{"id":113266,"date":"2026-10-30T07:00:01","date_gmt":"2026-10-30T07:00:01","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=113266"},"modified":"2026-10-30T07:01:37","modified_gmt":"2026-10-30T07:01:37","slug":"uretim-parcasi-onay-prosesi","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/","title":{"rendered":"\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; \u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>\u00dcretim par\u00e7as\u0131 onay prosesi (PPAP)<\/strong>, tedarik\u00e7inin m\u00fc\u015fterinin \u00fcr\u00fcn gereksinimlerini anlad\u0131\u011f\u0131n\u0131 ve seri \u00fcretimde kullanmay\u0131 planlad\u0131\u011f\u0131 prosesin bu gereksinimleri, mutab\u0131k kal\u0131nan \u00fcretim h\u0131z\u0131nda s\u00fcrekli olarak kar\u015f\u0131layabildi\u011fini g\u00f6stermesini sa\u011flayan yap\u0131land\u0131r\u0131lm\u0131\u015f bir y\u00f6ntemdir. Tedarik\u00e7i gerekli kan\u0131tlar\u0131 ve numuneleri haz\u0131rlar; m\u00fc\u015fteri sunulan dosyay\u0131 inceler ve onay karar\u0131n\u0131 verir.<\/p>\n\n\n<p>\u0130yi bir prototip, par\u00e7ay\u0131 \u00fcretip \u00fcretemedi\u011finizi g\u00f6sterir. PPAP ise daha zor bir soruya yan\u0131t arar: Seri \u00fcretim i\u00e7in \u00f6ng\u00f6r\u00fclen proses, ger\u00e7ek \u00fcretim ko\u015fullar\u0131nda bu par\u00e7ay\u0131 tutarl\u0131 bi\u00e7imde \u00fcretebilir mi?<\/p>\n\n\n<p>Bu nedenle PPAP, yaln\u0131zca belgeleri belirli bir tarihe yeti\u015ftirmekten ibaret de\u011fildir. Kan\u0131tlar\u0131n elde edilmesi i\u00e7in \u00fcretim, \u00f6l\u00e7\u00fcm ve test \u00e7al\u0131\u015fmalar\u0131n\u0131n mevcut sipari\u015flerle birlikte planlanmas\u0131 gerekir. SkyPlanner APS, bu \u00e7al\u0131\u015fmalar\u0131 fabrikan\u0131n ger\u00e7ek kapasitesine g\u00f6re planlaman\u0131za yard\u0131mc\u0131 olur. B\u00f6ylece onaya haz\u0131rlan\u0131rken s\u00f6z verdi\u011finiz teslimatlar\u0131 da g\u00f6zden ka\u00e7\u0131rmazs\u0131n\u0131z.<\/p>\n\n\n<h2 class=\"wp-block-heading\">PPAP ne zaman gerekir?<\/h2>\n\n\n<p>PPAP, otomotiv tedarik zincirleriyle yak\u0131ndan ili\u015fkilidir; ancak di\u011fer imalat sekt\u00f6rlerindeki m\u00fc\u015fteriler de \u00fcretim par\u00e7as\u0131 onay\u0131na y\u00f6nelik \u015fartlar koyabilir. S\u00f6z konusu par\u00e7a ve proses i\u00e7in hangi gerekliliklerin ge\u00e7erli oldu\u011funu m\u00fc\u015fteriyle yapt\u0131\u011f\u0131n\u0131z ilgili anla\u015fma belirler.<\/p>\n\n\n<p>Yeni bir \u00fcretim par\u00e7as\u0131 devreye al\u0131n\u0131rken PPAP konusunu m\u00fc\u015fteriyle g\u00f6r\u00fc\u015fmek gerekir. Tasar\u0131m, malzeme, tak\u0131m, \u00fcretim yeri, tedarik\u00e7i veya \u00fcretim prosesindeki de\u011fi\u015fiklikler de m\u00fc\u015fteriye bildirim yap\u0131lmas\u0131n\u0131, onay al\u0131nmas\u0131n\u0131 ya da yeni bir dosya sunulmas\u0131n\u0131 gerektirebilir. Bir sonraki sevkiyat\u0131 beklemek yerine, de\u011fi\u015fikli\u011fi uygulamadan \u00f6nce ge\u00e7erli de\u011fi\u015fiklik kurallar\u0131n\u0131 kontrol edin.<\/p>\n\n\n<p>\u00d6nce par\u00e7a numaras\u0131n\u0131 ve revizyonunu, sunum nedenini, gerekli kan\u0131tlar\u0131, sunum seviyesini ve m\u00fc\u015fterinin yetkili irtibat ki\u015fisini netle\u015ftirin. \u00dcretimin hangi ko\u015fullarda yap\u0131laca\u011f\u0131, numune alma ve et\u00fct gereklilikleri, dosyan\u0131n sunulaca\u011f\u0131 tarih ve sevkiyat izni kurallar\u0131 \u00fczerinde mutab\u0131k kal\u0131n. Haz\u0131rlaman\u0131z gereken \u00e7al\u0131\u015fmalar\u0131 bu kararlar belirler.<\/p>\n\n\n<h3 class=\"wp-block-heading\">PPAP, APQP ve ilk \u00fcr\u00fcn muayenesi birbirinin yerine kullan\u0131lamaz<\/h3>\n\n\n<p><strong>\u0130leri \u00dcr\u00fcn Kalite Planlamas\u0131 (APQP)<\/strong>, bir \u00fcr\u00fcn\u00fcn ve \u00fcretim prosesinin geli\u015ftirilip devreye al\u0131nmas\u0131n\u0131 kapsayan daha geni\u015f bir planlama yakla\u015f\u0131m\u0131d\u0131r. PPAP, bu kapsaml\u0131 \u00e7al\u0131\u015fma i\u00e7inde \u00fcretim par\u00e7as\u0131n\u0131n onay\u0131 i\u00e7in gereken kan\u0131tlar\u0131 sa\u011flar.<\/p>\n\n\n<p><strong><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-urun-muayenesi\/\">\u0130lk \u00fcr\u00fcn muayenesi (FAI)<\/a><\/strong>, \u00fcretimden \u00e7\u0131kan ilk \u00fcr\u00fcn\u00fcn ge\u00e7erli gerekliliklere uygunlu\u011funun do\u011frulanmas\u0131na ve belgelenmesine odaklan\u0131r. Sonu\u00e7lar\u0131 onay dosyas\u0131na katk\u0131 sa\u011flayabilir; ancak tek ba\u015f\u0131na bir muayene raporu, PPAP i\u00e7in gereken proses, \u00f6l\u00e7\u00fcm, risk ve m\u00fc\u015fteriye \u00f6zel kan\u0131tlar\u0131n tamam\u0131n\u0131 sa\u011flamaz.