{"id":105714,"date":"2026-10-22T05:45:06","date_gmt":"2026-10-22T05:45:06","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105714"},"modified":"2026-10-22T05:46:59","modified_gmt":"2026-10-22T05:46:59","slug":"uretimde-fire-orani","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/","title":{"rendered":"\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/tr\/\">Ana Sayfa<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/\">Kaynaklar<\/a> &raquo; \u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Tahmini okuma s\u00fcresi: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> dakika<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Partinin \u00fcretimi bitti, ama sipari\u015f hen\u00fcz tamamlanmad\u0131. Kontrolde, kurtar\u0131lmas\u0131 m\u00fcmk\u00fcn olmayan par\u00e7alar reddedildi. Malzeme \u00e7oktan t\u00fcketildi ve m\u00fc\u015fteri h\u00e2l\u00e2 cuma g\u00fcn\u00fc miktar\u0131n tamam\u0131n\u0131 bekliyor.<\/p>\n\n\n<p><strong>\u00dcretimde fire oran\u0131, tan\u0131mlanm\u0131\u015f bir \u00fcretim miktar\u0131n\u0131n ama\u00e7lanan kullan\u0131ma uygun bulunmay\u0131p kesin olarak reddedilen b\u00f6l\u00fcm\u00fcn\u00fcn y\u00fczdesidir.<\/strong> Birbiriyle kar\u015f\u0131la\u015ft\u0131r\u0131labilir par\u00e7alardan olu\u015fan ve t\u00fcm sonu\u00e7lar\u0131 kesinle\u015fmi\u015f bir grup i\u00e7in hesaplama \u015f\u00f6yledir:<\/p>\n\n\n<p><strong>Fire oran\u0131 (%) = Kesin olarak fireye ayr\u0131lan par\u00e7a say\u0131s\u0131 \u00f7 Ayn\u0131 \u00fcretim grubundaki toplam par\u00e7a say\u0131s\u0131 \u00d7 100<\/strong><\/p>\n\n\n<p>Payda, hem kabul edilen hem de fireye ayr\u0131lan par\u00e7alar\u0131 kapsar. Yeniden i\u015flemeyle ba\u015far\u0131yla kurtar\u0131lan par\u00e7alar nihai fire say\u0131lmaz; kabul edilen \u00fcretim miktar\u0131na dahildir.<\/p>\n\n\n<p>G\u00fcvenilir bir oran, tekrarlayan kay\u0131plar\u0131 belirlemenize yard\u0131mc\u0131 olur. Bu kay\u0131plara m\u00fcdahale etmek i\u00e7in malzemenin ger\u00e7ek durumunu da netle\u015ftirmek ve gerekiyorsa telafi \u00fcretimine yer a\u00e7mak gerekir. SkyPlanner, hatal\u0131 par\u00e7a kay\u0131tlar\u0131 \u00fczerinden fire bildirimini destekler; malzeme takibi yap\u0131land\u0131r\u0131lm\u0131\u015fsa bu par\u00e7alar\u0131n malzeme t\u00fcketimini de hesaba katar. Ard\u0131ndan yapay zek\u00e2 destekli \u00e7izelgeleme, onaylanm\u0131\u015f telafi operasyonlar\u0131n\u0131, teslim s\u00f6z\u00fc verilmi\u015f sipari\u015flerle ayn\u0131 plana yerle\u015ftirmenize yard\u0131mc\u0131 olur.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Fire oran\u0131n\u0131 her ba\u015far\u0131s\u0131z kontrole g\u00f6re de\u011fil, nihai sonu\u00e7lara g\u00f6re hesaplay\u0131n<\/h2>\n\n\n<p>Tala\u015fl\u0131 imalatla \u00fcretilen 1.000 par\u00e7al\u0131k bir parti d\u00fc\u015f\u00fcn\u00fcn. Ba\u015flang\u0131\u00e7taki par\u00e7alar\u0131, her birinin nihai durumu kesinle\u015fene kadar kontrol ve izin verilen yeniden i\u015fleme ad\u0131mlar\u0131 boyunca takip ediyorsunuz:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Ba\u015flang\u0131\u00e7taki partinin nihai durumu<\/th><th>Par\u00e7a say\u0131s\u0131<\/th><th>Nihai fire oran\u0131nda nas\u0131l de\u011ferlendirilir?<\/th><\/tr><\/thead><tbody><tr><td>\u0130lk seferde kabul edilen<\/td><td>920<\/td><td>Kabul edilen \u00fcretim miktar\u0131<\/td><\/tr><tr><td>Yeniden i\u015fleme sonras\u0131 kabul edilen<\/td><td>30<\/td><td>Kabul edilen \u00fcretim miktar\u0131; ek i\u015f ayr\u0131ca kaydedilir<\/td><\/tr><tr><td>Kesin olarak fireye ayr\u0131lan<\/td><td>50<\/td><td>Fire oran\u0131n\u0131n pay\u0131<\/td><\/tr><tr><td>Ba\u015flang\u0131\u00e7taki toplam par\u00e7a say\u0131s\u0131<\/td><td>1.000<\/td><td>Payda<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Nihai fire oran\u0131 <strong>50 \u00f7 1.000 \u00d7 100 = %5<\/strong> olur. Kabul edilen 950 par\u00e7a bulundu\u011fundan nihai verim %95&#8217;tir.