{"id":23900,"date":"2023-10-03T14:01:00","date_gmt":"2023-10-03T14:01:00","guid":{"rendered":"https:\/\/skyplanner.ai\/kaynaklar\/silide-uretim-muduru-maasi-2023\/"},"modified":"2026-06-14T14:10:22","modified_gmt":"2026-06-14T14:10:22","slug":"silide-uretim-muduru-maasi-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/","title":{"rendered":"\u015eili&#8217;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-production-manager-salary-in-chile-2026\">\u015eili&#8217;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/tr\/\">Home<\/a> \u00bb <a href=\"\/tr\/kaynaklar\/\">Kaynaklar<\/a> \u00bb \u015eili&#8217;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015flar\u0131 2026<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>\u015eili&#8217;de 2026 y\u0131l\u0131nda ortalama \u00fcretim m\u00fcd\u00fcr\u00fc maa\u015f\u0131 y\u0131ll\u0131k <strong>24.000.<\/strong> 000 CLP veya vergi \u00f6ncesi ayl\u0131k 2.000.000 CLP civar\u0131ndad\u0131r.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>\u015eili, kimyasal \u00fcretim, g\u0131da i\u015fleme (bal\u0131k, \u015farap ve meyve dahil), tekstil ve konfeksiyon \u00fcretimi, ah\u015fap ve ka\u011f\u0131t \u00fcr\u00fcnleri imalat\u0131 ve birincil sekt\u00f6rlerini g\u00fc\u00e7lendirmek i\u00e7in end\u00fcstriyel makine ve ekipman yap\u0131m\u0131n\u0131 kapsayan kapsaml\u0131 bir imalat sekt\u00f6r\u00fcn\u00fcn yan\u0131 s\u0131ra, ba\u015fta bak\u0131r olmak \u00fczere madencilik ve metal \u00fcretimindeki h\u00fcnerleriyle de tan\u0131nmaktad\u0131r. 2026&#8217;te \u00fcretim faaliyetlerindeki art\u0131\u015fla birlikte, becerikli <a href=\"\/tr\/kaynaklar\/uretim-muduru-is-tanimi\/\">\u00fcretim y\u00f6neticilerine<\/a> olan talep de art\u0131yor. Bu uzmanlar, sorunsuz ve verimli \u00fcretim hatlar\u0131n\u0131n sa\u011flanmas\u0131nda etkili olmaktad\u0131r. Peki 2026 y\u0131l\u0131nda \u015eili&#8217;de bir \u00fcretim m\u00fcd\u00fcr\u00fcn\u00fcn \u00fccreti ne olacak?<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u015eili&#8217;nin Kazan\u00e7lar\u0131na Bir Bak\u0131\u015f  <\/h2>\n\n\n\n<p>\u015eili&#8217;de bir \u00fcretim m\u00fcd\u00fcr\u00fcn\u00fcn 2026 y\u0131l\u0131ndaki tipik y\u0131ll\u0131k kazanc\u0131 <strong>24.000.000 CLP<\/strong> veya vergi \u00f6ncesi ayl\u0131k <strong>2.000.000 CLP<\/strong> civar\u0131nda seyretmektedir. Daha geni\u015f bir anlay\u0131\u015f i\u00e7in, \u015eili&#8217;deki t\u00fcm mesleklerde medyan maa\u015f <strong>y\u0131ll\u0131k<\/strong> yakla\u015f\u0131k <strong> <strong>17.368.671<\/strong> CLP<\/strong> veya vergi \u00f6ncesi <strong>ayl\u0131k 1.447.389 CLP<\/strong> olarak belirlenmi\u015ftir.  Bu rakam bir \u00f6n fikir verse de, ger\u00e7ek kazan\u00e7lar, belirli istihdam sekt\u00f6r\u00fc ve ikamet edilen \u015fehir gibi \u00e7e\u015fitli fakt\u00f6rlerden etkilenerek dalgalanabilir.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Kar\u015f\u0131la\u015ft\u0131rmal\u0131 Maa\u015f Analizi: G\u00fcney Amerika Perspektifi<\/h2>\n\n\n\n<p>Kar\u015f\u0131la\u015ft\u0131rmal\u0131 bir analiz yap\u0131ld\u0131\u011f\u0131nda, \u015eili&#8217;deki \u00fcretim m\u00fcd\u00fcr\u00fc maa\u015f\u0131n\u0131n <a href=\"\/tr\/kaynaklar\/peruda-ueretim-mueduerue-maasi-2026\/\">Peru<\/a>&#8216;daki \u00fcretim m\u00fcd\u00fcr\u00fc maa\u015f\u0131, <a href=\"\/tr\/kaynaklar\/brezilyada-uretim-muduru-maaslari-2026\/\">Brezilya<\/a>&#8216;daki \u00fcretim m\u00fcd\u00fcr\u00fc maa\u015f\u0131 ve <a href=\"\/tr\/kaynaklar\/kolombiyada-uretim-muduru-maasi-2026\/\">Kolombiya<\/a>&#8216;daki \u00fcretim m\u00fcd\u00fcr\u00fc maa\u015f\u0131 ile yan yana getirildi\u011finde rekabet\u00e7i oldu\u011fu g\u00f6r\u00fclmektedir. \u00d6rne\u011fin, bu i\u015f, hayat pahal\u0131l\u0131\u011f\u0131 ve ekonomik hiyerar\u015filerdeki farkl\u0131l\u0131klar nedeniyle bu \u00fclkeler aras\u0131nda farkl\u0131 maa\u015f \u00f6l\u00e7ekleriyle kar\u015f\u0131la\u015fabilir. Bu kar\u015f\u0131la\u015ft\u0131rmal\u0131 duru\u015f, \u015eili&#8217;yi G\u00fcney Amerika b\u00f6lgesinde \u00fcretim y\u00f6netimi alan\u0131nda kariyerini ilerletmek isteyenler i\u00e7in uygun bir konuma yerle\u015ftirmektedir.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">\u015eili&#8217;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131n\u0131 Etkileyen Fakt\u00f6rler<\/h2>\n\n\n\n<p>\u015eili&#8217;de bir \u00fcretim m\u00fcd\u00fcr\u00fcn\u00fcn maa\u015f\u0131ndan bahsederken, \u00e7e\u015fitli fakt\u00f6rler ne kadar kazanacaklar\u0131n\u0131 de\u011fi\u015ftirebilir. Daha iyi anlamak i\u00e7in bu fakt\u00f6rleri inceleyelim: <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\u0130stihdam Sekt\u00f6r\u00fc: <\/strong>\u015eili&#8217;de \u00fcretim y\u00f6neticileri g\u0131da i\u015fleme, madencilik, giyim \u00fcretimi ve daha bir\u00e7ok sekt\u00f6rde i\u015f bulabilirler. Her sekt\u00f6r\u00fcn kendine \u00f6zg\u00fc zorluklar\u0131 ve talepleri vard\u0131r. \u00d6rne\u011fin, madencilik sekt\u00f6r\u00fcndeki bir \u00fcretim m\u00fcd\u00fcr\u00fcn\u00fcn giyim sekt\u00f6r\u00fcndekinden daha fazla teknik bilgiye ihtiyac\u0131 olabilir. Bu farkl\u0131 talepler nedeniyle, baz\u0131 sekt\u00f6rler \u00fcretim m\u00fcd\u00fcrlerine daha y\u00fcksek maa\u015flar sunabilir. Dolay\u0131s\u0131yla, bir \u00fcretim m\u00fcd\u00fcr\u00fcn\u00fcn \u00e7al\u0131\u015ft\u0131\u011f\u0131 sekt\u00f6r\u00fcn t\u00fcr\u00fc kazan\u00e7lar\u0131n\u0131 \u00f6nemli \u00f6l\u00e7\u00fcde etkileyebilir.    <\/li>\n\n\n\n<li><strong>Co\u011frafi Konum: <\/strong>Bir \u00fcretim m\u00fcd\u00fcr\u00fcn\u00fcn \u00e7al\u0131\u015ft\u0131\u011f\u0131 \u015fehir de ne kadar kazanaca\u011f\u0131n\u0131 \u00f6nemli \u00f6l\u00e7\u00fcde etkiler. \u00d6rne\u011fin, Santiago, Valparaiso ve Concepci\u00f3n gibi \u015fehirler bir\u00e7ok end\u00fcstriye sahip olmalar\u0131yla bilinmektedir. Bu \u015fehirlerdeki \u015firketler, \u00fcretim m\u00fcd\u00fcrlerine daha y\u00fcksek maa\u015flar teklif edebilir \u00e7\u00fcnk\u00fc buralarda ya\u015famak daha pahal\u0131 olabilir. \u00d6te yandan, \u015eili&#8217;deki daha k\u00fc\u00e7\u00fck \u015fehirler veya kasabalar daha d\u00fc\u015f\u00fck ya\u015fam maliyetlerine sahip olabilir, bu nedenle buradaki \u015firketler daha d\u00fc\u015f\u00fck maa\u015flar sunabilir.   <\/li>\n\n\n\n<li><strong>Deneyim ve Nitelikler: <\/strong>Bir \u00fcretim m\u00fcd\u00fcr\u00fc ne kadar \u00e7ok deneyime ve daha iyi niteliklere sahipse, bekleyebilece\u011fi maa\u015f da o kadar y\u00fcksek olur. \u015eirketler, uzun y\u0131llar \u00e7al\u0131\u015fm\u0131\u015f, iyi bir e\u011fitim ge\u00e7mi\u015fine sahip \u00fcretim y\u00f6neticilerine de\u011fer veriyor. \u0130\u015fe de\u011ferli beceriler ve bilgiler getirebilecek \u00fcretim m\u00fcd\u00fcrlerine genellikle daha iyi \u00fccret teklif etmeye isteklidirler.  <\/li>\n\n\n\n<li><strong>\u015eirket B\u00fcy\u00fckl\u00fc\u011f\u00fc: <\/strong>Son olarak, \u015firketin b\u00fcy\u00fckl\u00fc\u011f\u00fc de bir \u00fcretim m\u00fcd\u00fcr\u00fcn\u00fcn maa\u015f\u0131n\u0131 etkiler. Daha b\u00fcy\u00fck \u015firketler genellikle daha kapsaml\u0131 operasyonlara ve \u00fcretim m\u00fcd\u00fcrlerine daha y\u00fcksek \u00fccretler sunmak i\u00e7in harcayacak daha fazla paraya sahiptir. Bu \u015firketler, deneyimli \u00fcretim y\u00f6neticilerinin becerilerine ihtiya\u00e7 duyan daha karma\u015f\u0131k s\u00fcre\u00e7lere de sahip olabilir. \u00d6te yandan, daha k\u00fc\u00e7\u00fck \u015firketlerin b\u00fct\u00e7eleri daha k\u0131s\u0131tl\u0131 olabilir, bu nedenle daha d\u00fc\u015f\u00fck maa\u015flar teklif edebilirler.   <\/li>\n<\/ol>\n\n\n\n<p>Bu fakt\u00f6rleri anlayarak, \u00fcretim m\u00fcd\u00fcrleri veya m\u00fcd\u00fcr olmak isteyenler \u015eili&#8217;de maa\u015f a\u00e7\u0131s\u0131ndan ne beklemeleri gerekti\u011fini daha iyi anlayabilirler. \u0130ster belirli bir sekt\u00f6rde \u00e7al\u0131\u015fmay\u0131 tercih etsinler ister daha fazla deneyim kazans\u0131nlar, \u00fcretim m\u00fcd\u00fcrlerinin kazan\u00e7lar\u0131n\u0131 potansiyel olarak art\u0131rmak i\u00e7in \u00e7e\u015fitli yollar\u0131 vard\u0131r. <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner Geli&#x15F;mi&#x15F; Planlama ve &#xC7;izelgeleme &#xDC;retim sorunlar&#x131;na &#xE7;&#xF6;z&#xFC;mler\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">\u00dcretim M\u00fcd\u00fcr\u00fcn\u00fcn Rol\u00fcne Bir Bak\u0131\u015f<\/h2>\n\n\n\n<p>\u00dcretim y\u00f6neticileri, \u00fcretim sekt\u00f6r\u00fcn\u00fcn temel ta\u015flar\u0131d\u0131r ve \u00fcretim s\u00fcrecinin d\u00fczenli bir \u015fekilde ilerlemesini sa\u011flamak i\u00e7in \u00e7e\u015fitli sorumluluklar \u00fcstlenirler. G\u00f6revleri strateji olu\u015fturmaktan koordinasyon ve y\u00fcr\u00fctmeye kadar uzan\u0131r ve \u00fcretim hedeflerinin verimli bir \u015fekilde kar\u015f\u0131lanmas\u0131n\u0131 sa\u011flar.  Temel sorumluluklar \u015funlar\u0131 i\u00e7erir:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Maliyet Etkinli\u011fi:<\/strong> B\u00fct\u00e7eleri izler, \u00fcretimin \u00f6ng\u00f6r\u00fclen finansal parametreler dahilinde kalmas\u0131n\u0131 sa\u011flarken verimlili\u011fi ve karl\u0131l\u0131\u011f\u0131 art\u0131rman\u0131n yollar\u0131n\u0131 ararlar.<\/li>\n\n\n\n<li><strong>G\u00fcvenlik Protokollerinin Sa\u011flanmas\u0131:<\/strong> G\u00fcvenli bir \u00e7al\u0131\u015fma ortam\u0131n\u0131n korunmas\u0131 \u00e7ok \u00f6nemlidir. Makinelerin bak\u0131m\u0131n\u0131, g\u00fcvenlik kurallar\u0131na uyulmas\u0131n\u0131 ve d\u00fczenli g\u00fcvenlik tatbikatlar\u0131n\u0131n d\u00fczenlenmesini sa\u011flarlar. <\/li>\n\n\n\n<li><strong>\u0130\u015fbirli\u011fi ve Koordinasyon:<\/strong> Sat\u0131n alma, lojistik ve sat\u0131\u015f departmanlar\u0131yla i\u015fbirli\u011fi, \u00fcretimden pazara sorunsuz \u00fcr\u00fcn ge\u00e7i\u015fi i\u00e7in \u00e7ok \u00f6nemlidir.<\/li>\n\n\n\n<li><strong>Modern Ara\u00e7lar\u0131n Entegrasyonu:<\/strong> G\u00fcn\u00fcm\u00fcz\u00fcn teknoloji odakl\u0131 d\u00fcnyas\u0131nda APS (Geli\u015fmi\u015f Planlama ve \u00c7izelgeleme) sistemleri, ERP (Kurumsal Kaynak Planlama) ve MES (\u00dcretim Y\u00fcr\u00fctme Sistemi) gibi modern ara\u00e7lar\u0131n entegrasyonu zorunludur. \u00dcretim y\u00f6neticileri, \u00fcretim planlamas\u0131n\u0131 g\u00fc\u00e7lendirmek ve verimlili\u011fi art\u0131rmak i\u00e7in bu sistemlerin benimsenmesini ve etkin kullan\u0131m\u0131n\u0131 denetler. <\/li>\n\n\n\n<li><strong>M\u00fc\u015fteri Memnuniyeti<\/strong>: \u00dcr\u00fcnlerin kalite, teslimat s\u00fcresi ve maliyet a\u00e7\u0131s\u0131ndan m\u00fc\u015fterilerin beklentilerini kar\u015f\u0131lamas\u0131n\u0131 