{"id":111613,"date":"2026-10-28T00:43:16","date_gmt":"2026-10-28T00:43:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111613"},"modified":"2026-10-28T00:44:52","modified_gmt":"2026-10-28T00:44:52","slug":"mtm-yontemi","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/","title":{"rendered":"MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Yeni bir montaj\u0131n \u00fcretimini planlama a\u015famas\u0131na geldiniz, ancak g\u00fcvenilir bir ortalama s\u00fcre belirleyecek kadar \u00fcretim deneyimi hen\u00fcz yok. Yine de i\u015f merkezi yerle\u015fimlerini kar\u015f\u0131la\u015ft\u0131rman\u0131z, i\u015f y\u00fck\u00fcn\u00fc tahmin etmeniz ve ilk sipari\u015flerin mevcut kapasiteye s\u0131\u011f\u0131p s\u0131\u011fmayaca\u011f\u0131na karar vermeniz gerekiyor.<\/p>\n\n\n<p>MTM y\u00f6ntemi, d\u00fczenli \u00fcretim ba\u015flamadan \u00f6nce elle yap\u0131lan i\u015fin y\u00f6ntemini analiz etmenizi sa\u011flar. Tamamlanan i\u015flere ait verilerin birikmesini beklemek yerine, tan\u0131ml\u0131 hareketlerden ve yerle\u015fik zaman verilerinden yola \u00e7\u0131karak s\u00fcreyi belirlersiniz. \u00d6nce y\u00f6ntem gelir: Daha k\u0131sa bir s\u00fcre, ancak insanlar\u0131n g\u00fcvenli ve do\u011fru bi\u00e7imde yapabilece\u011fi bir i\u015fi tan\u0131ml\u0131yorsa anlaml\u0131d\u0131r.<\/p>\n\n\n<p>Bu s\u00fcrenin planlamada kullan\u0131lmas\u0131 onayland\u0131\u011f\u0131nda, SkyPlanner APS s\u00fcreyi uygulamaya ge\u00e7irmenize yard\u0131mc\u0131 olur. SkyPlanner&#8217;\u0131n \u00e7izelgeleme yapay zek\u00e2s\u0131 Arcturus, operasyon s\u00fcrelerini ortak \u00fcretim \u00e7izelgesine yerle\u015ftirir. B\u00f6ylece iyile\u015ftirilen y\u00f6ntem, bir m\u00fchendislik dosyas\u0131nda tek ba\u015f\u0131na duran bir say\u0131 olarak kalmaz; daha sa\u011flam verilere dayanan bir plana d\u00f6n\u00fc\u015f\u00fcr.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTM y\u00f6ntemi nedir?<\/h2>\n\n\n<p>MTM, elle yap\u0131lan i\u015fleri tan\u0131mlamak, analiz etmek ve de\u011ferlendirmek i\u00e7in kullan\u0131lan, \u00f6nceden belirlenmi\u015f hareket zamanlar\u0131na dayal\u0131 bir sistemdir. Analist, tan\u0131mlanm\u0131\u015f bir y\u00f6ntemi hareketlere veya s\u00fcreci olu\u015fturan temel i\u015f \u00f6\u011felerine ay\u0131r\u0131r. Ard\u0131ndan ilgili zaman verilerini ve kurallar\u0131 uygulayarak y\u00f6ntemin referans performans d\u00fczeyindeki s\u00fcresini belirler.<\/p>\n\n\n<p>Ayr\u0131nt\u0131l\u0131 bir MTM-1 analizinde uzanma, kavrama, ta\u015f\u0131ma, konumland\u0131rma ve b\u0131rakma gibi hareketler yer al\u0131r. Bu hareketlerin hangi ko\u015fullarda yap\u0131ld\u0131\u011f\u0131 \u00f6nemlidir: Kolayca eri\u015filebilen bir par\u00e7ay\u0131 almak ile se\u00e7ilmesi ve konumland\u0131r\u0131lmas\u0131 zor bir par\u00e7ayla \u00e7al\u0131\u015fmak ayn\u0131 i\u015f de\u011fildir. MTM, bu farkl\u0131l\u0131klar\u0131 tek bir genel tahminin i\u00e7inde gizlemek yerine a\u00e7\u0131k\u00e7a ortaya koyar.<\/p>\n\n\n<p>MTM zaman de\u011ferleri, zaman \u00f6l\u00e7\u00fcm birimi olan TMU ile ifade edilir. Bir TMU, 0,036 saniyeye e\u015fittir; dolay\u0131s\u0131yla 1.000 TMU, 36 saniyedir. TMU bir zaman birimidir, verimlilik y\u00fczdesi de\u011fildir.<\/p>\n\n\n<p>Referans performans da \u00f6nemlidir. MTM, en h\u0131zl\u0131 operat\u00f6r\u00fcn\u00fcz\u00fcn s\u00fcresini \u00f6l\u00e7\u00fcp bunu standart kabul ederek i\u015fe ba\u015flamaz. Kulland\u0131\u011f\u0131 zaman verileri zaten tan\u0131ml\u0131 bir performans temeline dayan\u0131r. S\u0131rf ba\u015fka bir et\u00fctte kullan\u0131ld\u0131 diye kronometre et\u00fcd\u00fcne \u00f6zg\u00fc tempo de\u011ferlendirmesini burada yeniden uygulamay\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Di\u011fer zaman belirleme y\u00f6ntemleri yerine MTM ne zaman kullan\u0131lmal\u0131?