{"id":112293,"date":"2026-10-29T04:49:23","date_gmt":"2026-10-29T04:49:23","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=112293"},"modified":"2026-10-29T04:50:50","modified_gmt":"2026-10-29T04:50:50","slug":"uretim-yuku-kontrolu","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/","title":{"rendered":"\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; \u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Kesim makinesinde bo\u015f kapasite var, bu y\u00fczden bir sipari\u015f daha \u00fcretime al\u0131n\u0131yor. Kesim zaman\u0131nda tamamlan\u0131yor. Ancak par\u00e7alar, \u00e7oktan montaja ge\u00e7mi\u015f olmas\u0131 gereken i\u015flerle birlikte, tala\u015fl\u0131 imalat \u00f6n\u00fcnde giderek uzayan kuyru\u011fa kat\u0131l\u0131yor.<\/p>\n\n\n<p>Erken ba\u015flamak, m\u00fc\u015fteriye teslimat\u0131 \u00f6ne \u00e7ekmeden at\u00f6lyedeki yo\u011funlu\u011fu art\u0131rm\u0131\u015f oluyor.<\/p>\n\n\n<p>\u00dcretim y\u00fck\u00fc kontrol\u00fc, yeni bir i\u015f daha \u00fcretim alan\u0131na girmeden bu sorunu ele al\u0131r. Haz\u0131r olan her sipari\u015fi \u00fcretime almak yerine, sipari\u015fin rotas\u0131 boyunca ekleyece\u011fi i\u015f y\u00fck\u00fcn\u00fc de\u011ferlendirirsiniz. Bu yakla\u015f\u0131m \u00f6zellikle sipari\u015fe g\u00f6re \u00fcretimde faydal\u0131d\u0131r; \u00e7\u00fcnk\u00fc benzer g\u00f6r\u00fcnen iki sipari\u015f, ortak kaynaklarda \u00e7ok farkl\u0131 y\u00fckler olu\u015fturabilir.<\/p>\n\n\n<p>\u00dcretime alma karar\u0131, i\u015fin yaln\u0131zca yar\u0131s\u0131d\u0131r. Kabul edilen i\u015flerin bu kaynaklarda birbiriyle uyumlu bir s\u0131rayla i\u015flenmesi de gerekir. SkyPlanner APS bu i\u015fleri birbiriyle ba\u011flant\u0131l\u0131 tek bir \u00fcretim \u00e7izelgesine d\u00f6n\u00fc\u015ft\u00fcr\u00fcr. B\u00f6ylece \u00fcretime al\u0131nacak i\u015fler listesini ayr\u0131 ayr\u0131 makine kuyruklar\u0131yla e\u015fle\u015ftirmek i\u00e7in harcanan \u00e7aba azal\u0131r ve teslimata etkilerini g\u00f6rmek kolayla\u015f\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dcretim y\u00fck\u00fc kontrol\u00fc nedir?<\/h2>\n\n\n<p><strong>\u00dcretim y\u00fck\u00fc kontrol\u00fc (WLC), \u00fcretime girecek i\u015fleri kaynaklar\u0131n \u00fczerindeki y\u00fcke g\u00f6re d\u00fczenleyen bir \u00fcretim planlama ve kontrol yakla\u015f\u0131m\u0131d\u0131r. \u0130\u015f y\u00fck\u00fcne dayal\u0131 \u00fcretime alma uygulamas\u0131nda sipari\u015fler, ilgili kural \u00fcretim alan\u0131na giri\u015flerine izin verene kadar bir bekleme havuzunda tutulur. \u0130\u015f merkezleri i\u00e7in belirlenen y\u00fck s\u0131n\u0131rlar\u0131, hangi sipari\u015flerin \u00fcretime al\u0131nabilece\u011fine karar vermeye yard\u0131mc\u0131 olur.<\/strong><\/p>\n\n\n<p>Ama\u00e7, \u00fcretime al\u0131nm\u0131\u015f ancak hen\u00fcz tamamlanmam\u0131\u015f i\u015fleri, yani proses i\u00e7i i\u015fleri (WIP) kontrol alt\u0131nda tutmakt\u0131r. Bir i\u015f merkezi tek bir makineden veya birbirinin yerine kullan\u0131lmaya uygun bir kaynak grubundan olu\u015fabilir. \u0130\u015f y\u00fck\u00fc, o merkeze atanm\u0131\u015f i\u015f miktar\u0131d\u0131r ve genellikle tahmini i\u015flem saatiyle ifade edilir. Kapasite ise bu i\u015fi yapabilme olana\u011f\u0131d\u0131r. \u0130\u015f y\u00fck\u00fc s\u0131n\u0131r\u0131, \u00fcretime alma politikas\u0131nda kullan\u0131lan bir e\u015fiktir; mevcut kapasitenin ba\u015fka bir ad\u0131 de\u011fildir.<\/p>\n\n\n<p>WLC \u00f6zellikle \u00fcr\u00fcnlerin rotalar\u0131n\u0131n ve i\u015flem s\u00fcrelerinin farkl\u0131 oldu\u011fu yerlerde \u00f6nem kazan\u0131r: sipari\u015fe \u00f6zel tala\u015fl\u0131 imalat, metal imalat\u0131 ve \u00e7ok \u00e7e\u015fitli i\u015fler yapan di\u011fer at\u00f6lyeler gibi. Yaln\u0131zca sipari\u015f say\u0131s\u0131na bakmak, bu \u00e7e\u015fitlilik hakk\u0131nda pek az bilgi verir. Bir sipari\u015f k\u0131sa bir kesim i\u015fleminin ard\u0131ndan uzun s\u00fcreli tala\u015fl\u0131 imalat gerektirirken, ba\u015fka bir sipari\u015f hi\u00e7 tala\u015fl\u0131 imalata u\u011framayabilir.<\/p>\n\n\n<p>Daha geni\u015f kapsam\u0131yla WLC, teklif taleplerinin y\u00f6netimini ve teslim tarihi kararlar\u0131n\u0131 da destekleyebilir. Burada ise g\u00fcnl\u00fck \u00fcretime alma karar\u0131na odaklan\u0131yoruz: <strong>Bekleyen sipari\u015flerden hangileri \u015fimdi \u00fcretime al\u0131nmal\u0131?