sa\u011flamak hayati \u00f6nem ta\u015f\u0131maktad\u0131r. \u00dcretim y\u00f6neticileri, m\u00fc\u015fteri memnuniyetinin sa\u011flanmas\u0131nda, \u015firketin itibar\u0131na ve k\u00e2rl\u0131l\u0131\u011f\u0131na katk\u0131da bulunmada \u00e7ok \u00f6nemlidir. <\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">\u00dcretim M\u00fcd\u00fcr\u00fc i\u00e7in Gerekli Beceriler<\/h4>\n\n\n\n<ol class=\"wp-block-list\">\n<li>G\u00fc\u00e7l\u00fc liderlik yetenekleri<\/li>\n\n\n\n<li>Problem \u00e7\u00f6zme becerileri<\/li>\n\n\n\n<li>\u00dcretim s\u00fcre\u00e7leri hakk\u0131nda bilgi<\/li>\n\n\n\n<li>B\u00fct\u00e7e y\u00f6netimi becerisi<\/li>\n\n\n\n<li>Zaman y\u00f6netimi<\/li>\n\n\n\n<li>Sa\u011fl\u0131k ve g\u00fcvenlik y\u00f6netmeliklerine hakimiyet<\/li>\n\n\n\n<li>Teknik uzmanl\u0131k<\/li>\n\n\n\n<li>Etkili ileti\u015fim becerileri<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">\u015eili&#8217;de \u00dcretim M\u00fcd\u00fcrleri i\u00e7in Maa\u015f \u00d6tesi Avantajlar<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Kariyerde \u0130lerleme F\u0131rsatlar\u0131:<\/strong> Geli\u015fen imalat sekt\u00f6r\u00fc, kariyer geli\u015fimi i\u00e7in geni\u015f bir alan sa\u011flamaktad\u0131r.<\/li>\n\n\n\n<li><strong>A\u011f olu\u015fturma:<\/strong> Sekt\u00f6r i\u00e7indeki ve d\u0131\u015f\u0131ndaki \u00e7e\u015fitli profesyonellerle etkile\u015fim.<\/li>\n\n\n\n<li><strong>Beceri Geli\u015ftirme:<\/strong> S\u00fcrekli \u00f6\u011frenme ve ERP ve MES sistemleri gibi yeni teknolojilere adaptasyon.<\/li>\n\n\n\n<li><strong>\u0130\u015f G\u00fcvenli\u011fi:<\/strong> \u00dcretim m\u00fcd\u00fcrlerinin vazge\u00e7ilmez rol\u00fc genellikle i\u015f istikrar\u0131 anlam\u0131na gelir.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">\u015eili&#8217;de \u00dcretim M\u00fcd\u00fcrleri i\u00e7in Ufuk<\/h2>\n\n\n\n<p>\u015eili&#8217;deki \u00fcretim y\u00f6r\u00fcngesi y\u00fckseli\u015f e\u011filimini s\u00fcrd\u00fcr\u00fcyor ve yenilikler sekt\u00f6r\u00fc noktalad\u0131\u011f\u0131 s\u00fcrece, deneyimli \u00fcretim y\u00f6neticilerine olan talep sabit kal\u0131yor. Skyplanner&#8217;\u0131n APS&#8217;si gibi ara\u00e7lar\u0131 benimsemek ve karma\u015f\u0131k ve eski moda elektronik tablolar kullanmak yerine yapay zeka gibi en son teknolojileri entegre etmek, verimlili\u011fi ve \u00fcretkenli\u011fi \u00f6nemli \u00f6l\u00e7\u00fcde art\u0131rabilir ve \u015eili&#8217;nin geli\u015fen \u00fcretim ortam\u0131nda \u00fcretim y\u00f6neticileri i\u00e7in umut verici bir gelecek yaratabilir. <\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u015eili&#8217;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026 Home \u00bb Kaynaklar \u00bb \u015eili&#8217;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015flar\u0131 2026 \u015eili&#8217;de 2026 y\u0131l\u0131nda ortalama \u00fcretim m\u00fcd\u00fcr\u00fc maa\u015f\u0131 y\u0131ll\u0131k 24.000. 000 CLP veya vergi \u00f6ncesi ayl\u0131k 2.000.000 CLP civar\u0131ndad\u0131r. \u015eili, kimyasal \u00fcretim, g\u0131da i\u015fleme (bal\u0131k, \u015farap ve meyve dahil), tekstil ve konfeksiyon \u00fcretimi, ah\u015fap ve ka\u011f\u0131t \u00fcr\u00fcnleri imalat\u0131 ve birincil sekt\u00f6rlerini g\u00fc\u00e7lendirmek &#8230; <a title=\"\u015eili&#8217;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/\" aria-label=\"Read more about \u015eili&#8217;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":23365,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2717,314],"tags":[],"class_list":["post-23900","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kariyer-ve-maaslar","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u015eili&#039;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026 \u2013 SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u015eili&#039;de 2026 y\u0131l\u0131nda ortalama \u00fcretim m\u00fcd\u00fcr\u00fc maa\u015f\u0131 y\u0131ll\u0131k 24.000.000 CLP veya vergi \u00f6ncesi ayl\u0131k 2.000.000 CLP civar\u0131ndad\u0131r.