{"id":107903,"date":"2026-10-23T19:50:04","date_gmt":"2026-10-23T19:50:04","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=107903"},"modified":"2026-10-23T19:51:40","modified_gmt":"2026-10-23T19:51:40","slug":"ekonomik-siparis-miktari","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/","title":{"rendered":"Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>Ekonomik sipari\u015f miktar\u0131 (EOQ), temel EOQ modelinde sipari\u015f verme ve stok bulundurma maliyetlerinin toplam\u0131n\u0131 en aza indiren stok yenileme miktar\u0131d\u0131r.<\/strong> D\u00fczenli kullan\u0131lan bir par\u00e7ay\u0131 sat\u0131n alan \u00fcretici i\u00e7in \u015fu soruyu yan\u0131tlar: T\u00fcketimimizi ve maliyetlerimizi dikkate ald\u0131\u011f\u0131m\u0131zda her seferinde ne kadar sipari\u015f vermeliyiz?<\/p>\n\n\n<p>Form\u00fcl <strong>EOQ = \u221a(2 \u00d7 D \u00d7 S \/ H)<\/strong> \u015feklindedir. Burada D adet cinsinden y\u0131ll\u0131k talebi, S sipari\u015f ba\u015f\u0131na sabit maliyeti, H ise bir birimi bir y\u0131l stokta bulundurman\u0131n maliyetini ifade eder.<\/p>\n\n\n<p>Hesaplanan sonu\u00e7 yararl\u0131 bir ba\u015flang\u0131\u00e7 noktas\u0131d\u0131r; sat\u0131n alma karar\u0131n\u0131n tamam\u0131 de\u011fildir. Tedarik\u00e7inin ambalaj adedi veya asgari sipari\u015f miktar\u0131, sipari\u015f verilebilecek miktar\u0131 de\u011fi\u015ftirebilir. \u00dcstelik ekonomik bir al\u0131m, gelecek hafta teslim edilecekse yar\u0131n\u0131n \u00fcretimine katk\u0131 sa\u011flayamaz. SkyPlanner APS, beklenen malzeme teslimatlar\u0131n\u0131 bu malzemelere ihtiya\u00e7 duyan \u00fcretim emirleriyle ili\u015fkilendirir. B\u00f6ylece sat\u0131n alma ve \u00fcretim ekiplerinin ayr\u0131 listeleri uzla\u015ft\u0131rmak yerine ayn\u0131 \u00e7izelge \u00fczerinden \u00e7al\u0131\u015fmas\u0131na yard\u0131mc\u0131 olur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Daha fazla sipari\u015f vermek neden daha pahal\u0131ya mal olabilir?<\/h2>\n\n\n<p>Her stok yenilemede par\u00e7alar\u0131n bedeli d\u0131\u015f\u0131nda da maliyetler olu\u015fur: sat\u0131n alma sipari\u015finin haz\u0131rlanmas\u0131, mal kabul i\u015flemleri ve teslimat\u0131n elle\u00e7lenmesi. Daha b\u00fcy\u00fck miktarlarda al\u0131m yapmak, bu sabit i\u015fleri daha az say\u0131da sipari\u015fle y\u00fcr\u00fctmenizi sa\u011flar.<\/p>\n\n\n<p>Ancak daha b\u00fcy\u00fck teslimatlar, iki stok yenileme aras\u0131nda daha fazla stok tutulmas\u0131na da yol a\u00e7ar. Bu stok sermaye ba\u011flar; depolama, sigorta ve eskime maliyetleri getirir. \u0130ki kat\u0131 miktarda sat\u0131n almak, s\u0131rf sipari\u015f say\u0131s\u0131n\u0131 yar\u0131ya indiriyor diye kendili\u011finden ekonomik olmaz.<\/p>\n\n\n<p>EOQ bu iki etkiyi dengeler. Temel modelde, gelen partinin tamam\u0131 tek seferde kullan\u0131labilir hale gelir; ard\u0131ndan \u00fcretimde t\u00fcketildik\u00e7e stok d\u00fczenli olarak azal\u0131r. Bu nedenle ortalama \u00e7evrim sto\u011fu, sipari\u015f miktar\u0131n\u0131n yar\u0131s\u0131d\u0131r. Gerekiyorsa g\u00fcvenlik sto\u011fu ayr\u0131ca eklenir; sipari\u015f miktar\u0131n\u0131n yar\u0131s\u0131na dayanan bu hesaba dahil de\u011fildir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dc\u00e7 EOQ girdisini do\u011fru belirleyin<\/h2>\n\n\n<p>\u00d6l\u00e7\u00fc birimi ve zaman d\u00f6nemi tutarl\u0131 olmal\u0131d\u0131r. Y\u0131ll\u0131k taleple birlikte y\u0131ll\u0131k stok bulundurma maliyeti kullan\u0131lmal\u0131d\u0131r; ayl\u0131k bir maliyet, d\u00f6n\u00fc\u015ft\u00fcr\u00fclmeden ayn\u0131 hesaba kat\u0131lamaz.