{"id":113358,"date":"2026-10-30T09:55:28","date_gmt":"2026-10-30T09:55:28","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=113358"},"modified":"2026-10-30T09:57:02","modified_gmt":"2026-10-30T09:57:02","slug":"uygunsuzluk-raporu","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/","title":{"rendered":"Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">12<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Uygunsuzluk raporu (NCR)<\/strong>, bir \u015fart\u0131n kar\u015f\u0131lanmad\u0131\u011f\u0131n\u0131 kayda al\u0131r; etkilenen \u00fcr\u00fcn\u00fcn veya i\u015fin nas\u0131l kontrol alt\u0131na al\u0131nd\u0131\u011f\u0131n\u0131, de\u011ferlendirildi\u011fini ve sonuca ba\u011fland\u0131\u011f\u0131n\u0131 izler. \u00dcretimde bu rapor, soruna ili\u015fkin kan\u0131tlar\u0131 bundan sonra ne yap\u0131laca\u011f\u0131na dair yetkili kararla ili\u015fkilendirir ve karar\u0131n uyguland\u0131\u011f\u0131n\u0131 g\u00f6steren kan\u0131tlar\u0131 saklar.<\/p>\n\n\n<p>Reddedilen bir par\u00e7a h\u00e2l\u00e2 kullan\u0131labilir stokta g\u00f6r\u00fcn\u00fcyorsa, bir parti m\u00fchendislik karar\u0131n\u0131 bekliyorsa veya onayl\u0131 yeniden i\u015fleme i\u00e7in ba\u015fka bir sipari\u015fe ayr\u0131lm\u0131\u015f makinede s\u00fcre gerekiyorsa bu kay\u0131t \u00f6nem kazan\u0131r. Kusuru kaydetmek yaln\u0131zca ba\u015flang\u0131\u00e7t\u0131r.<\/p>\n\n\n<p>\u0130\u015fe yarayan bir uygunsuzluk raporu, kalite karar\u0131n\u0131 izlenebilir k\u0131lar. SkyPlanner APS, onaylanan takip i\u015flerini; malzemeleri, kapasiteyi ve ayn\u0131 kaynaklara ihtiya\u00e7 duyan di\u011fer teslimatlar\u0131 hesaba katan bir \u00fcretim plan\u0131na d\u00f6n\u00fc\u015ft\u00fcrmenize yard\u0131mc\u0131 olur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Uygunsuzluk raporu neleri i\u00e7ermeli?<\/h2>\n\n\n<p>Rapor, olay s\u0131ras\u0131nda orada bulunmayan birinin de \u015fart\u0131, g\u00f6zlenen uygunsuzlu\u011fu ve tam olarak hangi \u00fcr\u00fcnlerin ele al\u0131nmas\u0131 gerekti\u011fini anlamas\u0131n\u0131 sa\u011flamal\u0131d\u0131r. M\u00fc\u015fterinin zorunlu tuttu\u011fu formatlar da d\u00e2hil olmak \u00fczere, kurulu\u015funuzun onayl\u0131 formunu veya sistemini kullan\u0131n. \u00dcretime ili\u015fkin bir uygunsuzluk raporunda \u015fu bilgilere kolayca ula\u015f\u0131labilmelidir:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Tan\u0131mlay\u0131c\u0131 bilgiler:<\/strong> benzersiz rapor numaras\u0131, tarih, raporu d\u00fczenleyen ki\u015fi ve kay\u0131ttan sorumlu ki\u015fi.<\/li><li><strong>Etkilenen \u00fcr\u00fcnler:<\/strong> par\u00e7a veya \u00fcr\u00fcn numaras\u0131, revizyon, \u00fcretim emri, parti veya seri numaralar\u0131, miktar ve mevcut konum.<\/li><li><strong>\u015eart ve kan\u0131tlar:<\/strong> ge\u00e7erli teknik resim, \u015fartname veya talimat; fiil\u00ee g\u00f6zlem ya da \u00f6l\u00e7\u00fcm ve bunlar\u0131 destekleyen kay\u0131tlar veya foto\u011fraflar.<\/li><li><strong>Kontrol alt\u0131na alma ve kapsam:<\/strong> hangi \u00fcr\u00fcnlerin uygunsuzlu\u011funun do\u011fruland\u0131\u011f\u0131, hangilerinin h\u00e2l\u00e2 \u015f\u00fcpheli oldu\u011fu, hangilerinin ayr\u0131ld\u0131\u011f\u0131 ve ba\u015fka etkilenen \u00fcr\u00fcn olup olmad\u0131\u011f\u0131n\u0131 kimin kontrol etti\u011fi.<\/li><li><strong>\u0130\u015flem karar\u0131:<\/strong> \u00f6nerilen ve onaylanan i\u015flem, etkilenen miktarlar, karar\u0131 veren ki\u015fi ve varsa m\u00fc\u015fteri onay\u0131na veya \u015fartl\u0131 kabul iznine ait referans.<\/li><li><strong>Uygulama ve do\u011frulama:<\/strong> i\u015f talimatlar\u0131, sorumlu ki\u015filer, takip i\u015flerinin sonu\u00e7lar\u0131 ve kabul\u00fcn veya uygulanan di\u011fer nihai i\u015flemin kan\u0131tlar\u0131.<\/li><li><strong>Kapatma ve ba\u011flant\u0131l\u0131 faaliyetler:<\/strong> kayd\u0131 kimin, ne zaman kapatt\u0131\u011f\u0131; miktarlar\u0131n nihai durumu ve varsa ayr\u0131 y\u00fcr\u00fct\u00fclen k\u00f6k neden ara\u015ft\u0131rmas\u0131 veya d\u00fczeltici faaliyete ait referanslar.