-uretim-verimliligin-kilidi-acildi\/\">Yal\u0131n \u00fcretim<\/a>, gereksiz bekleme ve ta\u015f\u0131malar\u0131 ortaya \u00e7\u0131karmaya yard\u0131mc\u0131 olur. Birbiriyle uyumlu bir \u00e7izelge, bu iyile\u015ftirmeleri g\u00fcnl\u00fck sipari\u015f plan\u0131na yans\u0131tmay\u0131 sa\u011flar. Daha kapsaml\u0131 iyile\u015ftirme y\u00f6ntemleri i\u00e7in <a href=\"\/tr\/kaynaklar\/teslimat-suresini-azaltmak-daha-akilli-is-yapmanin-sirri\/\">lead time&#8217;\u0131 azaltma<\/a> rehberimize bak\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner ile operasyonlar aras\u0131ndaki s\u00fcreyi k\u0131salt\u0131n<\/h2>\n\n\n<p>SkyPlanner APS, sipari\u015f operasyonlar\u0131ndan sonlu kapasiteli bir \u00fcretim \u00e7izelgesi olu\u015fturur. \u00c7izelgeleme i\u00e7in kulland\u0131\u011f\u0131 yapay zek\u00e2 Arcturus, tan\u0131mlanan i\u015f merkezi kapasitelerini, vardiyalar\u0131, ba\u011f\u0131ml\u0131l\u0131klar\u0131 ve \u00f6ncelikleri dikkate al\u0131r. Malzeme durumunu dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde, malzeme kullan\u0131labilirli\u011fi de i\u015flerin ne zaman yap\u0131labilece\u011fini etkiler.<\/p>\n\n\n<p>Bu yakla\u015f\u0131m, planlama uzman\u0131na \u201cher i\u015f sekiz g\u00fcn s\u00fcrer\u201d gibi sabit bir taahh\u00fctten daha yararl\u0131 bir ba\u015flang\u0131\u00e7 noktas\u0131 sunar. Gantt zaman \u00e7izelgesi, i\u015f merkezleri aras\u0131ndaki s\u0131ralamay\u0131 g\u00f6sterir. B\u00f6ylece sipari\u015fin nerede ba\u015flamas\u0131n\u0131n planland\u0131\u011f\u0131n\u0131, hangi noktalarda h\u00e2l\u00e2 beklemeler oldu\u011funu ve son operasyonunun ne zaman bitmesinin beklendi\u011fini inceleyebilirsiniz.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Lead time&#8217;\u0131 k\u0131saltmay\u0131 \u00f6ncelikleriniz aras\u0131na al\u0131n<\/h3>\n\n\n<p>SkyPlanner&#8217;da \u00f6zel bir <strong>lead time \u00f6nceli\u011fi<\/strong> bulunur: Arcturus, her sipari\u015f kaleminin ilk ve son i\u015flem ad\u0131m\u0131 aras\u0131ndaki s\u00fcreyi en aza indirmeye \u00e7al\u0131\u015f\u0131r. Bu \u00f6zellik, i\u015fin kendisi nispeten k\u0131sa s\u00fcrd\u00fc\u011f\u00fc h\u00e2lde ad\u0131mlar aras\u0131nda uzun aral\u0131klar oldu\u011funda de\u011ferlidir.<\/p>\n\n\n<p>Optimize edilen bu aral\u0131k, yukar\u0131da tan\u0131mlad\u0131\u011f\u0131m\u0131z \u00fcretime a\u00e7\u0131lma an\u0131ndan sevkiyata haz\u0131r olma an\u0131na kadar ge\u00e7en s\u00fcreden daha dard\u0131r. \u0130lk ad\u0131mdan \u00f6nceki t\u00fcm beklemeleri kapsamaz; sat\u0131n alma veya m\u00fc\u015fteriye ta\u015f\u0131ma s\u00fcrelerini k\u0131saltma taahh\u00fcd\u00fc de de\u011fildir.<\/p>\n\n\n<p>Bu \u00f6nceli\u011fi, tamamlanma tarihi, m\u00fc\u015fteri ve i\u015f \u00f6ncelikleriyle birlikte siz y\u00f6nlendirirsiniz. Bir kalemin \u00fcretimde ge\u00e7irdi\u011fi s\u00fcreyi k\u0131salt\u0131rken di\u011fer sipari\u015flerin teslim taahh\u00fctleriyle denge kurmak gerekir. Her \u015feyi ayn\u0131 derecede acil ilan etmek yerine, \u00e7izelgeleme sistemine i\u015fletmenizin ger\u00e7ekten izlemesini istedi\u011fi \u00f6ncelikleri verin.<\/p>\n\n\n<p>Bu \u00e7izelgeleme i\u015flevi hakk\u0131nda daha fazla bilgi i\u00e7in <a href=\"\/tr\/kaynaklar\/teslimat-suresi-yonetimi-ozelligi-her-dakikayi-optimize-edin\/\">SkyPlanner&#8217;\u0131n lead time y\u00f6netimi \u00f6zelli\u011fini inceleyin<\/a>.