<\/p>\n\n\n<p>Benzer \u015fekilde, <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/proses-yeterliligi\/\">proses yeterlili\u011fi \u00e7al\u0131\u015fmas\u0131<\/a> da kan\u0131tlardan biridir; onay karar\u0131n\u0131n kendisi de\u011fildir. Bu \u00e7al\u0131\u015fmalar\u0131n birbiriyle ba\u011flant\u0131s\u0131n\u0131 koruyun, ancak adlar\u0131n\u0131 e\u015f anlaml\u0131 olarak kullanmay\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">PPAP\u2019\u0131n 18 \u00f6\u011fesi nelerdir?<\/h2>\n\n\n<p>Yayg\u0131n olarak kullan\u0131lan AIAG yakla\u015f\u0131m\u0131ndaki PPAP \u00e7er\u00e7evesi 18 \u00f6\u011feden olu\u015fur. Bu listeyi kan\u0131t kategorilerini anlamak i\u00e7in kullan\u0131n; ard\u0131ndan hangilerinin sizin durumunuzda ge\u00e7erli oldu\u011funu, hangilerinin sunulmas\u0131 veya saklanmas\u0131 gerekti\u011fini m\u00fc\u015fterinizle netle\u015ftirin:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>1. Tasar\u0131m kay\u0131tlar\u0131:<\/strong> ge\u00e7erli \u00fcr\u00fcn tan\u0131m\u0131 ve teknik \u015fartnameler.<\/li><li><strong>2. Onayl\u0131 m\u00fchendislik de\u011fi\u015fikli\u011fi belgeleri:<\/strong> uygulanabilir oldu\u011fu durumlarda, tasar\u0131m kay\u0131tlar\u0131na hen\u00fcz i\u015flenmemi\u015f de\u011fi\u015fiklikler.<\/li><li><strong>3. M\u00fc\u015fteri m\u00fchendislik onay\u0131:<\/strong> m\u00fc\u015fterinin talep etti\u011fi durumlarda bu onaya ili\u015fkin kan\u0131tlar.<\/li><li><strong>4. Tasar\u0131m FMEA:<\/strong> sorumluluk alan\u0131n\u0131z i\u00e7in ge\u00e7erli oldu\u011fu durumlarda, tasar\u0131m hata t\u00fcrleri ve etkileri analizi.<\/li><li><strong>5. Proses ak\u0131\u015f \u015femas\u0131:<\/strong> par\u00e7an\u0131n \u00fcretim prosesinde izledi\u011fi yol.<\/li><li><strong>6. Proses FMEA:<\/strong> \u00fcretim prosesinde ortaya \u00e7\u0131kabilecek hatalar\u0131n analizi.<\/li><li><strong>7. Kontrol plan\u0131:<\/strong> \u00fcr\u00fcn ve proses \u00f6zelliklerini y\u00f6netmek i\u00e7in uygulanan kontroller.<\/li><li><strong>8. \u00d6l\u00e7\u00fcm sistemi analizi \u00e7al\u0131\u015fmalar\u0131:<\/strong> \u00f6l\u00e7\u00fcm sisteminin amac\u0131na uygun oldu\u011funu g\u00f6steren kan\u0131tlar.<\/li><li><strong>9. Boyutsal \u00f6l\u00e7\u00fcm sonu\u00e7lar\u0131:<\/strong> belirtilen boyutsal gerekliliklere g\u00f6re elde edilen sonu\u00e7lar.<\/li><li><strong>10. Malzeme ve performans testi sonu\u00e7lar\u0131:<\/strong> malzeme ve i\u015flevsellikle ilgili gerekli kan\u0131tlar.<\/li><li><strong>11. Ba\u015flang\u0131\u00e7 proses \u00e7al\u0131\u015fmalar\u0131:<\/strong> gerekliliklere g\u00f6re proses performans\u0131n\u0131 veya yeterlili\u011fini g\u00f6steren kan\u0131tlar.<\/li><li><strong>12. Laboratuvar yeterlilik belgeleri:<\/strong> kullan\u0131lan laboratuvarlar\u0131n yeterlili\u011fini destekleyen kan\u0131tlar.<\/li><li><strong>13. G\u00f6r\u00fcn\u00fcm Onay Raporu:<\/strong> g\u00f6r\u00fcn\u00fcm onay\u0131n\u0131n gerekli oldu\u011fu durumlarda haz\u0131rlan\u0131r.<\/li><li><strong>14. \u00dcretimden al\u0131nan numune par\u00e7alar:<\/strong> ilgili \u00fcretimden al\u0131nmas\u0131 gereken par\u00e7alar.<\/li><li><strong>15. Ana numune:<\/strong> gerekliliklere uygun olarak saklanan referans numune.<\/li><li><strong>16. Kontrol yard\u0131mc\u0131lar\u0131:<\/strong> ilgili muayene fikst\u00fcrleri, mastarlar veya di\u011fer kontrol ekipmanlar\u0131.<\/li><li><strong>17. M\u00fc\u015fteriye \u00f6zel gereklilikler:<\/strong> ek gerekliliklerin kar\u015f\u0131land\u0131\u011f\u0131n\u0131 g\u00f6steren kay\u0131tlar.<\/li><li><strong>18. Par\u00e7a Sunum Belgesi (PSW):<\/strong> sunulan dosyan\u0131n \u00f6zeti ve tedarik\u00e7inin buna ili\u015fkin beyan\u0131.<\/li><\/ul>\n\n\n<p>Bu \u00f6\u011felerin de\u011feri, birbirlerini nas\u0131l desteklediklerinde yatar. Proses ak\u0131\u015f\u0131, \u00fcretim rotas\u0131n\u0131 tan\u0131mlar. Proses FMEA, bu rotada nelerin ters gidebilece\u011fini inceler. Kontrol plan\u0131 ise riskleri ve gereklilikleri kontrollere, muayenelere ve m\u00fcdahale ad\u0131mlar\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcr. Bu belgeler, ayn\u0131 \u00fcretim prosesinin \u00fc\u00e7 farkl\u0131 s\u00fcr\u00fcm\u00fcn\u00fc de\u011fil, tek ve ayn\u0131 prosesi tarif etmelidir.