{"id":108299,"date":"2026-10-24T03:23:09","date_gmt":"2026-10-24T03:23:09","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=108299"},"modified":"2026-10-24T03:24:50","modified_gmt":"2026-10-24T03:24:50","slug":"toplam-uretken-bakim","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/","title":{"rendered":"Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">12<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Toplam \u00fcretken bak\u0131m (TPM), rutin bak\u0131m, planl\u0131 bak\u0131m ve s\u00fcrekli iyile\u015ftirme yoluyla ekipman etkinli\u011fini art\u0131rmay\u0131 ama\u00e7layan, i\u015fletme genelini kapsayan bir yakla\u015f\u0131md\u0131r.<\/strong> Operat\u00f6rler, bak\u0131m uzmanlar\u0131, m\u00fchendisler ve y\u00f6neticiler, \u00fcretimin sa\u011fl\u0131kl\u0131 ilerlemesini engelleyen ekipman kaynakl\u0131 kay\u0131plar\u0131 \u00f6nlemek i\u00e7in birlikte \u00e7al\u0131\u015f\u0131r.<\/p>\n\n\n<p>Zor olan, bu ortak sorumlulu\u011fu yo\u011fun bir vardiyada i\u015fler h\u00e2le getirmektir. Operat\u00f6r ayn\u0131 k\u0131sa duru\u015fu bir kez daha bildirir. Bak\u0131m ekibi makineye m\u00fcdahale gerekti\u011fini bilir. \u00dcretim ekibinin ise s\u0131radaki sipari\u015fi tamamlamas\u0131 gerekir. Yap\u0131lacak m\u00fcdahalenin sorumlulu\u011funu biri \u00fcstlenmez ve harekete ge\u00e7mek i\u00e7in zaman ayr\u0131lmazsa bu g\u00f6zlem, kay\u0131t defterindeki bir sat\u0131rdan ibaret kal\u0131r.<\/p>\n\n\n<p>\u0130\u015fe yarayan bir TPM program\u0131 bu faaliyetleri birbirine ba\u011flar: anormal durumu fark etmek, m\u00fcdahaleyi bir sorumluya atamak, i\u015fi yapmak ve kayb\u0131n tekrarlan\u0131p tekrarlanmad\u0131\u011f\u0131n\u0131 kontrol etmek. Y\u00f6netebilece\u011finiz tek bir alandan ba\u015flay\u0131n. Uygulamay\u0131 fabrikan\u0131n geneline yaymadan \u00f6nce bu i\u015fleyi\u015fi t\u00fcm ad\u0131mlar\u0131yla oturtun.<\/p>\n\n\n<h2 class=\"wp-block-heading\">TPM neden \u00f6nleyici bak\u0131mdan daha fazlas\u0131d\u0131r?<\/h2>\n\n\n<p>\u00d6nleyici bak\u0131m, uygun aral\u0131klarla yap\u0131lan bak\u0131m i\u015fleriyle ar\u0131zalar\u0131n \u00f6n\u00fcne ge\u00e7meye yard\u0131mc\u0131 olur. TPM bu i\u015fleri de kapsar, ancak hem bak\u0131m b\u00f6l\u00fcm\u00fcn\u00fcn hem de ar\u0131za \u00f6nlemenin \u00f6tesine uzan\u0131r.<\/p>\n\n\n<p>\u201cToplam\u201d s\u00f6zc\u00fc\u011f\u00fcn\u00fcn \u00fc\u00e7 \u00f6nemli anlam\u0131 vard\u0131r: i\u015fletmenin her b\u00f6l\u00fcm\u00fcnden \u00e7al\u0131\u015fanlar kat\u0131l\u0131r, ekipman kay\u0131plar\u0131 bir b\u00fct\u00fcn olarak ele al\u0131n\u0131r ve ekipman\u0131n \u00f6mr\u00fc boyunca deneyimlerden yararlan\u0131l\u0131r. Operat\u00f6rler g\u00fcnl\u00fck \u00e7al\u0131\u015fma ko\u015fullar\u0131na ili\u015fkin bilgilerini, uzmanlar ise te\u015fhis ve bak\u0131m konusundaki uzmanl\u0131klar\u0131n\u0131 ortaya koyar. M\u00fchendislik ekibi ekipman\u0131 ve y\u00f6ntemleri iyile\u015ftirirken y\u00f6netim \u00f6ncelikleri belirler ve kaynak sa\u011flar.<\/p>\n\n\n<p>Bu kay\u0131plar aras\u0131nda uzun duru\u015flar, haz\u0131rl\u0131k ve ayar s\u00fcreleri, k\u0131sa duru\u015flar, d\u00fc\u015f\u00fck \u00e7al\u0131\u015fma h\u0131z\u0131, fire ve yeniden i\u015fleme bulunur. Hi\u00e7 ar\u0131zalanmayan bir makine bile yava\u015f \u00e7al\u0131\u015farak veya d\u00fczeltilmesi gereken par\u00e7alar \u00fcreterek kapasiteyi bo\u015fa harcayabilir. TPM, ekibin yaln\u0131zca sorunsuz bir bak\u0131m siciline sahip olmas\u0131n\u0131 de\u011fil, bu kay\u0131plar\u0131 anlamas\u0131n\u0131 ve azaltmas\u0131n\u0131 ister.<\/p>\n\n\n<p>Bunun getirisi, \u00fcretime ayr\u0131lan s\u00fcrenin daha g\u00fcvenilir h\u00e2le gelmesidir. Tekrarlayan kesintilerin ve ekipman kaynakl\u0131 kusurlar\u0131n azalmas\u0131; daha az malzeme israf\u0131, daha az acil m\u00fcdahale ve m\u00fc\u015fteri talebini kar\u015f\u0131lamak i\u00e7in daha sa\u011flam bir zemin demektir. Yine de ekip, bu kapasiteyi k\u00e2rl\u0131 bi\u00e7imde nas\u0131l kullanaca\u011f\u0131na karar vermelidir. S\u0131rf makine \u00e7al\u0131\u015f\u0131yor diye gereksiz stok \u00fcretmek bir iyile\u015ftirme say\u0131lmaz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Sekiz s\u00fctun: tek programda farkl\u0131 g\u00f6revler<\/h2>\n\n\n<p>TPM genellikle sekiz s\u00fctun \u00fczerine kurulur. Bu yap\u0131y\u0131, ay\u0131klama, d\u00fczenleme, temizlik, standartla\u015ft\u0131rma ve s\u00fcrd\u00fcrme ad\u0131mlar\u0131ndan olu\u015fan 5S gibi i\u015f yeri d\u00fczenleme uygulamalar\u0131 destekler. S\u00fctunlar program\u0131n kapsam\u0131n\u0131 g\u00f6sterir; sekiz b\u00fcy\u00fck projeye ayn\u0131 g\u00fcn ba\u015flamay\u0131 gerektirmez.