{"id":113083,"date":"2026-10-30T01:32:22","date_gmt":"2026-10-30T01:32:22","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=113083"},"modified":"2026-10-30T01:34:04","modified_gmt":"2026-10-30T01:34:04","slug":"girdi-kontrolu","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/","title":{"rendered":"Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Girdi kontrol\u00fc<\/strong>, sat\u0131n al\u0131nan malzeme, par\u00e7a veya bile\u015fenlerin, kullan\u0131mlar\u0131na onay verilmeden \u00f6nce belirtilen \u015fartlara uygunlu\u011funun do\u011frulanmas\u0131d\u0131r. Giri\u015f kalite kontrol\u00fc olarak da adland\u0131r\u0131lan bu s\u00fcre\u00e7, tedarik\u00e7inin teslim etti\u011fi malzeme ile fabrikan\u0131n g\u00fcvenle \u00fcretime alabilece\u011fi malzeme aras\u0131ndaki ba\u011f\u0131 kurar.<\/p>\n\n\n<p>Bu ayr\u0131m, mal kabul alan\u0131n\u0131n yo\u011fun oldu\u011fu zamanlarda \u00f6nem kazan\u0131r. Bir sevkiyat tesise ula\u015fm\u0131\u015f, say\u0131lm\u0131\u015f ve stok kayd\u0131 yap\u0131lm\u0131\u015f olsa da boyutsal kontrol\u00fc veya zorunlu bir sertifikay\u0131 bekliyor olabilir. \u00dcretim bu teslimat\u0131 kullan\u0131labilir malzeme olarak de\u011ferlendirirse makinede s\u0131raya al\u0131nan i\u015fler daha ba\u015ftan yanl\u0131\u015f bir varsay\u0131ma dayanabilir.<\/p>\n\n\n<p>Bu nedenle, i\u015fe yarayan bir girdi kontrol\u00fc s\u00fcreci net bir kararla sonu\u00e7lan\u0131r: Hangi malzemenin kullan\u0131m\u0131na onay verildi, ne kadar\u0131 kullan\u0131labilir ve hangileri h\u00e2l\u00e2 beklemede? Bu karar\u0131 \u00fcretim planlamaya aktar\u0131rsan\u0131z malzeme eksikli\u011fi y\u00fcz\u00fcnden bir vardiya bo\u015f ge\u00e7meden veya teslimat aksamadan \u00f6nlem alabilirsiniz. SkyPlanner APS, g\u00fcncel malzeme durumuna g\u00f6re, ayn\u0131 malzeme ve kaynaklara ihtiya\u00e7 duyan sipari\u015fler i\u00e7in uygulanabilir bir \u00fcretim \u00e7izelgesi olu\u015fturman\u0131za yard\u0131mc\u0131 olur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Girdi kontrol\u00fcnde nelere bak\u0131lmal\u0131?<\/h2>\n\n\n<p>Her \u00fcr\u00fcne ayn\u0131 genel kontrol listesini uygulamak yerine, ilgili malzemenin gerekliliklerinden ba\u015flay\u0131n. D\u0131\u015far\u0131dan sat\u0131n al\u0131nan i\u015flenmi\u015f bir par\u00e7a, elektronik bir bile\u015fen ve s\u0131cakl\u0131\u011fa duyarl\u0131 bir ham madde i\u00e7in farkl\u0131 uygunluk kan\u0131tlar\u0131 gerekir.<\/p>\n\n\n<p>Her mal kabul\u00fcnde uygulanacak kontrolleri belirleyin:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Kimlik bilgileri:<\/strong> Tedarik\u00e7i, par\u00e7a numaras\u0131, revizyon ve malzeme s\u0131n\u0131f\u0131n\u0131n do\u011frulu\u011fu; gerekti\u011finde parti, d\u00f6k\u00fcm veya seri numaras\u0131yla tan\u0131mlama.<\/li><li><strong>Miktar:<\/strong> Teslim edilen miktar\u0131n ve \u00f6l\u00e7\u00fc birimlerinin sat\u0131n alma sipari\u015fi ve sevkiyat belgeleriyle kar\u015f\u0131la\u015ft\u0131r\u0131lmas\u0131.<\/li><li><strong>Fiziksel durum:<\/strong> Hasar, kirlenme, ambalaj b\u00fct\u00fcnl\u00fc\u011f\u00fc ve belirtilmi\u015f ta\u015f\u0131ma veya depolama ko\u015fullar\u0131.<\/li><li><strong>Belgeler:<\/strong> Gerekli sertifikalar, test raporlar\u0131 veya di\u011fer uygunluk kan\u0131tlar\u0131n\u0131n teslim al\u0131nan malzemeyle e\u015fle\u015ftirilmesi.<\/li><li><strong>\u00dcr\u00fcn \u00f6zellikleri:<\/strong> Kontrol plan\u0131nda belirtilen boyutlar, g\u00f6r\u00fcn\u00fcm, bile\u015fim, i\u015flev veya di\u011fer \u00f6zellikler.