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Girdi<\/th><th>Sat\u0131n al\u0131nan bir par\u00e7a i\u00e7in anlam\u0131<\/th><th>Birim<\/th><\/tr><\/thead><tbody><tr><td>D<\/td><td>Par\u00e7an\u0131n beklenen y\u0131ll\u0131k t\u00fcketimi<\/td><td>Adet\/y\u0131l<\/td><\/tr><tr><td>S<\/td><td>Bir stok yenileme sipari\u015finin verilmesi ve mal kabul\u00fc i\u00e7in olu\u015fan sabit maliyet<\/td><td>Para birimi\/sipari\u015f<\/td><\/tr><tr><td>H<\/td><td>Bir birimi bir y\u0131l stokta bulundurman\u0131n maliyeti<\/td><td>Para birimi\/adet\/y\u0131l<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">D: Sat\u0131\u015f gelirini de\u011fil, par\u00e7a t\u00fcketimini kullan\u0131n<\/h3>\n\n\n<p>Sat\u0131n al\u0131nan rulmanlar i\u00e7in D, \u00fcretimde y\u0131l boyunca t\u00fcketilmesi beklenen rulman adedidir. Rulmanlar\u0131n kullan\u0131ld\u0131\u011f\u0131 makinelerin sat\u0131\u015f de\u011feri de\u011fildir. Ge\u00e7en y\u0131l\u0131n sat\u0131n alma miktar\u0131na da her zaman e\u015fit olmaz; al\u0131mlar t\u00fcketimin \u00fczerinde veya alt\u0131nda kald\u0131\u011f\u0131 i\u00e7in stok artm\u0131\u015f ya da azalm\u0131\u015f olabilir.<\/p>\n\n\n<p>Par\u00e7ay\u0131 kullanan t\u00fcm \u00fcr\u00fcnlerin ihtiya\u00e7lar\u0131n\u0131 hesaba kat\u0131n ve beklenen proses kay\u0131plar\u0131 i\u00e7in uygun paylar\u0131 ekleyin. Y\u0131ll\u0131k toplam\u0131n, y\u0131l boyunca yeterince d\u00fczenli bir t\u00fcketim yap\u0131s\u0131n\u0131 yans\u0131t\u0131p yans\u0131tmad\u0131\u011f\u0131n\u0131 kontrol edin. Yaln\u0131zca iki b\u00fcy\u00fck m\u00fc\u015fteri projesinde kullan\u0131lan bir par\u00e7a i\u00e7in, y\u0131ll\u0131k toplamdan t\u00fcretilmi\u015f yapay bir sabit t\u00fcketim h\u0131z\u0131 de\u011fil, tarihleri belirlenmi\u015f bir sat\u0131n alma plan\u0131 gerekir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">S: Sipari\u015f i\u015fleminin maliyetini sat\u0131n alma bedelinden ay\u0131r\u0131n<\/h3>\n\n\n<p>S, her stok yenilemede ortaya \u00e7\u0131kan sabit i\u015f y\u00fck\u00fcn\u00fcn maliyetini veya sabit \u00fccretleri kapsar. Sipari\u015fin idari i\u015flemleri, sabit teslimat \u00fccreti ve mal kabul i\u015fleri buna \u00f6rnektir. Sipari\u015fteki t\u00fcm par\u00e7alar\u0131n toplam fatura tutar\u0131n\u0131 ifade etmez.<\/p>\n\n\n<p>Kar\u015f\u0131la\u015ft\u0131rd\u0131\u011f\u0131n\u0131z sipari\u015f i\u015flemi i\u00e7in gerek\u00e7elendirilebilir bir maliyet kullan\u0131n. Birden fazla kalem ayn\u0131 sat\u0131n alma sipari\u015finde veya kamyonda yer al\u0131yorsa, sevkiyat maliyetinin tamam\u0131n\u0131 her kaleme ayr\u0131 ayr\u0131 y\u00fcklemek S de\u011ferini oldu\u011fundan y\u00fcksek g\u00f6sterir. Ayn\u0131 \u015fekilde, a\u011f\u0131rl\u0131\u011fa g\u00f6re de\u011fi\u015fen nakliye bedeli de b\u00fct\u00fcn\u00fcyle sipari\u015f ba\u015f\u0131na sabit maliyet say\u0131lamaz. Tahmininizi, tedarik\u00e7iyle \u00e7al\u0131\u015fma ve mal kabul d\u00fczeninize g\u00f6re yap\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">H: Stok bulundurma oran\u0131n\u0131 parasal tutara d\u00f6n\u00fc\u015ft\u00fcr\u00fcn<\/h3>\n\n\n<p>Bir par\u00e7an\u0131n maliyeti $20 ve y\u0131ll\u0131k stok bulundurma maliyeti oran\u0131 %25 ise buna kar\u015f\u0131l\u0131k gelen stok bulundurma maliyeti \u015f\u00f6yledir:<\/p>\n\n\n<p><strong>H = $20 \u00d7 0,25 = par\u00e7a ba\u015f\u0131na y\u0131lda $5<\/strong><\/p>\n\n\n<p>EOQ form\u00fcl\u00fcne 25 veya 0,25 de\u011fil, $5 girin. Stok bulundurma maliyetini hesaplarken ilgili sermaye, depolama ve stok riski maliyetlerini dahil edin; ayn\u0131 maliyeti iki kez saymay\u0131n.<\/p>\n\n\n<p>Muhasebede genel olarak da\u011f\u0131t\u0131lan bir gider, daha k\u00fc\u00e7\u00fck partiyle al\u0131m yap\u0131ld\u0131\u011f\u0131nda otomatik olarak nakit tasarrufuna d\u00f6n\u00fc\u015fmez. Hesaplama, miktar karar\u0131ndan hangi maliyetlerin etkilendi\u011fi konusunda sat\u0131n alma ve finans ekipleri uzla\u015ft\u0131\u011f\u0131nda en yararl\u0131 sonucu verir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hesaplama \u00f6rne\u011fi: \u00dcretim i\u00e7in rulman sat\u0131n alma<\/h2>\n\n\n<p>Birden fazla \u00fcr\u00fcnde kullan\u0131lan standart bir rulman\u0131 sat\u0131n alan bir \u00fcretici d\u00fc\u015f\u00fcn\u00fcn. Planlama varsay\u0131mlar\u0131 \u015f\u00f6yle olsun:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Y\u0131ll\u0131k t\u00fcketim D: <strong>12.000 rulman<\/strong>.