{"id":105897,"date":"2026-10-23T17:38:10","date_gmt":"2026-10-23T17:38:10","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105897"},"modified":"2026-10-23T17:39:50","modified_gmt":"2026-10-23T17:39:50","slug":"stok-devir-hizi","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/","title":{"rendered":"\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; \u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Stok de\u011feriniz artt\u0131\u011f\u0131 h\u00e2lde fabrikan\u0131zda ihtiya\u00e7 duyulan par\u00e7alar h\u00e2l\u00e2 eksik. Baz\u0131 malzemeler hi\u00e7 kullan\u0131lmadan duruyor, tamamlanmam\u0131\u015f sipari\u015fler makineler aras\u0131nda bekliyor. M\u00fc\u015fteriler ba\u015fka \u00fcr\u00fcnlerin pe\u015findeyken tamamlanm\u0131\u015f \u00fcr\u00fcnler yer kapl\u0131yor. T\u00fcm stok kalemlerini azaltmak stok de\u011ferini d\u00fc\u015f\u00fcr\u00fcr, ancak \u00fcretimi mutlaka daha iyi h\u00e2le getirmez.<\/p>\n\n\n<p><strong>Stok devir h\u0131z\u0131, bir i\u015fletmenin belirli bir d\u00f6nemde ortalama stokunu ka\u00e7 kez sat\u0131p yeniledi\u011fini \u00f6l\u00e7er. Sat\u0131lan \u00fcr\u00fcnlerin maliyetinin ortalama stok de\u011ferine b\u00f6l\u00fcnmesiyle hesaplan\u0131r.<\/strong> Bir \u00fcreticide bu stok; hammadde, yar\u0131 mamul ve mamulleri kapsar.<\/p>\n\n\n<p>Hesaplamadan sonra as\u0131l sorulmas\u0131 gereken \u015fudur: Bu stokun hangi k\u0131sm\u0131 gereksiz ve birikmesine ne neden oluyor? \u0130\u015flerin erken ba\u015flat\u0131lmas\u0131 ve birbirinden ba\u011f\u0131ms\u0131z makine kuyruklar\u0131 stok birikimine yol a\u00e7\u0131yorsa SkyPlanner APS, malzemeleri, kapasiteyi ve sipari\u015f \u00f6nceliklerini tek bir \u00fcretim \u00e7izelgesinde koordine etmenize yard\u0131mc\u0131 olur. Her g\u00fcn ayr\u0131 kuyruklar\u0131 birbiriyle uyumlu h\u00e2le getirmeye \u00e7al\u0131\u015fmak yerine \u00fcretimde gereksiz yere bekleyen i\u015fleri azaltabilirsiniz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Stok devir h\u0131z\u0131 nas\u0131l hesaplan\u0131r?<\/h2>\n\n\n<p>Her iki girdi i\u00e7in de ayn\u0131 d\u00f6nemi ve tutarl\u0131 bir maliyet esas\u0131n\u0131 kullan\u0131n:<\/p>\n\n\n<p><strong>Stok devir h\u0131z\u0131 = sat\u0131lan \u00fcr\u00fcnlerin maliyeti \u00f7 ortalama stok de\u011feri<\/strong><\/p>\n\n\n<p>Sonu\u00e7 y\u00fczde olarak de\u011fil, d\u00f6nem i\u00e7indeki devir say\u0131s\u0131 olarak ifade edilir. Y\u0131ll\u0131k sat\u0131lan \u00fcr\u00fcn maliyetini ayn\u0131 y\u0131l\u0131n ortalama stokuna b\u00f6ld\u00fc\u011f\u00fcn\u00fczde y\u0131ll\u0131k devir say\u0131s\u0131n\u0131 elde edersiniz.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sat\u0131\u015f gelirini de\u011fil, sat\u0131lan \u00fcr\u00fcnlerin maliyetini kullan\u0131n<\/h3>\n\n\n<p>Sat\u0131lan \u00fcr\u00fcnlerin maliyeti, yani COGS, d\u00f6nem i\u00e7inde sat\u0131lan \u00fcr\u00fcnlere y\u00fcklenen maliyettir. \u00dcretimde bu tutar, s\u00f6z konusu \u00fcr\u00fcnlerin ta\u015f\u0131d\u0131\u011f\u0131 malzeme, direkt i\u015f\u00e7ilik ve da\u011f\u0131t\u0131lm\u0131\u015f genel \u00fcretim giderlerini kapsar. Bu de\u011feri, \u00fczerinde mutab\u0131k kal\u0131nm\u0131\u015f mali kay\u0131tlar\u0131n\u0131zdan al\u0131n.<\/p>\n\n\n<p>Sat\u0131\u015f geliri k\u00e2r marj\u0131n\u0131z\u0131 da i\u00e7erir. Bu nedenle geliri maliyetle de\u011ferlenmi\u015f stoka b\u00f6lmek farkl\u0131 bir \u00f6l\u00e7\u00fcm verir. Sat\u0131n alma tutar\u0131 da bunun yerine kullan\u0131lamaz; sat\u0131n al\u0131nan malzemenin bir k\u0131sm\u0131 h\u00e2l\u00e2 rafta olabilir. \u00dcretilen \u00fcr\u00fcnlerin maliyeti de COGS ile ayn\u0131 de\u011fildir; tamamlanm\u0131\u015f \u00fcr\u00fcnler sat\u0131lmadan mamul stokunda kalabilir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">D\u00f6nemi temsil eden bir ortalama hesaplay\u0131n<\/h3>\n\n\n<p>Ba\u015flang\u0131\u00e7 i\u00e7in basit bir y\u00f6ntem:<\/p>\n\n\n<p><strong>Ortalama stok = (d\u00f6nem ba\u015f\u0131 stoku + d\u00f6nem sonu stoku) \u00f7 2<\/strong><\/p>\n\n\n<p>Mevsimsel \u00e7al\u0131\u015fan veya b\u00fcy\u00fck miktarlarda malzeme teslim alan bir fabrikada, yaln\u0131zca iki tarihteki de\u011ferler y\u0131l\u0131n b\u00fcy\u00fck b\u00f6l\u00fcm\u00fcn\u00fc yans\u0131tmayabilir. Bunun yerine d\u00fczenli ay sonu stok bakiyelerinin ortalamas\u0131n\u0131 al\u0131n; stoklar keskin dalgalanmalar g\u00f6steriyorsa daha s\u0131k \u00f6l\u00e7\u00fcm yap\u0131n. D\u00f6nemleri kar\u015f\u0131la\u015ft\u0131r\u0131rken \u00f6l\u00e7\u00fcm y\u00f6ntemini de\u011fi\u015ftirmeyin.