<\/li><\/ul>\n\n\n<p>Bir sertifika, ancak do\u011fru malzemeyi kaps\u0131yor ve gerekliliklerinizi kar\u015f\u0131layan kan\u0131tlar\u0131 sunuyorsa i\u015fe yarar. Par\u00e7a numaras\u0131n\u0131n tutmas\u0131, yanl\u0131\u015f revizyon sorununu ortadan kald\u0131rmaz. Kutunun sa\u011flam olmas\u0131 da kritik bir \u00f6l\u00e7\u00fcn\u00fcn tolerans i\u00e7inde oldu\u011funu g\u00f6stermez.<\/p>\n\n\n<p>Girdi kontrol\u00fcn\u00fcn kapsam\u0131n\u0131 <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-urun-muayenesi\/\">ilk \u00fcr\u00fcn muayenesi<\/a> ile kar\u0131\u015ft\u0131rmay\u0131n. Girdi kontrol\u00fc, teslim al\u0131nan partiye y\u00f6neliktir. \u0130lk \u00fcr\u00fcn muayenesi ise \u00fcretimden \u00e7\u0131kan ilk \u00fcr\u00fcn\u00fcn ge\u00e7erli gerekliliklere uygunlu\u011funu do\u011frular ve buna ili\u015fkin kan\u0131tlar\u0131 olu\u015fturur. \u0130lk \u00fcr\u00fcn\u00fcn onaylanmas\u0131, sonraki t\u00fcm teslimatlar\u0131n kabul edilece\u011fi anlam\u0131na gelmez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Uygulanabilir bir girdi kontrol\u00fc s\u00fcreci<\/h2>\n\n\n<p>A\u015fa\u011f\u0131daki i\u015f ak\u0131\u015f\u0131, mal kabul, kalite, sat\u0131n alma ve \u00fcretim ekiplerine malzemenin tesise geli\u015finden kullan\u0131m\u0131na kadar ortak bir yol sunar. Sorumluluklar\u0131 i\u015fletmenizde a\u00e7\u0131k\u00e7a tan\u0131mlanm\u0131\u015f rollere atay\u0131n; k\u00fc\u00e7\u00fck bir fabrikada ayn\u0131 ki\u015fi birden fazla rol \u00fcstlenebilir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Teslimat gelmeden gereklilikleri haz\u0131rlay\u0131n<\/h3>\n\n\n<p>\u0130\u015fi yapacak ki\u015filerin g\u00fcncel teknik resme veya \u015fartnameye, sat\u0131n alma \u015fartlar\u0131na ve kontrol talimatlar\u0131na eri\u015fmesini sa\u011flay\u0131n. Nelerin kontrol edilece\u011fini, kabul kriterlerini, uygulanacaksa \u00f6rnekleme y\u00f6ntemini ve kullan\u0131m onay\u0131n\u0131 kimin verebilece\u011fini belirleyin.<\/p>\n\n\n<p>Sevkiyatla birlikte hangi uygunluk belgelerinin gelmesi gerekti\u011fini de belirleyin. Makine kapasitesi ayr\u0131ld\u0131ktan sonra eksik malzeme sertifikas\u0131n\u0131 istemek, \u00f6nlenebilir bir gecikmeye yol a\u00e7ar. Sat\u0131n alma ekibi bu gereklili\u011fi sevkiyattan \u00f6nce tedarik\u00e7iye a\u00e7\u0131k\u00e7a bildirebilir.<\/p>\n\n\n<p>Kontrol\u00fcn kapsam\u0131n\u0131, uygunsuzlu\u011fun do\u011furaca\u011f\u0131 sonu\u00e7lara, ge\u00e7erli gerekliliklere ve tedarik\u00e7inin performans\u0131na g\u00f6re belirleyin. Teslimat acil diye zorunlu bir kontrol\u00fc azaltmay\u0131n. D\u0131\u015far\u0131da test yap\u0131lmas\u0131 gerekiyorsa malzemenin geldi\u011fi g\u00fcn \u00fcretimde kullan\u0131labilece\u011fini varsaymak yerine, testin sonu\u00e7lanma s\u00fcresini beklenen kullan\u0131labilirlik tarihine yans\u0131t\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Malzemeyi teslim al\u0131n, tan\u0131mlay\u0131n ve kontrol alt\u0131nda tutun<\/h3>\n\n\n<p>Mal kabul kayd\u0131n\u0131 olu\u015fturun; malzemenin kimlik bilgilerini, miktar\u0131n\u0131 ve g\u00f6zle g\u00f6r\u00fcl\u00fcr ta\u015f\u0131ma hasarlar\u0131n\u0131 kontrol edin. Fiziksel malzeme, tedarik\u00e7i partisi ve ilgili belgeler aras\u0131ndaki ba\u011f\u0131 koruyun. Hen\u00fcz do\u011frulanmam\u0131\u015f bir teslimat\u0131, onayl\u0131 stoktan ay\u0131rt edilemeyecek \u015fekilde kar\u0131\u015ft\u0131rmay\u0131n.<\/p>\n\n\n<p>Hakk\u0131nda hen\u00fcz karar verilmemi\u015f malzemenin onayl\u0131 stok gibi \u00e7ekilmesini \u00f6nlemek i\u00e7in belirlenmi\u015f bir bekletme alan\u0131, durumu a\u00e7\u0131k\u00e7a g\u00f6steren i\u015faretler ve uygun sistem kontrolleri kullan\u0131n. Bekletme alan\u0131na s\u0131\u011fmayan b\u00fcy\u00fck par\u00e7alar\u0131n durumu da hi\u00e7bir teredd\u00fcde yer b\u0131rakmayacak \u015fekilde belirtilmelidir.