{"id":110597,"date":"2026-10-26T03:51:55","date_gmt":"2026-10-26T03:51:55","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110597"},"modified":"2026-10-26T03:53:46","modified_gmt":"2026-10-26T03:53:46","slug":"dongusel-sayim","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/","title":{"rendered":"\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; \u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Stok kay\u0131tlar\u0131na g\u00f6re par\u00e7alar mevcut. Ancak operat\u00f6r kab\u0131 a\u00e7t\u0131\u011f\u0131nda i\u015fi tamamlamaya yetecek kadar par\u00e7a olmad\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcyor. \u015eimdi depo ekibi par\u00e7alar\u0131 ar\u0131yor, sat\u0131n alma eksikleri tedarik etmeye \u00e7al\u0131\u015f\u0131yor, \u00fcretim planlama uzman\u0131 ise bu par\u00e7alar\u0131n mevcut oldu\u011fu varsay\u0131m\u0131yla haz\u0131rlanm\u0131\u015f \u00e7izelgeyi yeniden olu\u015fturuyor.<\/p>\n\n\n<p>D\u00f6ng\u00fcsel say\u0131m, bu uyumsuzlu\u011fu daha erken yakalamaya yard\u0131mc\u0131 olur. T\u00fcm deponun say\u0131lmas\u0131n\u0131 beklemek yerine se\u00e7ti\u011finiz stoklar\u0131 d\u00fczenli olarak kontrol eder, farklar\u0131 ara\u015ft\u0131r\u0131r ve bunlara yol a\u00e7an s\u00fcreci d\u00fczeltirsiniz. Kazan\u0131m yaln\u0131zca daha do\u011fru bir stok raporu de\u011fildir. Sadece kay\u0131tlarda var olan malzemelere dayanarak al\u0131nan \u00fcretim kararlar\u0131n\u0131n da azalmas\u0131d\u0131r.<\/p>\n\n\n<p>D\u00fczeltilen bilgilerin \u00fcretim plan\u0131na da yans\u0131mas\u0131 gerekir. SkyPlanner APS, malzeme kullan\u0131labilirli\u011fini o malzemeye ba\u011fl\u0131 sipari\u015fler, makineler ve vardiyalarla ili\u015fkilendirir. B\u00f6ylece planlama uzman\u0131n\u0131z, her i\u015f kuyru\u011funu elle yeniden olu\u015fturmadan malzeme eksikli\u011fine g\u00f6re d\u00fczenleme yapabilir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">D\u00f6ng\u00fcsel say\u0131m nedir?<\/h2>\n\n\n<p>D\u00f6ng\u00fcsel say\u0131m, stoklar\u0131n se\u00e7ilen b\u00f6l\u00fcmlerinin planl\u0131 bir s\u0131rayla tekrar tekrar fiziksel olarak say\u0131lmas\u0131d\u0131r. Ayn\u0131 malzeme, konum, stok durumu ve an i\u00e7in say\u0131lan miktar\u0131 kay\u0131tl\u0131 miktarla kar\u015f\u0131la\u015ft\u0131r\u0131r, ard\u0131ndan varsa fark\u0131 ara\u015ft\u0131r\u0131p giderirsiniz.<\/p>\n\n\n<p>Say\u0131m program\u0131nda depo konumlar\u0131, malzeme gruplar\u0131 veya tek tek malzeme-konum kay\u0131tlar\u0131 s\u0131rayla ele al\u0131nabilir. Baz\u0131 stoklar daha s\u0131k kontrol edilir; \u00e7\u00fcnk\u00fc bu stoklardaki hatalar mali a\u00e7\u0131dan veya \u00fcretim a\u00e7\u0131s\u0131ndan daha b\u00fcy\u00fck risk ta\u015f\u0131r. Ama\u00e7, malzeme eksikli\u011fi i\u015fi durdurduktan sonra ara s\u0131ra arama yapmak de\u011fil, s\u00fcreklili\u011fi olan bir do\u011frulama d\u00fczeni kurmakt\u0131r.<\/p>\n\n\n<p>Birbiriyle ili\u015fkili bu \u00fc\u00e7 uygulaman\u0131n i\u015flevleri farkl\u0131d\u0131r:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>S\u00fcrekli stok kay\u0131tlar\u0131<\/strong>, giri\u015f, \u00e7\u0131k\u0131\u015f, t\u00fcketim ve di\u011fer i\u015flemlere g\u00f6re stok bakiyesini g\u00fcncel tutar. Sisteme g\u00f6re elde ne bulundu\u011funu g\u00f6sterir.<\/li><li><strong>D\u00f6ng\u00fcsel say\u0131mlar<\/strong>, y\u0131l boyunca se\u00e7ilen kay\u0131tlar\u0131 fiziksel say\u0131mla do\u011frular. \u0130\u015flemlerin izleri hen\u00fcz tazeyken eksik kay\u0131tlar\u0131, yanl\u0131\u015f miktarlar\u0131 ve di\u011fer farklar\u0131 ortaya \u00e7\u0131karmaya yard\u0131mc\u0131 olur.<\/li><li><strong>Tam fiziksel say\u0131m<\/strong>, belirlenen kapsamdaki stoklar\u0131n tamam\u0131n\u0131 se\u00e7ilen bir zamanda kontrol eder. D\u00f6ng\u00fcsel say\u0131m ise do\u011frulamay\u0131 tek seferde yapmak yerine daha k\u00fc\u00e7\u00fck b\u00f6l\u00fcmlere yayar.