<\/strong><\/p>\n\n\n<h2 class=\"wp-block-heading\">Yaln\u0131zca ilk makinenin kuyru\u011funa bakmay\u0131n<\/h2>\n\n\n<p>Bir makinenin \u00f6n\u00fcnde g\u00f6r\u00fcnen kuyruk, o makineye gelecek i\u015flerin tamam\u0131n\u0131 g\u00f6stermez. \u00dcretime al\u0131nm\u0131\u015f i\u015fler h\u00e2l\u00e2 \u00f6nceki a\u015famalarda, bir operasyon i\u00e7in bekliyor veya i\u015fleniyor olabilir. Bu i\u015fler daha sonra sonraki a\u015famalarda ayn\u0131 kapasiteyi kullanmak i\u00e7in yar\u0131\u015facakt\u0131r.<\/p>\n\n\n<p>\u00dcretime alma karar\u0131n\u0131 verirken \u015fu y\u00fckleri birbirinden ay\u0131r\u0131n:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Do\u011frudan y\u00fck:<\/strong> \u0130\u015f merkezine ula\u015fm\u0131\u015f, bekleyen veya i\u015flenmekte olan i\u015fler.<\/li><li><strong>Dolayl\u0131 y\u00fck:<\/strong> \u00dcretime al\u0131nm\u0131\u015f sipari\u015flerin hen\u00fcz \u00f6nceki a\u015famalarda bulunan, ancak s\u00f6z konusu i\u015f merkezine gelecek olan i\u015fleri.<\/li><li><strong>Havuzdaki y\u00fck:<\/strong> Hen\u00fcz \u00fcretime al\u0131nmam\u0131\u015f sipari\u015flerin i\u00e7erdi\u011fi i\u015fler. Bir sipari\u015fi \u00fcretime almay\u0131 de\u011ferlendirirken, sipari\u015fin mevcut y\u00fcke ne kadar ekleyece\u011fini hesaba katars\u0131n\u0131z.<\/li><\/ul>\n\n\n<p>Bu sabah tala\u015fl\u0131 imalat\u0131n sakin g\u00f6r\u00fcnd\u00fc\u011f\u00fcn\u00fc, ancak \u00fcretime al\u0131nm\u0131\u015f birka\u00e7 imalat sipari\u015finin yar\u0131n buraya ula\u015faca\u011f\u0131n\u0131 d\u00fc\u015f\u00fcn\u00fcn. \u0130malat alan\u0131n\u0131 daha fazla tala\u015fl\u0131 imalata gidecek i\u015fle doldurmak, yakla\u015fan bu y\u00fck\u00fc g\u00f6z ard\u0131 etmek olur. Buna kar\u015f\u0131l\u0131k, tala\u015fl\u0131 imalata u\u011framayan bekleyen bir sipari\u015f, \u00fcretime al\u0131nmak i\u00e7in uygun bir aday olabilir.<\/p>\n\n\n<p>Rotaya dayal\u0131 kontrol\u00fcn de\u011feri burada ortaya \u00e7\u0131kar: B\u00fcy\u00fcyen bir kuyru\u011fa y\u00fck ekleyen i\u015flerle farkl\u0131 bir yol izleyen i\u015fleri ay\u0131rt eder. B\u00f6ylece \u201cBa\u015flamak i\u00e7in yer var\u201d d\u00fc\u015f\u00fcncesinin yerini, \u201cBu sipari\u015fin u\u011frayaca\u011f\u0131 ve y\u00fck\u00fc kontrol edilen i\u015f merkezlerinde, getirece\u011fi y\u00fck i\u00e7in yer var\u201d de\u011ferlendirmesi al\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">S\u0131n\u0131r\u0131 belirlemeden \u00f6nce y\u00fck\u00fcn nas\u0131l hesaplanaca\u011f\u0131n\u0131 tan\u0131mlay\u0131n<\/h2>\n\n\n<p>WLC, her yerde ge\u00e7erli tek bir form\u00fcl de\u011fil, bir yakla\u015f\u0131mlar b\u00fct\u00fcn\u00fcd\u00fcr. \u00dcretime alma y\u00f6ntemleri; sonraki a\u015famalardaki i\u015fleri nas\u0131l hesaba katt\u0131klar\u0131, bekleme havuzunu ne zaman g\u00f6zden ge\u00e7irdikleri ve bir i\u015f merkezinde i\u015f kalmad\u0131\u011f\u0131nda nas\u0131l tepki verdikleri a\u00e7\u0131s\u0131ndan farkl\u0131l\u0131k g\u00f6sterir.<\/p>\n\n\n<p>Literat\u00fcrde yer alan y\u00f6ntemlerden biri <strong>d\u00fczeltilmi\u015f toplam y\u00fck<\/strong> hesab\u0131n\u0131 kullan\u0131r. Her operasyonun y\u00fcke katk\u0131s\u0131, tahmini i\u015flem s\u00fcresinin sipari\u015fin ilk tan\u0131mlanan rotas\u0131ndaki s\u0131ra numaras\u0131na b\u00f6l\u00fcnmesiyle hesaplan\u0131r. \u0130lk operasyon s\u00fcresinin tamam\u0131 kadar, ikinci operasyon yar\u0131s\u0131 kadar, \u00fc\u00e7\u00fcnc\u00fc operasyon ise \u00fc\u00e7te biri kadar katk\u0131da bulunur. Atanan bu katk\u0131, ilgili operasyon tamamlanana kadar o i\u015f merkezinin y\u00fck\u00fcnde kal\u0131r.<\/p>\n\n\n<p>Bu d\u00fczeltme, h\u00e2lihaz\u0131rda kayna\u011f\u0131n \u00f6n\u00fcnde bulunan i\u015fle \u00fcretime al\u0131nd\u0131ktan sonra zaman\u0131n\u0131n bir b\u00f6l\u00fcm\u00fcn\u00fc \u00f6nceki a\u015famalarda ge\u00e7irecek i\u015fi birbirinden ay\u0131r\u0131r. Bu bir y\u00fck hesaplama kural\u0131d\u0131r; makinenin sonunda sa\u011flamas\u0131 gereken i\u015flem s\u00fcresini azaltmaz.<\/p>\n\n\n<p>Hesaplama y\u00f6ntemlerini birbirine kar\u0131\u015ft\u0131rmay\u0131n. Bu y\u00f6ntemde alt\u0131 saat s\u00fcren ikinci bir operasyon, d\u00fczeltilmi\u015f y\u00fcke \u00fc\u00e7 saat katk\u0131da bulunur; ancak \u00fcretim \u00e7izelgesinde yine alt\u0131 saatlik i\u015flem s\u00fcresine ihtiya\u00e7 duyar. D\u00fczeltilmi\u015f y\u00fcke g\u00f6re ayarlanm\u0131\u015f bir s\u0131n\u0131r, sonraki a\u015famalardaki her operasyonu tam s\u00fcresiyle sayan bir y\u00fck hesab\u0131nda do\u011frudan kullan\u0131lamaz.