{"id":44154,"date":"2024-10-15T08:06:16","date_gmt":"2024-10-15T08:06:16","guid":{"rendered":"https:\/\/skyplanner.ai\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/"},"modified":"2024-10-15T08:24:49","modified_gmt":"2024-10-15T08:24:49","slug":"nesting-sofware-nedir-ve-nasil-calisir","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/","title":{"rendered":"Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r?"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-nesting-sofware-what-it-is-and-how-it-works\">Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/\">Home<\/a> &#8221; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &#8221; Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">12<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\"><strong>Nesting yaz\u0131l\u0131m\u0131, d\u00fcz malzemeler \u00fczerinde \u015fekillerin d\u00fczenlenmesini geli\u015ftiren, malzeme kullan\u0131m\u0131n\u0131 en \u00fcst d\u00fczeye \u00e7\u0131karan ve israf\u0131 en aza indiren bir \u00e7\u00f6z\u00fcmd\u00fcr.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Her \u00fcretici her zaman israf\u0131 azaltman\u0131n yollar\u0131n\u0131 arar. \u0130ster art\u0131k malzemeleri azaltmak, ister de\u011ferli zamandan tasarruf etmek veya enerjiyi daha verimli kullanmak olsun, daha ak\u0131ll\u0131 kaynak y\u00f6netimi daha iyi sonu\u00e7lara yol a\u00e7ar. Bunu yapmak i\u00e7in do\u011fru ara\u00e7lar\u0131 bulmak \u00e7ok \u00f6nemlidir ve i\u00e7 i\u00e7e yerle\u015ftirme yaz\u0131l\u0131m\u0131 burada devreye girer. Bu ara\u00e7, g\u00f6revler aras\u0131nda zaman kazanman\u0131za, maliyetleri azaltman\u0131za ve \u00fcretim s\u0131ras\u0131nda malzemelerin nas\u0131l kullan\u0131ld\u0131\u011f\u0131n\u0131 d\u00fczene sokman\u0131za yard\u0131mc\u0131 olarak israf\u0131 en aza indirir ve<a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/aps-ile-yesil-uretimi-guclendirme\/\"> ye\u015fil \u00fcretime<\/a> olan ba\u011fl\u0131l\u0131\u011f\u0131n\u0131z\u0131 destekler.   <\/p>\n\n\n\n<p>Bu makalede, nesting yaz\u0131l\u0131m\u0131n\u0131n ne oldu\u011funu, bu \u00e7\u00f6z\u00fcm\u00fcn nas\u0131l \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131 ve \u00fcretim s\u00fcre\u00e7lerinize getirebilece\u011fi b\u00fcy\u00fck fark\u0131 inceleyece\u011fiz. Ayr\u0131ca bu yaz\u0131l\u0131m\u0131 SkyPlanner ile e\u015fle\u015ftirmenin s\u00fcre\u00e7leriniz aras\u0131ndaki verimlili\u011fi nas\u0131l art\u0131rabilece\u011fine de de\u011finece\u011fiz. <\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-3df69bf8      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#nesting-sofware-nedir-ve-nas\u0131l-\u00e7al\u0131\u015f\u0131r\" class=\"uagb-toc-link__trigger\">Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/a><ul class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#yerle\u015ftirme-yaz\u0131l\u0131m\u0131n\u0131-anlama\" class=\"uagb-toc-link__trigger\">Yerle\u015ftirme Yaz\u0131l\u0131m\u0131n\u0131 Anlama<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#\u00fcretimde-yerle\u015ftirme-nas\u0131l-\u00e7al\u0131\u015f\u0131r\" class=\"uagb-toc-link__trigger\">\u00dcretimde Yerle\u015ftirme: Nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#\u00fcretimde-yerle\u015ftirme-yaz\u0131l\u0131m\u0131n\u0131n-5-temel-faydas\u0131\" class=\"uagb-toc-link__trigger\">\u00dcretimde Yerle\u015ftirme Yaz\u0131l\u0131m\u0131n\u0131n 5 Temel Faydas\u0131<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#yerle\u015ftirme-yaz\u0131l\u0131m\u0131ndan-b\u00fcy\u00fck-fayda-sa\u011flayan-sekt\u00f6rler\" class=\"uagb-toc-link__trigger\">Yerle\u015ftirme Yaz\u0131l\u0131m\u0131ndan B\u00fcy\u00fck Fayda Sa\u011flayan