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ko\u015fullar de\u011fi\u015fti\u011finde \u00e7izelgeyi yeniden hesaplay\u0131n<\/h3>\n\n\n<p>Acil bir sipari\u015f geldi\u011finde veya vardiya de\u011fi\u015fti\u011finde Arcturus, \u00e7izelgeyi g\u00fcncel duruma g\u00f6re yeniden hesaplayabilir. Yaln\u0131zca yerini de\u011fi\u015ftirdi\u011finiz operasyonu de\u011fil, ortaya \u00e7\u0131kan tamamlanma tarihlerini de inceleyin. Kilitler, sabit kalmas\u0131 gereken \u00e7izelgeleme kararlar\u0131n\u0131 koruman\u0131z\u0131 sa\u011flar.<\/p>\n\n\n<p>B\u00f6ylece kuyruklar\u0131 tek tek yeniden d\u00fczenlemek i\u00e7in daha az zaman harcar, bir de\u011fi\u015fikli\u011fin sonu\u00e7lar\u0131n\u0131 daha net g\u00f6r\u00fcrs\u00fcn\u00fcz. Sipari\u015fin planlanan sevk zaman\u0131 gelmeden \u00f6nce kapasiteyi ayarlamaya, bir \u00f6nceli\u011fi de\u011fi\u015ftirmeye veya yeni bir tarihi g\u00f6r\u00fc\u015fmeye karar verebilirsiniz.<\/p>\n\n\n<p>Mevcut sistemlerinizden yararlanmaya devam edersiniz. <a href=\"\/tr\/kaynaklar\/uretim-erpsi-kapsamli-bir-kilavuz\/\">ERP sistemi<\/a> sipari\u015f bilgilerini sa\u011flar; <a href=\"\/tr\/kaynaklar\/mes-sistemi-nedir-ve-ne-ise-yarar\/\">MES<\/a> ise \u00fcretimin y\u00fcr\u00fct\u00fclmesine ili\u015fkin bilgileri sunabilir. <strong>SkyPlanner, a\u00e7\u0131k REST API \u00fczerinden her ERP veya MES ile entegre olur<\/strong> ve bu bilgileri \u00fcretim \u00e7izelgeleme ile bir araya getirir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Daha net bir g\u00f6r\u00fcn\u00fcm Eskomatic&#8217;te neleri de\u011fi\u015ftirdi?<\/h2>\n\n\n<p>Finlandiyal\u0131 fason tala\u015fl\u0131 imalat firmas\u0131 Eskomatic, daha \u00f6nce eski bir ERP ve \u00fcretim kontrol sisteminde i\u015f kuyruklar\u0131n\u0131 b\u00fcy\u00fck \u00f6l\u00e7\u00fcde elle d\u00fczenliyordu. Genel durumu g\u00f6rmek emek gerektiriyor, malzeme eksiklikleri ise bir i\u015fin planlanan ba\u015flang\u0131c\u0131na \u00e7ok az zaman kala ortaya \u00e7\u0131kabiliyordu.<\/p>\n\n\n<p>SkyPlanner sayesinde \u015firketin planlama uzmanlar\u0131, i\u015f kuyruklar\u0131n\u0131 g\u00f6rsel olarak daha net takip edebilir ve yakla\u015fan i\u015f y\u00fck\u00fcn\u00fc yapay zek\u00e2n\u0131n olu\u015fturdu\u011fu \u00e7izelgede g\u00f6rebilir h\u00e2le geldi. Eskomatic&#8217;teki uygulamada eksik malzemeler \u00fcretim planlama a\u015famas\u0131nda g\u00f6r\u00fcn\u00fcr h\u00e2le geliyor. Bu da ekibin malzeme eksikli\u011finden kaynaklanan duru\u015flar\u0131 \u00f6nlemesine yard\u0131mc\u0131 oluyor.<\/p>\n\n\n<p>\u0130\u015f y\u00fck\u00fcn\u00fcn otomatik \u00e7izelgelenmesi, Eskomatic&#8217;in ger\u00e7ek\u00e7i tamamlanma zamanlar\u0131n\u0131 g\u00f6rmesine ve m\u00fc\u015fterilere daha do\u011fru teslim tarihleri vermesine de yard\u0131mc\u0131 oluyor. Lead time ile \u00e7izelgeleme aras\u0131ndaki pratik ba\u011f tam olarak budur: Tarih, her sipari\u015fe standart bir s\u00fcre eklenerek de\u011fil, yap\u0131lacak i\u015fler ve k\u0131s\u0131tlar g\u00f6r\u00fclerek belirlenir.