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/ilk-seferde-dogru-verim\/\">\u0130lk seferde do\u011fru verim<\/a> farkl\u0131 bir soruyu yan\u0131tlar. Yaln\u0131zca d\u00fczeltme gerektirmeden kabul edilen 920 par\u00e7a ilk seferde ba\u015far\u0131l\u0131 oldu\u011fundan <strong>FPY %92&#8217;dir<\/strong>. Geriye kalan %8&#8217;in tamam\u0131 fire de\u011fildir: 30 par\u00e7a kurtar\u0131lm\u0131\u015ft\u0131r. Yeniden i\u015fleme zaman harcar, ancak her zaman yeni bir ham par\u00e7an\u0131n tamam\u0131n\u0131 t\u00fcketmek ya da ilk par\u00e7ay\u0131 kullan\u0131lamaz h\u00e2le getirmek anlam\u0131na gelmez.<\/p>\n\n\n<p>Benzer \u015fekilde, reddedilen 50 par\u00e7ay\u0131 kabul edilen 950 par\u00e7aya b\u00f6ld\u00fc\u011f\u00fcn\u00fczde yakla\u015f\u0131k %5,26 elde edersiniz; bu, ba\u015flang\u0131\u00e7taki \u00fcretimin kaybedilen pay\u0131 olan %5 ile ayn\u0131 de\u011fildir. Firenin sa\u011flam \u00fcretime oran\u0131 ayr\u0131 bir maliyet hesab\u0131nda yararl\u0131 olabilir, ancak bu oran\u0131 do\u011fru adland\u0131r\u0131n. Firenin toplam \u00fcretime oran\u0131yla kar\u015f\u0131la\u015ft\u0131rmay\u0131n.<\/p>\n\n\n<p>Fireyi telafi edecek par\u00e7alar \u00fcretildi\u011finde, bu \u00fcretimin ayr\u0131 olarak izlenebilmesini sa\u011flay\u0131n. Bunlar ba\u015flang\u0131\u00e7taki partiye uygulanan ek kontroller de\u011fil, yeni par\u00e7alard\u0131r. Bunlar\u0131 da kapsayan birle\u015fik bir sonu\u00e7 raporluyorsan\u0131z, hem kabul edilen yeni par\u00e7alar\u0131 hem de olu\u015fan ek fireyi ayn\u0131 hesaplama grubuna dahil edin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ekibinizin tutarl\u0131 bi\u00e7imde uygulayabilece\u011fi say\u0131m kurallar\u0131 belirleyin<\/h2>\n\n\n<p>\u00d6l\u00e7\u00fcm\u00fcn a\u00e7\u0131k\u00e7a tan\u0131mlanmas\u0131, s\u0131rf bir vardiya hatalar\u0131 di\u011ferinden farkl\u0131 kaydediyor diye oran\u0131n de\u011fi\u015fmesini \u00f6nler. E\u011filimi yorumlamadan \u00f6nce \u00fcr\u00fcn grubu, prosesin kapsam\u0131, raporlaman\u0131n hangi esasa dayanaca\u011f\u0131 ve par\u00e7alar\u0131n nihai durumunun nas\u0131l belirlenece\u011fi konusunda uzla\u015f\u0131n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Reddedilen par\u00e7alar\u0131 ait olduklar\u0131 \u00fcretimle e\u015fle\u015ftirin<\/h3>\n\n\n<p>Nihai sonu\u00e7lar\u0131 toplam miktarla kar\u015f\u0131la\u015ft\u0131r\u0131l\u0131p do\u011frulanabilen, izlenebilir bir parti veya sipari\u015f miktar\u0131yla ba\u015flay\u0131n. Kontrol ya da yeniden i\u015fleme birka\u00e7 g\u00fcn s\u00fcr\u00fcyorsa, bug\u00fcn fireye ayr\u0131lan miktar\u0131 bug\u00fcn \u00fcretime al\u0131nan miktara b\u00f6lmek farkl\u0131 gruplar\u0131 birbirine kar\u0131\u015ft\u0131rabilir.<\/p>\n\n\n<p>D\u00fczenli d\u00f6nem raporlar\u0131nda, ge\u00e7 verilen kararlar\u0131n hangi d\u00f6neme yaz\u0131laca\u011f\u0131n\u0131 ve hen\u00fcz sonu\u00e7lanmam\u0131\u015f miktarlar\u0131n nas\u0131l g\u00f6sterilece\u011fini tan\u0131mlay\u0131n. Nihai durum karar\u0131 bekleyen 20 par\u00e7a varsa bunlar ne sa\u011flam oldu\u011fu do\u011frulanm\u0131\u015f \u00fcretim ne de kesinle\u015fmi\u015f firedir. Bunlar\u0131 durumu hen\u00fcz kesinle\u015fmemi\u015f olarak g\u00f6sterin ve gruptaki t\u00fcm par\u00e7alar\u0131n durumu netle\u015fti\u011finde sonucu kesinle\u015ftirin. Oran\u0131 daha iyi g\u00f6stermek i\u00e7in bu par\u00e7alar\u0131 sessizce hesap d\u0131\u015f\u0131na \u00e7\u0131karmay\u0131n.<\/p>\n\n\n<p>Ba\u015flang\u0131\u00e7taki her par\u00e7ay\u0131, se\u00e7ti\u011finiz proses kapsam\u0131nda yaln\u0131zca bir kez say\u0131n. Tala\u015fl\u0131 imalatta reddedilen ve son kontrol raporunda tekrar yer alan bir par\u00e7ay\u0131 fire hesab\u0131nda iki kez saymay\u0131n. Ayn\u0131 par\u00e7ada birden fazla hata bulunmas\u0131 da tek bir par\u00e7a kayb\u0131d\u0131r; ancak her hata inceleme a\u00e7\u0131s\u0131ndan \u00f6nemli olabilir.<\/p>\n\n\n<p>Operasyon baz\u0131ndaki sonu\u00e7larla rotan\u0131n tamam\u0131na ait sonu\u00e7lar ayr\u0131 ayr\u0131 tan\u0131mlanmal\u0131d\u0131r. Tala\u015fl\u0131 imalat fire oran\u0131, o operasyona giren par\u00e7alar \u00fczerinden hesaplan\u0131r; u\u00e7tan uca oran ise ba\u015flang\u0131\u00e7taki \u00fcretim grubunu rotan\u0131n tamam\u0131 boyunca izler. Operasyon y\u00fczdelerini toplamak, fabrika geneli i\u00e7in g\u00fcvenilir bir fire oran\u0131 vermez.