Sekt\u00f6rler<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#montaj-i\u015fleri-skyplannerda-\u00f6nemli-bir-\u00f6zellik\" class=\"uagb-toc-link__trigger\">Montaj i\u015fleri: SkyPlanner&#039;da \u00f6nemli bir \u00f6zellik<\/a><\/ul><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"wp-block-heading\" id=\"h-understanding-nesting-software\">Yerle\u015ftirme Yaz\u0131l\u0131m\u0131n\u0131 Anlama<\/h2>\n\n\n\n<p><strong>Nesting yaz\u0131l\u0131m\u0131, d\u00fcz malzemeler \u00fczerinde \u015fekillerin d\u00fczenlenmesini geli\u015ftiren, malzeme kullan\u0131m\u0131n\u0131 en \u00fcst d\u00fczeye \u00e7\u0131karan ve israf\u0131 en aza indiren bir \u00e7\u00f6z\u00fcmd\u00fcr.<\/strong>  Ayr\u0131ca farkl\u0131 sipari\u015flerdeki par\u00e7alar\u0131 ayn\u0131 malzeme sayfas\u0131nda birle\u015ftirerek verimlili\u011fi daha da art\u0131rabilir. Ah\u015fap i\u015fleme, sac metal imalat\u0131 ve CNC i\u015fleme gibi sekt\u00f6rlerdeki \u00fcreticiler, malzemeleri m\u00fcmk\u00fcn oldu\u011funca verimli bir \u015fekilde kestiklerinden emin olmak i\u00e7in buna g\u00fcveniyor. <\/p>\n\n\n\n<p>Yerle\u015ftirme yaz\u0131l\u0131m\u0131, 2D ve 3D par\u00e7alar\u0131n bir malzeme alan\u0131na tam olarak nas\u0131l yerle\u015ftirilece\u011fini planlama gibi a\u011f\u0131r bir i\u015fi \u00fcstlenir ki bunu manuel olarak ba\u015farmak \u00e7ok zordur.  <strong>Bir b\u00fct\u00fcn olarak Nesting yaz\u0131l\u0131m\u0131, \u00fcretimi h\u0131zland\u0131r\u0131rken gereksiz israf\u0131 ortadan kald\u0131rmak i\u00e7in tasarlanm\u0131\u015ft\u0131r ve verimlili\u011fi art\u0131rmak isteyen her \u00fcretici i\u00e7in \u00f6nemli bir ara\u00e7t\u0131r.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u00dcretimde Yerle\u015ftirme: Nas\u0131l \u00e7al\u0131\u015f\u0131r?<\/h2>\n\n\n\n<p>Yerle\u015ftirme yaz\u0131l\u0131m\u0131, israf\u0131 en aza indirmek i\u00e7in d\u00fcz bir malzeme tabakas\u0131 \u00fczerinde bir \u00fcr\u00fcn \u00fcretmek \u00fczere \u015fekilleri veya par\u00e7alar\u0131 m\u00fcmk\u00fcn olan en verimli \u015fekilde d\u00fczenler. Yaz\u0131l\u0131m, malzemenin boyutlar\u0131n\u0131 ve kesilmesi gereken \u015fekilleri analiz eder, ard\u0131ndan en iyi d\u00fczeni belirler. Bu d\u00fczen, \u00fcreticilerin malzemenin her par\u00e7as\u0131n\u0131 kullanmas\u0131na ve minimum hurda b\u0131rakmas\u0131na olanak tan\u0131r.  <\/p>\n\n\n\n<p>Kolay bir \u00f6rnek olarak, b\u00fcy\u00fck bir cam levha kullanan ve bu levhadan farkl\u0131 sipari\u015fler i\u00e7in birka\u00e7 pencere paneli kesmesi gereken bir pencere \u00fcreticisi verilebilir. Yerle\u015ftirme yaz\u0131l\u0131m\u0131, bu panelleri tabaka \u00fczerinde d\u00fczenlemenin en iyi yolunu hesaplar, b\u00f6ylece en az miktarda art\u0131k camla maksimum say\u0131da pencere kesebilirsiniz. Ayn\u0131 \u015fey ah\u015fap i\u00e7in de ge\u00e7erlidir &#8211; mobilya i\u00e7in par\u00e7alar kesiyorsan\u0131z, yaz\u0131l\u0131m her bir ah\u015fap tabakas\u0131ndan en iyi \u015fekilde yararlanman\u0131z\u0131 sa\u011flayacak, at\u0131klar\u0131 en aza indirecek ve maliyetleri d\u00fc\u015f\u00fcrecektir.  <\/p>\n\n\n\n<p>Manuel olarak d\u00fczen olu\u015fturman\u0131n aksine, bu yaz\u0131l\u0131m malzemeleri d\u00fczenlemenin en iyi yolunu h\u0131zl\u0131 ve do\u011fru bir \u015fekilde belirleyerek modern \u00fcretimde \u00e7ok kullan\u0131\u015fl\u0131 bir ara\u00e7 haline getirir.