<\/p>\n\n\n<p>Bir \u00fcretime alma s\u0131n\u0131r\u0131 uygulamadan \u00f6nce y\u00fck birimini, hangi operasyonlar\u0131n y\u00fcke katk\u0131da bulundu\u011funu, bu katk\u0131lar\u0131n nas\u0131l hesapland\u0131\u011f\u0131n\u0131 ve her katk\u0131n\u0131n hangi tamamlanma olay\u0131yla hesaptan d\u00fc\u015f\u00fcld\u00fc\u011f\u00fcn\u00fc yaz\u0131l\u0131 olarak tan\u0131mlay\u0131n. Bu tan\u0131mlar, farkl\u0131 planlamac\u0131lar\u0131n ve vardiyalar\u0131n ayn\u0131 karar\u0131 tutarl\u0131 bi\u00e7imde verebilmesini sa\u011flar.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ad\u0131m ad\u0131m i\u015f y\u00fck\u00fcne dayal\u0131 \u00fcretime alma karar\u0131<\/h2>\n\n\n<p>\u00dcretime al\u0131nmay\u0131 bekleyen bir sipari\u015fin rotas\u0131n\u0131n \u015f\u00f6yle oldu\u011funu d\u00fc\u015f\u00fcn\u00fcn: iki saat kesim, alt\u0131 saat tala\u015fl\u0131 imalat ve \u00fc\u00e7 saat montaj. Yukar\u0131daki d\u00fczeltilmi\u015f toplam y\u00fck hesab\u0131na g\u00f6re, bu sipari\u015fin y\u00fcke katk\u0131lar\u0131 s\u0131ras\u0131yla iki, \u00fc\u00e7 ve bir saattir.<\/p>\n\n\n<p>Mevcut y\u00fck kay\u0131tlar\u0131n\u0131n ve i\u015fletme ko\u015fullar\u0131na g\u00f6re se\u00e7ilmi\u015f s\u0131n\u0131rlar\u0131n a\u015fa\u011f\u0131daki gibi oldu\u011funu varsayal\u0131m. Bu say\u0131lar karar\u0131 \u00f6rneklemek i\u00e7indir; \u00f6nerilen s\u0131n\u0131r de\u011ferleri de\u011fildir.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Y\u00fck\u00fc kontrol edilen i\u015f merkezi<\/th><th>Mevcut d\u00fczeltilmi\u015f y\u00fck<\/th><th>Aday sipari\u015fin y\u00fck katk\u0131s\u0131<\/th><th>\u00dcretime al\u0131n\u0131rsa olu\u015facak y\u00fck<\/th><th>\u0130\u015f y\u00fck\u00fc s\u0131n\u0131r\u0131<\/th><\/tr><\/thead><tbody><tr><td>Kesim<\/td><td>5<\/td><td>2<\/td><td>7<\/td><td>8<\/td><\/tr><tr><td>Tala\u015fl\u0131 imalat<\/td><td>8<\/td><td>3<\/td><td>11<\/td><td>10<\/td><\/tr><tr><td>Montaj<\/td><td>4<\/td><td>1<\/td><td>5<\/td><td>6<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Kesim ve montaj kendi s\u0131n\u0131rlar\u0131 i\u00e7inde kal\u0131rken tala\u015fl\u0131 imalat s\u0131n\u0131r\u0131 a\u015f\u0131l\u0131yor. Rotada y\u00fck\u00fc kontrol edilen her i\u015f merkezinin kendi s\u0131n\u0131r\u0131 i\u00e7inde kalmas\u0131n\u0131 gerektiren bir kurala g\u00f6re sipari\u015f bekleme havuzunda kal\u0131r. Kesim makinesinin bo\u015f olmas\u0131, tala\u015fl\u0131 imalat s\u0131n\u0131r\u0131n\u0131 ge\u00e7ersiz k\u0131lmaz.<\/p>\n\n\n<p>Bir sonraki de\u011ferlendirmede, tamamlanan tala\u015fl\u0131 imalat i\u015fleri sayesinde kay\u0131tlardan iki saatlik d\u00fczeltilmi\u015f y\u00fck\u00fcn d\u00fc\u015f\u00fcld\u00fc\u011f\u00fcn\u00fc varsayal\u0131m. Ba\u015fka bir y\u00fck de\u011fi\u015fikli\u011fi yoksa tala\u015fl\u0131 imalat\u0131n mevcut y\u00fck\u00fc art\u0131k alt\u0131 saattir; aday sipari\u015fin \u00fc\u00e7 saatlik katk\u0131s\u0131 eklenince dokuz saate \u00e7\u0131kar. B\u00f6ylece sipari\u015f \u00fc\u00e7 kontrol\u00fc de ge\u00e7er.<\/p>\n\n\n<p>Uygulanabilir bir periyodik \u00fcretime alma prosed\u00fcr\u00fc bu mant\u0131\u011f\u0131 izler:<\/p>\n\n\n<p>1. <strong>Mevcut y\u00fck\u00fc g\u00fcncelleyin.<\/strong> Tamamlanan operasyonlara atanm\u0131\u015f y\u00fck katk\u0131lar\u0131n\u0131 kay\u0131tlardan \u00e7\u0131kar\u0131n ve \u00fcretime al\u0131nm\u0131\u015f i\u015flerdeki de\u011fi\u015fiklikleri kay\u0131tlara yans\u0131t\u0131n.<\/p>\n\n\n<p>2. <strong>Havuzdaki uygun sipari\u015fleri s\u0131ralay\u0131n.<\/strong> \u00dcretime haz\u0131r olup olmad\u0131klar\u0131n\u0131 kontrol ettikten sonra teslim tarihi veya planlanan \u00fcretime alma tarihi gibi \u00fczerinde anla\u015f\u0131lm\u0131\u015f bir kurala g\u00f6re s\u0131ralama yap\u0131n.<\/p>\n\n\n<p>3. <strong>S\u0131radaki sipari\u015fin rotas\u0131n\u0131 kontrol edin.<\/strong> Sipari\u015fin getirece\u011fi y\u00fck katk\u0131lar\u0131n\u0131 mevcut kay\u0131tlara ekleyerek olu\u015facak y\u00fckleri ilgili s\u0131n\u0131rlarla kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/p>\n\n\n<p>4. <strong>Yaln\u0131zca \u00fcretime al\u0131nmas\u0131 kabul edilen sipari\u015fi kesin olarak kaydedin.<\/strong> Bu sipari\u015fin y\u00fck katk\u0131lar\u0131n\u0131 kay\u0131tlara ekleyin. Sipari\u015f kontrolden ge\u00e7emezse havuzda tutun; deneme s\u0131ras\u0131nda eklenen y\u00fck\u00fcn\u00fc kay\u0131tlarda b\u0131rakmay\u0131n.<\/p>\n\n\n<p>5. <strong>Di\u011fer adaylar\u0131 de\u011ferlendirmeye devam edin.