{"id":111706,"date":"2026-10-28T03:02:21","date_gmt":"2026-10-28T03:02:21","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111706"},"modified":"2026-10-28T03:03:57","modified_gmt":"2026-10-28T03:03:57","slug":"iki-kutu-sistemi","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/","title":{"rendered":"\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; \u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Bir montaj istasyonunda k\u00fc\u00e7\u00fck bir par\u00e7a t\u00fckenir. Fabrikan\u0131n bir yerinde stok vard\u0131r, ancak birinin bu sto\u011fu bulmas\u0131, ikmal talebinde bulunmas\u0131 ve par\u00e7alar\u0131 operat\u00f6re getirmesi gerekir. D\u00fc\u015f\u00fck maliyetli bir bile\u015fen y\u00fcz\u00fcnden de\u011ferli \u00fcretim zaman\u0131 kaybedilmeye ba\u015flam\u0131\u015ft\u0131r.<\/p>\n\n\n<p>\u0130ki kutu sistemi, i\u015f merkezindeki par\u00e7alar tamamen t\u00fckenmeden bu ihtiyac\u0131 g\u00f6r\u00fcn\u00fcr k\u0131lar. Operat\u00f6rler bir kutudan par\u00e7a kullan\u0131rken di\u011feri yedekte bekler. \u0130lk kutunun bo\u015falmas\u0131 ikmali tetikler; yeni par\u00e7alar gelene kadar ikinci kutu \u00fcretimin ihtiyac\u0131n\u0131 kar\u015f\u0131lar.<\/p>\n\n\n<p>As\u0131l mesele iki kutunuzun olup olmamas\u0131 de\u011fil, yedek stok t\u00fckenmeden ikmalin yerine ula\u015f\u0131p ula\u015famayaca\u011f\u0131d\u0131r. Ortak kullan\u0131lan makinelerde \u00fcretti\u011finiz par\u00e7alar i\u00e7in SkyPlanner APS bu soruyu yan\u0131tlaman\u0131za yard\u0131mc\u0131 olur. Kabul edilmi\u015f ikmal i\u015flerini ayr\u0131 bir listede bekletmek yerine m\u00fc\u015fteri sipari\u015fleriyle birlikte \u00e7izelgeler.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u0130ki kutu sistemi nedir?<\/h2>\n\n\n<p><strong>\u0130ki kutu sistemi<\/strong>, ayn\u0131 malzemenin belirlenmi\u015f iki ayr\u0131 miktar\u0131yla tekrarlanan bir t\u00fcketim ve ikmal d\u00f6ng\u00fcs\u00fc olu\u015fturan g\u00f6rsel bir ikmal y\u00f6ntemidir. Bir kutu, kullan\u0131m noktas\u0131n\u0131n ihtiyac\u0131n\u0131 kar\u015f\u0131lar. Bu kutu bo\u015fald\u0131\u011f\u0131nda bir kart, bo\u015f kutunun kendisi veya \u00fczerinde anla\u015f\u0131lm\u0131\u015f ba\u015fka bir sinyal arac\u0131l\u0131\u011f\u0131yla ikmal talep edilir ve ikinci kutudan t\u00fcketim ba\u015flar.<\/p>\n\n\n<p>\u0130kinci kutu, ikmal tamamlanana kadar gereken sto\u011fu sa\u011flar. Faydas\u0131 basittir: Operat\u00f6r\u00fcn ikmal zaman\u0131n\u0131n geldi\u011fini anlamak i\u00e7in kalan par\u00e7alar\u0131 tek tek saymas\u0131 gerekmez. Kutunun bo\u015falmas\u0131, ihtiyac\u0131 a\u00e7\u0131k\u00e7a ortaya koyar.<\/p>\n\n\n<p>Bu y\u00f6ntem \u00fcretimde \u00f6zellikle d\u00fczenli kullan\u0131lan ba\u011flant\u0131 elemanlar\u0131, rakorlar ve benzeri k\u00fc\u00e7\u00fck par\u00e7alar i\u00e7in yararl\u0131d\u0131r. \u0130kmal merkezi bir depodan, d\u0131\u015f tedarik\u00e7iden veya i\u015fletme i\u00e7indeki bir \u00fcretim s\u00fcrecinden sa\u011flanabilir. Kayna\u011fa g\u00f6re sinyalin ard\u0131ndan yap\u0131lacak i\u015fler de\u011fi\u015fir, ancak ikmalin g\u00fcvenilir bi\u00e7imde tamamlanmas\u0131 gere\u011fi de\u011fi\u015fmez.<\/p>\n\n\n<h3 class=\"wp-block-heading\">E\u015fit miktarl\u0131 kutularda d\u00f6ng\u00fc nas\u0131l i\u015fler?<\/h3>\n\n\n<p>Basit bir pilot uygulama i\u00e7in ayn\u0131 standart miktarda par\u00e7a i\u00e7eren iki kutu kullan\u0131n:<\/p>\n\n\n<p>1. <strong>Yaln\u0131zca bir kutudan par\u00e7a kullan\u0131n.<\/strong> \u0130kinci kutunun alternatif bir par\u00e7a alma yeri de\u011fil, yedek stok oldu\u011funu a\u00e7\u0131k\u00e7a belirtin.<\/p>\n\n\n<p>2. <strong>Kullan\u0131mdaki kutu bo\u015fald\u0131\u011f\u0131nda sinyal verin.<\/strong> Bo\u015f kutuyu veya kart\u0131n\u0131 belirlenen toplama noktas\u0131na g\u00f6t\u00fcr\u00fcn ya da kararla\u015ft\u0131r\u0131lan elektronik talebi kaydedin.