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u00dcretimde Yerle\u015ftirme Yaz\u0131l\u0131m\u0131n\u0131n 5 Temel Faydas\u0131<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Malzeme \u0130sraf\u0131n\u0131 En Aza \u0130ndirir<\/strong>: Yerle\u015ftirme yaz\u0131l\u0131m\u0131 her bir malzeme par\u00e7as\u0131n\u0131n verimli bir \u015fekilde kullan\u0131lmas\u0131n\u0131 sa\u011flar, yani \u00e7\u00f6p kutusuna daha az hurda gider. \u00d6rne\u011fin, bir cam levhadan pencere panelleri kesiyorsan\u0131z, yaz\u0131l\u0131m kesimleri minimum art\u0131k par\u00e7a b\u0131rakacak \u015fekilde d\u00fczenleyerek hammaddeden tasarruf etmenizi sa\u011flar. <\/li>\n\n\n\n<li><strong>\u00dcretimde Zaman Kazand\u0131r\u0131r<\/strong>: Manuel planlama zaman al\u0131c\u0131d\u0131r ve hatalara a\u00e7\u0131kt\u0131r. Yerle\u015ftirme yaz\u0131l\u0131m\u0131 yerle\u015fim s\u00fcrecini otomatikle\u015ftirir, b\u00f6ylece \u00fcretim planlamac\u0131lar\u0131 \u015fekilleri bir sayfaya nas\u0131l s\u0131\u011fd\u0131racaklar\u0131n\u0131 bulmak i\u00e7in de\u011ferli saatler harcamak zorunda kalmazlar. <\/li>\n\n\n\n<li><strong>\u00dcretim Verimlili\u011fini Ar<\/strong>t\u0131r\u0131r: Yaz\u0131l\u0131m, hassas kesim d\u00fczenleri olu\u015fturarak \u00fcretim s\u00fcrecini h\u0131zland\u0131r\u0131r. Makineler daha sorunsuz \u00e7al\u0131\u015f\u0131r ve \u00fcretim d\u00f6ng\u00fcleri k\u0131sal\u0131r. <\/li>\n\n\n\n<li><strong>S\u00fcrd\u00fcr\u00fclebilir \u00dcretimi Destekler<\/strong>: Yerle\u015ftirme yaz\u0131l\u0131m\u0131n\u0131n s\u00fcrd\u00fcr\u00fclebilir uygulamalarla uyumlu olmas\u0131 \u015fa\u015f\u0131rt\u0131c\u0131 de\u011fildir. Malzeme israf\u0131n\u0131 azaltarak ve \u00fcretim verimlili\u011fini art\u0131rarak, \u00fcreticilerin \u00e7evre \u00fczerindeki etkilerini azaltmalar\u0131na yard\u0131mc\u0131 olur. Daha az at\u0131k, daha az hammaddeye ihtiya\u00e7 duyulmas\u0131 anlam\u0131na gelir, bu da hem i\u015f hem de gezegen i\u00e7in iyidir. <\/li>\n\n\n\n<li><strong>Y\u00f6netim Kurulu Genelinde Maliyetleri D\u00fc\u015f\u00fcr\u00fcr<\/strong>: Daha az at\u0131k ve daha h\u0131zl\u0131 \u00fcretim, k\u00e2rl\u0131l\u0131\u011f\u0131n\u0131z\u0131 do\u011frudan etkiler. Malzeme maliyetlerinden tasarruf ediyor, i\u015f\u00e7ilik ve enerji giderlerini azalt\u0131yorsunuz. Yerle\u015ftirme yaz\u0131l\u0131m\u0131 t\u00fcm s\u00fcreci daha yal\u0131n hale getirerek daha az\u0131yla daha fazlas\u0131n\u0131 yapman\u0131z\u0131 sa\u011flar.  <\/li>\n<\/ol>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\" id=\"h-industries-that-benefit-greatly-from-nesting-software\">Yerle\u015ftirme Yaz\u0131l\u0131m\u0131ndan B\u00fcy\u00fck Fayda Sa\u011flayan Sekt\u00f6rler<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-c013d753 gb-headline-text\">Cam \u0130malat\u0131<\/h4>\n\n\n\n<p><text x=\"-9999\" y=\"-9999\"><\/text><path d=\"M37.5324 16.8707C37.9808 15.5241 38.1363 14.0974 37.9886 12.6859C37.8409 11.2744 37.3934 9.91076 36.676 8.68622C35.6126 6.83404 33.9882 5.3676 32.0373 4.4985C30.0864 3.62941 27.9098 3.40259 25.8215 3.85078C24.8796 2.7893 23.7219 1.94125 22.4257 1.36341C21.1295 0.785575 19.7249 0.491269 18.3058 0.500197C16.1708 0.495044 14.0893 1.16803 12.3614 2.42214C10.6335 3.67624 9.34853 5.44666 8.6917 7.47815C7.30085 7.76286 5.98686 8.3414 4.8377 9.17505C3.68854 10.0087 2.73073 11.0782 2.02839 12.312C0.956464 14.1591 0.498905 16.2988 0.721698 18.4228C0.944492 20.5467 1.83612 22.5449 3.268 24.1293C2.81966 25.4759 2.66413 26.9026 2.81182 28.3141C2.95951 29.7256 3.40701 31.0892 4.12437 32.3138C5.18791 34.1659 6.8123 35.6322 8.76321 36.5013C10.7141 37.3704 12.8907 37.5973 14.9789 37.1492C15.9208 38.2107 17.0786 39.0587 18.3747 39.6366C19.6709 40.2144 21.0755 40.5087 22.4946 40.4998C24.6307 40.5054 26.7133 39.8321 28.4418 38.5772C30.1704 37.3223 31.4556 35.5506 32.1119 33.5179C33.5027 33.2332 34.8167 32.6547 35.9659 31.821C37.115 30.9874 38.0728 29.9178 38.7752 28.684C39.8458 26.8371 40.3023 24.6979 40.0789 22.5748C39.8556 20.4517 38.9639 18.4544 37.5324 