<\/p>\n\n\n<p>\u00dcretimin \u00fc\u00e7 a\u015famas\u0131ndaki stok de\u011ferlerini de hesaba kat\u0131n; her kalemi yaln\u0131zca bulundu\u011fu a\u015famada, bir kez say\u0131n. <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/yari-mamul-stoku\/\">Yar\u0131 mamul stokunun (WIP) de\u011feri, o ana kadar birikmi\u015f maliyetleri kapsar<\/a>; bitmi\u015f bir \u00fcr\u00fcn\u00fcn tam maliyetini otomatik olarak i\u00e7ermez. Stok bakiyeleri i\u00e7in finans b\u00f6l\u00fcm\u00fcyle mutabakat yap\u0131n. B\u00f6ylece de\u011ferleme de\u011fi\u015fiklikleri, eksik mal giri\u015fleri veya tamamland\u0131\u011f\u0131 kaydedilmemi\u015f \u00fcretim i\u015fleri, fiziksel ak\u0131\u015ftaki de\u011fi\u015fiklikler gibi g\u00f6r\u00fcnmez.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hesaplaman\u0131n d\u00f6nemini a\u00e7\u0131k\u00e7a belirtin<\/h3>\n\n\n<p>Bir y\u0131l\u0131n COGS de\u011ferini o y\u0131l\u0131n ortalama stokuyla, bir \u00e7eyre\u011fin COGS de\u011ferini ise o \u00e7eyre\u011fin ortalama stokuyla kar\u015f\u0131la\u015ft\u0131r\u0131n. \u00c7eyreklik oran, y\u0131ll\u0131k devir say\u0131s\u0131n\u0131 de\u011fil, o \u00e7eyrekteki devir say\u0131s\u0131n\u0131 g\u00f6sterir. Mevsimsellikten etkilenen bir \u00e7eyre\u011fin sonucunu d\u00f6rtle \u00e7arpmak, y\u0131l geneli i\u00e7in yan\u0131lt\u0131c\u0131 bir tablo verebilir.<\/p>\n\n\n<p>Stok hareketleri ise farkl\u0131 bir konudur. Bir paletin depodan tala\u015fl\u0131 imalata, ard\u0131ndan son i\u015flemlere ta\u015f\u0131nmas\u0131 stok hareketleri olu\u015fturur. Bu, i\u015fletmenin o stoku \u00fc\u00e7 kez sat\u0131p yeniledi\u011fi anlam\u0131na gelmez.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dcretimden bir hesaplama \u00f6rne\u011fi<\/h2>\n\n\n<p>Y\u0131ll\u0131k COGS de\u011feri <strong>$3.600.000<\/strong> olan bir \u00fcretici d\u00fc\u015f\u00fcn\u00fcn. D\u00fczenli stok \u00f6l\u00e7\u00fcmleri, ayn\u0131 y\u0131l i\u00e7in \u015fu ortalama bakiyeleri veriyor:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Stok a\u015famas\u0131<\/th><th>Ortalama de\u011fer<\/th><\/tr><\/thead><tbody><tr><td>Hammadde ve sat\u0131n al\u0131nan bile\u015fenler<\/td><td>$300.000<\/td><\/tr><tr><td>Yar\u0131 mamul<\/td><td>$420.000<\/td><\/tr><tr><td>Mamul<\/td><td>$180.000<\/td><\/tr><tr><td>Toplam stok<\/td><td>$900.000<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Hesaplama \u015f\u00f6yledir:<\/p>\n\n\n<p><strong>$3.600.000 \u00f7 $900.000 = y\u0131lda 4 stok devri<\/strong><\/p>\n\n\n<p>\u0130\u015fletme, o y\u0131l\u0131n sat\u0131\u015f maliyeti \u00fczerinden ortalama stok de\u011ferinin d\u00f6rt kat\u0131na e\u015fde\u011fer \u00fcr\u00fcn satm\u0131\u015ft\u0131r. Bu, her bile\u015fenin veya \u00fcr\u00fcn\u00fcn d\u00f6rt kez devretti\u011fi anlam\u0131na gelmez. S\u0131k kullan\u0131lan bir ba\u011flant\u0131 eleman\u0131 ile art\u0131k kullan\u0131lmayan bir montaj grubu, ayn\u0131 \u015firket ortalamas\u0131n\u0131n i\u00e7inde yer alabilir.<\/p>\n\n\n<p>Ayn\u0131 ili\u015fkiyi g\u00fcn cinsinden de ifade edebilirsiniz:<\/p>\n\n\n<p><strong>Stokta kalma s\u00fcresi = d\u00f6nemdeki g\u00fcn say\u0131s\u0131 \u00f7 stok devir h\u0131z\u0131<\/strong><\/p>\n\n\n<p>365 g\u00fcnl\u00fck bir y\u0131l i\u00e7in:<\/p>\n\n\n<p><strong>365 \u00f7 4 = 91,25 g\u00fcn<\/strong><\/p>\n\n\n<p>Bu, toplam stoka ili\u015fkin, ge\u00e7mi\u015fe d\u00f6n\u00fck ve maliyet esasl\u0131 bir g\u00f6stergedir. Her sipari\u015fin 91,25 g\u00fcn s\u00fcrece\u011fini veya bug\u00fcn mevcut olan stokun \u00f6n\u00fcm\u00fczdeki 91,25 g\u00fcnl\u00fck talebi kar\u015f\u0131layaca\u011f\u0131n\u0131 vaat etmez. Sipari\u015flerin fiil\u00ee lead time s\u00fcreleri ile mevcut stokun gelecekteki talebi ka\u00e7 g\u00fcn kar\u015f\u0131layabilece\u011fi farkl\u0131 sorulara yan\u0131t verir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u0130yi bir stok devir h\u0131z\u0131 ka\u00e7 olmal\u0131?