<\/p>\n\n\n<p>Sonu\u00e7lar\u0131n da anlaml\u0131 olmas\u0131 gerekir. \u00d6l\u00e7\u00fclen bir boyut, ancak \u00f6l\u00e7\u00fcm y\u00f6ntemi uygunsa yararl\u0131 bir kan\u0131t olu\u015fturur. Bir yeterlilik sonucu i\u00e7in uygun bir \u00e7al\u0131\u015fma yap\u0131lmal\u0131 ve sonu\u00e7 do\u011fru yorumlanmal\u0131d\u0131r; kapak sayfas\u0131na olumlu bir say\u0131 yazmak yeterli de\u011fildir. Dosyay\u0131 haz\u0131r olarak sunmadan \u00f6nce kan\u0131tlardaki eksikleri giderin.<\/p>\n\n\n<p>Sunum kontrol listesi, nelerin tamamland\u0131\u011f\u0131n\u0131 takip etmenize yard\u0131mc\u0131 olur. Ancak tek ba\u015f\u0131na prosesin \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131 g\u00f6steremez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Be\u015f PPAP sunum seviyesi, a\u015famalar\u0131 de\u011fil kapsam\u0131 tan\u0131mlar<\/h2>\n\n\n<p>Sunum seviyesi, m\u00fc\u015fteriye nelerin iletilece\u011fini veya m\u00fc\u015fterinin neleri inceleyece\u011fini belirler. Bu seviyeler, <strong>her par\u00e7an\u0131n s\u0131rayla ge\u00e7mesi gereken be\u015f ad\u0131m de\u011fildir<\/strong>. Sunulan dosyan\u0131n daha dar kapsaml\u0131 olmas\u0131, haz\u0131rlanmas\u0131 veya saklanmas\u0131 gereken kan\u0131tlar\u0131n da mutlaka daha az oldu\u011fu anlam\u0131na gelmez.<\/p>\n\n\n<p>Seviyeler genel olarak \u015f\u00f6yle tan\u0131mlan\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Seviye 1:<\/strong> yaln\u0131zca Par\u00e7a Sunum Belgesi ve gerekli oldu\u011fu durumlarda g\u00f6r\u00fcn\u00fcm raporu.<\/li><li><strong>Seviye 2:<\/strong> Par\u00e7a Sunum Belgesi, numune par\u00e7alar ve s\u0131n\u0131rl\u0131 destekleyici veriler.<\/li><li><strong>Seviye 3:<\/strong> Par\u00e7a Sunum Belgesi, numune par\u00e7alar ve destekleyici verilerin tamam\u0131.<\/li><li><strong>Seviye 4:<\/strong> Par\u00e7a Sunum Belgesi ve m\u00fc\u015fterinin tan\u0131mlad\u0131\u011f\u0131 di\u011fer gereklilikler.<\/li><li><strong>Seviye 5:<\/strong> Par\u00e7a Sunum Belgesi, numune par\u00e7alar ve destekleyici verilerin tamam\u0131n\u0131n, tedarik\u00e7inin \u00fcretim tesisinde incelemeye haz\u0131r bulundurulmas\u0131.<\/li><\/ul>\n\n\n<p>M\u00fc\u015fterinizin istedi\u011fi seviyeyi ve ayr\u0131nt\u0131l\u0131 sunum ve saklama kurallar\u0131n\u0131 do\u011frulay\u0131n. Seviye 4 m\u00fc\u015fteri taraf\u0131ndan tan\u0131mlan\u0131r; Seviye 3\u2019ten sonra gelen, yaln\u0131zca biraz daha kapsaml\u0131 bir belge paketi de\u011fildir. Seviye 5 ise incelemenin nas\u0131l yap\u0131laca\u011f\u0131n\u0131 de\u011fi\u015ftirir; be\u015finci bir onay a\u015famas\u0131 de\u011fildir.<\/p>\n\n\n<p>Seviyeyi, benzer bir m\u00fc\u015fterinin \u00f6nceki i\u015fte ne istedi\u011fini tahmin ederek se\u00e7meyin. \u0130\u015fin ba\u015f\u0131nda net bir mutabakata varmak, hem gereksiz haz\u0131rl\u0131klar\u0131 hem de dosyan\u0131n eksik kan\u0131t nedeniyle geri \u00e7evrilmesini \u00f6nler.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u0130ncelemeye haz\u0131r bir PPAP dosyas\u0131 nas\u0131l haz\u0131rlan\u0131r?<\/h2>\n\n\n<h3 class=\"wp-block-heading\">1. Kapsam\u0131 belirleyin ve kan\u0131tlar\u0131 haz\u0131rlayacak sorumlular\u0131 atay\u0131n<\/h3>\n\n\n<p>Haz\u0131rl\u0131\u011fa kalite, \u00fcretim m\u00fchendisli\u011fi, \u00fcretim planlama ve ilgili tasar\u0131m veya sat\u0131n alma \u00e7al\u0131\u015fanlar\u0131n\u0131 dahil edin. Gereken her belge ve kay\u0131t i\u00e7in sorumluyu, revizyonu ve tamamlanma tarihini belirleyin; m\u00fc\u015fteriden hen\u00fcz netle\u015ftirilmesi gereken konular i\u00e7in de sorumluluk atay\u0131n.<\/p>\n\n\n<p>Dosyan\u0131n tamam\u0131nda par\u00e7a ve proses tan\u0131mlar\u0131n\u0131n tutarl\u0131 olmas\u0131n\u0131 sa\u011flay\u0131n. Teknik resim revizyonu, malzeme \u015fartnamesi veya \u00fcretim yeri belgeler aras\u0131nda farkl\u0131l\u0131k g\u00f6steriyorsa m\u00fc\u015fteri neyi onaylad\u0131\u011f\u0131n\u0131 anlayamayabilir.