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>TPM s\u00fctunu<\/th><th>Uygulamadaki amac\u0131<\/th><\/tr><\/thead><tbody><tr><td>Otonom bak\u0131m<\/td><td>Operat\u00f6rleri tan\u0131mlanm\u0131\u015f rutin bak\u0131m i\u015flerini yapma, anormallikleri fark etme ve yetkilerini a\u015fan i\u015fleri ilgili sorumlulara iletme konusunda e\u011fitmek.<\/td><\/tr><tr><td>Planl\u0131 bak\u0131m<\/td><td>Ekipmandaki bozulma, \u00f6nlenebilir bir \u00fcretim aksamas\u0131na d\u00f6n\u00fc\u015fmeden \u00f6nce uygun bak\u0131m i\u00e7in haz\u0131rl\u0131k yapmak ve bak\u0131m\u0131 ger\u00e7ekle\u015ftirmek.<\/td><\/tr><tr><td>Odaklanm\u0131\u015f iyile\u015ftirme<\/td><td>Tekrarlayan belirli bir ekipman kayb\u0131n\u0131 ortadan kald\u0131rmak ve de\u011fi\u015fikli\u011fin sonucunu do\u011frulamak i\u00e7in ilgili g\u00f6revlerdeki ki\u015fileri bir araya getirmek.<\/td><\/tr><tr><td>Kalite bak\u0131m\u0131<\/td><td>Kusurlu \u00fcr\u00fcnleri sonradan tekrar tekrar ay\u0131klamak yerine, uygun kalitede \u00fcretimi sa\u011flayan ekipman ko\u015fullar\u0131n\u0131 korumak.<\/td><\/tr><tr><td>Erken ekipman y\u00f6netimi<\/td><td>Ekipman\u0131n teknik \u015fartlar\u0131n\u0131 belirlerken, sat\u0131n al\u0131rken ve devreye al\u0131rken i\u015fletme ve bak\u0131m deneyimlerinden yararlanmak.<\/td><\/tr><tr><td>E\u011fitim ve geli\u015fim<\/td><td>Ekipman\u0131 \u00e7al\u0131\u015ft\u0131rmak, kontrol etmek, bak\u0131m\u0131n\u0131 yapmak ve iyile\u015ftirmek i\u00e7in gereken becerileri geli\u015ftirmek.<\/td><\/tr><tr><td>\u0130\u015f g\u00fcvenli\u011fi, sa\u011fl\u0131k ve \u00e7evre<\/td><td>G\u00fcvenli \u00e7al\u0131\u015fma ko\u015fullar\u0131n\u0131 ve \u00e7evresel sorumluluklar\u0131 ekipman bak\u0131m\u0131 ve iyile\u015ftirme \u00e7al\u0131\u015fmalar\u0131n\u0131n bir par\u00e7as\u0131 h\u00e2line getirmek.<\/td><\/tr><tr><td>Ofis TPM<\/td><td>Bilgi ak\u0131\u015f\u0131, sat\u0131n alma ve onaylar gibi destek i\u015flerini, \u00fcretim ve bak\u0131m\u0131n etkin bi\u00e7imde y\u00fcr\u00fct\u00fclmesini engellemeyecek \u015fekilde iyile\u015ftirmek.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u00d6nerilen bir program\u0131 bu \u00e7er\u00e7eveyle de\u011ferlendirin. Program yaln\u0131zca temizlik kontrol listelerinden olu\u015fuyorsa tekrarlayan kirlenmenin kayna\u011f\u0131n\u0131 kim ortadan kald\u0131racak? Yaln\u0131zca uzmanlar\u0131n yapaca\u011f\u0131 bak\u0131m i\u015flerinden olu\u015fuyorsa operat\u00f6rler geli\u015fmekte olan bir sorunu nas\u0131l fark edip bildirecek? Gereken par\u00e7a hi\u00e7bir zaman haz\u0131r bulunmuyorsa hangi sat\u0131n alma veya haz\u0131rl\u0131k s\u00fcrecinin de\u011fi\u015fmesi gerekiyor?<\/p>\n\n\n<p>S\u00fctunlar\u0131 birbirine ba\u011flayan \u015fey, \u00e7\u00f6z\u00fcme kavu\u015fturulan ekipman sorunudur. Bu, her b\u00f6l\u00fcme kendi s\u00fctunu hakk\u0131nda bir sunum haz\u0131rlama g\u00f6revi vermekten daha yararl\u0131 bir ba\u015flang\u0131\u00e7 noktas\u0131d\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ger\u00e7ek bir \u00fcretim sorunu olan bir pilot alan se\u00e7in<\/h2>\n\n\n<p>Ekipman performans\u0131ndaki iyile\u015fmenin anlaml\u0131 bir fark yarataca\u011f\u0131 ve farkl\u0131 b\u00f6l\u00fcmlerden olu\u015fan bir ekibin \u00e7al\u0131\u015fmay\u0131 y\u00fcr\u00fctebilece\u011fi bir alan se\u00e7in. Tekrarlayan, anla\u015f\u0131labilir kay\u0131plar\u0131n ya\u015fand\u0131\u011f\u0131, y\u00f6netilebilir \u00f6l\u00e7ekte bir h\u00fccre veya makine; sorumlusu belli olmayan fabrika \u00e7ap\u0131nda bir ba\u015flang\u0131ca g\u00f6re genellikle daha iyi bir \u00f6\u011frenme ortam\u0131 sunar.<\/p>\n\n\n<p>Se\u00e7imi yaln\u0131zca kolayl\u0131\u011fa g\u00f6re yapmay\u0131n. Az kullan\u0131lan bir makineyi temizlemek kolay olabilir; ancak \u00fcretim ve bak\u0131m ekiplerinin normal i\u015f bask\u0131s\u0131 alt\u0131nda nas\u0131l i\u015f birli\u011fi yapaca\u011f\u0131 hakk\u0131nda pek az \u015fey g\u00f6sterebilir. \u00d6te yandan, g\u00fcvenlik a\u00e7\u0131s\u0131ndan kritik veya \u00e7ok karma\u015f\u0131k bir ekipman\u0131n ilk pilota uygun h\u00e2le gelmesi i\u00e7in uzmanlarca haz\u0131rl\u0131k yap\u0131lmas\u0131 gerekebilir.<\/p>\n\n\n<p>\u00dcretim sorumlusu, bak\u0131m sorumlusu ve operat\u00f6rlerle birlikte pilot \u00e7al\u0131\u015fma i\u00e7in k\u0131sa bir mutabakat metni haz\u0131rlay\u0131n. Ekipman\u0131, ele al\u0131nacak kayb\u0131, ilerlemeden sorumlu ki\u015fiyi, katk\u0131 sa\u011flayacak \u00e7al\u0131\u015fanlar\u0131 ve kullan\u0131labilecek zaman ile kaynaklar\u0131 belirtin. Sorun kalite veya m\u00fchendislik ekiplerinin sorumluluk alan\u0131na da giriyorsa onlar\u0131 da \u00e7al\u0131\u015fmaya dahil edin.