<\/h2>\n\n\n<p>MTM, \u00f6zellikle elle yap\u0131lan i\u015fin nas\u0131l tasarlanaca\u011f\u0131na karar verirken yararl\u0131d\u0131r: yeni bir \u00fcr\u00fcn, de\u011fi\u015ftirilen bir fikst\u00fcr, par\u00e7alar\u0131n operat\u00f6re farkl\u0131 bi\u00e7imde sunulmas\u0131 veya iki montaj s\u0131ras\u0131 aras\u0131nda se\u00e7im yap\u0131lmas\u0131 gibi. Y\u00f6ntemi kesinle\u015ftirmeden \u00f6nce i\u015f i\u00e7eri\u011fini kar\u015f\u0131la\u015ft\u0131rabilirsiniz.<\/p>\n\n\n<p>Ancak bu, s\u00fcreyle ilgili her sorunun do\u011fru yan\u0131t\u0131n\u0131n MTM oldu\u011fu anlam\u0131na gelmez. Verece\u011finiz karara uygun veriyi se\u00e7in:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>MTM:<\/strong> Elle yap\u0131lan i\u015f i\u00e7in tan\u0131mlanan bu y\u00f6ntem ne kadar s\u00fcre gerektirmeli? Yeterli \u00fcretim ge\u00e7mi\u015fi olu\u015fmadan \u00f6nce i\u015fi tasarlamak ve alternatifleri kar\u015f\u0131la\u015ft\u0131rmak i\u00e7in yararl\u0131d\u0131r.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-zaman-etudu\/\">Kronometreyle zaman et\u00fcd\u00fc<\/a>:<\/strong> G\u00f6zlenen i\u015f \u00f6\u011feleri belirtilen ko\u015fullarda ne kadar s\u00fcr\u00fcyor ve bu verilere dayanarak hangi s\u00fcre standard\u0131 belirlenebilir? Operasyon h\u00e2lihaz\u0131rda yap\u0131l\u0131yorsa ve incelenebiliyorsa yararl\u0131d\u0131r.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/is-orneklemesi\/\">\u0130\u015f \u00f6rneklemesi<\/a>:<\/strong> Zaman\u0131n ne kadar\u0131 montaj, haz\u0131rl\u0131k, bekleme veya di\u011fer faaliyetlere ayr\u0131l\u0131yor? Her k\u0131sa hareketin s\u00fcresini \u00f6l\u00e7mek i\u00e7in de\u011fil, bir \u00e7al\u0131\u015fma d\u00f6neminin faaliyetler aras\u0131nda nas\u0131l da\u011f\u0131ld\u0131\u011f\u0131n\u0131 anlamak i\u00e7in yararl\u0131d\u0131r.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-suresi-takibi\/\">\u0130\u015f baz\u0131nda s\u00fcre takibi<\/a>:<\/strong> Bu sipari\u015fte veya operasyonda ger\u00e7ekte ne oldu? \u00dcretimde ya\u015fananlar\u0131 de\u011ferlendirmek ve plandan sapmalar\u0131 a\u00e7\u0131klamak i\u00e7in yararl\u0131d\u0131r.<\/li><\/ul>\n\n\n<p>Bu yakla\u015f\u0131mlar birbirini destekleyebilir. MTM analizi, \u00f6nerilen y\u00f6ntemin s\u00fcresini belirlerken daha sonraki \u00fcretim g\u00f6zlemleri eksik bir i\u015f \u00f6\u011fesini veya de\u011fi\u015fen bir ko\u015fulu ortaya \u00e7\u0131karabilir. Ancak malzeme beklemelerini de i\u00e7eren kay\u0131tl\u0131 \u00e7al\u0131\u015fma saatlerinin ortalamas\u0131, elle yap\u0131lan i\u015fin \u00f6nceden belirlenmi\u015f i\u00e7eri\u011fiyle ayn\u0131 \u015fey de\u011fildir.<\/p>\n\n\n<p>Otomatik makine \u00e7evrimlerinde, prosesin belirledi\u011fi s\u00fcreyi ayr\u0131 olarak saptay\u0131n. MTM, operat\u00f6r\u00fcn y\u00fckleme, bo\u015faltma ve elle\u00e7leme i\u015flerini tan\u0131mlayabilir; makinenin kesme program\u0131n\u0131 veya k\u00fcrleme gereksinimini bir el hareketine d\u00f6n\u00fc\u015ft\u00fcrmez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTM-1, MTM-2 ve MTM-UAS: Do\u011fru ayr\u0131nt\u0131 d\u00fczeyini se\u00e7in<\/h2>\n\n\n<p>MTM, farkl\u0131 ayr\u0131nt\u0131 d\u00fczeylerine sahip bir sistem ailesidir. Yapaca\u011f\u0131n\u0131z se\u00e7im, hem analizin neyi tan\u0131mlayaca\u011f\u0131n\u0131 hem de haz\u0131rlanmas\u0131 i\u00e7in ne kadar emek gerekece\u011fini etkiler.