{"id":111924,"date":"2026-10-28T19:23:39","date_gmt":"2026-10-28T19:23:39","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111924"},"modified":"2026-10-28T19:25:04","modified_gmt":"2026-10-28T19:25:04","slug":"epei","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/","title":{"rendered":"EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Bir \u00fcr\u00fcn ailesindeki her par\u00e7ay\u0131 daha s\u0131k, daha k\u00fc\u00e7\u00fck partilerle \u00fcretmek istiyorsunuz. \u00dcretim d\u00f6ng\u00fcs\u00fc k\u00e2\u011f\u0131t \u00fczerinde d\u00fczenli g\u00f6r\u00fcn\u00fcyor: \u00f6nce A, sonra B, ard\u0131ndan C ve yeniden A. Ancak makinenin tamamlamas\u0131 gereken m\u00fc\u015fteri sipari\u015fleri de var. \u00dcstelik her d\u00f6ng\u00fcde tip de\u011fi\u015fimlerinin t\u00fcm\u00fc yeniden yap\u0131l\u0131yor.<\/p>\n\n\n<p>Every Part Every Interval, k\u0131saca EPEI, bu \u00fcr\u00fcn ailesinin \u00fcretiminin hangi aral\u0131klarla tekrarlanabilece\u011fini de\u011ferlendirmenize yard\u0131mc\u0131 olur. Burada as\u0131l soru yaln\u0131zca aral\u0131\u011f\u0131n ne kadar k\u0131sa olmas\u0131n\u0131 istedi\u011finiz de\u011fildir. \u0130\u015fleme s\u00fcrelerinin, haz\u0131rl\u0131klar\u0131n ve di\u011fer i\u015flerin bu aral\u0131\u011fa s\u0131\u011f\u0131p s\u0131\u011fmad\u0131\u011f\u0131d\u0131r.<\/p>\n\n\n<p>\u00d6nce bu kapasite kontrol\u00fcn\u00fc yap\u0131n. Ard\u0131ndan tekrarlayan sipari\u015fleri, \u00fcretimin geri kalan\u0131yla ayn\u0131 \u00e7izelgeye al\u0131n. SkyPlanner APS, se\u00e7ti\u011finiz \u00fcretim ritmini uygulamak i\u00e7in her makinenin i\u015f s\u0131ras\u0131n\u0131 s\u00fcrekli yeniden d\u00fczenlemek zorunda kalmadan bunu yapman\u0131za yard\u0131mc\u0131 olur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">EPEI nedir?<\/h2>\n\n\n<p><strong>EPEI, belirli bir \u00fcr\u00fcn ailesindeki her par\u00e7an\u0131n belirli bir proseste art arda yap\u0131lan \u00fcretimleri aras\u0131nda ge\u00e7en s\u00fcredir.<\/strong> \u0130ki i\u015f g\u00fcnl\u00fck bir EPEI hedefi, bu ailedeki her par\u00e7an\u0131n \u00fcretimine iki i\u015f g\u00fcn\u00fcnde bir d\u00f6n\u00fclmesi ve bu ikmal ritmi i\u00e7in gereken miktar\u0131n \u00fcretilmesi anlam\u0131na gelir.<\/p>\n\n\n<p>Bu kavramla \u201cevery product every interval\u201d ad\u0131yla veya EPEx k\u0131saltmas\u0131yla da kar\u015f\u0131la\u015fabilirsiniz; burada x, se\u00e7ilen zaman aral\u0131\u011f\u0131n\u0131 belirtir. \u00d6nemli olan, fabrikan\u0131n hangi k\u0131saltmay\u0131 kulland\u0131\u011f\u0131 de\u011fil, \u00fcretimin tekrarlanma s\u0131kl\u0131\u011f\u0131d\u0131r.<\/p>\n\n\n<p>Bir de\u011fer vermeden \u00f6nce kapsam\u0131 belirleyin. \u201c\u0130ki g\u00fcn\u201d ifadesi, ancak hangi par\u00e7alar\u0131, hangi kayna\u011f\u0131 ve hangi \u00e7al\u0131\u015fma takvimini kapsad\u0131\u011f\u0131 herkes\u00e7e biliniyorsa anlaml\u0131d\u0131r. Tala\u015fl\u0131 imalatta iki g\u00fcnde bir \u00fcretilen bir \u00fcr\u00fcn ailesi, sonraki a\u015famada haftada bir \u00e7al\u0131\u015fan bir prosesi yine de beklemek zorunda kalabilir.<\/p>\n\n\n<p>Ayr\u0131ca \u015fu \u00fc\u00e7 kavram\u0131 birbirinden ay\u0131r\u0131n:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Hesaplanan alt s\u0131n\u0131r:<\/strong> belirtilen kapasite hesab\u0131na g\u00f6re uygulanabilir olan en k\u0131sa aral\u0131k.<\/li><li><strong>Planlama hedefi:<\/strong> uygulanabilirli\u011fi, talebi ve \u00e7al\u0131\u015fma ko\u015fullar\u0131n\u0131 de\u011ferlendirerek se\u00e7ti\u011finiz \u00fcretim ritmi.<\/li><li><strong>Ger\u00e7ekle\u015fen aral\u0131k:<\/strong> her par\u00e7an\u0131n art arda yap\u0131lan \u00fcretimleri aras\u0131nda fiilen ge\u00e7en s\u00fcre.<\/li><\/ul>\n\n\n<p>\u00dcretim d\u00f6ng\u00fcs\u00fcnde bir hedefin yer almas\u0131, sahada bu hedefe ula\u015f\u0131ld\u0131\u011f\u0131n\u0131 g\u00f6stermez. EPEI; tek bir par\u00e7an\u0131n \u00fcretim \u00e7evrim s\u00fcresi, talebin gerektirdi\u011fi takt zaman\u0131 veya bir sipari\u015fin \u00fcretime ba\u015flamas\u0131ndan tamamlanmas\u0131na kadar ge\u00e7en toplam s\u00fcre de de\u011fildir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kapasiteye g\u00f6re EPEI alt s\u0131n\u0131r\u0131 nas\u0131l hesaplan\u0131r?