<\/p>\n\n\n<p>Hen\u00fcz netle\u015fmemi\u015f bir gereklilik ile yaln\u0131zca tamamlanmam\u0131\u015f bir i\u015fi birbirinden ay\u0131r\u0131n. Bir test y\u00f6nteminin m\u00fc\u015fteri taraf\u0131ndan teyit edilmesi gerekiyorsa bunu sunum kontrol listesinin sonuna b\u0131rakmay\u0131n; test i\u00e7in zaman ay\u0131rmadan \u00f6nce netle\u015ftirin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Onay ama\u00e7l\u0131 \u00fcretimin ko\u015fullar\u0131nda mutab\u0131k kal\u0131n ve \u00f6l\u00e7\u00fcmlere haz\u0131rlan\u0131n<\/h3>\n\n\n<p>Onay ama\u00e7l\u0131 \u00fcretim, seri \u00fcretimde kullan\u0131lmas\u0131 planlanan prosese ili\u015fkin kan\u0131t sa\u011flamal\u0131d\u0131r. Gerekli tak\u0131m, ekipman, malzeme, personel, \u00e7al\u0131\u015fma ko\u015fullar\u0131, miktar ve \u00fcretim h\u0131z\u0131n\u0131 ge\u00e7erli gerekliliklere g\u00f6re teyit edin. Farkl\u0131 bir \u00fcretim rotas\u0131nda \u00f6zenle haz\u0131rlanm\u0131\u015f bir prototip, \u00fczerinde mutab\u0131k kal\u0131nan \u00fcretim kan\u0131tlar\u0131n\u0131n yerini tutmaz.<\/p>\n\n\n<p>\u00dcretim ba\u015flamadan \u00f6nce muayene ve test d\u00fczenlemelerini haz\u0131rlay\u0131n. \u00d6l\u00e7\u00fcm sisteminin haz\u0131r olup olmad\u0131\u011f\u0131n\u0131, gerekli laboratuvar \u00e7al\u0131\u015fmalar\u0131n\u0131, numunelerin tan\u0131mlanmas\u0131n\u0131 ve par\u00e7alar, sonu\u00e7lar ile kullan\u0131lan \u00fcretim ko\u015fullar\u0131 aras\u0131ndaki ba\u011flant\u0131y\u0131 kontrol edin. Gerekti\u011finde d\u0131\u015far\u0131da yapt\u0131r\u0131lan testlerin sonu\u00e7lanma s\u00fcrelerini de hesaba kat\u0131n.<\/p>\n\n\n<p>Buradaki ama\u00e7, ba\u015far\u0131l\u0131 bir \u00fcretimin sonunda numunelerin gerekli \u00e7al\u0131\u015fma i\u00e7in kullan\u0131lamayaca\u011f\u0131n\u0131 fark etmenizi \u00f6nlemektir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Kan\u0131tlar\u0131 olu\u015fturacak i\u015fleri \u00e7izelgeleyin<\/h3>\n\n\n<p>\u00dcretimin haz\u0131rl\u0131k ve i\u015flem s\u00fcrelerini \u00fcretim plan\u0131na ekleyin. Kendi kaynaklar\u0131n\u0131z\u0131 kullanan muayene ve test i\u015flerini dahil edin; d\u0131\u015far\u0131dan gelecek sonu\u00e7lar\u0131n ne zaman haz\u0131r olaca\u011f\u0131n\u0131 da hesaba kat\u0131n. Hangi faaliyetlerin tamamlanm\u0131\u015f par\u00e7alara ba\u011fl\u0131 oldu\u011funu, hangi haz\u0131rl\u0131klar\u0131n ise daha \u00f6nce yap\u0131labilece\u011fini belirleyin.<\/p>\n\n\n<p>PPAP sunum tarihini tala\u015fl\u0131 imalat\u0131n biti\u015f tarihiyle bir tutmay\u0131n. \u00d6l\u00e7\u00fcmler, \u00e7al\u0131\u015fmalar\u0131n g\u00f6zden ge\u00e7irilmesi, eksik belgelerin tamamlanmas\u0131 ve i\u00e7 kontroller de zaman al\u0131r. M\u00fc\u015fteri incelemesi i\u00e7in de takvimde s\u00fcre ay\u0131rmak gerekir; bu s\u00fcre, fabrikan\u0131n daha h\u0131zl\u0131 \u00e7al\u0131\u015farak art\u0131rabilece\u011fi makine kapasitesi gibi d\u00fc\u015f\u00fcn\u00fclemez.<\/p>\n\n\n<p>Ek \u00e7al\u0131\u015fma gerekirse \u00f6nce hangi i\u015flemlerin yap\u0131lmas\u0131na izin verildi\u011fini netle\u015ftirin. Ard\u0131ndan ek \u00fcretim, muayene veya test i\u015flerini \u00e7izelgeleyin ve di\u011fer bekleyen sipari\u015fler \u00fczerindeki etkisini de\u011ferlendirin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Par\u00e7a Sunum Belgesini g\u00f6ndermeden \u00f6nce dosyay\u0131 kontrol edin<\/h3>\n\n\n<p>Sonu\u00e7lar\u0131 \u00fczerinde mutab\u0131k kal\u0131nan gerekliliklere g\u00f6re g\u00f6zden ge\u00e7irin; tasar\u0131m kay\u0131tlar\u0131, proses belgeleri, numuneler ve \u00e7al\u0131\u015fmalar aras\u0131ndaki tutars\u0131zl\u0131klar\u0131 giderin. Sapmalar\u0131, tamamlanm\u0131\u015f bir kontrol listesinin arkas\u0131na gizlemek yerine m\u00fc\u015fterinin istedi\u011fi s\u00fcrece g\u00f6re kayda al\u0131n.<\/p>\n\n\n<p>PSW, sunumu \u00f6zetler ve tedarik\u00e7inin beyan\u0131n\u0131 i\u00e7erir. Bu belgenin doldurulmas\u0131 veya imzalanmas\u0131 tek ba\u015f\u0131na m\u00fc\u015fterinin par\u00e7ay\u0131 onaylad\u0131\u011f\u0131 anlam\u0131na gelmez. Gerekli dosyay\u0131 \u00fczerinde mutab\u0131k kal\u0131nan yoldan sunun ve karar\u0131n ilgili par\u00e7a, revizyon ve prosesle ba\u011flant\u0131s\u0131n\u0131n izlenebilir olmas\u0131n\u0131 sa\u011flay\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. M\u00fc\u015fterinin karar\u0131na g\u00f6re hareket edin<\/h3>\n\n\n<p>M\u00fc\u015fteri sunumu onaylayabilir, s\u0131n\u0131rl\u0131 bir ge\u00e7ici veya ko\u015fullu uygulamaya izin verebilir ya da ek \u00e7al\u0131\u015fma yap\u0131lana kadar reddedebilir. M\u00fc\u015fterinin karar\u0131n\u0131n tam olarak ne anlama geldi\u011fini ve hangi ko\u015fullar\u0131 i\u00e7erdi\u011fini esas al\u0131n.