<\/p>\n\n\n<p>Mal kabul, neyin teslim al\u0131nd\u0131\u011f\u0131n\u0131 do\u011frular. Kalite biriminin kullan\u0131m onay\u0131 ise neyin kullan\u0131labilece\u011fini do\u011frular. Bu iki i\u015flem k\u0131sa aral\u0131klarla ger\u00e7ekle\u015febilir; ancak ikisi de stok kayd\u0131n\u0131 etkiliyor diye aralar\u0131ndaki ayr\u0131m kaybolmamal\u0131d\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Kontrol\u00fc yap\u0131n ve sonucu kaydedin<\/h3>\n\n\n<p>Belirlenen kontrolleri uygun ekipmanla ve g\u00fcncel talimatlara g\u00f6re yap\u0131n. \u00d6l\u00e7\u00fcm gerekiyorsa uygunlu\u011fu ve kalibrasyon durumu kalite s\u00fcrecinizin gereklerini kar\u015f\u0131layan \u00f6l\u00e7\u00fcm ekipmanlar\u0131 kullan\u0131n.<\/p>\n\n\n<p>Verilen karar\u0131 sonradan destekleyebilecek kadar kan\u0131t kaydedin: Nelerin kontrol edildi\u011fi, hangi gereklili\u011fin esas al\u0131nd\u0131\u011f\u0131, sonu\u00e7, malzemenin kimlik bilgileri, kontrol\u00fc kimin ve ne zaman yapt\u0131\u011f\u0131. Boyutsal bir kontrolde, tolerans\u0131yla birlikte kaydedilmi\u015f ger\u00e7ek \u00f6l\u00e7\u00fcm sonucu, a\u00e7\u0131klamas\u0131z bir onay i\u015faretinden daha yararl\u0131d\u0131r.<\/p>\n\n\n<p>Gerekli bir uygunluk kan\u0131t\u0131 eksikse bunu a\u00e7\u0131k\u00e7a kaydedin. Eksik bir rapor ile \u00f6l\u00e7\u00fcmle tespit edilmi\u015f bir uygunsuzluk, her ikisi de \u015fimdilik kullan\u0131m onay\u0131na engel olsa bile farkl\u0131 sorunlard\u0131r. Bu ayr\u0131m, sat\u0131n alma ekibinin tedarik\u00e7iden soruna uygun bir yan\u0131t almas\u0131n\u0131 kolayla\u015ft\u0131r\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Parti hakk\u0131nda karar verin<\/h3>\n\n\n<p>Yetkili ki\u015fi, malzemenin kullan\u0131m onay\u0131 i\u00e7in gereken \u015fartlar\u0131 kar\u015f\u0131lay\u0131p kar\u015f\u0131lamad\u0131\u011f\u0131na karar verir. Kabul edilen malzemenin kullan\u0131ma onayl\u0131 oldu\u011fu a\u00e7\u0131k\u00e7a belirtilir. Ek kan\u0131t bekleyen malzeme ise beklemede tutulur; takibinden sorumlu ki\u015fi ve bir sonraki i\u015flem belirlenir.<\/p>\n\n\n<p>Uygunsuzluk varsa hangi malzemelerin etkilendi\u011fini belirleyin, uygunsuzlu\u011fu kaydedin ve yanl\u0131\u015fl\u0131kla kullan\u0131lmalar\u0131n\u0131 \u00f6nleyin. Onaylanan i\u015fleme g\u00f6re bir sonraki ad\u0131m tedarik\u00e7iye iade, yenisiyle de\u011fi\u015ftirme, ay\u0131klama, yeniden i\u015fleme veya ret olabilir. \u015eartl\u0131 kabul kapsam\u0131nda kullan\u0131m i\u00e7in ge\u00e7erli s\u00fcrecin gerektirdi\u011fi onay al\u0131nmal\u0131d\u0131r; \u00fcretimin yeti\u015fmesi gereken tarih bu onay\u0131n yerini tutmaz.<\/p>\n\n\n<p>K\u0131smi kullan\u0131m onay\u0131n\u0131 net bi\u00e7imde tan\u0131mlay\u0131n. Ayr\u0131 olarak tan\u0131mlanm\u0131\u015f bir b\u00f6l\u00fcm\u00fcn kabul\u00fc i\u00e7in ge\u00e7erli bir dayanak varsa onay verilen miktar\u0131 ve malzeme kimli\u011fini, ayr\u0131ca nelerin beklemede kald\u0131\u011f\u0131n\u0131 eksiksiz kaydedin. Teslimat\u0131n geneline ili\u015fkin belirsiz bir notu, t\u00fcm kaplardaki malzemeyi kullanma izni olarak yorumlamay\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Kullan\u0131labilirlik bilgilerini ve \u00fcretim plan\u0131n\u0131 g\u00fcncelleyin<\/h3>\n\n\n<p>Kullan\u0131m\u0131na onay verilen miktar\u0131 gecikmeden bildirin. Malzeme h\u00e2l\u00e2 beklemedeyse planlama ekibine, eldeki bilgilere dayanan en ger\u00e7ek\u00e7i kullan\u0131labilirlik tahminini, \u00e7\u00f6z\u00fclmemi\u015f sorunu ve bir sonraki g\u00fcncellemeden kimin sorumlu oldu\u011funu iletin. Tedarik\u00e7inin yar\u0131n yan\u0131t verece\u011fini s\u00f6ylemesi, malzemenin yar\u0131n kullan\u0131m onay\u0131 alaca\u011f\u0131n\u0131n kesinle\u015fmesi demek de\u011fildir.