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u015eili&#039;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026\" \/>\n<meta property=\"og:description\" content=\"\u015eili&#039;de 2026 y\u0131l\u0131nda ortalama \u00fcretim m\u00fcd\u00fcr\u00fc maa\u015f\u0131 y\u0131ll\u0131k 24.000.000 CLP veya vergi \u00f6ncesi ayl\u0131k 2.000.000 CLP civar\u0131ndad\u0131r.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-03T14:01:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-14T14:10:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Chile-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/silide-uretim-muduru-maasi-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/silide-uretim-muduru-maasi-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"\u015eili&#8217;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026\",\"datePublished\":\"2023-10-03T14:01:00+00:00\",\"dateModified\":\"2026-06-14T14:10:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/silide-uretim-muduru-maasi-2026\\\/\"},\"wordCount\":1305,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/silide-uretim-muduru-maasi-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Manager-Salary-Chile.png\",\"articleSection\":[\"Kariyer ve maa\u015flar\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/silide-uretim-muduru-maasi-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/silide-uretim-muduru-maasi-2026\\\/\",\"name\":\"\u015eili'de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026 \u2013 SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/silide-uretim-muduru-maasi-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/silide-uretim-muduru-maasi-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Manager-Salary-Chile.png\",\"datePublished\":\"2023-10-03T14:01:00+00:00\",\"dateModified\":\"2026-06-14T14:10:22+00:00\",\"description\":\"\u015eili'de 2026 y\u0131l\u0131nda ortalama \u00fcretim m\u00fcd\u00fcr\u00fc maa\u015f\u0131 y\u0131ll\u0131k 24.000.000 CLP veya vergi \u00f6ncesi ayl\u0131k 2.000.000 CLP civar\u0131ndad\u0131r.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/silide-uretim-muduru-maasi-2026\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/silide-uretim-muduru-maasi-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/silide-uretim-muduru-maasi-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Manager-Salary-Chile.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Manager-Salary-Chile.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Manager Salary Chile\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/silide-uretim-muduru-maasi-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u015eili&#8217;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u015eili'de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026 \u2013 SkyPlanner","description":"\u015eili'de 2026 y\u0131l\u0131nda ortalama \u00fcretim m\u00fcd\u00fcr\u00fc maa\u015f\u0131 y\u0131ll\u0131k 24.000.000 CLP veya vergi \u00f6ncesi ayl\u0131k 2.000.000 CLP civar\u0131ndad\u0131r.