<\/li><\/ul>\n\n\n<p>Bunlar uygulamada ihtiya\u00e7 duyulan bilgilerdir; her yerde kullan\u0131lmas\u0131 zorunlu bir form de\u011fildir. Yaln\u0131zca kusuru tarif etmekle yetinmeyin; karar\u0131 ve s\u00fcrecinizin ya da m\u00fc\u015fterinizin gerektirdi\u011fi onaylar\u0131 da kaydedin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Bulguyu, \u015fart\u0131 ve g\u00f6zlemi kar\u015f\u0131la\u015ft\u0131rarak yaz\u0131n<\/h3>\n\n\n<p>\u201c\u00d6l\u00e7\u00fcler hatal\u0131\u201d ifadesi, kayd\u0131 devralan ki\u015fiyi as\u0131l sorunun ne oldu\u011funu ara\u015ft\u0131rmak zorunda b\u0131rak\u0131r. A\u00e7\u0131k bir ifade ise ilgili \u00f6zelli\u011fi, kar\u015f\u0131lamas\u0131 gereken \u015fart\u0131 ve sapman\u0131n kan\u0131t\u0131n\u0131 belirtir.<\/p>\n\n\n<p>\u00d6rne\u011fin: \u201cTeknik resmin C revizyonunda delik \u00e7ap\u0131 20,00\u201320,05 mm olarak belirtilmi\u015ftir. 30 numaral\u0131 operasyonda, kay\u0131tl\u0131 muayene y\u00f6ntemi kullan\u0131larak S041\u2013S046 par\u00e7alar\u0131nda 19,92\u201319,96 mm de\u011ferleri \u00f6l\u00e7\u00fclm\u00fc\u015ft\u00fcr. Muayene sonu\u00e7lar\u0131 ektedir.\u201d<\/p>\n\n\n<p>G\u00f6zlemi, do\u011frulanmam\u0131\u015f a\u00e7\u0131klamalardan ayr\u0131 tutun. \u201cKusura tak\u0131m a\u015f\u0131nmas\u0131 neden oldu\u201d ifadesi, yaln\u0131zca boyut kontrol\u00fcyle kan\u0131tlanm\u0131\u015f bir ger\u00e7ek de\u011fil, ara\u015ft\u0131r\u0131lmas\u0131 gereken bir sonu\u00e7tur. Kan\u0131tlar\u0131n do\u011fru kaydedilmesi, m\u00fchendislik ve kalite ekiplerinin par\u00e7alara g\u00fcvenle hangi i\u015flemlerin uygulanabilece\u011fine karar vermesi i\u00e7in daha sa\u011flam bir temel olu\u015fturur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00d6nce etkilenen ve \u015f\u00fcpheli \u00fcr\u00fcnleri kontrol alt\u0131na al\u0131n<\/h2>\n\n\n<p>Kontrol alt\u0131na alma \u00f6nlemleri, durum de\u011ferlendirilirken \u015f\u00fcpheli \u00fcr\u00fcnlerin kullan\u0131lmas\u0131n\u0131 veya teslim edilmesini \u00f6nler. Bu \u00fcr\u00fcnleri a\u00e7\u0131k\u00e7a tan\u0131mlay\u0131n, ayr\u0131 tutun ya da uygun kontrolleri uygulay\u0131n. \u00dcr\u00fcnleri ta\u015f\u0131yabilecek, \u00fcretimde kullanabilecek veya sevk edebilecek ki\u015filerin \u00fcr\u00fcnlerin durumunu g\u00f6rebilmesini sa\u011flay\u0131n.<\/p>\n\n\n<p>\u00d6l\u00e7t\u00fc\u011f\u00fcn\u00fcz alt\u0131 par\u00e7a, etkilenen par\u00e7alar\u0131n tamam\u0131 olmayabilir. \u00dcretim ge\u00e7mi\u015fini inceleyin: Ayn\u0131 tezg\u00e2h ayar\u0131yla, ayn\u0131 malzeme partisiyle, ayn\u0131 tak\u0131m ko\u015fullar\u0131nda veya ayn\u0131 proses aral\u0131\u011f\u0131nda hangi par\u00e7alar \u00fcretildi? Kapsam\u0131 neye dayanarak s\u0131n\u0131rland\u0131rd\u0131\u011f\u0131n\u0131z\u0131 kaydedin ve uygunsuzlu\u011fu do\u011frulanm\u0131\u015f par\u00e7alar\u0131 h\u00e2l\u00e2 muayene bekleyenlerden ay\u0131r\u0131n. Yeni kan\u0131tlar elde edildik\u00e7e kapsam\u0131 g\u00fcncelleyin.<\/p>\n\n\n<p>Yaln\u0131zca makinenin yan\u0131ndaki kasay\u0131 de\u011fil; yar\u0131 mamulleri, bitmi\u015f \u00fcr\u00fcn stokunu ve ilgili montajlar\u0131 da kapsama al\u0131n. Etkilenmi\u015f olabilecek \u00fcr\u00fcnler daha \u00f6nce teslim edildiyse ge\u00e7erli m\u00fc\u015fteri bildirim ve \u00fcst mercilere iletme s\u00fcrecini uygulay\u0131n. Yaln\u0131zca depodaki \u00fcr\u00fcnleri bloke etmek, m\u00fc\u015fterinin sahas\u0131ndaki \u00fcr\u00fcnleri kontrol alt\u0131na almaz.<\/p>\n\n\n<p>\u00dcretim planlamada da ayn\u0131 durum ayr\u0131m\u0131na ihtiya\u00e7 vard\u0131r. Bir palet fiziksel olarak mevcut olsa bile bir sonraki sipari\u015fte kullan\u0131lamayabilir. Planlamada kullan\u0131labilir g\u00f6r\u00fcnen miktar\u0131n, kullan\u0131m\u0131na ger\u00e7ekten izin verilen miktarla \u00f6rt\u00fc\u015fmesini sa\u011flay\u0131n. Karar bekleyen \u00fcr\u00fcnlerin uygun stok varsay\u0131lmas\u0131na izin vermeyin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Uygunsuzluk raporunda i\u015flem karar\u0131 ne anlama gelir?<\/h2>\n\n\n<p><strong>\u0130\u015flem karar\u0131, uygunsuz \u00fcr\u00fcne ne yap\u0131laca\u011f\u0131 konusunda yetkili ki\u015fi veya merci taraf\u0131ndan verilen karard\u0131r.<\/strong> Yaln\u0131zca nedeni ara\u015ft\u0131rmakla g\u00f6revlendirilen ki\u015fiyi ya da raporun kapat\u0131lmas\u0131 i\u00e7in belirlenen son tarihi ifade etmez.<\/p>\n\n\n<p>Yayg\u0131n se\u00e7enekler \u015funlard\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Yeniden i\u015fleme:<\/strong> \u00fcr\u00fcn\u00fc ilk belirtilen \u015fartlara yeniden uygun h\u00e2le getirmeyi ama\u00e7layan i\u015flemleri uygulamak ve ard\u0131ndan sonucu do\u011frulamak.