<\/p>\n\n\n<p><strong>MTM-1<\/strong>, temel hareketler d\u00fczeyinde \u00e7al\u0131\u015f\u0131r. Her bir hareketin ger\u00e7ekle\u015fti\u011fi ko\u015fullar\u0131n i\u015f tasar\u0131m\u0131n\u0131 etkiledi\u011fi, k\u0131sa ve tekrarl\u0131 elle \u00e7al\u0131\u015fma s\u00fcre\u00e7lerinin ayr\u0131nt\u0131l\u0131 incelenmesine uygundur.<\/p>\n\n\n<p><strong>MTM-2<\/strong>, temel hareketleri daha b\u00fcy\u00fck gruplar h\u00e2linde birle\u015ftirir. Her MTM-1 hareketini ayr\u0131 ayr\u0131 kaydetmek yerine, uygun i\u015fleri daha az ayr\u0131nt\u0131yla analiz etme olana\u011f\u0131 sunar.<\/p>\n\n\n<p><strong>MTM-UAS<\/strong>, yani Universal Analyzing System, s\u00fcreci daha \u00fcst d\u00fczey i\u015f \u00f6\u011feleriyle ele al\u0131r ve parti tipi \u00fcretimdeki i\u015flerle ili\u015fkilidir. MTM-1&#8217;in ba\u015fka bir ad\u0131ndan ibaret de\u011fildir.<\/p>\n\n\n<p>Sistemi, bu konuda e\u011fitimli bir analistle birlikte; prosese, i\u015fin tekrarlanma ve de\u011fi\u015fkenlik d\u00fczeyine ve sonucun desteklemesi gereken karara g\u00f6re se\u00e7in. Daha fazla ayr\u0131nt\u0131, ancak karar\u0131 de\u011fi\u015ftirebilecekse harcanan eme\u011fe de\u011fer. Do\u011fru uygulama i\u00e7in se\u00e7ilen sisteme ait e\u011fitim, g\u00fcncel veriler ve kurallar gerekir; genel bir rehber bunlar\u0131n yerini tutamaz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTM analizinden planlamada kullan\u0131labilecek bir s\u00fcre nas\u0131l elde edilir?<\/h2>\n\n\n<p>\u0130\u015fe yarar bir analiz \u00e7\u0131kt\u0131s\u0131, yaln\u0131zca bir s\u00fcreden ibaret de\u011fildir. Belgelenmi\u015f bir y\u00f6ntem ve i\u015fi devralan planlama uzman\u0131n\u0131n da ne anlama geldi\u011fini anlayabilece\u011fi bir s\u00fcre i\u00e7ermelidir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. \u0130\u015fi ve ko\u015fullar\u0131 tan\u0131mlay\u0131n<\/h3>\n\n\n<p>\u00dcr\u00fcn varyant\u0131n\u0131, operasyonu ve y\u00f6ntem revizyonunu se\u00e7in. Tak\u0131mlar\u0131, fikst\u00fcr\u00fc, par\u00e7alar\u0131n operat\u00f6re sunulu\u015f bi\u00e7imini, i\u015f s\u0131ras\u0131n\u0131, kalite kontrollerini ve ba\u015flang\u0131\u00e7 ile biti\u015f noktalar\u0131n\u0131 tan\u0131mlay\u0131n. Analizin bir par\u00e7ay\u0131 m\u0131, bir \u00e7evrimi mi yoksa bir partiyi mi kapsad\u0131\u011f\u0131n\u0131 belirtin.<\/p>\n\n\n<p>\u0130\u015fi yapan veya yapacak ki\u015fileri s\u00fcrece kat\u0131n. K\u00e2\u011f\u0131t \u00fczerinde kusursuz g\u00f6r\u00fcnen bir \u00e7izimde g\u00f6zden ka\u00e7an zor bir uzanma hareketini, gerekli bir kontrol\u00fc veya kap de\u011fi\u015fimini onlar fark edebilir. G\u00fcvenli \u00e7al\u0131\u015fmay\u0131 ve \u00fcr\u00fcn kalitesini y\u00f6ntemin bir par\u00e7as\u0131 olarak koruyun; gerekli i\u015fleri \u00e7\u0131karmak iyile\u015ftirme de\u011fildir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. \u0130\u015f s\u0131ras\u0131n\u0131 se\u00e7ilen sistemle analiz edin<\/h3>\n\n\n<p>E\u011fitimli bir analist, uygun temel i\u015f \u00f6\u011felerini ve bunlar\u0131 etkileyen ko\u015fullar\u0131 kullanarak i\u015fi tan\u0131mlar. Analiz, yaln\u0131zca belirli aral\u0131klarla yap\u0131lan i\u015fler de d\u00e2hil olmak \u00fczere ger\u00e7ekte yap\u0131lan t\u00fcm i\u015fleri hesaba katmal\u0131d\u0131r.<\/p>\n\n\n<p>Sistemin i\u015f s\u0131ras\u0131 ve e\u015fzamanl\u0131 faaliyetlere ili\u015fkin kurallar\u0131na uyun. \u0130ki elin ayn\u0131 anda hareket etmesi, bu hareketlerin s\u00fcrelerinin mutlaka art arda toplanaca\u011f\u0131 anlam\u0131na gelmez. Eksik bir y\u00f6ntem tan\u0131m\u0131ndaki bo\u015flu\u011fu doldurmak i\u00e7in hareket s\u00fcresi de uydurulmamal\u0131d\u0131r.