<\/li><\/ul>\n\n\n<p>G\u00fcncel tutulan bir stok bakiyesi, fiziksel stokun kan\u0131t\u0131 de\u011fildir. Ayn\u0131 \u015fekilde, bir d\u00f6ng\u00fcsel say\u0131m program\u0131 da \u015firketinizin finansal raporlama veya denetim gerekliliklerini kendili\u011finden kar\u015f\u0131lamaz. Bu gereklilikleri, g\u00fcnl\u00fck i\u015fleyi\u015fe y\u00f6nelik bu uygulamadan ayr\u0131 olarak belirleyin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00d6nce stok fark\u0131n\u0131 i\u00e7 sevkiyat sorunundan ay\u0131r\u0131n<\/h2>\n\n\n<p>Bir par\u00e7an\u0131n i\u015f merkezinde bulunmamas\u0131, stok kayd\u0131n\u0131n mutlaka yanl\u0131\u015f oldu\u011fu anlam\u0131na gelmez. Par\u00e7a h\u00e2l\u00e2 kay\u0131tlarda belirtilen depo konumunda, i\u00e7 sevkiyat\u0131 bekliyor olabilir. Bu durumda sorun, stoktan d\u00fc\u015f\u00fclmesi gereken bir miktar de\u011fil, <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/pfep\/\">malzemenin i\u015fin yap\u0131laca\u011f\u0131 yere nas\u0131l ula\u015ft\u0131r\u0131ld\u0131\u011f\u0131d\u0131r<\/a>.<\/p>\n\n\n<p>Miktarlar\u0131 kar\u015f\u0131la\u015ft\u0131rmadan \u00f6nce kapsamlar\u0131n\u0131n ayn\u0131 oldu\u011funu do\u011frulay\u0131n. Bina genelindeki toplam stok, hat yan\u0131ndaki tek bir kutunun i\u00e7eri\u011fiyle do\u011frudan kar\u015f\u0131la\u015ft\u0131r\u0131lamaz. Bir i\u015f i\u00e7in \u00e7\u0131k\u0131\u015f\u0131 yap\u0131lm\u0131\u015f stok, hen\u00fcz \u00e7\u0131k\u0131\u015f\u0131 yap\u0131lmam\u0131\u015f depo stoku olarak yeniden say\u0131lmamal\u0131d\u0131r. Kalite onay\u0131 bekleyen par\u00e7alar fiziksel olarak mevcut olsa da \u00fcretimde kullan\u0131ma a\u00e7\u0131k olmayabilir.<\/p>\n\n\n<p>Kar\u015f\u0131la\u015ft\u0131rma ger\u00e7ekten bir fark ortaya koyuyorsa, buna yol a\u00e7m\u0131\u015f olabilecek i\u015flemleri ve malzeme hareketlerini inceleyin:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Olas\u0131 neden<\/th><th>Kontrol edilecekler<\/th><\/tr><\/thead><tbody><tr><td>Mal giri\u015finin yanl\u0131\u015f miktarla kaydedilmesi<\/td><td>Teslim edilen miktar\u0131, mal kabul kontrol\u00fcn\u00fc ve kaydedilen mal giri\u015fini kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/td><\/tr><tr><td>Kutu ile adedin kar\u0131\u015ft\u0131r\u0131lmas\u0131<\/td><td>Sat\u0131n alma, stoklama ve t\u00fcketim birimleriyle bunlar aras\u0131ndaki d\u00f6n\u00fc\u015f\u00fcmleri do\u011frulay\u0131n.<\/td><\/tr><tr><td>Malzeme ta\u015f\u0131nd\u0131\u011f\u0131 h\u00e2lde konum kayd\u0131n\u0131n de\u011fi\u015ftirilmemesi<\/td><td>\u00c7\u0131k\u0131\u015f ve var\u0131\u015f konumlar\u0131yla transfer kayd\u0131n\u0131 kontrol edin.<\/td><\/tr><tr><td>Fiil\u00ee kullan\u0131m\u0131n kay\u0131tl\u0131 t\u00fcketimden farkl\u0131 olmas\u0131<\/td><td>Stok \u00e7\u0131k\u0131\u015f y\u00f6ntemini, \u00fcr\u00fcn a\u011fac\u0131ndaki miktarlar\u0131, fireyi ve iadeleri inceleyin.<\/td><\/tr><tr><td>Benzer par\u00e7alar\u0131n veya farkl\u0131 revizyonlar\u0131n birbirine kar\u0131\u015fmas\u0131<\/td><td>Etiketleri, tan\u0131mlay\u0131c\u0131 bilgileri ve kaplar\u0131n ger\u00e7ek i\u00e7eri\u011fini do\u011frulay\u0131n.<\/td><\/tr><tr><td>Hasarl\u0131 veya bloke stokun kullan\u0131labilir kabul edilmesi<\/td><td>Stokun fiziksel durumunu, kay\u0131tlardaki kullan\u0131labilirlik bilgisiyle kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Bu kontroller farkl\u0131 \u00e7\u00f6z\u00fcm yollar\u0131na i\u015faret eder. Mal kabulde daha disiplinli \u00e7al\u0131\u015fmak yanl\u0131\u015f t\u00fcketim miktar\u0131n\u0131 d\u00fczeltmez; fazladan stok sat\u0131n almak da eksik bir transfer kayd\u0131n\u0131 gidermez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Neyi, ne s\u0131kl\u0131kta sayaca\u011f\u0131n\u0131z\u0131 belirleyin<\/h2>\n\n\n<p>Farklar\u0131n ciddi aksamalara yol a\u00e7t\u0131\u011f\u0131, y\u00f6netilebilir b\u00fcy\u00fckl\u00fckte bir \u00fcretim alan\u0131 veya malzeme grubuyla ba\u015flay\u0131n. Program i\u00e7in bir sorumlu belirleyin, ba\u015fka i\u015flere ayr\u0131lmayacak bir zaman dilimi olu\u015fturun ve bulgular\u0131n nas\u0131l \u00e7\u00f6z\u00fcme kavu\u015fturulaca\u011f\u0131n\u0131 netle\u015ftirin. Tespit edilen sorunlar\u0131 sonu\u00e7land\u0131ran k\u00fc\u00e7\u00fck bir rutin, kimsenin ara\u015ft\u0131rmaya zaman bulamad\u0131\u011f\u0131 uzun bir say\u0131m listesinden daha yararl\u0131d\u0131r.