<\/strong> Sonraki her kontrolde, daha \u00f6nce \u00fcretime al\u0131nmas\u0131 kabul edilen sipari\u015flerle g\u00fcncellenmi\u015f y\u00fck kay\u0131tlar\u0131n\u0131 kullan\u0131n.<\/p>\n\n\n<p>Bu son ayr\u0131nt\u0131 \u00f6nemlidir. \u0130ki sipari\u015f, sabahki ba\u015flang\u0131\u00e7 y\u00fck\u00fcne g\u00f6re ayr\u0131 ayr\u0131 s\u0131n\u0131rlar i\u00e7inde kalabilir; ancak birlikte \u00fcretime al\u0131nd\u0131klar\u0131nda bir s\u0131n\u0131r\u0131 a\u015fabilir. Bir sipari\u015fin reddedilmesi de t\u00fcm \u00fcretime alma i\u015flemlerini durdurmak zorunda de\u011fildir: havuzdan se\u00e7im i\u00e7in belirlenen kurala ba\u011fl\u0131 olarak ba\u015fka bir rota s\u0131n\u0131rlar i\u00e7inde kalabilir.<\/p>\n\n\n<p>Bir operasyon tamamland\u0131\u011f\u0131nda, o operasyona atanm\u0131\u015f y\u00fck katk\u0131s\u0131n\u0131 ilgili i\u015f merkezinin kay\u0131tlar\u0131ndan \u00e7\u0131kar\u0131n. Yaln\u0131zca ilk operasyon tamamland\u0131 diye sipari\u015fin t\u00fcm y\u00fck\u00fcn\u00fc sonraki i\u015f merkezlerinin tamam\u0131ndan silmeyin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ak\u0131\u015f\u0131 koruyacak bir \u00fcretime alma d\u00fczeni se\u00e7in<\/h2>\n\n\n<p>Periyodik \u00fcretime almada adaylar belirli aral\u0131klarla de\u011ferlendirilir. S\u00fcrekli \u00fcretime almada ise tan\u0131mlanm\u0131\u015f y\u00fck ko\u015fullar\u0131 olu\u015ftu\u011fu anda i\u015flem yap\u0131l\u0131r. Baz\u0131 WLC y\u00f6ntemleri ikisini birle\u015ftirir: periyodik kararlarla y\u00fckler dengelenirken ek bir kuralla i\u015f merkezinin i\u015fleyecek i\u015f kalmad\u0131\u011f\u0131 i\u00e7in bo\u015fta kalmas\u0131 durumu ele al\u0131n\u0131r.<\/p>\n\n\n<p>Bu nedenle bir kuyru\u011fun bo\u015falmas\u0131, elde ne varsa \u00fcretime almaya y\u00f6nelik gayriresm\u00ee bir talimat\u0131 de\u011fil, \u00fczerinde anla\u015f\u0131lm\u0131\u015f politikay\u0131 devreye sokmal\u0131d\u0131r. \u0130\u015f merkezinin i\u015fsiz kalmas\u0131n\u0131 \u00f6nleyecek kural, hangi i\u015fin \u00fcretime girebilece\u011fini ve y\u00fck\u00fcn\u00fcn nas\u0131l kaydedilece\u011fini belirtmelidir. Aksi takdirde istisnalar zamanla kontrol\u00fc etkisiz h\u00e2le getirebilir.<\/p>\n\n\n<p>Ayn\u0131 disiplin acil sipari\u015fler i\u00e7in de ge\u00e7erlidir. Sipari\u015flerin havuzda ne kadar s\u00fcredir bekledi\u011fini ve teslimat riskini g\u00f6r\u00fcn\u00fcr tutun. Teslim tarihi gelen bir sipari\u015f y\u00fck s\u0131n\u0131r\u0131n\u0131 tekrar tekrar a\u015farak kontrolden ge\u00e7emiyorsa kapasiteyi, rotay\u0131, \u00f6nceli\u011fi veya teslimat taahh\u00fcd\u00fcn\u00fc de\u011fi\u015ftirip de\u011fi\u015ftirmeyece\u011finize karar verin. Sipari\u015fi yaln\u0131zca acil olarak etiketlemek, ek i\u015flem s\u00fcresi yaratmaz.<\/p>\n\n\n<p>Bir y\u00fck s\u0131n\u0131r\u0131, s\u00fcrekli a\u015f\u0131r\u0131 y\u00fcklenmeyi de \u00e7\u00f6zemez. Kabul edilen talep, kritik bir kayna\u011f\u0131n sa\u011flayabilece\u011fi \u00fcretim miktar\u0131n\u0131 s\u00fcrekli a\u015f\u0131yorsa daha fazla sipari\u015fi \u00fcretim d\u0131\u015f\u0131nda tutmak yaln\u0131zca bekledikleri yeri de\u011fi\u015ftirir. Kapasite ve m\u00fc\u015fteriye verilen taahh\u00fctler yine ele al\u0131nmal\u0131d\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Y\u00fck s\u0131n\u0131rlar\u0131n\u0131 \u00fcretim sahas\u0131n\u0131n d\u00fczenli g\u00f6r\u00fcnmesine g\u00f6re de\u011fil, toplam lead time&#8217;a g\u00f6re ayarlay\u0131n<\/h2>\n\n\n<p>\u00c7ok gev\u015fek bir y\u00fck s\u0131n\u0131r\u0131 i\u015fleri kolayca \u00fcretime al\u0131r, ancak kuyruklar\u0131n b\u00fcy\u00fcmesine izin verir. \u00c7ok s\u0131k\u0131 bir s\u0131n\u0131r ise i\u015flerin \u00fcretim sahas\u0131nda ge\u00e7irdi\u011fi s\u00fcreyi k\u0131salt\u0131rken havuzda gere\u011finden uzun beklemelerine yol a\u00e7abilir. \u00d6zellikle b\u00fcy\u00fck i\u015fleri \u00fcretime almak zorla\u015fabilir.<\/p>\n\n\n<p>Havuza giren bir sipari\u015fin tamamlanmas\u0131na kadar ge\u00e7en s\u00fcreyi, birbirine ba\u011fl\u0131 iki b\u00f6l\u00fcm olarak de\u011ferlendirin:<\/p>\n\n\n<p><strong>Havuzda bekleme s\u00fcresi + \u00fcretime al\u0131nmas\u0131ndan tamamlanmas\u0131na kadar ge\u00e7en s\u00fcre.<\/strong><\/p>\n\n\n<p>Bir haftal\u0131k beklemeyi \u00fcretim sahas\u0131ndan havuza ta\u015f\u0131mak, m\u00fc\u015fteri i\u00e7in kendili\u011finden bir hafta kazan\u0131ld\u0131\u011f\u0131 anlam\u0131na gelmez.