<\/p>\n\n\n<p>Haz\u0131rl\u0131k i\u015flerini tekrarlanan i\u015flerden ayr\u0131 tutun. Parti i\u00e7in bir kez yap\u0131lan fikst\u00fcr haz\u0131rl\u0131\u011f\u0131, her par\u00e7an\u0131n s\u00fcresine eklenen bir haz\u0131rl\u0131k i\u015fine d\u00f6n\u00fc\u015fmemelidir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Yaln\u0131zca toplam s\u00fcreleri de\u011fil, y\u00f6ntemleri kar\u015f\u0131la\u015ft\u0131r\u0131n<\/h3>\n\n\n<p>Bir y\u00f6ntemin neden daha az i\u015f gerektirdi\u011fini sorgulamak i\u00e7in analizden yararlan\u0131n. Par\u00e7a, operat\u00f6re her seferinde ayn\u0131 y\u00f6nde sunulabilir mi? Bir fikst\u00fcr, tekrar tekrar konumland\u0131rma ihtiyac\u0131n\u0131 ortadan kald\u0131rabilir mi? \u0130\u015f s\u0131ras\u0131n\u0131 de\u011fi\u015ftirmek, kontrolden vazge\u00e7meden elle\u00e7lemeyi ortadan kald\u0131r\u0131r m\u0131?<\/p>\n\n\n<p>Alternatifleri ayn\u0131 kapsam ve kalite gereklilikleriyle kar\u015f\u0131la\u015ft\u0131r\u0131n. Malzeme ikmali veya kontrol i\u015flemi analiz d\u0131\u015f\u0131nda b\u0131rak\u0131ld\u0131\u011f\u0131 i\u00e7in daha h\u0131zl\u0131 g\u00f6r\u00fcnen bir y\u00f6ntem, ger\u00e7ekte i\u015fi azaltm\u0131\u015f olmayabilir. MTM tam da burada, resm\u00ee g\u00f6r\u00fcn\u00fcml\u00fc bir tahmin olmaktan \u00e7\u0131k\u0131p bir i\u015f tasar\u0131m\u0131 arac\u0131na d\u00f6n\u00fc\u015f\u00fcr.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Kullan\u0131ma al\u0131nacak s\u00fcrenin neleri i\u00e7erdi\u011fini belirleyin<\/h3>\n\n\n<p>Sonucu \u00fcretim standard\u0131 olarak adland\u0131rmadan \u00f6nce s\u00fcrenin hangi temele dayand\u0131\u011f\u0131n\u0131 kontrol edin. Tekrarlanan destek i\u015flerini belirleyin; ki\u015fisel ihtiya\u00e7lar\u0131n, dinlenmenin ve ka\u00e7\u0131n\u0131lmaz gecikmelerin nas\u0131l ele al\u0131naca\u011f\u0131n\u0131 netle\u015ftirin. Hangi paylar\u0131n d\u00e2hil edildi\u011fini ve nas\u0131l hesapland\u0131\u011f\u0131n\u0131 kaydedin; her durumda ge\u00e7erli bir y\u00fczde oldu\u011funu varsaymay\u0131n.<\/p>\n\n\n<p>\u00d6nlenebilir kesintileri, \u00e7\u00f6z\u00fclmesi gereken sorunlar olarak g\u00f6r\u00fcn\u00fcr tutun. Eksik par\u00e7a nedeniyle bekleme, fark ettirmeden her uzanma ve kavrama dizisinin par\u00e7as\u0131 h\u00e2line gelmemelidir. Ayn\u0131 \u015fekilde, gerekli ve tekrarlanan i\u015fleri i\u00e7ermeyen bir planlama s\u00fcresi de yeni y\u00f6ntemi \u00e7izelgeye yerle\u015ftirmeyi ger\u00e7ekte oldu\u011fundan daha kolay g\u00f6sterir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Y\u00f6ntemi do\u011frulay\u0131n ve kullan\u0131m i\u00e7in onaylay\u0131n<\/h3>\n\n\n<p>Y\u00f6ntemi kullan\u0131ma almadan \u00f6nce, \u00f6ng\u00f6r\u00fclen ekipmanla, malzeme sunum d\u00fczeniyle ve kalite gerekliliklerine uygun bi\u00e7imde uygulanabildi\u011fini kontrol edin. Pilot \u00fcretim veya ilk \u00fcretim sonu\u00e7lar\u0131 elde edildi\u011finde, benzer i\u015flere g\u00f6re olu\u015fan farklar\u0131 inceleyin. \u00d6\u011frenme s\u00fcreci, de\u011fi\u015ftirilen bir fikst\u00fcr ve analizde eksik kalan bir unsur farkl\u0131 m\u00fcdahaleler gerektirir.<\/p>\n\n\n<p>Analizi, kullan\u0131lan sistemi, y\u00f6ntem revizyonunu, varsay\u0131mlar\u0131, dahil edilen paylar\u0131, onay\u0131 ve y\u00fcr\u00fcrl\u00fck tarihini kay\u0131t alt\u0131nda tutun. Y\u00f6ntem veya uygulama ko\u015fullar\u0131 de\u011fi\u015fti\u011finde s\u00fcreyi yeniden de\u011ferlendirin. Ama\u00e7, etkileyici bir say\u0131y\u0131 s\u00fcresiz olarak korumak de\u011fil, i\u015f ile plan aras\u0131ndaki ba\u011f\u0131n g\u00fcvenilirli\u011fini korumakt\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00d6rnek: daha iyi bir montaj y\u00f6ntemi, \u00e7izelgeye kendili\u011finden yans\u0131maz<\/h2>\n\n\n<p>Par\u00e7alar\u0131n farkl\u0131 y\u00f6nlere d\u00f6n\u00fck olarak geldi\u011fi bir manuel montaj istasyonu d\u00fc\u015f\u00fcn\u00fcn. \u00d6nerilen y\u00f6ntemde, par\u00e7alar\u0131 se\u00e7me ve yeniden konumland\u0131rma ihtiyac\u0131n\u0131 azaltan, geli\u015ftirilmi\u015f bir par\u00e7a sunum tepsisi ve konumland\u0131rma fikst\u00fcr\u00fc kullan\u0131l\u0131yor. Ekip y\u00f6ntemi kontrol edip kullan\u0131m\u0131n\u0131 onayl\u0131yor.