<\/p>\n\n\n<p>3. <strong>Dolu yedek kutuyu kullanmaya ba\u015flay\u0131n.<\/strong> \u0130kmal sorumlusu yeni par\u00e7alar\u0131n teminini d\u00fczenlerken \u00fcretim devam eder.<\/p>\n\n\n<p>4. <strong>\u0130kmal talebinin i\u015fleme al\u0131nd\u0131\u011f\u0131n\u0131 teyit edin.<\/strong> Sinyali alan sorumlu, talebi ald\u0131\u011f\u0131n\u0131 bildirir ve kullan\u0131labilir par\u00e7alar\u0131n ne zaman yerine ula\u015fmas\u0131 gerekti\u011fini belirler.<\/p>\n\n\n<p>5. <strong>Yeniden doldurulan kutuyu yede\u011fe al\u0131n.<\/strong> Par\u00e7ay\u0131 ve miktar\u0131 kontrol edin, kutunun tan\u0131mlama bilgilerinin yeniden eksiksiz olmas\u0131n\u0131 sa\u011flay\u0131n ve ikmal kayd\u0131n\u0131 kapat\u0131n. Kullan\u0131mdaki kutu bo\u015falana kadar par\u00e7alar\u0131 bu kutudan almaya devam edin.<\/p>\n\n\n<p>Ard\u0131ndan kutular\u0131n rolleri yeniden de\u011fi\u015fir. Kullan\u0131mdaki kutuya s\u00fcrekli par\u00e7a eklemeyin; bu, ikmali tetiklemesi gereken bo\u015falma an\u0131n\u0131 gizleyebilir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Talep ve tedarik yap\u0131s\u0131 y\u00f6nteme uygun par\u00e7alar\u0131 se\u00e7in<\/h2>\n\n\n<p>D\u00fczenli t\u00fcketilen, a\u00e7\u0131k\u00e7a tan\u0131mlanm\u0131\u015f ve g\u00fcvenilir bir ikmal kayna\u011f\u0131 bulunan par\u00e7alarla ba\u015flay\u0131n. Standart miktarlarda kolayca ta\u015f\u0131n\u0131p kullan\u0131labilen ve teknik \u00f6zellikleri i\u015ften i\u015fe de\u011fi\u015fmeyen par\u00e7alar en uygun adaylard\u0131r.<\/p>\n\n\n<p>Ucuz bir par\u00e7a, yoklu\u011fu pahal\u0131 bir operasyonu durdursa bile iyi bir aday olabilir. Sat\u0131n alma fiyat\u0131, par\u00e7an\u0131n t\u00fckenmesinin maliyetini g\u00f6stermez. Buna kar\u015f\u0131l\u0131k, pahal\u0131 ve nadiren kullan\u0131lan bir malzemeyle iki b\u00fcy\u00fck kutuyu doldurmak, tekrarlayan bir tedarik sorununu \u00e7\u00f6zmeden sermayeyi sto\u011fa ba\u011flayabilir.<\/p>\n\n\n<p>T\u00fcketim d\u00fczensizse veya b\u00fcy\u00fck \u00f6l\u00e7\u00fcde ara s\u0131ra gelen y\u00fcksek miktarl\u0131 sipari\u015flere ba\u011fl\u0131ysa daha temkinli olun. Tek seferde al\u0131nan par\u00e7alar, ola\u011fan ikmal yerine ula\u015fmadan \u00e7ok \u00f6nce yedek sto\u011fu t\u00fcketebilir. Sipari\u015fe \u00f6zel bile\u015fenler, s\u0131k m\u00fchendislik revizyonlar\u0131, k\u0131sa raf \u00f6m\u00fcrleri veya s\u0131k\u0131 parti kontrol\u00fc gereklilikleri s\u00f6z konusu oldu\u011funda da yaln\u0131zca kullan\u0131\u015fl\u0131 iki kutu yeterli de\u011fildir. Gerekli tan\u0131mlama, stok rotasyonu ve izlenebilirlik kontrollerini s\u00fcrd\u00fcr\u00fcn.<\/p>\n\n\n<p>\u0130ki kutuyla ikmalin <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-kanban\/\">kanban ile ba\u011flant\u0131s\u0131 vard\u0131r<\/a>, ancak <strong>iki kutu, iki kanban kart\u0131 demek de\u011fildir<\/strong>. \u0130ki kartl\u0131 bir \u00fcretim d\u00f6ng\u00fcs\u00fcnde \u00fcretim izni ile malzeme ta\u015f\u0131ma izni birbirinden ayr\u0131l\u0131r. Bu yaz\u0131da ele al\u0131nan iki kutulu d\u00fczen ise fiziksel stokla ve belirlenen miktar t\u00fckendi\u011finde yap\u0131lacak ikmalle ilgilidir.<\/p>\n\n\n<p>Bu d\u00fczeni se\u00e7mek, <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/min-maks-stok-yonetimi\/\">min\u2013maks stok politikas\u0131<\/a> belirlemekle de ayn\u0131 \u015fey de\u011fildir. Min\u2013maks politikas\u0131nda bir yeniden sipari\u015f noktas\u0131 ve sto\u011fun tamamlanaca\u011f\u0131 hedef seviye kullan\u0131l\u0131r; iki kutu ise belirli bir t\u00fcketim e\u015fi\u011fini kullan\u0131m noktas\u0131nda g\u00f6r\u00fcn\u00fcr k\u0131lar. Bir toplama turuyla bo\u015f ve dolu kutular ta\u015f\u0131nabilir, ancak turun yap\u0131lmas\u0131 tek ba\u015f\u0131na