<\/p>\n\n\n<p>M\u00fc\u015fteri hik\u00e2yesinin tamam\u0131 i\u00e7in <a href=\"\/tr\/musteri-hikayeleri\/eskomatic\/\">Eskomatic&#8217;in SkyPlanner deneyimini okuyun<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Yaln\u0131zca rakam\u0131 de\u011fil, ger\u00e7ekte ge\u00e7en s\u00fcreyi k\u0131salt\u0131n<\/h2>\n\n\n<p>Sipari\u015fleri s\u00fcrekli olarak beklenenden uzun s\u00fcrede tamamlanan bir \u00fcr\u00fcn ailesiyle ba\u015flay\u0131n. \u00dcretime serbest b\u0131rakma, operasyon ve sevkiyata haz\u0131r olma zamanlar\u0131n\u0131 kar\u015f\u0131la\u015ft\u0131r\u0131n. Tamamlanmay\u0131 en s\u0131k geciktiren, tekrar eden bekleme aral\u0131\u011f\u0131n\u0131 bulun. Ard\u0131ndan bu aral\u0131\u011f\u0131 k\u0131saltmak i\u00e7in \u00e7izelgelemede veya s\u00fcre\u00e7te bir de\u011fi\u015fiklik deneyin.<\/p>\n\n\n<p>Lead time ile birlikte teslimat performans\u0131n\u0131 da izleyin. \u00dcretim s\u00fcresinin k\u0131salmas\u0131, teslim s\u00f6z\u00fc verilmi\u015f di\u011fer sipari\u015fleri geciktiriyorsa bir iyile\u015fme say\u0131lmaz. Benzer \u015fekilde, \u00fcretime serbest b\u0131rakma zaman\u0131n\u0131 ertelemek, m\u00fc\u015fterinin toplam bekleme s\u00fcresi hi\u00e7 de\u011fi\u015fmedi\u011fi h\u00e2lde serbest b\u0131rakmadan sevkiyata haz\u0131r olmaya kadar ge\u00e7en lead time de\u011ferini daha k\u0131sa g\u00f6sterebilir. Serbest b\u0131rakma \u00f6ncesindeki bu beklemeyi g\u00f6r\u00fcnmez k\u0131lmak yerine ayr\u0131 olarak takip edin.<\/p>\n\n\n<p>Ayn\u0131 kaynaklar\u0131 kullanan \u00e7ok say\u0131da sipari\u015fi koordine etmekte zorlan\u0131yorsan\u0131z SkyPlanner g\u00fc\u00e7l\u00fc bir se\u00e7enektir. Arcturus \u00e7izelgeleme hesaplamalar\u0131n\u0131 yaparken \u00f6ncelikler ve de\u011fi\u015fmemesi i\u00e7in kilitledi\u011finiz kararlar sizin kontrol\u00fcn\u00fczde kal\u0131r. Her i\u015f kuyru\u011funu elle g\u00fcncellemek zorunda kalmadan, bekleme aral\u0131klar\u0131n\u0131 k\u0131saltmak ve daha g\u00fcvenilir tamamlanma tarihleri belirlemek i\u00e7in \u00e7al\u0131\u015fabilirsiniz.<\/p>\n\n\n<p><a href=\"\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a> ve saatler s\u00fcren i\u015f gerektirdi\u011fi h\u00e2lde tamamlanmas\u0131 g\u00fcnler alan bir sipari\u015f \u00f6rne\u011fi getirin. Bu sipari\u015fin rotas\u0131, beklemeleri ve kulland\u0131\u011f\u0131 en yo\u011fun kaynak, koordineli bir \u00e7izelgenin neleri de\u011fi\u015ftirebilece\u011fini g\u00f6rmek i\u00e7in iyi bir ba\u015flang\u0131\u00e7 noktas\u0131d\u0131r. \u00d6nce kendiniz ke\u015ffetmek isterseniz <a href=\"\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>.<\/p>\n\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn \u00dcretim rotas\u0131nda on iki saat yaz\u0131yor. M\u00fc\u015fteriye ise sekiz g\u00fcn denmi\u015f. \u0130lk operasyondan sipari\u015fin tamamlanmas\u0131na kadar ge\u00e7en s\u00fcrede i\u015f, \u00fczerinde \u00e7al\u0131\u015f\u0131ld\u0131\u011f\u0131ndan \u00e7ok daha uzun s\u00fcre bekliyor. Bir \u00fcretim planlama uzman\u0131 i\u00e7in \u00fcretimde lead time&#8217;\u0131 iyile\u015ftirmenin ilk ad\u0131m\u0131 bu fark\u0131 anlamakt\u0131r. Daha h\u0131zl\u0131 i\u015fleme fayda sa\u011flayabilir, ancak \u00e7izelgede kendisine &#8230; <a title=\"\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/\" aria-label=\"Read more about \u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":98259,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-8302","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ve-cizelgeleme","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn<\/title>\n<meta name=\"description\" content=\"Saatler s\u00fcren i\u015f g\u00fcnler alabilir. \u00dcretimde lead time&#039;\u0131 anlay\u0131n, operasyonlar aras\u0131 