<\/p>\n\n\n<p>Say\u0131m s\u0131kl\u0131\u011f\u0131n\u0131 belirlerken birden fazla g\u00f6stergeyi dikkate al\u0131n. T\u00fcketimin parasal de\u011feri, <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/abc-stok-analizi\/\">ABC stok analizi<\/a> yoluyla mali kontrol\u00fcn nereye odaklanaca\u011f\u0131n\u0131 belirlemeye yard\u0131mc\u0131 olabilir. \u0130\u015flem s\u0131kl\u0131\u011f\u0131 ve ge\u00e7mi\u015fte ya\u015fanan farklar, kay\u0131tlar\u0131n nerelerde h\u0131zla ger\u00e7ek stoktan uzakla\u015fabilece\u011fini g\u00f6sterir. Malzemenin \u00fcretim a\u00e7\u0131s\u0131ndan kritikli\u011fi ise ba\u015fka bir bak\u0131\u015f a\u00e7\u0131s\u0131 sunar: Sat\u0131n al\u0131nan ucuz bir par\u00e7a, pahal\u0131 bir montaj i\u015fini durdurabilir.<\/p>\n\n\n<p>Her A grubu malzemenin ayl\u0131k, her C grubu malzemenin y\u0131ll\u0131k say\u0131lmas\u0131 gerekti\u011fi gibi herkese uygulanacak bir kural\u0131 kopyalamay\u0131n. Risklerinize ve say\u0131m ile ara\u015ft\u0131rmaya ay\u0131rabilece\u011finiz zamana uygun aral\u0131klar se\u00e7in. Hatalar\u0131n tekrarland\u0131\u011f\u0131 yerlere daha fazla odaklan\u0131n; ard\u0131ndan sorunun kayna\u011f\u0131nda yap\u0131lan d\u00fczeltmenin kay\u0131tlar\u0131 daha g\u00fcvenilir h\u00e2le getirip getirmedi\u011fini de\u011ferlendirin.<\/p>\n\n\n<p>Konum bazl\u0131 say\u0131m, birbirine yak\u0131n stoklar\u0131 bir arada ele alarak fiziksel say\u0131m\u0131 kolayla\u015ft\u0131rabilir. Malzeme bazl\u0131 say\u0131m ise ayn\u0131 par\u00e7ay\u0131 birden fazla konumda takip etmeye yard\u0131mc\u0131 olur. Hangisini se\u00e7erseniz se\u00e7in, eri\u015fimi zor konumlar\u0131n, yava\u015f hareket g\u00f6ren malzemelerin ve beklenmedik \u015fekilde bo\u015f \u00e7\u0131kan kutular\u0131n program d\u0131\u015f\u0131nda kalmamas\u0131 i\u00e7in kapsam\u0131 belirleyin. Kay\u0131tlarda pozitif bakiye g\u00f6r\u00fcnen bo\u015f bir kutu, say\u0131m\u0131 atlamak i\u00e7in bir neden de\u011fil, bir bulgudur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Stok farklar\u0131n\u0131 gideren bir d\u00f6ng\u00fcsel say\u0131m prosed\u00fcr\u00fc<\/h2>\n\n\n<h3 class=\"wp-block-heading\">1. Say\u0131m kapsam\u0131n\u0131 belirleyin<\/h3>\n\n\n<p>Malzemeyi ve konumunu, ayr\u0131ca i\u015fletmenizde kullan\u0131lan parti, revizyon veya stok durumu ayr\u0131mlar\u0131n\u0131 belirleyin. Stoklama birimini ve kapal\u0131 ambalajlar\u0131n ya da k\u0131smen kullan\u0131lm\u0131\u015f kaplar\u0131n nas\u0131l say\u0131laca\u011f\u0131n\u0131 belirtin. Kapsam\u0131, ba\u015fka bir ki\u015finin de ayn\u0131 say\u0131m\u0131 tekrarlayabilece\u011fi kadar a\u00e7\u0131k tan\u0131mlay\u0131n.<\/p>\n\n\n<p>Say\u0131m kapsam\u0131nda beklenmedik \u015fekilde bulunan stoklar\u0131 da d\u00e2hil edin. Yaln\u0131zca listede yaz\u0131l\u0131 malzemeleri kontrol etmek, kaydedilmemi\u015f bir mal giri\u015finin veya yanl\u0131\u015f yere konmu\u015f bir par\u00e7an\u0131n g\u00f6zden ka\u00e7mas\u0131na neden olabilir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. \u0130\u015flemler i\u00e7in g\u00fcvenilir bir kesim an\u0131 belirleyin<\/h3>\n\n\n<p>Fiziksel say\u0131m ile sistemdeki bakiye ayn\u0131 ana ait olmal\u0131d\u0131r. Aksi h\u00e2lde, say\u0131m s\u0131ras\u0131nda do\u011fru bi\u00e7imde kaydedilmi\u015f bir malzeme toplama i\u015flemi bile eksik stok varm\u0131\u015f gibi g\u00f6r\u00fcnebilir.<\/p>\n\n\n<p>K\u00fc\u00e7\u00fck bir pilot uygulamada en basit kontrol, se\u00e7ilen konumdaki hareketleri k\u0131sa s\u00fcreli\u011fine durdurmak olabilir. \u0130\u015flerin devam etmesi gerekiyorsa say\u0131m s\u0131ras\u0131ndaki mal giri\u015flerini, toplama ve transfer i\u015flemlerini kaydetmek ve ger\u00e7ekle\u015fme zamanlar\u0131n\u0131 dikkate alarak say\u0131m ile kay\u0131tlar\u0131 uzla\u015ft\u0131rmak i\u00e7in tan\u0131ml\u0131 bir s\u00fcre\u00e7 kullan\u0131n. Malzemeyle \u00e7al\u0131\u015fanlara neyin say\u0131ld\u0131\u011f\u0131n\u0131 ve istisnalara kimin izin verdi\u011fini bildirin. Yaln\u0131zca se\u00e7ti\u011finiz kapsam\u0131 kontrol alt\u0131na al\u0131yorsunuz; t\u00fcm depoyu kapatman\u0131z \u015fart de\u011fildir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Beklenen miktardan ba\u011f\u0131ms\u0131z say\u0131m yap\u0131n<\/h3>\n\n\n<p>Uygulanabildi\u011fi durumlarda, say\u0131m\u0131 yapan ki\u015finin ilk say\u0131mda kay\u0131tl\u0131 bakiyeyi g\u00f6rmesini engelleyin. Ekrandaki rakam\u0131 onaylamas\u0131n\u0131 de\u011fil, fiilen sayd\u0131\u011f\u0131 miktar\u0131 bildirmesini isteyin.