<\/h2>\n\n\n<p>Her \u00fcretici i\u00e7in ge\u00e7erli tek bir iyi de\u011fer yoktur. \u00dcr\u00fcn karmas\u0131, tedarik\u00e7i lead time de\u011ferleri, \u00fcretim rotalar\u0131, mevsimsellik ve taahh\u00fct etti\u011finiz hizmet d\u00fczeyi, i\u015fletmenin ne kadar stoka ihtiya\u00e7 duydu\u011funu etkiler. Uzun \u00fcretim rotalar\u0131na sahip bir ekipman \u00fcreticisi ile k\u0131sa \u00f6m\u00fcrl\u00fc standart \u00fcr\u00fcnler \u00fcreten bir i\u015fletmeye ayn\u0131 hedef konulmamal\u0131d\u0131r.<\/p>\n\n\n<p>\u00d6nce kendi kar\u015f\u0131la\u015ft\u0131r\u0131labilir d\u00f6nemlerinizi ve \u00fcr\u00fcn ailelerinizi inceleyin. Ard\u0131ndan sekt\u00f6r\u00fcn\u00fczdeki benzer i\u015fletmeleri referans al\u0131n; ancak stok kapsamlar\u0131n\u0131n ve hesaplama y\u00f6ntemlerinin sizinkiyle \u00f6rt\u00fc\u015f\u00fcp \u00f6rt\u00fc\u015fmedi\u011fini kontrol edin. Yaln\u0131zca mamul stokuna dayanan bir oran, hammadde ve yar\u0131 mamul\u00fc de i\u00e7eren bir oranla do\u011frudan kar\u015f\u0131la\u015ft\u0131r\u0131lamaz.<\/p>\n\n\n<p>E\u011filimi; teslimat performans\u0131, stok yetersizlikleri, \u00fcretim miktar\u0131 ve stok ya\u015f\u0131yla birlikte de\u011ferlendirin:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Stok artarken ve talep de\u011fi\u015fmezken devir h\u0131z\u0131 d\u00fc\u015f\u00fcyorsa:<\/strong> fazla sat\u0131n almay\u0131, erken \u00fcretimi, ilerleyemeyen i\u015fleri ve art\u0131k sat\u0131lmayan \u00fcr\u00fcnleri ara\u015ft\u0131r\u0131n.<\/li><li><strong>Teslimatlar aksamadan s\u00fcrerken ortalama stok azal\u0131yor ve devir h\u0131z\u0131 y\u00fckseliyorsa:<\/strong> i\u015fletme, stoka daha az sermaye ba\u011flayarak talebi kar\u015f\u0131l\u0131yor olabilir.<\/li><li><strong>Devir h\u0131z\u0131 y\u00fckselirken stok yetersizlikleri veya acil sevkiyatlar art\u0131yorsa:<\/strong> stok, s\u00fcrecin g\u00fcvenilir bi\u00e7imde \u00e7al\u0131\u015fmas\u0131 i\u00e7in gereken d\u00fczeyin alt\u0131na indirilmi\u015f olabilir.<\/li><li><strong>B\u00fcy\u00fck bir maliyet veya de\u011ferleme de\u011fi\u015fikli\u011finin ard\u0131ndan oran de\u011fi\u015fiyorsa:<\/strong> de\u011fi\u015fimin ne kadar\u0131n\u0131n daha h\u0131zl\u0131 ak\u0131\u015ftan de\u011fil, muhasebe de\u011ferlerinden kaynakland\u0131\u011f\u0131n\u0131 kontrol edin.<\/li><\/ul>\n\n\n<p>Y\u00fcksek bir toplam stok devir h\u0131z\u0131, bir \u00fcr\u00fcn ailesindeki at\u0131l stoku ve bir di\u011ferindeki eksikleri yine de gizleyebilir. Hedef, oran\u0131 m\u00fcmk\u00fcn oldu\u011funca y\u00fckseltmek de\u011fil, gereksiz stoku azalt\u0131rken m\u00fc\u015fteri taleplerini g\u00fcvenilir bi\u00e7imde kar\u015f\u0131lamakt\u0131r.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Nedenini hammadde, yar\u0131 mamul veya mamul stokunda aray\u0131n<\/h2>\n\n\n<p>Toplam oran, sorgulamaya nereden ba\u015flayaca\u011f\u0131n\u0131z\u0131 g\u00f6sterir. A\u015fama baz\u0131ndaki da\u011f\u0131l\u0131m ise kimin harekete ge\u00e7mesi gerekti\u011fini belirlemenize yard\u0131mc\u0131 olur.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Stokun birikti\u011fi a\u015fama<\/th><th>Ara\u015ft\u0131r\u0131lacak konular<\/th><th>\u0130lk at\u0131labilecek ad\u0131m<\/th><\/tr><\/thead><tbody><tr><td>Hammadde<\/td><td>Sat\u0131n alma miktarlar\u0131, malzemelerin geli\u015f zaman\u0131, de\u011fi\u015fen talep, kullan\u0131lamayan stok veya ge\u00e7erli bir gerek\u00e7eyle tutulan tampon stok<\/td><td>Yeniden sat\u0131n almadan \u00f6nce yakla\u015fan ihtiya\u00e7lar\u0131 kullan\u0131labilir stok bakiyeleri ve a\u00e7\u0131k sat\u0131n alma sipari\u015fleriyle kar\u015f\u0131la\u015ft\u0131r\u0131n<\/td><\/tr><tr><td>Yar\u0131 