<\/p>\n\n\n<p>Ge\u00e7ici onay, s\u0131n\u0131rs\u0131z sevkiyat izni de\u011fildir. Nelere izin verdi\u011fini, varsa miktar veya s\u00fcre s\u0131n\u0131r\u0131n\u0131, kalan i\u015flemleri ve bunlar\u0131n kapat\u0131lmas\u0131n\u0131 kimin onaylamas\u0131 gerekti\u011fini netle\u015ftirin. Sunum reddedilirse par\u00e7ay\u0131 normal teslimata haz\u0131r kabul etmeden \u00f6nce gerekli d\u00fczeltme ve yeniden sunum \u00e7al\u0131\u015fmalar\u0131nda mutab\u0131k kal\u0131n.<\/p>\n\n\n<p>Serbest b\u0131rakma s\u00fcrecinizde sevkiyat iznini a\u00e7\u0131k\u00e7a belirtin. \u00dcretimin tamamlanm\u0131\u015f olmas\u0131, PSW&#8217;nin sunulmas\u0131 veya bir sevk tarihinin planlanmas\u0131, gerekli m\u00fc\u015fteri izninin yerini tutmaz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">PPAP tarihini tutturmak i\u00e7in yaln\u0131zca makinede bo\u015f zaman de\u011fil, muayene kapasitesi de gerekir<\/h2>\n\n\n<p>Tala\u015fl\u0131 imalatla \u00fcretilen ve onay ama\u00e7l\u0131 \u00fcretiminde seri \u00fcretim i\u00e7in planlanan rotan\u0131n kullan\u0131lmas\u0131 gereken bir par\u00e7a d\u00fc\u015f\u00fcn\u00fcn. \u0130\u015fleme merkezinde uygun bir bo\u015fluk vard\u0131r. Ekip de par\u00e7alar\u0131n bitece\u011fi zamana g\u00f6re bir sunum tarihi taahh\u00fct eder.<\/p>\n\n\n<p>Ancak bu par\u00e7alar\u0131n, m\u00fc\u015fteri sipari\u015fleriyle zaten dolu olan bir \u00f6l\u00e7\u00fcm kayna\u011f\u0131nda boyutsal muayeneden ge\u00e7mesi de gerekir. Kalite m\u00fchendisinin gerekli \u00e7al\u0131\u015fmalar\u0131 tamamlayabilmesi i\u00e7in bu \u00f6l\u00e7\u00fcmlerden elde edilecek verilere ihtiyac\u0131 vard\u0131r. Tala\u015fl\u0131 imalat zaman\u0131nda biterken kan\u0131tlar\u0131 olu\u015fturacak i\u015fler ba\u015fka bir kuyrukta bekler.<\/p>\n\n\n<p>Muayeneye \u00f6ncelik vermek sunum tarihini kurtarabilir, ancak bu kapasiteyi kullanmas\u0131 planlanan sipari\u015fleri geciktirebilir. \u00dcretimin tekrarlanmas\u0131 gerekirse ayn\u0131 kaynaklar \u00fczerindeki rekabet bir kez daha artar.<\/p>\n\n\n<p>\u00c7\u00f6z\u00fcm, kan\u0131tlar\u0131 olu\u015fturacak i\u015fleri normal \u00fcretimle ayn\u0131 kapasite plan\u0131nda ele almakt\u0131r. B\u00f6ylece bir \u00f6nceli\u011fi de\u011fi\u015ftirmek, ek kapasite ayarlamak veya m\u00fc\u015fteriyle ger\u00e7ek\u00e7i bir tarihi g\u00f6r\u00fc\u015fmek i\u00e7in h\u00e2l\u00e2 zaman varken k\u0131s\u0131t\u0131 g\u00f6rebilirsiniz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner ile PPAP haz\u0131rl\u0131\u011f\u0131n\u0131 \u00fcretim \u00e7izelgesine dahil edin<\/h2>\n\n\n<p>SkyPlanner APS, imalat i\u00e7in geli\u015ftirilmi\u015f bir ileri planlama ve \u00e7izelgeleme yaz\u0131l\u0131m\u0131d\u0131r. \u00c7izelgeleme yapay zek\u00e2s\u0131 <strong>Arcturus<\/strong>, modellenmi\u015f \u00fcretim operasyonlar\u0131n\u0131 kapasite, vardiya, operasyon s\u00fcresi ve ba\u011f\u0131ml\u0131l\u0131k bilgilerine g\u00f6re uygun i\u015f istasyonlar\u0131na yerle\u015ftirir. Malzemeyi dikkate alan \u00e7izelgeleme, sistemde g\u00fcncel tutulan malzeme bulunabilirlik bilgilerini de hesaba katar.<\/p>\n\n\n<p>PPAP haz\u0131rl\u0131\u011f\u0131 i\u00e7in \u00fczerinde mutab\u0131k kal\u0131nan \u00fcretim rotas\u0131n\u0131 tan\u0131mlay\u0131n ve kapasitesi s\u0131n\u0131rl\u0131 i\u00e7 kaynaklar\u0131 kullanan muayene i\u015flerini modelleyin. Bir \u00f6l\u00e7\u00fcm istasyonu veya muayene i\u015f merkezi i\u00e7in de t\u0131pk\u0131 bir makinede oldu\u011fu gibi ger\u00e7ek\u00e7i kullan\u0131labilirlik ve i\u015flem s\u00fcreleri gerekir. B\u00f6ylece onay \u00e7al\u0131\u015fmalar\u0131, <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">ayn\u0131 kaynaklar i\u00e7in rekabet eden sipari\u015flerle ayn\u0131 \u00e7izelgede<\/a> yer al\u0131r.<\/p>\n\n\n<p>Gantt g\u00f6r\u00fcn\u00fcm\u00fc, i\u015flerin ne zaman yap\u0131lmas\u0131n\u0131n planland\u0131\u011f\u0131n\u0131 ve kaynaklara nas\u0131l da\u011f\u0131t\u0131ld\u0131\u011f\u0131n\u0131 g\u00f6sterir. Yetkili ki\u015filerce onaylanan bir tekrar \u00fcretim veya ek muayene i\u015f y\u00fck\u00fcn\u00fc de\u011fi\u015ftirdi\u011finde i\u015fleri g\u00fcncelleyin ve Arcturus&#8217;un \u00e7izelgeyi yeniden hesaplamas\u0131n\u0131 sa\u011flay\u0131n. \u00d6ncelikleri siz belirlersiniz; \u00e7izelgeleme hesaplamas\u0131n\u0131 SkyPlanner yapar. Ayr\u0131 bir PPAP takvimini her makinenin i\u015f kuyru\u011funa g\u00f6re elle d\u00fczenlemek yerine verece\u011finiz karara ve bu karar\u0131n teslimatlar \u00fczerindeki etkilerine odaklanabilirsiniz.