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Nihai fireyi, yeniden i\u015flemeyi ve malzeme at\u0131\u011f\u0131n\u0131 ayr\u0131 tutun<\/h3>\n\n\n<p>Kontrolden ge\u00e7emeyen bir par\u00e7a i\u00e7in sonraki ad\u0131m\u0131n ne olaca\u011f\u0131na karar verilmelidir. Par\u00e7a yeniden i\u015flenebilir, inceleme i\u00e7in bekletilebilir veya kesin olarak fireye ayr\u0131labilir. KPI hesab\u0131na veri sa\u011flayan kay\u0131tlarda bu ayr\u0131m\u0131 koruyun.<\/p>\n\n\n<p>Reddedilen \u00fcr\u00fcnleri, proses gere\u011fi olu\u015fmas\u0131 beklenen at\u0131klardan da ay\u0131r\u0131n. Tala\u015f, kesim art\u0131klar\u0131 ve \u00fcretime ba\u015flang\u0131\u00e7ta t\u00fcketilen malzeme, t\u00fcm bitmi\u015f par\u00e7alar kontrolden ge\u00e7se bile malzeme kayb\u0131 \u00f6l\u00e7\u00fcm\u00fcne dahil edilebilir. Bunlar\u0131 adet baz\u0131ndaki ret say\u0131s\u0131na kar\u0131\u015ft\u0131rmak, sonucu yorumlamay\u0131 zorla\u015ft\u0131r\u0131r.<\/p>\n\n\n<p>Malzeme firesini a\u011f\u0131rl\u0131kla \u00f6l\u00e7\u00fcyorsan\u0131z, hesab\u0131n hem pay\u0131nda hem paydas\u0131nda a\u011f\u0131rl\u0131k kullan\u0131n. \u00d6rne\u011fin, tamamlanm\u0131\u015f bir kesim partisinde 500 kg malzeme girdisi oldu\u011funu, bunun 40 kg&#8217;\u0131n\u0131n fire olarak s\u0131n\u0131fland\u0131r\u0131ld\u0131\u011f\u0131n\u0131 ve kalan 460 kg&#8217;\u0131n yararl\u0131 \u00e7\u0131kt\u0131 olarak kaydedildi\u011fini d\u00fc\u015f\u00fcn\u00fcn. Malzeme fire oran\u0131 <strong>40 \u00f7 500 \u00d7 100 = %8<\/strong> olur. Bu firenin normal kesim art\u0131klar\u0131n\u0131 m\u0131, normal d\u0131\u015f\u0131 retleri mi, yoksa ikisini de mi i\u00e7erdi\u011fini belirtin. Yeniden kullan\u0131labilir art\u0131klar\u0131 ve h\u00e2l\u00e2 \u00fcretimde olan malzemeyi ayr\u0131ca hesaba kat\u0131n.<\/p>\n\n\n<p>Bu %8, partideki adet bazl\u0131 %5 ret oran\u0131yla do\u011frudan kar\u015f\u0131la\u015ft\u0131r\u0131lamaz. \u0130kisi farkl\u0131 kay\u0131plar\u0131 g\u00f6sterir. Reddedilen a\u011f\u0131r bir d\u00f6k\u00fcm par\u00e7as\u0131n\u0131n malzeme t\u00fcketimine etkisi, reddedilen k\u00fc\u00e7\u00fck bir ba\u011flant\u0131 par\u00e7as\u0131ndan \u00e7ok daha b\u00fcy\u00fck olabilir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Birbiriyle ilgisiz y\u00fczdeleri de\u011fil, miktarlar\u0131 toplay\u0131n<\/h3>\n\n\n<p>Ayn\u0131 esasa g\u00f6re \u00f6l\u00e7\u00fclen, kar\u015f\u0131la\u015ft\u0131r\u0131labilir \u00fcr\u00fcnlerde \u00f6nce fire miktarlar\u0131n\u0131 ve toplam miktarlar\u0131 ayr\u0131 ayr\u0131 toplay\u0131n, ard\u0131ndan b\u00f6lme i\u015flemini yap\u0131n. Parti b\u00fcy\u00fckl\u00fckleri farkl\u0131ysa parti y\u00fczdelerinin basit ortalamas\u0131n\u0131 almay\u0131n.<\/p>\n\n\n<p>Malzeme de\u011feri, \u00fcretim rotas\u0131 veya kayb\u0131n etkileri farkl\u0131 olan \u00fcr\u00fcnleri ayr\u0131 ayr\u0131 izlenebilir tutun. Fabrika ortalamas\u0131, yaln\u0131zca \u00fcretimi kolay bir \u00fcr\u00fcnden daha fazla \u00fcretildi\u011fi i\u00e7in d\u00fc\u015febilir. Prosesin iyile\u015fti\u011fi sonucuna varmadan \u00f6nce oran\u0131, dayand\u0131\u011f\u0131 miktarlar, \u00fcr\u00fcn karmas\u0131 ve kayb\u0131n maliyetiyle birlikte de\u011ferlendirin.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kayb\u0131n parasal kar\u015f\u0131l\u0131\u011f\u0131n\u0131 hesaplay\u0131n<\/h2>\n\n\n<p>Fire oran\u0131 miktar\u0131 g\u00f6sterir; mali etkinin tamam\u0131n\u0131 g\u00f6stermez. Birka\u00e7 operasyondan sonra reddedilen bir par\u00e7a i\u00e7in, tala\u015fl\u0131 imalata ba\u015flamadan reddedilen bir par\u00e7aya g\u00f6re daha fazla i\u015f yap\u0131lm\u0131\u015ft\u0131r.