mamul<\/td><td>\u0130\u015flerin erken ba\u015flat\u0131lmas\u0131, sonraki a\u015famalardaki kaynaklar\u0131n a\u015f\u0131r\u0131 y\u00fcklenmesi, eksik bile\u015fenler veya kalite nedeniyle bekletilen i\u015fler<\/td><td>Uzun s\u00fcredir bekleyen bir sipari\u015fin kalan rotas\u0131n\u0131 izleyin ve bir sonraki operasyonuna ge\u00e7mesini neyin engelledi\u011fini belirleyin<\/td><\/tr><tr><td>Mamul<\/td><td>Talepten \u00f6nce yap\u0131lan \u00fcretim, iptal edilen ihtiya\u00e7lar, sevkiyat\u0131n bekletilmesi veya yava\u015f sat\u0131lan \u00fcr\u00fcnler<\/td><td>Tamamlanm\u0131\u015f \u00fcr\u00fcn stokunu ger\u00e7ek taleple e\u015fle\u015ftirin ve yeni stok ikmallerini g\u00f6zden ge\u00e7irin<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">Hammadde: G\u00fcvenlik amac\u0131yla tutulan stoku fazla stoktan ay\u0131r\u0131n<\/h3>\n\n\n<p>Yava\u015f hareket eden bir bile\u015fen, \u00f6nemli bir m\u00fc\u015fteri taahh\u00fcd\u00fcn\u00fc yerine getirmenizi sa\u011fl\u0131yor olabilir. Stokunu azaltmadan \u00f6nce t\u00fckenmesinin sonu\u00e7lar\u0131n\u0131 ve ne kadar g\u00fcvenilir bi\u00e7imde ikmal edilebilece\u011fini kontrol edin. Ge\u00e7erli bir gerek\u00e7eyle ayr\u0131lm\u0131\u015f <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/guvenlik-stogu\/\">g\u00fcvenlik sto\u011fu<\/a> ile beklenen malzeme teslimat\u0131 sistemde g\u00f6r\u00fcnmedi\u011fi i\u00e7in iki kez sipari\u015f edilmi\u015f malzeme ayn\u0131 \u015fey de\u011fildir.<\/p>\n\n\n<p>Belirli bir a\u015faman\u0131n devir h\u0131z\u0131n\u0131 \u00f6l\u00e7erken, o a\u015famaya uygun ak\u0131\u015f\u0131 kullan\u0131n. \u00d6rnekteki fabrikada y\u0131ll\u0131k $1.800.000 hammadde t\u00fcketimini $300.000 ortalama hammadde stokuna b\u00f6ld\u00fc\u011f\u00fcm\u00fczde <strong>hammadde devir h\u0131z\u0131 6<\/strong> olur. Bu, fabrikan\u0131n t\u00fcm stokunun sat\u0131\u015f\u0131n\u0131 de\u011fil, \u00fcretimde t\u00fcketilen hammaddeyi \u00f6l\u00e7er. Toplam stok i\u00e7in hesaplanan 4 devir de\u011ferinin yerine ge\u00e7mez.<\/p>\n\n\n<p>Toplam COGS de\u011ferini her a\u015faman\u0131n stok bakiyesine b\u00f6l\u00fcp sonu\u00e7lar\u0131 do\u011frudan kar\u015f\u0131la\u015ft\u0131r\u0131labilir a\u015fama devir h\u0131zlar\u0131 olarak de\u011ferlendirmeyin. Malzeme, d\u00f6n\u00fc\u015ft\u00fcrme ve mamul maliyetlerinin kapsamlar\u0131 farkl\u0131d\u0131r. Verisi mevcutsa her a\u015fama i\u00e7in o a\u015famayla uyumlu ak\u0131\u015flar\u0131 kullan\u0131n. \u00dcretimdeki sorunu te\u015fhis etmek i\u00e7in de stok ya\u015f\u0131n\u0131 ve bekleme nedenlerini inceleyin.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Yar\u0131 mamul: Bir sonraki operasyonun neyi bekledi\u011fini bulun<\/h3>\n\n\n<p>\u00d6rnekte ortalama stok de\u011feri en y\u00fcksek olan kalem yar\u0131 mamullerdir; bu nedenle \u00f6ncelikle buna odaklanmak gerekir. Ancak at\u0131lacak ad\u0131m, t\u00fcm yeni i\u015fleri durdurmak de\u011fildir. En uzun s\u00fcredir bekleyen veya \u00f6nemli \u00f6l\u00e7\u00fcde maliyet birikmi\u015f sipari\u015fleri belirleyin; ard\u0131ndan kalan operasyonlar\u0131n\u0131, malzeme ihtiya\u00e7lar\u0131n\u0131 ve teslimat taahh\u00fctlerini kontrol edin.<\/p>\n\n\n<p>Tala\u015fl\u0131 imalatta bir partinin pazartesi g\u00fcn\u00fc tamamland\u0131\u011f\u0131n\u0131, ancak kaplamaya cuma g\u00fcn\u00fcnden \u00f6nce al\u0131namad\u0131\u011f\u0131n\u0131 d\u00fc\u015f\u00fcn\u00fcn. Ba\u015fka bir sipari\u015f i\u00e7inse d\u0131\u015far\u0131dan sat\u0131n al\u0131nan ve ancak gelecek hafta teslim edilecek bir par\u00e7a gerekiyor. Her iki sipari\u015fi de erkenden ba\u015flatmak ilk makineyi me\u015fgul tutar, ancak sonraki operasyona ge\u00e7emeyen yar\u0131 mamul stoku olu\u015fturur.