<\/p>\n\n\n<p>Kalite kayd\u0131n\u0131n yan\u0131 s\u0131ra planlama verilerini de g\u00fcncelleyin. Aksi h\u00e2lde depo kayd\u0131nda malzeme do\u011fru bi\u00e7imde beklemede g\u00f6r\u00fcn\u00fcrken \u00fcretim \u00e7izelgesi o malzemeyi kullanmaya devam edebilir. Planlamaya aktar\u0131lmas\u0131 gereken bilgi, ilgili sipari\u015flerle ili\u015fkilendirilmi\u015f <strong>kullan\u0131labilir miktar ve g\u00fcvenilir zaman bilgisidir<\/strong>.<\/p>\n\n\n<p>Ard\u0131ndan \u00fcretim \u00fczerindeki etkileri de\u011ferlendirin. Hangi i\u015fler devam edebilir? Hangileri i\u00e7in ba\u015fka bir parti gerekir? Sorun \u00e7\u00f6z\u00fclene kadar bo\u015fta kalan kapasitede ba\u015fka i\u015fler yap\u0131labilir mi? Kontrol s\u00fcreci bu noktada yaln\u0131zca mal kabule ait bir g\u00f6rev olmaktan \u00e7\u0131kar ve teslimat taahh\u00fctlerini korumaya ba\u015flar.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Her par\u00e7ay\u0131 m\u0131 kontrol etmeli, \u00f6rnekleme mi yapmal\u0131?<\/h2>\n\n\n<p>Gelen t\u00fcm malzemeler i\u00e7in ge\u00e7erli tek bir kontrol y\u00fczdesi yoktur. Se\u00e7im; gerekliliklere, kusurlu malzemeyi kabul etmenin sonu\u00e7lar\u0131na, kontrol y\u00f6ntemine ve tedarik\u00e7inin durumuna ba\u011fl\u0131d\u0131r. Tahribatl\u0131 testler de uygulamada nelerin m\u00fcmk\u00fcn oldu\u011funu etkiler.<\/p>\n\n\n<p>Kabul \u00f6rneklemesinde, tan\u0131ml\u0131 bir parti hakk\u0131nda karar vermek i\u00e7in rastgele se\u00e7ilmi\u015f bir \u00f6rneklemin sonu\u00e7lar\u0131 kullan\u0131l\u0131r. Bu, her bir par\u00e7an\u0131n sa\u011flam oldu\u011funu g\u00f6stermez. Plan, kutunun \u00fcst\u00fcnden kolayca al\u0131nan birka\u00e7 par\u00e7aya de\u011fil, \u00f6nceden belirlenmi\u015f bir \u00f6rneklem b\u00fcy\u00fckl\u00fc\u011f\u00fcne ve karar kurallar\u0131na dayanmal\u0131d\u0131r.<\/p>\n\n\n<p>Sonu\u00e7 ret gerektiriyorsa parti hakk\u0131nda karar vermek i\u00e7in tan\u0131mlanm\u0131\u015f s\u00fcreci izleyin. \u00d6rneklemde bulunan kusurlu par\u00e7alar\u0131 ay\u0131rmak, kontrol edilmemi\u015f kalan k\u0131sm\u0131 kendili\u011finden kabul edilebilir h\u00e2le getirmez. Ek kontrol veya ay\u0131klama, yetkili ki\u015filerce onaylanan bir i\u015flemin par\u00e7as\u0131 olabilir; ancak bunun i\u00e7in ayr\u0131 bir karar gerekir.<\/p>\n\n\n<p>\u0130statistiksel a\u00e7\u0131dan daha fazla bilgi sunan <a href=\"https:\/\/www.itl.nist.gov\/div898\/handbook\/pmc\/section2\/pmc21.htm\">NIST&#8217;in parti kabul \u00f6rneklemesi k\u0131lavuzu<\/a>, bir partiyi de\u011ferlendirmekle tedarik\u00e7inin prosesini kontrol alt\u0131nda tutmak aras\u0131ndaki fark\u0131 a\u00e7\u0131klar. Genel bir \u00f6rne\u011fi kabul standard\u0131 olarak almak yerine, uygulaman\u0131z\u0131n gerektirdi\u011fi \u00f6rnekleme plan\u0131n\u0131 kullan\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kullan\u0131m onay\u0131n\u0131n ilgili ekiplere aktar\u0131lmas\u0131: k\u0131sa kontrol listesi<\/h2>\n\n\n<p>Girdi kontrol\u00fcn\u00fc tamamlamadan \u00f6nce, s\u00fcreci devralan ki\u015finin tekrar telefon a\u00e7maya gerek duymadan \u015fu sorular\u0131 yan\u0131tlayabildi\u011finden emin olun:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Hangi malzeme?<\/strong> Tedarik\u00e7i, malzeme kodu ve revizyonu; ilgili mal kabul ve parti referanslar\u0131.<\/li><li><strong>Hangi karar verildi?<\/strong> Kullan\u0131ma onayland\u0131, h\u00e2l\u00e2 bekletiliyor veya reddedildi; karar\u0131 destekleyen kontrol kay\u0131tlar\u0131 ve yetkili ki\u015finin karar\u0131.<\/li><li><strong>Ne kadar\u0131 kullan\u0131labilir?<\/strong> Bekletilen veya reddedilen miktardan ayr\u0131 olarak, kullan\u0131ma onaylanan kesin miktar ve \u00f6l\u00e7\u00fc birimi.<\/li><li><strong>Hangi konular h\u00e2l\u00e2 a\u00e7\u0131k?