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/","og_locale":"tr_TR","og_type":"article","og_title":"\u015eili'de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026","og_description":"\u015eili'de 2026 y\u0131l\u0131nda ortalama \u00fcretim m\u00fcd\u00fcr\u00fc maa\u015f\u0131 y\u0131ll\u0131k 24.000.000 CLP veya vergi \u00f6ncesi ayl\u0131k 2.000.000 CLP civar\u0131ndad\u0131r.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-10-03T14:01:00+00:00","article_modified_time":"2026-06-14T14:10:22+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Chile-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"SkyPlanner","Tahmini okuma s\u00fcresi":"9 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"\u015eili&#8217;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026","datePublished":"2023-10-03T14:01:00+00:00","dateModified":"2026-06-14T14:10:22+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/"},"wordCount":1305,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Chile.png","articleSection":["Kariyer ve maa\u015flar","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/","name":"\u015eili'de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026 \u2013 SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Chile.png","datePublished":"2023-10-03T14:01:00+00:00","dateModified":"2026-06-14T14:10:22+00:00","description":"\u015eili'de 2026 y\u0131l\u0131nda ortalama \u00fcretim m\u00fcd\u00fcr\u00fc maa\u015f\u0131 y\u0131ll\u0131k 24.000.000 CLP veya vergi \u00f6ncesi ayl\u0131k 2.000.000 CLP civar\u0131ndad\u0131r.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Chile.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Chile.png","width":4990,"height":3327,"caption":"Production Manager Salary Chile"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/silide-uretim-muduru-maasi-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"\u015eili&#8217;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Chile.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Chile-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Chile-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Chile-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Chile-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Chile-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Chile-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Manager-Salary-Chile.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/tr\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"\u015eili&#8217;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015f\u0131 2026 Home \u00bb Kaynaklar \u00bb \u015eili&#8217;de \u00dcretim M\u00fcd\u00fcr\u00fc Maa\u015flar\u0131 2026 \u015eili&#8217;de 2026 y\u0131l\u0131nda ortalama \u00fcretim m\u00fcd\u00fcr\u00fc maa\u015f\u0131 y\u0131ll\u0131k 24.000. 000 CLP veya vergi \u00f6ncesi ayl\u0131k 2.000.000 CLP civar\u0131ndad\u0131r. \u015eili, kimyasal \u00fcretim, g\u0131da i\u015fleme (bal\u0131k, \u015farap ve meyve dahil), tekstil ve konfeksiyon \u00fcretimi, ah\u015fap ve ka\u011f\u0131t \u00fcr\u00fcnleri imalat\u0131 ve birincil sekt\u00f6rlerini g\u00fc\u00e7lendirmek&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/23900","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=23900"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/23900\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/23365"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=23900"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=23900"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=23900"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}