<\/li><li>Sabit sipari\u015f verme maliyeti S: <strong>stok yenileme ba\u015f\u0131na $75<\/strong>.<\/li><li>Birim sat\u0131n alma fiyat\u0131: <strong>$20<\/strong>.<\/li><li>Y\u0131ll\u0131k stok bulundurma maliyeti oran\u0131: <strong>%25<\/strong>; buna g\u00f6re H, <strong>rulman ba\u015f\u0131na $5<\/strong> olur.<\/li><\/ul>\n\n\n<p>Bu girdiler yaln\u0131zca \u00f6rnek ama\u00e7l\u0131d\u0131r; \u00fcretim maliyetleri i\u00e7in k\u0131yas \u00f6l\u00e7\u00fct\u00fc veya bir SkyPlanner m\u00fc\u015fterisinin elde etti\u011fi sonu\u00e7lar de\u011fildir.<\/p>\n\n\n<p><strong>EOQ = \u221a[(2 \u00d7 12.000 \u00d7 75) \/ 5] = \u221a360.000 = 600 rulman<\/strong><\/p>\n\n\n<p>Sipari\u015f ba\u015f\u0131na 600 rulman al\u0131nd\u0131\u011f\u0131nda model, 12.000 \/ 600 = <strong>y\u0131lda 20 sipari\u015f<\/strong> ve 600 \/ 2 = <strong>300 rulman<\/strong> ortalama \u00e7evrim sto\u011fu verir.<\/p>\n\n\n<p>600 adedin neden ekonomik oldu\u011funu g\u00f6rmek i\u00e7in, sipari\u015f miktar\u0131 Q ile de\u011fi\u015fen y\u0131ll\u0131k maliyetleri kar\u015f\u0131la\u015ft\u0131r\u0131n:<\/p>\n\n\n<p><strong>Y\u0131ll\u0131k sipari\u015f verme maliyeti = (D \/ Q) \u00d7 S<\/strong><\/p>\n\n\n<p><strong>\u00c7evrim sto\u011funun y\u0131ll\u0131k bulundurma maliyeti = (Q \/ 2) \u00d7 H<\/strong><\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Sipari\u015f miktar\u0131<\/th><th>Y\u0131ll\u0131k sipari\u015f verme maliyeti<\/th><th>\u00c7evrim sto\u011funun y\u0131ll\u0131k bulundurma maliyeti<\/th><th>Toplam y\u0131ll\u0131k maliyet<\/th><\/tr><\/thead><tbody><tr><td>300 rulman<\/td><td>$3.000<\/td><td>$750<\/td><td>$3.750<\/td><\/tr><tr><td>600 rulman<\/td><td>$1.500<\/td><td>$1.500<\/td><td>$3.000<\/td><\/tr><tr><td>900 rulman<\/td><td>$1.000<\/td><td>$2.250<\/td><td>$3.250<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>K\u0131s\u0131tlar\u0131n olmad\u0131\u011f\u0131 optimum noktada sipari\u015f verme maliyeti, \u00e7evrim sto\u011funu bulundurma maliyetine e\u015fittir. Miktar\u0131 900&#8217;e \u00e7\u0131karmak sipari\u015f i\u015flemlerini azalt\u0131r, ancak stok bulundurma maliyetindeki art\u0131\u015f sa\u011flanan tasarrufu a\u015far.<\/p>\n\n\n<p>$3.000, <strong>rulmanlar\u0131 sat\u0131n alman\u0131n toplam y\u0131ll\u0131k maliyeti de\u011fildir<\/strong>. Par\u00e7alar\u0131n sat\u0131n alma bedeli h\u00e2l\u00e2 y\u0131lda 12.000 \u00d7 $20 = $240.000 tutar\u0131ndad\u0131r. Bu \u00f6rnekte s\u00f6z konusu tutar sipari\u015f b\u00fcy\u00fckl\u00fc\u011f\u00fcyle de\u011fi\u015fmedi\u011fi i\u00e7in en uygun Q de\u011ferini etkilemez. Birim fiyat miktara g\u00f6re de\u011fi\u015fiyorsa sat\u0131n alma bedeli de kar\u015f\u0131la\u015ft\u0131rmaya yeniden dahil edilmelidir.<\/p>\n\n\n<p>Bunlar uzun d\u00f6nem i\u00e7in hesaplanan y\u0131ll\u0131k maliyet tahminleridir. 900 adetlik bir parti i\u00e7in y\u0131lda 13,33 sipari\u015f gibi bir sonu\u00e7, ortalama sipari\u015f s\u0131kl\u0131\u011f\u0131n\u0131 ifade eder; bir sat\u0131n alma sipari\u015finin kesirli olarak verilmesi gerekti\u011fi anlam\u0131na gelmez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hesaplanan miktar\u0131 tedarik\u00e7iye verilebilecek bir sipari\u015fe d\u00f6n\u00fc\u015ft\u00fcr\u00fcn<\/h2>\n\n\n<p>Temel EOQ modeli; talebin d\u00fczenli ve bilinen, sipari\u015f verme ve stok bulundurma maliyetlerinin istikrarl\u0131, stok yenileme lead time de\u011ferinin sabit oldu\u011funu varsayar. Ayr\u0131ca gelen partinin tamam\u0131n\u0131n kullan\u0131labilir olmas\u0131n\u0131 ve stok yetersizli\u011fi ya\u015fanmamas\u0131n\u0131 esas al\u0131r. Miktar indirimi veya ba\u011flay\u0131c\u0131 bir miktar k\u0131s\u0131t\u0131 olmad\u0131\u011f\u0131 da varsay\u0131l\u0131r. Modeli en g\u00fcvenle, sat\u0131n alma d\u00fczeni bu ko\u015fullara benzeyen ve d\u00fczenli kullan\u0131lan kalemlerde uygulayabilirsiniz.