<\/h2>\n\n\n<p>Tek bir kaynakta s\u0131rayla \u00fcretilen basit bir \u00fcr\u00fcn ailesi i\u00e7in \u00fc\u00e7 girdiden ba\u015flay\u0131n:<\/p>\n\n\n<p>1. <strong>Bu \u00fcr\u00fcn ailesi i\u00e7in i\u015f g\u00fcn\u00fc ba\u015f\u0131na kullan\u0131labilir s\u00fcre.<\/strong> Planl\u0131 \u00fcretim d\u0131\u015f\u0131 s\u00fcreleri ve kayna\u011f\u0131n di\u011fer i\u015flere ayr\u0131lm\u0131\u015f kapasitesini d\u00fc\u015f\u00fcr\u00fcn.<\/p>\n\n\n<p>2. <strong>Talebi kar\u015f\u0131lamak i\u00e7in gereken g\u00fcnl\u00fck i\u015fleme s\u00fcresi.<\/strong> Her par\u00e7a i\u00e7in ortalama g\u00fcnl\u00fck talebi par\u00e7a ba\u015f\u0131na i\u015fleme s\u00fcresiyle \u00e7arp\u0131n, ard\u0131ndan sonu\u00e7lar\u0131 toplay\u0131n.<\/p>\n\n\n<p>3. <strong>Tekrarlayan bir tam d\u00f6ng\u00fcn\u00fcn haz\u0131rl\u0131k s\u00fcresi.<\/strong> Son par\u00e7adan ilk par\u00e7aya d\u00f6n\u00fc\u015f de dahil olmak \u00fczere t\u00fcm ge\u00e7i\u015fleri hesaba kat\u0131n.<\/p>\n\n\n<p>Kullan\u0131labilir s\u00fcreden g\u00fcnl\u00fck i\u015fleme s\u00fcresi \u00e7\u0131kar\u0131ld\u0131\u011f\u0131nda, haz\u0131rl\u0131klara kalan kapasite bulunur. Temel hesap \u015f\u00f6yledir:<\/p>\n\n\n<p><strong>\u0130\u015f g\u00fcn\u00fc cinsinden en k\u0131sa aral\u0131k = tekrarlayan d\u00f6ng\u00fc ba\u015f\u0131na toplam haz\u0131rl\u0131k s\u00fcresi \u00f7 haz\u0131rl\u0131klara kalan g\u00fcnl\u00fck kapasite<\/strong><\/p>\n\n\n<p>Form\u00fclde A g\u00fcnl\u00fck kullan\u0131labilir s\u00fcreyi, R g\u00fcnl\u00fck gerekli i\u015fleme s\u00fcresini, S ise tam d\u00f6ng\u00fc ba\u015f\u0131na haz\u0131rl\u0131k s\u00fcresini dakika cinsinden g\u00f6stersin:<\/p>\n\n\n<p><strong>T \u2265 S \u00f7 (A \u2212 R)<\/strong><\/p>\n\n\n<p>Hesab\u0131n mant\u0131\u011f\u0131 basittir. T i\u015f g\u00fcn\u00fc boyunca R \u00d7 T dakika i\u015fleme s\u00fcresine ve S dakika haz\u0131rl\u0131k s\u00fcresine ihtiya\u00e7 vard\u0131r. Bunlar\u0131n, kullan\u0131labilir A \u00d7 T dakikaya s\u0131\u011fmas\u0131 gerekir. Bu ko\u015ful yeniden d\u00fczenlendi\u011finde yukar\u0131daki aral\u0131k elde edilir.<\/p>\n\n\n<p>Birimleri tutarl\u0131 kullan\u0131n. Talep g\u00fcnl\u00fck adet, i\u015fleme s\u00fcresi ise par\u00e7a ba\u015f\u0131na saniye olarak verilmi\u015fse, hesaplanan saniyeleri g\u00fcnl\u00fck kullan\u0131labilir dakikadan \u00e7\u0131karmadan \u00f6nce dakikaya \u00e7evirin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">De\u011fi\u015fkenlik i\u00e7in bilin\u00e7li olarak pay b\u0131rak\u0131n<\/h3>\n\n\n<p>Temel alt s\u0131n\u0131rda, kalan kapasitenin tamam\u0131 tip de\u011fi\u015fimlerine harcan\u0131r. Ola\u011fan de\u011fi\u015fkenli\u011fi kar\u015f\u0131layacak hi\u00e7bir pay yoksa bu, uygulamada k\u0131r\u0131lgan bir hedeftir.<\/p>\n\n\n<p>Aral\u0131\u011f\u0131 hesaplamadan \u00f6nce, gecikmeleri telafi etmek veya talep dalgalanmalar\u0131n\u0131 kar\u015f\u0131lamak i\u00e7in her g\u00fcn belirli say\u0131da dakikay\u0131 yedek olarak ay\u0131rabilirsiniz. Bu pay\u0131 A&#8217;dan \u00e7\u0131kar\u0131n. Ayn\u0131 pay\u0131 iki kez d\u00fc\u015fmeyin: molalar, bilinen duru\u015flar, ayn\u0131 kayna\u011f\u0131 kullanan di\u011fer i\u015fler ve telafi s\u00fcresi a\u00e7\u0131k\u00e7a ve ayr\u0131 ayr\u0131 ele al\u0131nmal\u0131d\u0131r.<\/p>\n\n\n<p>A \u2212 R s\u0131f\u0131r veya negatifse haz\u0131rl\u0131klara ayr\u0131labilecek pozitif bir s\u00fcre kalmaz. S\u00fcrekli i\u015fleme y\u00fck\u00fc zaten kullan\u0131labilir kapasitenin tamam\u0131n\u0131 t\u00fcketiyorsa, aral\u0131\u011f\u0131 uzatmak sorunu \u00e7\u00f6zmez. Y\u00fck\u00fc, gereken i\u015fleme s\u00fcresini veya kapasiteyi de\u011fi\u015ftirmeniz gerekir.