ikmal talebinin al\u0131nd\u0131\u011f\u0131n\u0131 teyit etmez veya ikmali tamamlamaz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Yedek stok miktar\u0131n\u0131 ikmalin t\u00fcm s\u00fcresini kar\u015f\u0131layacak \u015fekilde belirleyin<\/h2>\n\n\n<p>S\u00fcreyi, <strong>t\u00fcketim sinyalinin verilmesinden yeni par\u00e7alar\u0131n belirlenen i\u015f merkezinde kullan\u0131labilir h\u00e2le gelmesine kadar<\/strong> \u00f6l\u00e7\u00fcn. Sat\u0131n alma sipari\u015fi g\u00f6nderildi\u011finde, makinede kesim bitti\u011finde veya teslimat fabrika kap\u0131s\u0131na ula\u015ft\u0131\u011f\u0131nda s\u00fcre \u00f6l\u00e7\u00fcm\u00fcn\u00fc sonland\u0131rmay\u0131n.<\/p>\n\n\n<p>Bu s\u00fcre; sinyalin toplanmas\u0131n\u0131 beklemeyi, talebin kontrol edilip i\u015fleme al\u0131nmas\u0131n\u0131, depodan toplamay\u0131 veya \u00fcretimi, muayeneyi, ta\u015f\u0131may\u0131 ve par\u00e7alar\u0131n do\u011fru yere geri konmas\u0131n\u0131 kapsayabilir. \u0130\u015fletme i\u00e7inde \u00fcretilen par\u00e7alarda, ortak kullan\u0131lan bir makinenin kuyru\u011funda bekleme s\u00fcresi i\u015flem s\u00fcresinden daha belirleyici olabilir.<\/p>\n\n\n<p>Ba\u015flang\u0131\u00e7 hesab\u0131 olarak, \u00e7al\u0131\u015fma d\u00f6nemi ba\u015f\u0131na beklenen t\u00fcketimi ikmal s\u00fcresine denk gelen \u00e7al\u0131\u015fma d\u00f6nemi say\u0131s\u0131yla \u00e7arp\u0131n. Ard\u0131ndan s\u00fcrecinizin kar\u015f\u0131lamas\u0131 gereken talep ve ikmal s\u00fcresi de\u011fi\u015fkenli\u011fine kar\u015f\u0131 ek pay ay\u0131r\u0131n. G\u00fcvenlik sto\u011fu, bu miktar\u0131n i\u00e7indeki ek koruma pay\u0131d\u0131r; ikinci kutunun tamam\u0131 olmak zorunda de\u011fildir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u0130ki kutu sistemini a\u00e7\u0131klayan bir \u00f6rnek<\/h3>\n\n\n<p>Bir montaj istasyonunun \u00e7al\u0131\u015f\u0131lan her vardiyada 40 klips kulland\u0131\u011f\u0131n\u0131 d\u00fc\u015f\u00fcn\u00fcn. Her kutuda 240 kullan\u0131labilir klips bulunur. Kutulardan biri bo\u015fal\u0131p operat\u00f6r di\u011ferine ge\u00e7ti\u011finde, dolu kutu bu t\u00fcketim h\u0131z\u0131nda alt\u0131 \u00e7al\u0131\u015fma vardiyas\u0131 boyunca ihtiyac\u0131 kar\u015f\u0131lar.<\/p>\n\n\n<p>\u0130kmalin tamamlanmas\u0131 d\u00f6rt \u00e7al\u0131\u015fma vardiyas\u0131 s\u00fcrerse istasyon beklerken 160 klips t\u00fcketir. Yeni par\u00e7alar yerine ula\u015ft\u0131\u011f\u0131nda kullan\u0131mdaki kutuda h\u00e2l\u00e2 80 klips vard\u0131r. Kalan bu miktar, \u00f6rnekteki de\u011fi\u015fkenli\u011fe kar\u015f\u0131 koruma pay\u0131d\u0131r; her fabrika i\u00e7in \u00f6nerilen bir pay de\u011fildir.<\/p>\n\n\n<p>\u015eimdi de klipslerin \u00fcretiminin k\u0131sa s\u00fcrd\u00fc\u011f\u00fcn\u00fc, ancak \u00fcretildikleri makinedeki kuyruk nedeniyle par\u00e7alar\u0131n geri d\u00f6nmesinin alt\u0131 \u00e7al\u0131\u015fma vardiyas\u0131ndan uzun s\u00fcrd\u00fc\u011f\u00fcn\u00fc varsayal\u0131m. Uygun kutular ve g\u00f6r\u00fcn\u00fcr bir sinyal olsa da sistem i\u015flemez. \u0130kmal s\u00fcrecini iyile\u015ftirmeniz, koruma pay\u0131n\u0131 art\u0131rman\u0131z veya farkl\u0131 bir ikmal d\u00fczeni se\u00e7meniz gerekir.<\/p>\n\n\n<p>Hesapta kulland\u0131\u011f\u0131n\u0131z \u00e7al\u0131\u015fma takvimlerinin tutarl\u0131 olmas\u0131na dikkat edin. Montajda gece vardiyas\u0131nda t\u00fcketim s\u00fcrerken depo, tedarik\u00e7i veya ikmal s\u00fcreci \u00e7al\u0131\u015fm\u0131yorsa bu aradaki t\u00fcketim de koruma pay\u0131n\u0131 azalt\u0131r. Hesab\u0131, takvim g\u00fcnleriyle \u00e7al\u0131\u015fma saatlerini dayana\u011f\u0131 belirsiz bi\u00e7imde kar\u0131\u015ft\u0131rarak de\u011fil, yeni par\u00e7alar\u0131n temin edilemedi\u011fi s\u00fcre boyunca ger\u00e7ekle\u015fen t\u00fcketim \u00fczerinden yap\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u0130ki kutuda da ayn\u0131 miktarda par\u00e7a m\u0131 olmal\u0131?