<\/p>\n\n\n<p>\u00d6rne\u011fimizdeki fireye ayr\u0131lan 50 par\u00e7aya d\u00f6nelim. Her par\u00e7an\u0131n 12 $ de\u011ferinde malzeme i\u00e7erdi\u011fini ve reddedildi\u011fi ana kadar 8 $ d\u00f6n\u00fc\u015ft\u00fcrme maliyeti birikti\u011fini varsayal\u0131m. Malzeme kayb\u0131 <strong>600 $<\/strong>, birikmi\u015f d\u00f6n\u00fc\u015ft\u00fcrme maliyeti ise <strong>400 $<\/strong> olur. Hurda malzemenin geri kazan\u0131m\u0131, reddedilen par\u00e7a ba\u015f\u0131na 2 $ getiriyorsa bu basitle\u015ftirilmi\u015f hesaba g\u00f6re kayda ge\u00e7en net kay\u0131p \u015f\u00f6yledir:<\/p>\n\n\n<p><strong>50 \u00d7 (12 $ + 8 $ \u2212 2 $) = 900 $<\/strong><\/p>\n\n\n<p>Ret an\u0131na kadar biriken maliyetleri kendi maliyetlendirme kurallar\u0131n\u0131za g\u00f6re hesaplay\u0131n. Geri d\u00f6n\u00fc\u015f\u00fcm geliri net mali kayb\u0131 azaltabilir; ancak reddedilen par\u00e7alar\u0131 yeniden teslim edilebilir \u00fcr\u00fcne d\u00f6n\u00fc\u015ft\u00fcrmez ve harcanan \u00fcretim s\u00fcresini geri getirmez.<\/p>\n\n\n<p>Ger\u00e7ekle\u015fmi\u015f kayb\u0131, bu kayb\u0131 telafi etmek i\u00e7in ileride yap\u0131lacak harcamalardan ayr\u0131 tutun. Telafi par\u00e7alar\u0131n\u0131n \u00fcretimi ek malzeme ve operasyon gerektirir. Hesaplar\u0131n kapsam\u0131n\u0131 a\u00e7\u0131klamadan, gelecekteki bu i\u015fleri hem t\u00fcm maliyetleri i\u00e7eren bir kay\u0131p tutar\u0131na hem de ayr\u0131 bir telafi maliyeti tahminine dahil ederek iki kez saymay\u0131n.<\/p>\n\n\n<p>\u00d6n\u00fcn\u00fczdeki karar i\u00e7in hangi kalemlerin de\u011fi\u015fece\u011fini belirleyin: \u00f6rne\u011fin ek malzeme al\u0131m\u0131, fazla mesai, fason i\u015flem veya h\u0131zl\u0131 nakliye. Bo\u015fa \u00e7\u0131kan makine s\u00fcresi, \u00fccret ya da ekipman \u00f6demesini hemen ortadan kald\u0131rmasa bile de\u011ferli olabilir. \u00d6nlenen her bir dolarl\u0131k fire kayb\u0131n\u0131 an\u0131nda nakit tasarrufu saymak, sonucu oldu\u011fundan b\u00fcy\u00fck g\u00f6sterir.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Teslimat\u0131 h\u00e2l\u00e2 ger\u00e7ekle\u015ftirebilmek i\u00e7in eksik miktar\u0131n \u00fcretimini planlay\u0131n<\/h2>\n\n\n<p>\u00d6rnekte, ba\u015flang\u0131\u00e7taki 1.000 par\u00e7adan yaln\u0131zca 950&#8217;si kabul edilmi\u015ftir. M\u00fc\u015fterinin ihtiyac\u0131 1.000 par\u00e7aysa ve uygun stok yoksa geriye 50 sa\u011flam par\u00e7a ihtiyac\u0131 kal\u0131r. Bu, bir kalite sonucu olman\u0131n yan\u0131nda teslimatla ilgili bir karar da gerektirir.<\/p>\n\n\n<p>\u00d6nce bu i\u015f i\u00e7in ger\u00e7ekte hangi malzemenin kullan\u0131labilir oldu\u011funu belirleyin. Ard\u0131ndan telafi \u00fcretiminin rotas\u0131n\u0131, miktar\u0131n\u0131 ve gerekli kontrollerini onaylay\u0131n. Ger\u00e7ek\u00e7i operasyon s\u00fcreleri kullan\u0131n ve haz\u0131rl\u0131k s\u00fcrelerini hesaba kat\u0131n. Ek verim kay\u0131plar\u0131 bekleniyorsa telafi i\u00e7in \u00fcretilen her par\u00e7an\u0131n kontrolden ge\u00e7ece\u011fini varsaymak yerine, \u00fcretim miktar\u0131na eklenecek kay\u0131p pay\u0131n\u0131 a\u00e7\u0131k\u00e7a belirtin.<\/p>\n\n\n<p>Onaylanan telafi \u00fcretiminin par\u00e7a ba\u015f\u0131na alt\u0131 dakika tala\u015fl\u0131 imalat gerektirdi\u011fini d\u00fc\u015f\u00fcn\u00fcn. Bu \u00f6rnek i\u00e7in ba\u015fka ret olu\u015fmayaca\u011f\u0131n\u0131 varsayal\u0131m. 50 par\u00e7a, ek haz\u0131rl\u0131k ve kontrol s\u00fcreleri hari\u00e7 <strong>300 dakika, yani be\u015f saat tala\u015fl\u0131 imalat s\u00fcresi<\/strong> gerektirir. Sonraki operasyonun ba\u015flamas\u0131 gereken zamana kadar bu makinede yaln\u0131zca \u00fc\u00e7 saat bo\u015f kapasite varsa telafi \u00fcretimi planland\u0131\u011f\u0131 \u015fekliyle bu aral\u0131\u011fa s\u0131\u011fmaz.<\/p>\n\n\n<p>Bu i\u015fi plan d\u0131\u015f\u0131nda tutulan bir acil i\u015fler kuyru\u011funa eklemek \u00e7ak\u0131\u015fmay\u0131 gizler; eksik kapasiteyi yaratmaz. Ba\u015fka bir uygun makinenin kullan\u0131l\u0131p kullan\u0131lamayaca\u011f\u0131na, ek kapasitenin maliyetine de\u011fip de\u011fmeyece\u011fine, ba\u015fka bir sipari\u015fin kayd\u0131r\u0131l\u0131p kayd\u0131r\u0131lamayaca\u011f\u0131na veya teslimat taahh\u00fcd\u00fcn\u00fcn de\u011fi\u015fmesi gerekip gerekmedi\u011fine karar vermeniz gerekir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">SkyPlanner ile malzeme t\u00fcketimini ve telafi \u00fcretimini birbiriyle ba\u011flant\u0131l\u0131 tutun<\/h3>\n\n\n<p>SkyPlanner, operat\u00f6rlerin <strong>i\u015f s\u00fcresi sayac\u0131n\u0131 durdururken fireyi hatal\u0131 par\u00e7a olarak bildirmesine<\/strong> olanak tan\u0131r. Malzeme takibi yap\u0131land\u0131r\u0131lm\u0131\u015fsa bu hatal\u0131 par\u00e7alarda kullan\u0131lan malzeme de t\u00fcketime dahil edilir ve stok bakiyeleri g\u00fcncellenir. B\u00f6ylece bir sonraki i\u015fin, reddedilen par\u00e7alar\u0131 \u00fcretmek i\u00e7in zaten t\u00fcketilmi\u015f ham par\u00e7alara dayanarak planlanmas\u0131 \u00f6nlenebilir.