<\/p>\n\n\n<p>Bu, ekonomik a\u00e7\u0131dan en uygun aral\u0131k de\u011fil, kapasiteye dayal\u0131 bir alt s\u0131n\u0131rd\u0131r. Hesap, talebi temsil eden \u00fcr\u00fcn karmas\u0131n\u0131n sabit kald\u0131\u011f\u0131n\u0131, her par\u00e7an\u0131n d\u00f6ng\u00fc ba\u015f\u0131na bir kez \u00fcretildi\u011fini ve belirtilen s\u0131ran\u0131n izlendi\u011fini varsayar. Asgari parti miktarlar\u0131, sabit s\u00fcreli prosesler, malzeme bulunabilirli\u011fi ve di\u011fer operasyonlar daha uzun bir aral\u0131k gerektirebilir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">EPEI hesaplama \u00f6rne\u011fi: tek makinede \u00fc\u00e7 par\u00e7a<\/h2>\n\n\n<p>D\u00fczenli olarak \u00fc\u00e7 farkl\u0131 par\u00e7an\u0131n \u00fcretildi\u011fi bir tala\u015fl\u0131 imalat h\u00fccresi d\u00fc\u015f\u00fcn\u00fcn. Planl\u0131 \u00fcretim d\u0131\u015f\u0131 s\u00fcreler ve \u00f6nceden ayr\u0131lm\u0131\u015f di\u011fer i\u015fler d\u00fc\u015f\u00fcld\u00fckten sonra, bu \u00fcr\u00fcn ailesi i\u00e7in <strong>i\u015f g\u00fcn\u00fc ba\u015f\u0131na 420 dakika<\/strong> kullan\u0131labilir s\u00fcre kal\u0131yor.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Par\u00e7a<\/th><th>\u0130\u015f g\u00fcn\u00fc ba\u015f\u0131na talep<\/th><th>Par\u00e7a ba\u015f\u0131na i\u015fleme s\u00fcresi<\/th><th>\u0130\u015f g\u00fcn\u00fc ba\u015f\u0131na gereken i\u015fleme s\u00fcresi<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>100 adet<\/td><td>2 dakika<\/td><td>200 dakika<\/td><\/tr><tr><td>B<\/td><td>60 adet<\/td><td>1,5 dakika<\/td><td>90 dakika<\/td><\/tr><tr><td>C<\/td><td>40 adet<\/td><td>1 dakika<\/td><td>40 dakika<\/td><\/tr><tr><td>Toplam<\/td><td>200 adet<\/td><td>\u2014<\/td><td>330 dakika<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Tam A\u2013B\u2013C\u2013A d\u00f6ng\u00fcs\u00fcndeki tip de\u011fi\u015fimleri 90 dakika s\u00fcrer. Bu toplama C&#8217;den A&#8217;ya d\u00f6n\u00fc\u015f de dahildir; aksi halde sonraki d\u00f6ng\u00fc, hesapta unutulmu\u015f bir haz\u0131rl\u0131kla ba\u015flard\u0131.<\/p>\n\n\n<p>Yedek pay ayr\u0131lmad\u0131\u011f\u0131nda, haz\u0131rl\u0131klara kalan g\u00fcnl\u00fck kapasite 420 \u2212 330 = 90 dakikad\u0131r. Dolay\u0131s\u0131yla hesaplanan en k\u0131sa aral\u0131k <strong>90 \u00f7 90 = bir i\u015f g\u00fcn\u00fcd\u00fcr<\/strong>. G\u00fcnl\u00fck \u00fcretim mevcut s\u00fcreye tam olarak s\u0131\u011far, ancak gecikmeleri telafi edecek hi\u00e7 pay kalmaz.<\/p>\n\n\n<p>\u015eimdi g\u00fcnde 45 dakikay\u0131 yedek olarak ay\u0131r\u0131n. Haz\u0131rl\u0131klara kalan s\u00fcre 420 \u2212 45 \u2212 330 = 45 dakika\/g\u00fcn olur. Buna g\u00f6re:<\/p>\n\n\n<p><strong>Kapasiteye g\u00f6re EPEI alt s\u0131n\u0131r\u0131 = 90 \u00f7 45 = iki i\u015f g\u00fcn\u00fc<\/strong><\/p>\n\n\n<p>Bu ritimde bir d\u00f6ng\u00fcde A&#8217;dan 200, B&#8217;den 120 ve C&#8217;den 80 adet \u00fcretilir. \u0130\u015fleme 660 dakika, haz\u0131rl\u0131klar ise ek olarak 90 dakika s\u00fcrer. \u0130ki g\u00fcn\u00fcn toplam kullan\u0131labilir s\u00fcresi olan 840 dakikan\u0131n 750 dakikas\u0131 kullan\u0131l\u0131r ve ama\u00e7lanan 90 dakikal\u0131k yedek pay kal\u0131r.<\/p>\n\n\n<p>B\u00f6ylece iki i\u015f g\u00fcn\u00fc makul bir se\u00e7enek haline gelir; ancak hen\u00fcz uygulanabilirli\u011fi do\u011frulanm\u0131\u015f bir \u00e7izelge de\u011fildir. \u00dcretim s\u0131ras\u0131n\u0131n ger\u00e7ek vardiya saatlerine s\u0131\u011fd\u0131\u011f\u0131n\u0131, par\u00e7alar\u0131n ve tak\u0131mlar\u0131n haz\u0131r oldu\u011funu ve sonraki operasyonlar\u0131n bu i\u015fleri kabul edebilece\u011fini kontrol edin. Araya hafta sonu girdi\u011finde iki i\u015f g\u00fcn\u00fc, iki takvim g\u00fcn\u00fcnden daha uzun bir s\u00fcreye yay\u0131labilir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Aral\u0131\u011f\u0131 ne k\u0131salt\u0131r, ne uzat\u0131r?