<\/p>\n\n\n<p>\u00c7al\u0131\u015fma bi\u00e7imini de\u011fi\u015ftirmeden \u00f6nce ba\u015flang\u0131\u00e7 durumunu belirleyin. Kayb\u0131n ne zaman ya\u015fand\u0131\u011f\u0131n\u0131, \u00fcretimi ne kadar s\u00fcre kesintiye u\u011fratt\u0131\u011f\u0131n\u0131, hangi \u00fcr\u00fcn veya \u00e7al\u0131\u015fma ko\u015fuluyla ili\u015fkili oldu\u011funu ve nedeni hakk\u0131nda bilinenleri kaydedin. G\u00f6zlem ile te\u015fhisi birbirinden ay\u0131r\u0131n: \u201cmakine devreye alma s\u0131ras\u0131nda durdu\u201d ifadesi bir olay\u0131n kan\u0131t\u0131d\u0131r; olay\u0131n bir operat\u00f6rden, par\u00e7adan veya malzemeden kaynakland\u0131\u011f\u0131n\u0131 kan\u0131tlamaz.<\/p>\n\n\n<p>Tipik \u00e7al\u0131\u015fma ko\u015fullar\u0131n\u0131 ve \u00fcr\u00fcn de\u011fi\u015fimlerini g\u00f6zlemlemeye yetecek uzunlukta bir de\u011ferlendirme d\u00f6nemi se\u00e7in. Her yerde ge\u00e7erli say\u0131lan bir OEE hedefini benimsemeden veya sabit bir y\u00fczdelik art\u0131\u015f vaat etmeden, hangi iyile\u015fmenin pilotun kapsam\u0131n\u0131 geni\u015fletmeyi hakl\u0131 k\u0131laca\u011f\u0131 konusunda anla\u015f\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Operat\u00f6r bir sorun buldu\u011funda kimin harekete ge\u00e7ece\u011fini belirleyin<\/h2>\n\n\n<p><strong>Otonom bak\u0131m, e\u011fitimli operat\u00f6rlerin tan\u0131mlanm\u0131\u015f ekipman bak\u0131m i\u015flerini \u00fcstlenmesi demektir; her bak\u0131m g\u00f6revini \u00fcstlenmeleri de\u011fil.<\/strong> Programda rutin kontroller, yetki dahilindeki ayarlar ve uzman gerektiren i\u015fler aras\u0131ndaki s\u0131n\u0131rlar a\u00e7\u0131k\u00e7a \u00e7izilmelidir.<\/p>\n\n\n<p>Her g\u00f6rev i\u00e7in neyin kontrol edilece\u011fini veya yap\u0131laca\u011f\u0131n\u0131, normal durumun ne oldu\u011funu, g\u00f6revin ne zaman yap\u0131laca\u011f\u0131n\u0131 ve anormal bir bulgu kar\u015f\u0131s\u0131nda nas\u0131l hareket edilece\u011fini tan\u0131mlay\u0131n. Gerekti\u011finde bunu <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/is-talimati-hazirlama\/\">uygulamada kullan\u0131labilecek bir g\u00f6rsel veya talimatla<\/a> destekleyin. Yaln\u0131zca \u201cmakineyi kontrol et\u201d diyen bir kontrol maddesi, en \u00f6nemli kararlar\u0131n ki\u015filerin hat\u0131rlad\u0131klar\u0131na g\u00f6re verilmesine yol a\u00e7ar.<\/p>\n\n\n<p>Bulgunun sorumlu ki\u015fiye nas\u0131l ula\u015faca\u011f\u0131n\u0131 belirleyin. Makineyi, bulgunun yerini, g\u00f6zlemlenen durumu ve \u00fcretime etkisini belirtin. Operat\u00f6re acil sorunlarda izleyece\u011fi a\u00e7\u0131k bir yol, acil olmayan bulgularda ise \u00e7\u00f6z\u00fclene kadar durumu takip edebilece\u011fi bir y\u00f6ntem sunun. \u0130ncelenmemi\u015f ar\u0131za etiketlerinin giderek birikmesi, ortak sorumluluk anlam\u0131na gelmez.<\/p>\n\n\n<p>Bak\u0131m ekibi teknik m\u00fcdahaleyi tan\u0131mlamal\u0131 ve operat\u00f6rlerin kararla\u015ft\u0131r\u0131lan g\u00f6revler i\u00e7in e\u011fitimine yard\u0131mc\u0131 olmal\u0131d\u0131r. Vardiya sorumlusu, kontrollerin belirsiz bo\u015f zamanlara s\u0131\u011fd\u0131r\u0131lmas\u0131n\u0131 beklemek yerine vardiya i\u00e7inde yap\u0131labilmesini sa\u011flamal\u0131d\u0131r. Y\u00f6neticiler kaynak \u00e7at\u0131\u015fmalar\u0131n\u0131 \u00e7\u00f6zer ve yaln\u0131zca kontrol listelerinin imzalan\u0131p imzalanmad\u0131\u011f\u0131n\u0131 de\u011fil, eylemlerin tamamlan\u0131p tamamlanmad\u0131\u011f\u0131n\u0131 da g\u00f6zden ge\u00e7irir.<\/p>\n\n\n<p>Bu s\u0131n\u0131rlar\u0131 belirlerken ekipman\u0131n onayl\u0131 prosed\u00fcrlerini ve ge\u00e7erli g\u00fcvenlik d\u00fczenlemelerini esas al\u0131n. Baz\u0131 kontroller normal \u00e7al\u0131\u015fma s\u0131ras\u0131nda d\u0131\u015far\u0131dan yap\u0131labilir; di\u011ferleri i\u00e7in makinenin durdurulmas\u0131, enerji kaynaklar\u0131ndan izole edilmesi ve kontrollerin yetkin personel taraf\u0131ndan yap\u0131lmas\u0131 gerekir. Bir \u00e7al\u0131\u015fman\u0131n TPM ad\u0131 alt\u0131nda y\u00fcr\u00fct\u00fclmesi bu gereklilikleri de\u011fi\u015ftirmez veya tehlikeli alanlara eri\u015fim yetkisi vermez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Temel \u00e7al\u0131\u015fma ko\u015fullar\u0131n\u0131 yeniden sa\u011flay\u0131n ve bak\u0131m\u0131 tekrarlanabilir h\u00e2le getirin<\/h2>\n\n\n<p>Pilot alan\u0131 operat\u00f6rler ve bak\u0131m ekibiyle birlikte inceleyin. Belirlenen kusurlar\u0131 uygun, yetki dahilindeki \u00e7al\u0131\u015fmalarla gidererek g\u00fcvenilir \u00e7al\u0131\u015fma ve anlaml\u0131 kontroller i\u00e7in gereken temel ko\u015fullar\u0131 yeniden sa\u011flay\u0131n.