<\/strong> Eksik kan\u0131tlar, ek testler, tedarik\u00e7i yan\u0131t\u0131 veya onaylanm\u0131\u015f d\u00fczeltici i\u015flemler; bunlar\u0131n sorumlusu ve bir sonraki g\u00fcncelleme zaman\u0131.<\/li><li><strong>\u00dcretim ekibine hangi bilgiler aktar\u0131ld\u0131?<\/strong> Kullan\u0131labilir miktar ve zamanlamaya ili\u015fkin g\u00fcncel bilgiler ile etkilenen ve g\u00f6zden ge\u00e7irilmesi gereken i\u015fler veya teslimat taahh\u00fctleri.<\/li><\/ul>\n\n\n<p>Uzun s\u00fcredir bekletilen malzemeleri d\u00fczenli olarak g\u00f6zden ge\u00e7irin. \u00d6zellikle malzeme g\u00fcnlerdir tesiste duruyorsa, takibinden sorumlu kimse olmad\u0131\u011f\u0131nda planlama s\u0131ras\u0131nda kullan\u0131labilir oldu\u011fu fark edilmeden varsay\u0131labilir. Tekrarlayan kusurlar\u0131 ve belge sorunlar\u0131n\u0131 da tedarik\u00e7i y\u00f6netimine bildirin; b\u00f6ylece ayn\u0131 sorunla her teslimatta yeniden kar\u015f\u0131la\u015f\u0131lmaz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner ile kullan\u0131m onay\u0131 verilen malzemeyi ger\u00e7ek\u00e7i bir \u00fcretim \u00e7izelgesine yans\u0131t\u0131n<\/h2>\n\n\n<p>Ayr\u0131 ayr\u0131 tan\u0131mlanm\u0131\u015f iki alt parti h\u00e2linde 1.000 bile\u015fen teslim edildi\u011fini d\u00fc\u015f\u00fcn\u00fcn. 600 bile\u015fenlik alt partinin gerekli kontrolleri tamamlanm\u0131\u015f ve kullan\u0131m\u0131na onay verilmi\u015ftir. Di\u011fer 400 bile\u015fen ise gerekli kan\u0131tlar eksik oldu\u011fu i\u00e7in bekletilmektedir.<\/p>\n\n\n<p>\u0130ki \u00fcretim emrinin s\u0131ras\u0131yla 400 ve 350 bile\u015fene ihtiyac\u0131 var. Kullan\u0131m\u0131na onay verilen 600 bile\u015fen, iki emri birden kar\u015f\u0131lamaya yetmez. \u0130lk emre \u00f6ncelik verilirse ikinci emre 200 bile\u015fen kal\u0131r; bu da ihtiyac\u0131n\u0131n tamam\u0131n\u0131 kar\u015f\u0131lamaz. Teslimat\u0131n tamam\u0131n\u0131 kullan\u0131labilir saymak, malzeme eksikli\u011fini gizler. 600 bile\u015fenin kullan\u0131m\u0131na onay verilmesi, kalan 400 bile\u015fenin de kullan\u0131labilir oldu\u011fu anlam\u0131na gelmez.<\/p>\n\n\n<p>Malzeme tahsisini \u00e7\u00f6zseniz bile, her iki emir de ayn\u0131 montaj istasyonuna ve ard\u0131ndan test kapasitesine ihtiya\u00e7 duyabilir. Bir i\u015fin zaman\u0131n\u0131 de\u011fi\u015ftirmek, di\u011fer i\u015flere ayr\u0131labilecek kapasiteyi de de\u011fi\u015ftirir. Mal kabul listesi malzemenin durumunu do\u011fru g\u00f6sterebilir, ancak t\u00fcm bu operasyonlar\u0131n yeni durumda nas\u0131l \u00e7izelgelenece\u011fini g\u00f6stermez.<\/p>\n\n\n<p><strong>SkyPlanner APS, <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">malzeme kullan\u0131labilirli\u011fini ve \u00fcretim kapasitesini<\/a> ayn\u0131 \u00e7izelgeleme hesab\u0131nda bir araya getirir.<\/strong> Malzemeyi dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde, yapay zek\u00e2 motoru Arcturus; sistemde g\u00fcncel tutulan malzeme miktarlar\u0131n\u0131 i\u015f istasyonlar\u0131, vardiyalar, proses ad\u0131mlar\u0131 aras\u0131ndaki ba\u011f\u0131ml\u0131l\u0131klar ve \u00e7izelgeleme \u00f6nceliklerinizle birlikte kullan\u0131r. Gantt zaman \u00e7izelgesi, ortaya \u00e7\u0131kan i\u015f s\u0131ras\u0131n\u0131 ve tamamlanma tarihlerini g\u00f6sterir. B\u00f6ylece malzeme listesini ayr\u0131 makine kuyruklar\u0131yla e\u015fle\u015ftirmeye daha az, \u00f6nemli teslimatlar\u0131 nas\u0131l g\u00fcvence alt\u0131na alaca\u011f\u0131n\u0131za karar vermeye daha fazla zaman ay\u0131r\u0131rs\u0131n\u0131z.