16.8707ZM22.4978 37.8849C20.7443 37.8874 19.0459 37.2733 17.6994 36.1501C17.7601 36.117 17.8666 36.0586 17.936 36.0161L25.9004 31.4156C26.1003 31.3019 26.2663 31.137 26.3813 30.9378C26.4964 30.7386 26.5563 30.5124 26.5549 30.2825V19.0542L29.9213 20.998C29.9389 21.0068 29.9541 21.0198 29.9656 21.0359C29.977 21.052 29.9842 21.0707 29.9867 21.0902V30.3889C29.9842 32.375 29.1946 34.2791 27.7909 35.6841C26.3872 37.0892 24.4838 37.8806 22.4978 37.8849ZM6.39227 31.0064C5.51397 29.4888 5.19742 27.7107 5.49804 25.9832C5.55718 26.0187 5.66048 26.0818 5.73461 26.1244L13.699 30.7248C13.8975 30.8408 14.1233 30.902 14.3532 30.902C14.583 30.902 14.8088 30.8408 15.0073 30.7248L24.731 25.1103V28.9979C24.7321 29.0177 24.7283 29.0376 24.7199 29.0556C24.7115 29.0736 24.6988 29.0893 24.6829 29.1012L16.6317 33.7497C14.9096 34.7416 12.8643 35.0097 10.9447 34.4954C9.02506 33.9811 7.38785 32.7263 6.39227 31.0064ZM4.29707 13.6194C5.17156 12.0998 6.55279 10.9364 8.19885 10.3327C8.19885 10.4013 8.19491 10.5228 8.19491 10.6071V19.808C8.19351 20.0378 8.25334 20.2638 8.36823 20.4629C8.48312 20.6619 8.64893 20.8267 8.84863 20.9404L18.5723 26.5542L15.206 28.4979C15.1894 28.5089 15.1703 28.5155 15.1505 28.5173C15.1307 28.5191 15.1107 28.516 15.0924 28.5082L7.04046 23.8557C5.32135 22.8601 4.06716 21.2235 3.55289 19.3046C3.03862 17.3858 3.30624 15.3413 4.29707 13.6194ZM31.955 20.0556L22.2312 14.4411L25.5976 12.4981C25.6142 12.4872 25.6333 12.4805 25.6531 12.4787C25.6729 12.4769 25.6928 12.4801 25.7111 12.4879L33.7631 17.1364C34.9967 17.849 36.0017 18.8982 36.6606 20.1613C37.3194 21.4244 37.6047 22.849 37.4832 24.2684C37.3617 25.6878 36.8382 27.0432 35.9743 28.1759C35.1103 29.3086 33.9415 30.1717 32.6047 30.6641C32.6047 30.5947 32.6047 30.4733 32.6047 30.3889V21.188C32.6066 20.9586 32.5474 20.7328 32.4332 20.5338C32.319 20.3348 32.154 20.1698 31.955 20.0556ZM35.3055 15.0128C35.2464 14.9765 35.1431 14.9142 35.069 14.8717L27.1045 10.2712C26.906 10.1554 26.6803 10.0943 26.4504 10.0943C26.2206 10.0943 25.9948 10.1554 25.7963 10.2712L16.0726 15.8858V11.9982C16.0715 11.9783 16.0753 11.9585 16.0837 11.9405C16.0921 11.9225 16.1048 11.9068 16.1207 11.8949L24.1719 7.25025C25.4053 6.53903 26.8158 6.19376 28.2383 6.25482C29.6608 6.31589 31.0364 6.78077 32.2044 7.59508C33.3723 8.40939 34.2842 9.53945 34.8334 10.8531C35.3826 12.1667 35.5464 13.6095 35.3055 15.0128ZM14.2424 21.9419L10.8752 19.9981C10.8576 19.9893 10.8423 19.9763 10.8309 19.9602C10.8195 19.9441 10.8122 19.9254 10.8098 19.9058V10.6071C10.8107 9.18295 11.2173 7.78848 11.9819 6.58696C12.7466 5.38544 13.8377 4.42659 15.1275 3.82264C16.4173 3.21869 17.8524 2.99464 19.2649 3.1767C20.6775 3.35876 22.0089 3.93941 23.1034 4.85067C23.0427 4.88379 22.937 4.94215 22.8668 4.98473L14.9024 9.58517C14.7025 9.69878 14.5366 9.86356 14.4215 10.0626C14.3065 10.2616 14.2466 10.4877 14.2479 10.7175L14.2424 21.9419ZM16.071 17.9991L20.4018 15.4978L24.7325 17.9975V22.9985L20.4018 25.4983L16.071 22.9985V17.9991Z\" fill=\"currentColor\"><\/path>Yerle\u015ftirme yaz\u0131l\u0131m\u0131, \u00fcreticilerin cam panelleri b\u00fcy\u00fck levhalar \u00fczerinde verimli bir \u015fekilde d\u00fczenlemesine yard\u0131mc\u0131 olarak m\u00fcmk\u00fcn oldu\u011funca fazla malzeme kullanmalar\u0131n\u0131 sa\u011flar. Pencereleri veya aynalar\u0131 kesti\u011finizi d\u00fc\u015f\u00fcn\u00fcn; yaz\u0131l\u0131m en iyi yerle\u015fimi hesaplayarak art\u0131k par\u00e7alar\u0131 azalt\u0131r ve hem camdan hem de paradan tasarruf sa\u011flar. Bu, hammaddelerin maliyetli oldu\u011fu sekt\u00f6rlerde hayati \u00f6nem ta\u015f\u0131r.