<\/p>\n\n\n<p>Burada temizlik, sorunlar\u0131 tespit etmeye de hizmet eder: s\u0131z\u0131nt\u0131lar\u0131, hasar\u0131 veya ola\u011fan d\u0131\u015f\u0131 a\u015f\u0131nmay\u0131 g\u00f6rmeyi kolayla\u015ft\u0131rabilir. Aletlerin ve eri\u015fim noktalar\u0131n\u0131n d\u00fczenlenmesi, onayl\u0131 bak\u0131m i\u015flerinin tutarl\u0131 bi\u00e7imde yap\u0131lmas\u0131n\u0131 kolayla\u015ft\u0131r\u0131r. Bu \u00e7al\u0131\u015fmalar\u0131n hi\u00e7biri, kayb\u0131 gidermeden yaln\u0131zca g\u00f6r\u00fcn\u00fc\u015f\u00fc iyile\u015ftirmekle s\u0131n\u0131rl\u0131 kalmamal\u0131d\u0131r.<\/p>\n\n\n<p>Ekibin bulgular\u0131n\u0131 rutin uygulamay\u0131 iyile\u015ftirmek i\u00e7in kullan\u0131n. Bir kontrol noktas\u0131 s\u00fcrekli kirle kaplan\u0131yorsa kirin neden birikti\u011fini ara\u015ft\u0131r\u0131n. Eri\u015fim g\u00fc\u00e7l\u00fc\u011f\u00fc nedeniyle bir kontrol s\u00fcrekli atlan\u0131yorsa yaln\u0131zca bir hat\u0131rlatma daha eklemek yerine m\u00fchendislik ve bak\u0131m ekiplerinden y\u00f6ntemi iyile\u015ftirmelerini isteyin.<\/p>\n\n\n<p>\u0130lgili t\u00fcm vardiyalarda bu g\u00f6revleri yapacak ki\u015fileri e\u011fitin. Hem i\u015flemi hem de karar verme bi\u00e7imlerini g\u00f6stermelerini isteyin: normal durum nas\u0131l g\u00f6r\u00fcn\u00fcr, hangi durumda dururlar veya yard\u0131m isterler? Pilot hen\u00fcz k\u00fc\u00e7\u00fck \u00f6l\u00e7ekteyken anla\u015f\u0131lmayan talimatlar\u0131 d\u00fczeltin.<\/p>\n\n\n<p>Uzmanlar\u0131n y\u00fcr\u00fctece\u011fi takip \u00e7al\u0131\u015fmalar\u0131n\u0131 g\u00f6r\u00fcn\u00fcr tutun. \u00c7\u00f6z\u00fclmemi\u015f her bulgunun bir sorumlusu, bir sonraki ad\u0131m\u0131 ve uygun bir tamamlanma tarihi olmal\u0131d\u0131r. Bir onar\u0131m veya iyile\u015ftirme tamamland\u0131\u011f\u0131nda neyin de\u011fi\u015fti\u011fini, ilgili bak\u0131m talimat\u0131n\u0131n ya da bak\u0131m g\u00f6revinin de g\u00fcncellenmesi gerekip gerekmedi\u011fini do\u011frulay\u0131n.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kararla\u015ft\u0131r\u0131lan bak\u0131ma \u00fcretim plan\u0131nda yer ay\u0131r\u0131n<\/h2>\n\n\n<p>Bir sorunun bulunmas\u0131, ancak fabrika harekete ge\u00e7ebiliyorsa de\u011fer yarat\u0131r. Bak\u0131m ekibi bir m\u00fcdahaleyi kararla\u015ft\u0131rd\u0131\u011f\u0131nda \u00fcretim ekibi, ilgili makine veya tak\u0131m\u0131n ne zaman kullan\u0131lamayaca\u011f\u0131n\u0131 hesaba katmal\u0131d\u0131r. Bu karar\u0131 ayr\u0131 bir bak\u0131m takviminde b\u0131rakmak, acil bir sipari\u015f geldi\u011finde yeni bir tart\u0131\u015fmaya zemin haz\u0131rlar.<\/p>\n\n\n<p>\u0130\u015fte bu noktada <strong>SkyPlanner APS, TPM kapsam\u0131nda kararla\u015ft\u0131r\u0131lan i\u015fleri uygulanabilir \u00fcretim planlar\u0131na d\u00f6n\u00fc\u015ft\u00fcrmenize yard\u0131mc\u0131 olur<\/strong>. <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/bakim-sirasinda-uretim-cizelgeleme\/\">\u00dczerinde mutab\u0131k kal\u0131nan makine bak\u0131m d\u00f6nemini<\/a> i\u015f merkezi i\u00e7in bir istisna olarak kaydedin. Bu kay\u0131t kullan\u0131labilir kapasiteyi de\u011fi\u015ftirir; ard\u0131ndan SkyPlanner&#8217;\u0131n \u00e7izelgeleme yapay zek\u00e2s\u0131 Arcturus, \u00fcretim \u00e7izelgesini bu d\u00f6nemi dikkate alarak yeniden hesaplayabilir. Tak\u0131mlar\u0131n da bak\u0131m tarihleri vard\u0131r ve bu tarihler, tak\u0131mlar\u0131n ihtiya\u00e7 duyulan i\u015flerde kullan\u0131labilirli\u011fini etkiler.<\/p>\n\n\n<p>Proses ad\u0131mlar\u0131; \u00fcretim rotas\u0131n\u0131, kullan\u0131labilecek i\u015f merkezlerini, s\u00fcreleri ve ba\u011f\u0131ml\u0131l\u0131klar\u0131 tan\u0131mlar. Bu ili\u015fkiler ortak planda yer ald\u0131\u011f\u0131nda bak\u0131m m\u00fcdahalesinin etkisi, tek bir makinenin takvimindeki bo\u015flukla s\u0131n\u0131rl\u0131 kalmaz; sonraki i\u015flere de yans\u0131r. Ortaya \u00e7\u0131kan s\u0131ralama, inceleme i\u00e7in Gantt \u015femas\u0131nda g\u00f6sterilir.<\/p>\n\n\n<p>\u00d6ncelikler ve \u00fczerinde mutab\u0131k kal\u0131nan \u00fcretim kararlar\u0131 sizin kontrol\u00fcn\u00fczde kal\u0131r. Arcturus, birbirine ba\u011fl\u0131 i\u015fleri birlikte hesaba katarak \u00e7izelgeyi hesaplar. B\u00f6ylece her bak\u0131m d\u00f6nemi de\u011fi\u015fti\u011finde makinelerin i\u015f kuyruklar\u0131n\u0131 tek tek elle d\u00fczeltmeniz gerekmez.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\u00d6rnek: bir bulgudan iyile\u015ftirmeye uzanan s\u00fcre\u00e7<\/h3>\n\n\n<p>Tekrarlayan k\u0131sa duru\u015flar\u0131n ve \u00fcretime ba\u015flarken \u00e7\u0131kan hatal\u0131 par\u00e7alar\u0131n g\u00f6r\u00fcld\u00fc\u011f\u00fc bir enjeksiyon kal\u0131plama h\u00fccresi d\u00fc\u015f\u00fcn\u00fcn. Pilot ekip, makine kullan\u0131m\u0131n\u0131 art\u0131rmaya y\u00f6nelik genel bir talimat vermek yerine, ilk olarak bu olaylar\u0131n yol a\u00e7t\u0131\u011f\u0131 kayb\u0131 ara\u015ft\u0131rmay\u0131 se\u00e7er.