<\/p>\n\n\n<p>\u00d6nce y\u00fck kay\u0131tlar\u0131n\u0131n ve tamamlanma bildirimlerinin g\u00fcvenilir olmas\u0131n\u0131 sa\u011flay\u0131n. Y\u00fck s\u0131n\u0131rlar\u0131n\u0131 kademeli olarak uygulamaya al\u0131n veya s\u0131k\u0131la\u015ft\u0131r\u0131n; ard\u0131ndan \u00fcretim h\u0131z\u0131n\u0131n, teslimat performans\u0131n\u0131n ve toplam sipari\u015f lead time&#8217;\u0131n\u0131n birlikte iyile\u015fip iyile\u015fmedi\u011fini inceleyin. Ortalamalar\u0131n yan\u0131 s\u0131ra havuzda en uzun s\u00fcredir bekleyen sipari\u015fleri de izleyin. Yaln\u0131zca \u00fcretim sahas\u0131ndaki WIP azalmas\u0131n\u0131 ba\u015far\u0131 saymak yerine i\u015f merkezlerinin neden i\u015fsiz kald\u0131\u011f\u0131n\u0131 ara\u015ft\u0131r\u0131n.<\/p>\n\n\n<p>Her yerde ge\u00e7erli, \u201cdo\u011fru\u201d bir y\u00fck saati miktar\u0131 yoktur. Rotalar\u0131n da\u011f\u0131l\u0131m\u0131, kapasite, tahminlerin kalitesi ve se\u00e7ilen y\u00fck hesaplama y\u00f6ntemi, i\u015fe yarayan d\u00fczeyi birlikte belirler. Bu ko\u015fullar de\u011fi\u015fti\u011finde s\u0131n\u0131r\u0131 yeniden de\u011ferlendirin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">WLC, BOA, CONWIP ve POLCA: farkl\u0131 kontrol sorular\u0131<\/h2>\n\n\n<p>Bu y\u00f6ntemlerin hepsi \u00fcretim ak\u0131\u015f\u0131n\u0131 ele al\u0131r, ancak kulland\u0131klar\u0131 sinyaller birbirinin yerine ge\u00e7mez.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Yakla\u015f\u0131m<\/th><th>Kontrol\u00fcn odak noktas\u0131<\/th><\/tr><\/thead><tbody><tr><td>WLC kapsam\u0131nda y\u00fcke dayal\u0131 \u00fcretime alma<\/td><td>Aday sipari\u015fin y\u00fck katk\u0131lar\u0131n\u0131n, rotas\u0131nda yer alan ve kontrol edilen i\u015f merkezlerinin y\u00fck s\u0131n\u0131rlar\u0131 i\u00e7inde kal\u0131p kalmad\u0131\u011f\u0131.<\/td><\/tr><tr><td>BOA<\/td><td>Almanya k\u00f6kenli y\u00fcke dayal\u0131 \u00fcretime alma yakla\u015f\u0131m\u0131: \u00fcretim emirlerinin kapasite y\u00fck\u00fcne ve tan\u0131mlanm\u0131\u015f bir y\u00fck s\u0131n\u0131r\u0131na g\u00f6re \u00fcretime al\u0131nmas\u0131.<\/td><\/tr><tr><td><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/conwip\/\">CONWIP<\/a><\/td><td>Tan\u0131mlanm\u0131\u015f bir \u00fcretim alan\u0131ndaki toplam WIP s\u0131n\u0131r\u0131na g\u00f6re \u00fcretime giri\u015f izni verilmesi.<\/td><\/tr><tr><td><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/polca\/\">POLCA<\/a><\/td><td>\u0130\u015f i\u00e7in verilen izne ek olarak, h\u00fccre \u00e7iftlerine atanm\u0131\u015f ve birbiriyle \u00f6rt\u00fc\u015fen kart d\u00f6ng\u00fcleriyle kapasite kullan\u0131m izni verilmesi.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Klasik BOA ile farkl\u0131 WLC \u00fcretime alma y\u00f6ntemleri ayn\u0131 algoritmaym\u0131\u015f gibi ele al\u0131nmamal\u0131d\u0131r. \u00d6zellikle, y\u00f6ntemin y\u00fck\u00fc nas\u0131l \u00f6l\u00e7t\u00fc\u011f\u00fcn\u00fc ve s\u0131n\u0131r\u0131 nas\u0131l belirledi\u011fini tan\u0131mlamadan bir BOA y\u00fckleme y\u00fczdesini d\u00fczeltilmi\u015f y\u00fck \u00f6rne\u011fine uygulamay\u0131n.<\/p>\n\n\n<p>Se\u00e7iminizi, kontrol etmeniz gereken karara g\u00f6re yap\u0131n. Toplam WIP tavan\u0131, tan\u0131ml\u0131 alan i\u00e7indeki miktar\u0131 s\u0131n\u0131rlar; i\u015f merkezi y\u00fck s\u0131n\u0131rlar\u0131 ise farkl\u0131 rotalar\u0131n y\u00fck\u00fc nereye getirece\u011fini ayr\u0131 ayr\u0131 ele al\u0131r. Bu yakla\u015f\u0131mlar\u0131n hi\u00e7biri tek ba\u015f\u0131na her operasyonun hangi makinede, ne zaman ba\u015flayaca\u011f\u0131n\u0131 belirlemez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dcretime al\u0131nan i\u015fleri SkyPlanner ile b\u00fct\u00fcnl\u00fckl\u00fc bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcn<\/h2>\n\n\n<p>Y\u00fck kontrol\u00fcnden ge\u00e7mek, bir sipari\u015fin se\u00e7ilen \u00fcretime alma politikas\u0131na g\u00f6re \u00fcretime girebilece\u011fi anlam\u0131na gelir. Bir sonraki operasyonunun hemen ba\u015flayabilece\u011fi veya teslim tarihinin g\u00fcvence alt\u0131nda oldu\u011fu anlam\u0131na gelmez. Makinelerin vardiyalar\u0131, malzemelerin temin tarihleri vard\u0131r; operasyonlar da \u00f6nceki i\u015flerin tamamlanmas\u0131na ba\u011fl\u0131d\u0131r.<\/p>\n\n\n<p>SkyPlanner APS, kabul edilen i\u015flerin t\u00fcm\u00fcn\u00fc bu k\u0131s\u0131tlar\u0131 birlikte ele alarak \u00e7izelgeler. \u00c7izelgeleme i\u00e7in kulland\u0131\u011f\u0131 yapay zek\u00e2 Arcturus, tan\u0131mlanm\u0131\u015f kapasiteyi, vardiyalar\u0131, ba\u011f\u0131ml\u0131l\u0131klar\u0131 ve \u00f6ncelikleri dikkate alarak i\u015flem ad\u0131mlar\u0131n\u0131 uygun i\u015f istasyonlar\u0131na atar. Malzeme durumunu dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde, malzeme kullan\u0131labilirli\u011fi de hesaplamaya kat\u0131l\u0131r. Gantt g\u00f6r\u00fcn\u00fcm\u00fc, ortaya \u00e7\u0131kan plan\u0131 t\u00fcm kaynaklar i\u00e7in g\u00f6sterir.