<\/p>\n\n\n<p>Ard\u0131ndan, ger\u00e7ekten sat\u0131n alabilece\u011finiz miktarlar\u0131 kar\u015f\u0131la\u015ft\u0131r\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ambalaj adetleri ve asgari sipari\u015f miktarlar\u0131<\/h3>\n\n\n<p>Rulman tedarik\u00e7isinin 250 adetlik ambalajlarla sat\u0131\u015f yapt\u0131\u011f\u0131n\u0131 varsayal\u0131m. Bu durumda 600 rulmanl\u0131k sipari\u015f verilemez. Ayn\u0131 maliyet denklemiyle, bu miktara yak\u0131n tam ambalaj katlar\u0131n\u0131 kar\u015f\u0131la\u015ft\u0131r\u0131n:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>500 rulman:<\/strong> $1.800 sipari\u015f verme + $1.250 stok bulundurma = <strong>y\u0131lda $3.050<\/strong>.<\/li><li><strong>750 rulman:<\/strong> $1.200 sipari\u015f verme + $1.875 stok bulundurma = <strong>y\u0131lda $3.075<\/strong>.<\/li><\/ul>\n\n\n<p>Ba\u015fka bir k\u0131s\u0131t yoksa bu modelde 500 adet daha d\u00fc\u015f\u00fck maliyetlidir. Miktar\u0131 otomatik olarak yukar\u0131 yuvarlamak, bu sonucu g\u00f6zden ka\u00e7\u0131rman\u0131za neden olur.<\/p>\n\n\n<p>\u015eimdi de tedarik\u00e7inin ayr\u0131ca 750 adetlik asgari sipari\u015f \u015fart\u0131 koydu\u011funu varsayal\u0131m. Art\u0131k 500 adetlik se\u00e7enek kullan\u0131lamaz. 750 adedi se\u00e7mek, modelde k\u0131s\u0131ts\u0131z optimuma g\u00f6re y\u0131lda $75, yani %2,5 daha fazla maliyet yarat\u0131r. Bu fark, daha d\u00fc\u015f\u00fck bir asgari miktar i\u00e7in pazarl\u0131k yapmaya de\u011fip de\u011fmeyece\u011fine karar vermek a\u00e7\u0131s\u0131ndan somut bir dayanak sa\u011flar.<\/p>\n\n\n<p>MOQ, tedarik\u00e7inin belirledi\u011fi alt s\u0131n\u0131rd\u0131r. EOQ ise al\u0131c\u0131n\u0131n hesaplad\u0131\u011f\u0131, maliyeti en aza indiren miktard\u0131r. \u0130kisi farkl\u0131 sorular\u0131 yan\u0131tlar.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Miktar indirimleri ve teslimat anla\u015fmalar\u0131<\/h3>\n\n\n<p>Daha d\u00fc\u015f\u00fck birim fiyat, daha b\u00fcy\u00fck bir sipari\u015fi avantajl\u0131 hale getirebilir. Ancak toplam etkiyi kar\u015f\u0131la\u015ft\u0131r\u0131n: y\u0131ll\u0131k sat\u0131n alma bedeli, sipari\u015f verme maliyeti, stok bulundurma maliyeti ve varsa miktara ba\u011fl\u0131 nakliye bedeli. Ger\u00e7ekte uygulanan indirim yap\u0131s\u0131n\u0131 esas al\u0131n; t\u00fcm birimlere uygulanan bir fiyat ile yaln\u0131zca belirli bir e\u015fi\u011fin \u00fczerindeki birimlere uygulanan indirim ayn\u0131 de\u011fildir.<\/p>\n\n\n<p>Birden fazla teslimat \u00e7a\u011fr\u0131s\u0131 i\u00e7eren \u00e7er\u00e7eve sipari\u015flerde de hangi i\u015flemin sipari\u015f verme olarak say\u0131ld\u0131\u011f\u0131 ve fiilen ne kadar stok tuttu\u011funuz de\u011fi\u015fir. Teslimatlar ve \u00fccretlendirmeler ayr\u0131 ayr\u0131 ger\u00e7ekle\u015fiyorsa s\u00f6zle\u015fmedeki toplam miktar\u0131 tek seferde teslim al\u0131nm\u0131\u015f gibi de\u011ferlendirmeyin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Depolama, raf \u00f6mr\u00fc ve d\u00fczensiz talep<\/h3>\n\n\n<p>Partinin kullan\u0131labilir depolama alan\u0131na s\u0131\u011fd\u0131\u011f\u0131n\u0131 ve son kullanma tarihi dolmadan, tasar\u0131m de\u011fi\u015fmeden veya m\u00fc\u015fterinin ihtiyac\u0131 sona ermeden t\u00fcketilebilece\u011fini kontrol edin. Kullan\u0131lamayacak bir miktar, yaln\u0131zca basitle\u015ftirilmi\u015f bir maliyet e\u011frisinde en d\u00fc\u015f\u00fck noktay\u0131 verdi\u011fi i\u00e7in ekonomik say\u0131lmaz.