<\/p>\n\n\n<p>\u00d6rne\u011fin, iki par\u00e7a fireye ayr\u0131ld\u0131\u011f\u0131 i\u00e7in sekiz sa\u011flam par\u00e7a elde etmek \u00fczere on ham par\u00e7a t\u00fcketiliyorsa, malzeme kayd\u0131nda sekiz de\u011fil on ham par\u00e7a g\u00f6r\u00fcnmelidir. Bu durumda iki hatal\u0131 par\u00e7a, kesin olarak fireye ayr\u0131ld\u0131\u011f\u0131 do\u011frulanm\u0131\u015f par\u00e7alard\u0131r. Nihai fire KPI\u2019\u0131n\u0131 kay\u0131tlarla kar\u015f\u0131la\u015ft\u0131r\u0131rken onar\u0131labilir par\u00e7alar\u0131 ve kalite karar\u0131 bekleyen par\u00e7alar\u0131 ayr\u0131 tutun. Yaln\u0131zca kalite kontrol\u00fcnden ge\u00e7emeyen toplam par\u00e7a say\u0131s\u0131, her par\u00e7an\u0131n nihai durumunu g\u00f6stermez.<\/p>\n\n\n<p>Ard\u0131ndan, fireyi telafi etmek i\u00e7in onaylanan \u00fcretim operasyonlar\u0131n\u0131 SkyPlanner\u2019\u0131n <a href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretim-cizelgeleme-nedir\/\">ortak \u00fcretim \u00e7izelgesine<\/a> ekleyin. <strong>SkyPlanner\u2019\u0131n \u00e7izelgeleme yapay zek\u00e2s\u0131 Arcturus, tan\u0131mlanan kapasiteyi, operasyon ba\u011f\u0131ml\u0131l\u0131klar\u0131n\u0131 ve \u00f6ncelikleri dikkate alarak bu operasyonlar\u0131n \u00e7izelgedeki yerini hesaplar.<\/strong> Gantt zaman \u00e7izelgesi, ortaya \u00e7\u0131kan s\u0131ralamay\u0131 ve tamamlanma tarihlerini ayn\u0131 kaynaklar\u0131 kullanan di\u011fer sipari\u015flerle birlikte g\u00f6sterir. Malzeme durumunu dikkate alan \u00e7izelgeleme etkinle\u015ftirildi\u011finde, malzeme kullan\u0131labilirli\u011fi de bu hesab\u0131 etkiler.<\/p>\n\n\n<p>Be\u015f saatlik telafi \u00fcretimi i\u00e7in bir tamamlanma tarihi taahh\u00fct etmeden \u00f6nce, kalan operasyonlar\u0131n ve di\u011fer m\u00fc\u015fteri sipari\u015flerinin nas\u0131l etkilenece\u011fini inceleyebilirsiniz. \u00d6ncelikler ve \u00e7izelgede korunacak kararlar sizin kontrol\u00fcn\u00fczdedir. Arcturus, etkilenen her makinenin i\u015f kuyru\u011funu elle yeniden d\u00fczenlemenize gerek kalmadan, birbirine ba\u011fl\u0131 i\u015flerin \u00e7izelgeleme hesab\u0131n\u0131 yapar.<\/p>\n\n\n<p>Bu nedenle, fire \u00fcretimi tekrar tekrar aksat\u0131yorsa SkyPlanner kullanmaya ge\u00e7mek yararl\u0131 olabilir: kaydedilen kay\u0131p, t\u00fcketilen malzeme ve hen\u00fcz yap\u0131lmas\u0131 gereken i\u015fler, kalite ekibinin, deponun ve \u00fcretim sorumlusunun sonradan uzla\u015ft\u0131raca\u011f\u0131 ayr\u0131 rakamlar olarak kalmaz; kayb\u0131 kar\u015f\u0131layacak plan\u0131n par\u00e7as\u0131 olur. SkyPlanner, a\u00e7\u0131k REST API \u00fczerinden her ERP veya MES ile entegre olur. B\u00f6ylece mevcut sipari\u015f ve kalite kay\u0131tlar\u0131 da bu ba\u011flant\u0131l\u0131 i\u015f ak\u0131\u015f\u0131n\u0131n par\u00e7as\u0131 olmaya devam edebilir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Malzeme durumunun g\u00f6r\u00fcn\u00fcr olmas\u0131 Eskomatic\u2019te neleri de\u011fi\u015ftirdi?<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/tr\/musteri-hikayeleri\/eskomatic\/\">Fason tala\u015fl\u0131 imalat firmas\u0131 Eskomatic<\/a>, daha \u00f6nce eski bir ERP ve \u00fcretim kontrol sisteminde i\u015f kuyruklar\u0131n\u0131 b\u00fcy\u00fck \u00f6l\u00e7\u00fcde elle d\u00fczenliyordu. Malzeme durumu yeterince g\u00f6r\u00fcn\u00fcr olmad\u0131\u011f\u0131ndan, eksiklikler i\u015fin planlanan ba\u015flang\u0131\u00e7 zaman\u0131na \u00e7ok az kala ortaya \u00e7\u0131kabiliyordu.<\/p>\n\n\n<p>SkyPlanner\u2019\u0131n mevcut ERP\u2019ye ba\u011flanmas\u0131yla \u015firket, Gantt \u00fczerinde i\u015f kuyru\u011funu daha net g\u00f6rmeye, malzeme eksiklerini izlemeye ve i\u015f y\u00fck\u00fcn\u00fc otomatik olarak \u00e7izelgelemeye ba\u015flad\u0131. Eskomatic, teslimat tarihlerini daha do\u011fru belirledi\u011fini ve eksik malzeme nedeniyle ya\u015fanan \u00fcretim duru\u015flar\u0131n\u0131n azald\u0131\u011f\u0131n\u0131 bildiriyor.