<\/li><li><strong>Tamir:<\/strong> \u00fcr\u00fcn ilk belirtilen \u015fart\u0131 her bak\u0131mdan kar\u015f\u0131lamasa da ama\u00e7lanan kullan\u0131m\u0131 i\u00e7in kabul edilebilir h\u00e2le gelmesini sa\u011flayan onayl\u0131 bir i\u015flem uygulamak.<\/li><li><strong>Oldu\u011fu gibi kullan\u0131m:<\/strong> gerekli yetkili onay\u0131yla, belirlenen sapmay\u0131 ba\u015fka bir i\u015flem yapmadan kabul etmek.<\/li><li><strong>Hurdaya ay\u0131rma:<\/strong> \u00fcr\u00fcn\u00fc ama\u00e7lanan kullan\u0131m\u0131n d\u0131\u015f\u0131na \u00e7\u0131karmak ve yanl\u0131\u015fl\u0131kla kullan\u0131labilir stoka d\u00f6nmesini \u00f6nleyecek \u015fekilde kontrol alt\u0131nda tutmak.<\/li><li><strong>Tedarik\u00e7iye iade:<\/strong> etkilenen sat\u0131n al\u0131nm\u0131\u015f malzemeyi, tedarik\u00e7iyle mutab\u0131k kal\u0131nan s\u00fcre\u00e7 \u00fczerinden iade etmek. \u0130ade edilen miktara ne yap\u0131ld\u0131\u011f\u0131n\u0131 ve yerine yeni malzeme gerekip gerekmedi\u011fini kaydetmek.<\/li><\/ul>\n\n\n<p>Yeniden i\u015fleme ile tamir, birbirinin yerine kullan\u0131labilecek terimler de\u011fildir. \u00c7ap\u0131 k\u00fc\u00e7\u00fck kalm\u0131\u015f bir deli\u011fi belirtilen \u00f6l\u00e7\u00fcye getirmek i\u00e7in yeniden i\u015flemek ile teknik resimden sapma b\u0131rakan bir tamiri kabul etmek farkl\u0131d\u0131r. Bu ayr\u0131m hem kabul kriterlerini hem de i\u015flemi kimin onaylayabilece\u011fini etkiler.<\/p>\n\n\n<p><strong>\u015eartl\u0131 kabul izni<\/strong>, belirli uygunsuz \u00fcr\u00fcnlerin \u00fczerinde mutab\u0131k kal\u0131nan ko\u015fullarla kullan\u0131lmas\u0131na veya serbest b\u0131rak\u0131lmas\u0131na verilen izindir. Bu izin, uygunsuz \u00f6zelli\u011fi uygun h\u00e2le getirmez ve gelecek partiler i\u00e7in s\u0131n\u0131rs\u0131z izin sa\u011flamaz. \u0130znin kapsam\u0131n\u0131 ve ko\u015fullar\u0131n\u0131, ger\u00e7ekten kapsad\u0131\u011f\u0131 \u00fcr\u00fcnlerle ili\u015fkilendirerek kaydedin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u0130\u015flem karar\u0131n\u0131 kim onaylayabilir?<\/h3>\n\n\n<p>Kalite s\u00fcrecinizin, s\u00f6zle\u015fmenizin ve m\u00fc\u015fteri \u015fartlar\u0131n\u0131n tan\u0131mlad\u0131\u011f\u0131 karar yetkilerine uyun. Baz\u0131 kurulu\u015flar, ilgili kalite ve m\u00fchendislik yetkilileriyle di\u011fer karar vericileri bir araya getiren bir malzeme de\u011ferlendirme kurulu (MRB) kullan\u0131r. Kurulun ad\u0131, tek ba\u015f\u0131na m\u00fc\u015fterinin teknik resminden sapmay\u0131 kabul etme yetkisi vermez.<\/p>\n\n\n<p>M\u00fc\u015fteri \u015fartlar\u0131, kurum i\u00e7inde onaylayabilece\u011finiz i\u015flemler ile m\u00fc\u015fteri onay\u0131 gerektiren i\u015flemleri birbirinden ay\u0131rabilir. \u00d6rne\u011fin JPL&#8217;nin yay\u0131mlad\u0131\u011f\u0131 <a href=\"https:\/\/qaexternal.jpl.nasa.gov\/qcprint.php?clause=QC120\">Uygunsuzluklar\u0131n \u0130\u015flenmesi ve Malzeme De\u011ferlendirmesi maddesi<\/a>, devredilmi\u015f yeniden i\u015fleme yetkisini, JPL&#8217;nin mutabakat\u0131n\u0131 gerektiren tamir ve oldu\u011fu gibi kullan\u0131m kararlar\u0131ndan ay\u0131r\u0131r. Bu, ge\u00e7erli s\u00f6zle\u015fmenin neden \u00f6nemli oldu\u011funa dair somut bir \u00f6rnektir; her fabrikaya aynen aktar\u0131lacak bir kural de\u011fildir.<\/p>\n\n\n<p>Onay gerektiren i\u015fe ba\u015flamadan \u00f6nce onaylanan i\u015flemi, kapsanan \u00fcr\u00fcnleri ve miktarlar\u0131, varsa ko\u015fullar\u0131 ve onay\u0131 kimin verdi\u011fini kaydedin. Uygunsuzluk raporunda \u00f6nerilen bir tamir, onayl\u0131 bir tamir talimat\u0131 de\u011fildir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Karar\u0131 uygulay\u0131n, do\u011frulay\u0131n ve kayd\u0131 kapat\u0131n<\/h2>\n\n\n<p>\u0130\u015flem karar\u0131 onayland\u0131ktan sonra i\u015fin sorumlusunu ve kabul i\u00e7in esas al\u0131nacak kriterleri a\u00e7\u0131k\u00e7a belirleyin. Yeniden i\u015fleme i\u00e7in kontroll\u00fc bir talimat, ek bir tala\u015fl\u0131 imalat operasyonu ve tekrar muayene gerekebilir. Yerine yeni \u00fcr\u00fcn \u00fcretmek i\u00e7in malzeme ve kapasite gerekir. Hurdaya ay\u0131rmada ise miktar d\u00fczeltmesinin kaydedilmesi ve uygun fiziksel kontrollerin uygulanmas\u0131 gerekir.