<\/p>\n\n\n<p>Bunun sonucunda planlamada kullan\u0131lan s\u00fcrenin par\u00e7a ba\u015f\u0131na iki dakikadan bir bu\u00e7uk dakikaya d\u00fc\u015ft\u00fc\u011f\u00fcn\u00fc varsayal\u0131m. Bunlar MTM veri kart\u0131ndan al\u0131nm\u0131\u015f de\u011ferler de\u011fil, \u00f6rnek i\u00e7in onayland\u0131\u011f\u0131 varsay\u0131lan planlama girdileridir. Bir ki\u015finin tek bir istasyonda i\u015fleri s\u0131rayla yapt\u0131\u011f\u0131n\u0131, bu i\u015flerle e\u015f zamanl\u0131 y\u00fcr\u00fcyen bir makine \u00e7evrimi bulunmad\u0131\u011f\u0131n\u0131 ve s\u00fcrelerle kullan\u0131labilir \u00e7al\u0131\u015fma takviminin paylar a\u00e7\u0131s\u0131ndan uyumlu hale getirildi\u011fini kabul edelim.<\/p>\n\n\n<p>Haz\u0131rl\u0131k s\u00fcresi 30 dakika olarak kalan 120 par\u00e7al\u0131k bir sipari\u015f i\u00e7in:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\u00d6nceki y\u00f6ntem:<\/strong> 120 \u00d7 2 dakika + 30 dakika = 270 dakika, yani d\u00f6rt bu\u00e7uk saat.<\/li><li><strong>Yeni y\u00f6ntem:<\/strong> 120 \u00d7 1,5 dakika + 30 dakika = 210 dakika, yani \u00fc\u00e7 bu\u00e7uk saat.<\/li><\/ul>\n\n\n<p>Sipari\u015fin bu istasyonda ihtiya\u00e7 duydu\u011fu s\u00fcre bir saat azal\u0131r. B\u00f6ylece kullan\u0131labilir kapasite a\u00e7\u0131l\u0131r; ancak bu, sevkiyat\u0131n kendili\u011finden bir saat erkene al\u0131naca\u011f\u0131 anlam\u0131na gelmez. Montaj\u0131 tamamlanan \u00fcr\u00fcn h\u00e2l\u00e2 test tezg\u00e2h\u0131n\u0131 bekleyebilir, bir sonraki operasyon i\u00e7in gereken kaynak ba\u015fka bir sipari\u015fle dolu olabilir veya a\u00e7\u0131lan bir saat, ba\u015fka bir i\u015fin ihtiya\u00e7 duydu\u011fu zaman aral\u0131\u011f\u0131n\u0131n d\u0131\u015f\u0131nda kalabilir.<\/p>\n\n\n<p>Dolay\u0131s\u0131yla bir sonraki ad\u0131m, \u201cteslim tarihini bir saat \u00f6ne \u00e7ekmek\u201d de\u011fildir. Yap\u0131lmas\u0131 gereken, \u201cbu sipari\u015fin ve di\u011fer i\u015flerin mevcut kaynaklarla nas\u0131l y\u00fcr\u00fct\u00fclece\u011fini yeniden hesaplamak\u201dt\u0131r. SkyPlanner bu hesab\u0131 sizin i\u00e7in yapar.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Onaylanm\u0131\u015f y\u00f6ntem s\u00fcrelerini SkyPlanner ile planlamada kullan\u0131n<\/h2>\n\n\n<p>SkyPlanner&#8217;da bir operasyonun s\u00fcresini par\u00e7a ba\u015f\u0131na s\u00fcre, \u00fcretim h\u0131z\u0131 veya sabit s\u00fcre olarak tan\u0131mlayabilirsiniz. Haz\u0131rl\u0131k ve s\u00f6k\u00fcm s\u00fcreleri ayr\u0131 ayr\u0131 girilir. B\u00f6ylece tamamen manuel y\u00fcr\u00fct\u00fclen bu \u00f6rnekte, sipari\u015f miktarlar\u0131 de\u011fi\u015fse de onaylanm\u0131\u015f par\u00e7a ba\u015f\u0131 planlama s\u00fcresi ile parti haz\u0131rl\u0131k s\u00fcresi ayr\u0131 tutulabilir.<\/p>\n\n\n<p>\u00d6nce, bu s\u00fcre boyunca hangi kaynaklar\u0131n ayr\u0131lmas\u0131 gerekti\u011fini kontrol edin. \u0130nsan eme\u011fiyle yap\u0131lan i\u015fin s\u00fcresi, makinenin me\u015fgul kald\u0131\u011f\u0131 s\u00fcre ve operasyonun ba\u015flang\u0131c\u0131ndan biti\u015fine kadar ge\u00e7en s\u00fcre farkl\u0131 \u00f6l\u00e7\u00fclerdir. Operat\u00f6r ba\u015fka bir par\u00e7ay\u0131 haz\u0131rlarken makine \u00e7al\u0131\u015fmaya devam ediyorsa, t\u00fcm faaliyetlerin s\u00fcrelerini toplamak makine i\u00e7in gere\u011finden fazla s\u00fcre ay\u0131rman\u0131za yol a\u00e7abilir. Yaln\u0131zca manuel i\u015f s\u00fcresini kullanmak ise ekipman\u0131n ba\u015fka bir i\u015f i\u00e7in kullan\u0131lamad\u0131\u011f\u0131 s\u00fcreyi g\u00f6zden ka\u00e7\u0131rman\u0131za neden olabilir. Y\u00f6ntemi, operasyonun ger\u00e7ekten ihtiya\u00e7 duydu\u011fu kaynaklarla e\u015fle\u015ftirin.