<\/p>\n\n\n<p>Bu deneyim, malzemelerin haz\u0131r olmas\u0131n\u0131 i\u015f s\u0131ras\u0131yla uyumlu h\u00e2le getirmenin pratik de\u011ferini g\u00f6steriyor: \u00fcretim ba\u015flamak \u00fczereyken daha az s\u00fcrprizle kar\u015f\u0131la\u015fmak ve m\u00fc\u015fteriye verilen tarihi daha sa\u011flam bir temele dayand\u0131rmak.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Do\u011frulanm\u0131\u015f nedeni gidererek fireyi azalt\u0131n<\/h2>\n\n\n<p>Her \u00fcretim s\u00fcreci i\u00e7in kabul edilebilir say\u0131lacak tek bir fire oran\u0131 yoktur. Belirli bir \u00fcr\u00fcne ayr\u0131lm\u0131\u015f tekrarl\u0131 bir prosesin, yeni \u00fcr\u00fcn devreye alman\u0131n ve y\u00fcksek de\u011ferli bir par\u00e7an\u0131n tala\u015fl\u0131 imalat rotas\u0131n\u0131n kay\u0131p yap\u0131lar\u0131 farkl\u0131d\u0131r. Hedefinizi %5 gibi evrensel bir kabul s\u0131n\u0131r\u0131na g\u00f6re de\u011fil; kar\u015f\u0131la\u015ft\u0131r\u0131labilir \u00fcretime, m\u00fc\u015fteri gereksinimlerine ve uygunsuzlu\u011fun sonu\u00e7lar\u0131na g\u00f6re belirleyin.<\/p>\n\n\n<p>Neyi ara\u015ft\u0131raca\u011f\u0131n\u0131za karar vermek i\u00e7in oran\u0131n dayand\u0131\u011f\u0131 kay\u0131tlar\u0131 kullan\u0131n. Bilgi mevcut oldu\u011funda kay\u0131plar\u0131 \u00fcr\u00fcne, operasyona, malzeme partisine ve do\u011frulanm\u0131\u015f nedene g\u00f6re grupland\u0131r\u0131n. Sorunlar\u0131 kaybedilen miktara, maliyete ve teslimata etkisine g\u00f6re \u00f6nceliklendirin. En b\u00fcy\u00fck fire y\u0131\u011f\u0131n\u0131 her zaman en acil \u00fcretim sorunu de\u011fildir.<\/p>\n\n\n<p>Uygulanacak ad\u0131mlar\u0131 bulgulara g\u00f6re belirleyin:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Tekrarlayan \u00f6l\u00e7\u00fc uygunsuzluklar\u0131:<\/strong> tak\u0131m\u0131n durumunu, fikst\u00fcrleri, ofsetleri ve proses ayarlar\u0131n\u0131, kar\u015f\u0131lanamayan \u00f6l\u00e7\u00fc gereksinimine g\u00f6re kontrol edin.<\/li><li><strong>Tek bir malzeme partisinde yo\u011funla\u015fan kay\u0131plar:<\/strong> makineyi veya operat\u00f6r\u00fc sorumlu tutmadan \u00f6nce gelen malzemeyi ve tedarik\u00e7iyle ilgili bulgular\u0131 inceleyin.<\/li><li><strong>\u00dcretime ba\u015flang\u0131\u00e7ta veya tip de\u011fi\u015fiminde olu\u015fan uygunsuz par\u00e7alar:<\/strong> partinin tamam\u0131n\u0131 \u00fcretime almadan \u00f6nce haz\u0131rl\u0131k ayarlar\u0131n\u0131 ve ilk par\u00e7a onay\u0131n\u0131 do\u011frulay\u0131n.<\/li><li><strong>Operasyonlar aras\u0131nda olu\u015fan hasar:<\/strong> hasar\u0131n olu\u015ftu\u011fu noktadaki ta\u015f\u0131ma, depolama ve koruma ko\u015fullar\u0131n\u0131 inceleyin.<\/li><\/ul>\n\n\n<p>D\u00fczeltici faaliyet i\u00e7in bir sorumlu atay\u0131n ve sonraki kar\u015f\u0131la\u015ft\u0131r\u0131labilir partileri ayn\u0131 kabul kurallar\u0131yla kontrol edin. Kontrol\u00fc daha erken yapmak, hatan\u0131n kayna\u011f\u0131 hen\u00fcz giderilmemi\u015f olsa bile zaten hatal\u0131 olan bir par\u00e7aya daha fazla de\u011fer eklemenizi \u00f6nleyebilir. Oran\u0131n d\u00fc\u015fmesi yaln\u0131zca kontrollerin gev\u015fetilmesinden veya reddedilen par\u00e7alar\u0131n kayda al\u0131nmamas\u0131ndan kaynaklan\u0131yorsa, bu bir iyile\u015fme de\u011fildir.<\/p>\n\n\n<p>Kalite iyile\u015ftirmesi bir sonraki kayb\u0131 \u00f6nler. Ger\u00e7ek\u00e7i bir malzeme ve kapasite plan\u0131 ise olu\u015fmu\u015f kayb\u0131 y\u00f6netmenize yard\u0131mc\u0131 olur. Bu iki \u00e7al\u0131\u015fmay\u0131 birlikte y\u00fcr\u00fctt\u00fc\u011f\u00fcn\u00fczde, fire oran\u0131n\u0131 izlemek daha iyi \u00fcretim kontrol\u00fcne d\u00f6n\u00fc\u015f\u00fcr.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Reddedilen bir partinin bir sonraki teslimat\u0131n\u0131z\u0131 nas\u0131l etkiledi\u011fini g\u00f6r\u00fcn<\/h2>\n\n\n<p>SkyPlanner demosuna, yak\u0131n zamanda kesin olarak fireye ayr\u0131lm\u0131\u015f par\u00e7alar i\u00e7eren bir \u00f6rnekle kat\u0131l\u0131n: ba\u015flang\u0131\u00e7taki ve kabul edilen miktarlar\u0131, t\u00fcketilen malzemeyi, telafi \u00fcretimi i\u00e7in onaylanan operasyonlar\u0131 ve etkilenen bir m\u00fc\u015fteri sipari\u015fini getirin.