<\/p>\n\n\n<p>Uygunsuzluk raporunu kapatmadan \u00f6nce kayd\u0131n s\u00fcreci eksiksiz yans\u0131tt\u0131\u011f\u0131n\u0131 kontrol edin:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Ba\u015flang\u0131\u00e7taki kapsam sonradan geni\u015fletildiyse bu geni\u015fleme de dahil olmak \u00fczere, etkilenen t\u00fcm \u00fcr\u00fcnlerin durumu belirlenmi\u015f ve kayda al\u0131nm\u0131\u015ft\u0131r.<\/li><li>Onaylanan i\u015flem, do\u011fru \u00fcr\u00fcnlere ve do\u011fru miktarlarda uygulanm\u0131\u015ft\u0131r.<\/li><li>Do\u011frulama sonu\u00e7lar\u0131 nihai kabul karar\u0131n\u0131 desteklemektedir ya da hurdaya ay\u0131rma, iade veya di\u011fer i\u015flemlerin yap\u0131ld\u0131\u011f\u0131na ili\u015fkin kan\u0131tlar mevcuttur.<\/li><li>\u00dcr\u00fcn tan\u0131mlama bilgileri, stok durumu ve ilgili \u00fcretim kay\u0131tlar\u0131 nihai sonucu yans\u0131tmaktad\u0131r.<\/li><li>Gerekli onaylar, m\u00fc\u015fteriyle kurulan ileti\u015fim ve ba\u011flant\u0131l\u0131 takip faaliyetleri izlenebilir durumdad\u0131r.<\/li><\/ul>\n\n\n<p>Yeniden i\u015fleme operasyonunun tamamlanmas\u0131, sonucunun kabul edildi\u011fi anlam\u0131na gelmez. \u00dcretimin tamamland\u0131\u011f\u0131n\u0131 g\u00f6steren zaman kayd\u0131n\u0131 kalite kabul\u00fcn\u00fcn kan\u0131t\u0131 saymak yerine, do\u011frulama sonu\u00e7lar\u0131n\u0131 ve serbest b\u0131rakma karar\u0131n\u0131 a\u00e7\u0131k\u00e7a g\u00f6r\u00fcn\u00fcr tutun.<\/p>\n\n\n<p>Benzer \u015fekilde, etkilenen partiyle ilgili i\u015flemlerin kapat\u0131lmas\u0131, altta yatan nedenin ortadan kald\u0131r\u0131ld\u0131\u011f\u0131n\u0131 kan\u0131tlamaz. S\u00fcreciniz, d\u00fczeltici faaliyet tamamlanana kadar uygunsuzluk raporunu a\u00e7\u0131k tutabilir veya ba\u011flant\u0131l\u0131 inceleme s\u00fcrerken \u00fcr\u00fcnle ilgili i\u015flem s\u00fcrecini kapatabilir. Her iki durumda da kalan i\u015fin sorumlusunu, yap\u0131lacak faaliyeti ve do\u011frulamay\u0131 a\u00e7\u0131k\u00e7a belirtin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00d6rnek: ayn\u0131 parti i\u00e7in farkl\u0131 i\u015flem kararlar\u0131 i\u00e7eren bir tala\u015fl\u0131 imalat uygunsuzluk raporu<\/h2>\n\n\n<p>Tala\u015fl\u0131 imalatla \u00fcretilecek 60 g\u00f6vde i\u00e7in bir \u00fcretim emri oldu\u011funu d\u00fc\u015f\u00fcn\u00fcn. Proses i\u00e7i \u00e7ap kontrol\u00fcnde alt\u0131 deli\u011fin uygun olmad\u0131\u011f\u0131 g\u00f6r\u00fcl\u00fcr. Ekip, uygunsuzlu\u011fun kapsam\u0131n\u0131 belirlerken 60 g\u00f6vdenin tamam\u0131n\u0131 kontrol alt\u0131nda tutar. \u0130lave muayene sonucunda alt\u0131 g\u00f6vdenin yeniden i\u015flenmesi gerekti\u011fi, di\u011fer 54 g\u00f6vdenin ise ge\u00e7erli kabul kriterlerini kar\u015f\u0131lad\u0131\u011f\u0131 do\u011frulan\u0131r.<\/p>\n\n\n<p>K\u0131sa ve \u00f6z bir kay\u0131t \u015fu bilgileri i\u00e7erebilir:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Bulgu:<\/strong> Seri numaralar\u0131 belirlenen alt\u0131 g\u00f6vdenin delik \u00e7aplar\u0131, teknik resmin C revizyonundaki \u00f6l\u00e7\u00fcn\u00fcn alt\u0131ndad\u0131r; \u00f6l\u00e7\u00fcm sonu\u00e7lar\u0131 ektedir.<\/li><li><strong>Kontrol alt\u0131na alma:<\/strong> 60 g\u00f6vdenin tamam\u0131 tan\u0131mlanm\u0131\u015f ve muayeneye kadar beklemeye al\u0131nm\u0131\u015ft\u0131r; bekletildikleri yerler ve sorumlu ki\u015fi kaydedilmi\u015ftir.<\/li><li><strong>Kapsam\u0131n belirlenmesi:<\/strong> Muayene, 60 seri numaras\u0131n\u0131n tamam\u0131n\u0131n durumunu ortaya koymu\u015ftur. Uygun bulunan 54 g\u00f6vde yetkili ki\u015fi taraf\u0131ndan serbest b\u0131rak\u0131lm\u0131\u015ft\u0131r; di\u011fer alt\u0131 g\u00f6vde kontrol alt\u0131nda tutulmaya devam etmektedir.<\/li><li><strong>Onaylanan i\u015flem karar\u0131:<\/strong> Alt\u0131 delik, onayl\u0131 talimata g\u00f6re yeniden i\u015flenecek ve ard\u0131ndan belirtilen do\u011frulama yap\u0131lacakt\u0131r. Karar ve onay referans\u0131 kaydedilmi\u015ftir.<\/li><li><strong>\u00dcretime etkisi:<\/strong> Alt\u0131 g\u00f6vde i\u00e7in ilave bir tala\u015fl\u0131 imalat operasyonuna ve muayene kapasitesine ihtiya\u00e7 vard\u0131r. Planlama, bu g\u00f6vdeleri hen\u00fcz kullan\u0131ma haz\u0131r bitmi\u015f \u00fcr\u00fcn olarak hesaba katamaz.<\/li><li><strong>Kapatma kan\u0131tlar\u0131:<\/strong> Yeniden i\u015fleme ve do\u011frulama sonu\u00e7lar\u0131n\u0131 ekleyin, etkilenen her g\u00f6vdenin nihai durumunu kaydedin ve tekrar\u0131 \u00f6nlemek i\u00e7in gereken faaliyetleri kay\u0131tla ili\u015fkilendirin.