<\/p>\n\n\n<p>S\u00fcreye eklenen paylar\u0131 da \u00e7al\u0131\u015fma takvimiyle uyumlu hale getirin. Kullan\u0131labilir kapasiteden zaten d\u00fc\u015f\u00fclm\u00fc\u015f bir mola, ayn\u0131 mola i\u00e7in eklenen bir payla ikinci kez hesaba kat\u0131lmamal\u0131d\u0131r. Onaylanm\u0131\u015f et\u00fct kayd\u0131n\u0131 koruyun ve et\u00fcd\u00fcn bile\u015fenlerinin planlama girdilerine nas\u0131l d\u00f6n\u00fc\u015ft\u00fcr\u00fcld\u00fc\u011f\u00fcn\u00fc belgeleyin.<\/p>\n\n\n<p>Arcturus, bu operasyon s\u00fcrelerini tan\u0131mlanm\u0131\u015f i\u015f merkezlerine, vardiyalara, ba\u011f\u0131ml\u0131l\u0131klara ve \u00f6nceliklere g\u00f6re \u00e7izelgeler. Gantt zaman \u00e7izelgesi, i\u015flerin birbirine nas\u0131l ba\u011fland\u0131\u011f\u0131n\u0131 g\u00f6sterir. Onaylanm\u0131\u015f bir y\u00f6ntem de\u011fi\u015fikli\u011fini uygulamaya ald\u0131\u011f\u0131n\u0131zda, etkilenen planlama girdilerini g\u00fcncelleyin ve sonraki operasyonlarla ayn\u0131 kapasiteyi kullanmak isteyen di\u011fer sipari\u015fler \u00fczerindeki etkisini g\u00f6rmek i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">\u00e7izelgeyi yeniden hesaplay\u0131n<\/a>.<\/p>\n\n\n<p>Her revizyondan sonra ayr\u0131 i\u015f kuyruklar\u0131n\u0131 elle yeniden olu\u015fturmak zorunda kalmazs\u0131n\u0131z. Daha da \u00f6nemlisi, tamamlanm\u0131\u015f i\u015flere ait kapsaml\u0131 bir ge\u00e7mi\u015f hen\u00fcz olu\u015fmadan, yeni y\u00f6ntem i\u00e7in gerek\u00e7elendirilebilir bir s\u00fcreyi ileriye d\u00f6n\u00fck planlamada kullanabilirsiniz. Hangi y\u00f6ntemin onaylanaca\u011f\u0131na ve hangi taahh\u00fctlerin \u00f6ncelik ta\u015f\u0131d\u0131\u011f\u0131na siz karar verirsiniz; SkyPlanner ise t\u00fcm i\u015fleri birbirleriyle ba\u011flant\u0131l\u0131 olarak \u00e7izelgeler.<\/p>\n\n\n<p>Daha sonra ger\u00e7ekle\u015fen \u00fcretim, ek veriler sa\u011flar. SkyPlanner, ge\u00e7mi\u015f s\u00fcre kay\u0131tlar\u0131na dayanarak operasyon s\u00fcrelerinin tahmin edilmesini de destekler. Bu kayna\u011f\u0131 MTM&#8217;den ayr\u0131 tutun: biri kaydedilmi\u015f \u00fcretim verilerinden tahmin yaparken di\u011feri, tan\u0131mlanm\u0131\u015f bir manuel \u00e7al\u0131\u015fma y\u00f6ntemini \u00f6nceden belirlenmi\u015f verilerle de\u011ferlendirir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ortak bir \u00e7izelge neden \u00f6nemlidir?<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/utu\/\">Finlandiyal\u0131 elektrik panosu ve \u015falt donan\u0131m\u0131 \u00fcreticisi UTU<\/a>, daha \u00f6nce planlamas\u0131n\u0131 b\u00f6l\u00fcmlere \u00f6zel elektronik tablolarla yap\u0131yordu. ERP&#8217;deki s\u0131ralama de\u011fi\u015fiklikleri \u00fcretim sahas\u0131na her zaman ula\u015fm\u0131yor, ger\u00e7ek\u00e7i kapasiteyi g\u00f6rmek de zor oluyordu.<\/p>\n\n\n<p>UTU, SkyPlanner&#8217;\u0131 Oracle NetSuite ile entegre ederek Ulvila fabrikas\u0131n\u0131n hatlar\u0131n\u0131 ve b\u00f6l\u00fcmlerini tek bir sistemde bir araya getirdi. Ekip, proje teslimatlar\u0131n\u0131n daha hassas \u00e7izelgelenmesinin yan\u0131 s\u0131ra g\u00fcncellenen i\u015f kuyru\u011funun montaj \u00e7al\u0131\u015fanlar\u0131na saniyeler i\u00e7inde ula\u015ft\u0131\u011f\u0131n\u0131 belirtiyor. Bu deneyim, her b\u00f6l\u00fcm\u00fc kendi i\u015f kuyru\u011funu di\u011ferleriyle uyumlu hale getirmekle ba\u015f ba\u015fa b\u0131rakmak yerine, t\u00fcm i\u015f y\u00fck\u00fcn\u00fc ortak bir plana dahil etmenin de\u011ferini g\u00f6steriyor.