<\/p>\n\n\n<p>Yaln\u0131zca kab\u0131n etiketini de\u011fil, ger\u00e7ek i\u00e7eri\u011fini kontrol edin. Say\u0131m zaman\u0131n\u0131, birimi, konumu ve say\u0131m\u0131 yapan ki\u015fiyi kaydedin; tan\u0131mlama belirsizliklerini veya m\u00fcdahale gerektiren hasarl\u0131 ambalajlar\u0131 da not edin. Tart\u0131m ya da ba\u015fka bir dolayl\u0131 y\u00f6ntem kullan\u0131l\u0131yorsa y\u00f6ntemi ve s\u00f6z konusu malzemeye uygunlu\u011funu do\u011frulay\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Yeniden say\u0131n ve farklar\u0131 uzla\u015ft\u0131r\u0131n<\/h3>\n\n\n<p>Bakiyeyi de\u011fi\u015ftirmeden \u00f6nce malzemeyi, birimi, konumu ve kesim an\u0131n\u0131 do\u011frulay\u0131n. \u00d6nemli veya a\u00e7\u0131klanamayan bir fark varsa ikinci bir ki\u015finin ba\u011f\u0131ms\u0131z olarak yeniden say\u0131m yapmas\u0131n\u0131 sa\u011flay\u0131n. Ard\u0131ndan say\u0131m \u00f6ncesi ve sonras\u0131ndaki mal giri\u015flerini, transferleri, \u00fcretime \u00e7\u0131k\u0131\u015flar\u0131, t\u00fcketimleri, iadeleri ve fireleri inceleyin.<\/p>\n\n\n<p>Birisi beklenen sonucu bulana kadar tekrar tekrar say\u0131m yapmay\u0131n. \u0130lk say\u0131m sonucunu ve sonradan elde edilen kan\u0131tlar\u0131 saklay\u0131n. Miktar fark\u0131, say\u0131m zaman\u0131ndan sonra ger\u00e7ekle\u015fen ge\u00e7erli bir hareketle a\u00e7\u0131klan\u0131yorsa ayr\u0131ca stok d\u00fczeltmesi kaydetmek yerine bu hareketi dikkate alarak kay\u0131tlar\u0131 uzla\u015ft\u0131r\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Uygun d\u00fczeltmeyi onaylay\u0131n<\/h3>\n\n\n<p>Say\u0131m sonucunun kaydedilmesi ile stok de\u011fi\u015fikli\u011finin onaylanmas\u0131n\u0131 birbirinden ay\u0131r\u0131n. Par\u00e7an\u0131n de\u011ferine ve \u00fcretim a\u00e7\u0131s\u0131ndan ta\u015f\u0131d\u0131\u011f\u0131 riske uygun onay sorumluluklar\u0131 ve \u00fcst onay gerektiren s\u0131n\u0131rlar belirleyin.<\/p>\n\n\n<p>Kabul edilen miktar\u0131, fark\u0131, nedenini, onaylayan ki\u015fiyi ve destekleyici kan\u0131tlar\u0131 kaydedin. As\u0131l hatay\u0131 d\u00fczeltin: yanl\u0131\u015f konum veya stok durumu i\u00e7in miktar d\u00fczeltmesinden farkl\u0131 bir i\u015flem gerekebilir. Sonradan kaydedilen bir mal kabul ya da t\u00fcketim i\u015fleminin ayn\u0131 fark\u0131 ikinci kez d\u00fczeltmemesi i\u00e7in d\u00fczeltme girmeden \u00f6nce kaydedilmemi\u015f kaynak i\u015flemleri kontrol edin.<\/p>\n\n\n<p>Do\u011frulanm\u0131\u015f bir stok a\u00e7\u0131\u011f\u0131 devam eden i\u015fleri tehdit ediyorsa \u00fcretim planlama uzman\u0131na vakit kaybetmeden haber verin. Daha uzun s\u00fcrecek k\u00f6k neden ara\u015ft\u0131rmas\u0131 devam ederken teslimat riskini gizli b\u0131rakmay\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Hataya yol a\u00e7an s\u00fcreci d\u00fczeltin<\/h3>\n\n\n<p>Kabul edilen bir stok d\u00fczeltmesi bug\u00fcnk\u00fc kayd\u0131 d\u00fczeltir. Ancak hatan\u0131n neden olu\u015ftu\u011funu a\u00e7\u0131klamaz ve tekrarlanmas\u0131n\u0131 \u00f6nlemez.<\/p>\n\n\n<p>D\u00fczeltici faaliyet i\u00e7in bir sorumlu ve tamamlanma tarihi belirleyin. Bu faaliyet; mal kabul kontrol\u00fcn\u00fcn de\u011fi\u015ftirilmesi, birim d\u00f6n\u00fc\u015f\u00fcm\u00fcn\u00fcn d\u00fczeltilmesi, firenin olu\u015ftu\u011fu operasyonda kaydedilmesi veya kullan\u0131lmayan bile\u015fenlerin depoya iade s\u00fcrecinin d\u00fczeltilmesi olabilir. S\u00fcre\u00e7 yeniden i\u015fledikten sonra ilgili sto\u011fu tekrar kontrol edin. Ba\u015far\u0131 \u00f6l\u00e7\u00fct\u00fc, d\u00fczeltmenin sisteme sorunsuz kaydedilmesi de\u011fil, fark\u0131n tekrarlan\u0131p tekrarlanmamas\u0131d\u0131r.