<\/p>\n\n\n<p>SkyPlanner, a\u00e7\u0131k REST API \u00fczerinden her t\u00fcrl\u00fc ERP veya MES ile entegre olur. Malzeme bakiyeleri entegrasyonla g\u00fcncel tutulabilir veya SkyPlanner&#8217;\u0131n Depo mod\u00fcl\u00fcndeki stok hareketleriyle y\u00f6netilebilir. Devreye alma s\u0131ras\u0131nda, kalite karar\u0131n\u0131n planlama verilerine kullan\u0131labilir miktar ve zamanlama olarak nas\u0131l aktar\u0131laca\u011f\u0131n\u0131 kararla\u015ft\u0131r\u0131n. Buna k\u0131smi kullan\u0131m onaylar\u0131 ve bekletilen malzemeye ili\u015fkin de\u011fi\u015fen beklentiler de d\u00e2hil olmal\u0131d\u0131r.<\/p>\n\n\n<p>Bu bilgi aktar\u0131m\u0131 \u00f6nemlidir; \u00e7\u00fcnk\u00fc malzemenin geldi\u011finin do\u011frulanmas\u0131, kalite onay\u0131 anlam\u0131na gelmez. SkyPlanner&#8217;da sat\u0131n alma sipari\u015finin teslim tarihi, malzemenin kullan\u0131labilir olmas\u0131n\u0131n beklendi\u011fi tarihi belirtir. Sipari\u015fi Teslim Al\u0131nd\u0131 olarak i\u015faretlemek ise sto\u011fu g\u00fcnceller. Kararla\u015ft\u0131r\u0131lan veri ak\u0131\u015f\u0131n\u0131n, \u00fcretimin ger\u00e7ekten kullanabilece\u011fi miktar\u0131 ve zamanlamay\u0131 yans\u0131tt\u0131\u011f\u0131ndan emin olun; kontrol ve kullan\u0131m onay\u0131 karar\u0131 kalite s\u00fcrecinizin sorumlulu\u011fundad\u0131r.<\/p>\n\n\n<p>Claude, ChatGPT veya Microsoft Copilot gibi kendi yapay zek\u00e2 asistan\u0131n\u0131z \u00fczerinden de \u00e7al\u0131\u015fabilirsiniz. SkyPlanner&#8217;\u0131n MCP ba\u011flant\u0131s\u0131, yetkilendirilmi\u015f bir asistan\u0131 SkyPlanner&#8217;\u0131n verilerine, \u00fcr\u00fcn bilgilerine ve i\u015flevlerine ba\u011flar. B\u00f6ylece planlama g\u00f6revini farkl\u0131 ekranlarda yeniden olu\u015fturmak yerine ne yapmak istedi\u011finizi anlatabilirsiniz. \u00d6rne\u011fin, hangi sipari\u015flerin bekletilen bir bile\u015fene ba\u011fl\u0131 oldu\u011funu sorabilir, ard\u0131ndan yetkileriniz d\u00e2hilinde SkyPlanner i\u015flevlerini kullanarak plan\u0131 g\u00fcncellemek i\u00e7in asistandan yard\u0131m alabilirsiniz. \u00c7izelgeleme hesab\u0131n\u0131 Arcturus yapar; \u00f6ncelikleri siz belirlersiniz. Asistan, yetkili ki\u015finin malzeme kullan\u0131m onay\u0131 karar\u0131n\u0131n yerini almaz.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ortak bir plana ge\u00e7mek neden buna de\u011fer?<\/h3>\n\n\n<p>Elektrikli ekipman \u00fcreticisi UTU&#8217;da \u00fcretim planlama daha \u00f6nce departmanlara \u00f6zel elektronik tablolarla y\u00fcr\u00fct\u00fcl\u00fcyordu. ERP&#8217;deki \u00fcretim s\u0131ras\u0131 de\u011fi\u015fiklikleri her zaman \u00fcretim sahas\u0131na ula\u015fm\u0131yordu. SkyPlanner, fabrikan\u0131n hatlar\u0131n\u0131 ve departmanlar\u0131n\u0131 ERP ile entegre tek bir planlama sisteminde birle\u015ftirdi. UTU, g\u00fcncellenen i\u015f kuyru\u011funun montaj personeline saniyeler i\u00e7inde ula\u015ft\u0131\u011f\u0131n\u0131 belirtiyor.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/utu\/\">UTU&#8217;nun SkyPlanner de\u011ferlendirmesi<\/a>, birbirinden ayr\u0131 tutulan planlar\u0131n \u00f6tesine ge\u00e7menin de\u011ferini g\u00f6steriyor. Gelen malzemeyi y\u00f6neten ekip i\u00e7in de ayn\u0131 planlama ilkesi yararl\u0131d\u0131r: kullan\u0131labilirlik de\u011fi\u015fti\u011finde, i\u015flerin fiilen atand\u0131\u011f\u0131 noktadaki \u00fcretim s\u0131ras\u0131 da bu de\u011fi\u015fikli\u011fi yans\u0131tmal\u0131d\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Malzemenin bekletilmesinin kendi sipari\u015flerinize etkisini g\u00f6r\u00fcn<\/h2>\n\n\n<p>Sa\u011flam bir girdi kontrol s\u00fcreci, g\u00fcvenebilece\u011finiz bir karar sa\u011flar. SkyPlanner bu karar\u0131 \u00e7izelgelemede kullanman\u0131z\u0131 sa\u011flar: hangi i\u015flerin y\u00fcr\u00fct\u00fclebilece\u011fini, \u00e7izelgede nereye yerle\u015fece\u011fini ve g\u00fcncellenen plan\u0131n teslimat a\u00e7\u0131s\u0131ndan ne anlama geldi\u011fini g\u00f6sterir.