<\/p>\n\n\n<h2 class=\"wp-block-heading\">G\u00fcvenilir bir y\u00f6ntem s\u00fcresinden g\u00fcvenilir bir \u00fcretim plan\u0131na<\/h2>\n\n\n<p>\u00dcretim ge\u00e7mi\u015finin hen\u00fcz yan\u0131t veremedi\u011fi bir a\u015famada manuel i\u015fi tasarlaman\u0131z ve gerek\u00e7elendirmeniz gerekiyorsa MTM&#8217;yi kullan\u0131n. Ard\u0131ndan, onaylanm\u0131\u015f bu s\u00fcreye mevcut sipari\u015fler aras\u0131nda ger\u00e7ek\u00e7i bir yer bulmak i\u00e7in SkyPlanner&#8217;\u0131 se\u00e7in. Sa\u011flam bir y\u00f6ntem, i\u015fin ne gerektirdi\u011fini ortaya koyar; sonlu kapasite \u00e7izelgeleme ise bu i\u015fin nerede ve ne zaman yap\u0131labilece\u011fini g\u00f6sterir.<\/p>\n\n\n<p>SkyPlanner, a\u00e7\u0131k REST API&#8217;si arac\u0131l\u0131\u011f\u0131yla her ERP veya MES ile entegre olur. B\u00f6ylece mevcut \u00fcretim bilgilerinizden yararlanarak daha iyi bir \u00e7izelgeleme yapabilirsiniz.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>; g\u00f6r\u00fc\u015fmeye onaylanm\u0131\u015f bir y\u00f6ntem s\u00fcresi, ilgili operasyon rotas\u0131 ve ayn\u0131 kapasiteye ihtiya\u00e7 duyan di\u011fer sipari\u015flerle kat\u0131l\u0131n. Y\u00f6ntem de\u011fi\u015fikli\u011finin yaln\u0131zca tek bir operasyonun s\u00fcresini de\u011fil, \u00fcretim plan\u0131n\u0131 ve teslim tarihlerini nas\u0131l etkiledi\u011fini g\u00f6r\u00fcn. \u00d6nce kendiniz ke\u015ffetmek isterseniz <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a> veya Asistan&#8217;\u0131n yapay zek\u00e2 destekli Ba\u015flang\u0131\u00e7 rehberini kullan\u0131n.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n Ana Sayfa &raquo; Kaynaklar &raquo; MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n Yeni bir montaj\u0131n \u00fcretimini planlama a\u015famas\u0131na geldiniz, ancak g\u00fcvenilir bir ortalama s\u00fcre belirleyecek kadar \u00fcretim deneyimi hen\u00fcz yok. Yine de i\u015f merkezi yerle\u015fimlerini kar\u015f\u0131la\u015ft\u0131rman\u0131z, i\u015f y\u00fck\u00fcn\u00fc tahmin etmeniz ve ilk sipari\u015flerin mevcut kapasiteye s\u0131\u011f\u0131p s\u0131\u011fmayaca\u011f\u0131na karar vermeniz gerekiyor. &#8230; <a title=\"MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/\" aria-label=\"Read more about MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111623,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[314,2570],"tags":[],"class_list":["post-111613","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kaynaklar","category-uretim-verimliligi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n<\/title>\n<meta name=\"description\" content=\"Yeni bir elle \u00e7al\u0131\u015fma y\u00f6ntemi ne kadar s\u00fcrer? MTM ile s\u00fcreyi \u00fcretimden \u00f6nce belirleyin, onayl\u0131 s\u00fcreleri SkyPlanner ile uygulanabilir bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n\" \/>\n<meta property=\"og:description\" content=\"Yeni bir elle \u00e7al\u0131\u015fma y\u00f6ntemi ne kadar s\u00fcrer? MTM ile s\u00fcreyi \u00fcretimden \u00f6nce belirleyin, onayl\u0131 s\u00fcreleri SkyPlanner ile uygulanabilir bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T00:43:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T00:44:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/mtm-yontemi\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/mtm-yontemi\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:44:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/mtm-yontemi\\\/\"},\"wordCount\":2822,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/mtm-yontemi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"articleSection\":[\"Kaynaklar\",\"\u00dcretim