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a34394b5 gb-headline-text\">Mobilya \u00dcretimi ve A\u011fa\u00e7 \u0130\u015fleri<\/h4>\n\n\n\n<p>Ah\u015fapla \u00e7al\u0131\u015f\u0131rken, \u00f6zellikle de sert a\u011fa\u00e7 gibi pahal\u0131 malzemelerde her in\u00e7 \u00f6nemlidir. Yerle\u015ftirme yaz\u0131l\u0131m\u0131, \u00fcretim planlamac\u0131lar\u0131n\u0131n mobilya par\u00e7alar\u0131n\u0131 kesmenin en verimli yolunu bulmalar\u0131na yard\u0131mc\u0131 olarak israf\u0131 azalt\u0131r ve her tabakadan en iyi \u015fekilde yararlanman\u0131z\u0131 sa\u011flar. Daha az ah\u015fap at\u0131\u011f\u0131, daha d\u00fc\u015f\u00fck maliyet ve daha s\u00fcrd\u00fcr\u00fclebilir \u00fcretim anlam\u0131na gelir.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-2bad86e6 gb-headline-text\">Tekstil ve Konfeksiyon \u0130malat\u0131<\/h4>\n\n\n\n<p>\u0130pek gibi kuma\u015flar\u0131n son derece pahal\u0131 olabildi\u011fi moda gibi sekt\u00f6rlerde israf h\u0131zla artabilir. Yerle\u015ftirme yaz\u0131l\u0131m\u0131, kuma\u015f par\u00e7alar\u0131n\u0131 israf\u0131 en aza indirecek \u015fekilde d\u00fczenleyerek \u00fcreticilerin her bir malzemeyi en verimli \u015fekilde kullanmas\u0131n\u0131 sa\u011flar. \u0130ster \u00fcst d\u00fczey bir elbise ister d\u00f6\u015femelik olsun, bu yaz\u0131l\u0131m planlamac\u0131lara kuma\u015f\u0131 daha etkili bir \u015fekilde kesme, maliyetlerden tasarruf etme ve <strong>ye\u015fil \u00fcretim<\/strong> uygulamalar\u0131na uyum sa\u011flama konusunda yard\u0131mc\u0131 olur.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6aecb910 gb-headline-text\">Metal \u0130malat\u0131<\/h4>\n\n\n\n<p>\u0130ster otomobiller i\u00e7in \u00e7elik ister u\u00e7ak par\u00e7alar\u0131 i\u00e7in al\u00fcminyum kesiyor olun, yerle\u015ftirme yaz\u0131l\u0131m\u0131 metal levhalar\u0131 en verimli \u015fekilde d\u00fczenler. Bu, hurda metalin azalt\u0131lmas\u0131na yard\u0131mc\u0131 olarak zaman i\u00e7inde b\u00fcy\u00fck tasarruflar sa\u011flar. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4dbad421 gb-headline-text\">Havac\u0131l\u0131k ve Uzay \u0130malat\u0131<\/h4>\n\n\n\n<p>Havac\u0131l\u0131k ve uzay \u00fcreticileri karbon fiber veya titanyum gibi y\u00fcksek maliyetli, israf\u0131n pahal\u0131 oldu\u011fu ve hassasiyetin tart\u0131\u015f\u0131lmaz oldu\u011fu malzemelerle u\u011fra\u015f\u0131rlar. Yaz\u0131l\u0131m, \u00fcreticilerin her bir par\u00e7ay\u0131 verimli bir \u015fekilde kullanmas\u0131n\u0131 sa\u011flamak i\u00e7in bu malzemeleri dikkatlice d\u00fczenler. Sonu\u00e7 sadece malzeme maliyetlerinde tasarruf de\u011fil, ayn\u0131 zamanda \u00fcretim verimlili\u011finde de art\u0131\u015f oluyor; her ikisi de m\u00fckemmellik isteyen bir sekt\u00f6rde kilit \u00f6nem ta\u015f\u0131yor.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-2c602590 gb-headline-text\">Plastik ve Kompozit Malzeme \u00dcretimi<\/h4>\n\n\n\n<p>Plastik ve kompozit malzemelerin kullan\u0131ld\u0131\u011f\u0131 ambalaj veya elektronik gibi sekt\u00f6rlerde yerle\u015ftirme yaz\u0131l\u0131m\u0131, levhalar\u0131n kesim \u015feklini optimize ederek at\u0131klar\u0131n azalt\u0131lmas\u0131na yard\u0131mc\u0131 olur. Bu, \u00f6zellikle b\u00fcy\u00fck \u00f6l\u00e7ekte \u00fcretim yapt\u0131\u011f\u0131n\u0131zda \u00f6nemlidir. Daha az at\u0131k, daha az hammaddeye ihtiya\u00e7 duyulmas\u0131 anlam\u0131na gelir, bu da daha d\u00fc\u015f\u00fck maliyetler ve daha modern bir \u00fcretim s\u00fcreci anlam\u0131na gelir.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-35a13511 gb-headline-text\">Deri ve Ayakkab\u0131 Sekt\u00f6r\u00fc<\/h4>\n\n\n\n<p>Deri, \u00f6zellikle y\u00fcksek kaliteli veya maliyetli derilerle \u00e7al\u0131\u015f\u0131rken her hurdan\u0131n \u00f6nemli oldu\u011fu bir ba\u015fka malzemedir. Yerle\u015ftirme yaz\u0131l\u0131m\u0131 ayakkab\u0131, \u00e7anta veya di\u011fer aksesuarlar i\u00e7in gereken par\u00e7alar\u0131 d\u00fczenleyerek art\u0131k deriyi en aza indirir. Bu, \u00fcreticilerin ayn\u0131 miktarda malzemeden daha fazla \u00fcr\u00fcn \u00fcretebilece\u011fi, maliyetleri d\u00fc\u015f\u00fcrebilece\u011fi ve at\u0131klar\u0131 azaltabilece\u011fi anlam\u0131na gelir.  <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-3cd85835 gb-headline-text\">Montaj i\u015fleri: SkyPlanner&#8217;da \u00f6nemli bir \u00f6zellik<\/h2>\n\n\n\n<p>Yerle\u015ftirme yaz\u0131l\u0131m\u0131 ve yapay zekal\u0131 <a href=\"https:\/\/skyplanner.ai\/tr\/\">SkyPlanner \u00fcretim plan<\/a> lamas\u0131, \u00fcretimi kolayla\u015ft\u0131rmak ve maliyetleri d\u00fc\u015f\u00fcrmek i\u00e7in g\u00fc\u00e7l\u00fc bir kombinasyon olu\u015fturur. Yerle\u015ftirme yaz\u0131l\u0131m\u0131, malzeme israf\u0131n\u0131 en aza indirmek i\u00e7in en uygun kesim d\u00fczenini olu\u015fturmaya odaklan\u0131rken, SkyPlanner bir sonraki a\u015famay\u0131 ele almak i\u00e7in devreye girer. SkyPlanner, \u00f6zellikle montaj i\u015fleri \u00f6zelli\u011fi ile yapay zeka odakl\u0131 planlamas\u0131n\u0131 kullanarak, i\u00e7 i\u00e7e yerle\u015ftirme yaz\u0131l\u0131m\u0131n\u0131n ideal d\u00fczenine dayal\u0131 olarak birden fazla sipari\u015fi tek bir verimli g\u00f6revde hizalar. Bu, \u00fcreticilerin farkl\u0131 sipari\u015flerdeki par\u00e7alar\u0131 ayn\u0131 malzemeden ayn\u0131 anda kesmesine olanak tan\u0131yarak israf\u0131 \u00f6nemli \u00f6l\u00e7\u00fcde azalt\u0131r ve \u00fcretimi h\u0131zland\u0131r\u0131r.<a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/excel-uretim-planlama-zorluklari-ve-skyplanner-aps\/\"> Excel \u00fcretim planlamas\u0131<\/a> gibi geleneksel ara\u00e7lar bu hassasiyet ve verimlilik seviyesiyle rekabet edemez.    <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"366\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-1024x366.png\" alt=\"Montaj &#x130;&#x15F;i Skyplanner\" class=\"wp-image-44072\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-1024x366.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-300x107.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-768x274.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner.png 1419w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Yapay zekaya sahip bu <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/gelismis-planlama-ve-cizelgeleme\/\">Geli\u015fmi\u015f Planlama ve \u00c7izelgeleme sistemi<\/a>, optimum kaynak kullan\u0131m\u0131n\u0131 sa\u011flar, <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/aps-ile-uretim-maliyetini-dusurun\/\">\u00fcretim maliyetini d\u00fc\u015f\u00fcr<\/a>\u00fcr ve teslim s\u00fcrelerini en aza indirir. Yerle\u015ftirme yaz\u0131l\u0131m\u0131n\u0131n hassasiyetini SkyPlanner&#8217;\u0131n ak\u0131ll\u0131 programlamas\u0131yla birle\u015ftiren \u00fcreticiler, \u00fcretimi ba\u015ftan sona optimize eden son derece verimli ve esnek bir \u00e7\u00f6z\u00fcm elde edebilirler. <\/p>\n\n\n\n<p>Ne i\u00e7in bekliyorsunuz? <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">2 haftal\u0131k \u00fccretsiz deneme<\/a> s\u00fcr\u00fcm\u00fcm\u00fcz\u00fc deneyin ve nesting yaz\u0131l\u0131m\u0131 ile SkyPlanner&#8217;\u0131n \u00fcretim s\u00fcrecinizde yaratabilece\u011fi fark\u0131 deneyimleyin. Sorunsuz entegrasyon hizmetlerimiz hakk\u0131nda daha fazla bilgi edinmek ve verimlili\u011finizi optimize etmeye ba\u015flamak i\u00e7in bug\u00fcn <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">profesyonel ekibimizle ileti\u015fime<\/a> ge\u00e7in! <\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"Assembly Jobs: Save time and reduce costs in your processes\" width=\"1200\" height=\"675\" src=\"https:\/\/www.youtube.com\/embed\/i5i94qP5VZo?