<\/p>\n\n\n<p>Sipari\u015flere, sipari\u015f kalemlerine ve proses ad\u0131mlar\u0131na \u00fcretim notlar\u0131 ve ekler de eklenebilir. B\u00f6ylece i\u015fi yapanlar ilgili talimatlara ula\u015fabilir. \u00c7izelge, i\u015flerin y\u00fcr\u00fct\u00fclmesini destekler; kan\u0131tlar\u0131n kabul\u00fc ve m\u00fc\u015fterinin serbest b\u0131rakma onay\u0131 ise \u00fczerinde mutab\u0131k kald\u0131\u011f\u0131n\u0131z kalite s\u00fcreci kapsam\u0131nda verilen kararlar olmaya devam eder.<\/p>\n\n\n<p><strong>SkyPlanner, a\u00e7\u0131k REST API arac\u0131l\u0131\u011f\u0131yla her ERP veya MES ile entegre olur.<\/strong> Sipari\u015flerinizi ve kalite kay\u0131tlar\u0131n\u0131z\u0131 zaten y\u00f6neten sistemleri de\u011fi\u015ftirmek yerine mevcut \u00fcretim verilerinizi sonlu kapasite \u00e7izelgeleme ile birle\u015ftirebilirsiniz.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Planlama i\u015flerinde kendi yapay zek\u00e2 asistan\u0131n\u0131zdan yard\u0131m al\u0131n<\/h3>\n\n\n<p>MCP \u00fczerinden SkyPlanner&#8217;a ba\u011flanan <strong>Claude, ChatGPT veya Microsoft Copilot<\/strong> gibi kendi yapay zek\u00e2 asistan\u0131n\u0131zla \u00e7al\u0131\u015fabilirsiniz. MCP, asistan\u0131n \u015firketinizin \u00fcretim verileriyle birlikte SkyPlanner&#8217;\u0131n \u00fcr\u00fcn bilgisini ve kullan\u0131m\u0131na izin verilen i\u015flevlerini kullanmas\u0131n\u0131 sa\u011flayan ba\u011flant\u0131d\u0131r.<\/p>\n\n\n<p>\u00d6rne\u011fin asistan\u0131n\u0131zdan, onay ama\u00e7l\u0131 \u00fcretim i\u00e7in planlanan i\u015fleri ve muayene kayna\u011f\u0131ndaki y\u00fck\u00fc g\u00f6zden ge\u00e7irmenize yard\u0131mc\u0131 olmas\u0131n\u0131 isteyin. Yazma yetkisi verildi\u011finde ilgili planlama verilerini g\u00fcncellemenize ve SkyPlanner&#8217;\u0131n \u00e7izelgeleme i\u015flevlerini kullanman\u0131za yard\u0131mc\u0131 olabilir. Her ayar\u0131 kendiniz bulmak yerine planlama ihtiyac\u0131n\u0131z\u0131 anlat\u0131rs\u0131n\u0131z; \u00e7izelgeleme hesaplamas\u0131n\u0131 yine Arcturus yapar.<\/p>\n\n\n<p>M\u00fc\u015fteri onay\u0131na ili\u015fkin karar yetkili ki\u015filerde kal\u0131r. Sa\u011flanan fayda, kan\u0131tlar\u0131 olu\u015fturacak i\u015flerin tamamlanmas\u0131n\u0131 sa\u011flayan plan\u0131 daha kolay haz\u0131rlamak ve g\u00fcncellemektir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Kapasiteyi ortak bir g\u00f6r\u00fcn\u00fcmde izlemek Mamec&#8217;te neleri de\u011fi\u015ftirdi?<\/h3>\n\n\n<p>Kar\u0131\u015ft\u0131rma teknolojileri ve y\u00fcksek teknolojili fason \u00fcretim alanlar\u0131nda \u00e7al\u0131\u015fan Finlandiyal\u0131 Mamec, daha \u00f6nce i\u015fleri k\u00e2\u011f\u0131t \u00fczerindeki sipari\u015flere ve teslim tarihlerine g\u00f6re \u00f6nceliklendiriyordu. Birbirine ba\u011f\u0131ml\u0131 binlerce i\u015f, \u00fcretimin b\u00fct\u00fcn\u00fcn\u00fc g\u00f6rmeyi zorla\u015ft\u0131r\u0131yordu.<\/p>\n\n\n<p>SkyPlanner&#8217;\u0131 Oscar ERP sistemiyle entegre ettikten sonra \u015firket, i\u015flerin ve \u00fcretim y\u00fck\u00fcn\u00fcn herkes taraf\u0131ndan ayn\u0131 g\u00f6r\u00fcn\u00fcmde izlenmesini sa\u011flad\u0131. <a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/mamec\/\">Mamec,<\/a> planlama i\u015f y\u00fck\u00fcn\u00fcn hafifledi\u011fini ve \u00fcretim s\u0131ralamas\u0131ndaki de\u011fi\u015fiklikleri y\u00f6netmenin kolayla\u015ft\u0131\u011f\u0131n\u0131 belirtiyor. Bu da m\u00fc\u015fterilere hangi taahh\u00fctlerin verilebilece\u011fini a\u00e7\u0131klamay\u0131 kolayla\u015ft\u0131r\u0131yor.<\/p>\n\n\n<p>Bu deneyim, burada s\u00f6z konusu olan \u00e7izelgeleme faydas\u0131n\u0131 g\u00f6steriyor: haz\u0131rl\u0131k veya ek \u00e7al\u0131\u015fmalar \u00fcretim i\u015flerini de\u011fi\u015ftirdi\u011finde ekibin kapasite ve taahh\u00fctler \u00fczerindeki etkiyi anlamas\u0131 gerekir. Plan\u0131 kullan\u0131\u015fl\u0131 k\u0131lan, ayr\u0131 tutulan bir ba\u015fka son tarih listesi de\u011fil, bu ortak g\u00f6r\u00fcn\u00fcmd\u00fcr.