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>; gelen malzemelerinizden ger\u00e7ek bir bile\u015feni, kullan\u0131m\u0131na onay verilen veya kullan\u0131labilir olmas\u0131 beklenen miktar\u0131n\u0131 ve bu miktar\u0131 payla\u015fmas\u0131 gereken sipari\u015fleri g\u00f6r\u00fc\u015fmeye getirin. Bu \u00f6rnek \u00fczerinden, malzeme kullan\u0131labilirli\u011fi ile sonlu kapasitenin plan\u0131 birlikte nas\u0131l de\u011fi\u015ftirdi\u011fini inceleyin.<\/p>\n\n\n<p>\u00d6nce kendiniz ke\u015ffetmek isterseniz <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a> veya SkyPlanner Assistant&#8217;taki yapay zek\u00e2 destekli Ba\u015flang\u0131\u00e7 deneyimini kullan\u0131n. Kendi kontrol s\u00fcrecinizde al\u0131nan kararlar\u0131n kullan\u0131labilirlik bilgisine nas\u0131l aktar\u0131laca\u011f\u0131n\u0131 belirlemeden \u00f6nce \u00e7izelgelemenin nas\u0131l \u00e7al\u0131\u015ft\u0131\u011f\u0131n\u0131 g\u00f6rebilirsiniz.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na Ana Sayfa &raquo; Kaynaklar &raquo; Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na Girdi kontrol\u00fc, sat\u0131n al\u0131nan malzeme, par\u00e7a veya bile\u015fenlerin, kullan\u0131mlar\u0131na onay verilmeden \u00f6nce belirtilen \u015fartlara uygunlu\u011funun do\u011frulanmas\u0131d\u0131r. Giri\u015f kalite kontrol\u00fc olarak da adland\u0131r\u0131lan bu s\u00fcre\u00e7, tedarik\u00e7inin teslim etti\u011fi malzeme ile fabrikan\u0131n g\u00fcvenle \u00fcretime alabilece\u011fi malzeme aras\u0131ndaki ba\u011f\u0131 &#8230; <a title=\"Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/\" aria-label=\"Read more about Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":113099,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-113083","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ve-cizelgeleme","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na<\/title>\n<meta name=\"description\" content=\"Teslim al\u0131nan malzeme kullan\u0131ma haz\u0131r olmayabilir. Kullan\u0131m onay\u0131n\u0131 y\u00f6neten, \u00fcretime uygulanabilir bir plan sunan bir girdi kontrol\u00fc s\u00fcreci olu\u015fturun.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na\" \/>\n<meta property=\"og:description\" content=\"Teslim al\u0131nan malzeme kullan\u0131ma haz\u0131r olmayabilir. Kullan\u0131m onay\u0131n\u0131 y\u00f6neten, \u00fcretime uygulanabilir bir plan sunan bir girdi kontrol\u00fc s\u00fcreci olu\u015fturun.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-30T01:32:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-30T01:34:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/girdi-kontrolu\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/girdi-kontrolu\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na\",\"datePublished\":\"2026-10-30T01:32:22+00:00\",\"dateModified\":\"2026-10-30T01:34:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/girdi-kontrolu\\\/\"},\"wordCount\":2673,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/girdi-kontrolu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"articleSection\":[\"APS ve \u00e7izelgeleme\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/girdi-kontrolu\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/girdi-kontrolu\\\/\",\"name\":\"Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/girdi-kontrolu\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/girdi-kontrolu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"datePublished\":\"2026-10-30T01:32:22+00:00\",\"dateModified\":\"2026-10-30T01:34:04+00:00\",\"description\":\"Teslim al\u0131nan malzeme kullan\u0131ma haz\u0131r olmayabilir. Kullan\u0131m onay\u0131n\u0131 y\u00f6neten, \u00fcretime uygulanabilir bir plan sunan bir girdi kontrol\u00fc s\u00fcreci olu\u015fturun.