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r? Home &#8221; Kaynaklar &#8221; Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r? Nesting yaz\u0131l\u0131m\u0131, d\u00fcz malzemeler \u00fczerinde \u015fekillerin d\u00fczenlenmesini geli\u015ftiren, malzeme kullan\u0131m\u0131n\u0131 en \u00fcst d\u00fczeye \u00e7\u0131karan ve israf\u0131 en aza indiren bir \u00e7\u00f6z\u00fcmd\u00fcr. Her \u00fcretici her zaman israf\u0131 azaltman\u0131n yollar\u0131n\u0131 arar. \u0130ster art\u0131k malzemeleri azaltmak, ister de\u011ferli zamandan tasarruf etmek veya &#8230; <a title=\"Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/\" aria-label=\"Read more about Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r?\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[314,2570],"tags":[],"class_list":["post-44154","post","type-post","status-publish","format-standard","hentry","category-kaynaklar","category-uretim-verimliligi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r? &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Nesting yaz\u0131l\u0131m\u0131, d\u00fcz malzemeler \u00fczerinde \u015fekillerin d\u00fczenlenmesini geli\u015ftiren, malzeme kullan\u0131m\u0131n\u0131 en \u00fcst d\u00fczeye \u00e7\u0131karan ve israf\u0131 en aza indiren bir \u00e7\u00f6z\u00fcmd\u00fcr.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r?\" \/>\n<meta property=\"og:description\" content=\"Nesting yaz\u0131l\u0131m\u0131, d\u00fcz malzemeler \u00fczerinde \u015fekillerin d\u00fczenlenmesini geli\u015ftiren, malzeme kullan\u0131m\u0131n\u0131 en \u00fcst d\u00fczeye \u00e7\u0131karan ve israf\u0131 en aza indiren bir \u00e7\u00f6z\u00fcmd\u00fcr.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-15T08:06:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-15T08:24:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-1024x366.png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/nesting-sofware-nedir-ve-nasil-calisir\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/nesting-sofware-nedir-ve-nasil-calisir\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r?\",\"datePublished\":\"2024-10-15T08:06:16+00:00\",\"dateModified\":\"2024-10-15T08:24:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/nesting-sofware-nedir-ve-nasil-calisir\\\/\"},\"wordCount\":1704,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/nesting-sofware-nedir-ve-nasil-calisir\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Assembly-Job-Skyplanner-1024x366.png\",\"articleSection\":[\"Kaynaklar\",\"\u00dcretim verimlili\u011fi\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/nesting-sofware-nedir-ve-nasil-calisir\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/nesting-sofware-nedir-ve-nasil-calisir\\\/\",\"name\":\"Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r? &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/nesting-sofware-nedir-ve-nasil-calisir\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/nesting-sofware-nedir-ve-nasil-calisir\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Assembly-Job-Skyplanner-1024x366.png\",\"datePublished\":\"2024-10-15T08:06:16+00:00\",\"dateModified\":\"2024-10-15T08:24:49+00:00\",\"description\":\"Nesting yaz\u0131l\u0131m\u0131, d\u00fcz malzemeler \u00fczerinde \u015fekillerin d\u00fczenlenmesini geli\u015ftiren, malzeme kullan\u0131m\u0131n\u0131 en \u00fcst d\u00fczeye \u00e7\u0131karan ve israf\u0131 en aza indiren bir \u00e7\u00f6z\u00fcmd\u00fcr.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/nesting-sofware-nedir-ve-nasil-calisir\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/nesting-sofware-nedir-ve-nasil-calisir\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/nesting-sofware-nedir-ve-nasil-calisir\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Assembly-Job-Skyplanner-1024x366.