<\/p>\n\n\n<p>Talep mevsimselse veya stoktan b\u00fcy\u00fck miktarlarda ve d\u00fczensiz aral\u0131klarla \u00e7eki\u015f yap\u0131l\u0131yorsa d\u00f6nemlere g\u00f6re belirlenmi\u015f ihtiya\u00e7lar\u0131 ve uygun bir stok yenileme politikas\u0131n\u0131 kullan\u0131n. Talebin ya da tedarik\u00e7inin teslimat zaman\u0131n\u0131n belirsiz oldu\u011fu durumlarda g\u00fcvenlik sto\u011funu ayr\u0131ca de\u011ferlendirin. EOQ&#8217;yu art\u0131rmak, stoksuz kalma riskini anlaman\u0131n yerini tutmaz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">EOQ, ne zaman de\u011fil ne kadar sipari\u015f verece\u011finizi belirler<\/h2>\n\n\n<p>Rulman \u00f6rne\u011finde 250 i\u015f g\u00fcn\u00fcnde 12.000 adet t\u00fcketilir; bu da <strong>i\u015f g\u00fcn\u00fc ba\u015f\u0131na 48 rulman<\/strong> demektir. Bu t\u00fcketim h\u0131z\u0131nda 600 rulmanl\u0131k bir parti <strong>12,5 i\u015f g\u00fcn\u00fc<\/strong> yeter. Bu s\u00fcre, partinin t\u00fcketim \u00e7evrimidir; tedarik\u00e7inin lead time de\u011feri de\u011fildir.<\/p>\n\n\n<p>Stoklar\u0131n s\u00fcrekli g\u00f6zden ge\u00e7irildi\u011fi bir yenileme politikas\u0131nda sipari\u015f verme e\u015fi\u011fi genellikle \u015f\u00f6yle belirlenir:<\/p>\n\n\n<p><strong>Yeniden sipari\u015f noktas\u0131 = stok yenileme lead time s\u00fcresince beklenen talep + g\u00fcvenlik sto\u011fu<\/strong><\/p>\n\n\n<p>Sipari\u015f edilen rulmanlar\u0131n kullan\u0131ma haz\u0131r hale gelmesi sekiz i\u015f g\u00fcn\u00fc s\u00fcr\u00fcyorsa ve bundan ba\u011f\u0131ms\u0131z olarak, \u00f6rnek amac\u0131yla 96 rulmanl\u0131k bir tampon stok se\u00e7erseniz:<\/p>\n\n\n<p><strong>Yeniden sipari\u015f noktas\u0131 = (48 \u00d7 8) + 96 = 480 rulman<\/strong><\/p>\n\n\n<p>B\u00f6ylece iki karar birbirinden ayr\u0131l\u0131r: Bu politikada sipari\u015f miktar\u0131 <strong>600<\/strong>, sipari\u015f verme e\u015fi\u011fi ise <strong>480<\/strong> olur. 96 adetlik tampon stok, \u00f6rnek i\u00e7in varsay\u0131lm\u0131\u015ft\u0131r; EOQ ile hesaplanmam\u0131\u015ft\u0131r. Belirsizlik i\u00e7in ayr\u0131lacak pay\u0131 de\u011ferlendirmek \u00fczere <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/guvenlik-stogu\/\">g\u00fcvenlik sto\u011fu rehberinden<\/a> yararlan\u0131n.<\/p>\n\n\n<p>Sipari\u015f e\u015fi\u011fini stok pozisyonuna uygulay\u0131n: Eldeki kullan\u0131labilir sto\u011fa hen\u00fcz teslim al\u0131nmam\u0131\u015f yenileme sipari\u015flerini ekleyin; stok kay\u0131t kurallar\u0131n\u0131za g\u00f6re kar\u015f\u0131lanmas\u0131 gereken veya stok tahsis edilmi\u015f talebi \u00e7\u0131kar\u0131n. Ayn\u0131 taahh\u00fcd\u00fc iki kez hesaba katmay\u0131n. Yaln\u0131zca raftaki miktara bakmak, malzeme zaten yoldayken m\u00fckerrer sipari\u015f verilmesine yol a\u00e7abilir.<\/p>\n\n\n<p>Ancak sipari\u015f edilmi\u015f malzeme hen\u00fcz kullan\u0131labilir durumda de\u011fildir. Bir sat\u0131n alma sipari\u015fi stok pozisyonunu sipari\u015f e\u015fi\u011finin \u00fczerinde tutabilir; buna ra\u011fmen beklenen teslimat tarihi, bir m\u00fc\u015fteri sipari\u015fini kar\u015f\u0131lamak i\u00e7in ge\u00e7 kalabilir. Miktar ile teslimat zaman\u0131 birlikte kontrol edilmelidir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Stok yenileme partisini kendiniz \u00fcretiyorsan\u0131z?<\/h2>\n\n\n<p>T\u00fcketim devam ederken stok kademeli olarak yenileniyorsa <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-uretim-miktari\/\">ekonomik \u00fcretim miktar\u0131n\u0131<\/a> (EPQ) kullan\u0131n. D\u00fczenli olarak \u00fcretilen bir par\u00e7an\u0131n sto\u011fa kademeli bi\u00e7imde al\u0131nmas\u0131 buna \u00f6rnektir. EPQ, \u00fcretim h\u0131z\u0131 ile t\u00fcketim h\u0131z\u0131 aras\u0131ndaki ili\u015fkiyi hesaba katar; temel EOQ modeli ise partinin tamam\u0131n\u0131n ayn\u0131 anda kullan\u0131labilir hale geldi\u011fini varsayar.