<\/h3>\n\n\n<p>Di\u011fer t\u00fcm ko\u015fullar ayn\u0131 kal\u0131rken tam \u00e7evrimin toplam haz\u0131rl\u0131k s\u00fcresi 90 dakikadan 45 dakikaya d\u00fc\u015ferse, rezerv kapasiteyi hesaba katan alt s\u0131n\u0131r <strong>45 \u00f7 45 = bir i\u015f g\u00fcn\u00fc<\/strong> olur. Haz\u0131rl\u0131k s\u00fcresindeki azalma yaln\u0131zca tip de\u011fi\u015fimini h\u0131zland\u0131rmakla kalmaz; her par\u00e7an\u0131n \u00fcretimine daha s\u0131k d\u00f6nmeyi de sa\u011flar.<\/p>\n\n\n<p>Tersi durum kolayca g\u00f6zden ka\u00e7abilir. G\u00fcnl\u00fck i\u015flem s\u00fcresi ihtiyac\u0131 330 dakikadan 360 dakikaya \u00e7\u0131karsa, ayn\u0131 rezerv korundu\u011funda haz\u0131rl\u0131klar i\u00e7in g\u00fcnde yaln\u0131zca 420 \u2212 45 \u2212 360 = 15 dakika kal\u0131r. \u00c7evrimin toplam haz\u0131rl\u0131k s\u00fcresi ba\u015flang\u0131\u00e7taki gibi 90 dakika oldu\u011funda alt s\u0131n\u0131r <strong>alt\u0131 i\u015f g\u00fcn\u00fcne<\/strong> \u00e7\u0131kar.<\/p>\n\n\n<p>Haz\u0131rl\u0131klara ayr\u0131labilecek kapasite azald\u0131\u011f\u0131nda, i\u015flem y\u00fck\u00fcndeki k\u00fc\u00e7\u00fck bir art\u0131\u015f bile tekrar aral\u0131\u011f\u0131n\u0131 ciddi \u00f6l\u00e7\u00fcde uzatabilir. EPEI de\u011ferini yaln\u0131zca haz\u0131rl\u0131k s\u00fcrelerini iyile\u015ftirme projesinden sonra de\u011fil, \u00fcr\u00fcn karmas\u0131 veya ayn\u0131 kayna\u011f\u0131 payla\u015fan i\u015flerin y\u00fck\u00fc de\u011fi\u015fti\u011finde de yeniden kontrol edin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Yaln\u0131zca \u00fcretim d\u00f6ng\u00fcs\u00fcne de\u011fil, talebe de uygun bir ritim se\u00e7in<\/h2>\n\n\n<p>Tekrar aral\u0131\u011f\u0131 k\u0131sald\u0131\u011f\u0131nda bir par\u00e7an\u0131n stokunu daha erken yenileyebilir ve stokla kar\u015f\u0131lanmas\u0131 gereken iki \u00fcretim aras\u0131ndaki s\u00fcreyi k\u0131saltabilirsiniz. B\u00f6ylece daha k\u00fc\u00e7\u00fck ikmal partileriyle \u00e7al\u0131\u015fmak ve iki \u00fcretim aras\u0131nda daha az stok tutmak m\u00fcmk\u00fcn olur. Ancak aral\u0131k k\u0131sald\u0131k\u00e7a haz\u0131rl\u0131klar da daha s\u0131k tekrarlan\u0131r.<\/p>\n\n\n<p>Talep h\u0131z\u0131 sabitse, her \u00fcretimde yap\u0131lacak miktar\u0131 belirlemek i\u00e7in ba\u015flang\u0131\u00e7 noktas\u0131, i\u015f g\u00fcn\u00fc ba\u015f\u0131na talep ile se\u00e7ilen aral\u0131\u011f\u0131n \u00e7arp\u0131m\u0131d\u0131r. \u00d6rnekte A par\u00e7as\u0131ndan her seferinde 100 \u00d7 2 = 200 adet \u00fcretilmesi gerekir. Bu, \u00e7evrim boyunca olu\u015fan talebi kar\u015f\u0131layan miktard\u0131r; tek ba\u015f\u0131na eksiksiz bir g\u00fcvenlik sto\u011fu veya ikmal politikas\u0131 de\u011fildir. Mevcut stok, eksikler, asgari parti miktarlar\u0131 ve talepteki de\u011fi\u015fimler de dikkate al\u0131nmal\u0131d\u0131r.<\/p>\n\n\n<p>\u00dcretim ritmini se\u00e7erken s\u0131k kar\u015f\u0131la\u015f\u0131lan \u015fu \u00fc\u00e7 hatadan ka\u00e7\u0131n\u0131n.<\/p>\n\n\n<p><strong>Stok kar\u015f\u0131lama s\u00fcresini \u00fcretim kabiliyetiyle kar\u0131\u015ft\u0131rmay\u0131n.<\/strong> Stok miktar\u0131n\u0131 g\u00fcnl\u00fck talebe b\u00f6lmek, o stokun t\u00fcketimi ne kadar s\u00fcre kar\u015f\u0131layabilece\u011fini g\u00f6sterir. Ancak kayna\u011f\u0131n, t\u00fcm \u00fcr\u00fcn ailesini stok yenilemeye yetecek s\u0131kl\u0131kta \u00fcretip gerekli tip de\u011fi\u015fimlerini yap\u0131p yapamayaca\u011f\u0131n\u0131 g\u00f6stermez.<\/p>\n\n\n<p><strong>Talebi d\u00fc\u015f\u00fck her \u00fcr\u00fcn\u00fc her \u00e7evrimde \u00fcretmeyin.<\/strong> D\u00fczenli \u00fcretilen ve tekrarlanabilir bir grup olu\u015fturan \u00fcr\u00fcnler i\u00e7in k\u0131sa bir aral\u0131k uygun olabilir. Talebi aral\u0131kl\u0131 olan \u00fcr\u00fcnler ise ger\u00e7ek ihtiya\u00e7 do\u011frultusunda daha seyrek \u00fcretilebilir. Bu kapsam ayr\u0131m\u0131n\u0131 a\u00e7\u0131k\u00e7a belirtin. Bir \u00fcr\u00fcn yaln\u0131zca her \u00fc\u00e7 \u00e7evrimde bir \u00fcretiliyorsa, d\u00fczenli \u00fcr\u00fcnlerin tek \u00e7evrimlik EPEI de\u011ferini payla\u015fmaz.<\/p>\n\n\n<p><strong>Haz\u0131rl\u0131k s\u00fcrelerini di\u011fer ihtiya\u00e7lardan ba\u011f\u0131ms\u0131z olarak optimize etmeyin.