<\/p>\n\n\n<p>\u00d6rne\u011fe d\u00f6nelim: tala\u015fl\u0131 i\u015fleme i\u00e7in belirlenen y\u00fck s\u0131n\u0131r\u0131 art\u0131k sipari\u015fin \u00fcretime al\u0131nmas\u0131na izin veriyor, ancak alt\u0131 saatlik operasyonuna mevcut i\u015fler aras\u0131nda h\u00e2l\u00e2 yer bulunmas\u0131 gerekiyor. SkyPlanner bu yerle\u015fimi kesim, montaj ve di\u011fer sipari\u015flerle birlikte hesaplar. Her makinenin kuyru\u011funu elle yeniden olu\u015fturmadan, i\u015fin ne zaman tamamlanmas\u0131n\u0131n beklendi\u011fini ve \u00f6ncelik de\u011fi\u015fikliklerinin etkisini g\u00f6rebilirsiniz.<\/p>\n\n\n<p>Siz \u00f6ncelikler, kurallar ve kilitlerle \u00e7izelgeyi y\u00f6nlendirirsiniz; \u00e7izelgeleme hesaplamas\u0131n\u0131 Arcturus yapar. SkyPlanner&#8217;\u0131 y\u00fcke dayal\u0131 bir \u00fcretime alma politikas\u0131yla birlikte kullanman\u0131n pratik gerek\u00e7esi budur: <strong>i\u015fleri birbiriyle uyumlu hale getirmek i\u00e7in daha az elle d\u00fczenleme yapmak ve kabul edilen i\u015flerin teslimatlara etkisini daha net g\u00f6rmek.<\/strong><\/p>\n\n\n<p>Sipari\u015fin ba\u015flayabilece\u011fi en erken tarihi belirleyen kural etkinle\u015ftirildi\u011finde, bu tarih \u00e7izelgelemede \u00fczerinde anla\u015f\u0131lm\u0131\u015f en erken ba\u015flang\u0131\u00e7 s\u0131n\u0131r\u0131 olarak kullan\u0131labilir. Bu tarih bir \u00e7izelgeleme k\u0131s\u0131t\u0131d\u0131r; sipari\u015fin g\u00fcncel WLC y\u00fck s\u0131n\u0131rlar\u0131na g\u00f6re kontrolden ge\u00e7ti\u011fini kan\u0131tlamaz. \u0130\u015f ak\u0131\u015f\u0131n\u0131 tasarlarken \u00fcretime alma karar\u0131n\u0131 ve y\u00fck kay\u0131tlar\u0131n\u0131 a\u00e7\u0131k\u00e7a tan\u0131mlay\u0131n.<\/p>\n\n\n<p>SkyPlanner&#8217;\u0131n \u0130\u015f Raporu ve Sipari\u015f Kalemi Raporu, kaydedilen i\u015fleri ve s\u00fcre farklar\u0131n\u0131 incelemenize de yard\u0131mc\u0131 olur. Bu raporlar, planlamada kullan\u0131lan s\u00fcre tahminlerini iyile\u015ftirmek i\u00e7in bir temel sunar; ancak \u00fcretime alma politikas\u0131 i\u00e7in tamamlanma bildirimleri ve y\u00fck hesaplama kurallar\u0131 yine tan\u0131mlanm\u0131\u015f olmal\u0131d\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Daha iyi zamanlama Mamec&#8217;te neleri de\u011fi\u015ftirdi?<\/h3>\n\n\n<p>End\u00fcstriyel kar\u0131\u015ft\u0131rma ekipmanlar\u0131 ve y\u00fcksek teknolojili \u00fcr\u00fcnler \u00fcreten fason imalat\u00e7\u0131 Mamec, SkyPlanner&#8217;\u0131 kullanmaya ba\u015flad\u0131ktan sonra \u00fcretim planlama i\u015f y\u00fck\u00fcn\u00fcn belirgin bi\u00e7imde hafifledi\u011fini bildiriyor. <a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/mamec\/\">M\u00fc\u015fteri hik\u00e2yesinde<\/a> ayr\u0131ca, i\u015flerin do\u011fru zamanda ba\u015flamas\u0131 sayesinde daha makul lead time de\u011ferlerine ula\u015f\u0131ld\u0131\u011f\u0131 ve WIP&#8217;ye gereksiz yere ba\u011flanan i\u015fletme sermayesinin azald\u0131\u011f\u0131 anlat\u0131l\u0131yor.<\/p>\n\n\n<p>\u00dcretime alma kontrol\u00fcn\u00fcn yan\u0131nda \u00e7izelgelemede hedeflenmesi gereken sonu\u00e7 budur: i\u015flerin yaln\u0131zca ba\u015fka bir kuyru\u011fa eklenmesi de\u011fil, ilerleyebilecekleri zamanda ba\u015flamas\u0131. \u00dcretime alma s\u0131n\u0131rlar\u0131yla \u00e7al\u0131\u015fan bir planlamac\u0131 i\u00e7in de ayn\u0131 ayr\u0131m \u00f6nemlidir: kontroll\u00fc bir ba\u015flang\u0131c\u0131n ard\u0131ndan, kuyruklar\u0131n yeniden d\u00fczeltilmesini gerektiren bir s\u00fcre\u00e7 de\u011fil, koordineli bir plan gelmelidir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tek bir \u00fcretime alma karar\u0131yla ba\u015flay\u0131n, teslimata kadar izleyin<\/h2>\n\n\n<p>\u0130lk uygulamada, y\u00fck\u00fcn\u00fc kontrol edece\u011finiz i\u015f merkezlerini anlaml\u0131 bir kapsam olu\u015fturacak \u015fekilde se\u00e7in ve tipik sipari\u015f rotalar\u0131n\u0131 belirleyin. Ayn\u0131 gruptaki makinelerin i\u015fleri ger\u00e7ekten payla\u015fabildi\u011fini do\u011frulay\u0131n, operasyonlar\u0131n tamamland\u0131\u011f\u0131na ili\u015fkin geri bildirim d\u00fczenini kurun ve y\u00fck s\u0131n\u0131rlar\u0131n\u0131 zaman\u0131nda kar\u015f\u0131layamayan bir i\u015f i\u00e7in nas\u0131l ilerleyece\u011finiz konusunda anla\u015f\u0131n. Ard\u0131ndan \u00fcretime alma kararlar\u0131n\u0131z\u0131n <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">\u00fcretim \u00e7izelgenizle<\/a> tutarl\u0131 olup olmad\u0131\u011f\u0131n\u0131 s\u0131nay\u0131n.