<\/p>\n\n\n<p>Bu bir koordinasyon sorunudur. \u0130htiyac\u0131n\u0131z olan, her makineyi me\u015fgul g\u00f6sterecek ayr\u0131 talimatlar de\u011fil, rotan\u0131n tamam\u0131n\u0131 kapsayan bir pland\u0131r. Kapasitesi k\u0131s\u0131tl\u0131 bir kayna\u011f\u0131n i\u015fsiz kalmas\u0131n\u0131 \u00f6nlemek i\u00e7in \u00f6n\u00fcnde bir miktar haz\u0131r i\u015f bulundurmak gerekebilir. Gereksiz olan, sonraki a\u015famalarda nas\u0131l ilerleyece\u011fi belli olmadan \u00fcretime sal\u0131nan i\u015flerdir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mamul stoku: \u00fcretimin tamamlanmas\u0131, sat\u0131\u015f\u0131n ger\u00e7ekle\u015fti\u011fi anlam\u0131na gelmez<\/h3>\n\n\n<p>Bir sipari\u015fi yar\u0131 mamul stokundan \u00e7\u0131karmak, \u00fcretimi daha iyi durumda g\u00f6sterebilir; oysa ayn\u0131 \u00fcr\u00fcnler h\u00e2l\u00e2 depodad\u0131r. Bir sonraki stok yenileme partisini \u00fcretmeden \u00f6nce hangi \u00fcr\u00fcnlerin zaten tamamland\u0131\u011f\u0131n\u0131 ve m\u00fc\u015fteri talebinin bu \u00fcretimi h\u00e2l\u00e2 gerektirip gerektirmedi\u011fini kontrol edin.<\/p>\n\n\n<p>Mamul stoku talep ortadan kalkt\u0131\u011f\u0131 i\u00e7in eskimi\u015fse \u00e7\u00f6z\u00fcm; sat\u0131\u015f \u00e7al\u0131\u015fmalar\u0131n\u0131, \u00fcr\u00fcnle ilgili kararlar\u0131 veya \u00fczerinde anla\u015f\u0131lm\u0131\u015f bir elden \u00e7\u0131karma y\u00f6ntemini gerektirir. \u00dcretimi yeniden \u00e7izelgelemek, eksik olan talebi yaratamaz. \u00dcr\u00fcnler sevkiyat ya da evrakla ilgili bir engel nedeniyle bekliyorsa sorunu \u00fcretim kapasitesi yetersizli\u011fi olarak g\u00f6rmek yerine bu engeli giderin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Malzeme geli\u015f tarihlerini, malzemeye ihtiya\u00e7 duyan i\u015flerle SkyPlanner \u00fczerinden e\u015fle\u015ftirin<\/h2>\n\n\n<p>\u0130ncelemeniz i\u015flerin erken ba\u015flat\u0131ld\u0131\u011f\u0131na veya i\u015f kuyruklar\u0131n\u0131n birbiriyle \u00e7ak\u0131\u015ft\u0131\u011f\u0131na i\u015faret ediyorsa kalan i\u015fleri SkyPlanner ile <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">ortak bir \u00fcretim \u00e7izelgesinde<\/a> bir araya getirin. SkyPlanner&#8217;\u0131n \u00e7izelgeleme i\u00e7in kulland\u0131\u011f\u0131 yapay zek\u00e2 Arcturus; i\u015f istasyonlar\u0131n\u0131, vardiyalar\u0131, operat\u00f6rleri, operasyon s\u00fcrelerini, ba\u011f\u0131ml\u0131l\u0131klar\u0131 ve \u00f6nceliklerinizi dikkate alarak i\u015f s\u0131ras\u0131n\u0131 hesaplar. Gantt g\u00f6r\u00fcn\u00fcm\u00fc, i\u015flerin kaynaklar aras\u0131nda nas\u0131l planland\u0131\u011f\u0131n\u0131 g\u00f6sterir.<\/p>\n\n\n<p>Malzeme durumunu dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde stok kullan\u0131labilirli\u011fi de hesaplamay\u0131 etkiler. Sat\u0131n alma sipari\u015flerinin teslimat tarihleri, <strong>malzemenin ne zaman kullan\u0131labilir olmas\u0131n\u0131n beklendi\u011fini<\/strong> belirtir. Malzeme geldi\u011finde ve sat\u0131n alma sipari\u015finin teslim al\u0131nd\u0131\u011f\u0131 onayland\u0131\u011f\u0131nda stok bakiyesi g\u00fcncellenir. B\u00f6ylece yoldaki malzeme, rafta haz\u0131r bulunan malzemeyle kar\u0131\u015ft\u0131r\u0131lmadan planlamada kullan\u0131labilir.<\/p>\n\n\n<p>Tedarik\u00e7i bir tarihi de\u011fi\u015ftirdi\u011finde bu tarihi g\u00fcncelleyin ve \u00e7izelgeyi yeniden hesaplay\u0131n. Sat\u0131n alma listesini ve birden fazla makinenin i\u015f kuyru\u011funu ayr\u0131 ayr\u0131 d\u00fczeltmek yerine, etkilenen operasyonlar\u0131 kapasiteyle ve ayn\u0131 kaynaklar\u0131 kullanmak i\u00e7in bekleyen di\u011fer sipari\u015flerle birlikte de\u011ferlendirebilirsiniz.<\/p>\n\n\n<p>Bekleyecek tala\u015fl\u0131 imalat partisi i\u00e7in as\u0131l karar, \u00f6nceki operasyonun \u015fimdi yap\u0131l\u0131p yap\u0131lmamas\u0131 ya da ba\u015fka bir sipari\u015fin daha verimli ilerleyip ilerleyemeyece\u011fidir. \u00d6ncelikleri siz belirlersiniz; Arcturus, koydu\u011funuz kurallar \u00e7er\u00e7evesinde \u00e7izelgeyi hesaplar. Bu sayede sevk edilmesi gereken sipari\u015fleri korurken, hen\u00fcz ilerleyemeyecek i\u015flere gere\u011finden erken malzeme ve \u00fcretim eme\u011fi harcamaktan ka\u00e7\u0131nmak kolayla\u015f\u0131r.