<\/p>\n\n\n<p>Bu \u00f6rnek \u00fczerinden somut bir telafi plan\u0131n\u0131 inceleyin. Eksik malzemeyi hesaba kat\u0131n, yap\u0131lacak i\u015fleri mevcut taahh\u00fctlerinize g\u00f6re \u00e7izelgeye yerle\u015ftirin ve m\u00fc\u015fteri sormak zorunda kalmadan \u00f6nce hangi teslimat kararlar\u0131n\u0131n ele al\u0131nmas\u0131 gerekti\u011fini g\u00f6r\u00fcn.<\/p>\n\n\n<p>\u00dcretiminizi g\u00f6r\u00fc\u015fmek i\u00e7in <strong><a href=\"https:\/\/skyplanner.ai\/tr\/iletisim-satis\/\">SkyPlanner demosu i\u00e7in randevu al\u0131n<\/a><\/strong> veya \u00f6nce kendiniz ke\u015ffetmek isterseniz <strong><a href=\"https:\/\/skyplanner.ai\/tr\/deneme\/\">SkyPlanner\u2019\u0131 demo verileriyle deneyin<\/a><\/strong>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n Partinin \u00fcretimi bitti, ama sipari\u015f hen\u00fcz tamamlanmad\u0131. Kontrolde, kurtar\u0131lmas\u0131 m\u00fcmk\u00fcn olmayan par\u00e7alar reddedildi. Malzeme \u00e7oktan t\u00fcketildi ve m\u00fc\u015fteri h\u00e2l\u00e2 cuma g\u00fcn\u00fc miktar\u0131n tamam\u0131n\u0131 bekliyor. \u00dcretimde fire oran\u0131, tan\u0131mlanm\u0131\u015f bir \u00fcretim miktar\u0131n\u0131n ama\u00e7lanan kullan\u0131ma uygun bulunmay\u0131p kesin olarak reddedilen &#8230; <a title=\"\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/\" aria-label=\"Read more about \u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105729,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[314,2570],"tags":[],"class_list":["post-105714","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-kaynaklar","category-uretim-verimliligi","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n<\/title>\n<meta name=\"description\" content=\"Fire maliyeti malzemeyle s\u0131n\u0131rl\u0131 de\u011fil. G\u00fcvenilir fire oran\u0131n\u0131 hesaplay\u0131n, stok kayb\u0131n\u0131 hesaba kat\u0131n, telafi \u00fcretimini ger\u00e7ek\u00e7i teslimat plan\u0131na al\u0131n.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n\" \/>\n<meta property=\"og:description\" content=\"Fire maliyeti malzemeyle s\u0131n\u0131rl\u0131 de\u011fil. G\u00fcvenilir fire oran\u0131n\u0131 hesaplay\u0131n, stok kayb\u0131n\u0131 hesaba kat\u0131n, telafi \u00fcretimini ger\u00e7ek\u00e7i teslimat plan\u0131na al\u0131n.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-22T05:45:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T05:46:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-fire-orani\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-fire-orani\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n\",\"datePublished\":\"2026-10-22T05:45:06+00:00\",\"dateModified\":\"2026-10-22T05:46:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-fire-orani\\\/\"},\"wordCount\":2896,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-fire-orani\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"articleSection\":[\"Kaynaklar\",\"\u00dcretim verimlili\u011fi\"],\"inLanguage\":\"tr\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-fire-orani\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-fire-orani\\\/\",\"name\":\"\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-fire-orani\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-fire-orani\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"datePublished\":\"2026-10-22T05:45:06+00:00\",\"dateModified\":\"2026-10-22T05:46:59+00:00\",\"description\":\"Fire maliyeti malzemeyle s\u0131n\u0131rl\u0131 de\u011fil. G\u00fcvenilir fire oran\u0131n\u0131 hesaplay\u0131n, stok kayb\u0131n\u0131 hesaba kat\u0131n, telafi \u00fcretimini ger\u00e7ek\u00e7i teslimat plan\u0131na al\u0131n.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-fire-orani\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-fire-orani\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-fire-orani\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"width\":1776,\"height\":999,\"caption\":\"Accepted machined rings sit beside broken scrap components, with an empty delivery-tray slot showing the shortfall.