beklemeleri bulun, SkyPlanner ile daha g\u00fcvenilir tarihler planlay\u0131n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn\" \/>\n<meta property=\"og:description\" content=\"Saatler s\u00fcren i\u015f g\u00fcnler alabilir. \u00dcretimde lead time&#039;\u0131 anlay\u0131n, operasyonlar aras\u0131 beklemeleri bulun, SkyPlanner ile daha g\u00fcvenilir tarihler planlay\u0131n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-28T07:54:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:41:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jesse Sinisalo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jesse Sinisalo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-teslim-suresi-nasil-optimize-edilir\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-teslim-suresi-nasil-optimize-edilir\\\/\"},\"author\":{\"name\":\"Jesse Sinisalo\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\"},\"headline\":\"\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn\",\"datePublished\":\"2022-10-28T07:54:22+00:00\",\"dateModified\":\"2026-10-19T14:41:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-teslim-suresi-nasil-optimize-edilir\\\/\"},\"wordCount\":2204,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-teslim-suresi-nasil-optimize-edilir\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"articleSection\":[\"APS ve \u00e7izelgeleme\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-teslim-suresi-nasil-optimize-edilir\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-teslim-suresi-nasil-optimize-edilir\\\/\",\"name\":\"\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-teslim-suresi-nasil-optimize-edilir\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-teslim-suresi-nasil-optimize-edilir\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"datePublished\":\"2022-10-28T07:54:22+00:00\",\"dateModified\":\"2026-10-19T14:41:33+00:00\",\"description\":\"Saatler s\u00fcren i\u015f g\u00fcnler alabilir. \u00dcretimde lead time'\u0131 anlay\u0131n, operasyonlar aras\u0131 beklemeleri bulun, SkyPlanner ile daha g\u00fcvenilir tarihler planlay\u0131n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-teslim-suresi-nasil-optimize-edilir\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-teslim-suresi-nasil-optimize-edilir\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-teslim-suresi-nasil-optimize-edilir\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"width\":1280,\"height\":720,\"caption\":\"Parts waiting between manufacturing stations illustrate the gaps within manufacturing lead time\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-teslim-suresi-nasil-optimize-edilir\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Makaleler\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\",\"name\":\"Jesse Sinisalo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"caption\":\"Jesse Sinisalo\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn","description":"Saatler s\u00fcren i\u015f g\u00fcnler alabilir. \u00dcretimde lead time'\u0131 anlay\u0131n, operasyonlar aras\u0131 beklemeleri bulun, SkyPlanner ile daha g\u00fcvenilir tarihler planlay\u0131n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/","og_locale":"tr_TR","og_type":"article","og_title":"\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn","og_description":"Saatler s\u00fcren i\u015f g\u00fcnler alabilir. \u00dcretimde lead time'\u0131 anlay\u0131n, operasyonlar aras\u0131 beklemeleri bulun, SkyPlanner ile daha g\u00fcvenilir tarihler planlay\u0131n.