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bir sonraki planlama g\u00f6r\u00fc\u015fmenizde onay ama\u00e7l\u0131 \u00fcretimi ele al\u0131n<\/h2>\n\n\n<p>SkyPlanner&#8217;\u0131n nas\u0131l yard\u0131mc\u0131 olabilece\u011fini g\u00f6rmek i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">demo randevusu al\u0131n<\/a>. G\u00f6r\u00fc\u015fmeye, \u00fcretim par\u00e7as\u0131 onay\u0131 i\u00e7in kullan\u0131lacak ger\u00e7ek bir \u00fcretim rotas\u0131 \u00f6rne\u011fiyle gelin: kullan\u0131lmas\u0131 planlanan makineler, muayene kapasitesi, malzeme ihtiya\u00e7lar\u0131 ve ayn\u0131 kaynaklar\u0131 kullanacak sipari\u015fler. Bu \u00f6rnek \u00fczerinden i\u015flerin ne zaman bitebilece\u011fini ve bir de\u011fi\u015fikli\u011fin di\u011fer teslimatlar i\u00e7in ne anlama gelece\u011fini inceleyin.<\/p>\n\n\n<p>\u00d6nce kendiniz ke\u015ffetmek isterseniz <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a> veya SkyPlanner Assistant i\u00e7indeki yapay zek\u00e2 destekli Getting Started rehberini kullan\u0131n. \u0130lk ad\u0131m basit: onay tarihine yeti\u015fmek i\u00e7in yap\u0131lmas\u0131 gereken \u00fcretim ve muayene i\u015flerini tek bir \u00e7izelgede g\u00f6r\u00fcn\u00fcr k\u0131l\u0131n.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya \u00dcretim par\u00e7as\u0131 onay prosesi (PPAP), tedarik\u00e7inin m\u00fc\u015fterinin \u00fcr\u00fcn gereksinimlerini anlad\u0131\u011f\u0131n\u0131 ve seri \u00fcretimde kullanmay\u0131 planlad\u0131\u011f\u0131 prosesin bu gereksinimleri, mutab\u0131k kal\u0131nan \u00fcretim h\u0131z\u0131nda s\u00fcrekli olarak kar\u015f\u0131layabildi\u011fini g\u00f6stermesini sa\u011flayan yap\u0131land\u0131r\u0131lm\u0131\u015f bir y\u00f6ntemdir. Tedarik\u00e7i gerekli kan\u0131tlar\u0131 ve numuneleri haz\u0131rlar; m\u00fc\u015fteri sunulan &#8230; <a title=\"\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/\" aria-label=\"Read more about \u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":113282,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-113266","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ve-cizelgeleme","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya<\/title>\n<meta name=\"description\" content=\"PPAP kan\u0131tlar\u0131n\u0131, sunum seviyelerini ve m\u00fc\u015fteri onay\u0131n\u0131 \u00f6\u011frenin. Di\u011fer teslimatlar\u0131 da kontrol alt\u0131nda tutarak \u00fcretim ve muayene i\u015flerini planlay\u0131n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya\" \/>\n<meta property=\"og:description\" content=\"PPAP kan\u0131tlar\u0131n\u0131, sunum seviyelerini ve m\u00fc\u015fteri onay\u0131n\u0131 \u00f6\u011frenin. Di\u011fer teslimatlar\u0131 da kontrol alt\u0131nda tutarak \u00fcretim ve muayene i\u015flerini planlay\u0131n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-30T07:00:01+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-30T07:01:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-part-approval-process-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-parcasi-onay-prosesi\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-parcasi-onay-prosesi\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya\",\"datePublished\":\"2026-10-30T07:00:01+00:00\",\"dateModified\":\"2026-10-30T07:01:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-parcasi-onay-prosesi\\\/\"},\"wordCount\":3016,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-parcasi-onay-prosesi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-part-approval-process-hero.png\",\"articleSection\":[\"APS ve \u00e7izelgeleme\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-parcasi-onay-prosesi\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-parcasi-onay-prosesi\\\/\",\"name\":\"\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-parcasi-onay-prosesi\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-parcasi-onay-prosesi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-part-approval-process-hero.png\",\"datePublished\":\"2026-10-30T07:00:01+00:00\",\"dateModified\":\"2026-10-30T07:01:37+00:00\",\"description\":\"PPAP kan\u0131tlar\u0131n\u0131, sunum seviyelerini ve m\u00fc\u015fteri onay\u0131n\u0131 \u00f6\u011frenin. Di\u011fer teslimatlar\u0131 da kontrol alt\u0131nda tutarak \u00fcretim ve muayene i\u015flerini planlay\u0131n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-parcasi-onay-prosesi\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-parcasi-onay-prosesi\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-parcasi-onay-prosesi\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-part-approval-process-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-part-approval-process-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Machining and another production bench feed parts to a shared inspection station for production-part approval work.