<\/p>\n\n\n<p>Operat\u00f6rler, kararla\u015ft\u0131r\u0131lan kontrolleri uygulayarak g\u00f6zlemledikleri ko\u015fullar\u0131 kaydeder. Bak\u0131m ve m\u00fchendislik ekipleri tekrarlayan durumu ara\u015ft\u0131r\u0131r ve kal\u0131ba m\u00fcdahale gerekti\u011fini belirler. Yap\u0131lacak i\u015f, kal\u0131b\u0131n kullan\u0131lamayaca\u011f\u0131 s\u00fcre ve yeniden \u00fcretime al\u0131nmadan \u00f6nce yap\u0131lmas\u0131 gereken kontroller \u00fczerinde mutab\u0131k kal\u0131rlar.<\/p>\n\n\n<p>Planlamac\u0131, kal\u0131b\u0131n bak\u0131m tarihlerini SkyPlanner&#8217;a kaydeder ve \u00e7izelgeyi yeniden hesaplar. \u0130\u015f h\u00e2l\u00e2 kullan\u0131m d\u0131\u015f\u0131 olan ayn\u0131 kal\u0131b\u0131 gerektiriyorsa ba\u015fka bir enjeksiyon makinesine aktar\u0131lmas\u0131 bu k\u0131s\u0131t\u0131 ortadan kald\u0131rmaz. Ekip, etkilenen sipari\u015fleri sonraki montaj veya paketleme i\u015fleriyle birlikte de\u011ferlendirir ve hangi taahh\u00fctlerin ele al\u0131nmas\u0131 gerekti\u011fine karar verir.<\/p>\n\n\n<p>M\u00fcdahaleden sonra pilot ekip, benzer \u00fcretim ko\u015fullar\u0131nda duru\u015flar\u0131n ve \u00fcretime ba\u015flarken \u00e7\u0131kan hatal\u0131 par\u00e7alar\u0131n tekrarlan\u0131p tekrarlanmad\u0131\u011f\u0131n\u0131 kontrol eder. Tekrarlan\u0131yorsa ara\u015ft\u0131rma devam eder. \u0130yile\u015fme kal\u0131c\u0131 olursa ekip, ilgili ekipman bak\u0131m\u0131 rutinlerini g\u00fcnceller ve \u00f6\u011frendiklerini payla\u015f\u0131r.<\/p>\n\n\n<p>TPM d\u00f6ng\u00fcs\u00fc uygulamada b\u00f6yle i\u015fler. G\u00f6zlem, teknik \u00e7al\u0131\u015fma, \u00fcretim karar\u0131 ve sonu\u00e7 ayn\u0131 iyile\u015ftirme \u00e7al\u0131\u015fmas\u0131n\u0131n par\u00e7alar\u0131d\u0131r. SkyPlanner, \u00fczerinde mutab\u0131k kal\u0131nan kapasite kayb\u0131n\u0131, bu kay\u0131ptan etkilenen m\u00fc\u015fteri i\u015fleriyle ayn\u0131 \u00e7izelgede tutarak s\u00fcrecin \u00fcretim taraf\u0131n\u0131 destekler.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Yaln\u0131zca kontrol listesinin tamamlanmas\u0131n\u0131 de\u011fil, kayb\u0131 da \u00f6l\u00e7\u00fcn<\/h2>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/oee\/\">Toplam ekipman etkinli\u011fi (OEE)<\/a>; kullan\u0131labilirlik, performans ve kaliteyi bir araya getirir. Ekipman\u0131n duru\u015flar, d\u00fc\u015f\u00fck h\u0131zda \u00e7al\u0131\u015fma veya kabul edilemeyen \u00fcr\u00fcnler nedeniyle \u00fcretken zaman kaybedip kaybetmedi\u011fini ortaya \u00e7\u0131karmaya yard\u0131mc\u0131 olur. At\u0131lacak ad\u0131m\u0131 belirlerken bu kay\u0131plar\u0131 esas al\u0131n; tek ba\u015f\u0131na toplam y\u00fczde de\u011feri, neyin de\u011fi\u015ftirilmesi gerekti\u011fini a\u00e7\u0131klayamaz.<\/p>\n\n\n<p>Pilot uygulamada, \u015fu \u00fc\u00e7 soruyu yan\u0131tlayan az say\u0131da \u00f6l\u00e7\u00fct kullan\u0131n:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Rutinler uygulan\u0131yor mu?<\/strong> Kararla\u015ft\u0131r\u0131lan operat\u00f6r bak\u0131m\u0131n\u0131n, uzman takibinin ve planl\u0131 m\u00fcdahalelerin ama\u00e7land\u0131\u011f\u0131 \u015fekilde tamamlan\u0131p tamamlanmad\u0131\u011f\u0131n\u0131 kontrol edin.<\/li><li><strong>Hedef al\u0131nan kay\u0131p de\u011fi\u015fiyor mu?<\/strong> Pilot uygulaman\u0131n gidermeyi ama\u00e7lad\u0131\u011f\u0131 tekrarlayan duru\u015flar\u0131, duru\u015f s\u00fcrelerini, h\u0131z kay\u0131plar\u0131n\u0131 veya ekipmandan kaynaklanan \u00fcr\u00fcn kusurlar\u0131n\u0131 izleyin.<\/li><li><strong>\u00dcretim bundan yarar sa\u011fl\u0131yor mu?<\/strong> Kullan\u0131labilir \u00fcr\u00fcn miktar\u0131, fazla mesai, sonraki a\u015famalarda bekleyen i\u015fler ve teslimat taahh\u00fctleri \u00fczerindeki etkiyi de\u011ferlendirin.<\/li><\/ul>\n\n\n<p>Tan\u0131mlar\u0131 ve kar\u015f\u0131la\u015ft\u0131rma ko\u015fullar\u0131n\u0131 tutarl\u0131 tutun. \u00dcr\u00fcn karmas\u0131, planlanan \u00fcretim s\u00fcresi veya \u00f6l\u00e7\u00fcm y\u00f6ntemindeki bir de\u011fi\u015fiklik, onar\u0131m\u0131n i\u015fe yarad\u0131\u011f\u0131n\u0131 kan\u0131tlamadan OEE sonucunu de\u011fi\u015ftirebilir. Ortalama bir de\u011fer de belirli bir \u00fcr\u00fcnde veya vardiyada ciddi boyutta devam eden bir sorunu gizleyebilir.