<\/li><\/ul>\n\n\n<p>Rapor, alt\u0131 g\u00f6vdenin tamam\u0131n\u0131n yeniden muayeneden ge\u00e7ece\u011fini \u00f6ng\u00f6rmez. Hangi i\u015flemin onayland\u0131\u011f\u0131n\u0131 ve bir sonraki a\u015famada hangi kan\u0131tlar\u0131n gerekti\u011fini belirler. Bir par\u00e7a tekrar uygunsuz bulunursa veya farkl\u0131 bir i\u015flem gerekirse, nihai miktar\u0131 sessizce de\u011fi\u015ftirmek yerine karar\u0131 ilgili yetkilinin onay\u0131yla g\u00fcncelleyin.<\/p>\n\n\n<p>\u0130yi y\u00f6netilen bir uygunsuzluk raporu bile bu noktada \u00fcretimin zorlanmas\u0131n\u0131 engellemeyebilir. Yeniden i\u015fleme listesi ne yap\u0131lmas\u0131 gerekti\u011fini s\u00f6yler; ancak ilave tala\u015fl\u0131 imalat ve muayenenin, teslim zaman\u0131 gelen di\u011fer i\u015flerin aras\u0131na nas\u0131l yerle\u015ftirilece\u011fini g\u00f6stermez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Uygunsuzluk raporu, 8D raporu veya d\u00fczeltici faaliyetle ayn\u0131 \u015fey midir?<\/h2>\n\n\n<p>Hay\u0131r. Uygunsuzluk raporu, belirli bir uygunsuzlu\u011fu ve bunun giderilme s\u00fcrecini kayda al\u0131r ve kontrol alt\u0131nda tutar. <strong><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/8d-problem-cozme\/\">8D, yap\u0131land\u0131r\u0131lm\u0131\u015f bir problem \u00e7\u00f6zme yakla\u015f\u0131m\u0131d\u0131r<\/a><\/strong>; nedenleri ara\u015ft\u0131rmak, kal\u0131c\u0131 d\u00fczeltici faaliyet uygulamak ve etkinli\u011fini do\u011frulamak i\u00e7in kullan\u0131l\u0131r. Bir uygunsuzluk raporu, 8D s\u00fcrecini ba\u015flatabilir veya bu s\u00fcrecin kayd\u0131yla ili\u015fkilendirilebilir; ancak bu iki kay\u0131t farkl\u0131 ama\u00e7lara hizmet eder.<\/p>\n\n\n<p><strong>D\u00fczeltme<\/strong> ile <strong>d\u00fczeltici faaliyet<\/strong> aras\u0131ndaki ayr\u0131m da ayn\u0131 \u00f6l\u00e7\u00fcde \u00f6nemlidir. Etkilenen g\u00f6vdelerin d\u00fczeltilmesi, bu olayda tespit edilen uygunsuzlu\u011fu giderir. Do\u011frulanm\u0131\u015f bir nedeni ortadan kald\u0131rmak ve tekrar\u0131 \u00f6nlemek amac\u0131yla prosesi de\u011fi\u015ftirmek ise d\u00fczeltici faaliyettir. Ne hurdaya ay\u0131rma kayd\u0131 ne de ba\u015far\u0131l\u0131 bir yeniden i\u015fleme, tek ba\u015f\u0131na tekrar\u0131n \u00f6nlendi\u011fini g\u00f6sterir.<\/p>\n\n\n<p>Gerekli incelemeyi ve konunun hangi yetki kademesine ta\u015f\u0131naca\u011f\u0131n\u0131 riske, tekrarlanma durumuna ve ge\u00e7erli \u015fartlara g\u00f6re belirleyin. Her uygunsuzluk raporunun ayn\u0131 kapsaml\u0131 8D \u00e7al\u0131\u015fmas\u0131n\u0131 gerektirdi\u011fini veya k\u00fc\u00e7\u00fck g\u00f6r\u00fcnen bir sapmada zorunlu m\u00fc\u015fteri onay\u0131n\u0131n atlanabilece\u011fini varsaymay\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Uygunsuzluk raporu kapsam\u0131nda onaylanan i\u015fleri SkyPlanner ile \u00fcretim \u00e7izelgesine ekleyin<\/h2>\n\n\n<p>Kalite karar\u0131, \u00fcr\u00fcne hangi i\u015flemlerin uygulanabilece\u011fini belirler. Bundan sonra planlamada, onaylanan i\u015fin fabrikan\u0131n di\u011fer t\u00fcm taahh\u00fctleriyle birlikte nas\u0131l tamamlanabilece\u011fi ele al\u0131n\u0131r.<\/p>\n\n\n<p><strong>SkyPlanner APS, bu i\u015fleri m\u00fc\u015fteri sipari\u015flerinizle <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">ayn\u0131 \u00fcretim \u00e7izelgesine<\/a> dahil eder.<\/strong> Onaylanan muayene, yeniden i\u015fleme veya yerine yenisini \u00fcretme rotas\u0131n\u0131; i\u015flem ad\u0131mlar\u0131, s\u00fcreler, uygun i\u015f merkezleri ve ba\u011f\u0131ml\u0131l\u0131klar\u0131yla birlikte modelleyin. Malzemeyi dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde ve kullan\u0131labilir miktarlar g\u00fcncel tutuldu\u011funda SkyPlanner, i\u015fi yapmak i\u00e7in gereken malzemeyi de hesaba katar.<\/p>\n\n\n<p>SkyPlanner&#8217;\u0131n \u00e7izelgeleme yapay zek\u00e2s\u0131 Arcturus, i\u015fleri tan\u0131mlanm\u0131\u015f vardiyalar\u0131, i\u015f merkezi kapasitesini, malzemeleri ve \u00f6ncelikleri dikkate alarak \u00e7izelgeye yerle\u015ftirir. Ayr\u0131 bir uygunsuzluk faaliyet listesini her makinenin i\u015f kuyru\u011fuyla elle e\u015fle\u015ftirmek yerine, s\u0131ralamay\u0131 Gantt \u00e7izelgesinde incelersiniz. B\u00f6ylece planlamaya harcad\u0131\u011f\u0131n\u0131z emekten tasarruf eder, teslimata etkileri daha net g\u00f6r\u00fcrs\u00fcn\u00fcz.