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/kaynaklar\\\/uretimde-fire-orani\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/tr\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n","description":"Fire maliyeti malzemeyle s\u0131n\u0131rl\u0131 de\u011fil. G\u00fcvenilir fire oran\u0131n\u0131 hesaplay\u0131n, stok kayb\u0131n\u0131 hesaba kat\u0131n, telafi \u00fcretimini ger\u00e7ek\u00e7i teslimat plan\u0131na al\u0131n.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/","og_locale":"tr_TR","og_type":"article","og_title":"\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n","og_description":"Fire maliyeti malzemeyle s\u0131n\u0131rl\u0131 de\u011fil. G\u00fcvenilir fire oran\u0131n\u0131 hesaplay\u0131n, stok kayb\u0131n\u0131 hesaba kat\u0131n, telafi \u00fcretimini ger\u00e7ek\u00e7i teslimat plan\u0131na al\u0131n.","og_url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-22T05:45:06+00:00","article_modified_time":"2026-10-22T05:46:59+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"Jussi M\u00e4ntyl\u00e4","Tahmini okuma s\u00fcresi":"14 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n","datePublished":"2026-10-22T05:45:06+00:00","dateModified":"2026-10-22T05:46:59+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/"},"wordCount":2896,"publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","articleSection":["Kaynaklar","\u00dcretim verimlili\u011fi"],"inLanguage":"tr"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/","url":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/","name":"\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n","isPartOf":{"@id":"https:\/\/skyplanner.ai\/tr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","datePublished":"2026-10-22T05:45:06+00:00","dateModified":"2026-10-22T05:46:59+00:00","description":"Fire maliyeti malzemeyle s\u0131n\u0131rl\u0131 de\u011fil. G\u00fcvenilir fire oran\u0131n\u0131 hesaplay\u0131n, stok kayb\u0131n\u0131 hesaba kat\u0131n, telafi \u00fcretimini ger\u00e7ek\u00e7i teslimat plan\u0131na al\u0131n.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","width":1776,"height":999,"caption":"Accepted machined rings sit beside broken scrap components, with an empty delivery-tray slot showing the shortfall."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/tr\/kaynaklar\/uretimde-fire-orani\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/tr\/"},{"@type":"ListItem","position":2,"name":"\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/tr\/#website","url":"https:\/\/skyplanner.ai\/tr\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/tr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/tr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/tr\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/tr\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/tr\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/tr\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n Ana Sayfa &raquo; Kaynaklar &raquo; \u00dcretimde Fire Oran\u0131: Ger\u00e7ek Kayb\u0131 Hesaplay\u0131n Partinin \u00fcretimi bitti, ama sipari\u015f hen\u00fcz tamamlanmad\u0131. Kontrolde, kurtar\u0131lmas\u0131 m\u00fcmk\u00fcn olmayan par\u00e7alar reddedildi. Malzeme \u00e7oktan t\u00fcketildi ve m\u00fc\u015fteri h\u00e2l\u00e2 cuma g\u00fcn\u00fc miktar\u0131n tamam\u0131n\u0131 bekliyor. \u00dcretimde fire oran\u0131, tan\u0131mlanm\u0131\u015f bir \u00fcretim miktar\u0131n\u0131n ama\u00e7lanan kullan\u0131ma uygun bulunmay\u0131p kesin olarak reddedilen&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/105714","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/comments?post=105714"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/105714\/revisions"}],"predecessor-version":[{"id":105776,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/posts\/105714\/revisions\/105776"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media\/105729"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/media?parent=105714"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/categories?post=105714"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/tr\/wp-json\/wp\/v2\/tags?post=105714"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}