<\/p>\n\n\n<h3 class=\"wp-block-heading\">7. D\u00fczeltilmi\u015f malzeme kullan\u0131labilirli\u011fini \u00fcretim \u00e7izelgelemeye yans\u0131t\u0131n<\/h3>\n\n\n<p>Kabul edilen d\u00fczeltmenin, \u00fcretim \u00e7izelgesine malzeme bilgisi sa\u011flayan sisteme ula\u015ft\u0131\u011f\u0131ndan emin olun. Ard\u0131ndan bu malzemeyi t\u00fcketen sipari\u015fleri, \u00f6nceliklerini ve di\u011fer i\u015flerle ortak kulland\u0131klar\u0131 kaynaklar\u0131 yeniden de\u011ferlendirin.<\/p>\n\n\n<p>Stok ekibi art\u0131k ba\u015flang\u0131\u00e7 miktar\u0131n\u0131 daha do\u011fru belirlemi\u015ftir. Ancak planlama uzman\u0131n\u0131n h\u00e2l\u00e2 ba\u015fka bir soruya yan\u0131t bulmas\u0131 gerekir: <strong>\u015eimdi neyi, hangi s\u0131rayla \u00fcretebiliriz ve teslimat tarihleri bundan nas\u0131l etkilenir?<\/strong><\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00d6rnek: Say\u0131m tamamland\u0131, ancak iki sipari\u015f i\u00e7in de par\u00e7a gerekiyor<\/h2>\n\n\n<p>Kay\u0131tlar\u0131nda depoda 120 adet kullan\u0131labilir g\u00f6vde bulundu\u011fu g\u00f6r\u00fcnen bir \u00fcretici d\u00fc\u015f\u00fcn\u00fcn. Yakla\u015fan iki sipari\u015fin her biri i\u00e7in 60 adet gerekiyor. Kontroll\u00fc bir say\u0131mda 90 adet bulunuyor ve ba\u011f\u0131ms\u0131z bir tekrar say\u0131m\u0131 bu miktar\u0131 do\u011fruluyor.<\/p>\n\n\n<p>Ekip, g\u00f6vdelerin ba\u015fka bir konuma ta\u015f\u0131nmad\u0131\u011f\u0131n\u0131 veya daha \u00f6nce stok \u00e7\u0131k\u0131\u015f\u0131n\u0131n yap\u0131lmad\u0131\u011f\u0131n\u0131 kontrol ediyor. Fark\u0131n, daha \u00f6nceki elle\u00e7leme s\u0131ras\u0131nda fire i\u015flemi kaydedilmeden ayr\u0131lan hasarl\u0131 g\u00f6vdelerden kaynakland\u0131\u011f\u0131n\u0131 sapt\u0131yor. Onaylanan d\u00fczeltmeyle kullan\u0131labilir stok bakiyesi 90 oluyor. Ekip ayr\u0131ca bundan sonra ayr\u0131lan par\u00e7alar\u0131n kayd\u0131n\u0131 kimin tutaca\u011f\u0131n\u0131 a\u00e7\u0131k\u00e7a belirliyor.<\/p>\n\n\n<p>B\u00f6ylece mevcut miktar fark\u0131 kapat\u0131l\u0131yor. Ancak bu i\u015flem, her iki sipari\u015fe yetecek kadar g\u00f6vde sa\u011flam\u0131yor: toplam ihtiya\u00e7 h\u00e2l\u00e2 120 adet. Sat\u0131n alma ekibi eksik miktar\u0131n tedarikini ara\u015ft\u0131r\u0131rken planlama uzman\u0131 hangi teslimat taahh\u00fcd\u00fcn\u00fcn \u00f6ncelikli oldu\u011funa karar veriyor.<\/p>\n\n\n<p>Etkilenen sipari\u015fin zaman\u0131n\u0131 de\u011fi\u015ftirmek, yaln\u0131zca malzeme listesini de\u011fi\u015ftirmekle kalmaz. Sipari\u015fin tala\u015fl\u0131 imalat ve montaj operasyonlar\u0131, bu g\u00f6vdeleri kullanmayan i\u015fler de d\u00e2hil olmak \u00fczere di\u011fer sipari\u015flerle ayn\u0131 kaynaklar\u0131 payla\u015f\u0131r. Bu nedenle d\u00fczeltilmi\u015f bir stok bakiyesi, birden fazla i\u015f s\u0131ras\u0131n\u0131 ve teslimat tarihini de\u011fi\u015ftirebilir. Stok bilgilerinin <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">ortak bir \u00fcretim \u00e7izelgesine<\/a> ba\u011flanmas\u0131, tam da bu noktada elle yap\u0131lan planlama i\u015fini azalt\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Yaln\u0131zca d\u00fczeltilmi\u015f bakiyeyi de\u011fil, ilk say\u0131m sonucunu \u00f6l\u00e7\u00fcn<\/h2>\n\n\n<p>Stok do\u011frulu\u011funun a\u00e7\u0131k\u00e7a tan\u0131mlanmas\u0131 gerekir. Kay\u0131tlar\u0131n say\u0131mla ne \u00f6l\u00e7\u00fcde e\u015fle\u015fti\u011fini pratik bi\u00e7imde \u00f6l\u00e7mek i\u00e7in ilk say\u0131mda e\u015fle\u015fen par\u00e7a-konum kay\u0131tlar\u0131n\u0131n say\u0131s\u0131n\u0131 kontrol edilen t\u00fcm par\u00e7a-konum kay\u0131tlar\u0131n\u0131n say\u0131s\u0131na b\u00f6l\u00fcn ve sonucu y\u00fczde olarak ifade edin. E\u015fle\u015fmenin tam uyum mu yoksa \u00fczerinde anla\u015f\u0131lm\u0131\u015f bir tolerans i\u00e7inde kalmak m\u0131 oldu\u011funu belirtin ve bu tan\u0131m\u0131 tutarl\u0131 bi\u00e7imde uygulay\u0131n.<\/p>\n\n\n<p>Do\u011frulu\u011fu \u00f6l\u00e7erken d\u00fczeltme \u00f6ncesindeki say\u0131m\u0131 esas al\u0131n. Yaln\u0131zca t\u00fcm farklar d\u00fczeltildikten sonra al\u0131nan bir rapor, say\u0131m\u0131n ortaya \u00e7\u0131kard\u0131\u011f\u0131 ger\u00e7ek durumu gizler.