<\/p>\n\n\n<p>G\u00f6vde \u00f6rne\u011finde, ilave tala\u015fl\u0131 imalat di\u011fer tala\u015fl\u0131 imalat i\u015fleriyle ayn\u0131 kapasiteyi kullanmak zorundad\u0131r; do\u011frulama da mevcut muayene i\u015f y\u00fck\u00fcne eklenir. Bu operasyonlar\u0131 ortak planda g\u00f6rmek, \u00f6ncelik de\u011fi\u015fikli\u011finin veya kullan\u0131labilir ba\u015fka bir kayna\u011f\u0131n fayda sa\u011flay\u0131p sa\u011flamayaca\u011f\u0131n\u0131 ve di\u011fer hangi taahh\u00fctlerin etkilenece\u011fini de\u011ferlendirmenizi sa\u011flar. Yeniden i\u015flemenin onaylan\u0131r onaylanmaz yap\u0131labilece\u011fini varsaymak yerine, kalan i\u015fleri g\u00f6rerek yeni bir teslim tarihini g\u00f6r\u00fc\u015febilirsiniz.<\/p>\n\n\n<p>Yetkili ki\u015filerce verilen kalite karar\u0131n\u0131 ve serbest b\u0131rakma kan\u0131tlar\u0131n\u0131, \u00fczerinde mutab\u0131k kald\u0131\u011f\u0131n\u0131z kalite s\u00fcrecinde tutun. Onaylanan i\u015fleri ve do\u011fru kullan\u0131labilir miktarlar\u0131 \u00e7izelgelemeye aktar\u0131n. Kaydedilen hatal\u0131 \u00fcr\u00fcn miktar\u0131, \u00fcr\u00fcne uygulanacak i\u015flemin onayland\u0131\u011f\u0131 anlam\u0131na gelmez; yerine yenisini \u00fcretmek i\u00e7in otomatik olarak \u00fcretim ba\u015flatma talimat\u0131 da de\u011fildir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mevcut sistemlerinizi koruyun, veri aktar\u0131m\u0131n\u0131 i\u015fe yarar h\u00e2le getirin<\/h3>\n\n\n<p>SkyPlanner, a\u00e7\u0131k REST API \u00fczerinden her ERP veya MES ile entegre olur. Sipari\u015fleri ve kalite kay\u0131tlar\u0131n\u0131 y\u00f6netti\u011finiz sistemleri korurken \u00fcretime, g\u00fcncel tutulan sipari\u015f, i\u015f ve malzeme verilerine dayal\u0131, sonlu kapasiteye g\u00f6re haz\u0131rlanm\u0131\u015f bir \u00e7izelge sunabilirsiniz.<\/p>\n\n\n<p>Kullan\u0131labilir miktar\u0131n hangi sistemde g\u00fcncel tutulaca\u011f\u0131n\u0131 ve kalite durumundaki de\u011fi\u015fikliklerin planlamaya nas\u0131l aktar\u0131laca\u011f\u0131n\u0131 kararla\u015ft\u0131r\u0131n. B\u00f6ylece karantinadaki bir parti, s\u0131rf stokta h\u00e2l\u00e2 mevcut oldu\u011fu i\u00e7in kullan\u0131labilir g\u00f6r\u00fcnmez. Buradaki de\u011fer, planlamac\u0131n\u0131n ayr\u0131ca g\u00fcncelleyece\u011fi bir liste olu\u015fturmak de\u011fil, planlamada tek ve tutarl\u0131 bir g\u00f6r\u00fcn\u00fcm sa\u011flamakt\u0131r.<\/p>\n\n\n<p>MCP \u00fczerinden SkyPlanner&#8217;a ba\u011flanan <strong>Claude, ChatGPT veya Microsoft Copilot<\/strong> gibi kendi yapay zek\u00e2 asistan\u0131n\u0131zla da \u00e7al\u0131\u015fabilirsiniz. MCP, asistan\u0131n SkyPlanner&#8217;\u0131n \u00fcr\u00fcn bilgisini ve izin verilen i\u015flevlerini kullanmas\u0131n\u0131 sa\u011flayan ba\u011flant\u0131d\u0131r. Onaylanan takip i\u015flerini a\u00e7\u0131klay\u0131n ve ilgili i\u015f y\u00fck\u00fcn\u00fc incelemek i\u00e7in yard\u0131m isteyin. Yetkilendirilmi\u015f yazma eri\u015fimi varsa asistan, \u00fcretim verilerini g\u00fcncellemenize ve \u00e7izelgeleme i\u015flevlerini \u00e7al\u0131\u015ft\u0131rman\u0131za yard\u0131mc\u0131 olabilir. Arcturus \u00fcretim s\u0131ralamas\u0131n\u0131 hesaplarken \u00f6ncelikleri ve kararlar\u0131 siz y\u00f6nlendirirsiniz.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Malzeme ve teslimat durumunu daha net g\u00f6rmek ne sa\u011flar?<\/h3>\n\n\n<p>Fason tala\u015fl\u0131 imalat firmas\u0131 Eskomatic, \u00f6nceden i\u015f kuyruklar\u0131n\u0131 b\u00fcy\u00fck \u00f6l\u00e7\u00fcde elle olu\u015fturuyor ve malzeme eksikliklerini yeterince erken g\u00f6rmekte zorlan\u0131yordu. Firma, <a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/eskomatic\/\">SkyPlanner de\u011ferlendirmesinde<\/a> daha anla\u015f\u0131l\u0131r bir g\u00f6rsel i\u015f kuyru\u011fundan, teslim tarihlerinin daha isabetli belirlenmesinden ve malzeme eksikli\u011fi kaynakl\u0131 \u00fcretim duru\u015flar\u0131n\u0131n azalmas\u0131ndan s\u00f6z ediyor.