<\/strong> Tip de\u011fi\u015fiminin y\u00f6n\u00fc \u00f6nemliyse, se\u00e7ilen s\u0131radaki ger\u00e7ek ge\u00e7i\u015fleri esas al\u0131n. Bir <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/hazirlik-suresi-matrisi\/\">haz\u0131rl\u0131k s\u00fcresi matrisi<\/a>, daha verimli bir s\u0131ra belirlemeye yard\u0131mc\u0131 olabilir. Ancak tip de\u011fi\u015fimlerini azaltmak i\u00e7in ayn\u0131 \u00fcr\u00fcn\u00fc \u00e7ok uzun s\u00fcre kesintisiz \u00fcretmek, ba\u015fka bir par\u00e7an\u0131n bir sonraki \u00fcretimini fazla geciktirebilir.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/heijunka\/\">\u00dcretim dengeleme<\/a>, \u00fcretim hacmini ve \u00fcr\u00fcn karmas\u0131n\u0131 zamana yaymay\u0131 kapsayan daha geni\u015f bir \u00e7al\u0131\u015fmad\u0131r. EPEI bu \u00e7al\u0131\u015fma i\u00e7inde somut bir soruya odaklan\u0131r: Bu par\u00e7alar\u0131n \u00fcretimine ne s\u0131kl\u0131kta d\u00f6nebiliriz? T\u00fcm \u00fcr\u00fcn yelpazesini kat\u0131 bir kal\u0131ba sokmadan bu soruyu yan\u0131tlay\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tekrarlanan i\u015fleri ger\u00e7ek \u00fcretim \u00e7izelgesine dahil edin<\/h2>\n\n\n<p>Kapasite hesab\u0131 bilin\u00e7li olarak basit tutulmu\u015ftur. Fabrikan\u0131z\u0131n \u00fcretim \u00e7izelgesi ise bu kadar basit de\u011fildir. Ayn\u0131 makineleri ba\u015fka sipari\u015fler de kullan\u0131r, operat\u00f6rler belirli vardiyalarda \u00e7al\u0131\u015f\u0131r ve eksik bir malzeme s\u0131radaki planl\u0131 \u00fcretimi kesintiye u\u011fratabilir.<\/p>\n\n\n<p>SkyPlanner APS tam bu noktada de\u011fer sa\u011flar. Ayr\u0131 bir \u00fcretim d\u00f6ng\u00fcs\u00fc tutup di\u011fer t\u00fcm i\u015fleri bunun \u00e7evresine elle yerle\u015ftirmek yerine, <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">se\u00e7ti\u011finiz ikmal sipari\u015flerini di\u011fer sipari\u015flerinizle birlikte \u00e7izelgeleyin<\/a>. B\u00f6ylece tekrarlanan i\u015flerin m\u00fc\u015fteri taahh\u00fctleriyle birlikte y\u00fcr\u00fct\u00fcl\u00fcp y\u00fcr\u00fct\u00fclemeyece\u011fini daha net g\u00f6r\u00fcr, makinelerdeki i\u015f s\u0131ralar\u0131n\u0131 buna g\u00f6re d\u00fczenlemek i\u00e7in her g\u00fcn daha az u\u011fra\u015f\u0131rs\u0131n\u0131z.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00dcr\u00fcn ailesinin ger\u00e7ekten ihtiya\u00e7 duydu\u011fu s\u00fcreyi modelleyin<\/h3>\n\n\n<p>SkyPlanner, her proses ad\u0131m\u0131 i\u00e7in par\u00e7a ba\u015f\u0131na i\u015flem s\u00fcrelerini, \u00fcretim h\u0131zlar\u0131n\u0131 ve sabit s\u00fcreleri, ayr\u0131ca haz\u0131rl\u0131k s\u00fcrelerini ve uygun i\u015f merkezlerini tan\u0131mlaman\u0131za olanak tan\u0131r. Her partiyi yaln\u0131zca adet ile \u00e7evrim s\u00fcresinin \u00e7arp\u0131m\u0131 olarak ele almak yerine, her operasyon i\u00e7in uygun y\u00f6ntemi kullan\u0131n.<\/p>\n\n\n<p>Se\u00e7ilen miktarlar\u0131, \u00fcretim rotalar\u0131n\u0131 ve termin tarihlerini, ilgili vardiyalar ve kaynak kapasitesiyle birlikte \u00e7izelgeye dahil edin. SkyPlanner&#8217;\u0131n \u00e7izelgeleme motoru Arcturus, tan\u0131mlanan \u00f6ncelikleri ve operasyonlar aras\u0131ndaki ba\u011f\u0131ml\u0131l\u0131klar\u0131 kullanarak i\u015fleri \u00e7izelgeye yerle\u015ftirir. Malzeme durumunu dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde, malzeme kullan\u0131labilirli\u011fi de hesaba kat\u0131l\u0131r. Ortaya \u00e7\u0131kan i\u015f s\u0131ras\u0131 Gantt zaman \u00e7izelgesinde g\u00f6r\u00fcn\u00fcr hale gelir.<\/p>\n\n\n<p>Planlama kararlar\u0131 sizde kal\u0131r: Hangi \u00fcr\u00fcn ailesinin tekrarlanaca\u011f\u0131na, hangi hedefin uygun oldu\u011funa ve istisnalar\u0131n nas\u0131l \u00f6nceliklendirilece\u011fine siz karar verirsiniz. Bir sipari\u015fin erken \u00fcretilmemesi gerekiyorsa, \u00fcretime ba\u015flanabilecek en erken tarih tan\u0131mlanarak bu tarihten \u00f6nce \u00e7izelgelenmesi \u00f6nlenebilir. Bu, en erken ba\u015flang\u0131ca ili\u015fkin bir k\u0131s\u0131tt\u0131r; ayn\u0131 par\u00e7an\u0131n bir sonraki \u00fcretimine ne zaman d\u00f6n\u00fclece\u011fini garanti etmez.