<\/p>\n\n\n<p>Bir i\u015fin ba\u015flang\u0131c\u0131n\u0131 ertelemek, sat\u0131n al\u0131nm\u0131\u015f malzemeyi ortadan kald\u0131rmaz. Finansal iyile\u015fme, ham maddeyi yaln\u0131zca yar\u0131 mamul olarak yeniden s\u0131n\u0131fland\u0131rmaktan de\u011fil, t\u00fcm ak\u0131\u015f boyunca gereksiz stoklar\u0131 azalt\u0131rken talebi kar\u015f\u0131lamaya devam etmekten gelir. S\u00fcre\u00e7leri birbirine ba\u011flayan bir \u00e7izelge, bu de\u011fi\u015fikli\u011fi koordine etmenizi ve harekete ge\u00e7meden \u00f6nce teslimatlara etkisini g\u00f6rmenizi sa\u011flayan pratik bir ara\u00e7t\u0131r.<\/p>\n\n\n<p>SkyPlanner, a\u00e7\u0131k REST API \u00fczerinden her ERP veya MES ile entegre olur. B\u00f6ylece ayr\u0131 bir plan daha tutmak yerine mevcut sipari\u015f ve \u00fcretim verilerinizi \u00e7izelgelemede kullanabilirsiniz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Piristeel&#8217;de neler de\u011fi\u015fti?<\/h2>\n\n\n<p>\u00c7at\u0131 g\u00fcvenlik \u00fcr\u00fcnleri ve ya\u011fmur suyu sistemleri \u00fcreten Piristeel, daha \u00f6nce b\u00fcy\u00fck partiler ve tampon stoklarla \u00e7al\u0131\u015f\u0131yordu. \u00dcretim sorunsuz g\u00f6r\u00fcnebilse de y\u00fcksek stok de\u011ferleri ve departmanlar\u0131n birbirlerinin i\u015fleyi\u015fini yeterince g\u00f6rememesi, de\u011fi\u015fiklik yapmay\u0131 zorla\u015ft\u0131r\u0131yordu.<\/p>\n\n\n<p>Piristeel, <a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/piristeel\/\">SkyPlanner de\u011ferlendirmesinde<\/a> \u00fc\u00e7 \u00fcretim departman\u0131n\u0131 kapsayan detayl\u0131 \u00e7izelgelemeyi, ortak Gantt g\u00f6r\u00fcn\u00fcm\u00fcn\u00fc ve Visma Nova entegrasyonunu anlat\u0131yor. Stok hareketlerinin ERP sistemine ger\u00e7ek zamanl\u0131 aktar\u0131lmas\u0131yla \u015firket, daha k\u00fc\u00e7\u00fck \u00fcretim partilerini daha iyi koordine etmeye ve stok kay\u0131tlar\u0131n\u0131 daha do\u011fru tutmaya ba\u015flad\u0131. Sorunsuz i\u015fleyi\u015f i\u00e7in b\u00fcy\u00fck tampon stoklar art\u0131k bir \u00f6n ko\u015ful de\u011fildi.<\/p>\n\n\n<p>Stok devir h\u0131z\u0131 a\u00e7\u0131s\u0131ndan \u00f6nemli olan, \u00e7al\u0131\u015fma bi\u00e7imindeki de\u011fi\u015fimdir: g\u00f6r\u00fcn\u00fcrl\u00fc\u011f\u00fcn ve koordinasyonun artmas\u0131, y\u00f6netilebilir bir plan\u0131n yerine stok kullanma ihtiyac\u0131n\u0131 azaltt\u0131. \u00dcretim zamanlamas\u0131ndaki belirsizli\u011fi telafi etmek i\u00e7in fazla stok tutan bir fabrika a\u00e7\u0131s\u0131ndan bu, stok bilgileriyle \u00e7izelgelemeyi bir araya getirmek i\u00e7in somut bir gerek\u00e7edir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u0130yile\u015fmenin toplam stoka da yans\u0131d\u0131\u011f\u0131n\u0131 kontrol edin<\/h2>\n\n\n<p>\u00d6rnekteki \u00fcreticiye d\u00f6nelim. Y\u0131ll\u0131k sat\u0131lan mal maliyeti (COGS) ayn\u0131 $3.600.000 d\u00fczeyinde kal\u0131rken ortalama yar\u0131 mamul stokunun $420.000 yerine $240.000 oldu\u011funu ve di\u011fer a\u015famalardaki ortalama stok de\u011ferlerinin de\u011fi\u015fmedi\u011fini varsayal\u0131m. Bu durumda ortalama toplam stok de\u011feri <strong>$720.000<\/strong> olur.<\/p>\n\n\n<p><strong>$3.600.000 \u00f7 $720.000 = y\u0131lda 5 devir<\/strong><\/p>\n\n\n<p><strong>365 \u00f7 5 = 73 g\u00fcnl\u00fck stokta kalma s\u00fcresi<\/strong><\/p>\n\n\n<p>Bu, sat\u0131lan mal maliyeti ayn\u0131 kal\u0131rken ortalama stokun <strong>$180.000 daha d\u00fc\u015f\u00fck olmas\u0131<\/strong> demektir. $180.000 k\u00e2r elde edildi\u011fi veya otomatik olarak nakit giri\u015fi sa\u011fland\u0131\u011f\u0131 anlam\u0131na gelmez. Azalman\u0131n ba\u015fka bir stok s\u0131n\u0131f\u0131na aktar\u0131mdan ya da de\u011ferleme d\u00fczeltmesinden kaynaklanmad\u0131\u011f\u0131n\u0131, ger\u00e7ek bir azalma oldu\u011funu ve teslimat performans\u0131n\u0131n korunabildi\u011fini kontrol edin.<\/p>\n\n\n<p>\u0130lk iyile\u015ftirme i\u00e7in yava\u015f d\u00f6nen bir \u00fcr\u00fcn ailesi se\u00e7in. Her a\u015famadaki stokunu, ne kadar s\u00fcredir ve neden bekledi\u011fini, gelecek malzemelerin tarihlerini ve \u00fcretim rotas\u0131nda kalan ad\u0131mlar\u0131 kaydedin. Yap\u0131lacak de\u011fi\u015fiklik \u00fczerinde sat\u0131n alma, \u00fcretim ve m\u00fc\u015fteriye verilen taahh\u00fctlerden sorumlu ki\u015filerle uzla\u015f\u0131n. Ard\u0131ndan kar\u015f\u0131la\u015ft\u0131r\u0131labilir d\u00f6nemlerde stok devir h\u0131z\u0131n\u0131 ve m\u00fc\u015fteriye sunulan hizmet d\u00fczeyini birlikte de\u011ferlendirin.