<\/p>\n\n\n<p>Bu deneyim, burada s\u00f6z konusu olan planlama faydas\u0131n\u0131 g\u00f6steriyor: malzeme kullan\u0131labilirli\u011fini o malzemeye ihtiya\u00e7 duyan i\u015flerle ili\u015fkilendirdi\u011finizde, s\u0131rada ne yap\u0131labilece\u011fini anlamak kolayla\u015f\u0131r. Bir uygunsuzluk raporu kullan\u0131labilir miktar\u0131 de\u011fi\u015ftirdi\u011finde veya ilave bir operasyon gerektirdi\u011finde de ayn\u0131 ortak g\u00f6r\u00fcn\u00fcm, plandan kopuk bir takip listesinden \u00e7ok daha faydal\u0131d\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Planlama g\u00f6r\u00fc\u015fmesine ger\u00e7ek bir uygunsuzluk \u00f6rne\u011fi getirin<\/h2>\n\n\n<p>\u0130yi haz\u0131rlanm\u0131\u015f bir uygunsuzluk raporu; neyin uygunsuz oldu\u011funu, hangi \u00fcr\u00fcnlerin etkilendi\u011fini, uygulanacak i\u015fleme kimin karar verebilece\u011fini ve sonucun nas\u0131l do\u011frulanaca\u011f\u0131n\u0131 g\u00f6sterir. \u0130\u015fe yarayan bir \u00fcretim plan\u0131 ise onaylanan i\u015flerin fabrikan\u0131n mevcut taahh\u00fctleri aras\u0131na nas\u0131l yerle\u015ftirilece\u011fini ortaya koyar. Sorunu belgelemekten gerekli i\u015flemleri tamamlamaya ge\u00e7mek i\u00e7in ikisine de ihtiyac\u0131n\u0131z vard\u0131r.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>; yak\u0131n zamanda \u00fcretimde ya\u015fanan bir uygunsuzlu\u011fu, onaylanan i\u015flem rotas\u0131n\u0131, de\u011fi\u015fen kullan\u0131labilir miktar\u0131 ve ayn\u0131 kayna\u011fa ihtiya\u00e7 duyan di\u011fer i\u015fleri g\u00f6r\u00fc\u015fmeye getirin. Takip i\u015flerinin ortak bir \u00e7izelgeye nas\u0131l yerle\u015ftirilebilece\u011fini ve bunun teslimat plan\u0131n\u0131z a\u00e7\u0131s\u0131ndan ne anlama geldi\u011fini g\u00f6r\u00fcn.<\/p>\n\n\n<p>\u00d6nce kendiniz incelemeyi tercih ederseniz <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a> veya SkyPlanner Assistant i\u00e7indeki yapay zek\u00e2 destekli Ba\u015flang\u0131\u00e7 \u00f6zelli\u011fini kullan\u0131n. Uygunsuzluk raporunun ard\u0131ndaki \u00e7izelgeleme sorunuyla ba\u015flay\u0131n: onaylanan i\u015flere g\u00fcnl\u00fck \u00fcretim i\u00e7inde ger\u00e7ek\u00e7i bir yer bulmak.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na Ana Sayfa &raquo; Kaynaklar &raquo; Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na Uygunsuzluk raporu (NCR), bir \u015fart\u0131n kar\u015f\u0131lanmad\u0131\u011f\u0131n\u0131 kayda al\u0131r; etkilenen \u00fcr\u00fcn\u00fcn veya i\u015fin nas\u0131l kontrol alt\u0131na al\u0131nd\u0131\u011f\u0131n\u0131, de\u011ferlendirildi\u011fini ve sonuca ba\u011fland\u0131\u011f\u0131n\u0131 izler. \u00dcretimde bu rapor, soruna ili\u015fkin kan\u0131tlar\u0131 bundan sonra ne yap\u0131laca\u011f\u0131na dair yetkili kararla ili\u015fkilendirir ve karar\u0131n uyguland\u0131\u011f\u0131n\u0131 g\u00f6steren kan\u0131tlar\u0131 &#8230; <a title=\"Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/\" aria-label=\"Read more about Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":113374,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-113358","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ve-cizelgeleme","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na<\/title>\n<meta name=\"description\" content=\"\u00dcretimde net i\u015flem karar\u0131 ve do\u011frulanm\u0131\u015f kapan\u0131\u015f sa\u011flayan bir uygunsuzluk raporu haz\u0131rlay\u0131n. Onayl\u0131 takip i\u015flerini \u00fcretim \u00e7izelgesine almay\u0131 \u00f6\u011frenin.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na\" \/>\n<meta property=\"og:description\" content=\"\u00dcretimde net i\u015flem karar\u0131 ve do\u011frulanm\u0131\u015f kapan\u0131\u015f sa\u011flayan bir uygunsuzluk raporu haz\u0131rlay\u0131n. Onayl\u0131 takip i\u015flerini \u00fcretim \u00e7izelgesine almay\u0131 \u00f6\u011frenin.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-30T09:55:28+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-30T09:57:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uygunsuzluk-raporu\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uygunsuzluk-raporu\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na\",\"datePublished\":\"2026-10-30T09:55:28+00:00\",\"dateModified\":\"2026-10-30T09:57:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uygunsuzluk-raporu\\\/\"},\"wordCount\":3145,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uygunsuzluk-raporu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/nonconformance-report-manufacturing-hero.png\",\"articleSection\":[\"APS ve \u00e7izelgeleme\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uygunsuzluk-raporu\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uygunsuzluk-raporu\\\/\",\"name\":\"Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uygunsuzluk-raporu\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uygunsuzluk-raporu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/nonconformance-report-manufacturing-hero.png\",\"datePublished\":\"2026-10-30T09:55:28+00:00\",\"dateModified\":\"2026-10-30T09:57:02+00:00\",\"description\":\"\u00dcretimde net i\u015flem karar\u0131 ve do\u011frulanm\u0131\u015f kapan\u0131\u015f sa\u011flayan bir uygunsuzluk raporu haz\u0131rlay\u0131n. Onayl\u0131 takip i\u015flerini \u00fcretim \u00e7izelgesine almay\u0131 \u00f6\u011frenin.