<\/p>\n\n\n<p>Gerekli bak\u0131m\u0131 kar\u015f\u0131la\u015ft\u0131rman\u0131n d\u0131\u015f\u0131nda tutarak g\u00f6r\u00fcnmez k\u0131lmay\u0131n veya hi\u00e7bir m\u00fc\u015fterinin ihtiya\u00e7 duymad\u0131\u011f\u0131 \u00fcr\u00fcnleri stok i\u00e7in \u00fcreterek g\u00f6stergeyi y\u00fckseltmeyin. Ama\u00e7, sipari\u015flerden kopuk bir rakama ula\u015fmak de\u011fil; kabul edilebilir \u00fcr\u00fcnleri g\u00fcvenilir ve g\u00fcvenli bi\u00e7imde \u00fcretmektir.<\/p>\n\n\n<p>\u00c7\u00f6z\u00fcme kavu\u015fmam\u0131\u015f bulgular\u0131, e\u011filim grafi\u011fini izledi\u011finiz kadar ciddiyetle takip edin. Operat\u00f6rler bir durumu s\u00fcrekli bildiriyor ama hi\u00e7bir geri d\u00f6n\u00fc\u015f alm\u0131yorsa program onlara bildirim yapman\u0131n anlams\u0131z oldu\u011funu \u00f6\u011fretir. Bildirimlerin sonucunu operat\u00f6rlere ileterek geri bildirim d\u00f6ng\u00fcs\u00fcn\u00fc tamamlamak, kat\u0131l\u0131m\u0131n s\u00fcrd\u00fcr\u00fclmesi i\u00e7in \u00f6nemlidir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pilot uygulamay\u0131 de\u011ferlendirin, ard\u0131ndan ger\u00e7ekten i\u015fe yarayanlar\u0131 yayg\u0131nla\u015ft\u0131r\u0131n<\/h2>\n\n\n<p>Pilot uygulamadan sorumlu ki\u015filerle d\u00fczenli, k\u0131sa de\u011ferlendirme toplant\u0131lar\u0131 yap\u0131n. Yeni bulgular\u0131, geciken aksiyonlar\u0131, \u00fczerinde mutab\u0131k kal\u0131nan bir sonraki m\u00fcdahaleyi ve kay\u0131plar\u0131n seyrini ele al\u0131n. Kararlara odaklan\u0131n: S\u0131rada kim ne yapacak, hangi deste\u011fe veya \u00fcretimden ayr\u0131lacak ne kadar zamana ihtiya\u00e7 var?<\/p>\n\n\n<p>Uygulamay\u0131 yayg\u0131nla\u015ft\u0131rmadan \u00f6nce rutinin vardiya de\u011fi\u015fiminde, bir \u00e7al\u0131\u015fan\u0131n yoklu\u011funda ve yo\u011fun \u00fcretim d\u00f6neminde de s\u00fcrd\u00fc\u011f\u00fcn\u00fc do\u011frulay\u0131n. Talimatlar\u0131n uygulanabilirli\u011fini, operat\u00f6rlerin yetki s\u0131n\u0131rlar\u0131n\u0131 anlay\u0131p anlamad\u0131\u011f\u0131n\u0131 ve uzmanlar\u0131n bulgular\u0131 ele almaya yeti\u015fip yeti\u015femedi\u011fini kontrol edin. Ba\u015far\u0131, hevesli tek bir ki\u015finin her aksiyonu gayriresm\u00ee olarak takip etmesine ba\u011fl\u0131ysa \u00f6nce s\u00fcreci g\u00fc\u00e7lendirin.<\/p>\n\n\n<p>Her kontrol\u00fc veya kontrol aral\u0131\u011f\u0131n\u0131 oldu\u011fu gibi kopyalamak yerine, \u00f6\u011frendiklerinizi uygun ba\u015fka bir alana uyarlay\u0131n. Farkl\u0131 ekipmanlar\u0131n ar\u0131za bi\u00e7imleri, eri\u015fim gereksinimleri ve bak\u0131m ihtiya\u00e7lar\u0131 farkl\u0131d\u0131r. Ortak sorumluluk, e\u011fitim, bulgulara m\u00fcdahale ve de\u011ferlendirme yakla\u015f\u0131m\u0131n\u0131 koruyun; teknik i\u00e7eri\u011fi uyarlay\u0131n.<\/p>\n\n\n<p>Tekrarlayan g\u00fc\u00e7l\u00fckleri ekipman sat\u0131n alma ve de\u011fi\u015fiklik kararlar\u0131nda da dikkate al\u0131n. Kontrol\u00fc, temizli\u011fi veya bak\u0131m\u0131 zor olan bir makine ileride ek i\u015f yarat\u0131r. Yeni ekipman\u0131n gereksinimleri belirlenirken operat\u00f6rleri ve bak\u0131m ekibini s\u00fcrece katmak, deneyimlerinden mevcut pilot uygulaman\u0131n \u00f6tesinde de yararlanman\u0131z\u0131 sa\u011flar.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner ile TPM&#8217;nin \u00fcretim taraf\u0131n\u0131 kolayla\u015ft\u0131r\u0131n<\/h2>\n\n\n<p>Bir TPM program\u0131n\u0131n ihtiyac\u0131, \u00fcretim ekibinin elle uzla\u015ft\u0131rmak zorunda kalaca\u011f\u0131 ikinci bir plan de\u011fil, kararla\u015ft\u0131r\u0131lan i\u015fler i\u00e7in ayr\u0131lm\u0131\u015f zamand\u0131r. Bu m\u00fcdahaleleri sipari\u015flerin ger\u00e7ek \u00fcretim rotalar\u0131 ve teslimat \u00f6ncelikleriyle koordine etmeniz gerekti\u011finde SkyPlanner&#8217;\u0131 se\u00e7in. Kapasite ve \u00e7izelgeyi bir arada sunan ortak g\u00f6r\u00fcn\u00fcm sayesinde planlamac\u0131, \u00fcretime yans\u0131yan etkileri g\u00f6rebilir ve her i\u015f kuyru\u011funu ba\u015ftan olu\u015fturmadan s\u0131ralamay\u0131 g\u00fcncel tutabilir.<\/p>\n\n\n<p>Finlandiyal\u0131 g\u0131da ambalaj\u0131 \u00fcreticisi <a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/fredman-operations\/\">Fredman Operations<\/a>, bu ortak g\u00f6r\u00fcn\u00fcm\u00fcn de\u011ferini g\u00f6steren bir \u00f6rnektir. Daha \u00f6nce \u015firketin planlamac\u0131s\u0131, makinelerin ne zaman bo\u015fa \u00e7\u0131kaca\u011f\u0131n\u0131 ve vardiya kapasitesini net olarak g\u00f6remeden i\u015fleri \u00f6nceliklendiriyordu. SkyPlanner&#8217;\u0131n \u015firketin L7 ve LTR sistemlerine ba\u011flanmas\u0131yla makine kapasitesi ve i\u015flerin zamanlamas\u0131 Gantt \u015femas\u0131nda birlikte g\u00f6r\u00fcn\u00fcr h\u00e2le geldi. Fredman, \u00e7izelge de\u011fi\u015fikliklerine daha h\u0131zl\u0131 yan\u0131t verdi\u011fini ve fazla mesai ihtiyac\u0131n\u0131n azald\u0131\u011f\u0131n\u0131 belirtiyor. Bunun pratikteki faydas\u0131, yeniden elle hesaplama yapmak yerine \u00fcretimin neler yapabilece\u011fine karar vermek i\u00e7in ortak bir dayana\u011fa sahip olmakt\u0131r.