<\/h3>\n\n\n<p>Hay\u0131r. Miktarlar\u0131n e\u015fit olmad\u0131\u011f\u0131 bir d\u00fczende, kullan\u0131m kutusunda daha fazla par\u00e7a bulunabilir ve daha k\u00fc\u00e7\u00fck bir yedek stok ikmal s\u00fcresini kar\u015f\u0131layacak \u015fekilde belirlenebilir. Ancak bu d\u00fczen i\u00e7in kutular\u0131n nas\u0131l yeniden doldurulaca\u011f\u0131n\u0131 ayr\u0131 bir kuralla belirtin: Yeni par\u00e7alar geldi\u011finde \u00f6nce yedek sto\u011fu belirlenen miktara tamamlay\u0131n, kalan\u0131n\u0131 kullan\u0131m kutusuna koyun.<\/p>\n\n\n<p>Farkl\u0131 miktarda par\u00e7a i\u00e7eren kutular\u0131, ikisi de ayn\u0131 korumay\u0131 sa\u011fl\u0131yormu\u015f gibi d\u00f6n\u00fc\u015f\u00fcml\u00fc kullanmay\u0131n. \u0130lk uygulamada e\u015fit miktarlar, kutular\u0131n s\u0131rayla kullan\u0131m\u0131n\u0131 anlamay\u0131 ve denetlemeyi kolayla\u015ft\u0131r\u0131r. E\u015fit olmayan miktarlar\u0131 ancak stok veya alan avantaj\u0131, gereken ek disiplini hakl\u0131 \u00e7\u0131kar\u0131yorsa tercih edin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Her bo\u015f kutu sinyali i\u00e7in bir sorumlu belirleyin<\/h2>\n\n\n<p>Bir tepside bekleyen kart bir taleptir; birinin harekete ge\u00e7ti\u011finin kan\u0131t\u0131 de\u011fildir. Pilot uygulamaya ba\u015flamadan \u00f6nce sinyali kimin alaca\u011f\u0131n\u0131, ne kadar s\u00fcrede ald\u0131\u011f\u0131n\u0131 teyit edece\u011fini ve ikmal gecikecekse kimin devreye girece\u011fini kararla\u015ft\u0131r\u0131n. Sorumlulu\u011fu t\u00fcm vardiyalar\u0131 kapsayacak \u015fekilde da\u011f\u0131t\u0131n ve as\u0131l sorumlunun olmad\u0131\u011f\u0131 durumlar i\u00e7in bir yedek belirleyin.<\/p>\n\n\n<p>Sinyalde, telefonla bilgi almaya gerek kalmadan i\u015flem yap\u0131labilecek kadar a\u00e7\u0131k bilgi bulunsun. Par\u00e7ay\u0131 ve gerekti\u011finde revizyonunu, standart ikmal miktar\u0131n\u0131, kayna\u011f\u0131, d\u00f6n\u00fc\u015f yerini ve kutu veya kart tan\u0131mlay\u0131c\u0131s\u0131n\u0131 belirtin. \u0130kmali y\u00fcr\u00fcten ki\u015fi bu talebi, zaten i\u015flemde olan bir talepten ay\u0131rt edebilmelidir.<\/p>\n\n\n<p>\u00d6rne\u011fin talep edildi, kabul edildi ve yerine ula\u015ft\u0131 gibi \u00fczerinde anla\u015f\u0131lm\u0131\u015f durumlar kullan\u0131n. Sinyali alan sorumlu talebi ald\u0131\u011f\u0131n\u0131 teyit etti\u011fi ve a\u00e7\u0131k talepler g\u00f6r\u00fcn\u00fcr kald\u0131\u011f\u0131 s\u00fcrece k\u00e2\u011f\u0131t \u00fczerinden sinyal vermek de gayet iyi i\u015fleyebilir. Ayn\u0131 talep elektronik ortamda da kaydediliyorsa ikinci bir ikmal ba\u015flatmak yerine iki kayd\u0131 birbiriyle ili\u015fkilendirin.<\/p>\n\n\n<p>Fiziksel d\u00f6ng\u00fc ile stok kay\u0131tlar\u0131 da birbiriyle uyumlu olmal\u0131d\u0131r. Bir kutunun ta\u015f\u0131nmas\u0131, tek ba\u015f\u0131na elektronik bir stok hareketi kayd\u0131 veya \u00fcretim emri olu\u015fturmaz. Se\u00e7ti\u011finiz i\u015f ak\u0131\u015f\u0131nda t\u00fcketimin, i\u00e7 transferin, mal kabul\u00fcn\u00fcn ve varsa \u00fcretim talebinin ne zaman kaydedilece\u011fini belirleyin. Stok, \u00fcretim bildirimiyle zaten d\u00fc\u015f\u00fclm\u00fc\u015fse s\u0131rf bo\u015f kutu topland\u0131 diye ayn\u0131 miktar\u0131 tekrar d\u00fc\u015fmeyin.<\/p>\n\n\n<p>Dolu kutu kullan\u0131m noktas\u0131na d\u00f6nd\u00fc\u011f\u00fcnde, talebi kapatmadan \u00f6nce kullan\u0131labilir miktar\u0131, par\u00e7a kimli\u011fini ve konumu do\u011frulay\u0131n. Dolu g\u00f6r\u00fcnen bir kutudaki hasarl\u0131 par\u00e7alar, ama\u00e7lanan korumay\u0131 sa\u011flamaz. \u0130kmal, \u00f6nceki a\u015famalardaki bir g\u00f6revin tamamland\u0131 olarak i\u015faretlenmesiyle de\u011fil, do\u011fru ve kullan\u0131labilir par\u00e7alar\u0131n kullan\u0131m noktas\u0131nda haz\u0131r olmas\u0131yla tamamlan\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Yedek kutudan t\u00fcketimi normal bir sinyal, geciken ikmali ise istisna olarak ele al\u0131n<\/h3>\n\n\n<p>\u0130kinci kutunun kullan\u0131lmas\u0131 beklenen bir durumdur. \u0130kmal gelmeden onun da t\u00fckenmesi ise beklenen bir durum de\u011fildir.