<\/p>\n\n\n<p>Belirleyici olan, sipari\u015fin yaln\u0131zca i\u00e7 veya d\u0131\u015f sipari\u015f olarak adland\u0131r\u0131lmas\u0131 de\u011fil, sto\u011fun nas\u0131l kullan\u0131labilir hale geldi\u011fidir. Tedarik\u00e7inin b\u00f6l\u00fcnm\u00fc\u015f teslimatlar\u0131 veya nihai kalite onay\u0131na kadar bekletilen bir \u00fcretim partisi i\u00e7in, bu adland\u0131rman\u0131n ilk akla getirdi\u011finden farkl\u0131 bir model gerekebilir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner ile planlad\u0131\u011f\u0131n\u0131z teslimat\u0131 \u00fcretime ba\u011flay\u0131n<\/h2>\n\n\n<p>600 rulman\u0131n pazartesi g\u00fcn\u00fc gelmesinin beklendi\u011fini d\u00fc\u015f\u00fcn\u00fcn. \u0130ki m\u00fc\u015fteri sipari\u015fi bu rulmanlara ihtiya\u00e7 duyuyor; her ikisi de tala\u015fl\u0131 imalat ve montaj kapasitesi i\u00e7in di\u011fer i\u015flerle yar\u0131\u015f\u0131yor. Tedarik\u00e7i teslimat\u0131 per\u015fembeye erteliyor. Sat\u0131n alma miktar\u0131 de\u011fi\u015fmiyor, ancak pazartesi g\u00fcnk\u00fc \u00fcretim plan\u0131 art\u0131k ger\u00e7ek\u00e7i de\u011fil.<\/p>\n\n\n<p>Yaln\u0131zca sat\u0131n alma listesini g\u00fcncellemek, makine i\u015f s\u0131ralar\u0131 ile taahh\u00fct edilen teslimat tarihlerinin birbiriyle uyumsuz kalmas\u0131na neden olur. SkyPlanner, bu ba\u011flant\u0131lar\u0131 <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">ortak bir \u00fcretim \u00e7izelgesine<\/a> ta\u015f\u0131r.<\/p>\n\n\n<p>Sat\u0131n alma sipari\u015fleri, malzeme miktarlar\u0131n\u0131 ve teslimat tarihlerini i\u00e7erir. Teslimat tarihi, malzemenin kullan\u0131labilir olmas\u0131n\u0131n beklendi\u011fi tarihi g\u00f6sterir; malzemenin geli\u015fini Teslim edildi olarak onaylamak sto\u011fu g\u00fcnceller. Malzeme durumunu dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde, SkyPlanner&#8217;\u0131n \u00e7izelgeleme yapay zek\u00e2s\u0131 Arcturus i\u015fleri tan\u0131mlanm\u0131\u015f kapasiteye, operasyon ba\u011f\u0131ml\u0131l\u0131klar\u0131na ve \u00f6nceliklere g\u00f6re \u00e7izelgelerken malzeme kullan\u0131labilirli\u011fini de hesaba katar.<\/p>\n\n\n<p>Yeni teslimat tarihini kaydedin ve \u00e7izelgeyi yeniden hesaplay\u0131n. B\u00f6ylece etkilenen i\u015f emirleri tedarik\u00e7inin tarihine uyarlanabilir; Gantt g\u00f6r\u00fcn\u00fcm\u00fc de bu i\u015flerin zamanlamas\u0131n\u0131 di\u011fer \u00fcretim i\u015fleriyle birlikte g\u00f6sterir. Planlama uzman\u0131, birbirine ba\u011fl\u0131 her operasyonu ayr\u0131 i\u015f s\u0131ralar\u0131 aras\u0131nda ta\u015f\u0131mak yerine karara odaklanabilir: par\u00e7an\u0131n tedarikini h\u0131zland\u0131rmak, \u00f6ncelikleri de\u011fi\u015ftirmek, alternatif bir tedarik kayna\u011f\u0131 bulmak veya teslimat taahh\u00fcd\u00fcn\u00fc g\u00fcncellemek.<\/p>\n\n\n<p>Sat\u0131n alma politikan\u0131z\u0131 SkyPlanner ile desteklemenin nedeni budur: <strong>malzeme plan\u0131 ile fabrika \u00e7izelgesi aras\u0131nda daha az manuel koordinasyon ve teslimat tarihindeki bir de\u011fi\u015fikli\u011fin m\u00fc\u015fteri sipari\u015flerine etkisini daha erken g\u00f6rebilme.<\/strong> Sat\u0131n alma birimi, ekonomik ve s\u00f6zle\u015fmeye uygun parti miktar\u0131n\u0131 belirler. Ortak \u00e7izelge ise bunun \u00fcretime etkilerini g\u00f6r\u00fcn\u00fcr k\u0131lar.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/eskomatic\/\">Eskomatic&#8217;in SkyPlanner de\u011ferlendirmesi<\/a>, bu g\u00f6r\u00fcn\u00fcrl\u00fc\u011f\u00fcn neden \u00f6nemli oldu\u011funu g\u00f6steriyor. Fason tala\u015fl\u0131 imalat yapan \u015firket, \u00f6nceden i\u015f s\u0131ralar\u0131n\u0131 b\u00fcy\u00fck \u00f6l\u00e7\u00fcde elle y\u00f6netiyordu ve malzeme eksiklikleri bazen planlanan ba\u015flang\u0131ca \u00e7ok az kala ortaya \u00e7\u0131k\u0131yordu. \u015eirket, ERP ba\u011flant\u0131l\u0131 Gantt \u00e7izelgeleme ve malzeme durumunun daha net g\u00f6r\u00fclebilmesi sayesinde malzeme eksikli\u011finden kaynaklanan \u00fcretim duru\u015flar\u0131n\u0131n azald\u0131\u011f\u0131n\u0131 ve teslimat tarihlerinin daha do\u011fru belirlendi\u011fini bildiriyor. Malzeme durumunu daha iyi g\u00f6rebilmek, ekibin g\u00fcnl\u00fck plan\u0131n\u0131 daha g\u00fcvenilir bir temele oturtuyor.