<\/p>\n\n\n<p>SkyPlanner, a\u00e7\u0131k REST API \u00fczerinden her t\u00fcrl\u00fc ERP veya MES sistemiyle entegre olur. B\u00f6ylece mevcut sipari\u015f ve \u00fcretim bilgilerinizi kullanarak koordinasyonu iyile\u015ftirebilirsiniz.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>; TPM ekibinizin bir makine veya tak\u0131m i\u00e7in kararla\u015ft\u0131rd\u0131\u011f\u0131 bir m\u00fcdahaleyi ve bu ekipman\u0131 kullanan bir m\u00fc\u015fteri sipari\u015fini \u00f6rnek olarak getirin. Ekipman\u0131n kullan\u0131lamad\u0131\u011f\u0131 d\u00f6nemin \u00fcretim s\u0131ras\u0131n\u0131 nas\u0131l de\u011fi\u015ftirdi\u011fini, sonraki operasyonlar\u0131 nas\u0131l etkiledi\u011fini ve hangi teslimat kararlar\u0131n\u0131 ele alman\u0131z gerekti\u011fini g\u00f6r\u00fcn. \u00d6nce \u00e7izelgeleme yakla\u015f\u0131m\u0131n\u0131 ke\u015ffetmek isterseniz <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya Ana Sayfa &raquo; Kaynaklar &raquo; Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya Toplam \u00fcretken bak\u0131m (TPM), rutin bak\u0131m, planl\u0131 bak\u0131m ve s\u00fcrekli iyile\u015ftirme yoluyla ekipman etkinli\u011fini art\u0131rmay\u0131 ama\u00e7layan, i\u015fletme genelini kapsayan bir yakla\u015f\u0131md\u0131r. Operat\u00f6rler, bak\u0131m uzmanlar\u0131, m\u00fchendisler ve y\u00f6neticiler, \u00fcretimin sa\u011fl\u0131kl\u0131 ilerlemesini engelleyen ekipman kaynakl\u0131 kay\u0131plar\u0131 \u00f6nlemek i\u00e7in birlikte \u00e7al\u0131\u015f\u0131r. Zor olan, &#8230; <a title=\"Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/\" aria-label=\"Read more about Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":108309,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[314,2570],"tags":[],"class_list":["post-108299","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kaynaklar","category-uretim-verimliligi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya<\/title>\n<meta name=\"description\" content=\"TPM&#039;yi g\u00fcnl\u00fck ekip i\u015fine d\u00f6n\u00fc\u015ft\u00fcr\u00fcn: bak\u0131m rollerini belirleyin, yararl\u0131 bir pilot ba\u015flat\u0131n, SkyPlanner ile kararla\u015ft\u0131r\u0131lan bak\u0131ma \u00fcretim plan\u0131nda zaman ay\u0131r\u0131n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya\" \/>\n<meta property=\"og:description\" content=\"TPM&#039;yi g\u00fcnl\u00fck ekip i\u015fine d\u00f6n\u00fc\u015ft\u00fcr\u00fcn: bak\u0131m rollerini belirleyin, yararl\u0131 bir pilot ba\u015flat\u0131n, SkyPlanner ile kararla\u015ft\u0131r\u0131lan bak\u0131ma \u00fcretim plan\u0131nda zaman ay\u0131r\u0131n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-24T03:23:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-24T03:24:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-productive-maintenance-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"17 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/toplam-uretken-bakim\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/toplam-uretken-bakim\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya\",\"datePublished\":\"2026-10-24T03:23:09+00:00\",\"dateModified\":\"2026-10-24T03:24:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/toplam-uretken-bakim\\\/\"},\"wordCount\":3385,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/toplam-uretken-bakim\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/total-productive-maintenance-hero.png\",\"articleSection\":[\"Kaynaklar\",\"\u00dcretim verimlili\u011fi\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/toplam-uretken-bakim\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/toplam-uretken-bakim\\\/\",\"name\":\"Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/toplam-uretken-bakim\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/toplam-uretken-bakim\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/total-productive-maintenance-hero.png\",\"datePublished\":\"2026-10-24T03:23:09+00:00\",\"dateModified\":\"2026-10-24T03:24:50+00:00\",\"description\":\"TPM'yi g\u00fcnl\u00fck ekip i\u015fine d\u00f6n\u00fc\u015ft\u00fcr\u00fcn: bak\u0131m rollerini belirleyin, yararl\u0131 bir pilot ba\u015flat\u0131n, SkyPlanner ile kararla\u015ft\u0131r\u0131lan bak\u0131ma \u00fcretim plan\u0131nda zaman ay\u0131r\u0131n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/toplam-uretken-bakim\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/toplam-uretken-bakim\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/toplam-uretken-bakim\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/total-productive-maintenance-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/total-productive-maintenance-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A production machine surrounded by inspection, maintenance and finished parts in a connected TPM care loop.