<\/p>\n\n\n<p>Stok t\u00fckenmeden m\u00fcdahale edebilmek i\u00e7in talebin ne zaman yetkili ki\u015fiye iletilece\u011fini belirleyen bir e\u015fik koyun. \u0130kmal sorumlusu, kalan stokun yetece\u011fi s\u00fcre i\u00e7inde dolu kutunun d\u00f6nece\u011fini teyit edemiyorsa tedarik veya \u00fcretim karar\u0131n\u0131 de\u011fi\u015ftirebilecek ki\u015fiyi devreye al\u0131n. Acil transfer uygun bir \u00e7\u00f6z\u00fcm olabilir; ancak bunu kaydedin ve ard\u0131ndan iki kutudaki miktarlar\u0131 yeniden standart seviyelerine getirin. Ba\u015fka bir istasyondan haber vermeden par\u00e7a almak, eksikli\u011fi yaln\u0131zca ba\u015fka bir yere ta\u015f\u0131r.<\/p>\n\n\n<p>Pilot uygulama s\u0131ras\u0131nda teyit edilmeyen talepleri, sinyalden dolu kutunun d\u00f6n\u00fc\u015f\u00fcne kadar ge\u00e7en ger\u00e7ek s\u00fcreyi, d\u00f6n\u00fc\u015f an\u0131nda kalan yedek stoku ve acil m\u00fcdahaleleri inceleyin. Stoku azaltmadan \u00f6nce bu g\u00f6zlemlerle toplama ve ikmal s\u00fcrecini iyile\u015ftirin. Talep, vardiyalar, tedarik\u00e7i performans\u0131 veya \u00fcretim rotas\u0131 de\u011fi\u015fti\u011finde miktarlar\u0131 yeniden g\u00f6zden ge\u00e7irin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u0130\u00e7 \u00fcretimle yap\u0131lan ikmali, ayn\u0131 kapasiteyi kullanan di\u011fer i\u015flerle birlikte \u00e7izelgeleyin<\/h2>\n\n\n<p>Sat\u0131n al\u0131nan ba\u011flant\u0131 elemanlar\u0131nda ikmal s\u00fcreci a\u011f\u0131rl\u0131kl\u0131 olarak depodan toplama, tedarik\u00e7i teslimat\u0131 ve i\u00e7 ta\u015f\u0131madan olu\u015fabilir. \u0130\u015fletme i\u00e7inde \u00fcretilen bir klips, braket veya ara par\u00e7a s\u00f6z konusu oldu\u011funda ise ikmal, makine ve zaman kullan\u0131m\u0131 a\u00e7\u0131s\u0131ndan m\u00fc\u015fteri i\u015fleriyle de yar\u0131\u015f\u0131r. Bu y\u00fck\u00fcml\u00fcl\u00fckleri dikkate almayan bir ikmal listesine dayanarak g\u00fcvenilir bir d\u00f6n\u00fc\u015f tarihi verilemez.<\/p>\n\n\n<p><strong>\u0130kmaliniz bu ortak \u00fcretim kapasitesine ihtiya\u00e7 duyuyorsa SkyPlanner&#8217;\u0131 se\u00e7in.<\/strong> \u0130kmal bir \u00fcretim emri olarak kabul edildikten sonra SkyPlanner&#8217;\u0131n \u00e7izelgeleme yapay zek\u00e2s\u0131 Arcturus, <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">bu emrin operasyonlar\u0131n\u0131 di\u011fer i\u015flerle birlikte \u00e7izelgeler<\/a>. Tan\u0131mlanm\u0131\u015f i\u015f merkezlerini, kapasiteyi, vardiyalar\u0131, operasyonlar aras\u0131ndaki ba\u011f\u0131ml\u0131l\u0131klar\u0131 ve \u00f6ncelikleri dikkate al\u0131r. Gantt \u00e7izelgesi, ortaya \u00e7\u0131kan s\u0131ralamay\u0131 ve planlanan tamamlanma zaman\u0131n\u0131 g\u00f6sterir.<\/p>\n\n\n<p>B\u00f6ylece m\u00fc\u015fteri sipari\u015fleri ve ikmal partileri i\u00e7in ayr\u0131 ayr\u0131 i\u015f kuyruklar\u0131 tutup ard\u0131ndan bunlar\u0131 elle uzla\u015ft\u0131rmaya \u00e7al\u0131\u015fman\u0131z gerekmez. \u0130kmalin, yedek stokun t\u00fckenmesi beklenen zamandan \u00f6nce \u00e7izelgeye s\u0131\u011f\u0131p s\u0131\u011fmad\u0131\u011f\u0131n\u0131 ve \u00f6ncelik de\u011fi\u015fikli\u011finin di\u011fer y\u00fck\u00fcml\u00fcl\u00fckleri nas\u0131l etkiledi\u011fini g\u00f6rebilirsiniz.