<\/p>\n\n\n<p>SkyPlanner, a\u00e7\u0131k REST API \u00fczerinden her t\u00fcrl\u00fc ERP veya MES ile entegre olur. B\u00f6ylece \u00fcretim \u00e7izelgenizi iyile\u015ftirmek i\u00e7in sipari\u015flerinizi tuttu\u011funuz sistemi de\u011fi\u015ftirmeniz gerekmez.<\/p>\n\n\n<p>Bu ba\u011flant\u0131y\u0131 kendi \u00fcretiminizde g\u00f6rmek i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>. G\u00f6r\u00fc\u015fmeye bekleyen bir sipari\u015fin rotas\u0131n\u0131, i\u015f merkezlerinin mevcut y\u00fcklerini ve uygulamay\u0131 d\u00fc\u015f\u00fcnd\u00fc\u011f\u00fcn\u00fcz \u00fcretime alma kural\u0131n\u0131 getirin. \u00dcretime al\u0131nmas\u0131 onaylanan i\u015fin \u00e7izelgede nas\u0131l ilerledi\u011fini takip edin; tamamlanma tarihlerine ve ayn\u0131 kaynaklar\u0131 kullanacak di\u011fer sipari\u015flere etkisini inceleyin.<\/p>\n\n\n<p>\u00d6nce kendiniz ke\u015ffetmek mi istersiniz? <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a> veya SkyPlanner Asistan\u0131&#8217;ndaki yapay zek\u00e2 destekli Ba\u015flang\u0131\u00e7 ad\u0131mlar\u0131n\u0131 izleyin. \u00d6nceliklerin kontrol\u00fc sizde kal\u0131rken rotan\u0131n tamam\u0131n\u0131n tek bir yerde hesaplanmas\u0131yla planlaman\u0131n ne kadar kolayla\u015ft\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcn.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131? Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131? Kesim makinesinde bo\u015f kapasite var, bu y\u00fczden bir sipari\u015f daha \u00fcretime al\u0131n\u0131yor. Kesim zaman\u0131nda tamamlan\u0131yor. Ancak par\u00e7alar, \u00e7oktan montaja ge\u00e7mi\u015f olmas\u0131 gereken i\u015flerle birlikte, tala\u015fl\u0131 imalat \u00f6n\u00fcnde giderek uzayan kuyru\u011fa kat\u0131l\u0131yor. Erken ba\u015flamak, m\u00fc\u015fteriye &#8230; <a title=\"\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/\" aria-label=\"Read more about \u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":112304,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-112293","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ve-cizelgeleme","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?<\/title>\n<meta name=\"description\" content=\"\u0130lk makine bo\u015fken sonraki a\u015fama dolu olabilir. Y\u00fcke g\u00f6re \u00fcretime almay\u0131 \u00f6\u011frenin; onaylanan i\u015fleri birbiriyle ba\u011flant\u0131l\u0131 tek bir \u00fcretim plan\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?\" \/>\n<meta property=\"og:description\" content=\"\u0130lk makine bo\u015fken sonraki a\u015fama dolu olabilir. Y\u00fcke g\u00f6re \u00fcretime almay\u0131 \u00f6\u011frenin; onaylanan i\u015fleri birbiriyle ba\u011flant\u0131l\u0131 tek bir \u00fcretim plan\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-29T04:49:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-29T04:50:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/workload-control-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"17 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-yuku-kontrolu\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-yuku-kontrolu\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?\",\"datePublished\":\"2026-10-29T04:49:23+00:00\",\"dateModified\":\"2026-10-29T04:50:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-yuku-kontrolu\\\/\"},\"wordCount\":3324,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-yuku-kontrolu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/workload-control-manufacturing-hero.png\",\"articleSection\":[\"APS ve \u00e7izelgeleme\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-yuku-kontrolu\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-yuku-kontrolu\\\/\",\"name\":\"\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-yuku-kontrolu\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-yuku-kontrolu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/workload-control-manufacturing-hero.png\",\"datePublished\":\"2026-10-29T04:49:23+00:00\",\"dateModified\":\"2026-10-29T04:50:50+00:00\",\"description\":\"\u0130lk makine bo\u015fken sonraki a\u015fama dolu olabilir. Y\u00fcke g\u00f6re \u00fcretime almay\u0131 \u00f6\u011frenin; onaylanan i\u015fleri birbiriyle ba\u011flant\u0131l\u0131 tek bir \u00fcretim plan\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-yuku-kontrolu\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-yuku-kontrolu\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-yuku-kontrolu\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/workload-control-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/workload-control-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A waiting parts tray faces an idle cutting station and a downstream machining queue before release.