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Bir sonraki \u00fcretim ihtiyac\u0131n\u0131 g\u00f6zden ka\u00e7\u0131rmadan haz\u0131rl\u0131k s\u00fcresinden tasarruf edin<\/h3>\n\n\n<p>SkyPlanner, i\u015fleri tak\u0131m, malzeme veya renk gibi ortak \u00f6zelliklerine g\u00f6re grupland\u0131rabilir. \u0130\u015f merkezi benzerlik kurallar\u0131, se\u00e7ilen \u00f6zelli\u011fi ve farkl\u0131 i\u015fler aras\u0131ndaki haz\u0131rl\u0131k s\u00fcresini dikkate al\u0131r. Grupland\u0131rman\u0131n ne kadar \u00f6ncelikli olaca\u011f\u0131 ise Dinamik \u00d6ncelikler \u00fczerinden ayarlan\u0131r.<\/p>\n\n\n<p>Bu yakla\u015f\u0131m, \u00f6nlenebilir tip de\u011fi\u015fimlerinde kaybedilen zaman\u0131 geri kazanmaya yard\u0131mc\u0131 olur. Ancak haz\u0131rl\u0131k s\u00fcresinden tasarruf etmek ile k\u0131sa bir tekrar aral\u0131\u011f\u0131 sa\u011flamak her zaman ayn\u0131 hedef de\u011fildir. Benzer i\u015fleri \u00e7ok uzun s\u00fcre bir arada tutmak, ba\u015fka bir par\u00e7an\u0131n bir sonraki \u00fcretimini geciktirebilir. Grupland\u0131rman\u0131n a\u011f\u0131rl\u0131\u011f\u0131n\u0131 teslimat \u00f6ncelikleriyle birlikte belirleyin, ard\u0131ndan olu\u015fan s\u0131ray\u0131 se\u00e7ti\u011finiz tekrar aral\u0131\u011f\u0131na g\u00f6re de\u011ferlendirin.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/kjh-comp\/\">KJH-Comp<\/a>&#8216;ta daha \u00f6nce ERP \u00fczerinden haftal\u0131k y\u00fckleme ve elektronik tablolar kullan\u0131l\u0131yor, g\u00fcnl\u00fck makine atamalar\u0131 ise saha sorumlular\u0131na b\u0131rak\u0131l\u0131yordu. SkyPlanner ile sonlu kapasite \u00e7izelgeleme ve makine atamalar\u0131 otomatik hale geldi. \u015eirket, b\u00fck\u00fcm operasyonlar\u0131nda ayn\u0131 tak\u0131m\u0131n kullan\u0131ld\u0131\u011f\u0131 ve malzeme kal\u0131nl\u0131\u011f\u0131n\u0131n ayn\u0131 oldu\u011fu i\u015fleri grupland\u0131rarak haz\u0131rl\u0131k s\u00fcrelerini k\u0131saltt\u0131\u011f\u0131n\u0131 ve bo\u015fta ge\u00e7en s\u00fcreyi azaltt\u0131\u011f\u0131n\u0131 belirtiyor.<\/p>\n\n\n<p>Bu kazan\u0131mlar, tekrarl\u0131 \u00fcretilen bir \u00fcr\u00fcn ailesi i\u00e7in de \u00f6nemlidir: \u00d6nlenebilir haz\u0131rl\u0131klar azal\u0131r ve g\u00fcnl\u00fck plan\u0131 yeniden olu\u015fturmak daha az zaman al\u0131r. Sonraki ad\u0131m, se\u00e7ti\u011finiz tekrar aral\u0131\u011f\u0131n\u0131 toplam i\u015f y\u00fck\u00fcn\u00fc dikkate alarak kontrol etmektir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dcretim ko\u015fullar\u0131 de\u011fi\u015ftik\u00e7e tekrar aral\u0131\u011f\u0131n\u0131 kontrol edin<\/h2>\n\n\n<p>Bir hedef belirledikten sonra, \u00fczerinde uzla\u015f\u0131lan proseste her par\u00e7an\u0131n ard\u0131\u015f\u0131k \u00fcretim zamanlar\u0131n\u0131 tutarl\u0131 bi\u00e7imde kaydedin. Her kay\u0131tta ayn\u0131 olay\u0131, \u00f6rne\u011fin \u00fcretim ba\u015flang\u0131c\u0131n\u0131, ve ayn\u0131 \u00e7al\u0131\u015fma takvimini esas al\u0131n. \u00dcretimler aras\u0131ndaki s\u00fcreleri, \u00f6zellikle de hedeflenen zamanda ger\u00e7ekle\u015fmeyen tekrarlar\u0131 inceleyin. Tek ba\u015f\u0131na ortalama de\u011fer, s\u00fcrekli fazla bekleyen bir par\u00e7ay\u0131 gizleyebilir.<\/p>\n\n\n<p>Bir par\u00e7an\u0131n yeniden \u00fcretimi gecikti\u011finde, hedefi de\u011fi\u015ftirmeden \u00f6nce nedenini belirleyin. Ba\u015flang\u0131\u00e7ta haz\u0131rl\u0131klar i\u00e7in ayr\u0131lan s\u00fcre fazla m\u0131 iyimserdi? Kapasiteyi ba\u015fka bir sipari\u015f mi kulland\u0131? Malzeme mi yoktu, yoksa sonraki proseslerden birindeki k\u0131s\u0131t m\u0131 planlanan ak\u0131\u015f\u0131 engelledi?