<\/p>\n\n\n<p>Klips \u00f6rne\u011fine d\u00f6nelim. Planlama a\u00e7\u0131s\u0131ndan as\u0131l soru, kabul edilen ikmal partisinin kontrol edilip montaja geri teslim edilebilmesi i\u00e7in \u00fcretim rotas\u0131n\u0131 zaman\u0131nda tamamlay\u0131p tamamlayamayaca\u011f\u0131d\u0131r. Ortak kullan\u0131lan makine ba\u015fka i\u015flere ayr\u0131lm\u0131\u015fsa bu \u00e7ak\u0131\u015fmay\u0131, montajdaki stok t\u00fckenmeden \u00f6nce ele al\u0131p karara ba\u011flayabilirsiniz. \u00d6ncelikleri siz belirlersiniz; Arcturus da \u00e7izelgeyi bu \u00f6nceliklere g\u00f6re hesaplar.<\/p>\n\n\n<p>Malzemeyi dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde ve stok bilgileri g\u00fcncel tutuldu\u011funda SkyPlanner, ikmal i\u00e7in gereken malzemeleri de hesaba katar. Partinin ham maddesi eksikse makinenin bo\u015f olmas\u0131 yeterli de\u011fildir. Sat\u0131n al\u0131nan par\u00e7alar i\u00e7in g\u00fcncel tutulan sat\u0131n alma sipari\u015fi geli\u015f tarihleri, bu par\u00e7alara ihtiya\u00e7 duyan i\u015flerin \u00e7izelgesinde dikkate al\u0131nabilir; tarihler de\u011fi\u015fti\u011finde \u00e7izelgeyi yeniden hesaplay\u0131n.<\/p>\n\n\n<p>SkyPlanner, a\u00e7\u0131k REST API \u00fczerinden her t\u00fcrl\u00fc ERP veya MES ile entegre olur. \u0130kmali di\u011fer s\u00fcre\u00e7lerden kopuk bi\u00e7imde planlamak yerine mevcut sipari\u015f ve stok bilgilerini \u00fcretim \u00e7izelgesine ba\u011flayabilirsiniz. \u0130\u015f merkezinde kullan\u0131lan kutu sinyalini basit tutun; bu sinyalin ba\u015flatt\u0131\u011f\u0131 i\u015fi ise fabrikan\u0131n geri kalan\u0131n\u0131 da hesaba katan bir planla y\u00f6netin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Malzeme g\u00f6r\u00fcn\u00fcrl\u00fc\u011f\u00fc Eskomatic&#8217;te neleri de\u011fi\u015ftirdi?<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/eskomatic\/\">Finlandiyal\u0131 fason tala\u015fl\u0131 imalat \u015firketi Eskomatic<\/a>, daha \u00f6nce i\u015f kuyruklar\u0131n\u0131 b\u00fcy\u00fck \u00f6l\u00e7\u00fcde elle d\u00fczenliyordu. Malzeme kullan\u0131labilirli\u011finin yeterince g\u00f6r\u00fcn\u00fcr olmamas\u0131 nedeniyle eksiklikler, i\u015fin planlanan ba\u015flang\u0131c\u0131na \u00e7ok az zaman kala ortaya \u00e7\u0131kabiliyordu.<\/p>\n\n\n<p>SkyPlanner&#8217;\u0131n mevcut ERP sistemine ba\u011flanmas\u0131yla \u015firket, daha anla\u015f\u0131l\u0131r bir g\u00f6rsel i\u015f kuyru\u011funa ve i\u015f y\u00fck\u00fcn\u00fc otomatik \u00e7izelgeleme olana\u011f\u0131na kavu\u015ftu. Eskomatic, teslimat tarihlerinin daha do\u011fru belirlendi\u011fini ve malzeme eksikli\u011finden kaynaklanan \u00fcretim duru\u015flar\u0131n\u0131n azald\u0131\u011f\u0131n\u0131 bildiriyor.<\/p>\n\n\n<p>\u015eirketin deneyimi, malzemelerin haz\u0131r olma durumunu g\u00fcnl\u00fck \u00e7izelgelemeyle ili\u015fkilendirmenin de\u011ferini g\u00f6steriyor: planlamac\u0131lar, i\u015fin \u00e7oktan ba\u015flam\u0131\u015f olmas\u0131 gereken anda sorunu \u00e7\u00f6zmeye u\u011fra\u015fmak yerine daha erken m\u00fcdahale edebiliyor. Ortak kullan\u0131lan makinelerde iki kutu sistemi i\u00e7in ikmal \u00fcretimi yap\u0131l\u0131rken de ayn\u0131 pratik ihtiya\u00e7 s\u00f6z konusudur: dolu kutunun beklenen d\u00f6n\u00fc\u015f zaman\u0131, ger\u00e7ek \u00fcretim plan\u0131na dayanmal\u0131d\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tek bir par\u00e7ayla ba\u015flay\u0131n ve d\u00f6ng\u00fcn\u00fcn tamam\u0131n\u0131n i\u015fledi\u011fini do\u011frulay\u0131n<\/h2>\n\n\n<p>D\u00fczenli kullan\u0131lan bir par\u00e7a i\u00e7in tek bir kullan\u0131m noktas\u0131nda pilot uygulama ba\u015flat\u0131n. Her iki kutunun ba\u015flang\u0131\u00e7 miktar\u0131n\u0131 do\u011frulay\u0131n, varsa a\u00e7\u0131k ikmal talepleriyle kay\u0131tlar\u0131 uzla\u015ft\u0131r\u0131n, konumlar\u0131 etiketleyin ve operat\u00f6rlerle ikmal sorumlular\u0131na bo\u015f kutu de\u011fi\u015fiminin provas\u0131n\u0131 yapt\u0131r\u0131n. Uygulamay\u0131 yayg\u0131nla\u015ft\u0131rmadan \u00f6nce vardiya devir teslimleri de dahil olmak \u00fczere birka\u00e7 tam d\u00f6ng\u00fcy\u00fc izleyin.