verimlili\u011fi\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/mtm-yontemi\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/mtm-yontemi\\\/\",\"name\":\"MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/mtm-yontemi\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/mtm-yontemi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:44:52+00:00\",\"description\":\"Yeni bir elle \u00e7al\u0131\u015fma y\u00f6ntemi ne kadar s\u00fcrer? MTM ile s\u00fcreyi \u00fcretimden \u00f6nce belirleyin, onayl\u0131 s\u00fcreleri SkyPlanner ile uygulanabilir bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/mtm-yontemi\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/mtm-yontemi\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/mtm-yontemi\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/mtm-yontemi\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n","description":"Yeni bir elle \u00e7al\u0131\u015fma y\u00f6ntemi ne kadar s\u00fcrer? MTM ile s\u00fcreyi \u00fcretimden \u00f6nce belirleyin, onayl\u0131 s\u00fcreleri SkyPlanner ile uygulanabilir bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/","og_locale":"tr_TR","og_type":"article","og_title":"MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n","og_description":"Yeni bir elle \u00e7al\u0131\u015fma y\u00f6ntemi ne kadar s\u00fcrer? MTM ile s\u00fcreyi \u00fcretimden \u00f6nce belirleyin, onayl\u0131 s\u00fcreleri SkyPlanner ile uygulanabilir bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T00:43:16+00:00","article_modified_time":"2026-10-28T00:44:52+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"14 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:44:52+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/"},"wordCount":2822,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","articleSection":["Kaynaklar","\u00dcretim verimlili\u011fi"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/","name":"MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:44:52+00:00","description":"Yeni bir elle \u00e7al\u0131\u015fma y\u00f6ntemi ne kadar s\u00fcrer? MTM ile s\u00fcreyi \u00fcretimden \u00f6nce belirleyin, onayl\u0131 s\u00fcreleri SkyPlanner ile uygulanabilir bir \u00e7izelgeye d\u00f6n\u00fc\u015ft\u00fcr\u00fcn.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","width":1774,"height":887,"caption":"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/mtm-yontemi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n Ana Sayfa &raquo; Kaynaklar &raquo; MTM y\u00f6ntemi: \u00dcretim ba\u015flamadan i\u015fi planlay\u0131n Yeni bir montaj\u0131n \u00fcretimini planlama a\u015famas\u0131na geldiniz, ancak g\u00fcvenilir bir ortalama s\u00fcre belirleyecek kadar \u00fcretim deneyimi hen\u00fcz yok. Yine de i\u015f merkezi yerle\u015fimlerini kar\u015f\u0131la\u015ft\u0131rman\u0131z, i\u015f y\u00fck\u00fcn\u00fc tahmin etmeniz ve ilk sipari\u015flerin mevcut kapasiteye s\u0131\u011f\u0131p s\u0131\u011fmayaca\u011f\u0131na karar vermeniz gerekiyor.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/111613","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=111613"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/111613\/revisions"}],"predecessor-version":[{"id":111677,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/111613\/revisions\/111677"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/111623"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=111613"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=111613"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=111613"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}