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/girdi-kontrolu\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/girdi-kontrolu\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/girdi-kontrolu\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/incoming-inspection-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Incoming brackets under a magnifier, with separate trays, an amber divider and a path to a workstation.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/girdi-kontrolu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na","description":"Teslim al\u0131nan malzeme kullan\u0131ma haz\u0131r olmayabilir. Kullan\u0131m onay\u0131n\u0131 y\u00f6neten, \u00fcretime uygulanabilir bir plan sunan bir girdi kontrol\u00fc s\u00fcreci olu\u015fturun.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/","og_locale":"tr_TR","og_type":"article","og_title":"Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na","og_description":"Teslim al\u0131nan malzeme kullan\u0131ma haz\u0131r olmayabilir. Kullan\u0131m onay\u0131n\u0131 y\u00f6neten, \u00fcretime uygulanabilir bir plan sunan bir girdi kontrol\u00fc s\u00fcreci olu\u015fturun.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-30T01:32:22+00:00","article_modified_time":"2026-10-30T01:34:04+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"13 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na","datePublished":"2026-10-30T01:32:22+00:00","dateModified":"2026-10-30T01:34:04+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/"},"wordCount":2673,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","articleSection":["APS ve \u00e7izelgeleme","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/","name":"Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","datePublished":"2026-10-30T01:32:22+00:00","dateModified":"2026-10-30T01:34:04+00:00","description":"Teslim al\u0131nan malzeme kullan\u0131ma haz\u0131r olmayabilir. Kullan\u0131m onay\u0131n\u0131 y\u00f6neten, \u00fcretime uygulanabilir bir plan sunan bir girdi kontrol\u00fc s\u00fcreci olu\u015fturun.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png","width":1672,"height":941,"caption":"Incoming brackets under a magnifier, with separate trays, an amber divider and a path to a workstation."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/girdi-kontrolu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/incoming-inspection-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na Ana Sayfa &raquo; Kaynaklar &raquo; Girdi Kontrol\u00fc: Teslim Almadan \u00dcretimde Kullan\u0131m Onay\u0131na Girdi kontrol\u00fc, sat\u0131n al\u0131nan malzeme, par\u00e7a veya bile\u015fenlerin, kullan\u0131mlar\u0131na onay verilmeden \u00f6nce belirtilen \u015fartlara uygunlu\u011funun do\u011frulanmas\u0131d\u0131r. Giri\u015f kalite kontrol\u00fc olarak da adland\u0131r\u0131lan bu s\u00fcre\u00e7, tedarik\u00e7inin teslim etti\u011fi malzeme ile fabrikan\u0131n g\u00fcvenle \u00fcretime alabilece\u011fi malzeme aras\u0131ndaki ba\u011f\u0131&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/113083","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=113083"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/113083\/revisions"}],"predecessor-version":[{"id":113146,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/113083\/revisions\/113146"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/113099"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=113083"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=113083"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=113083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}