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a>; g\u00f6r\u00fc\u015fmeye bu \u00fcretim rotas\u0131n\u0131 ve yak\u0131n zamanda gere\u011finden erken ba\u015flat\u0131lm\u0131\u015f bir i\u015f \u00f6rne\u011fini getirin. Malzeme tarihlerinin, ayn\u0131 kaynaklar\u0131 kullanmak isteyen sipari\u015flerin ve kullan\u0131labilir kapasitenin tek bir \u00e7izelgede nas\u0131l bir araya geldi\u011fini inceleyebilirsiniz. \u00d6nce sistemi kendiniz ke\u015ffetmek isterseniz <a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner&#8217;\u0131 demo verileriyle deneyin<\/a>. Hesaplama, sermayenin nerede ba\u011fl\u0131 kald\u0131\u011f\u0131n\u0131 g\u00f6sterir; s\u00fcre\u00e7leri birbirine ba\u011flayan plan ise buna yol a\u00e7an i\u015fleyi\u015fi de\u011fi\u015ftirmenize yard\u0131mc\u0131 olur.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme Stok de\u011feriniz artt\u0131\u011f\u0131 h\u00e2lde fabrikan\u0131zda ihtiya\u00e7 duyulan par\u00e7alar h\u00e2l\u00e2 eksik. Baz\u0131 malzemeler hi\u00e7 kullan\u0131lmadan duruyor, tamamlanmam\u0131\u015f sipari\u015fler makineler aras\u0131nda bekliyor. M\u00fc\u015fteriler ba\u015fka \u00fcr\u00fcnlerin pe\u015findeyken tamamlanm\u0131\u015f \u00fcr\u00fcnler yer kapl\u0131yor. T\u00fcm stok kalemlerini azaltmak stok de\u011ferini d\u00fc\u015f\u00fcr\u00fcr, ancak &#8230; <a title=\"\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/\" aria-label=\"Read more about \u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105907,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[314,2570],"tags":[],"class_list":["post-105897","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kaynaklar","category-uretim-verimliligi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme<\/title>\n<meta name=\"description\" content=\"Stok devir h\u0131z\u0131n\u0131 hesaplay\u0131n; nakdin neden hammadde, yar\u0131 mamul veya mamul stokunda ba\u011fl\u0131 kald\u0131\u011f\u0131n\u0131 bulun, teslimatlar\u0131 aksatmadan ak\u0131\u015f\u0131 iyile\u015ftirin.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme\" \/>\n<meta property=\"og:description\" content=\"Stok devir h\u0131z\u0131n\u0131 hesaplay\u0131n; nakdin neden hammadde, yar\u0131 mamul veya mamul stokunda ba\u011fl\u0131 kald\u0131\u011f\u0131n\u0131 bulun, teslimatlar\u0131 aksatmadan ak\u0131\u015f\u0131 iyile\u015ftirin.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-23T17:38:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-23T17:39:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"940\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/stok-devir-hizi\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/stok-devir-hizi\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme\",\"datePublished\":\"2026-10-23T17:38:10+00:00\",\"dateModified\":\"2026-10-23T17:39:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/stok-devir-hizi\\\/\"},\"wordCount\":2877,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/stok-devir-hizi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-turnover-manufacturing-hero.png\",\"articleSection\":[\"Kaynaklar\",\"\u00dcretim verimlili\u011fi\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/stok-devir-hizi\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/stok-devir-hizi\\\/\",\"name\":\"\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/stok-devir-hizi\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/stok-devir-hizi\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-turnover-manufacturing-hero.png\",\"datePublished\":\"2026-10-23T17:38:10+00:00\",\"dateModified\":\"2026-10-23T17:39:50+00:00\",\"description\":\"Stok devir h\u0131z\u0131n\u0131 hesaplay\u0131n; nakdin neden hammadde, yar\u0131 mamul veya mamul stokunda ba\u011fl\u0131 kald\u0131\u011f\u0131n\u0131 bulun, teslimatlar\u0131 aksatmadan ak\u0131\u015f\u0131 iyile\u015ftirin.