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/","og_site_name":"SkyPlanner","article_published_time":"2022-10-28T07:54:22+00:00","article_modified_time":"2026-10-19T14:41:33+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","type":"image\/png"}],"author":"Jesse Sinisalo","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jesse Sinisalo","Tahmini okuma s\u00fcresi":"11 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/"},"author":{"name":"Jesse Sinisalo","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd"},"headline":"\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn","datePublished":"2022-10-28T07:54:22+00:00","dateModified":"2026-10-19T14:41:33+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/"},"wordCount":2204,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","articleSection":["APS ve \u00e7izelgeleme","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/","name":"\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","datePublished":"2022-10-28T07:54:22+00:00","dateModified":"2026-10-19T14:41:33+00:00","description":"Saatler s\u00fcren i\u015f g\u00fcnler alabilir. \u00dcretimde lead time'\u0131 anlay\u0131n, operasyonlar aras\u0131 beklemeleri bulun, SkyPlanner ile daha g\u00fcvenilir tarihler planlay\u0131n.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","width":1280,"height":720,"caption":"Parts waiting between manufacturing stations illustrate the gaps within manufacturing lead time"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-teslim-suresi-nasil-optimize-edilir\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"Makaleler","item":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/"},{"@type":"ListItem","position":3,"name":"\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd","name":"Jesse Sinisalo","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","caption":"Jesse Sinisalo"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jesse Sinisalo","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jesse\/"},"uagb_comment_info":0,"uagb_excerpt":"\u00dcretimde Lead Time: \u0130\u015fler Aras\u0131ndaki Beklemeleri G\u00f6r\u00fcn \u00dcretim rotas\u0131nda on iki saat yaz\u0131yor. M\u00fc\u015fteriye ise sekiz g\u00fcn denmi\u015f. \u0130lk operasyondan sipari\u015fin tamamlanmas\u0131na kadar ge\u00e7en s\u00fcrede i\u015f, \u00fczerinde \u00e7al\u0131\u015f\u0131ld\u0131\u011f\u0131ndan \u00e7ok daha uzun s\u00fcre bekliyor. Bir \u00fcretim planlama uzman\u0131 i\u00e7in \u00fcretimde lead time&#8217;\u0131 iyile\u015ftirmenin ilk ad\u0131m\u0131 bu fark\u0131 anlamakt\u0131r. Daha h\u0131zl\u0131 i\u015fleme fayda sa\u011flayabilir, ancak \u00e7izelgede kendisine&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/8302","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=8302"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/8302\/revisions"}],"predecessor-version":[{"id":93115,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/8302\/revisions\/93115"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/98259"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=8302"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=8302"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=8302"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}