<\/p>\n\n\n<p>Bu y\u00fczdeyi; \u00e7\u00f6z\u00fclmemi\u015f farklar, tekrarlanan nedenler, say\u0131m kapsam\u0131 ve malzeme kaynakl\u0131 \u00fcretim kesintileriyle birlikte de\u011ferlendirin. Genel oran\u0131n y\u00fcksek olmas\u0131, kritik bir bile\u015fendeki a\u00e7\u0131\u011f\u0131 gizleyebilir. Benzer \u015fekilde, sorunlu par\u00e7alara \u00f6zellikle odaklanan risk temelli bir say\u0131m program\u0131, fabrikadaki t\u00fcm kay\u0131tlar\u0131n do\u011frulu\u011fu hakk\u0131nda tarafs\u0131z bir tahmin sunmaz.<\/p>\n\n\n<p>Anlaml\u0131 iyile\u015fme, yaln\u0131zca daha fazla say\u0131m yapmak de\u011fil; tekrarlanan hatalar\u0131n ve i\u015flerin planlanan ba\u015flang\u0131\u00e7lar\u0131nda ya\u015fanan s\u00fcrprizlerin azalmas\u0131d\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">D\u00fczeltilmi\u015f stok bilgilerini SkyPlanner ile uygulanabilir bir plana d\u00f6n\u00fc\u015ft\u00fcr\u00fcn<\/h2>\n\n\n<p>Ekibiniz malzeme kullan\u0131labilirli\u011fini belirleyebiliyor ancak bu bilgiyi sipari\u015flerle e\u015fle\u015ftirmek ve makinelerin i\u015f s\u0131ralar\u0131n\u0131 yeniden d\u00fczenlemek i\u00e7in h\u00e2l\u00e2 \u00e7ok zaman harc\u0131yorsa SkyPlanner&#8217;\u0131 se\u00e7in. SkyPlanner bu kararlar\u0131 tek bir \u00fcretim \u00e7izelgesinde bir araya getirir.<\/p>\n\n\n<p>Bir \u00fcr\u00fcne ba\u011flanan malzemeler, o \u00fcr\u00fcn\u00fcn sipari\u015f kalemlerine de aktar\u0131l\u0131r. Stok bilgileri entegrasyon yoluyla veya SkyPlanner&#8217;\u0131n Warehouse mod\u00fcl\u00fcnde g\u00fcncel tutulabilir. Malzemeyi dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde SkyPlanner&#8217;\u0131n \u00e7izelgeleme yapay zek\u00e2s\u0131 Arcturus; i\u015f merkezi kapasitesi, vardiyalar, operasyonlar aras\u0131ndaki ba\u011f\u0131ml\u0131l\u0131klar ve yap\u0131land\u0131rd\u0131\u011f\u0131n\u0131z kurallarla birlikte malzeme kullan\u0131labilirli\u011fini de hesaba katar.<\/p>\n\n\n<p>Kabul edilen stok d\u00fczeltmesi bu planlama verilerine yans\u0131d\u0131ktan sonra \u00e7izelgeyi yeniden hesaplay\u0131n ve sonucu Gantt zaman \u00e7izelgesinde inceleyin. Her kayna\u011f\u0131n i\u015f s\u0131ras\u0131n\u0131 ayr\u0131 ayr\u0131 d\u00fczenlemek yerine, etkilenen i\u015flerin di\u011fer sipari\u015fler aras\u0131na nas\u0131l yerle\u015fti\u011fini g\u00f6rebilirsiniz. \u00d6ncelikleri siz belirlersiniz; \u00e7izelgeleme hesab\u0131n\u0131 Arcturus yapar. B\u00f6ylece elle y\u00fcr\u00fct\u00fclen koordinasyon azal\u0131r ve hangi teslimat taahh\u00fctlerinin ele al\u0131nmas\u0131 gerekti\u011fi daha erken g\u00f6r\u00fcn\u00fcr.<\/p>\n\n\n<p>SkyPlanner, a\u00e7\u0131k REST API \u00fczerinden her t\u00fcrl\u00fc ERP veya MES ile entegre olur. \u0130\u015fleyi\u015finize uygun mal kabul, say\u0131m ve fark onay s\u00fcre\u00e7lerini koruyun; bu s\u00fcre\u00e7lerde g\u00fcncel tutulan malzeme bilgilerini detayl\u0131 \u00fcretim \u00e7izelgelemeye ba\u011flay\u0131n. Say\u0131m fiziksel durumu do\u011frular; SkyPlanner ise bunun \u00fcretime etkilerine g\u00f6re harekete ge\u00e7menize yard\u0131mc\u0131 olur.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Malzeme durumunun daha net g\u00f6r\u00fclmesi Eskomatic&#8217;te neleri de\u011fi\u015ftirdi?<\/h3>\n\n\n<p>Fason tala\u015fl\u0131 imalat \u015firketi Eskomatic, daha \u00f6nce eski bir \u00fcretim kontrol ortam\u0131nda b\u00fcy\u00fck \u00f6l\u00e7\u00fcde elle d\u00fczenlenen i\u015f s\u0131ralar\u0131na dayan\u0131yordu. Malzeme durumunun yeterince g\u00f6r\u00fcn\u00fcr olmamas\u0131 nedeniyle bir stok a\u00e7\u0131\u011f\u0131, i\u015fin planlanan ba\u015flang\u0131c\u0131na \u00e7ok az zaman kala ortaya \u00e7\u0131kabiliyordu.