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/toplam-uretken-bakim\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya","description":"TPM'yi g\u00fcnl\u00fck ekip i\u015fine d\u00f6n\u00fc\u015ft\u00fcr\u00fcn: bak\u0131m rollerini belirleyin, yararl\u0131 bir pilot ba\u015flat\u0131n, SkyPlanner ile kararla\u015ft\u0131r\u0131lan bak\u0131ma \u00fcretim plan\u0131nda zaman ay\u0131r\u0131n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/","og_locale":"tr_TR","og_type":"article","og_title":"Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya","og_description":"TPM'yi g\u00fcnl\u00fck ekip i\u015fine d\u00f6n\u00fc\u015ft\u00fcr\u00fcn: bak\u0131m rollerini belirleyin, yararl\u0131 bir pilot ba\u015flat\u0131n, SkyPlanner ile kararla\u015ft\u0131r\u0131lan bak\u0131ma \u00fcretim plan\u0131nda zaman ay\u0131r\u0131n.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-24T03:23:09+00:00","article_modified_time":"2026-10-24T03:24:50+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-productive-maintenance-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"17 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya","datePublished":"2026-10-24T03:23:09+00:00","dateModified":"2026-10-24T03:24:50+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/"},"wordCount":3385,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-productive-maintenance-hero.png","articleSection":["Kaynaklar","\u00dcretim verimlili\u011fi"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/","name":"Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-productive-maintenance-hero.png","datePublished":"2026-10-24T03:23:09+00:00","dateModified":"2026-10-24T03:24:50+00:00","description":"TPM'yi g\u00fcnl\u00fck ekip i\u015fine d\u00f6n\u00fc\u015ft\u00fcr\u00fcn: bak\u0131m rollerini belirleyin, yararl\u0131 bir pilot ba\u015flat\u0131n, SkyPlanner ile kararla\u015ft\u0131r\u0131lan bak\u0131ma \u00fcretim plan\u0131nda zaman ay\u0131r\u0131n.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-productive-maintenance-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-productive-maintenance-hero.png","width":1672,"height":941,"caption":"A production machine surrounded by inspection, maintenance and finished parts in a connected TPM care loop."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/toplam-uretken-bakim\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-productive-maintenance-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-productive-maintenance-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-productive-maintenance-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-productive-maintenance-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-productive-maintenance-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-productive-maintenance-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-productive-maintenance-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/total-productive-maintenance-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya Ana Sayfa &raquo; Kaynaklar &raquo; Toplam \u00dcretken Bak\u0131m: Plandan Uygulamaya Toplam \u00fcretken bak\u0131m (TPM), rutin bak\u0131m, planl\u0131 bak\u0131m ve s\u00fcrekli iyile\u015ftirme yoluyla ekipman etkinli\u011fini art\u0131rmay\u0131 ama\u00e7layan, i\u015fletme genelini kapsayan bir yakla\u015f\u0131md\u0131r. Operat\u00f6rler, bak\u0131m uzmanlar\u0131, m\u00fchendisler ve y\u00f6neticiler, \u00fcretimin sa\u011fl\u0131kl\u0131 ilerlemesini engelleyen ekipman kaynakl\u0131 kay\u0131plar\u0131 \u00f6nlemek i\u00e7in birlikte \u00e7al\u0131\u015f\u0131r. Zor olan,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/108299","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=108299"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/108299\/revisions"}],"predecessor-version":[{"id":108362,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/108299\/revisions\/108362"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/108309"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=108299"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=108299"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=108299"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}