<\/p>\n\n\n<p>\u0130ki kutu sistemini de\u011ferli k\u0131lan unsurlar\u0131 koruyun: a\u00e7\u0131k\u00e7a g\u00f6r\u00fclen bir sinyal ve operat\u00f6r i\u00e7in basit bir i\u015fleyi\u015f. Planlama \u00e7abas\u0131n\u0131 as\u0131l \u00f6nemli noktaya y\u00f6neltin: bu sinyalin ard\u0131ndan y\u00fcr\u00fct\u00fclen s\u00fcrecin ger\u00e7ekten ikmal sa\u011flayabildi\u011finden emin olun.<\/p>\n\n\n<p>SkyPlanner&#8217;\u0131n i\u015fletme i\u00e7indeki ikmal \u00fcretiminizi nas\u0131l \u00e7izelgeleyece\u011fini g\u00f6rmek i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">demo randevusu al\u0131n<\/a>. G\u00f6r\u00fc\u015fmeye d\u00fczenli kullan\u0131lan bir par\u00e7a, yedek stokunun yetece\u011fi s\u00fcre ve ayn\u0131 kayna\u011f\u0131 kullanmas\u0131 gereken bir m\u00fc\u015fteri i\u015fi \u00f6rne\u011fiyle kat\u0131l\u0131n. \u0130kmalin ortak \u00e7izelgedeki yerini ve di\u011fer i\u015fler \u00fczerindeki etkisini inceleyebilirsiniz. Ya da <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>; rehberli bir ba\u015flang\u0131c\u0131 tercih ederseniz Asistan&#8217;\u0131n yapay zek\u00e2 destekli Ba\u015flang\u0131\u00e7 \u00f6zelli\u011fini kullanabilirsiniz.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun Ana Sayfa &raquo; Kaynaklar &raquo; \u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun Bir montaj istasyonunda k\u00fc\u00e7\u00fck bir par\u00e7a t\u00fckenir. Fabrikan\u0131n bir yerinde stok vard\u0131r, ancak birinin bu sto\u011fu bulmas\u0131, ikmal talebinde bulunmas\u0131 ve par\u00e7alar\u0131 operat\u00f6re getirmesi gerekir. D\u00fc\u015f\u00fck maliyetli bir bile\u015fen y\u00fcz\u00fcnden de\u011ferli \u00fcretim zaman\u0131 kaybedilmeye &#8230; <a title=\"\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/\" aria-label=\"Read more about \u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111722,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[314,2570],"tags":[],"class_list":["post-111706","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kaynaklar","category-uretim-verimliligi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun<\/title>\n<meta name=\"description\" content=\"Bo\u015f kutu \u00fcretimi durdurmas\u0131n, ikmali ba\u015flats\u0131n. G\u00fcvenilir bir iki kutu sistemi kurun; kendi \u00fcretti\u011finiz par\u00e7alar\u0131 SkyPlanner ile \u00e7izelgeleyin.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun\" \/>\n<meta property=\"og:description\" content=\"Bo\u015f kutu \u00fcretimi durdurmas\u0131n, ikmali ba\u015flats\u0131n. G\u00fcvenilir bir iki kutu sistemi kurun; kendi \u00fcretti\u011finiz par\u00e7alar\u0131 SkyPlanner ile \u00e7izelgeleyin.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T03:02:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T03:03:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/iki-kutu-sistemi\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/iki-kutu-sistemi\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun\",\"datePublished\":\"2026-10-28T03:02:21+00:00\",\"dateModified\":\"2026-10-28T03:03:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/iki-kutu-sistemi\\\/\"},\"wordCount\":2848,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/iki-kutu-sistemi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"articleSection\":[\"Kaynaklar\",\"\u00dcretim verimlili\u011fi\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/iki-kutu-sistemi\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/iki-kutu-sistemi\\\/\",\"name\":\"\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/iki-kutu-sistemi\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/iki-kutu-sistemi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"datePublished\":\"2026-10-28T03:02:21+00:00\",\"dateModified\":\"2026-10-28T03:03:57+00:00\",\"description\":\"Bo\u015f kutu \u00fcretimi durdurmas\u0131n, ikmali ba\u015flats\u0131n. G\u00fcvenilir bir iki kutu sistemi kurun; kendi \u00fcretti\u011finiz par\u00e7alar\u0131 SkyPlanner ile \u00e7izelgeleyin.