<\/p>\n\n\n<p>SkyPlanner, a\u00e7\u0131k REST API arac\u0131l\u0131\u011f\u0131yla her t\u00fcrl\u00fc ERP veya MES ile entegre olur. B\u00f6ylece mevcut sistemlerinizdeki sat\u0131n alma ve sipari\u015f verileri, bu ba\u011flant\u0131l\u0131 \u00e7izelgeyi destekleyebilir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Miktar karar\u0131n\u0131 uygulamaya ge\u00e7irin<\/h2>\n\n\n<p>Sat\u0131n alma yoluyla stok yenilerken EOQ ile ba\u015flay\u0131n, tedarik\u00e7inin sa\u011flayabilece\u011fi uygun miktarlar\u0131 kar\u015f\u0131la\u015ft\u0131r\u0131n ve sipari\u015f verme e\u015fi\u011fini ayr\u0131ca belirleyin. Ard\u0131ndan teslimat\u0131, bu malzemeyi t\u00fcketecek sipari\u015flerle ba\u011flant\u0131l\u0131 tutun. Sat\u0131n ald\u0131\u011f\u0131n\u0131z bir par\u00e7a, beklenen teslimat tarihi ve bu par\u00e7aya ba\u011fl\u0131 iki m\u00fc\u015fteri sipari\u015fi \u00fczerinden bu ba\u011flant\u0131n\u0131n \u00fcretim plan\u0131n\u0131 nas\u0131l de\u011fi\u015ftirdi\u011fini g\u00f6rmek i\u00e7in <a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>. \u00d6nce kendiniz ke\u015ffetmek isterseniz <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n Ana Sayfa &raquo; Kaynaklar &raquo; Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n Ekonomik sipari\u015f miktar\u0131 (EOQ), temel EOQ modelinde sipari\u015f verme ve stok bulundurma maliyetlerinin toplam\u0131n\u0131 en aza indiren stok yenileme miktar\u0131d\u0131r. D\u00fczenli kullan\u0131lan bir par\u00e7ay\u0131 sat\u0131n alan \u00fcretici i\u00e7in \u015fu soruyu yan\u0131tlar: T\u00fcketimimizi ve maliyetlerimizi &#8230; <a title=\"Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/\" aria-label=\"Read more about Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":107916,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[314,2570],"tags":[],"class_list":["post-107903","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kaynaklar","category-uretim-verimliligi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n<\/title>\n<meta name=\"description\" content=\"D\u00fczenli kullan\u0131lan par\u00e7ada ekonomik sipari\u015f miktar\u0131n\u0131 bulun, tedarik\u00e7i k\u0131s\u0131tlar\u0131n\u0131 kontrol edin ve teslimat\u0131 par\u00e7aya ihtiya\u00e7 duyan \u00fcretim emirleriyle e\u015fleyin.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n\" \/>\n<meta property=\"og:description\" content=\"D\u00fczenli kullan\u0131lan par\u00e7ada ekonomik sipari\u015f miktar\u0131n\u0131 bulun, tedarik\u00e7i k\u0131s\u0131tlar\u0131n\u0131 kontrol edin ve teslimat\u0131 par\u00e7aya ihtiya\u00e7 duyan \u00fcretim emirleriyle e\u015fleyin.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-23T19:50:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-23T19:51:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-siparis-miktari\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-siparis-miktari\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n\",\"datePublished\":\"2026-10-23T19:50:04+00:00\",\"dateModified\":\"2026-10-23T19:51:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-siparis-miktari\\\/\"},\"wordCount\":2772,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-siparis-miktari\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"articleSection\":[\"Kaynaklar\",\"\u00dcretim verimlili\u011fi\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-siparis-miktari\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-siparis-miktari\\\/\",\"name\":\"Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-siparis-miktari\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-siparis-miktari\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"datePublished\":\"2026-10-23T19:50:04+00:00\",\"dateModified\":\"2026-10-23T19:51:40+00:00\",\"description\":\"D\u00fczenli kullan\u0131lan par\u00e7ada ekonomik sipari\u015f miktar\u0131n\u0131 bulun, tedarik\u00e7i k\u0131s\u0131tlar\u0131n\u0131 kontrol edin ve teslimat\u0131 par\u00e7aya ihtiya\u00e7 duyan \u00fcretim emirleriyle e\u015fleyin.