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretim-yuku-kontrolu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?","description":"\u0130lk makine bo\u015fken sonraki a\u015fama dolu olabilir. Y\u00fcke g\u00f6re \u00fcretime almay\u0131 \u00f6\u011frenin; onaylanan i\u015fleri birbiriyle ba\u011flant\u0131l\u0131 tek bir \u00fcretim plan\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/","og_locale":"tr_TR","og_type":"article","og_title":"\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?","og_description":"\u0130lk makine bo\u015fken sonraki a\u015fama dolu olabilir. Y\u00fcke g\u00f6re \u00fcretime almay\u0131 \u00f6\u011frenin; onaylanan i\u015fleri birbiriyle ba\u011flant\u0131l\u0131 tek bir \u00fcretim plan\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-29T04:49:23+00:00","article_modified_time":"2026-10-29T04:50:50+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/workload-control-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"17 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?","datePublished":"2026-10-29T04:49:23+00:00","dateModified":"2026-10-29T04:50:50+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/"},"wordCount":3324,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/workload-control-manufacturing-hero.png","articleSection":["APS ve \u00e7izelgeleme","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/","name":"\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/workload-control-manufacturing-hero.png","datePublished":"2026-10-29T04:49:23+00:00","dateModified":"2026-10-29T04:50:50+00:00","description":"\u0130lk makine bo\u015fken sonraki a\u015fama dolu olabilir. Y\u00fcke g\u00f6re \u00fcretime almay\u0131 \u00f6\u011frenin; onaylanan i\u015fleri birbiriyle ba\u011flant\u0131l\u0131 tek bir \u00fcretim plan\u0131na d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/workload-control-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/workload-control-manufacturing-hero.png","width":1672,"height":941,"caption":"A waiting parts tray faces an idle cutting station and a downstream machining queue before release."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-yuku-kontrolu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/workload-control-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/workload-control-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/workload-control-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/workload-control-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/workload-control-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/workload-control-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/workload-control-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/workload-control-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131? Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretim y\u00fck\u00fc kontrol\u00fc: \u0130\u015fler ne zaman \u00fcretime al\u0131nmal\u0131? Kesim makinesinde bo\u015f kapasite var, bu y\u00fczden bir sipari\u015f daha \u00fcretime al\u0131n\u0131yor. Kesim zaman\u0131nda tamamlan\u0131yor. Ancak par\u00e7alar, \u00e7oktan montaja ge\u00e7mi\u015f olmas\u0131 gereken i\u015flerle birlikte, tala\u015fl\u0131 imalat \u00f6n\u00fcnde giderek uzayan kuyru\u011fa kat\u0131l\u0131yor. Erken ba\u015flamak, m\u00fc\u015fteriye&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/112293","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=112293"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/112293\/revisions"}],"predecessor-version":[{"id":112357,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/112293\/revisions\/112357"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/112304"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=112293"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=112293"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=112293"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}