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/stok-devir-hizi\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/stok-devir-hizi\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/stok-devir-hizi\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-turnover-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-turnover-manufacturing-hero.png\",\"width\":1672,\"height\":940,\"caption\":\"Metal blanks, trays of unfinished brackets waiting for coating, and finished goods show inventory across a factory.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/stok-devir-hizi\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme","description":"Stok devir h\u0131z\u0131n\u0131 hesaplay\u0131n; nakdin neden hammadde, yar\u0131 mamul veya mamul stokunda ba\u011fl\u0131 kald\u0131\u011f\u0131n\u0131 bulun, teslimatlar\u0131 aksatmadan ak\u0131\u015f\u0131 iyile\u015ftirin.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/","og_locale":"tr_TR","og_type":"article","og_title":"\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme","og_description":"Stok devir h\u0131z\u0131n\u0131 hesaplay\u0131n; nakdin neden hammadde, yar\u0131 mamul veya mamul stokunda ba\u011fl\u0131 kald\u0131\u011f\u0131n\u0131 bulun, teslimatlar\u0131 aksatmadan ak\u0131\u015f\u0131 iyile\u015ftirin.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-23T17:38:10+00:00","article_modified_time":"2026-10-23T17:39:50+00:00","og_image":[{"width":1672,"height":940,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"14 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme","datePublished":"2026-10-23T17:38:10+00:00","dateModified":"2026-10-23T17:39:50+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/"},"wordCount":2877,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png","articleSection":["Kaynaklar","\u00dcretim verimlili\u011fi"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/","name":"\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png","datePublished":"2026-10-23T17:38:10+00:00","dateModified":"2026-10-23T17:39:50+00:00","description":"Stok devir h\u0131z\u0131n\u0131 hesaplay\u0131n; nakdin neden hammadde, yar\u0131 mamul veya mamul stokunda ba\u011fl\u0131 kald\u0131\u011f\u0131n\u0131 bulun, teslimatlar\u0131 aksatmadan ak\u0131\u015f\u0131 iyile\u015ftirin.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png","width":1672,"height":940,"caption":"Metal blanks, trays of unfinished brackets waiting for coating, and finished goods show inventory across a factory."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/stok-devir-hizi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png",1672,940,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero.png",1672,940,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-turnover-manufacturing-hero-360x202.png",360,202,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretimde Stok Devir H\u0131z\u0131: Hesaplama ve \u0130yile\u015ftirme Stok de\u011feriniz artt\u0131\u011f\u0131 h\u00e2lde fabrikan\u0131zda ihtiya\u00e7 duyulan par\u00e7alar h\u00e2l\u00e2 eksik. Baz\u0131 malzemeler hi\u00e7 kullan\u0131lmadan duruyor, tamamlanmam\u0131\u015f sipari\u015fler makineler aras\u0131nda bekliyor. M\u00fc\u015fteriler ba\u015fka \u00fcr\u00fcnlerin pe\u015findeyken tamamlanm\u0131\u015f \u00fcr\u00fcnler yer kapl\u0131yor. T\u00fcm stok kalemlerini azaltmak stok de\u011ferini d\u00fc\u015f\u00fcr\u00fcr, ancak&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/105897","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=105897"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/105897\/revisions"}],"predecessor-version":[{"id":106045,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/105897\/revisions\/106045"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/105907"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=105897"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=105897"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=105897"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}