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-siparis-miktari\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-siparis-miktari\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-siparis-miktari\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/economic-order-quantity-hero.png\",\"width\":1776,\"height\":999,\"caption\":\"A balance scale weighs a delivery parcel and purchase paperwork against boxes of components and a bearing.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/ekonomik-siparis-miktari\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n","description":"D\u00fczenli kullan\u0131lan par\u00e7ada ekonomik sipari\u015f miktar\u0131n\u0131 bulun, tedarik\u00e7i k\u0131s\u0131tlar\u0131n\u0131 kontrol edin ve teslimat\u0131 par\u00e7aya ihtiya\u00e7 duyan \u00fcretim emirleriyle e\u015fleyin.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/","og_locale":"tr_TR","og_type":"article","og_title":"Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n","og_description":"D\u00fczenli kullan\u0131lan par\u00e7ada ekonomik sipari\u015f miktar\u0131n\u0131 bulun, tedarik\u00e7i k\u0131s\u0131tlar\u0131n\u0131 kontrol edin ve teslimat\u0131 par\u00e7aya ihtiya\u00e7 duyan \u00fcretim emirleriyle e\u015fleyin.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-23T19:50:04+00:00","article_modified_time":"2026-10-23T19:51:40+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"14 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n","datePublished":"2026-10-23T19:50:04+00:00","dateModified":"2026-10-23T19:51:40+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/"},"wordCount":2772,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","articleSection":["Kaynaklar","\u00dcretim verimlili\u011fi"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/","name":"Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","datePublished":"2026-10-23T19:50:04+00:00","dateModified":"2026-10-23T19:51:40+00:00","description":"D\u00fczenli kullan\u0131lan par\u00e7ada ekonomik sipari\u015f miktar\u0131n\u0131 bulun, tedarik\u00e7i k\u0131s\u0131tlar\u0131n\u0131 kontrol edin ve teslimat\u0131 par\u00e7aya ihtiya\u00e7 duyan \u00fcretim emirleriyle e\u015fleyin.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png","width":1776,"height":999,"caption":"A balance scale weighs a delivery parcel and purchase paperwork against boxes of components and a bearing."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ekonomik-siparis-miktari\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/economic-order-quantity-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n Ana Sayfa &raquo; Kaynaklar &raquo; Ekonomik Sipari\u015f Miktar\u0131: Uygun Sat\u0131n Alma Partisini Hesaplay\u0131n Ekonomik sipari\u015f miktar\u0131 (EOQ), temel EOQ modelinde sipari\u015f verme ve stok bulundurma maliyetlerinin toplam\u0131n\u0131 en aza indiren stok yenileme miktar\u0131d\u0131r. D\u00fczenli kullan\u0131lan bir par\u00e7ay\u0131 sat\u0131n alan \u00fcretici i\u00e7in \u015fu soruyu yan\u0131tlar: T\u00fcketimimizi ve maliyetlerimizi&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/107903","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=107903"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/107903\/revisions"}],"predecessor-version":[{"id":107966,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/107903\/revisions\/107966"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/107916"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=107903"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=107903"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=107903"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}