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uygunsuzluk-raporu\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uygunsuzluk-raporu\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uygunsuzluk-raporu\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/nonconformance-report-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/nonconformance-report-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Tagged housing in an isolated tray, an approved-work document and a machining station with other housings waiting.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uygunsuzluk-raporu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na","description":"\u00dcretimde net i\u015flem karar\u0131 ve do\u011frulanm\u0131\u015f kapan\u0131\u015f sa\u011flayan bir uygunsuzluk raporu haz\u0131rlay\u0131n. Onayl\u0131 takip i\u015flerini \u00fcretim \u00e7izelgesine almay\u0131 \u00f6\u011frenin.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/","og_locale":"tr_TR","og_type":"article","og_title":"Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na","og_description":"\u00dcretimde net i\u015flem karar\u0131 ve do\u011frulanm\u0131\u015f kapan\u0131\u015f sa\u011flayan bir uygunsuzluk raporu haz\u0131rlay\u0131n. Onayl\u0131 takip i\u015flerini \u00fcretim \u00e7izelgesine almay\u0131 \u00f6\u011frenin.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-30T09:55:28+00:00","article_modified_time":"2026-10-30T09:57:02+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"16 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na","datePublished":"2026-10-30T09:55:28+00:00","dateModified":"2026-10-30T09:57:02+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/"},"wordCount":3145,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png","articleSection":["APS ve \u00e7izelgeleme","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/","name":"Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png","datePublished":"2026-10-30T09:55:28+00:00","dateModified":"2026-10-30T09:57:02+00:00","description":"\u00dcretimde net i\u015flem karar\u0131 ve do\u011frulanm\u0131\u015f kapan\u0131\u015f sa\u011flayan bir uygunsuzluk raporu haz\u0131rlay\u0131n. Onayl\u0131 takip i\u015flerini \u00fcretim \u00e7izelgesine almay\u0131 \u00f6\u011frenin.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png","width":1672,"height":941,"caption":"Tagged housing in an isolated tray, an approved-work document and a machining station with other housings waiting."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uygunsuzluk-raporu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/nonconformance-report-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na Ana Sayfa &raquo; Kaynaklar &raquo; Uygunsuzluk Raporu: Tespitten \u0130\u015flem Karar\u0131na Uygunsuzluk raporu (NCR), bir \u015fart\u0131n kar\u015f\u0131lanmad\u0131\u011f\u0131n\u0131 kayda al\u0131r; etkilenen \u00fcr\u00fcn\u00fcn veya i\u015fin nas\u0131l kontrol alt\u0131na al\u0131nd\u0131\u011f\u0131n\u0131, de\u011ferlendirildi\u011fini ve sonuca ba\u011fland\u0131\u011f\u0131n\u0131 izler. \u00dcretimde bu rapor, soruna ili\u015fkin kan\u0131tlar\u0131 bundan sonra ne yap\u0131laca\u011f\u0131na dair yetkili kararla ili\u015fkilendirir ve karar\u0131n uyguland\u0131\u011f\u0131n\u0131 g\u00f6steren kan\u0131tlar\u0131&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/113358","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=113358"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/113358\/revisions"}],"predecessor-version":[{"id":113421,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/113358\/revisions\/113421"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/113374"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=113358"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=113358"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=113358"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}