<\/p>\n\n\n<p>\u0130lgili kapasite, malzeme veya \u00f6ncelik bilgilerini g\u00fcncelleyin ve SkyPlanner&#8217;da \u00e7izelgeyi yeniden hesaplay\u0131n. Ard\u0131ndan s\u0131radaki ikmal \u00fcretimlerini ve bundan etkilenen m\u00fc\u015fteri i\u015flerini birlikte de\u011ferlendirin. Ama\u00e7, i\u015f kuyruklar\u0131 eski d\u00f6ng\u00fcden uzakla\u015f\u0131rken onu k\u00e2\u011f\u0131t \u00fczerinde korumak de\u011fil, altta yatan \u00e7ak\u0131\u015fmay\u0131 gidermektir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tekrarl\u0131 \u00fcretilen bir \u00fcr\u00fcn ailesini SkyPlanner ile test edin<\/h2>\n\n\n<p>\u0130\u015fe yarayan bir EPEI yakla\u015f\u0131m\u0131 \u00fc\u00e7 karar\u0131 birbirine ba\u011flar: Kapasitenizin destekleyebilece\u011fi tekrar aral\u0131\u011f\u0131, talebinizin gerektirdi\u011fi ikmal ritmi ve di\u011fer sipari\u015flerle birlikte bu ikisini de hayata ge\u00e7irecek \u00fcretim \u00e7izelgesi.<\/p>\n\n\n<p>SkyPlanner, bu \u00fc\u00e7\u00fcnc\u00fc karar i\u00e7in gerekli \u00e7izelgeleme altyap\u0131s\u0131n\u0131 sunar. A\u00e7\u0131k REST API \u00fczerinden her ERP veya MES ile entegre olur. B\u00f6ylece mevcut i\u015f sisteminizi kullanmaya devam ederken tekrarl\u0131 \u00fcretimi de sahan\u0131n di\u011fer i\u015fleriyle ayn\u0131 sonlu kapasiteli \u00e7izelgeye dahil edebilirsiniz.<\/p>\n\n\n<p>Bir \u00fcr\u00fcn ailesini, bu aileye ait i\u015flem ve tip de\u011fi\u015fimi s\u00fcrelerini, vardiya takvimini ve ayn\u0131 kayna\u011f\u0131 payla\u015fan di\u011fer sipari\u015fleri ele almak \u00fczere <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>. Bu g\u00f6r\u00fc\u015fmede, \u00f6nerdi\u011finiz \u00fcretim ritminin ger\u00e7ek i\u015f y\u00fck\u00fcne nas\u0131l uyaca\u011f\u0131n\u0131 de\u011ferlendirin. \u00d6nce ortam\u0131 ke\u015ffetmeyi tercih ederseniz, <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a> veya Asistan&#8217;\u0131n yapay zek\u00e2 destekli Ba\u015flang\u0131\u00e7 ak\u0131\u015f\u0131n\u0131 kullan\u0131n.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n Ana Sayfa &raquo; Kaynaklar &raquo; EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n Bir \u00fcr\u00fcn ailesindeki her par\u00e7ay\u0131 daha s\u0131k, daha k\u00fc\u00e7\u00fck partilerle \u00fcretmek istiyorsunuz. \u00dcretim d\u00f6ng\u00fcs\u00fc k\u00e2\u011f\u0131t \u00fczerinde d\u00fczenli g\u00f6r\u00fcn\u00fcyor: \u00f6nce A, sonra B, ard\u0131ndan C ve yeniden A. Ancak makinenin tamamlamas\u0131 gereken m\u00fc\u015fteri sipari\u015fleri de var. \u00dcstelik &#8230; <a title=\"EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/\" aria-label=\"Read more about EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111941,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-111924","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ve-cizelgeleme","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n<\/title>\n<meta name=\"description\" content=\"Her par\u00e7a yeterince s\u0131k \u00fcretilebilir mi? Tip de\u011fi\u015fimlerini hesaba kat\u0131p kapasiteye uygun EPEI hesaplay\u0131n, tekrarlayan i\u015fleri SkyPlanner&#039;a aktar\u0131n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n\" \/>\n<meta property=\"og:description\" content=\"Her par\u00e7a yeterince s\u0131k \u00fcretilebilir mi? Tip de\u011fi\u015fimlerini hesaba kat\u0131p kapasiteye uygun EPEI hesaplay\u0131n, tekrarlayan i\u015fleri SkyPlanner&#039;a aktar\u0131n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T19:23:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T19:25:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/epei\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/epei\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n\",\"datePublished\":\"2026-10-28T19:23:39+00:00\",\"dateModified\":\"2026-10-28T19:25:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/epei\\\/\"},\"wordCount\":2997,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/epei\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/every-part-every-interval-hero.png\",\"articleSection\":[\"APS ve \u00e7izelgeleme\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/epei\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/epei\\\/\",\"name\":\"EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/epei\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/epei\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/every-part-every-interval-hero.png\",\"datePublished\":\"2026-10-28T19:23:39+00:00\",\"dateModified\":\"2026-10-28T19:25:04+00:00\",\"description\":\"Her par\u00e7a yeterince s\u0131k \u00fcretilebilir mi? Tip de\u011fi\u015fimlerini hesaba kat\u0131p kapasiteye uygun EPEI hesaplay\u0131n, tekrarlayan i\u015fleri SkyPlanner'a aktar\u0131n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/epei\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/epei\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/epei\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/every-part-every-interval-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/every-part-every-interval-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Three different part shapes repeat around a machining station, illustrating a product family\u2019s return interval.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/epei\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n","description":"Her par\u00e7a yeterince s\u0131k \u00fcretilebilir mi? Tip de\u011fi\u015fimlerini hesaba kat\u0131p kapasiteye uygun EPEI hesaplay\u0131n, tekrarlayan i\u015fleri SkyPlanner'a aktar\u0131n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/","og_locale":"tr_TR","og_type":"article","og_title":"EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n","og_description":"Her par\u00e7a yeterince s\u0131k \u00fcretilebilir mi? Tip de\u011fi\u015fimlerini hesaba kat\u0131p kapasiteye uygun EPEI hesaplay\u0131n, tekrarlayan i\u015fleri SkyPlanner'a aktar\u0131n.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T19:23:39+00:00","article_modified_time":"2026-10-28T19:25:04+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"15 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n","datePublished":"2026-10-28T19:23:39+00:00","dateModified":"2026-10-28T19:25:04+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/"},"wordCount":2997,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","articleSection":["APS ve \u00e7izelgeleme","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/","name":"EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","datePublished":"2026-10-28T19:23:39+00:00","dateModified":"2026-10-28T19:25:04+00:00","description":"Her par\u00e7a yeterince s\u0131k \u00fcretilebilir mi? Tip de\u011fi\u015fimlerini hesaba kat\u0131p kapasiteye uygun EPEI hesaplay\u0131n, tekrarlayan i\u015fleri SkyPlanner'a aktar\u0131n.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","width":1774,"height":887,"caption":"Three different part shapes repeat around a machining station, illustrating a product family\u2019s return interval."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/epei\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n Ana Sayfa &raquo; Kaynaklar &raquo; EPEI: Ger\u00e7ek\u00e7i bir \u00fcretim tekrarlama aral\u0131\u011f\u0131 hesaplay\u0131n Bir \u00fcr\u00fcn ailesindeki her par\u00e7ay\u0131 daha s\u0131k, daha k\u00fc\u00e7\u00fck partilerle \u00fcretmek istiyorsunuz. \u00dcretim d\u00f6ng\u00fcs\u00fc k\u00e2\u011f\u0131t \u00fczerinde d\u00fczenli g\u00f6r\u00fcn\u00fcyor: \u00f6nce A, sonra B, ard\u0131ndan C ve yeniden A. Ancak makinenin tamamlamas\u0131 gereken m\u00fc\u015fteri sipari\u015fleri de var. \u00dcstelik&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/111924","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=111924"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/111924\/revisions"}],"predecessor-version":[{"id":111988,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/111924\/revisions\/111988"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/111941"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=111924"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=111924"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=111924"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}