<\/p>\n\n\n<p>SkyPlanner&#8217;\u0131n mevcut ERP sistemine ba\u011flanmas\u0131yla ekip, g\u00f6rsel bir i\u015f s\u0131ras\u0131na, i\u015f y\u00fck\u00fcn\u00fcn otomatik \u00e7izelgelenmesine ve malzeme durumunu daha net g\u00f6rme olana\u011f\u0131na kavu\u015ftu. <a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/eskomatic\/\">Eskomatic<\/a>, malzeme eksikli\u011finden kaynaklanan \u00fcretim duru\u015flar\u0131n\u0131n azald\u0131\u011f\u0131n\u0131 ve teslimat tarihlerinin daha do\u011fru belirlendi\u011fini bildiriyor. Bu deneyim, ortaya \u00e7\u0131kan sorunlar\u0131 son anda \u00e7\u00f6zmeyi planlama uzman\u0131na b\u0131rakmak yerine malzeme bilgilerini \u00e7izelgelemeye ba\u011flaman\u0131n de\u011ferini g\u00f6steriyor.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tekrarlanan tek bir stok fark\u0131yla ba\u015flay\u0131n<\/h2>\n\n\n<p>S\u00fcrekli aramak zorunda kald\u0131\u011f\u0131n\u0131z veya beklenmedik stok a\u00e7\u0131\u011f\u0131na yol a\u00e7an bir par\u00e7a se\u00e7in. Say\u0131m kapsam\u0131n\u0131 belirleyin, kontrol s\u0131ras\u0131nda stok hareketlerini kontrol alt\u0131nda tutun, fark\u0131 ara\u015ft\u0131r\u0131n ve d\u00fczeltici faaliyet i\u00e7in sorumlu atay\u0131n. Ard\u0131ndan kabul edilen kullan\u0131labilirlik de\u011fi\u015fikli\u011finin, bu par\u00e7aya ihtiya\u00e7 duyan sipari\u015flere nas\u0131l yans\u0131d\u0131\u011f\u0131n\u0131 takip edin.<\/p>\n\n\n<p>Bu son ad\u0131m\u0131 uygulamada g\u00f6rmek i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>. G\u00f6r\u00fc\u015fmeye haz\u0131rlan\u0131rken do\u011frulu\u011fundan emin olmad\u0131\u011f\u0131n\u0131z bir malzeme bakiyesini, bu par\u00e7ay\u0131 t\u00fcketen sipari\u015fleri ve bu sipari\u015flerin di\u011fer i\u015flerle ortak kulland\u0131\u011f\u0131 makineleri belirleyin. B\u00f6ylece g\u00f6r\u00fc\u015fmenin somut bir amac\u0131 olur: d\u00fczeltilmi\u015f malzeme bilgilerinin, ekibinizin kullanabilece\u011fi bir \u00fcretim plan\u0131na nas\u0131l d\u00f6n\u00fc\u015febilece\u011fini g\u00f6rmek. \u00d6nce kendiniz ke\u015ffetmeyi tercih ederseniz <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin Stok kay\u0131tlar\u0131na g\u00f6re par\u00e7alar mevcut. Ancak operat\u00f6r kab\u0131 a\u00e7t\u0131\u011f\u0131nda i\u015fi tamamlamaya yetecek kadar par\u00e7a olmad\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcyor. \u015eimdi depo ekibi par\u00e7alar\u0131 ar\u0131yor, sat\u0131n alma eksikleri tedarik etmeye \u00e7al\u0131\u015f\u0131yor, \u00fcretim planlama uzman\u0131 ise bu par\u00e7alar\u0131n mevcut oldu\u011fu varsay\u0131m\u0131yla haz\u0131rlanm\u0131\u015f \u00e7izelgeyi &#8230; <a title=\"\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/\" aria-label=\"Read more about \u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":110607,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2542,314],"tags":[],"class_list":["post-110597","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-ve-cizelgeleme","category-kaynaklar","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin<\/title>\n<meta name=\"description\" content=\"Kay\u0131tlarda stok var ama \u00fcretim bekliyor mu? D\u00f6ng\u00fcsel say\u0131mla farklar\u0131 giderin, d\u00fczeltilmi\u015f stok bilgilerini \u00fcretim plan\u0131n\u0131za yans\u0131t\u0131n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin\" \/>\n<meta property=\"og:description\" content=\"Kay\u0131tlarda stok var ama \u00fcretim bekliyor mu? D\u00f6ng\u00fcsel say\u0131mla farklar\u0131 giderin, d\u00fczeltilmi\u015f stok bilgilerini \u00fcretim plan\u0131n\u0131za yans\u0131t\u0131n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-26T03:51:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T03:53:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/dongusel-sayim\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/dongusel-sayim\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin\",\"datePublished\":\"2026-10-26T03:51:55+00:00\",\"dateModified\":\"2026-10-26T03:53:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/dongusel-sayim\\\/\"},\"wordCount\":3092,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/dongusel-sayim\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"articleSection\":[\"APS ve \u00e7izelgeleme\",\"Kaynaklar\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/dongusel-sayim\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/dongusel-sayim\\\/\",\"name\":\"\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/dongusel-sayim\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/dongusel-sayim\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"datePublished\":\"2026-10-26T03:51:55+00:00\",\"dateModified\":\"2026-10-26T03:53:46+00:00\",\"description\":\"Kay\u0131tlarda stok var ama \u00fcretim bekliyor mu? D\u00f6ng\u00fcsel say\u0131mla farklar\u0131 giderin, d\u00fczeltilmi\u015f stok bilgilerini \u00fcretim plan\u0131n\u0131za yans\u0131t\u0131n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/dongusel-sayim\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/dongusel-sayim\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/dongusel-sayim\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/cycle-counting-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A gloved finger checks metal parts arranged beside an open bin during a selected physical inventory count.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/dongusel-sayim\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin","description":"Kay\u0131tlarda stok var ama \u00fcretim bekliyor mu? D\u00f6ng\u00fcsel say\u0131mla farklar\u0131 giderin, d\u00fczeltilmi\u015f stok bilgilerini \u00fcretim plan\u0131n\u0131za yans\u0131t\u0131n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/","og_locale":"tr_TR","og_type":"article","og_title":"\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin","og_description":"Kay\u0131tlarda stok var ama \u00fcretim bekliyor mu? D\u00f6ng\u00fcsel say\u0131mla farklar\u0131 giderin, d\u00fczeltilmi\u015f stok bilgilerini \u00fcretim plan\u0131n\u0131za yans\u0131t\u0131n.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-26T03:51:55+00:00","article_modified_time":"2026-10-26T03:53:46+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"15 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin","datePublished":"2026-10-26T03:51:55+00:00","dateModified":"2026-10-26T03:53:46+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/"},"wordCount":3092,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","articleSection":["APS ve \u00e7izelgeleme","Kaynaklar"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/","name":"\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","datePublished":"2026-10-26T03:51:55+00:00","dateModified":"2026-10-26T03:53:46+00:00","description":"Kay\u0131tlarda stok var ama \u00fcretim bekliyor mu? D\u00f6ng\u00fcsel say\u0131mla farklar\u0131 giderin, d\u00fczeltilmi\u015f stok bilgilerini \u00fcretim plan\u0131n\u0131za yans\u0131t\u0131n.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png","width":1672,"height":941,"caption":"A gloved finger checks metal parts arranged beside an open bin during a selected physical inventory count."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/dongusel-sayim\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/cycle-counting-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretimde D\u00f6ng\u00fcsel Say\u0131m: Stok Farklar\u0131n\u0131 Giderin Stok kay\u0131tlar\u0131na g\u00f6re par\u00e7alar mevcut. Ancak operat\u00f6r kab\u0131 a\u00e7t\u0131\u011f\u0131nda i\u015fi tamamlamaya yetecek kadar par\u00e7a olmad\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcyor. \u015eimdi depo ekibi par\u00e7alar\u0131 ar\u0131yor, sat\u0131n alma eksikleri tedarik etmeye \u00e7al\u0131\u015f\u0131yor, \u00fcretim planlama uzman\u0131 ise bu par\u00e7alar\u0131n mevcut oldu\u011fu varsay\u0131m\u0131yla haz\u0131rlanm\u0131\u015f \u00e7izelgeyi&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/110597","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=110597"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/110597\/revisions"}],"predecessor-version":[{"id":110660,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/110597\/revisions\/110660"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/110607"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=110597"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=110597"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=110597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}