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/iki-kutu-sistemi\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/iki-kutu-sistemi\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/iki-kutu-sistemi\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/two-bin-system-manufacturing-hero.png\",\"width\":1536,\"height\":864,\"caption\":\"Two equal parts bins hold assembly clips: one supplies the workstation while the full second bin waits in reserve.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/iki-kutu-sistemi\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun","description":"Bo\u015f kutu \u00fcretimi durdurmas\u0131n, ikmali ba\u015flats\u0131n. G\u00fcvenilir bir iki kutu sistemi kurun; kendi \u00fcretti\u011finiz par\u00e7alar\u0131 SkyPlanner ile \u00e7izelgeleyin.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/","og_locale":"tr_TR","og_type":"article","og_title":"\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun","og_description":"Bo\u015f kutu \u00fcretimi durdurmas\u0131n, ikmali ba\u015flats\u0131n. G\u00fcvenilir bir iki kutu sistemi kurun; kendi \u00fcretti\u011finiz par\u00e7alar\u0131 SkyPlanner ile \u00e7izelgeleyin.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T03:02:21+00:00","article_modified_time":"2026-10-28T03:03:57+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"14 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun","datePublished":"2026-10-28T03:02:21+00:00","dateModified":"2026-10-28T03:03:57+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/"},"wordCount":2848,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","articleSection":["Kaynaklar","\u00dcretim verimlili\u011fi"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/","name":"\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","datePublished":"2026-10-28T03:02:21+00:00","dateModified":"2026-10-28T03:03:57+00:00","description":"Bo\u015f kutu \u00fcretimi durdurmas\u0131n, ikmali ba\u015flats\u0131n. G\u00fcvenilir bir iki kutu sistemi kurun; kendi \u00fcretti\u011finiz par\u00e7alar\u0131 SkyPlanner ile \u00e7izelgeleyin.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png","width":1536,"height":864,"caption":"Two equal parts bins hold assembly clips: one supplies the workstation while the full second bin waits in reserve."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/iki-kutu-sistemi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/two-bin-system-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun Ana Sayfa &raquo; Kaynaklar &raquo; \u0130ki Kutu Sistemi: K\u00fc\u00e7\u00fck Par\u00e7alar \u00dcretime Haz\u0131r Olsun Bir montaj istasyonunda k\u00fc\u00e7\u00fck bir par\u00e7a t\u00fckenir. Fabrikan\u0131n bir yerinde stok vard\u0131r, ancak birinin bu sto\u011fu bulmas\u0131, ikmal talebinde bulunmas\u0131 ve par\u00e7alar\u0131 operat\u00f6re getirmesi gerekir. D\u00fc\u015f\u00fck maliyetli bir bile\u015fen y\u00fcz\u00fcnden de\u011ferli \u00fcretim zaman\u0131 kaybedilmeye&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/111706","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=111706"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/111706\/revisions"}],"predecessor-version":[{"id":111769,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/111706\/revisions\/111769"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/111722"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=111706"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=111706"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=111706"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}