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-parcasi-onay-prosesi\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya","description":"PPAP kan\u0131tlar\u0131n\u0131, sunum seviyelerini ve m\u00fc\u015fteri onay\u0131n\u0131 \u00f6\u011frenin. Di\u011fer teslimatlar\u0131 da kontrol alt\u0131nda tutarak \u00fcretim ve muayene i\u015flerini planlay\u0131n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/","og_locale":"tr_TR","og_type":"article","og_title":"\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya","og_description":"PPAP kan\u0131tlar\u0131n\u0131, sunum seviyelerini ve m\u00fc\u015fteri onay\u0131n\u0131 \u00f6\u011frenin. Di\u011fer teslimatlar\u0131 da kontrol alt\u0131nda tutarak \u00fcretim ve muayene i\u015flerini planlay\u0131n.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-30T07:00:01+00:00","article_modified_time":"2026-10-30T07:01:37+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-part-approval-process-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"15 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya","datePublished":"2026-10-30T07:00:01+00:00","dateModified":"2026-10-30T07:01:37+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/"},"wordCount":3016,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-part-approval-process-hero.png","articleSection":["APS ve \u00e7izelgeleme","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/","name":"\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-part-approval-process-hero.png","datePublished":"2026-10-30T07:00:01+00:00","dateModified":"2026-10-30T07:01:37+00:00","description":"PPAP kan\u0131tlar\u0131n\u0131, sunum seviyelerini ve m\u00fc\u015fteri onay\u0131n\u0131 \u00f6\u011frenin. Di\u011fer teslimatlar\u0131 da kontrol alt\u0131nda tutarak \u00fcretim ve muayene i\u015flerini planlay\u0131n.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-part-approval-process-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-part-approval-process-hero.png","width":1672,"height":941,"caption":"Machining and another production bench feed parts to a shared inspection station for production-part approval work."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-parcasi-onay-prosesi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-part-approval-process-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-part-approval-process-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-part-approval-process-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-part-approval-process-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-part-approval-process-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-part-approval-process-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-part-approval-process-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-part-approval-process-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretim Par\u00e7as\u0131 Onay Prosesi: \u00dcretimden Onaya \u00dcretim par\u00e7as\u0131 onay prosesi (PPAP), tedarik\u00e7inin m\u00fc\u015fterinin \u00fcr\u00fcn gereksinimlerini anlad\u0131\u011f\u0131n\u0131 ve seri \u00fcretimde kullanmay\u0131 planlad\u0131\u011f\u0131 prosesin bu gereksinimleri, mutab\u0131k kal\u0131nan \u00fcretim h\u0131z\u0131nda s\u00fcrekli olarak kar\u015f\u0131layabildi\u011fini g\u00f6stermesini sa\u011flayan yap\u0131land\u0131r\u0131lm\u0131\u015f bir y\u00f6ntemdir. Tedarik\u00e7i gerekli kan\u0131tlar\u0131 ve numuneleri haz\u0131rlar; m\u00fc\u015fteri sunulan&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/113266","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=113266"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/113266\/revisions"}],"predecessor-version":[{"id":113329,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/113266\/revisions\/113329"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/113282"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=113266"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=113266"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=113266"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}