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Assembly-Job-Skyplanner-1024x366.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/nesting-sofware-nedir-ve-nasil-calisir\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r? &#8211; SkyPlanner","description":"Nesting yaz\u0131l\u0131m\u0131, d\u00fcz malzemeler \u00fczerinde \u015fekillerin d\u00fczenlenmesini geli\u015ftiren, malzeme kullan\u0131m\u0131n\u0131 en \u00fcst d\u00fczeye \u00e7\u0131karan ve israf\u0131 en aza indiren bir \u00e7\u00f6z\u00fcmd\u00fcr.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/","og_locale":"tr_TR","og_type":"article","og_title":"Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r?","og_description":"Nesting yaz\u0131l\u0131m\u0131, d\u00fcz malzemeler \u00fczerinde \u015fekillerin d\u00fczenlenmesini geli\u015ftiren, malzeme kullan\u0131m\u0131n\u0131 en \u00fcst d\u00fczeye \u00e7\u0131karan ve israf\u0131 en aza indiren bir \u00e7\u00f6z\u00fcmd\u00fcr.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/","og_site_name":"SkyPlanner","article_published_time":"2024-10-15T08:06:16+00:00","article_modified_time":"2024-10-15T08:24:49+00:00","og_image":[{"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-1024x366.png","type":"","width":"","height":""}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"SkyPlanner","Tahmini okuma s\u00fcresi":"8 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r?","datePublished":"2024-10-15T08:06:16+00:00","dateModified":"2024-10-15T08:24:49+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/"},"wordCount":1704,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-1024x366.png","articleSection":["Kaynaklar","\u00dcretim verimlili\u011fi"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/","name":"Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r? &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-1024x366.png","datePublished":"2024-10-15T08:06:16+00:00","dateModified":"2024-10-15T08:24:49+00:00","description":"Nesting yaz\u0131l\u0131m\u0131, d\u00fcz malzemeler \u00fczerinde \u015fekillerin d\u00fczenlenmesini geli\u015ftiren, malzeme kullan\u0131m\u0131n\u0131 en \u00fcst d\u00fczeye \u00e7\u0131karan ve israf\u0131 en aza indiren bir \u00e7\u00f6z\u00fcmd\u00fcr.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-1024x366.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-1024x366.png"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/nesting-sofware-nedir-ve-nasil-calisir\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/tr\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r? Home &#8221; Kaynaklar &#8221; Nesting Sofware: Nedir ve nas\u0131l \u00e7al\u0131\u015f\u0131r? Nesting yaz\u0131l\u0131m\u0131, d\u00fcz malzemeler \u00fczerinde \u015fekillerin d\u00fczenlenmesini geli\u015ftiren, malzeme kullan\u0131m\u0131n\u0131 en \u00fcst d\u00fczeye \u00e7\u0131karan ve israf\u0131 en aza indiren bir \u00e7\u00f6z\u00fcmd\u00fcr. Her \u00fcretici her zaman israf\u0131 azaltman\u0131n yollar\u0131n\u0131 arar. \u0130ster art\u0131k malzemeleri azaltmak, ister de\u011ferli zamandan tasarruf etmek veya&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/44154","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=44154"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/44154\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=44154"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=44154"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=44154"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}